status of changes recommended in 2006 and 2007 by clients sally campbell (for sue willits) pnw fia...

21
Status of Changes Status of Changes Recommended in 2006 and Recommended in 2006 and 2007 by Clients 2007 by Clients Sally Campbell (for Sue Willits) PNW FIA PNW Research Station Portland, OR

Upload: brice-simon

Post on 30-Dec-2015

214 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Status of Changes Recommended in 2006 and 2007 by Clients Sally Campbell (for Sue Willits) PNW FIA PNW Research Station Portland, OR

Status of Changes Recommended Status of Changes Recommended in 2006 and 2007 by Clientsin 2006 and 2007 by Clients

Sally Campbell

(for Sue Willits)PNW FIA

PNW Research Station

Portland, OR

Page 2: Status of Changes Recommended in 2006 and 2007 by Clients Sally Campbell (for Sue Willits) PNW FIA PNW Research Station Portland, OR

Quick review of:

• National Strategic Plan base items (Jan 2007)

Key concerns from:

• Dec 2006 User’s meeting

• Sept 2007 User’s Meeting

FIA response to Plan items and key concerns

Page 3: Status of Changes Recommended in 2006 and 2007 by Clients Sally Campbell (for Sue Willits) PNW FIA PNW Research Station Portland, OR

2007 Strategic Plan Base Elements2007 Strategic Plan Base Elements

• 3-phase program (P1, P2, P3)• Work with principal partners• National Woodland Owner Survey• Primary forest products output (TPO) surveys• Core field measurements• Annual data collection (10% per yr in West; 15% per

year in East)• Compile data annually; post online within 6 months of

data collection• 5-year reports• Special surveys in interior AK, Caribbean and Pacific

Islands

Page 4: Status of Changes Recommended in 2006 and 2007 by Clients Sally Campbell (for Sue Willits) PNW FIA PNW Research Station Portland, OR

Areas of Client ConcernAreas of Client Concern

• Implement the core program• All 50 states – get there!• Become more efficient• Need FIADB transparency and documentation• Keep or drop Phase 3 Indicators? • Consistency with expansion and estimation

methods • Provide geospatial services• Include GRM in 5-yr reports• Expand RS applications

Page 5: Status of Changes Recommended in 2006 and 2007 by Clients Sally Campbell (for Sue Willits) PNW FIA PNW Research Station Portland, OR

Implement Core ProgramImplement Core Program

Collect Core Data (P1, P2, P3)

• Doing this

Post Data Annually

• Doing this

Produce 5-year Reports

• Doing this

Page 6: Status of Changes Recommended in 2006 and 2007 by Clients Sally Campbell (for Sue Willits) PNW FIA PNW Research Station Portland, OR

All States AnnualAll States Annual

• 46 states fully annual (HI, WY, NV, and interior AK remaining)

• Special considerations needed for Pacific and Caribbean Islands and interior AK

• May implement HI and a portion of Interior Alaska if get stimulus $$

• May implement WY and NV if get stimulus $$

Page 7: Status of Changes Recommended in 2006 and 2007 by Clients Sally Campbell (for Sue Willits) PNW FIA PNW Research Station Portland, OR

FIA implementation status, 2006.FIA implementation status, 2006.

Annualized FIAAnnualized FIA

Nevada pilotNevada pilot

American SamoaGuamPalauPuerto RicoVirgin IslandsCommonwealthof the NorthernMariana IslandsFederated Statesof MicronesiaRepublic of theMarshall Islands

Other Islands(periodics)

Not annualizedNot annualized

Page 8: Status of Changes Recommended in 2006 and 2007 by Clients Sally Campbell (for Sue Willits) PNW FIA PNW Research Station Portland, OR

FIA implementation status, 2007.FIA implementation status, 2007.

Annualized FIAAnnualized FIA

American SamoaGuamPalauPuerto RicoVirgin IslandsCommonwealthof the NorthernMariana IslandsFederated Statesof MicronesiaRepublic of theMarshall Islands

Other Islands(periodics)

Not annualizedNot annualized

Page 9: Status of Changes Recommended in 2006 and 2007 by Clients Sally Campbell (for Sue Willits) PNW FIA PNW Research Station Portland, OR

FIA implementation status, 2008.FIA implementation status, 2008.

Annualized FIAAnnualized FIA

American SamoaGuamPalauPuerto RicoVirgin IslandsCommonwealthof the NorthernMariana IslandsFederated Statesof MicronesiaRepublic of theMarshall Islands

Other Islands(periodics)

Not annualizedNot annualized

Page 10: Status of Changes Recommended in 2006 and 2007 by Clients Sally Campbell (for Sue Willits) PNW FIA PNW Research Station Portland, OR

FIA implementation status, 2009/2010 – THE GOALFIA implementation status, 2009/2010 – THE GOAL

Annualized FIAAnnualized FIA

American SamoaGuamPalauPuerto RicoVirgin IslandsCommonwealthof the NorthernMariana IslandsFederated Statesof MicronesiaRepublic of theMarshall Islands

Other Islands(periodics)

Not annualizedNot annualized

Page 11: Status of Changes Recommended in 2006 and 2007 by Clients Sally Campbell (for Sue Willits) PNW FIA PNW Research Station Portland, OR

5-year State Reports5-year State Reports

• 13 completed 2005-2008

• 16 in progress for 2009 publishing

• GRM reported where remeasurement data is available; GRM in NIMS 4.0

• Analysts using core data from FIADB; supplementing with regional add-on data and region-relevant tables

Page 12: Status of Changes Recommended in 2006 and 2007 by Clients Sally Campbell (for Sue Willits) PNW FIA PNW Research Station Portland, OR

5-Yr Reports5-Yr Reports

• 2005: Maine & Indiana• 2006: Iowa• 2007: MN, MS, PN, MI, VA• 2008: WI, GA, TX (east)• 2009: OR, CA• 2009 Planned: 16 reports in progress• Recent reports for Puerto Rico, VI, Am

Samoa, Guam, CNMI

Page 13: Status of Changes Recommended in 2006 and 2007 by Clients Sally Campbell (for Sue Willits) PNW FIA PNW Research Station Portland, OR

Increase Program EfficiencyIncrease Program Efficiency

• National consistency with field manual, data recorder (MIDAS), compilation system (NIMS), and database (FIADB)

• Synchronization of P2 and P3

• 5-year report templates (national and regional)

• Remeasurement cost savings in east; coming soon for west

Page 14: Status of Changes Recommended in 2006 and 2007 by Clients Sally Campbell (for Sue Willits) PNW FIA PNW Research Station Portland, OR

FIA DatabaseFIA Database (transparency and documentation) (transparency and documentation)

Minimize changes• Plot, Subplot, Condition, and Tree tables stableMake available most recent plot measurements (vs most

recent cycle)• All FIA units posting data within 6 months of finishing

data collection (<2-yr-old data in FIADB)Documentation• FIADB 3.0 documentation completed; starting work on

4.0 documentation. http://www.fia.fs.fed.us/tools-data/docs/default.asp

• Change process for all field protocol/manual changes including documentation

Page 15: Status of Changes Recommended in 2006 and 2007 by Clients Sally Campbell (for Sue Willits) PNW FIA PNW Research Station Portland, OR

P3 IndicatorsP3 Indicators

Keep or drop P3 indicators?• High level of response from users to keep P3

(indicators of climate change, carbon contributions, etc)

P3 data needs to be more available• NIMS tables developed but not fully populated• All P3 data will be in FIADB 4.0 – summer 2009

Pre-2003 P3 data in MESS• Local responsibility to convert to NIMS

Page 16: Status of Changes Recommended in 2006 and 2007 by Clients Sally Campbell (for Sue Willits) PNW FIA PNW Research Station Portland, OR

Expansion and Estimation IssuesExpansion and Estimation Issues

Conduct time series analyses• Year by year analyses used in regional data QA

Are Green Book variance estimation methods sufficiently documented and used?

• 3 of 4 units using

Expansion factor documentation • Documented in Green Book; local

documentation of stratification

Page 17: Status of Changes Recommended in 2006 and 2007 by Clients Sally Campbell (for Sue Willits) PNW FIA PNW Research Station Portland, OR

Expand Remote Sensing Expand Remote Sensing

• All regions now using remotely sensed imagery for P1 layer

• Potential for RS in remote or low stocked areas

• Wall-to-wall mapping with RS data

• LIDAR research

Page 18: Status of Changes Recommended in 2006 and 2007 by Clients Sally Campbell (for Sue Willits) PNW FIA PNW Research Station Portland, OR

Consultation with ClientsConsultation with Clients

• Annual national user group meeting• Annual regional user group meetings (10

held in 2008)• Management team meetings (2 per year)• Customer consultations – 1,659 (6,656

hours) in 2008• Spatial Data Services centers at each FIA

unit – 483 requests in 2008 (91% completed)

Page 19: Status of Changes Recommended in 2006 and 2007 by Clients Sally Campbell (for Sue Willits) PNW FIA PNW Research Station Portland, OR

National Woodland Owner SurveyNational Woodland Owner Survey

Publish 5-year summary• Completed and compiled info from 1st cycle• 5-year summary completed – Butler 2008

http://treesearch.fs.fed.us/pubs/15758

On-line data distribution tool• Tool developed:

http://fiatools.fs.fed.us/NWOS/tablemaker.jspPlanning for next survey cycle• Staffed Family Forest Research Center

(UMASS)

Page 20: Status of Changes Recommended in 2006 and 2007 by Clients Sally Campbell (for Sue Willits) PNW FIA PNW Research Station Portland, OR

Range and Urban FIARange and Urban FIA

• Range pilot field data collected; analysis and report planned for 2009

• Urban pilots (TN & CO) data collection will be completed in 2009; urban protocols finalized

Page 21: Status of Changes Recommended in 2006 and 2007 by Clients Sally Campbell (for Sue Willits) PNW FIA PNW Research Station Portland, OR

A Look AheadA Look Ahead2007 Strategic Plan 5-Year Goals2007 Strategic Plan 5-Year Goals

• Complete 5-year reports for all annualized states• Include P1, P2, P3, and regional add-on data in NIMS• Include GRM components with documentation in NIMS• Develop NFS tools and products for forest planning• Complete first cycle and report for NWOS• Annualize TPO surveys and get data online• Complete web tools suite, improve client access to data,

and improve analysis assistance• Develop and document suite of spatial tools and

products• Continue to explore urban, range, other treed land

monitoring