status of thermal compensation in virgo

18
Roma Tor Vergata LIGO-G070350-00-Z Status of thermal compensation in Virgo

Upload: elia

Post on 08-Jan-2016

46 views

Category:

Documents


0 download

DESCRIPTION

Status of thermal compensation in Virgo. Roma Tor Vergata LIGO-G070350-00-Z. Thermal Lensing. Observed in Virgo through reduction of the sidebands gain. Difference is ~ 0.3%. Building and validating the FE model. Comparison with analytical solution Beausoleil ( LIGO-P020026-00-D ). - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Status of thermal compensation in Virgo

Roma Tor Vergata

LIGO-G070350-00-Z

Status of thermal compensation in Virgo

Page 2: Status of thermal compensation in Virgo

A. Rocchi - 24.05.2007 LSC-Virgo Meeting

Thermal Lensing

• Observed in Virgo through reduction of the sidebands gain.

Page 3: Status of thermal compensation in Virgo

A. Rocchi - 24.05.2007 LSC-Virgo Meeting

Building and validating the FE model

Comparison with analytical solutionBeausoleil (LIGO-P020026-00-D)

0

0,1

0,2

0,3

0,4

0,5

0 0,02 0,04 0,06 0,08 0,1 0,12 0,14 0,16

Analytical Solution (Beausoleil)Ansys - surf151

Tem

pera

ture

(K

)

Radial distance (m)

Difference is ~ 0.3%

Difference is 0.55Hzless than 0.01%

• DRUM MODE

• ANSYS FEM f= 5584.15 Hz

• Experimental value f= 5584.7 Hz

Page 4: Status of thermal compensation in Virgo

A. Rocchi - 24.05.2007 LSC-Virgo Meeting

0 2000 4000 6000 8000 1 104 1.2 104 1.4 104 1.6 104 1.8 104 2 104 2.2 104 2.4 1040

0.005

0.01

0.015

0.02

0.0250.021

0

wi t1( )

ni t2( )

WI ta( )

NI ta( )

256000 t1 t2 ta

Evaluating the losses of the ITMs

Red and blue curves experimental frequency shifts

WI 7.70 ppm NI 2.30 ppm

ITMs effective losses

0 2000 4000 6000 8000 1 104 1.2 104 1.4 104 1.6 104 1.8 104 2 104 2.2 104 2.4 1040

0.005

0.01

0.015

0.02

0.0250.021

1.719 106

wi t1( )

ni t2( )

256000 t1 t2 ta

WI

NI

green and pink FEM results

Page 5: Status of thermal compensation in Virgo

A. Rocchi - 24.05.2007 LSC-Virgo Meeting

Thermal Lensing

-100

-80

-60

-40

-20

0

0 0,02 0,04 0,06 0,08 0,1 0,12 0,14 0,16

OPL - WIOPL - NI

OP

L va

riatio

n (

nm

)

Radial distance (m)

Current Thermal lensing

-140

-120

-100

-80

-60

-40

-20

0

0 0,02 0,04 0,06 0,08 0,1 0,12 0,14 0,16

OPL - G35OPL - G19

OP

L va

riatio

n (

nm

)

Radial distance (m)

Thermal lensing in Virgo+,Plas=25W; Finesse=150(nominal losses)

Parameters as in R. Flaminio VIR-NOT-EGO-1390-324

Page 6: Status of thermal compensation in Virgo

A. Rocchi - 24.05.2007 LSC-Virgo Meeting

TL Compensation• Different solutions already investigated (LIGO):

– Heating ring– Shielded heating ring– CO2 laser

• Proposed TCS for Virgo+: annular heating of ITMs with dc CO2 laser

Desirable properties:• It is easily adaptable as new understanding of the ITF is realized• It does not require a significant vacuum incursion to install as this would

lead to significant down time to the instrument

• “Annular” profile

– from simulations: reasonable parameters to compensate inner radius~2.5 cm, outer radius~14 cm

Page 7: Status of thermal compensation in Virgo

A. Rocchi - 24.05.2007 LSC-Virgo Meeting

TCS Power requirements

Virgo now on WI mirror (losses 7.70ppm)

~1.8 W

Virgo (nominal losses) ~0.4 W

Virgo+ (Grec=19)

(nominal losses)~1.5 W

Virgo+ (Grec=35)

(nominal losses)~2.8 W

Page 8: Status of thermal compensation in Virgo

A. Rocchi - 24.05.2007 LSC-Virgo Meeting

Possible optical layout

AXICON

Page 9: Status of thermal compensation in Virgo

A. Rocchi - 24.05.2007 LSC-Virgo Meeting

10 100 1 1031 10 28

1 10 27

1 10 26

1 10 25

1 10 24

1 10 23

1 10 22

1 10 21

1 10 20

1 1020

0

ztot ( )

z1 ( )

z ( )

zrad ( )

Sh fv( )

1 10310 fv

Evaluation of TCS noise injected in Virgo+, if RIN is stabilized @ 3×10-7/√Hz.

All sources taken into account.

TotalFlexuralThermoelastic+ThermorefractiveRadiation pressure

Noise budget

Page 10: Status of thermal compensation in Virgo

A. Rocchi - 24.05.2007 LSC-Virgo Meeting

How to reduce TCS noise1. The obvious: reduce RIN

Page 11: Status of thermal compensation in Virgo

A. Rocchi - 24.05.2007 LSC-Virgo Meeting

How to reduce TCS noise1. The obvious: reduce RIN

2. Shine both ITMs with the same laser• Noise cancellation is complete only if the power injected on

the ITMs is exactly the same

CO2 Laser

Page 12: Status of thermal compensation in Virgo

A. Rocchi - 24.05.2007 LSC-Virgo Meeting

How to reduce TCS noise1. The obvious: reduce RIN2. Shine both ITMs with the same laser

• Noise cancellation is complete only if the power injected on the ITMs is exactly the same

3. Shine both sides of the ITMs (credit to P. Willems)

10 100 1 1031 10 29

1 10 28

1 10 27

1 10 26

1 10 25

1 10 24

1 10 23

1 10 22

1 10 21

1 10 20

1 1020

0

ztotc ( )

z1c ( )

zc ( )

zradc ( )

Sh fv( )

1 10310 fv

Page 13: Status of thermal compensation in Virgo

A. Rocchi - 24.05.2007 LSC-Virgo Meeting

10 100 1 1031 10 26

1 10 25

1 10 24

1 10 23

1 10 22

1 10 21

1 1021

0

Sh fv( )

ztotc ( )

ztot ( )

1 10310 fv

Noise reduction

TCS laser shines:1. Front face of the ITM2. Both faces of the ITM

Total noise reduced by a factor of 5

Page 14: Status of thermal compensation in Virgo

A. Rocchi - 24.05.2007 LSC-Virgo Meeting

Front heating

Front & back heating

Page 15: Status of thermal compensation in Virgo

A. Rocchi - 24.05.2007 LSC-Virgo Meeting

-500

-400

-300

-200

-100

0

100

0 0,02 0,04 0,06 0,08 0,1 0,12 0,14 0,16

Front heatingFront & back heating

OP

L d

iffe

ren

ce fr

om

cen

tre

(nm

)

Radial distance (m)

No change in the qualityof the compensation

matters doesn’t

Page 16: Status of thermal compensation in Virgo

A. Rocchi - 24.05.2007 LSC-Virgo Meeting

Reaction mass temperature field

Front heating Front & back heating

Page 17: Status of thermal compensation in Virgo

A. Rocchi - 24.05.2007 LSC-Virgo Meeting

Virgo path toward TCSPossible strategy for TCS implementation:

•First step:–Install TCS on Virgo after the Science Run–Time scale: system ready by December 2007/January 2008

•Second step:–TCS for Virgo+, stabilized CO2 laser, improved projector(?)–Time scale: TCS ready by half 2008

Page 18: Status of thermal compensation in Virgo

A. Rocchi - 24.05.2007 LSC-Virgo Meeting