  • 7/27/2019 Status of API Calibration Pits_BR

    1/24

    UH(API) Nuclear Logging CalibrationFacility

    Richard Liu, Professor

    University of HoustonOct. 8, 2011

  • 7/27/2019 Status of API Calibration Pits_BR

    2/24

    Agenda

    History of the API nuclear calibration

    pits

    Introduction to the pits

    The purpose of the facility

    Usage and maintenance

    Operation of the pits

  • 7/27/2019 Status of API Calibration Pits_BR

    3/24

    API Nuclear Calibration Facility

    Gamma Ray and Neutron Porosity

    Gamma Ray Spectroscopy(POTASSIUM-URANIUM-THORIUM, K-U-Th)

  • 7/27/2019 Status of API Calibration Pits_BR

    4/24

    Gamma

    & neutron

    K-U-Th

  • 7/27/2019 Status of API Calibration Pits_BR

    5/24

    N

  • 7/27/2019 Status of API Calibration Pits_BR

    6/24

    Gamma Ray and Neutron

    Porosity

    Built in 1957-1958

    Agreement between API and U ofHouston

    API provided funds

    UH provided land and maintenance

    May cancel agreement after 7 years

  • 7/27/2019 Status of API Calibration Pits_BR

    7/24

    54 Years Ago

  • 7/27/2019 Status of API Calibration Pits_BR

    8/24

    Core Preparation

  • 7/27/2019 Status of API Calibration Pits_BR

    9/24

    Construction

  • 7/27/2019 Status of API Calibration Pits_BR

    10/24

    API Neutron and Gamma Ray

    Calibration Facility (1995)

  • 7/27/2019 Status of API Calibration Pits_BR

    11/24

    Neutron pit Gamma Ray pit

  • 7/27/2019 Status of API Calibration Pits_BR

    12/24

    Technical Information

    API RP 33

    Web site:http://welllogging.egr.uh.edu/Information.html

  • 7/27/2019 Status of API Calibration Pits_BR

    13/24

    2

  • 7/27/2019 Status of API Calibration Pits_BR

    14/24

    K-U-Th Pits

    Constructed in 1983

    Agreement between API and U of

    Houston (1982-1983)

    API provided funds

    UH provided land and maintenance

    Treated as an addition to the gamma rayand neutron pits

  • 7/27/2019 Status of API Calibration Pits_BR

    15/24

    Gamma

    & neutron

    K-U-Th

  • 7/27/2019 Status of API Calibration Pits_BR

    16/24

  • 7/27/2019 Status of API Calibration Pits_BR

    17/24

    Technical Information

    API RP 65

    has not been officially endorsed by API

    Presented in Well Logging Laboratory

    Technical Report No. 23 (2002)

    Web site:

    http://welllogging.egr.uh.edu/Information.html

  • 7/27/2019 Status of API Calibration Pits_BR

    18/24

    Figure 1. KUTh Pit No. 1 (North pit)

  • 7/27/2019 Status of API Calibration Pits_BR

    19/24

    Restrictions for use of this

    borehole. See Sec. 4.7

    KUTh Pit No. 2 (South Pit)

  • 7/27/2019 Status of API Calibration Pits_BR

    20/24

    Physical Conditions

    Gamma Ray and Neutron Pits

    Television camera inspection of neutron pit

    Conducted in April 1987

    Ralph Wiley & Jerry Bowen,Amoco In remarkably good condition

    Confirmed existence of small fractures noted inRP33

    Small grooves and gouges were observed

    Do not seriously affect the utility of the pit

    Document and photos archived at WLL

  • 7/27/2019 Status of API Calibration Pits_BR

    21/24

    Physical Conditions

    K-U-Th Pits

    Television camera inspection

    Conducted in February 1994

    By Halliburton

    Video tape archived at WLL

  • 7/27/2019 Status of API Calibration Pits_BR

    22/24

    Usage of Calibration Facility

    by Company 2009-2011

    Alpha Neutronics, Inc.,

    Schlumberger

    ThruBit LLCTucker Energy Services

    Century Wireline

    Pioneer Wireline Services

    GE Energy

    Probe Technology Services

    US Geological Survey

    Halliburton Energy Services

    Teledrill Inc.,

    Pathfinder

    Weatherford Intl.Etudes et Productions

    Schlumberger

    Tucker

    Hotwell US LtdBakerHughes

    Wood Group

  • 7/27/2019 Status of API Calibration Pits_BR

    23/24

    Usage of calibration pits 2000-2011

    API Usage 2000-2011

    0

    5

    10

    15

    20

    25

    30

    00 01 02 03 04 05 06 07 08 09 10 11

    Year

    A

    P

    I

    U

    s

    a

    e

    Gamma

    Neutron

    Gamma+KUTH

  • 7/27/2019 Status of API Calibration Pits_BR

    24/24

    Annual Reports

    Before 1995:

    Mr. C. O. Liles

    American Petroleum Institute700 North Pearl Street, Suite 1840

    Dallas, TX 75201-2845

    1995-2000Mr. Tim Sampson

    American Petroleum Institute

    1220 L street, NWWashington, DC 20005