steap awards by town, then by year (fy05 - fy14) · 2010 bethany renovation and restoration of the...

18
STEAP AWARDS BY TOWN, THEN BY YEAR (FY05 - FY14) Year Town Name Project Description $ Amount Administering Agency 2005 Andover Construction of new wing to Town Office to provide a Community Center 500,000 DSS 2008 Andover Planning an design of the Route 6 economic development 65,000 DECD 2010 Andover Construction of a new senior center 250,000 DSS 2011 Andover Design and construction of a new recreational area on Long Hill Road 200,000 DEEP 2013 Andover Replace Times Farm Road Bridge 175,000 DOT 2007 Ashford Renovations and updates to the transfer station 300,000 DECD 2008 Ashford Construction of various capital improvements town-wide including the construction of a crosswalk, improvements at the town transfer station, the replacement of decaying guardrails, and the installation of HVAC system at the dog pound 156,250 DECD 2011 Ashford Reconstruction of Turnpike Road 200,000 DOT 2012 Ashford Reconstruct a portion of Hnath Road 196,000 OPM 2006 Avon The acquisition and construction of handicap accessible playground on Buckingham Road 150,000 DEEP 2008 Avon Implementation of a decorative lighting and sidewalk plan in the village center 309,595 DECD 2010 Avon Continuation of the Village Center Sidewalks and Lighting project 200,000 DECD 2011 Avon Installation of decorative lighting and handicap accessible sidewalks within the Village Center 200,000 DECD 2014 Avon Phases III & IV Village Center streetscape improvement 450,000 DECD 2005 Barkhamsted Riverton Streetscape improvements 500,000 DECD 2008 Barkhamsted Barkhamsted Historical Society for the continued development of the historic Squire's Tavern 150,000 DECD 2010 Barkhamsted Installation of public restrooms at Riverton Park 100,000 DEEP 2011 Barkhamsted Installation of a new integrated accessible playground at Barkhamsted Elementary School 171,229 DEEP 2012 Barkhamsted Repair four roads, including culverts and bridges 405,454 OPM 2013 Barkhamsted Replace 2 emergency generators 230,000 OPM 2014 Barkhamsted Two bridge repairs - Park Road 500,000 DOT 2008 BeaconFalls Renovation of tennis and basketball courts at the Pent Road recreation complex and the replacement of the driveway and parking lot at Matthies Park 105,000 DEEP 2010 BeaconFalls Construction of various road improvements through town 200,000 DOT 2011 BeaconFalls Reconstruction of Blackberry Hill Road 200,000 DOT 2005 Berlin Town Center Improvements 500,000 DECD 2007 Berlin The Berlin Commercial Corridor Streetscape project 400,000 DECD 2008 Berlin Construction of streetscape improvements in the vicinity of the Berlin Train Station as well as provide the local match for the Federal Transportation Enhancement Grant 400,000 DOT 2011 Berlin Renovation of the Berlin Train Station and parking area 250,000 DOT 2012 Berlin Construct phase II of the Berlin Veterans Memorial Park project 500,000 DECD 2013 Berlin Facade and landscape improvements to town businesses 500,000 OPM 2007 Bethany Improvements to Veterans Memorial Park 400,000 DEEP 2008 Bethany Replacement of the playground at Bethany Community School 120,000 DEEP 2010 Bethany Renovation and restoration of the Bethany airport hanger to serve as a community center and emergency shelter, and the development of 120 acres of land recently acquired by the town for recreational facilities 200,000 DSS 2013 Bethany Convert airport hanger to a community center/emergency shelter 500,000 DSS 2005 Bethel Sidewalk replacement program 250,000 DECD 2006 Bethel The replacement of a waterline leading to and within Clarke Industrial Park 500,000 DEEP

Upload: others

Post on 11-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: STEAP AWARDS BY TOWN, THEN BY YEAR (FY05 - FY14) · 2010 Bethany Renovation and restoration of the Bethany airport hanger to serve as a community center and emergency shelter, and

STEAP AWARDS BY TOWN, THEN BY YEAR (FY05 - FY14)

Year Town Name Project Description $ Amount

Administering

Agency

2005 Andover Construction of new wing to Town Office to provide a Community Center 500,000 DSS2008 Andover Planning an design of the Route 6 economic development 65,000 DECD2010 Andover Construction of a new senior center 250,000 DSS2011 Andover Design and construction of a new recreational area on Long Hill Road 200,000 DEEP

2013 Andover Replace Times Farm Road Bridge 175,000 DOT2007 Ashford Renovations and updates to the transfer station 300,000 DECD2008 Ashford Construction of various capital improvements town-wide including the

construction of a crosswalk, improvements at the town transfer station, the

replacement of decaying guardrails, and the installation of HVAC system at

the dog pound

156,250 DECD

2011 Ashford Reconstruction of Turnpike Road 200,000 DOT2012 Ashford Reconstruct a portion of Hnath Road 196,000 OPM2006 Avon The acquisition and construction of handicap accessible playground on

Buckingham Road

150,000 DEEP

2008 Avon Implementation of a decorative lighting and sidewalk plan in the village

center

309,595 DECD

2010 Avon Continuation of the Village Center Sidewalks and Lighting project 200,000 DECD2011 Avon Installation of decorative lighting and handicap accessible sidewalks within

the Village Center

200,000 DECD

2014 Avon Phases III & IV Village Center streetscape improvement 450,000 DECD2005 Barkhamsted Riverton Streetscape improvements 500,000 DECD2008 Barkhamsted Barkhamsted Historical Society for the continued development of the

historic Squire's Tavern

150,000 DECD

2010 Barkhamsted Installation of public restrooms at Riverton Park 100,000 DEEP2011 Barkhamsted Installation of a new integrated accessible playground at Barkhamsted

Elementary School

171,229 DEEP

2012 Barkhamsted Repair four roads, including culverts and bridges 405,454 OPM2013 Barkhamsted Replace 2 emergency generators 230,000 OPM2014 Barkhamsted Two bridge repairs - Park Road 500,000 DOT2008 BeaconFalls Renovation of tennis and basketball courts at the Pent Road recreation

complex and the replacement of the driveway and parking lot at Matthies

Park

105,000 DEEP

2010 BeaconFalls Construction of various road improvements through town 200,000 DOT2011 BeaconFalls Reconstruction of Blackberry Hill Road 200,000 DOT2005 Berlin Town Center Improvements 500,000 DECD2007 Berlin The Berlin Commercial Corridor Streetscape project 400,000 DECD2008 Berlin Construction of streetscape improvements in the vicinity of the Berlin Train

Station as well as provide the local match for the Federal Transportation

Enhancement Grant

400,000 DOT

2011 Berlin Renovation of the Berlin Train Station and parking area 250,000 DOT2012 Berlin Construct phase II of the Berlin Veterans Memorial Park project 500,000 DECD2013 Berlin Facade and landscape improvements to town businesses 500,000 OPM2007 Bethany Improvements to Veterans Memorial Park 400,000 DEEP2008 Bethany Replacement of the playground at Bethany Community School 120,000 DEEP2010 Bethany Renovation and restoration of the Bethany airport hanger to serve as a

community center and emergency shelter, and the development of 120

acres of land recently acquired by the town for recreational facilities

200,000 DSS

2013 Bethany Convert airport hanger to a community center/emergency shelter 500,000 DSS2005 Bethel Sidewalk replacement program 250,000 DECD2006 Bethel The replacement of a waterline leading to and within Clarke Industrial Park 500,000 DEEP

Page 2: STEAP AWARDS BY TOWN, THEN BY YEAR (FY05 - FY14) · 2010 Bethany Renovation and restoration of the Bethany airport hanger to serve as a community center and emergency shelter, and

STEAP AWARDS BY TOWN, THEN BY YEAR (FY05 - FY14)

2010 Bethel Re-paving of roads which are in poor condition due to the installation 200,000 DOT

2011 Bethel Demolition of a town building containing lead and asbestos and

construction of a parking lot

200,000 DEEP

2012 Bethel Reconstruct and repave roads impacted by the Stony Hill sewer extension 500,000 OPM

2013 Bethel Sidewalk project 250,000 OPM2014 Bethel Sidewalk improvements - Downtown Business District and Bethel Metro

North area

430,000 DOT

2005 Bethlehem East Street sidewalk 117,500 DECD2005 Bethlehem Firehouse upgrade 222,500 DESPP2006 Bethlehem An emergency power supply for Memorial Hall and Town Hall 70,000 OPM2006 Bethlehem A solid waste disposal project - cover structures for containers 50,000 OPM2007 Bethlehem The expansion and upgrade of a firehouse 275,000 DESPP2008 Bethlehem Construction of sidewalks 80,000 DECD2008 Bethlehem Rehabilitation and repaving of parking areas that serve the Bethlehem ball

fields, public works garage and firehouse

75,000 DECD

2008 Bethlehem Construction of a new playscape at the Bethlehem Town Beach 35,000 DEEP2010 Bethlehem Rehabilitation of Munger Lane including drainage improvements and

repaving

150,000 DOT

2011 Bethlehem Playscape replacement at the Town Center Recreation Complex 75,000 DEEP2011 Bethlehem Design and construction of solar power array with a DC inverter to generate

power for town hall and library

190,000 DEEP

2012 Bethlehem Rehabilitate Sanford Lane and Sanford Lane roadways 160,000 DOT2006 Bolton The Bolton Lakes sewer capital project 150,000 OPM2007 Bolton Bolton Lakes sewer capital project 200,000 DEEP2008 Bolton Planning and design of the Route 6 corridor economic development

enhancements

65,000 DECD

2008 Bolton Bolton Lakes sewer capital project 100,000 DEEP2010 Bolton Bolton Lakes sewer capital project 200,000 DEEP2011 Bolton Construction and installation of off-site wastewater disposal and sewer

service in Bolton Lakes area

200,000 DEEP

2013 Bolton Management plan for Bolton Lake 250,000 DEEP2010 Bozrah Renovation of the 1850 Victorian Farmhouse at Maples Farm Park 175,000 DECD2010 Branford Design and construction of public restrooms at Stony Creek's Bayview Park 150,000 DEEP

2011 Branford Construction of a municipal parking lot 75,000 DECD2012 Branford Complete a pedestrian walkway and install lighting in the green area 150,000 DECD

2012 Branford Produce a housing feasibility study 30,000 DECD2013 Branford Renovate Thimble Island municipal building 500,000 DEEP2007 Bridgewater The renovation and expansion of a town-owned building for a senior center 75,000 OPM

2005 Brookfield Village Center improvements 500,000 DECD2006 Brookfield The extension of a fire suppression water line south along Route 7/202 500,000 DEEP

2007 Brookfield Capital improvements in the downtown area 500,000 DECD2008 Brookfield Completion of a water distribution system that will serve the commercial

business area in the Route 7/Commercial corridor

500,000 DPH

2011 Brookfield Streetscape, signage, sidewalks and lighting improvements in the Four

Corners area

250,000 DECD

2006 Brooklyn Pedestrian safety and sidewalk improvements to Rte. 6 and Day Street 390,000 DECD

2006 Brooklyn The acquisition of a compactor and container for town's transfer station 35,000 OPM

Page 3: STEAP AWARDS BY TOWN, THEN BY YEAR (FY05 - FY14) · 2010 Bethany Renovation and restoration of the Bethany airport hanger to serve as a community center and emergency shelter, and

STEAP AWARDS BY TOWN, THEN BY YEAR (FY05 - FY14)

2007 Brooklyn Road and storm water run-off improvements on Day Street 465,000 DECD2010 Brooklyn Design and construction of Phase II of improvements to Riverside Park 200,000 DEEP

2011 Brooklyn Roadway reconstruction and safety improvements on Wolf Den, Elliot and

Woodward Roads

200,000 DOT

2012 Brooklyn Improve Allen Hill Road and South Street roadways 500,000 OPM2006 Burlington The replacement of the Prospect Street Bridge 120,000 DOT2007 Burlington Lighting on soccer fields at Nassehegan Recreation Complex 70,000 OPM2008 Burlington Construction of an addition to the historic Elton Brown Tavern 250,000 DECD2008 Burlington Replacement of a waste oil tank at the town's recycling center 35,150 DEEP2010 Burlington Installation of a LED two-sided sign on Town Hall grounds at Route 4 and

Beldon Road

39,210 DECD

2010 Burlington Acquisition and installation of a generator for the Evergreens Senior Citizen

Complex

27,550 DSS

2010 Burlington Acquisition and installation of a generator at Town Hall 11,669 DECD2011 Burlington Library improvements 44,011 DECD2011 Burlington Public water line extension in the Central Business Zone on Spielman

Highway

200,000 DPH

2012 Burlington Extend the public water line in the Central Business Zone along Covey Road 188,765 DPH

2012 Burlington Renovate and improve the Elton Tavern 154,000 DECD2013 Burlington Reconstruct Farmington River bike path 214,000 DOT2005 Canaan Construction of Volunteer Fire Department Services Center 250,000 DESPP2007 Canaan The relocation of utility poles consistent with the downtown infrastructure

plan

500,000 DECD

2008 Canaan Restoration and rehabilitation of the former Third Falls Village Methodist

Church into the Falls Village Community and Cultural Center

200,000 DSS

2010 Canaan Construction of the Falls Village Volunteer Fire Department new Emergency

Services Center Building

200,000 DECD

2011 Canaan David M. Hunt Library improvements 200,000 DECD2013 Canaan Repair South Canaan Meeting House 200,000 DECD2010 Canterbury Renovation of the town's solid waste transfer facility including new

construction

200,000 DEEP

2011 Canterbury Construction of a new Public Works garage 200,000 DECD2012 Canterbury Improvements to recreational facilities at Dr. Helen Baldwin Middle School

and Manship Park

265,000 OPM

2013 Canterbury Construct public works garage 270,000 OPM2007 Canton Improvements to the Canton Highway Garage 350,000 DOT2010 Canton Installation of a pedestrian activated traffic control signal at the

intersection of Front and Bridge Street

156,000 DOT

2011 Canton Rehabilitation or replacement of town bridge over the Farmington River 200,000 DOT

2014 Canton Mill Pond Park and Complex - improvements and upgrades 500,000 DEEP2005 Chaplin Construction of Chaplin Firehouse 485,000 DESPP2010 Chaplin Design and construction of drainage improvements on Bujac Road 195,000 DOT2011 Chaplin North Bear Hill Road Bridge replacement 200,000 DOT2012 Chaplin Design, plan and reconstruct Darling Pond dam 300,000 OPM2013 Chaplin Reconstruct Bedlam Road Bridge 450,000 DOT2005 Cheshire Closure and remediation of solid waste disposal area 500,000 DEEP2006 Cheshire Streetscape improvements along West Main Street commercial area 500,000 DECD

2008 Cheshire Continuation and completion of streetscape improvements along West

Main Street from Deepwood Drive to Grove/Warren Streets

400,000 DECD

2011 Cheshire Streetscape improvements in West Main Commercial District 100,000 DECD

Page 4: STEAP AWARDS BY TOWN, THEN BY YEAR (FY05 - FY14) · 2010 Bethany Renovation and restoration of the Bethany airport hanger to serve as a community center and emergency shelter, and

STEAP AWARDS BY TOWN, THEN BY YEAR (FY05 - FY14)

2014 Cheshire Town center sidewalks 500,000 DECD2006 Chester A water main extension to a manufacturing park 500,000 DEEP2010 Chester Reconstruction of Main Street 200,000 DOT2011 Chester Extension of water main to Haddam town line 250,000 DPH2011 Chester Extension of water main to Haddam town line (supplemental award) 250,000 DPH

2014 Chester Chester Village Revitalization project 450,000 DOT2007 Clinton The replacement of bulkhead structures throughout town 500,000 DEEP2010 Clinton Marina and beach improvements 200,000 DEEP2011 Clinton Replacement of bulkheads along the Indian River an streetscape and

parking improvements in Boston Post Road area

250,000 DEEP

2012 Clinton Construct downtown streetscape improvements 400,000 OPM2013 Clinton Phase II of downtown revitalization project 500,000 DOT2010 Colchester Development of engineering and cost information for municipal sewer and

water improvements

130,000 DEEP

2011 Colchester Expansion and sidewalk improvements from town's central district to the

southern entrance of the Colchester Airline Trail Spur and trail entrance

improvements

285,000 DEEP

2014 Colchester Dam removal, river bank restoration and rehab of Old Mill along Jeremy

River

350,000 DEEP

2005 Colebrook Handicap accessible restroom at Town Historic Society 17,000 OPM2007 Colebrook Recreation improvements at Smith Hill Park 159,100 DEEP2010 Colebrook Acquisition of a new generator which will serve Town Hall as well as the

Senior/Community Center

25,000 DECD

2011 Colebrook Reconstruction of Ruth Cross Road 40,505 DOT2011 Colebrook Renovation and exterior painting of the Historical Society building 69,000 DECD2012 Colebrook Rehabilitate Old Forge Road Bridge over Sandy Brook 205,500 DOT2013 Colebrook Renovate, paint Historical Society Museum 77,500 DECD2006 Columbia An addition to Beckish Senior Center 500,000 DSS2008 Columbia Planning and design of the Route 6 corridor economic development

enhancements

65,000 DECD

2008 Columbia Reconstruction of the Columbia Lake Town Beach 66,965 DEEP2010 Columbia Design for an expanded Saxton B. Little Free Library 50,000 DECD2010 Columbia Construction of additional parking for H.W. Porter School 47,546 DECD2011 Columbia Design, renovation and expansion of Columbia's library 150,000 DECD2012 Columbia Rehabilitate the Pucker Street Bridge over the Hop River 160,000 DOT2013 Columbia Improvement of local roads 250,000 OPM2005 Cornwall Renovations to town library, installation of restrooms 200,000 DECD2007 Cornwall Renovations to the Historical Society 250,000 DECD2008 Cornwall Implementation of a business façade and traffic calming program 150,000 DECD2011 Cornwall Continuation of the façade improvement program, traffic calming and

installation of tourism signs

150,000 DECD

2014 Cornwall Repairs to North Cornwall Meeting House 100,000 OPM2005 Coventry Access management in Coventry Village (road improvements) 250,000 DOT2007 Coventry Renovations and additions to the North Coventry Volunteer Fire Station 400,000 DESPP

2010 Coventry Improvements to the town's main sports complex on Ripley Hill Road 200,000 DEEP

2011 Coventry Redevelopment of town's landfill site into a multi-purpose recreational

facility including soccer fields, football fields and parking

200,000 DEEP

2012 Coventry Construct sidewalk and streetscape improvements in the Village District 400,000 DOT

2014 Coventry Sluiceway/Lake Gate 475,000 DEEP2005 Cromwell Sanitary sewer and utility improvements for commercial 500,000 DECD

Page 5: STEAP AWARDS BY TOWN, THEN BY YEAR (FY05 - FY14) · 2010 Bethany Renovation and restoration of the Bethany airport hanger to serve as a community center and emergency shelter, and

STEAP AWARDS BY TOWN, THEN BY YEAR (FY05 - FY14)

2007 Cromwell The historic downtown and riverfront development project 250,000 DECD2010 Cromwell Continuation of the Historic downtown Revitalization Project 200,000 DECD2011 Cromwell Property acquisition of former "oil tank farm" removal of existing oil pipes

and construction and feasibility study of bicycle/pedestrian trail

200,000 DEEP

2012 Cromwell Improve County Line Road and Connecticut Route 3 500,000 DECD2005 Darien Pear Tree Point Beach and Boat Ramp 44,000 DEEP2005 Darien Tilly Pond 31,000 DEEP2006 Darien The purchase and installation of signage in downtown area 85,000 OPM2008 Darien Construction of capital improvements to the Darien Arts Center including

accessibility improvements and space renovation for expansion

50,000 DECD

2010 Darien Reconstruction and repair of the existing fire training facility 210,000 DECD2011 Darien Gorham's Pond dredging 150,000 DEEP2013 Darien Remove sediment from Gorham's Pond 400,000 DEEP2006 DeepRiver Streetscape improvements in downtown area 500,000 DECD2008 DeepRiver Continuation of the Main Street streetscape program 400,000 DECD2010 DeepRiver Completion of the final phase of the Main Street Streetscape project 200,000 DECD

2011 DeepRiver Sidewalk replacement and installation of decorative brick on Main Street 150,000 DECD

2012 DeepRiver Construct streetscape improvements along Main Street and intersecting

roads

200,000 DECD

2013 DeepRiver Capital improvements to Plattwood Park 400,000 OPM2006 Durham Additions, renovations and improvements to Durham Center Community

Water supply

500,000 DEEP

2008 Durham Extension of tie-ins from the new water distribution system along Route 17

from Fowler Avenue south to Higganum Road

56,000 DPH

2008 Durham Ground Water Under Direct Influence Study of the Durham Center Water

System as required by the Department of Public Health

13,200 DPH

2010 Durham Replacement of culverts on Pickett Lane 200,000 DEEP2011 Durham Reconstruction of road culverts on Pickett Lane 150,000 DOT2013 Durham Replace Picket Lane culverts 500,00 DEEP2008 Eastford Implementation of various improvements to the town transfer station 101,950 DEEP

2010 Eastford construction of infrastructure improvements at Camp Nahaco 227,000 DEEP2011 Eastford Construction of an addition to the historic Union Society of Phoenixville

House including a local meeting room, artifact storage and display area

100,000 DECD

2012 Eastford Rehabilitate Mill Bridge Road #1 over Bungee Brook 386,680 OPM2007 EastGranby The completion of phase 1 of the E. Granby Farms Project 400,000 DEEP2010 EastGranby Repavement of approximately 5 miles of town roadways 250,000 DOT2011 EastGranby Roadway improvements on town roads 150,000 DOT2005 EastHaddam ADA and Fire Code improvements at community centers 100,000 DSS2005 EastHaddam Improvements to Powerhouse Road 400,000 DOT2006 EastHaddam Sidewalk construction in Moodus Village 250,000 DECD2010 EastHaddam Rehabilitation of Powerhouse Road 250,000 DOT2011 EastHaddam Renovation of a vacant middle school to consolidate municipal offices 200,000 DECD

2012 EastHaddam Rehabilitate, repair and improve the operations of the sewer treatment

plant owned and operated by the East Haddam Water Pollution Control

Authority

100,000 DEEP

2013 EastHaddam Develop an agricultural business incubator, community farm 431,200 DECD2006 EastHampton The implementation of Phase 1 of the Route 66 Streetscape project 499,944 DECD

Page 6: STEAP AWARDS BY TOWN, THEN BY YEAR (FY05 - FY14) · 2010 Bethany Renovation and restoration of the Bethany airport hanger to serve as a community center and emergency shelter, and

STEAP AWARDS BY TOWN, THEN BY YEAR (FY05 - FY14)

2010 EastHampton Construction of streetscape improvements in the town's village center 200,000 DECD

2011 EastHampton Extension & improvements to Air Line State Park Trail into Village Center 200,000 DEEP

2013 EastHampton Replace the Epoch Arts building roof 250,000 DECD2014 EastHampton Phase II blight removal/public safety and parking project - village 500,000 DECD2006 EastHartland Repairs and renovations to the Hartland Historical Society's Gaylord House 20,000 OPM

2007 EastHartland Renovations to West Hartland Community Center 441,500 DSS2007 EastHartland A new playscape and community trail 50,000 OPM2005 EastLyme Parking lots and sidewalks in downtown commercial district 500,000 DECD2007 EastLyme The Main Street enhancement project, including streetscape and sidewalk

improvements

400,000 DECD

2010 EastLyme Second phase of the streetscape enhancement of Main Street 200,000 DECD2011 EastLyme Phase III of the Main Street Enhancement project including sidewalk,

parking and streetscape improvements

200,000 DECD

2012 EastLyme Complete phase three of the Main street enhancement project 400,000 DECD2013 EastLyme Repair Niantic Bay Boardwalk 500,000 DEEP2007 Easton The construction of a new animal control facility 200,000 DESPP2008 Easton Construction of a youth baseball field for the Easton Little League 35,000 DEEP2008 Easton Renovation of an old school into a senior center 400,000 DSS2006 Ellington The relocation and restoration of the historic Pinney House 500,000 DECD2010 Ellington Design and construction of an additional firehouse in the southern section

of town

200,000 DECD

2011 Ellington Design and construction of four tennis courts on Ellington High School

property

170,000 DEEP

2012 Ellington Sewer extension along Route 30 75,000 DEEP2013 Ellington Construct addition to Human Services Department 250,000 OPM2014 Ellington Town Hall addition 500,000 OPM2005 Essex Town Center Improvements 486,090 DECD2006 Essex Phase 2 of the town-wide streetscape project 499,910 DECD2008 Essex Construction of additional sidewalks for Ivoryton Village 91,300 DECD2010 Essex Construction of boat launch ramps on Main Street and Novelty Lane 200,000 DEEP

2013 Essex Improvements to the Essex "Civic Campus" 471,500 DECD2007 Fairfield The reconstruction of the east wing of Penfield Pavilion 400,000 DEEP2008 Fairfield Implementation of a streetscape program as well as the renovation of a

town-owned building for art and culture activities

450,000 DECD

2010 Fairfield Design, demolition, and reconstruction of the west wing of Penfield Pavilion 200,000 DEEP

2011 Fairfield Design and renovation of Sturges Gardener's Cottage for a Town/Chamber

of Commerce Information Center

100,000 DECD

2012 Fairfield Reconstruct Penfield Pavilion parking lot and construct additional sidewalks 400,000 OPM

2012 Fairfield Handicap accessible beach access 100,000 DEEP2013 Fairfield Increase handicap accessibility at 4 coastal rec centers 275,000 DEEP2006 FallsVillage The exterior repair and restoration of 107 Main Street 275,000 DSS2006 Farmington The Unionville Center Improvement Program 500,000 DECD2008 Farmington Unionville Center improvement Program which includes streetscape

improvements and the restoration of historic buildings

400,000 DECD

2010 Farmington Revitalization of Unionville Center 200,000 DECD2011 Farmington Completion of Unionville Center Improvement Prog. including Unionville

Museum improvements & streetscape improvements on Mill St.

200,000 DECD

2014 Farmington Install athletic turf at Farmington High School 500,000 DEEP

Page 7: STEAP AWARDS BY TOWN, THEN BY YEAR (FY05 - FY14) · 2010 Bethany Renovation and restoration of the Bethany airport hanger to serve as a community center and emergency shelter, and

STEAP AWARDS BY TOWN, THEN BY YEAR (FY05 - FY14)

2005 Franklin Construction of town library 20,000 OPM2010 Franklin Construction of a drainage system and to repave all of Kahn Road 200,000 DOT2006 Glastonbury The Welles Street Riverfront Park project 500,000 DEEP2010 Glastonbury Renovation of the former Academy School Building into a multi-purpose

center for human services

200,000 DSS

2011 Glastonbury Design and construction of Phase II of Riverfront Park Development 200,000 DEEP

2013 Glastonbury Public access for four open space parcels 250,000 OPM2005 Goshen Restoration of Old Town Hall 100,000 DECD2005 Goshen Dredging of public swimming area at 291 Beach Street 44,471 DEEP2008 Goshen Replacement the dam at Tyler Lake 400,000 DEEP2005 Granby Street Lighting on Bank Street 60,000 OPM2007 Granby The construction and rehabilitation of existing mixed use structures at

Holcomb Farm

400,000 DSS

2011 Granby Construction of Salmon Brook Park House and rehabilitation of support

facility at Salmon Brook Park

250,000 DEEP

2013 Granby Construct a parking lot and upgrades for Holcomb Farm 500,000 OPM2010 Greenwich Identification, engineering and installation of alternate water sources for

the purposes of fire fighting

200,000 DPH

2011 Greenwich Installation of dry hydrants and pre-built cisterns for water storage 250,000 DECD

2012 Greenwich Renovate and expand the town's Department of Health Laboratory 100,000 OPM2013 Greenwich Upgrade town communication network 245,000 DESPP2014 Greenwich Expansion of the Nathaniel Witherell's Rehabilitation Center 500,000 DPH2011 Griswold Planning, design and initial construction in downtown Main Street area 200,000 DECD

2012 Griswold Construct roadway improvements on Geer and Lily Pond Roads 500,000 OPM2005 Guilford Renovation of town owned house for family services department 500,000 DSS2007 Guilford The construction of a new day care center for the Guilford Center for

Children

400,000 DSS

2010 Guilford Conduction of a feasibility study for the proposed extension of a public

water main into existing shoreline areas

200,000 DPH

2011 Guilford Construction of the Boston Terrace Zero Energy Housing Development 150,000 DECD

2012 Guilford Construct improvements at Jacobs Beach 500,000 OPM2010 Haddam Preparation of design and survey documents by CT Water Company to

engineer pumping public water from Chester to Tylerville

63,250 DPH

2011 Haddam Water main extension from Chester to Haddam 250,000 DPH2011 Haddam Water main extension from Chester to Haddam (supplemental award) 250,000 DPH

2007 Hampton Renovations and code upgrades at Grange Hall 299,000 DSS2007 Hampton Equipment and improvements at town transfer station 51,000 OPM2010 Hampton Construction of a new town garage 250,000 DECD2013 Hampton Purchase and install a generator 100,000 OPM2014 Hampton Resurface Old Route 6 450,000 DOT2008 Hartland Continued renovation of the West Hartland Community Center 83,250 DSS2010 Hartland Renovation of the W.H. Community Building and Emergency Shelter 89,625 DECD2010 Hartland Renovation and repair of a Hartland Historical Building, the Gaylord House 30,000 DECD

2010 Hartland Acquisition and installation of a generator at Bethany Lutheran Community

Parish Hall

43,563 DSS

2006 Harwinton The extension of waterlines to a low-income senior housing complex, town

hall and library

332,000 DEEP

2008 Harwinton Renovation and construction of an addition to a building for use by the

Harwinton Volunteer Ambulance Association

420,000 DECD

Page 8: STEAP AWARDS BY TOWN, THEN BY YEAR (FY05 - FY14) · 2010 Bethany Renovation and restoration of the Bethany airport hanger to serve as a community center and emergency shelter, and

STEAP AWARDS BY TOWN, THEN BY YEAR (FY05 - FY14)

2010 Harwinton Rehabilitation of the historic Old Town Hall for use as a community center

and meeting facility

200,000 DSS

2011 Harwinton Renovations to historic house and barn for recreation department staff

offices and recreational uses

150,000 DECD

2014 Harwinton Construction of a Municipal Emergency Operations Center 325,000 DECD2006 Hebron The Main Street commercial revitalization project 375,000 DECD2007 Hebron The development of a recently acquired park property 125,000 DEEP2008 Hebron Continuation of the Main Street Commercial Revitalization plan 487,630 DECD2010 Hebron Restoration of the historic Peters House for municipal purposes 200,000 DECD2011 Hebron Continuation of the Main Street corridor improvements including façade

improvements, sidewalk installation, tree installation, community event

sign and pedestrian cross walk signal

150,000 DECD

2012 Hebron Install a traffic signal 214,000 OPM2013 Hebron Parking & pedestrian safety improvements to Hebron Center 500,000 DECD2005 Kent Construction of transfer station 450,000 DEEP2007 Kent The renovation of a former factory building into a firehouse for the Kent

Volunteer Fire Department

400,000 DESPP

2008 Kent Renovation and repair of the historic Swift House 92,000 DECD2010 Kent Renovation of the Community House located at 93 North Main Street 200,000 DECD

2011 Kent Renovation of the Kent Community House including interior and exterior

painting, removal and replacement of existing table/chair storage and

installation of an audio/video system

100,000 DECD

2013 Kent Repair Bulls Bridge 100,000 DOT2014 Kent Property acquisition for municipal parking, public restrooms, town

park/village green

500,000 DECD

2008 Killingworth Renovation of the Sheldon Park Recreational Facility 400,000 DEEP2011 Killingworth Renovation and development of Killingworth's Parmelee Farm as historic,

cultural and environmental education center

150,000 DECD

2013 Killingworth Construct a new EOC 500,000 OPM2007 Lebanon The construction of a senior center 500,000 DSS2010 Lebanon Construction of the Alden Tavern Parking lot to provide one hundred

additional parking spaces to promote tourism

250,885 DECD

2011 Lebanon Construction of athletic fields at Tyler Field and Aspinall Recreation

Complex improvements

200,000 DEEP

2008 Ledyard Construction of site improvements to the Town Green 150,000 DEEP2014 Ledyard Town center improvements-parking, lighting, landscaping and cross-walk

expansion

500,000 DECD

2005 Litchfield Sidewalks and curbing for Town/Borough Center 170,000 DECD2005 Litchfield Bantam River Park, providing an accessible access 30,000 DEEP2005 Litchfield Duck Pond Road intersection improvement 50,000 DOT2006 Litchfield The completion of the sidewalk replacement project, which includes the

replacement of sidewalks from the Post Office on South Street along West

Street west to Meadow Street

170,000 DECD

2006 Litchfield The replacement of the right jamb on Bantam River 130,000 DEEP2006 Litchfield The Northfield Firehouse Community Center 200,000 DSS2008 Litchfield Upgrades to Litchfield Town Beach 90,000 DEEP2008 Litchfield Renovation of the town's community playscape 120,000 DEEP2010 Litchfield Construction of three affordable housing units on town-owned land 250,000 DECD

2011 Litchfield Construction of a bridge over the Bantam River to access jamb controls &

provide a pedestrian crossing & construction of new mechanically operated

jambs

250,000 DEEP

2013 Litchfield Construct showers at Bantam Firehouse 160,000 OPM

Page 9: STEAP AWARDS BY TOWN, THEN BY YEAR (FY05 - FY14) · 2010 Bethany Renovation and restoration of the Bethany airport hanger to serve as a community center and emergency shelter, and

STEAP AWARDS BY TOWN, THEN BY YEAR (FY05 - FY14)

2007 Lyme The construction of two baseball/softball fields at Town Woods

Recreational Park

325,000 DEEP

2011 Lyme Maintenance work on Day Hill Road bridge over Roaring Brook to remedy

scour issues

75,000 DOT

2013 Lyme Construct new public library and renovate existing town hall 500,000 OPM2010 Madison Completion of utility pole relocation on the north side and sidewalk

improvements on the west side of Boston Post Road

200,000 DECD

2012 Madison Relocate and remove overhead utilities and to construct streetscape

improvements on the Boston Post Road

400,000 DECD

2013 Madison Streetscape improvements to business district 500,000 DECD2005 Mansfield Downtown Revitalization and Enhancement Program 500,000 DECD2010 Mansfield Design and construction of the Town Square, a portion of the Downtown

Mansfield Revitalization and Enhancement Project

200,000 DECD

2012 Mansfield Construct infrastructure improvements along Village Street 500,000 DECD2005 Marlborough Town Center Streetscape Improvement Plan 275,000 DECD2006 Marlborough The town center sidewalk and streetscape improvement project 500,000 DECD2008 Marlborough Town Center Sidewalk and Streetscape Improvement Plan 400,000 DECD2010 Marlborough Expansion of the second floor of the Richmond Memorial Library 250,000 DECD2011 Marlborough Construction of sidewalks and streetscape improvements in the Village

Center area

150,000 DECD

2012 Marlborough Construct sidewalk and streetscape improvements in the Village Center

area

400,000 DECD

2013 Marlborough Public water system expansion 500,000 DPH2014 Marlborough North Main Street Exit 12 Gateway Economic Enhancement Project 500,000 DECD2007 Middlebury Improvements to the Mary I. Johnson Park 488,000 DEEP2010 Middlebury Construction of two all-weather tennis courts at Meadowview Park 203,780 DEEP2005 Middlefield Purchase of land for Industrial Park 500,000 DECD2007 Middlefield The renovation of Middlefield's Community Center which also houses the

senior center

350,000 DSS

2008 Middlefield Construction of improvements to Peckham Park 203,500 DEEP2011 Middlefield Installation of three solar powered omni directional sirens 52,456 DECD2012 Middlefield Rehabilitate the Miller Road Bridge over the Coginchaug River 250,000 DEEP2014 Middlefield Rehabilitate Mill Road Bridge 131,000 DEEP2014 Milford Design/reconstruct Beaverbrook Boardwalk & Nature Trail enhancements 500,000 DEEP

2005 Monroe Construction of an addition to Police Department 500,000 DESPP2007 Monroe The replacement of a public wading pool at Wolfe Park 450,000 DEEP2008 Monroe Construction of improvements in the Center Block area of Monroe

including various roadway and pedestrian improvements

400,000 DECD

2010 Monroe Installation of three fire cistern tanks to provide public water service 150,000 DPH

2011 Monroe Driveway and parking lot improvements at Monroe Food Pantry 39,105 DSS2013 Monroe Reclaim and repave Timothy Hill Road 110,000 OPM2010 Montville Renovation of the former Fair Oaks School building into a community

center

200,000 DSS

2012 Montville Design the Montville Road culvert at Trading Cove Brook 500,000 DOT2013 Montville Sidewalks for Chesterfield Road 250,000 DOT2005 Morris Town Landfill closure and Transfer Station additions 100,000 DEEP2007 Morris The construction of community recreation center at the Morris Town Beach

on Bantam Lake

225,000 DSS

2008 Morris Design and construction of additional improvements to the Morris Transfer

station as well as close the existing landfill

400,000 DEEP

2011 Morris Design and rehabilitation of the Smokey Hollow Road Bridge 150,000 DOT2014 Morris Generator replacement at highway department garage 35,000 OPM2006 NewCanaan The dredging of Mill Pond 500,000 DEEP

Page 10: STEAP AWARDS BY TOWN, THEN BY YEAR (FY05 - FY14) · 2010 Bethany Renovation and restoration of the Bethany airport hanger to serve as a community center and emergency shelter, and

STEAP AWARDS BY TOWN, THEN BY YEAR (FY05 - FY14)

2007 NewCanaan The dredging of Mead Pond 300,000 DEEP2008 NewCanaan Rehabilitation of the trail system at Waveny Park 150,000 DEEP2010 NewCanaan Construction of a bus operations building 150,000 DECD2010 NewCanaan Completion of the Market Demand study 75,000 DECD2005 NewFairfield Pedestrian Walkways in Town Center 350,000 DECD2006 NewFairfield The renovation and addition to property for a proposed senior center 500,000 DSS

2006 NewFairfield Renovations to Hidden Valley Nature Center 52,000 OPM2007 NewFairfield Additional funds for the renovation and expansion of the New Fairfield

community/senior center

200,000 DSS

2008 NewFairfield Connection of Consolidated and Meeting House Hill Schools into the new

centralized water system in the Town Center

500,000 DPH

2010 NewFairfield Construction of 3 new radio towers to improve radio communication ability

within the town

250,000 DECD

2011 NewFairfield Construction of a trail/walkway system to connect the town streetscape

project to new Senior Center property

150,000 DEEP

2005 NewHartford Relocation of Highway Department, Garage, Economic Development 500,000 DECD2007 NewHartford Various improvements to revitalize the downtown area 250,000 DECD2010 NewHartford Repair of two sewer lines located in the downtown vicinity 250,000 DEEP2011 NewHartford Repair and reconstruction of existing sewer line along Main Street 150,000 DEEP2007 Newington Phase 2 of town center streetscape improvements 400,000 DECD2010 Newington Fourth phase of the town center streetscape improvements on Market

Square

350,000 DECD

2011 Newington Phase IV of streetscape and drainage improvements along Market Square 200,000 DECD

2005 NewMilford Improvements to Railroad Street 420,700 DECD2008 NewMilford Construction of road and sidewalk repairs or replacement on Church Street,

Whittlesey Avenue and Elm Street

276,025 DOT

2010 NewMilford Creation of a cooperative grant fund to stimulate façade improvement in

the Village Center zone

50,000 DECD

2010 NewMilford Reconstruction of West Main Street including the rehabilitation of

sidewalks

200,000 DOT

2011 NewMilford Development of a strategic plan for the Town to include recommendations

from the New Milford Plan of Conservation and Development

80,000 DECD

2014 NewMilford Sidewalk and streetscape improvements Downtown Village Center 448,334 DOT2005 Newtown Engineering and development of a new industrial park 500,000 DECD2006 Newtown The installation of utility infrastructure at the former Fairfield Hills 275,000 DECD

2007 Newtown An archeological study and Army Corps review at Newtown Technology

Park

125,000 DECD

2008 Newtown Planning and construction of new parking areas and streetscape

improvements associated with the economic development projects

proceeding at the Fairfield Hills campus

300,000 DECD

2010 Newtown Planning and development of a new animal control facility 100,000 DECD2011 Newtown Sandy Hook streetscape project along Riverside Road, Glen Road and

Washington Street

100,000 DECD

2012 Newtown Construct infrastructure and streetscape improvements at the Fairfield Hills

Campus

400,000 OPM

2013 Newtown To assist local businesses impacted by the SHES tragedy 500,000 DECD2014 Newtown Hawleyville sewer extension project 500,000 DEEP2006 Norfolk Sidewalk replacement on the Village Green to comply ADA and public

safety

90,000 OPM

2007 Norfolk The construction of a new ambulance/resident trooper facility 400,000 DESPP

Page 11: STEAP AWARDS BY TOWN, THEN BY YEAR (FY05 - FY14) · 2010 Bethany Renovation and restoration of the Bethany airport hanger to serve as a community center and emergency shelter, and

STEAP AWARDS BY TOWN, THEN BY YEAR (FY05 - FY14)

2010 Norfolk Extension of water and sewer lines to service the Town Garage and a

planned affordable housing project

250,000 DEEP

2011 Norfolk Purchase and installation of a new playscape at Botelle Elementary School 40,000 DECD

2005 NorthBranford Extend public right of way and utilities to economic development site 500,000 DECD

2007 NorthBranford The installation of sanitary sewers along Route 80 250,000 DEEP2010 NorthBranford Development of Swajchuk Park as a centralized recreation facility 200,000 DEEP2011 NorthBranford Design and renovations to an elementary school for use as a community

and senior citizens center

200,000 DECD

2012 NorthBranford Relocation of little league field 350,000 DEEP2005 NorthCanaan Reconstruction of Canaan Union Station 500,000 DECD2011 NorthCanaan Restoration of Union Station 200,000 DOT2013 NorthCanaan Reconstruct Canaan Union Station 400,000 DOT2006 NorthFranklin Road improvements of Kahn Road 163,500 DOT2006 NorthGrosvenordale Phase 2 of the Quinebaug Fire House construction project 300,000 DESPP2005 NorthHaven Upgrade of sewer lines and road to industrial park 386,000 DECD2008 NorthHaven Public Works facility expansion and renovation project 350,000 DECD2010 NorthHaven Public Works Facility expansion and renovation project 250,000 DECD2011 NorthHaven Design and construction of a new playground at Clintonville Elementary

School and drainage improvements

188,000 DEEP

2011 NorthHaven Sidewalk replacement and refurbishment of Skiff Street 95,370 DOT2012 NorthHaven Design, construct new playground at Montowese Elementary School 50,000 OPM

2013 NorthHaven Refurbish Carina Park 127,240 OPM2014 NorthHaven Redesign and renovate public works garage 470,267 DECD2005 NorthStonington Completion of Assekonk Swamp Pedestrian Bridge 75,000 DEEP2006 NorthStonington The extension of a waterline on Main Street 303,000 DEEP2010 NorthStonington For the completion of engineering and feasibility studies on drinking water

supply wells

200,000 DPH

2011 NorthStonington Excavate, demolish, replace/rebuild basketball/tennis courts located on

Rocky Hollow Road

179,100 DEEP

2014 NorthStonington Water line extension to residential, fair grounds, grange hall, old fire

station, new EMS center and future water tower

245,400 DPH

2012 NorthwestRegionalCollaborationCoordinate, marketing and promote local business 80,000 DECD2005 OldLyme Construction and expansion of the Town Woods Playground 20,000 OPM2007 OldLyme The construction of two baseball/softball fields at Town Woods

Recreational Park

325,000 DEEP

2008 OldLyme Reconstruction of 912 feet of town-owned streets in the historic district 425,000 DOT

2011 OldLyme Repair Rogers Lake Dam 229,750 DEEP2013 OldLyme Expand, renovate Hains Park boathouse 478,000 DEEP2005 OldSaybrook Restoration of Town Hall for use as a community center 500,000 DECD2007 OldSaybrook The rehabilitation and safety improvements to historic Ferry Dock 250,000 DEEP2014 OldSaybrook Main Street connections park and parking lot project 500,000 DEEP2005 Orange Boston Post Road lighting improvements 150,000 DECD2005 Orange Connair Road 250,000 DOT2006 Orange Phase 2 of the Boston Post Road lighting project 175,000 DECD2007 Orange Improvements to the parking lot at Old Tavern Park 200,000 DEEP2010 Orange Design of the traffic light at the intersection of Edison Road and Marsh Hill

Road

25,000 DOT

2011 Orange Construction of Edison Road Extension 150,000 DOT2012 Orange Extend Edison Road to Marsh Hill Road 500,000 DOT2005 Oxford Rebuilding Christian Street 423,500 DOT

Page 12: STEAP AWARDS BY TOWN, THEN BY YEAR (FY05 - FY14) · 2010 Bethany Renovation and restoration of the Bethany airport hanger to serve as a community center and emergency shelter, and

STEAP AWARDS BY TOWN, THEN BY YEAR (FY05 - FY14)

2006 Oxford Construct or prepare for the construction of E Commerce Drive in Woodruff

Hill Industrial Park

500,000 DECD

2008 Oxford Construction of a right turning lane and signal at the corner of Great Hill

Road and Route 67

90,000 DOT

2010 Oxford Planning, engineering and construction of Christian Street - Phase III 200,000 DECD

2014 Oxford Phase II - Agnes Schiavi Tetlak Park Project 500,000 DEEP2008 Plainfield Design and construction of improvements to the former InterRoyal Mill site

for economic development purposes

400,000 DECD

2010 Plainfield Reconstruction of Starkweather Road to address safety concerns 250,000 DOT2011 Plainfield Sidewalk replacements on Allen Street, Linnell Street, Church Street,

Highland Street and North Main Street

200,000 DOT

2013 Plainfield Reconstruct and repair Green Hollow Road 500,000 DOT2008 Plymouth Construction of various improvements in historic downtown Terryville 300,000 DECD

2010 Plymouth Preservation of the historic Eli Terry, Jr. Waterwheel 150,000 DECD2011 Plymouth Phase II streetscape improvements along CT Route 6 150,000 DECD2014 Plymouth Route 6 streetscape 500,000 DECD2005 Pomfret Addition to town hall for use of senior center 275,000 DSS2007 Pomfret The acquisition of property fro the Airline Trail 140,000 DEEP2007 Pomfret Improvements to town recreation site 93,000 OPM2008 Pomfret Construction of a parking area and kiosk for the newly purchased trail head

on the Airline Trail

100,000 DEEP

2008 Pomfret Replacement of the bridge over Wolf Den Drive 50,000 DEEP2010 Pomfret Completion of renovations, construction of an addition and upgrades to a

historic meeting house

100,000 DECD

2010 Pomfret Construction of various improvements to recreation park 150,000 DEEP2011 Pomfret Addition and renovation to firehouse facility 200,000 DECD2012 Pomfret Design, plan and construct an emergency response center 500,000 OPM2013 Pomfret Design/plan/construct extension to Emergency Response Center 500,000 OPM2006 PomfretCenter Improvements to and bridge replacement on Wolf Den Drive 205,800 DEEP2006 PomfretCenter The development plan for town owned property for economic

development

40,000 OPM

2007 Portland The Main Street Streetscape project 250,000 DECD2008 Portland Design and construction of 700 linear feet of new road work and

streetscape improvements in the downtown Village District

326,170 DECD

2010 Portland Extension of Brownstone Avenue to Middlesex Avenue 200,000 DECD2011 Portland Phase III of Brownstone Avenue Extension Project including construction of

an open-air pavilion, outdoor amphitheater and restroom facility

200,000 DEEP

2012 Portland Design a recreational complex 230,000 OPM2013 Portland Design, construct a salt/sand storage shed 227,000 DECD2014 Portland Final Phase - Brownstone Ave. Extension project 363,000 DECD2012 Preston Demolish buildings located on the former Norwich State Hospital property 500,000 DECD

2007 Prospect Site improvements to provide additional parking for the senior center

expansion

135,000 DSS

2011 Prospect Construction of a public works garage 200,000 DECD2007 Putnam Putnam Connections, which is various town-wide capital improvements

aimed at attracting more visitors

375,000 DEEP

2011 Putnam Putnam Farmer's Market parking improvements and drainage installation 15,000 DECD

2011 Putnam Installation of message/information centers at River Mills Heritage Trail and

Putnam River Trail

5,000 DEEP

2011 Putnam Installation of sidewalks on Putnam Street 75,000 DOT

Page 13: STEAP AWARDS BY TOWN, THEN BY YEAR (FY05 - FY14) · 2010 Bethany Renovation and restoration of the Bethany airport hanger to serve as a community center and emergency shelter, and

STEAP AWARDS BY TOWN, THEN BY YEAR (FY05 - FY14)

2012 Putnam Construct roadway approaches to a bridge to be constructed for a planned

technology

469,000 DECD

2006 Redding Renovations to the Redding Police Department 500,000 DESPP2008 Redding Construction of various improvements to the athletic fields at John Read

Middle School

400,000 DEEP

2011 Redding Improvements at Route 107/57 and Route 107/North Main Street

intersections including installation of traffic signals and crosswalks

200,000 DOT

2014 Redding Mark Twain Library parking lot improvements 342,000 DECD2007 Ridgefield Pedestrian safety improvements along Route 35 250,000 DECD2008 Ridgefield Construction of various improvements along Danbury Road 250,000 DECD2010 Ridgefield Expansion of parking to support the recreational facilities at the Venus

Building Municipal Complex

200,000 DEEP

2012 Ridgefield Install a traffic signal at the intersection of Danbury Road & Route 7 75,000 OPM

2012 Ridgefield Reconstruct the municipal parking lot between Bailey Avenue and Prospect

Street

200,000 OPM

2014 Ridgefield Phase III - Danbury Road streetscape project 320,000 DECD2014 Ridgefield Final design/construction of exterior site improvements to town hall 180,000 OPM

2005 RockyHill Improvements and Enhancements to the Silas Deane 500,000 DECD2006 RockyHill Phase 2 of the Silas Deane Revitalization project 500,000 DECD2008 RockyHill Continuation of the Silas Deane Highway revitalization project 250,000 DECD2010 RockyHill Continuation of the design and construction of the Silas Deane Highway

Revitalization program

200,000 DECD

2011 RockyHill Design and construction of Silas Deane Highway streetscape improvements 250,000 DECD

2014 RockyHill Replace artificial turf at McVicar Field 444,000 DEEP2005 Roxbury Upgrade of River Road Bridge over Little Jack's Brook 200,000 DOT2007 Roxbury The rehabilitation of Minor Bridge 250,000 DOT2008 Roxbury Rehabilitation of Judds Briggs over Shepaug River 445,000 DOT2010 Roxbury Upgrade of the Roxbury Fire House 200,000 DECD2011 Roxbury Athletic field improvements including upgrade of ball field and soccer field

to behind the town hall and relocation of batting cages

70,000 DEEP

2011 Roxbury Replacement of playground equipment at Booth Free Elementary School 80,000 DECD

2012 Roxbury Rehabilitate a section of South Street 400,000 DOT2008 Salem Upgrade of Salem's Transfer Station to alleviate environmental concerns 250,000 DEEP

2010 Salem Installation of two new tennis courts and a basketball court at the town

recreation complex

160,868 DEEP

2011 Salem Construction of a community pavilion on Norwich Road 150,000 DECD2006 Salisbury Various improvements in the Railroad Station area of Lakeville 500,000 DECD2010 Salisbury Renovation and expansion of two town-owned industrial buildings for new

commercial uses

200,000 DECD

2011 Salisbury Phase II renovation and improvements at the SWSA ski jumping facility

including design and construction of an events/maintenance building,

improved snowmaking capabilities, and reconstruction of a meter tower for

children's jumping

250,000 DECD

2013 Salisbury Demo, remediation for affordable housing 500,000 DECD2008 Scotland Construction of improvements at Bowers Park 255,376 DEEP2010 Scotland Construction of various improvements to the Huntington Homestead

Museum

155,625 DECD

2008 Seymour Construction of new and replacement sidewalks throughout the

municipality

150,000 DECD

Page 14: STEAP AWARDS BY TOWN, THEN BY YEAR (FY05 - FY14) · 2010 Bethany Renovation and restoration of the Bethany airport hanger to serve as a community center and emergency shelter, and

STEAP AWARDS BY TOWN, THEN BY YEAR (FY05 - FY14)

2008 Seymour Repair to Sochrin's Pond Dam 150,000 DEEP2010 Seymour Continuation of the sidewalk replacement program 150,000 DECD2010 Seymour Construction of two new tennis courts at French Park 50,000 DEEP2011 Seymour Purchase and installation of directional and location signs to the Seymour

Industrial Park

37,000 DEC

2011 Seymour Construction of bathroom facilities at Chatfield Park 25,000 DEEP2011 Seymour Replacement of Seymour Police Department roof 45,000 DECD2013 Seymour Phase III of town sidewalk replacement 168,000 DECD2014 Seymour Phase IV - Seymour sidewalk replacement project 200,000 DECD2007 Sharon The repair of the Calkinstown Reservoir Dam 400,000 DEEP2008 Sharon Expansion of the highway facility and the construction of a new dog pound 305,000 DECD

2010 Sharon Acquisition and installation of a new playscape at the Sharon Center School 7,000 DEEP

2011 Sharon Construction of a new septic line from the town highway garage to the

municipal sewer

50,000 DEEP

2011 Sharon Construction/installation of a new water well for Veteran's Field and town

garage complexes

10,000 DEEP

2011 Sharon Connection of the dog pound to the municipal sewer 5,000 DEEP2011 Sharon Installation of a waste water/oil separator at the town garage 12,000 DECD2012 Sharon Construct an affordable home on Low Road 100,000 OPM2012 Sharon Construct the Expansion of Sharon Ridge 165,289 OPM2005 Sherman Historic Preservation to Town Hall/Senior Center 500,000 DSS2007 Sherman Improvements to the Sherman Playhouse 100,000 DECD2007 Sherman The construction of an activity center and handicap restrooms at town park

and beach

166,650 DEEP

2010 Sherman Renovation of an historic barn for use as a community room in conjunction

with the expansion of adjacent Library facilities

200,000 DSS

2011 Sherman Improvements to the Sherman Playhouse including window reglazing and

storm window construction

45,000 DECD

2011 Sherman Redesign and repair of the Fox Run retention basin 50,000 DEEP2012 Sherman Reconstruct a portion of Spring Lake Road 150,000 OPM2013 Sherman Upgrade Sherman Playhouse 68,000 DECD2014 Sherman Public works wash station 205,000 DECD2008 Simsbury Construction of fire and life safety code improvements at Eno Memorial

Hall which is the town's community and senior center

200,000 DSS

2010 Simsbury Design and construction of a secondary access road at the Simsbury Farms

and Recreation Complex

200,000 DEEP

2011 Simsbury Installation of a band shell curtain system at the Performing Arts Center

and Simsbury Meadows for rain protection and ventilation

115,000 DECD

2012 Simsbury Improve sidewalks and street surfaces on Riverside Road, Drake Hill Road

Bridge and Hopmeadow Street

350,000 DOT

2005 Somers Eradication of flooding in the vicinity of the Maple Street Bridge 500,000 DEEP2006 Somers The installation of sidewalks on the north side of Main Street in Somersville 200,000 DECD

2006 Somers The development of a master plan for streetscape improvements on Main

Street

25,000 OPM

2007 Somers A handicap accessible playground at Field Park Road 48,000 OPM2008 Somers Construction of streetscape improvements and traffic calming strategies in

Somersville

380,000 DECD

2010 Somers Construction of improvements to recreational facilities throughout town 200,000 DEEP

2011 Somers Sidewalk construction in the Senior Center, Elderly Housing, Cemetery area 120,000 DSS

2011 Somers Expansion of the Senior Center and parking lot resurfacing 100,000 DSS

Page 15: STEAP AWARDS BY TOWN, THEN BY YEAR (FY05 - FY14) · 2010 Bethany Renovation and restoration of the Bethany airport hanger to serve as a community center and emergency shelter, and

STEAP AWARDS BY TOWN, THEN BY YEAR (FY05 - FY14)

2012 Somers Paving of parking lot at Somers Town Hall 85,000 OPM2013 Somers Replace culverts and repave Mountain Road 500,000 DOT2005 Southbury Environmental Protection-reduce storm water pollution 200,000 DEEP2005 Southbury Road improvements to improve traffic safety 300,000 DOT2007 Southbury The development of a municipal senior and community center 500,000 DSS2008 Southbury Southbury Beach Parking Project 220,000 DEEP2008 Southbury Extension of utilities, design and construction of a comfort station for

Pomperaug High School

220,000 DEEP

2010 Southbury Renovation of Ballantine Park 200,000 DEEP2006 Southington Improvements to the Leach property and Canal Street 195,000 DECD2008 Southington Second phase of Industrial Drive including the construction of

approximately 445 feet of road

222,500 DECD

2011 Southington Development of Triano Drive including infrastructure to develop a new

heavy industrial park

250,000 DECD

2012 Southington Construct roadway improvements on Aircraft Road, Newell Street and

Redstone Street

250,000 OPM

2005 SouthWindsor I-291 Corridor District Municipal Development Project 500,000 DECD2007 SouthWindsor Installation of soccer fields at Rye Street Park 250,000 DEEP2010 SouthWindsor Construction of infrastructure improvements to the I-291 Corridor District 300,000 DECD

2011 SouthWindsor Renovation of existing police station 200,000 DECD2012 SouthWindsor Construct public infrastructure improvements to implement the I-291

municipal development project

500,000 DECD

2013 SouthWindsor Construct an EOC 500,000 OPM2010 Sprague Reconstruction of LaCroix Bridge off of Route 207 in Baltic 147,054 DOT2011 Sprague Upgrade of waste-water pump stations in Baltic and Hanover 200,000 DEEP2012 Sprague Rehabilitate the Hanover wastewater pump station 500,000 DOT2014 Sprague Reconstruction and drainage improvements - Pautipaug Hill Road 500,000 DOT2008 Stafford Reconstruction of 1,350 feet of Prospect Street located in a downtown

neighborhood of Stafford Springs

300,000 DECD

2010 Stafford Construction of sidewalks on East Main Street 227,000 DECD2011 Stafford High Street Road and sidewalk reconstruction, drainage improvements and

sewer line replacement

200,000 DOT

2006 StaffordSprings Sidewalk replacement along Main and East Main Street 494,319 DECD2005 Stonington Final design and engineering for expansion of town pier 175,000 DEEP2005 Stonington Tour bus parking lot and shuttle bus stop, tourist 175,000 DOT2006 Stonington Improvements to Pawcatuck Park Dock facility 500,000 DEEP2010 Stonington Construction of an ADA compliant restroom structure at the Spellman Park

Recreation Complex

65,000 DEEP

2010 Stonington Construction of various improvements at Donahue Park 105,960 DEEP2005 Suffield Redevelopment of Town Center 400,000 DECD2005 Suffield Renovation of Babbs Rink - to be used by community 100,000 DECD2006 Suffield The construction of a new Volunteer Ambulance Facility 500,000 DESPP2008 Suffield Creation of a new athletic field at Sullivan Field 60,000 DEEP2010 Suffield Expansion of a bulky waste site at the Suffield landfill 150,000 DECD2010 Suffield Acquisition of generators for the Suffield Police Department and the Senior

Center

90,000 DSS

2011 Suffield Kent Memorial library roof replacement including energy efficient skylights 200,000 DECD

2012 Suffield Construct roadway improvements on Harvey Lane 250,000 DOT2013 Suffield Construct roadway improvements on Canal Road 250,000 DOT2014 Suffield Restoration work at Hilltop Farm 250,000 DECD2006 Terryville Phase 4 of the Plymouth Business Park project 200,000 DECD2006 Thomaston Sidewalk improvements throughout town 200,040 DECD2007 Thomaston The repair of the Altair Avenue Bridge and culvert 300,000 DOT

Page 16: STEAP AWARDS BY TOWN, THEN BY YEAR (FY05 - FY14) · 2010 Bethany Renovation and restoration of the Bethany airport hanger to serve as a community center and emergency shelter, and

STEAP AWARDS BY TOWN, THEN BY YEAR (FY05 - FY14)

2008 Thomaston Sidewalk improvement program, phase 2 498,300 DECD2011 Thomaston Sidewalk replacement on Meadow, South Main, High, Judson and Tracy

Streets

200,000 DOT

2012 Thomaston Purchase and install an emergency generator for an emergency shelter 100,000 OPM

2013 Thomaston Design and construct a public safety communication system 500,000 OPM2014 Thomaston Phase I construction of track and athletic facility/ Nystrom Park 500,000 DEEP2008 Thompson Construction of a Town Social Services Building 150,000 DSS2011 Thompson Construction of a new building for the Thompson Ecumenical

Empowerment Group

200,000 DSS

2012 Thompson Replace the West Thompson fire department roof 150,000 OPM2012 Thompson Construction of TEEG social services building 65,000 DSS2006 Tolland The completion of the access road to the Tolland Business Park 500,000 DECD2010 Tolland Extension of 5,000 feet of sanitary sewers in the Neighborhood Commercial

Zone

200,000 DEEP

2012 Tolland Construct a multi-use concession facility with restrooms at the Cross Farms

Recreation Complex

394,350 OPM

2013 Tolland Design& installation of artificial field turf at Tolland High School 500,000 DEEP2014 Tolland Public library expansion 500,000 DECD2007 Trumbull Various recreation improvements throughout town 400,000 DEEP2007 Trumbull The development of a fenced-in, off leash dog park 22,000 OPM2008 Trumbull Revitalization of Trumbull Center including the installation of new

sidewalks, light posts, iron fences and benches

150,000 DECD

2008 Trumbull Replacement of the access bridge which spans from the Pequonnock River

in Old Mine Park

150,000 DEEP

2010 Trumbull Renovation and construction of an addition to the Trumbull Animal shelter 82,000 DECD

2010 Trumbull Expansion of parking lots at Beach Park and Indian Ledge Park 80,000 DEEP2010 Trumbull Installation of new flooring at the Teen Center at Indian Ledge Park 43,000 DSS2011 Trumbull Streetscape improvements in Trumbull Center 92,500 DECD2011 Trumbull Trumbull Corporate Industrial and Office Park roadway, signage, fencing

and streetscape improvements

100,000 DECD

2013 Trumbull Reconstruct Corporate Drive 500,000 DOT2014 Trumbull Renovations to Mary J. Sherlach Counseling Center 226,000 OPM2005 Union Mashapaug Road culvert replacement 145,600 DOT2006 Union The reconstruction of Rindge Road 148,620 DOT2007 Union The construction of a recyclables building at town transfer station 64,211 OPM2008 Union Construction of a salt storage building 120,200 DOT2010 Union Rehabilitation and paving of George Heck Road 210,260 DOT2011 Union Reconstruction of Old Brown Road 200,000 DOT2011 Union Purchase and installation of a veterans monument and landscaping 8,500 DECD

2012 Union Reconstruct Old Brown Road 202,350 DOT2013 Union Reconstruct Cemetery Road 261,000 DOT2006 Voluntown The Village Center Development project, including streetscape and other

improvements

500,000 DECD

2008 Voluntown Continuation of streetscape and other improvements in the Village Center 300,000 DECD

2010 Voluntown Construction of a Town Garage 250,000 DECD2011 Voluntown Acquisition of land construction of a public works garage 200,000 DECD2012 Voluntown Reconstruct the Church Street and Route 165 intersection 180,000 DOT2006 Wallingford The acquisition of property needed for the construction of a new fire

station

500,000 DESPP

2010 Wallingford Construction of a section of the Quinnipiac Linear Trail 200,000 DEEP2011 Wallingford Replacement of the Dave J. Doherty roof 200,000 DECD

Page 17: STEAP AWARDS BY TOWN, THEN BY YEAR (FY05 - FY14) · 2010 Bethany Renovation and restoration of the Bethany airport hanger to serve as a community center and emergency shelter, and

STEAP AWARDS BY TOWN, THEN BY YEAR (FY05 - FY14)

2012 Wallingford Construct roadway improvements along North Main Street Ext. 214,200 OPM2013 Wallingford Road, parking improvements to Veteran's Memorial Park 181,000 DEEP2011 Warren Renovation of old Town Hall into a Community/Senior Center 250,000 DSS2007 Washington Improvements to Mygatt Road 390,000 DOT2008 Washington Town Beach at Lake Waramaug Revitalization Project 300,000 DEEP2014 Waterford Design and improvements to Mago Point Park and business 500,000 DECD2006 Watertown The extension and connection of water mains in town 500,000 DEEP2008 Watertown Installation of a metal building for use as an indoor recreational facility in

Veterans' Memorial Park

498,697 DEEP

2010 Watertown Development of a walkway along a portion of the Steele Brook Stream

corridor

200,000 DEEP

2011 Watertown Construction of sidewalks along Main Street 150,000 DECD2011 Westbrook Property acquisition and design and construction of a parking lot in the

town center

250,000 DECD

2013 Westbrook Construct municipal parking lot 500,000 DECD2007 Weston Improvements to Bisceglie/Scribner Park 75,000 OPM2008 Weston Construction of an archival records facility on the grounds of the Weston

Historical Society

250,000 DECD

2011 Weston Drainage improvements at the Revson Ball Fields 86,000 DEEP2014 Weston Soccer/Lacrosse Field - synthetic turf installation 225,000 DEEP2005 Westport Renovation and expansion of Levitt Pavilion 250,000 DEEP2011 Westport Construction of a stage, entry pavilion and improved accessibility to the

river walk at Levitt Pavilion

200,000 DECD

2012 Westport Saugatuck Congregate Housing 300,000 DECD2005 Wethersfield Improvements and enhancements to the Silas Deane 500,000 DECD2006 Wethersfield Capital improvements on the Silas Deane Highway 500,000 DECD2007 Wethersfield The façade improvement loan program for businesses throughout town 200,000 DECD

2010 Wethersfield Completion of streetscape improvements to the Town Center area of the

Silas Deane Highway

250,000 DECD

2011 Wethersfield Silas Deane Highway/Church Street streetscape improvement project 250,000 DECD

2012 Wethersfield Construct improvements to Mill Woods Park 500,000 OPM2014 Wethersfield Commercial façade improvement program 450,000 DECD2006 Willington The installation of a water main from Tolland to Hall School 300,000 DEEP2007 Willington The upgrade of existing storm water drainage system serving Old Farms

Road

200,000 DOT

2008 Willington Installation of water mains from an existing water supply to Center School 350,000 DPH

2010 Willington Construction of improvements at the River Road Recreation Complex 150,000 DEEP

2011 Willington Old Town Hall renovation and restoration 100,000 DECD2012 Willington Reconstruct Turnpike Road, including drainage permits 400,000 OPM2014 Willington Phase III - Reconstruction and drainage improvements of Turnpike Road 500,000 DOT

2006 Wilton The resurfacing of Kristine Lilly Field with "crumb filled" rubber 250,000 DEEP2007 Wilton The reconstruction of two buildings at Ambler Farm 250,000 DECD2011 Wilton Reconstruction of River Road within the town center 200,000 DECD2014 Wilton Wilton Train Station Walkway Project 500,000 DOT2007 Winchester Pedestrian and civic improvements to Village Green also known as East End

Park

477,915 DEEP

2008 Winchester Completion of pedestrian and civic improvements to the "Village Green"

also known as East End Park

370,000 DEEP

2010 Winchester Renovation and improvements to parking areas at Walker Field 130,000 DEEP2011 Winchester Walker Field improvements including construction of new parking 150,000 DEEP

Page 18: STEAP AWARDS BY TOWN, THEN BY YEAR (FY05 - FY14) · 2010 Bethany Renovation and restoration of the Bethany airport hanger to serve as a community center and emergency shelter, and

STEAP AWARDS BY TOWN, THEN BY YEAR (FY05 - FY14)

2012 Winchester Install permanent restrooms at Walker Field 125,000 OPM2006 WindsorLocks Planning studies or the renovation and restoration of the historic Amtrak

train station

225,000 DECD

2007 WindsorLocks The construction of a new pool Bathhouse at Pesci Park 125,000 DEEP2007 WindsorLocks The acquisition of a generator and new automatic doors at the senior

center

59,000 OPM

2010 WindsorLocks Chestnut Street partial road, drainage, sewer and sidewalk project 65,838 DOT2010 WindsorLocks Church Street road, drainage, sewer and sidewalk project 150,000 DOT2011 WindsorLocks Pesci Park improvements including reconstruction of parking lot, upgrade

to parking lot lighting and installation of a light for the Veterans Memorial

Flag

138,553 DEEP

2012 WindsorLocks Construct sidewalks along Main Street and Elm Street 280,000 OPM2014 Winsted/Winchester Redevelop Lambert Kay Building 500,000 DECD2007 Wolcott Improvements to and expansion of the road at Route 69 and Nutmeg Valley

Road

500,000 DOT

2008 Wolcott Improvement of Hitchcock Lake and Cedar Lake including a pedestrian walk

way and water quality improvements

250,000 DEEP

2010 Wolcott Expansion and upgrade of the current firehouse station 200,000 DECD2011 Wolcott Roadway improvements on Town Line Road, Nutmeg Valley Road and

Tosun Road

200,000 DOT

2014 Wolcott Open space land acquisition across from high school 350,000 DEEP2005 Woodbridge Realign traffic flow, improve sight lines 110,000 DOT2005 Woodbridge Sidewalk construction, business district and town center 80,000 OPM2005 Woodbridge Design and construction of a new firehouse 25,000 DESPP2006 Woodbridge The construction of a new firehouse 500,000 DESPP2010 Woodbridge Traffic and safety improvements to the North entrance of Beecher Road

School

200,000 DOT

2011 Woodbridge Design and construction of sidewalks, streetscape improvements and

unified public signage system in business district

200,000 DECD

2012 Woodbridge Renovate the Police Department facility 500,000 OPM2014 Woodbridge Pedestrian & traffic flow improvements - North entrance to Beecher Road

Elementary School

500,000 OPM

2005 Woodbury Expansion and rehabilitation of sidewalks 214,875 DECD2006 Woodbury Road and drainage improvements on Peter Road 155,000 DOT2007 Woodbury Re-establish Pond Valley Road at Reichenback Pond Culvert 65,000 OPM2007 Woodbury The stabilization of the Pomperaug River 88,500 OPM2007 Woodbury Drainage improvements and the replacement of the culvert under Rowley

Road

66,326 OPM

2010 Woodbury Installation of drainage, widening and straightening of Brushy Hill Road 200,000 DOT

2011 Woodbury Reconstruction of Peter Road 141,988 DOT2012 Woodbury Construct roadway improvements on Peter Road 148,012 DOT2013 Woodmont Convert a firehouse into a borough town hall 500,000 OPM2007 Woodstock Various improvements to the town transfer station 30,000 OPM2008 Woodstock Expansion, renovation and rehabilitation of the existing highway facility 250,000 DECD

2010 Woodstock Expansion and renovation of the town highway facility 250,000 DECD2011 Woodstock Replacement of Butts Road Bridge and Peake Brook Road Bridge 200,000 DOT2012 Woodstock Replace the Hopkins Road Bridge 250,000 DOT2014 Woodstock Modify and update Woodstock Transfer Station 450,000 DEEP2009 NO STEAP GRANT AWARDS WERE MADE IN THE YEAR 2009 0