status & plans of the cbm-mpd sts consortium yuri murin for the cbm sts consortium...

14
Status & Plans of the CBM-MPD STS CONSORTIUM Yuri Murin for the CBM STS Consortium JINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP –(ITEP)-GSI

Upload: barnard-berry

Post on 04-Jan-2016

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Status & Plans of the CBM-MPD STS CONSORTIUM Yuri Murin for the CBM STS Consortium JINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP –(ITEP)- GSI

Status & Plans of the CBM-MPD STS CONSORTIUM Yuri Murin for the CBM STS

ConsortiumJINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP –(ITEP)-GSI

Page 2: Status & Plans of the CBM-MPD STS CONSORTIUM Yuri Murin for the CBM STS Consortium JINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP –(ITEP)- GSI

Task sharingLeading organization, assembling and QA

including in-beam tests

Assembling of modules and in-beam tests

Microcables, assembling of modules

Ultra light carbon fiber support and cooling, radiation test center

Double sided microstrip sensors and their QA

Cooling system design and prototyping

FEE and sensitive material supplies

Page 3: Status & Plans of the CBM-MPD STS CONSORTIUM Yuri Murin for the CBM STS Consortium JINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP –(ITEP)- GSI

The base ingredients for success

IBM==Igolkin+Borshchov+Merkin

Access to Russian funding

Recruiting of creative young people

Cooperation within IBM

Access to Radiation Test and in-beam test Facility

Page 4: Status & Plans of the CBM-MPD STS CONSORTIUM Yuri Murin for the CBM STS Consortium JINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP –(ITEP)- GSI

On the Road to CBM STS

Page 5: Status & Plans of the CBM-MPD STS CONSORTIUM Yuri Murin for the CBM STS Consortium JINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP –(ITEP)- GSI

2008 Tasks and their sharing

Technical design and production of CF support and cooling elements @SPbSU & KRI - Igolkin’s talk +

Establishing DSSDs production line @ SINP & ELMA – Merkin’s talk -

Development of n-irradiation site @KRI 20 MeV cyclotron + Murin’s (Jakovlev-Lashaev) talk Upgrading prototypes testing bench with collimated Ru-106 betas @

JINR + Organizing the in-beam testing site @ Protvino + Development of microcables prototypes @ Kharkov + Procenko’s talk Development of assembling site @ Russia (Protvino or/and Dubna) + Application for budgeting + Networking @ JINR or ITEP

Page 6: Status & Plans of the CBM-MPD STS CONSORTIUM Yuri Murin for the CBM STS Consortium JINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP –(ITEP)- GSI

Technical design and production of CF support and cooling elements @SPbSU & KRI ( S.N. Igolkin)

Details are in Sergey Igolkin’s talk

Page 7: Status & Plans of the CBM-MPD STS CONSORTIUM Yuri Murin for the CBM STS Consortium JINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP –(ITEP)- GSI

Establishing DSSDs production line @ SINP & ELMA( M.M. Merkin)

Details are in Michael Merkin’s talk

Page 8: Status & Plans of the CBM-MPD STS CONSORTIUM Yuri Murin for the CBM STS Consortium JINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP –(ITEP)- GSI

Development of n-irradiation testing site @KRI 20 MeV cyclotron

(V.A. Jakovlev, S.I.Lashaev (KRI)+D.E.Karmanov, M.G.Korolev(SINP) supported

by KRI Cyclotron Lab ) Зависимость напряжения полного обеднения от

интегрального потока нейтронов (в пересчёте на энергию нейтронов 1МэВ)

0

50

100

150

200

0 2E+12 4E+12 6E+12 8E+12 1E+13

Интегральный поток (n/см2)V

fdv

(В)

Vfd(init)=20VVfd(init)=30VFit

Equipment is purchased and implementedNeutron field studies done but need to be

confirmedFirst batch of one sided pad diods were

irradiated and analysed

Page 9: Status & Plans of the CBM-MPD STS CONSORTIUM Yuri Murin for the CBM STS Consortium JINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP –(ITEP)- GSI

Building Prototypes testing bench with Ru-106 betas @ JINR ( P.V. Nomokonov)

URGENT NEED: n-XITER FEE electronics + demonstrators

Current Activity:

Preparation of infrastucture and transition to N-xyter electronics and DAQ

Auxiliary electronics for demonstrator tests in 2009 on the way

Page 10: Status & Plans of the CBM-MPD STS CONSORTIUM Yuri Murin for the CBM STS Consortium JINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP –(ITEP)- GSI

Organizing the in-beam testing site @ Protvino

First run with Demonstrator-Zero-B is scheduled for 19.11-1.12.2008

final preparations are on the way

SVD-2 setup at IHEP/ 50 GeV protons with intensity up to 106/ spill

Page 11: Status & Plans of the CBM-MPD STS CONSORTIUM Yuri Murin for the CBM STS Consortium JINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP –(ITEP)- GSI

Development of microcables prototypes @ Kharkov

( V.N. Borshchov )

Demonstrator-Zero-B – talk of M.Procenko

Page 12: Status & Plans of the CBM-MPD STS CONSORTIUM Yuri Murin for the CBM STS Consortium JINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP –(ITEP)- GSI

Development of assembling site @ Russia (Protvino or Dubna or ?)

The next Step: visiting existing ALICE assembling sites at Strassburg (done) and/or Utrecht ( rescheduled for 2009)

To improve networking in FSU countries participating institutes (Skype to every member organization !)

Application for the support of the

3-d Work Meeting of the Consortium (together with MVD ?) in Sortavala, Karelia, June 1-4th,2009 (ready)

Page 13: Status & Plans of the CBM-MPD STS CONSORTIUM Yuri Murin for the CBM STS Consortium JINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP –(ITEP)- GSI

Milestones of the 2009 Work plan

Cooling Scheme Demonstrator ?

Demonstrator 1–A (technological) 1-B (electrical) 1-C (final)

Description: Three 1024 strip sensors connected serially

+short Al cable with pitch adapter

Demonstrator 2–A (technological) 2-B (electrical) 2-C (final)

Description: One 1024 strip sensor +long Al cable with pitch adapter

Ladder Demonstrator

Description: full scale mechanical dummy of the 4-th STS station (noncentral!)

In-Beam test time table ? In-Beam test time table for 2009 ?

(Protvino(April); Nuclotron (?) GSI(?)) Urgent need: Hybrid input pitch ?

Page 14: Status & Plans of the CBM-MPD STS CONSORTIUM Yuri Murin for the CBM STS Consortium JINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP –(ITEP)- GSI

Thank you for your attention!