stoi wellness center, community meeting - 1 - revised
TRANSCRIPT
Value Proposition•What problem or need
requires a solution? Business Planning•Business Model, Market
Study, and Planning•Determine how to
connect with the community.
•Costs, revenues, key partners, resources, activities, relationships, and channels.
Pre-Design•Programming & Planning•Architecture &
Engineering•Define criteria; conduct
research, develop conceptual plan
Design Process:•Schematic Design•Design Development•Construction
Documents
Construction Procurement•Design – Bid – Build•GC/CM•Design Build
Construction•General Contractor•Owner’s Representative•A&E Services•Groundbreaking
Business Operations•General Manager/CEO•Staff, Resources, Channels,
Costs, etc•Soft Opening•Grand Opening
Planning &
Feasibility
•Define the needs/wants
•How to deliver value.
Predesign[5%*]
•Programming•Functional Analysis•Concept Design
Schematic Design [10%]
•Floor plan•Elevations•Site Plan
Design Development
[15%]
•Architecture•Engineering
Construction Documents
[25%]
•Finalize Plans and Specifications for Construction
Construction Procurement
[5%]
•Bid•Qualifications based
Construction Phase
Services [40%]
•Construction•Project Close-out
Other Data Analysis: •295 responded•65% Live on Reservation; 35% off•65% Work for Tribe; 35% do not•67% suggested Demolishing the Alex
Sherwood Facility to make room for new facility. 33% stated not to demo.
Programming•Compile the information from
community meetings and previous survey to generate space sizing.
Functional Analysis•Analyze space relationships
Concept Design•Develop a concept site plan & floor
plan
Ball Field
Drop-off Area
Lower Level Parking
Main Entry
Proposed Wellness Center Location