1Stefano Barsali IT Academic Village

Barcelona 12-15 May 2003

A test facility for distributed cogeneration: experiences on a microturbine

and chiller based plant

S. Banetta, S. BarsaliUniversity of Pisa, Italy

Department of Electrical Systems and Automation

2Stefano Barsali IT Academic Village

Barcelona 12-15 May 2003

The cogeneration plant

• 45kW Microturbine

• 170kW absorption chiller/heater

• 330kW cooling tower

• Thermal (200kW) and electrical (50kW) load simulators

• Direct chiller connection to turbine exhaust

3Stefano Barsali IT Academic Village

Barcelona 12-15 May 2003

The cogeneration plant

4Stefano Barsali IT Academic Village

Barcelona 12-15 May 2003

The cogeneration plant

5Stefano Barsali IT Academic Village

Barcelona 12-15 May 2003

Plant scheme and monitoring

PUMP

GAS

TURBINE ALTERNATOR POWER

CONDITIONING UNIT

TURBOALTERNATOR

CHP PLANT

FUEL LINE

AIR INLET

FUEL COMPRESSOR

Q

T,P

T,P,Q

V,W

T

T

T,Q T,Q

T

T EXHAUST

GAS EXHAUST

GAS

THERMAL LOAD

CHILLED/HEATED WATER

GENERATOR

CONDENSER

EV

AP

OR

AT

OR

AB

SO

RB

ER

COOLING WATER

PUMP COOLING TOWER

V,W

LOCAL ELECTRIC LOAD

REMOTE ELECTRIC

LOAD (FACULTY)

DIS

TR

IBU

TIO

N G

RID

CHILLER/HEATER

1

2 3

4

5

6Stefano Barsali IT Academic Village

Barcelona 12-15 May 2003

0 1000 2000 3000 4000

0

200

400

600

800

10

30

50

70

90

110

130

Time [s]

Wat

er te

mpe

ratu

re [

°C]

Gas

tem

pera

ture

[°C

]

Turbine exhaust - 1

Chiller inlet - 2

Chiller outlet - 3

Cooling water - 5

Chilled water - 4

0 1000 2000 3000 4000

0

200

400

600

800

10

30

50

70

90

110

130

Time [s]

Wat

er te

mpe

ratu

re [

°C]

Gas

tem

pera

ture

[°C

]

Turbine exhaust - 1

Chiller inlet - 2

Chiller outlet - 3

Heated water - 4

Cooling mode Heating modeOperation tests

7Stefano Barsali IT Academic Village

Barcelona 12-15 May 2003

Electricity 38 kW

Chilling power 111.6 kW

Turboaltern. losses

16.4 kW

Duct losses

45.7 kW

Chiller losses

50.4 kW

Exhaust residual 55.4 kW

Cooling water

254.5 kW

Fuel 348.8 kW

Electricity 36.9 kW

Heating power 174.7 kW

Turboaltern. losses

16.4 kW

Duct losses

45.7 kW

Chiller losses

21.1 kW

Exhaust residual 47.6 kW

Fuel 342.8 kW

Power balanceCooling mode Heating mode

8Stefano Barsali IT Academic Village

Barcelona 12-15 May 2003

Interface response 1

0.00 0.04 0.08 0.12 0.16 0.20 -400

-200

0

200

400

-150

-75

0

75

150

0.00 0.04 0.08 0.12 0.16 0.20 -400

-200

0

200

400

-150

0

150

Cu

rre

nt

[A]

-75

75

Cu

rre

nt

[A]

Vol

tag

e [V

] V

olta

ge

[V]

Time [s]

Time [s]

Load step

9Stefano Barsali IT Academic Village

Barcelona 12-15 May 2003

Interface response 2

Loss of mains

0.0 0.2 0.4 0.6 0.8 1.0 1.2 Time [s]

47

48

49

50

51

Fre

qu

ency

[H

z]

10Stefano Barsali IT Academic Village

Barcelona 12-15 May 2003

0.0 0.02 0.04 0.06 0.08 0.10 -400

-300

-200

-100

0

100

200

300

400

-200

-150

-100

-50

0

50

100

150

200

-400

-300

-200

-100

0

100

200

300

400

-200

-150

-100

-50

0

50

100

150

200

-400

-300

-200

-100

0

100

200

300

400

-200

-150

-100

-50

0

50

100

150

200

0.0 0.02 0.04 0.06 0.08 0.10

0.0 0.02 0.04 0.06 0.08 0.10

Vol

tage

[V

]

Cur

ren

t [A

]

Vol

tage

[V

]

Cur

ren

t [A

]

Cur

ren

t [A

]

Vol

tage

[V

]

Time [s]

Time [s]

Time [s]

Interface response 3

Automatic reclosure

11Stefano Barsali IT Academic Village

Barcelona 12-15 May 2003

Remarks

• Low turboalternator efficiency, high losses• High temperatures mean high thermal losses• Fast interface response• High sensitivity to grid disturbances• Large impact of permitting procedure• High cost of measuring and monitoring

system

12Stefano Barsali IT Academic Village

Barcelona 12-15 May 2003

Future activity

• Set up of exhaust heat insulation

• Set up of a remote unit control system

• Development and testing of a biomass fired Stirling engine