steve edwards & simon trivella – 19 th august 2008 ofgem, millbank

15
DN Interruption 2008 – Annual Results and Indicative ad-hoc Invitation Interruptible Capacity Requirements Steve Edwards & Simon Trivella – 19 th August 2008 Ofgem, Millbank

Upload: xena-lancaster

Post on 31-Dec-2015

10 views

Category:

Documents


0 download

DESCRIPTION

DN Interruption 2008 – Annual Results and Indicative ad-hoc Invitation Interruptible Capacity Requirements. Steve Edwards & Simon Trivella – 19 th August 2008 Ofgem, Millbank. DN Interruption Update. Results from June 2008 Annual Invitation LDZ Aggregated Capacity LDZ Disaggregated Capacity - PowerPoint PPT Presentation

TRANSCRIPT

DN Interruption 2008 – Annual Results and Indicative ad-hoc Invitation Interruptible Capacity Requirements

Steve Edwards & Simon Trivella – 19th August 2008

Ofgem, Millbank

DN Interruption Update

• Results from June 2008 Annual Invitation

– LDZ Aggregated Capacity

– LDZ Disaggregated Capacity

• October 2008 ad-hoc Interruption Invitation

– Location Zones

– Indicative Requirements

– Process & Timescales

• All information published on both Joint Office and WWU websites

LDZNo of Valid Interruptible

offers ReceivedNo of Valid Interruptible

offers AcceptedAggregate Capacity Offered (kWh/day)

Aggregate Capacity Accepted (kWh/day)

Unsuccessful Bids

Highest Offered Overall Interruption Price

(p/kWh/day)

Lowest Offered Interruption Price

(p/kWh/day)

Highest Accepted Overall Interruption Price (p/kWh/day)

Lowest Accepted Overall Interruption Price (p/kWh/day)

WN 1 0 185,056 0 1 0.05182 0.05182 0.00000 0.00000

WS 35 1 13,848,234 142,243 34 5.07534 0.03448 0.29853 0.29853

SW 28 3 6,360,918 1,897,052 25 0.98635 0.05853 0.15219 0.10889

WN 1 0 185,056 0 1 0.05182 0.05182 0.00000 0.00000

WS 25 1 8,817,258 142,243 24 3.16849 0.03448 0.29853 0.29853

SW 18 0 5,022,915 0 18 0.18770 0.05670 0.00000 0.00000

WN 1 0 185,056 0 1 0.05182 0.05182 0.00000 0.00000

WS 25 1 8,817,258 142,243 24 2.69178 0.03448 0.28794 0.28794

SW 18 0 4,976,862 0 18 0.18770 0.05670 0.00000 0.00000

WN 1 0 185,056 0 1 0.05182 0.05182 0.00000 0.00000

WS 23 1 7,334,048 142,243 22 2.69178 0.03448 0.28794 0.28794

SW 18 0 4,976,862 0 18 0.18770 0.05670 0.00000 0.00000

WN 1 0 185,056 0 1 0.05182 0.05182 0.00000 0.00000

WS 23 1 7,334,048 142,243 22 2.69178 0.03448 0.28794 0.28794

SW 18 0 4,976,862 0 18 0.18770 0.05670 0.00000 0.00000

The aggregate number of valid bids and volumes received includes the total of all conditionally linked bids

2015-2016

Bids are reported only at LDZ level. This is in line with the requirements of the Uniform Network Code (TPD Section G para 6.4.3 and 6.4.4)

Bids based on Aggregated Capacity Offered

2011-2012

2012-2013

2013-2014

2014-2015

June 2008 Results Summary

June 2008 Results Summary

LDZNo of Valid Interruptible

offers ReceivedNo of Valid Interruptible

offers AcceptedDisaggregate Capacity

Offered (kWh/day)Disaggregate Capacity Accepted (kWh/day)

Unsuccessful Bids

Highest Offered Overall Interruption Price

(p/kWh/day)

Lowest Offered Interruption Price

(p/kWh/day)

Highest Accepted Overall Interruption Price (p/kWh/day)

Lowest Accepted Overall Interruption Price (p/kWh/day)

WN 1 0 185,056 0 1 0.05182 0.05182 0.00000 0.00000

WS 22 1 8,868,197 142,243 21 5.07534 0.03448 0.29853 0.29853

SW 22 3 5,027,896 1,897,052 19 0.98635 0.05853 0.15219 0.10889

WN 1 0 185,056 0 1 0.05182 0.05182 0.00000 0.00000

WS 12 1 3,837,221 142,243 11 3.16849 0.03448 0.29853 0.29853

SW 12 0 3,707,839 0 12 0.18770 0.05670 0.00000 0.00000

WN 1 0 185,056 0 1 0.05182 0.05182 0.00000 0.00000

WS 12 1 3,837,221 142,243 11 2.69178 0.03448 0.28794 0.28794

SW 12 0 3,696,874 0 12 0.18770 0.05670 0.00000 0.00000

WN 1 0 185,056 0 1 0.05182 0.05182 0.00000 0.00000

WS 10 1 2,354,011 142,243 9 2.69178 0.03448 0.28794 0.28794

SW 12 0 3,696,874 0 12 0.18770 0.05670 0.00000 0.00000

WN 1 0 185,056 0 1 0.05182 0.05182 0.00000 0.00000

WS 10 1 2,354,011 142,243 9 2.69178 0.03448 0.28794 0.28794

SW 12 0 3,696,874 0 12 0.18770 0.05670 0.00000 0.00000

The disaggregate number of bids and volumes includes only a single count of conditionally linked bids

2014-2015

2015-2016

Bids based on Disaggregated Capacity Offered

2011-2012

2012-2013

2013-2014

October 2008 ad-hoc Invitation

• Retaining Zone definition used in June 2008 Annual Invitation

– Interruptible Capacity Requirements in 7 out of 10 Zones

– No requirement for 2011/12 in:

• Dowlais (GT5082002)

• Northern (GT5083001)

• Aylesbeare (GT5083003)

• Indicative Interruptible Capacity Requirements

– 5 year requirement in all 7 Zones (2011/12 to 2015/16)

– Requirements finalised in ad-hoc Invitation on 8th September 2008

Indicative Requirements – Wales North IP

Location ID GT5081001

Location Description Wales North - IP

Postcode Boundaries(outcodes)

CH5, CH6, CH7, CH8

Contract start date 1st Oct 2011 1st Oct 2012 1st Oct 2013 1st Oct 2014 1st Oct 2015

Contract end date 30th Sept 2012 30th Sept 2013 30th Sept 2014 30th Sept 2015 30th Sept 2016

Minimum number ofinterruptible days to be

Offered1  1  1 1 1

Maximum number ofinterruptible days to be

Offered5 5 5 5 5

Aggregate InterruptibleCapacity Quantity

required (kWh)100,000 100,000 100,000 100,000 100,000

Indicative Requirements – Wales North

Location ID GT5081002

Location Description Wales North

Postcode Boundaries (outcodes)

LL11, LL12, LL13, LL14, LL16, LL17, LL18, LL32, LL53, LL55, LL57, LL65, LL77, SY16, SY21, SY23

Contract start date 1st Oct 2011 1st Oct 2012 1st Oct 2013 1st Oct 2014 1st Oct 2015

Contract end date 30th Sept 2012 30th Sept 2013 30th Sept 2014 30th Sept 2015 30th Sept 2016

Minimum number of interruptible days to be

Offered1 1 1 1 1

Maximum number of interruptible days to be

Offered10 11 11 11 11

Aggregate Interruptible Capacity Quantity

required (kWh)4,200,000 4,500,000 4,500,000 4,500,000 4,500,000

Indicative Requirements – Dyffryn Clydach

Location ID GT5082001

Location Description Dyffryn Clydach

Postcode Boundaries (outcodes)

SA1, SA10, SA11, SA12, SA13 1**, SA14, SA15, SA2, SA31, SA4, SA48, SA5, SA6, SA61, SA62, SA7

Contract start date 1st Oct 2011 1st Oct 2012 1st Oct 2013 1st Oct 2014 1st Oct 2015

Contract end date 30th Sept 2012 30th Sept 2013 30th Sept 2014 30th Sept 2015 30th Sept 2016

Minimum number of interruptible days to be

Offered1 1 1 1 1

Maximum number of interruptible days to be

Offered5 5 5 5 5

Aggregate Interruptible Capacity Quantity

required (kWh)1,800,000 1,800,000 1,800,000 1,800,000 1,800,000

Indicative Requirements – Nantgarw

Location ID GT5082003

Location Description Nantgarw

Postcode Boundaries (outcodes)

CF10, CF11, CF14, CF15, CF23, CF24, CF3, CF37, CF38, CF5, CF62, CF63, CF64, CF83

Contract start date 1st Oct 2011 1st Oct 2012 1st Oct 2013 1st Oct 2014 1st Oct 2015

Contract end date 30th Sept 2012 30th Sept 2013 30th Sept 2014 30th Sept 2015 30th Sept 2016

Minimum number of interruptible days to be

Offered1 1 1 1 1

Maximum number of interruptible days to be

Offered5 5 5 5 5

Aggregate Interruptible Capacity Quantity

required (kWh)700,000 1,800,000 1,800,000 1,800,000 1,800,000

Indicative Requirements – Gilwern

Location ID GT5082004

Location Description Gilwern

Postcode Boundaries (outcodes)

LD3, NP10, NP11, NP12, NP13, NP15, NP16, NP18, NP19, NP20, NP22, NP25, NP26, NP4, NP44, NP7, NP9

Contract start date 1st Oct 2011 1st Oct 2012 1st Oct 2013 1st Oct 2014 1st Oct 2015

Contract end date 30th Sept 2012 30th Sept 2013 30th Sept 2014 30th Sept 2015 30th Sept 2016

Minimum number of interruptible days to be

Offered1 1 1 1 1

Maximum number of interruptible days to be

Offered5 5 5 5 5

Aggregate Interruptible Capacity Quantity

required (kWh)2,700,000 2,800,000 2,800,000 2,800,000 2,800,000

Indicative Requirements – CentralLocation ID GT5083002

Location Description Central

Postcode Boundaries (outcodes)

BA10, BA12, BA13, BA14, BA16, BA20, BA21, BA3, BA4, BA5, BA7, BS14, BS3, BS30, BS31, BS4, SN10, SN12, SN13, SN14, SN15, TA1, TA2, TA20, TA23,

TA24, TA3, TA6, TA7

Contract start date 1st Oct 2011 1st Oct 2012 1st Oct 2013 1st Oct 2014 1st Oct 2015

Contract end date 30th Sept 2012 30th Sept 2013 30th Sept 2014 30th Sept 2015 30th Sept 2016

Minimum number of interruptible days to be

Offered1 1 1 1 1

Maximum number of interruptible days to be

Offered15 5 5 5 5

Aggregate Interruptible Capacity Quantity

required (kWh)500,000 1,900,000 1,900,000 1,900,000 1,900,000

Indicative Requirements – SouthernLocation ID GT5083004

Location Description Southern

Postcode Boundaries (outcodes)

EX1 2**, EX2 5**, EX2 8**, EX4 4**, EX4 5**, PL1, PL11, PL14, PL15, PL17, PL2, PL21, PL24, PL25, PL26, PL31, PL4, PL5, PL6, PL7, PL8, TQ1, TQ11, TQ12,

TQ2, TQ4, TQ5, TQ6, TQ9, TR1, TR12, TR15, TR8

Contract start date 1st Oct 2011 1st Oct 2012 1st Oct 2013 1st Oct 2014 1st Oct 2015

Contract end date 30th Sept 2012 30th Sept 2013 30th Sept 2014 30th Sept 2015 30th Sept 2016

Minimum number of interruptible days to be

Offered1 1 1 1 1

Maximum number of interruptible days to be

Offered5 5 5 5 5

Aggregate Interruptible Capacity Quantity

required (kWh)3,100,000 4,200,000 4,200,000 4,200,000 4,200,000

October 2008 ad-hoc Invitation

• Process

– Existing UK Link functionality

• Timescales / Key Dates

– Provisional Eligibility files issued to Shippers / Transporters 4 th August 2008

– Ad-hoc Invitation issued 8th September 2008

• Publication of Requirements & eligible supply point locations

– Ad-hoc Invitation Dates (10 consecutive Days)

• Monday 13th October 2008 to Friday 24th October 2008

– Results and Reports to be issued no later than 21st November 2008

October 2008 ad-hoc Invitation

Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun

1 2 3 4 5 6 7 1 2 3 4 5 1 2

8 9 10 11 12 13 14 6 7 8 9 10 11 12 3 4 5 6 7 8 9

15 16 17 18 19 20 21 13 14 15 16 17 18 19 10 11 12 13 14 15 16

22 23 24 25 26 27 28 20 21 22 23 24 25 26 17 18 19 20 21 22 23

29 30 27 28 29 30 31 24 25 26 27 28 29 30

Interruption Invitation Invitation Dates Notification & Reports

September 2008 October 2008 November 2008

DN Interruption 2008 – Annual Results and Indicative ad-hoc Invitation Interruptible Capacity Requirements

Steve Edwards & Simon Trivella – 19th August 2008

Ofgem, Millbank