strategic partnership 1520: central europepresentations.bd-events.ru/forum1520com/2018/day1/... ·...

11
STRATEGIC PARTNERSHIP 1520: CENTRAL EUROPE February 20-22, 2018, VIENNA, AUSTRIA International Rail Business Forum

Upload: others

Post on 21-Aug-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: STRATEGIC PARTNERSHIP 1520: CENTRAL EUROPEpresentations.bd-events.ru/forum1520com/2018/day1/... · 4 Reconstruction of the Belgrade –Bar railway line (455 km incl. Serbian section

STRATEGIC PARTNERSHIP 1520: CENTRAL EUROPEFebruary 20-22, 2018, VIENNA, AUSTRIA

International Rail Business Forum

Page 2: STRATEGIC PARTNERSHIP 1520: CENTRAL EUROPEpresentations.bd-events.ru/forum1520com/2018/day1/... · 4 Reconstruction of the Belgrade –Bar railway line (455 km incl. Serbian section

CONCEPT DEVELOPMENT

DESIGN

RAILROAD CONSTRUCTION

ELECTRIFICATION

PRE-PROJECT SURVEY

MAINTENANCE OF RAILWAYINFRASTRUCTURE AND TRAFFIC CONTROL

FOREIGN SPECIALISTS’ EDUCATION

FINAL RESULT – OPERATION BY THE CLIENT

SUPPLY OF ROLLING STOCK

2 RZD International LLC

Company profile

RZD International is a special purpose engineeringcompany established in accordance with the decision ofthe Board of Directors of the Russian Railways Holding(RZD) in order to centralize strategic planning andmanagement of the Holding`s infrastructure projectsabroad.

Today we offer our customers all over the World thewhole range of railway construction services andtechnologies, starting with pre-feasibility studies and upto detailed design and commissioning of projects on aturnkey basis.

Customers working with RZD International benefit fromthe vast intellectual and practical experience of theRussian railway industry as well as leading edge Russianand international technologies and know-how.

Many of our engineering solutions are unique and notmatched anywhere in the World.

WHAT WE OFFER

Page 3: STRATEGIC PARTNERSHIP 1520: CENTRAL EUROPEpresentations.bd-events.ru/forum1520com/2018/day1/... · 4 Reconstruction of the Belgrade –Bar railway line (455 km incl. Serbian section

Справочные материалы о ходе реализации

инфраструктурных проектов в Сербии

3 RZD International LLC

International activities

FOLLOWING ITS BUSINESS GOALS RZD INTERNATIONAL COOPERATES BOTH WITHCOMPANIES OF THE RZD HOLDING AND ITS INTERNATIONAL PARTNERS:

• design and survey institutes;

• construction companies;

• companies engaged in railway electrification, signaling, interlocking andtelecommunication systems;

• rail automation and remote control system manufacturers;

• educational and scientific centers;

• freight carriers and logistics companies;

• financial institutions;

• telecommunication companies.

Page 4: STRATEGIC PARTNERSHIP 1520: CENTRAL EUROPEpresentations.bd-events.ru/forum1520com/2018/day1/... · 4 Reconstruction of the Belgrade –Bar railway line (455 km incl. Serbian section

Справочные материалы о ходе реализации

инфраструктурных проектов в Сербии

4 RZD International LLC

Key advantages

Vast experience in railway infrastructure construction in various climatic/time zones andgeological conditions in different parts of the world with different gauges (1520, 1435,1067, 1676, etc.), using national and international standards (EN, UIC, GOST, TSI, etc.), aswell as its safe and efficient operation and maintenance.

Our most effective technical and organizational solutions, as well as calculation ofProject parameters in terms of its life cycle.

Providing our clients with a complete formula of subsequent railroad operation i.e. theknow-how of the efficient use of technology and the technical capacity of theinfrastructure and rolling stock, cargo management, as well as cost optimization solutionsfor passenger transportation on short and long distance lines, etc.

Providing integration of advanced Russian and international experience, the latesttechnology and innovative technical solutions, usage of the most modern equipment,machinery and materials from the leading manufacturers.

Page 5: STRATEGIC PARTNERSHIP 1520: CENTRAL EUROPEpresentations.bd-events.ru/forum1520com/2018/day1/... · 4 Reconstruction of the Belgrade –Bar railway line (455 km incl. Serbian section

5 RZD International LLC

Our Integrated Approach

COMBINED TRACK RENEWAL TECHNOLOGY

We have implemented the Combined Track Renewal Technology that gives us a possibility to increase the track disassembly speed up to 2000 meters per shift and seriously increase the overall speed oftrack overhauling.

Based on the Customer’s requirements and through a detailed analysis of the possibility of combiningthe systems of international and domestic manufacturers we implement integrated technical solutionsin the field of railway signaling and communications. We offer the best price/quality ratios for eachproject, taking into consideration the existing equipment on the line.

SIGNALING AND COMMUNICATIONS

Analyzing our customers’ requirements, taking into consideration our own expertise and globalpractices, we offer thoroughly balanced and harmonized solutions to provide efficient operation andmaintenance of the rolling stock.

ROLLING STOCK

We provide life cycle management for bridges and structures, providing custom-made andeconomically attractive solutions, which guarantee top quality and long service life of railwaystructures.

RAILWAY STRUCTURES

Page 6: STRATEGIC PARTNERSHIP 1520: CENTRAL EUROPEpresentations.bd-events.ru/forum1520com/2018/day1/... · 4 Reconstruction of the Belgrade –Bar railway line (455 km incl. Serbian section

RZD International is currently assigned byRussian Railways to collect and execute aportfolio of perspective infrastructureprojects which are supposed to expand theHolding`s geographic reach. These includegreenfield construction as well asrehabilitation of existing railwayinfrastructure facilities in a number ofcountries all over the World – in Europe,the Middle East, Africa, Asia, Latin America.

Current projects:

Serbia, India, Iran, Cuba

Projects we are involved in:

Greece, Bulgaria, Slovenia,Brazil, Vietnam

6 RZD International LLC

Projects worldwide

Page 7: STRATEGIC PARTNERSHIP 1520: CENTRAL EUROPEpresentations.bd-events.ru/forum1520com/2018/day1/... · 4 Reconstruction of the Belgrade –Bar railway line (455 km incl. Serbian section

7 RZD International LLC

1Reconstruction of the Pancevo-Belgrade railway line (16 km)

2Reconstruction of railway infrastructure of the Serbian part of thePan-European Transport Corridor X (112 km)

3Construction of the second railway track and reconstruction of theexisting track on the Stara Pazova – Novi Sad section (44 km)

4Reconstruction of the Belgrade – Bar railway line (455 km incl.Serbian section Belgrade – Vrbnica – 200 km), Addendum 4.1.(77,6 km)

Supply of DMUs manufactured by Metrovagonmash, Russia5

Total Cost of the Contract – $941 million

Serbia

Page 8: STRATEGIC PARTNERSHIP 1520: CENTRAL EUROPEpresentations.bd-events.ru/forum1520com/2018/day1/... · 4 Reconstruction of the Belgrade –Bar railway line (455 km incl. Serbian section

8 RZD International LLC

Cuba, India

Rehabilitation and modernization of railwayinfrastructure in the Republic of Cuba.Total length – 1078,4 kmProject target:• Train speed increase up to 120 km/h• Cargo flow increase up to 2 times• Passengers flow increase more than 3 times

REPUBLIC OF CUBA

Feasibility study for increasing train speeds betweenNagpur and Secunderabad up to 200 km/h.Length – 581 kmProject target: alternative technical solutions for themodernization of infrastructure.

REPUBLIC OF INDIA

Page 9: STRATEGIC PARTNERSHIP 1520: CENTRAL EUROPEpresentations.bd-events.ru/forum1520com/2018/day1/... · 4 Reconstruction of the Belgrade –Bar railway line (455 km incl. Serbian section

9 RZD International LLC

Iran, Brazil

Contract for Electrification of the Garmsar – IncheBouroun Railway Line, the East Branch of theInternational North – South Transport Corridor.Length – 495 km

ISLAMIC REPUBLIC OF IRAN

Sub-concession project on the North – South railwayline.Total length – 1582 kmCargo throughput – up to 36 mln. tons per year

FEDERATIVE REPUBLIC OF BRAZIL

Page 10: STRATEGIC PARTNERSHIP 1520: CENTRAL EUROPEpresentations.bd-events.ru/forum1520com/2018/day1/... · 4 Reconstruction of the Belgrade –Bar railway line (455 km incl. Serbian section

10 RZD International LLC

OUR KEY PARTNERS

Page 11: STRATEGIC PARTNERSHIP 1520: CENTRAL EUROPEpresentations.bd-events.ru/forum1520com/2018/day1/... · 4 Reconstruction of the Belgrade –Bar railway line (455 km incl. Serbian section

11 RZD International LLC

THANK YOU FORYOUR ATTENTION!