Agenda
History of the API nuclear calibration
pits
Introduction to the pits
The purpose of the facility
Usage and maintenance
Operation of the pits
-
7/27/2019 Status of API Calibration Pits_BR
3/24
API Nuclear Calibration Facility
Gamma Ray and Neutron Porosity
Gamma Ray Spectroscopy(POTASSIUM-URANIUM-THORIUM, K-U-Th)
-
7/27/2019 Status of API Calibration Pits_BR
4/24
Gamma
& neutron
K-U-Th
-
7/27/2019 Status of API Calibration Pits_BR
5/24
N
-
7/27/2019 Status of API Calibration Pits_BR
6/24
Gamma Ray and Neutron
Porosity
Built in 1957-1958
Agreement between API and U ofHouston
API provided funds
UH provided land and maintenance
May cancel agreement after 7 years
-
7/27/2019 Status of API Calibration Pits_BR
7/24
54 Years Ago
-
7/27/2019 Status of API Calibration Pits_BR
8/24
Core Preparation
-
7/27/2019 Status of API Calibration Pits_BR
9/24
Construction
-
7/27/2019 Status of API Calibration Pits_BR
10/24
API Neutron and Gamma Ray
Calibration Facility (1995)
-
7/27/2019 Status of API Calibration Pits_BR
11/24
Neutron pit Gamma Ray pit
-
7/27/2019 Status of API Calibration Pits_BR
12/24
Technical Information
API RP 33
Web site:http://welllogging.egr.uh.edu/Information.html
-
7/27/2019 Status of API Calibration Pits_BR
13/24
2
-
7/27/2019 Status of API Calibration Pits_BR
14/24
K-U-Th Pits
Constructed in 1983
Agreement between API and U of
Houston (1982-1983)
API provided funds
UH provided land and maintenance
Treated as an addition to the gamma rayand neutron pits
-
7/27/2019 Status of API Calibration Pits_BR
15/24
Gamma
& neutron
K-U-Th
-
7/27/2019 Status of API Calibration Pits_BR
16/24
-
7/27/2019 Status of API Calibration Pits_BR
17/24
Technical Information
API RP 65
has not been officially endorsed by API
Presented in Well Logging Laboratory
Technical Report No. 23 (2002)
Web site:
http://welllogging.egr.uh.edu/Information.html
-
7/27/2019 Status of API Calibration Pits_BR
18/24
Figure 1. KUTh Pit No. 1 (North pit)
-
7/27/2019 Status of API Calibration Pits_BR
19/24
Restrictions for use of this
borehole. See Sec. 4.7
KUTh Pit No. 2 (South Pit)
-
7/27/2019 Status of API Calibration Pits_BR
20/24
Physical Conditions
Gamma Ray and Neutron Pits
Television camera inspection of neutron pit
Conducted in April 1987
Ralph Wiley & Jerry Bowen,Amoco In remarkably good condition
Confirmed existence of small fractures noted inRP33
Small grooves and gouges were observed
Do not seriously affect the utility of the pit
Document and photos archived at WLL
-
7/27/2019 Status of API Calibration Pits_BR
21/24
Physical Conditions
K-U-Th Pits
Television camera inspection
Conducted in February 1994
By Halliburton
Video tape archived at WLL
-
7/27/2019 Status of API Calibration Pits_BR
22/24
Usage of Calibration Facility
by Company 2009-2011
Alpha Neutronics, Inc.,
Schlumberger
ThruBit LLCTucker Energy Services
Century Wireline
Pioneer Wireline Services
GE Energy
Probe Technology Services
US Geological Survey
Halliburton Energy Services
Teledrill Inc.,
Pathfinder
Weatherford Intl.Etudes et Productions
Schlumberger
Tucker
Hotwell US LtdBakerHughes
Wood Group
-
7/27/2019 Status of API Calibration Pits_BR
23/24
Usage of calibration pits 2000-2011
API Usage 2000-2011
0
5
10
15
20
25
30
00 01 02 03 04 05 06 07 08 09 10 11
Year
A
P
I
U
s
a
e
Gamma
Neutron
Gamma+KUTH
-
7/27/2019 Status of API Calibration Pits_BR
24/24
Annual Reports
Before 1995:
Mr. C. O. Liles
American Petroleum Institute700 North Pearl Street, Suite 1840
Dallas, TX 75201-2845
1995-2000Mr. Tim Sampson
American Petroleum Institute
1220 L street, NWWashington, DC 20005