2019-2022 Statewide Transportation Improvement Program Highway Projects

Upload: others

Post on 05-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

2019-2022Statewide TransportationImprovement ProgramHighway Projects

Page 2: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

2019-2022Statewide TransportationImprovement ProgramTxDOT Abilene DistrictHighway Projects

Page 3: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 3 OF 696

10:03:31 AM TXDOT ABILENE DISTRICT - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

ABILENE NOLAN 0006-02-114 2021 IH 20 C OTHER $ 40,000,000LIMITS FROM US 84 AT ROSCOE PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO .PROJECT CONSTRUCT NEW INTERCHANGE MPO PROJ NUM

DESCR FUNDING CAT(S) 12,4REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,226,457ROW PURCH $ 0 COST OF

CONSTR $ 45,437,909 APPROVEDCONST ENG $ 2,131,037 PHASES

CONTING $ 1,358,593 $ 40,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 51,153,996

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL12 $ 18,000,000 $ 2,000,000 $ 0 $ 0 $ 0 $ 20,000,0004 $ 18,000,000 $ 2,000,000 $ 0 $ 0 $ 0 $ 20,000,000TOTAL $ 36,000,000 $ 4,000,000 $ 0 $ 0 $ 0 $ 40,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 4: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

2019-2022Statewide TransportationImprovement ProgramTxDOT Atlanta DistrictHighway Projects

Page 5: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 5 OF 696

10:03:31 AM TXDOT ATLANTA DISTRICT - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

ATLANTA HARRISON 0919-03-062 2020 CS C,E OTHER $ 942,131LIMITS FROM ON JOHNSON STREET, FIVE NOTCH ROAD, PROJECT SPONSOR CITY OF MARSHALL

REVISION DATE 07/2018LIMITS TO AND POSITIVE PLACE IN MARSHALLPROJECT CONSTRUCT SIDEWALKS MPO PROJ NUM

DESCR FUNDING CAT(S) 9TAP,3LCREMARKS PROJECT NAME: MARSHALL-JOHNSON STREET SIDEWALKS PROJECT 2017 TASA STATE-SELECTED; COMMISSION APPROVED 10/26/17 MO

P7 HISTORY 115076 TOTAL PROJECT COST INFORMATION

PREL ENG $ 42,048ROW PURCH $ 0 COST OF

CONSTR $ 858,121 APPROVEDCONST ENG $ 41,962 PHASES

CONTING $ 9,697 $ 942,131INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 35,698TOTAL CST $ 987,526

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 626,543 $ 0 $ 0 $ 156,636 $ 0 $ 783,1793LC $ 0 $ 0 $ 0 $ 0 $ 158,952 $ 158,952TOTAL $ 626,543 $ 0 $ 0 $ 156,636 $ 158,952 $ 942,131

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

ATLANTA CAMP 3403-01-001 2020 SL 255 C OTHER $ 6,369,192LIMITS FROM FM 1520 PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO US 271PROJECT CONSTRUCT 2-LANE ROADWAY ON NEW LOCATION MPO PROJ NUM

DESCR FUNDING CAT(S) 11REMARKS FORMERLY FM 3535 PROJECT APPENDIX D

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 312,090ROW PURCH $ 1,527,600 COST OF

CONSTR $ 6,369,192 APPROVEDCONST ENG $ 312,090 PHASES

CONTING $ 79,615 $ 6,369,192INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 347,759TOTAL CST $ 8,600,587

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL11 $ 5,095,354 $ 1,273,838 $ 0 $ 0 $ 0 $ 6,369,192TOTAL $ 5,095,354 $ 1,273,838 $ 0 $ 0 $ 0 $ 6,369,192

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 6: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 6 OF 696

10:03:31 AM TXDOT ATLANTA DISTRICT - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

ATLANTA TITUS 1226-02-016 2021 FM 1735 C OTHER $ 8,325,202LIMITS FROM SH 49 PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO 2.1 MI. S. OF SH 49PROJECT RECONSTRUCT EXISTING 2-LANE HIGHWAY TO INCLUDE CENTER TURN LANE MPO PROJ NUM

DESCR FUNDING CAT(S) 11REMARKS PROJECT RECONSTRUCT EXISTING 2 LANE RURAL HIGHWAY TO STANDARDS

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 407,935ROW PURCH $ 0 COST OF

CONSTR $ 8,325,202 APPROVEDCONST ENG $ 407,102 PHASES

CONTING $ 94,075 $ 8,325,202INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 346,328TOTAL CST $ 9,234,314

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL11 $ 6,660,162 $ 1,665,040 $ 0 $ 0 $ 0 $ 8,325,202TOTAL $ 6,660,162 $ 1,665,040 $ 0 $ 0 $ 0 $ 8,325,202

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

ATLANTA UPSHUR 0520-05-040 2021 SH 155 C OTHER $ 4,955,668LIMITS FROM 0.3 MI E OF US 259 PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO GLENDIA DRIVEPROJECT RECONSTRUCT TO 4 LANE DIVIDED SECTION MPO PROJ NUM

DESCR FUNDING CAT(S) 11REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 242,828ROW PURCH $ 373,000 COST OF

CONSTR $ 4,955,668 APPROVEDCONST ENG $ 245,801 PHASES

CONTING $ 98,618 $ 4,955,668INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 185,341TOTAL CST $ 5,915,915

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL11 $ 3,964,534 $ 991,134 $ 0 $ 0 $ 0 $ 4,955,668TOTAL $ 3,964,534 $ 991,134 $ 0 $ 0 $ 0 $ 4,955,668

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 7: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

2019-2022Statewide TransportationImprovement ProgramTxDOT Austin DistrictHighway Projects

Page 8: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 8 OF 696

10:03:31 AM TXDOT AUSTIN DISTRICT - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN BLANCO 0914-23-012 2019 VA C,E OTHER $ 845,966LIMITS FROM VARIOUS LOCATIONS IN CITY OF BLANCO PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO 7TH ST, CHERRY ST and 11TH STPROJECT INSTALL BIKE AND PEDESTRIAN PATHWAY/SIDEWALKS MPO PROJ NUM

DESCR FUNDING CAT(S) 9TAPREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 110,474ROW PURCH $ 0 COST OF

CONSTR $ 736,492 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 845,966INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 846,966

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 793,573 $ 0 $ 0 $ 52,393 $ 0 $ 845,966TOTAL $ 793,573 $ 0 $ 0 $ 52,393 $ 0 $ 845,966

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 9: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

2019-2022Statewide TransportationImprovement ProgramTxDOT Beaumont DistrictHighway Projects

Page 10: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 10 OF 696

10:03:31 AM TXDOT BEAUMONT DISTRICT - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

BEAUMONT TYLER 0200-08-049 2021 US 69 C OTHER $ 70,000,000LIMITS FROM 0.1 Miles South of Black Creek PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO Hardin County LinePROJECT Widen non-freeway from 2 to 4 lanes. MPO PROJ NUM

DESCR FUNDING CAT(S) 12,4REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 3,430,000ROW PURCH $ 0 COST OF

CONSTR $ 70,000,000 APPROVEDCONST ENG $ 3,472,000 PHASES

CONTING $ 1,393,000 $ 70,000,000INDIRECT $ 4,466,000BOND FIN $ 0

PT CHG ORD $ 2,618,000TOTAL CST $ 85,379,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL12 $ 36,000,000 $ 9,000,000 $ 0 $ 0 $ 0 $ 45,000,0004 $ 20,000,000 $ 5,000,000 $ 0 $ 0 $ 0 $ 25,000,000TOTAL $ 56,000,000 $ 14,000,000 $ 0 $ 0 $ 0 $ 70,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 11: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

2019-2022Statewide TransportationImprovement ProgramTxDOT Bryan DistrictHighway Projects

Page 12: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 12 OF 696

10:03:31 AM TXDOT BRYAN DISTRICT - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

BRYAN MILAM 0204-06-060 2019 US 79 C,E ROCKDALE $ 1,596,200LIMITS FROM FM 487 (ACKERMAN STREET) PROJECT SPONSOR CITY OF ROCKDALE

REVISION DATE 07/2018LIMITS TO BURLESON STREETPROJECT CONSTRUCTION OF SIDEWALK, RAMPS, BENCHES & LIGHT’’’’G MPO PROJ NUM

DESCR FUNDING CAT(S) 9TAPREMARKS PROJECT NAME: ROCKDALE - HISTORIC CAMERON AVE SIDEW PROJECT 2017 TASA state-selected; Commission approved 10/26/17 MO

P7 ALKS HISTORY 115076 TOTAL PROJECT COST INFORMATION

PREL ENG $ 62,460ROW PURCH $ 0 COST OF

CONSTR $ 1,512,920 APPROVEDCONST ENG $ 20,820 PHASES

CONTING $ 16,635 $ 1,596,200INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,612,835

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 1,276,960 $ 183,216 $ 0 $ 136,024 $ 0 $ 1,596,200TOTAL $ 1,276,960 $ 183,216 $ 0 $ 136,024 $ 0 $ 1,596,200

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 13: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

2019-2022Statewide TransportationImprovement ProgramTxDOT Corpus Christi DistrictHighway Projects

Page 14: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 14 OF 696

10:03:31 AM TXDOT CORPUS CHRISTI DISTRICT - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

CORPUS CHRISTI SAN PATRICIO 0916-28-073 2019 CS C,E TAFT $ 884,975LIMITS FROM ON GREEN AVE, FROM HWY 181 TO PARK AVE. PROJECT SPONSOR CITY OF TAFT

REVISION DATE 07/2018LIMITS TO ON HARDING STREET FROM GREEN AVE TO RETAMA /WATER PARKPROJECT INSTALLATION OF ADA COMPLIANT SIDEWALKS IN TAFT MPO PROJ NUM

DESCR FUNDING CAT(S) 9TAPREMARKS PROJECT NAME: TAFT - SRTS, PARKS, AND PUBLIC BUILDI PROJECT 2017 TASA state-selected; Commission approved 10/26/17 MO

P7 NGS, IN-KIND CONTRIBUTION $62,000 HISTORY 115076 TOTAL PROJECT COST INFORMATION

PREL ENG $ 94,204ROW PURCH $ 0 COST OF

CONSTR $ 780,037 APPROVEDCONST ENG $ 10,735 PHASES

CONTING $ 9,050 $ 884,975INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 894,026

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 707,980 $ 88,738 $ 0 $ 88,257 $ 0 $ 884,975TOTAL $ 707,980 $ 88,738 $ 0 $ 88,257 $ 0 $ 884,975

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

CORPUS CHRISTI SAN PATRICIO 0087-06-030 2019 BS 359B C,E MATHIS $ 745,200LIMITS FROM ON SAN PATRICIO AVE, FROM NUECES STREET PROJECT SPONSOR CITY OF MATHIS

REVISION DATE 07/2018LIMITS TO SH 359PROJECT INSTALLATION OF SIDEWALKS AND BIKE LANES IN MATHIS MPO PROJ NUM

DESCR FUNDING CAT(S) 9TAPREMARKS PROJECT NAME: MATHIS - SAN PATRICIO AVE (SH 359) SI PROJECT 2017 TASA state-selected; Commission approved 10/26/17 MO

P7 DEWALKS HISTORY 115076 TOTAL PROJECT COST INFORMATION

PREL ENG $ 29,160ROW PURCH $ 0 COST OF

CONSTR $ 706,320 APPROVEDCONST ENG $ 9,720 PHASES

CONTING $ 7,541 $ 745,200INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 752,741

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 596,160 $ 79,056 $ 0 $ 69,984 $ 0 $ 745,200TOTAL $ 596,160 $ 79,056 $ 0 $ 69,984 $ 0 $ 745,200

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 15: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 15 OF 696

10:03:31 AM TXDOT CORPUS CHRISTI DISTRICT - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

CORPUS CHRISTI KLEBERG 0102-04-099 2020 US 77 C OTHER $ 35,000,000LIMITS FROM FM 1356 PROJECT SPONSOR TXDOT CORPUS CHRISTI DISTRICT

REVISION DATE 07/2018LIMITS TO CR 2130PROJECT CONSTRUCT MAINLANES, FRONTAGE ROADS AND STRUCTURES TO CONVERT FOUR LANE DIVIDED MPO PROJ NUM

DESCR HIGHWAY TO FOUR LANE DIVIDED FREEWAY FUNDING CAT(S) 4REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,836,845ROW PURCH $ 8,373,882 COST OF

CONSTR $ 35,000,000 APPROVEDCONST ENG $ 1,780,615 PHASES

CONTING $ 1,034,631 $ 35,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 2,474,118TOTAL CST $ 48,025,973

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 28,000,000 $ 7,000,000 $ 0 $ 0 $ 0 $ 35,000,000TOTAL $ 28,000,000 $ 7,000,000 $ 0 $ 0 $ 0 $ 35,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

CORPUS CHRISTI SAN PATRICIO 0074-05-098 2020 IH 37 C OTHER $ 10,000,000LIMITS FROM NUECES RIVER (CB) PROJECT SPONSOR TXDOT CORPUS CHRISTI DISTRICT

REVISION DATE 07/2018LIMITS TO IH 37/US 77 INTERCHANGEPROJECT WIDEN FREEWAY BY CONSTRUCTING ADDITIONAL 2 TRAVEL LANES NB & 1 ADDITIONAL TRAVEL MPO PROJ NUM

DESCR LANE SB FUNDING CAT(S) 4REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,177,454ROW PURCH $ 0 COST OF

CONSTR $ 10,000,000 APPROVEDCONST ENG $ 1,033,276 PHASES

CONTING $ 43,253 $ 10,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 1,131,797TOTAL CST $ 12,253,983

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 8,000,000 $ 2,000,000 $ 0 $ 0 $ 0 $ 10,000,000TOTAL $ 8,000,000 $ 2,000,000 $ 0 $ 0 $ 0 $ 10,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

CORPUS CHRISTI JIM WELLS 0255-15-005 2020 US 281 C OTHER $ 70,000,000LIMITS FROM 0.5 MI NORTH OF FM 1538 PROJECT SPONSOR TXDOT CORPUS CHRISTI DISTRICT

REVISION DATE 07/2018LIMITS TO 1 MI NORTH OF CR 431PROJECT CONSTRUCT A FOUR LANE RELIEF ROUTE ALONG US 281 AT PREMONT ON NEW LOCATION MPO PROJ NUM

DESCR FUNDING CAT(S) 4,12REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 3,660,745ROW PURCH $ 20,741,470 COST OF

CONSTR $ 70,000,000 APPROVEDCONST ENG $ 3,414,205 PHASES

CONTING $ 6,185,912 $ 70,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 4,392,894TOTAL CST $ 104,002,332

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL12 $ 32,000,000 $ 8,000,000 $ 0 $ 0 $ 0 $ 40,000,0004 $ 24,000,000 $ 6,000,000 $ 0 $ 0 $ 0 $ 30,000,000TOTAL $ 56,000,000 $ 14,000,000 $ 0 $ 0 $ 0 $ 70,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 16: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 16 OF 696

10:03:31 AM TXDOT CORPUS CHRISTI DISTRICT - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

CORPUS CHRISTI ARANSAS 0916-38-013 2021 CS C,E ROCKPORT $ 810,750LIMITS FROM VARIOUS LOCATIONS IN ROCKPORT PROJECT SPONSOR ARANSAS COUNTY

REVISION DATE 07/2018LIMITS TO ON LIVE OAK, 1ST , AUSTIN, AND BAY STREETSPROJECT INSTALLATION OF SIDEWALKS IN ROCKPORT MPO PROJ NUM

DESCR FUNDING CAT(S) 9TAPREMARKS PROJECT NAME: ARANSAS COUNTY - SIDEWALKS PROJECT 2017 TASA state-selected; Commission approved 10/26/17 MO

P7 HISTORY 115076 TOTAL PROJECT COST INFORMATION

PREL ENG $ 31,725ROW PURCH $ 0 COST OF

CONSTR $ 768,450 APPROVEDCONST ENG $ 10,575 PHASES

CONTING $ 8,204 $ 810,750INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 818,954

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 648,600 $ 0 $ 0 $ 162,150 $ 0 $ 810,750TOTAL $ 648,600 $ 0 $ 0 $ 162,150 $ 0 $ 810,750

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

CORPUS CHRISTI SAN PATRICIO 3540-01-001 2021 SH 200 C INGLESIDE $ 10,000,000LIMITS FROM SH 361 PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO FM 1069PROJECT NEW LOCATION TWO LANE ROADWAY MPO PROJ NUM

DESCR FUNDING CAT(S) 3LC,11REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 538,575ROW PURCH $ 5,484,974 COST OF

CONSTR $ 10,000,000 APPROVEDCONST ENG $ 538,575 PHASES

CONTING $ 137,392 $ 10,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 600,127TOTAL CST $ 16,699,516

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL11 $ 4,800,000 $ 1,200,000 $ 0 $ 0 $ 0 $ 6,000,0003LC $ 0 $ 0 $ 0 $ 0 $ 4,000,000 $ 4,000,000TOTAL $ 4,800,000 $ 1,200,000 $ 0 $ 0 $ 4,000,000 $ 10,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 17: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 17 OF 696

10:03:31 AM TXDOT CORPUS CHRISTI DISTRICT - HIGHWAY PROJECTS

FY 2022

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

CORPUS CHRISTI KLEBERG 0102-04-097 2022 US 77 C OTHER $ 80,000,000LIMITS FROM CR 2130 PROJECT SPONSOR TXDOT CORPUS CHRISTI DISTRICT

REVISION DATE 07/2018LIMITS TO 1.5 MI. N. OF SH 285PROJECT CONSTRUCT MAINLANES, FRONTAGE ROADS AND STRUCTURES TO CONVERT FOUR LANE DIVIDED MPO PROJ NUM

DESCR HIGHWAY TO FOUR LANE DIVIDED FREEWAY FUNDING CAT(S) 4REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 4,555,371ROW PURCH $ 4,213,194 COST OF

CONSTR $ 80,000,000 APPROVEDCONST ENG $ 4,248,581 PHASES

CONTING $ 7,697,647 $ 80,000,000INDIRECT $ 5,085,282BOND FIN $ 0

PT CHG ORD $ 5,466,445TOTAL CST $ 105,800,075

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 64,000,000 $ 16,000,000 $ 0 $ 0 $ 0 $ 80,000,000TOTAL $ 64,000,000 $ 16,000,000 $ 0 $ 0 $ 0 $ 80,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 18: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

2019-2022Statewide TransportationImprovement ProgramTxDOT Dallas DistrictHighway Projects

Page 19: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 19 OF 696

10:03:31 AM TXDOT DALLAS DISTRICT - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NAVARRO 0918-18-132 2019 CS C KERENS $ 653,524LIMITS FROM WRIGHT AVE TO NW SECOND ON SH 31 & PROJECT SPONSOR KERENS

REVISION DATE 07/2018LIMITS TO KISD CAMPUS TO SH 31 ON S HUMPHREYPROJECT HUMPHREY SAFE ROUTES TO SCHOOL - CONSTRUCT SIDEWALKS MPO PROJ NUM

DESCR FUNDING CAT(S) 9TAPREMARKS 2015 TAP PRJCT CALL-3 YRS TO OBL FUNDS;AFA 8/16;FPA PROJECT

P7 A 9/16 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 32,978ROW PURCH $ 0 COST OF

CONSTR $ 653,524 APPROVEDCONST ENG $ 32,911 PHASES

CONTING $ 7,605 $ 653,524INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 727,018

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 522,819 $ 49,668 $ 0 $ 81,037 $ 0 $ 653,524TOTAL $ 522,819 $ 49,668 $ 0 $ 81,037 $ 0 $ 653,524

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 20: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 20 OF 696

10:03:31 AM TXDOT DALLAS DISTRICT - HIGHWAY PROJECTS

FY 2022

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NAVARRO 0122-01-033 2022 US 287 E,R OTHER $ 11,609,336LIMITS FROM IH 45 PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO COUNTY ROAD SE 2040PROJECT WIDEN AND RECONSTRUCT 2 LANE RURAL TO 4 LANE URBAN MPO PROJ NUM

DESCR FUNDING CAT(S) S102,SBPEREMARKS NO TXDOT FUNDING COMMITMENT PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,609,336ROW PURCH $ 9,000,000 COST OF

CONSTR $ 53,251,762 APPROVEDCONST ENG $ 2,289,825 PHASES

CONTING $ 95,853 $ 11,609,336INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 67,246,776

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 2,609,336 $ 0 $ 0 $ 0 $ 2,609,336S102 $ 7,200,000 $ 900,000 $ 0 $ 900,000 $ 0 $ 9,000,000TOTAL $ 7,200,000 $ 3,509,336 $ 0 $ 900,000 $ 0 $ 11,609,336

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 21: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

2019-2022Statewide TransportationImprovement ProgramTxDOT El Paso DistrictHighway Projects

Page 22: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 22 OF 696

10:03:31 AM TXDOT EL PASO DISTRICT - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO PRESIDIO 0924-07-019 2019 CS C,E,ENV,ENG PRESIDIO $ 1,568,597LIMITS FROM ON LOUVAIN AND FOOTHILL BU 67(ERMA) PROJECT SPONSOR CITY OF PRESIDIO

REVISION DATE 07/2018LIMITS TO MARKET STREETPROJECT CONSTRUCTION OF SHARED USE PATH AND SIDEWALKS ALONG LOUVAIN STREET AND FOOTHILL MPO PROJ NUM

DESCR BLVD FUNDING CAT(S) 9TAPREMARKS PRESIDIO-LOUVAIN AND FOOTHILL BLVD SRTS;07/18 19-22 PROJECT 02/18 ADD FY19;2017 TASA STATE-SELECT;TTC APPRVD 102617 M

P7 STIP HISTORY O115076 TOTAL PROJECT COST INFORMATION

PREL ENG $ 80,439ROW PURCH $ 0 COST OF

CONSTR $ 1,641,610 APPROVEDCONST ENG $ 80,275 PHASES

CONTING $ 18,550 $ 1,568,597INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 68,291TOTAL CST $ 1,889,165

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 1,254,878 $ 246,270 $ 0 $ 67,450 $ 0 $ 1,568,597TOTAL $ 1,254,878 $ 246,270 $ 0 $ 67,450 $ 0 $ 1,568,597

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO PRESIDIO 0924-07-018 2019 CS C,E,ENV,ENG PRESIDIO $ 1,620,398LIMITS FROM ON BLEDSOE BLVD FROM LAFAYETE ST PROJECT SPONSOR CITY OF PRESIDIO

REVISION DATE 07/2018LIMITS TO FOOTHILL BLVDPROJECT CONSTRUCTION OF SHARED USE PATH AND SIDEWALKS ALONG BLEDSOE BLVD MPO PROJ NUM

DESCR FUNDING CAT(S) 9TAPREMARKS PRESIDIO-BLEDSOE BLVD SUP AND SIDEWALKS; 07/18 19-2 PROJECT 02/18 ADD FY 19;2017 TASA STATE-SELECT;TTC APPRD 102617 M

P7 2 STIP HISTORY O115076 TOTAL PROJECT COST INFORMATION

PREL ENG $ 83,095ROW PURCH $ 0 COST OF

CONSTR $ 1,695,822 APPROVEDCONST ENG $ 82,926 PHASES

CONTING $ 19,163 $ 1,620,398INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 70,546TOTAL CST $ 1,951,552

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 1,296,318 $ 254,402 $ 0 $ 69,677 $ 0 $ 1,620,398TOTAL $ 1,296,318 $ 254,402 $ 0 $ 69,677 $ 0 $ 1,620,398

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO PRESIDIO 0924-07-017 2019 CS C,E,ENV,ENG PRESIDIO $ 973,000LIMITS FROM ON THIRD ST./FROM FM 170-MILLINGTON PROJECT SPONSOR CITY OF PRESIDIO

REVISION DATE 07/2018LIMITS TO EAST OREILLY STREETPROJECT CONSTRUCTION OF SHARED USE PATH AND SIDEWALKS ALONG THIRD ST REET-HIGH/MIDDLE SC MPO PROJ NUM

DESCR HOOL_CONNECTOR FUNDING CAT(S) 9TAPREMARKS PRESIDIO-HIGH/MIDDLE SCHOOL CONNECTION; 07/18 19-22 PROJECT 02/18 ADD FY19; 2017 TASA STATE-SELECT; TTC APPRD 102617

P7 STIP HISTORY MO115076 TOTAL PROJECT COST INFORMATION

PREL ENG $ 49,896ROW PURCH $ 0 COST OF

CONSTR $ 1,018,290 APPROVEDCONST ENG $ 49,794 PHASES

CONTING $ 11,506 $ 973,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 42,360TOTAL CST $ 1,129,486

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 778,400 $ 152,761 $ 0 $ 41,839 $ 0 $ 973,000TOTAL $ 778,400 $ 152,761 $ 0 $ 41,839 $ 0 $ 973,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 23: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 23 OF 696

10:03:31 AM TXDOT EL PASO DISTRICT - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO PRESIDIO 0924-07-016 2019 CS C,E,ENV,ENG PRESIDIO $ 1,151,500LIMITS FROM (ON HURD AVE) MARKET ST PROJECT SPONSOR CITY OF PRESIDIO

REVISION DATE 07/2018LIMITS TO (ON REDE FRANCO RD) RANCH RDPROJECT SHARED USE PATH FOR PEDESTRIANS AND CYCLISTS (ON HURD AVE AN D REDE FRANCO RD) MPO PROJ NUM

DESCR FUNDING CAT(S) 9TAPREMARKS 07/2018 19-22 STIP;PRESIDIO‐HURD/REDE FRANCO PROJECT 02/18 AMEND FY 2018 TO 2019;2015 TAP STATE-SELECT

P7 SUP;IN-KIND $51,818. HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 58,680ROW PURCH $ 0 COST OF

CONSTR $ 1,197,560 APPROVEDCONST ENG $ 58,561 PHASES

CONTING $ 13,532 $ 1,151,500INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 49,819TOTAL CST $ 1,328,333

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 921,200 $ 188,846 $ 0 $ 41,454 $ 0 $ 1,151,500TOTAL $ 921,200 $ 188,846 $ 0 $ 41,454 $ 0 $ 1,151,500

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO PRESIDIO 0924-07-015 2019 VA C,E,ENV,ENG PRESIDIO $ 1,055,700LIMITS FROM ON RANCH RD AND OREILY ST PROJECT SPONSOR CITY OF PRESIDIO

REVISION DATE 07/2018LIMITS TO (BUNTON AVE TO REDE FRANCO)PROJECT CONSTRUCT SIDEWALKS, SHARED USE PATH AND CURB & GUTTER (ON RANCH RD AND OREILY S MPO PROJ NUM

DESCR T) FUNDING CAT(S) 9TAPREMARKS 07/18 19-22 STIP;PRESIDIO‐RANCH/OREILY SIDEWL PROJECT 02/18 AMEND FY 2018 TO 2019;2015 TAP STATE-SELECT

P7 K;PS&E INKIND $47507 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 53,798ROW PURCH $ 0 COST OF

CONSTR $ 1,097,928 APPROVEDCONST ENG $ 53,688 PHASES

CONTING $ 12,406 $ 1,055,700INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 45,673TOTAL CST $ 1,217,820

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 844,560 $ 165,745 $ 0 $ 45,395 $ 0 $ 1,055,700TOTAL $ 844,560 $ 165,745 $ 0 $ 45,395 $ 0 $ 1,055,700

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO PRESIDIO 0924-07-014 2019 CS C,E,ENV,ENG PRESIDIO $ 338,460LIMITS FROM FOOTHILL BLVD, MARKET ST, HURD ST PROJECT SPONSOR PRESIDIO COUNTY

REVISION DATE 07/2018LIMITS TO .PROJECT ADD SIDEWALKS, CURB & GUTTER AND BIKE LANES ON FOOTHILL BLVD , MARKET ST AND HUR MPO PROJ NUM

DESCR D ST FUNDING CAT(S) 9TAPREMARKS 07/2018 19-22 STIP PROJECT 02/18 AMEND FY 2018 TO 2019;2015 TAP STATE-SELECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 17,248ROW PURCH $ 0 COST OF

CONSTR $ 351,998 APPROVEDCONST ENG $ 17,213 PHASES

CONTING $ 3,978 $ 338,460INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 14,643TOTAL CST $ 405,080

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 270,768 $ 55,507 $ 0 $ 12,185 $ 0 $ 338,460TOTAL $ 270,768 $ 55,507 $ 0 $ 12,185 $ 0 $ 338,460

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 24: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 24 OF 696

10:03:31 AM TXDOT EL PASO DISTRICT - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO PRESIDIO 0924-07-013 2019 VA C,E,ENV,ENG MARFA $ 230,240LIMITS FROM COLUMBIA, ABBOTT & AUSTIN STREET PROJECT SPONSOR PRESIDIO COUNTY

REVISION DATE 07/2018LIMITS TO .PROJECT IMPROVE 3 PED BRIDGES ON COLUMBIA, ABBOT & AUSTIN ST AND CON STRUCT SIDEWALKS ON MPO PROJ NUM

DESCR AUSTIN ST FUNDING CAT(S) 9TAPREMARKS 07/2018 19-22 STIP PROJECT 02/18 AMEND FY 2018 TO 2019;2015 TAP STATE-SELECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 11,733ROW PURCH $ 0 COST OF

CONSTR $ 239,450 APPROVEDCONST ENG $ 11,709 PHASES

CONTING $ 2,706 $ 230,240INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 9,961TOTAL CST $ 275,559

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 184,192 $ 37,759 $ 0 $ 8,289 $ 0 $ 230,240TOTAL $ 184,192 $ 37,759 $ 0 $ 8,289 $ 0 $ 230,240

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 25: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 25 OF 696

10:03:31 AM TXDOT EL PASO DISTRICT - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO PRESIDIO 0924-07-020 2020 CS C,E,ENV,ENG PRESIDIO $ 326,542LIMITS FROM ON BAGLEY,SILVER,DURAN PROJECT SPONSOR PRESIDIO COUNTY

REVISION DATE 07/2018LIMITS TO ON VELA AND WILSON STREETPROJECT CONSTRUCTION OF SIDEWALKS ALONG VARIOUS STREET IN THE CITY O F PRESIDIO MPO PROJ NUM

DESCR FUNDING CAT(S) 9TAPREMARKS PRESIDIO CO-SRTS BAGLEY-SILVER-WILSON;07/18 19-22 S PROJECT 02/18 ADD FY20;2017 TASA STATE-SELECT;TTC APPRVD 102617 M

P7 TIP HISTORY O115076 TOTAL PROJECT COST INFORMATION

PREL ENG $ 17,415ROW PURCH $ 0 COST OF

CONSTR $ 355,411 APPROVEDCONST ENG $ 17,380 PHASES

CONTING $ 4,016 $ 326,542INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 14,785TOTAL CST $ 409,007

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 261,234 $ 51,267 $ 0 $ 14,041 $ 0 $ 326,542TOTAL $ 261,234 $ 51,267 $ 0 $ 14,041 $ 0 $ 326,542

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO PRESIDIO 0104-06-027 2020 US 67 C,E,ENV,ENG MARFA $ 306,603LIMITS FROM WACO STREET PROJECT SPONSOR PRESIDIO COUNTY

REVISION DATE 07/2018LIMITS TO 1900 FT S OF WACO STREETPROJECT CONSTRUCTION OF SHARED USE BICYCLE AND PEDESTRIAN FACILITY A LONG US 67 IN THE C MPO PROJ NUM

DESCR ITY OF MARFA FUNDING CAT(S) 9TAPREMARKS MARFA-US67 SUP;07/18 19-22 STIP PROJECT 02/18 ADD FY20;2017 TASA STATE-SELECT;TTC APPRVD 102617 M

P7 HISTORY O115076 TOTAL PROJECT COST INFORMATION

PREL ENG $ 16,352ROW PURCH $ 0 COST OF

CONSTR $ 333,709 APPROVEDCONST ENG $ 16,318 PHASES

CONTING $ 3,771 $ 306,603INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 13,882TOTAL CST $ 384,033

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 245,282 $ 48,137 $ 0 $ 13,184 $ 0 $ 306,603TOTAL $ 245,282 $ 48,137 $ 0 $ 13,184 $ 0 $ 306,603

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO JEFF DAVIS 0924-10-007 2020 VA C,E,ENV,ENG JEFF DAVIS $ 350,000LIMITS FROM WITHIN DAVIS MOUNTAIN STATE PARK PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO .PROJECT SEAL COAT PARK ROADS, PARKING LOTS AND CAMPSITE PULLOUTS MPO PROJ NUM

DESCR FUNDING CAT(S) 10REMARKS 07/18 19-22 STIP;FOR INFO PURPOSES PROJECT 02/17 ADD FY20;FOR INFO PURPOSES

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 18,549ROW PURCH $ 0 COST OF

CONSTR $ 378,559 APPROVEDCONST ENG $ 9,615 PHASES

CONTING $ 2,119 $ 350,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 6,511TOTAL CST $ 408,842

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL10 $ 0 $ 350,000 $ 0 $ 0 $ 0 $ 350,000TOTAL $ 0 $ 350,000 $ 0 $ 0 $ 0 $ 350,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 26: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 26 OF 696

10:03:31 AM TXDOT EL PASO DISTRICT - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO BREWSTER 0924-35-021 2020 VA C,E,ENV,ENG BREWSTER $ 315,321LIMITS FROM WITHIN BLACK GAP WMA PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO .PROJECT IMPROVE EXISTING UNPAVED WMA ROAD WITH ADDITIONAL ROAD BASE MATERIAL MPO PROJ NUM

DESCR FUNDING CAT(S) 10REMARKS 07/18 19-22 STIP; FOR INFO PURPOSES PROJECT 02/17 ADD FY20; FOR INFO PURPOSES

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 16,711ROW PURCH $ 0 COST OF

CONSTR $ 341,051 APPROVEDCONST ENG $ 16,677 PHASES

CONTING $ 3,853 $ 315,321INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 14,187TOTAL CST $ 378,292

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL10 $ 0 $ 315,321 $ 0 $ 0 $ 0 $ 315,321TOTAL $ 0 $ 315,321 $ 0 $ 0 $ 0 $ 315,321

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 27: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

2019-2022Statewide TransportationImprovement ProgramTxDOT Fort Worth DistrictHighway Projects

Page 28: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 28 OF 696

10:03:31 AM TXDOT FORT WORTH DISTRICT - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH PALO PINTO 0902-39-035 2019 VA C,E OTHER $ 5,300,000LIMITS FROM VARIOUS LOCATIONS @ PALO PINTO_MTNS PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO STATE PARK OFF OF FM 2372PROJECT CONSTRUCT NEW STATE PARK ROADWAYS AND CAMPING LOOPS MPO PROJ NUM

DESCR FUNDING CAT(S) 10REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 271,788ROW PURCH $ 0 COST OF

CONSTR $ 5,546,698 APPROVEDCONST ENG $ 271,788 PHASES

CONTING $ 69,333 $ 5,300,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 6,159,607

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL10 $ 4,240,000 $ 1,060,000 $ 0 $ 0 $ 0 $ 5,300,000TOTAL $ 4,240,000 $ 1,060,000 $ 0 $ 0 $ 0 $ 5,300,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 29: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

2019-2022Statewide TransportationImprovement ProgramTxDOT Laredo DistrictHighway Projects

Page 30: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 30 OF 696

10:03:31 AM TXDOT LAREDO DISTRICT - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

LAREDO VAL VERDE 0922-11-032 2019 VA C DEL RIO $ 3,632,139LIMITS FROM 109 LF SOUTH OF UP-RR TRACKS. PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO ALDERETE LANEPROJECT REHABILITATION OF EXISTING HIGHWAY MPO PROJ NUM

DESCR FUNDING CAT(S) 10REMARKS PROJECT FOR THE CONSTRUCTION OF A NEW LOCATION 2 LANE ROADWAY WIT

P7 HISTORY H A CONTINUES LEFT TURNING LANE TOTAL PROJECT COST INFORMATION

PREL ENG $ 169,534ROW PURCH $ 100,000 COST OF

CONSTR $ 3,632,139 APPROVEDCONST ENG $ 169,534 PHASES

CONTING $ 1,730 $ 3,632,139INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 156,940TOTAL CST $ 4,229,877

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL10 $ 2,970,939 $ 363,660 $ 0 $ 297,540 $ 0 $ 3,632,139TOTAL $ 2,970,939 $ 363,660 $ 0 $ 297,540 $ 0 $ 3,632,139

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 31: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 31 OF 696

10:03:31 AM TXDOT LAREDO DISTRICT - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

LAREDO LA SALLE 0922-20-015 2020 CS C OTHER $ 6,745,032LIMITS FROM IH 35 PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO SH 97PROJECT CONSTRUCT 4 LANE UNDIVIDED FACILITY WITH A CENTER LEFT TURN LANE MPO PROJ NUM

DESCR FUNDING CAT(S) 3LCREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 330,507ROW PURCH $ 0 COST OF

CONSTR $ 6,745,032 APPROVEDCONST ENG $ 330,507 PHASES

CONTING $ 84,313 $ 6,745,032INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 7,490,359

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 6,745,032 $ 6,745,032TOTAL $ 0 $ 0 $ 0 $ 0 $ 6,745,032 $ 6,745,032

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

LAREDO LA SALLE 0017-08-087 2020 IH 35 C OTHER $ 4,922,111LIMITS FROM 0.235 MI SOUTH OF RRGS AT RELIEF RT PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO 0.235 MI NORTH OF RRGS AT RELIEF RTPROJECT CONSTUCT 2 LANE UNDIVIDED FACILITY WITH ELEVATED INTERSECTION MPO PROJ NUM

DESCR FUNDING CAT(S) 3LCREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 241,183ROW PURCH $ 0 COST OF

CONSTR $ 4,922,111 APPROVEDCONST ENG $ 230,847 PHASES

CONTING $ 147,171 $ 4,922,111INDIRECT $ 73,731BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 5,615,043

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 4,922,111 $ 4,922,111TOTAL $ 0 $ 0 $ 0 $ 0 $ 4,922,111 $ 4,922,111

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 32: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

2019-2022Statewide TransportationImprovement ProgramTxDOT Lufkin DistrictHighway Projects

Page 33: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 33 OF 696

10:03:31 AM TXDOT LUFKIN DISTRICT - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

LUFKIN ANGELINA 0200-03-021 2019 US 69 C OTHER $ 34,900,000LIMITS FROM FM 1270 PROJECT SPONSOR LUFKIN DISTRICT

REVISION DATE 07/2018LIMITS TO JASPER COUNTY LINEPROJECT WIDEN from 2 to 4 LANES, DIVIDED MPO PROJ NUM

DESCR FUNDING CAT(S) 4REMARKS PROJECT widen to 4 lanes, divided, trunk system; added to 17-20 T

P7 HISTORY IP for PE; added to 19-22 TIP as individually listed project (7/18rev)

TOTAL PROJECT COST INFORMATIONPREL ENG $ 1,789,699

ROW PURCH $ 3,965,008 COST OFCONSTR $ 36,524,484 APPROVED

CONST ENG $ 1,811,614 PHASESCONTING $ 726,837 $ 34,900,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 1,366,015TOTAL CST $ 46,183,657

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 27,920,000 $ 6,980,000 $ 0 $ 0 $ 0 $ 34,900,000TOTAL $ 27,920,000 $ 6,980,000 $ 0 $ 0 $ 0 $ 34,900,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

LUFKIN NACOGDOCHES 0176-01-081 2019 US 59 C OTHER $ 75,551,000LIMITS FROM SH 7 PROJECT SPONSOR LUFKIN DISTRICT

REVISION DATE 07/2018LIMITS TO 1.242 MI SOUTH OF SPRADLEY STPROJECT CONSTRUCT TWO-WAY DIRECT CONNECTION MPO PROJ NUM

DESCR FUNDING CAT(S) 12,4REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 3,874,315ROW PURCH $ 13,570,932 COST OF

CONSTR $ 79,067,661 APPROVEDCONST ENG $ 3,708,273 PHASES

CONTING $ 2,364,123 $ 75,551,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 3,550,138TOTAL CST $ 106,135,442

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL12 $ 30,220,400 $ 7,555,100 $ 0 $ 0 $ 0 $ 37,775,5004 $ 30,220,400 $ 7,555,100 $ 0 $ 0 $ 0 $ 37,775,500TOTAL $ 60,440,800 $ 15,110,200 $ 0 $ 0 $ 0 $ 75,551,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 34: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 34 OF 696

10:03:31 AM TXDOT LUFKIN DISTRICT - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

LUFKIN ANGELINA 2553-01-115 2020 US 59 C OTHER $ 13,557,000LIMITS FROM OLD MOFFETT ROAD PROJECT SPONSOR LUFKIN DISTRICT

REVISION DATE 07/2018LIMITS TO SH 103PROJECT CONVERT TO 4 LANE FWY WITH FRONTAGE ROADS MPO PROJ NUM

DESCR FUNDING CAT(S) 4REMARKS PROJECT added to 17-20TIP for PE; added to 19-22TIP (7/18rev) as

P7 HISTORY individually listed project TOTAL PROJECT COST INFORMATION

PREL ENG $ 664,293ROW PURCH $ 5,476,286 COST OF

CONSTR $ 13,557,000 APPROVEDCONST ENG $ 643,957 PHASES

CONTING $ 374,173 $ 13,557,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 894,762TOTAL CST $ 21,610,471

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 10,845,600 $ 2,711,400 $ 0 $ 0 $ 0 $ 13,557,000TOTAL $ 10,845,600 $ 2,711,400 $ 0 $ 0 $ 0 $ 13,557,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

LUFKIN ANGELINA 0176-03-097 2020 US 59 C OTHER $ 142,055,910LIMITS FROM FM 2108 PROJECT SPONSOR LUFKIN DISTRICT

REVISION DATE 07/2018LIMITS TO 1.15 MI SOUTH OF WHITE OAK CREEKPROJECT CONSTRUCT NEW 4 LANE FREEWAY AT DIBOLL MPO PROJ NUM

DESCR FUNDING CAT(S) 12,4REMARKS PROJECT construct 4 lane freeway at Diboll; received funds to res

P7 HISTORY tart PE and ROW (11/12rev); added to 15-18TIP (7/14rev);added to 19-22TIP as individually listed project (7/18rev)

TOTAL PROJECT COST INFORMATIONPREL ENG $ 7,356,519

ROW PURCH $ 4,903,001 COST OFCONSTR $ 150,133,052 APPROVED

CONST ENG $ 6,861,080 PHASESCONTING $ 12,431,016 $ 142,055,910INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 8,827,823TOTAL CST $ 190,512,491

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL12 $ 48,000,000 $ 12,000,000 $ 0 $ 0 $ 0 $ 60,000,0004 $ 65,644,728 $ 16,411,182 $ 0 $ 0 $ 0 $ 82,055,910TOTAL $ 113,644,728 $ 28,411,182 $ 0 $ 0 $ 0 $ 142,055,910

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

LUFKIN TRINITY 0911-40-029 2020 VA C,E GROVETON $ 923,223LIMITS FROM AT VARIOUS LOCATIONS PROJECT SPONSOR CITY OF GROVETON

REVISION DATE 07/2018LIMITS TO ON DEVINE ST, FRONT ST, AND MAIN ST, SOUTH OF SH 94/ 1ST STPROJECT CONSTRUCT SIDEWALKS TO PROMOTE PEDESTRIAN TRAFFIC MPO PROJ NUM

DESCR FUNDING CAT(S) 9TAPREMARKS PROJECT NAME : GROVETON - DOWNTOWN SIDEWALKS, IN-KI PROJECT 2017 TASA state-selected; Commission approved 10/26/17 MO

P7 ND CONTRIBUTION $43,963 HISTORY 115076 TOTAL PROJECT COST INFORMATION

PREL ENG $ 78,369ROW PURCH $ 0 COST OF

CONSTR $ 833,387 APPROVEDCONST ENG $ 11,469 PHASES

CONTING $ 9,655 $ 923,223INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 932,880

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 738,579 $ 117,745 $ 0 $ 66,899 $ 0 $ 923,223TOTAL $ 738,579 $ 117,745 $ 0 $ 66,899 $ 0 $ 923,223

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 35: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 35 OF 696

10:03:31 AM TXDOT LUFKIN DISTRICT - HIGHWAY PROJECTS

FY 2022

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

LUFKIN POLK 0176-05-104 2022 US 59 C OTHER $ 69,600,000LIMITS FROM 3.0 MI S OF US 287 PROJECT SPONSOR LUFKIN DISTRICT

REVISION DATE 07/2018LIMITS TO US 287PROJECT CONSTRUCT NEW 4 LANE FREEWAY WEST SIDE OF CORRIGAN MPO PROJ NUM

DESCR FUNDING CAT(S) 4REMARKS PROJECT received funds to restart PE and ROW (11/12rev); added to

P7 HISTORY 15-18TIP(07/14rev); added to 19-22TIP(7/18rev) as individually listed project

TOTAL PROJECT COST INFORMATIONPREL ENG $ 3,975,627

ROW PURCH $ 2,850,000 COST OFCONSTR $ 81,135,253 APPROVED

CONST ENG $ 3,707,881 PHASESCONTING $ 6,717,998 $ 69,600,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 4,770,752TOTAL CST $ 103,157,511

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 55,680,000 $ 13,920,000 $ 0 $ 0 $ 0 $ 69,600,000TOTAL $ 55,680,000 $ 13,920,000 $ 0 $ 0 $ 0 $ 69,600,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

LUFKIN POLK 0176-04-056 2022 US 59 C OTHER $ 88,600,000LIMITS FROM 3.4 MI N OF US 287 PROJECT SPONSOR LUFKIN DISTRICT

REVISION DATE 07/2018LIMITS TO US 287PROJECT CONSTRUCT NEW 4 LANE FREEWAY WEST SIDE OF CORRIGAN MPO PROJ NUM

DESCR FUNDING CAT(S) 4REMARKS PROJECT received funds to restart PE and ROW (11/12rev); added to

P7 HISTORY 15-18TIP(7/14rev); added to 19-22TIP (7/18rev) as individually listed project

TOTAL PROJECT COST INFORMATIONPREL ENG $ 5,060,928

ROW PURCH $ 2,900,000 COST OFCONSTR $ 103,284,244 APPROVED

CONST ENG $ 4,720,089 PHASESCONTING $ 8,551,935 $ 88,600,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 6,073,113TOTAL CST $ 130,590,309

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 70,880,000 $ 17,720,000 $ 0 $ 0 $ 0 $ 88,600,000TOTAL $ 70,880,000 $ 17,720,000 $ 0 $ 0 $ 0 $ 88,600,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

LUFKIN ANGELINA 0176-02-118 2022 US 59 C OTHER $ 20,650,000LIMITS FROM FM 2021 PROJECT SPONSOR LUFKIN DISTRICT

REVISION DATE 07/2018LIMITS TO 0.34 MI NORTH OF LP 287PROJECT CONVERT TO 4 LANE FWY WITH FRONTAGE ROADS MPO PROJ NUM

DESCR FUNDING CAT(S) 4REMARKS PROJECT convert to 4 lane freeway with frontage roads; added to 1

P7 HISTORY 7-20TIP for PE; added to 19-22 TIP (7/18rev) as individually listed project

TOTAL PROJECT COST INFORMATIONPREL ENG $ 1,011,850

ROW PURCH $ 334,000 COST OFCONSTR $ 20,650,000 APPROVED

CONST ENG $ 980,875 PHASESCONTING $ 569,940 $ 20,650,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 1,362,900TOTAL CST $ 24,909,565

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 16,520,000 $ 4,130,000 $ 0 $ 0 $ 0 $ 20,650,000TOTAL $ 16,520,000 $ 4,130,000 $ 0 $ 0 $ 0 $ 20,650,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 36: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

2019-2022Statewide TransportationImprovement ProgramTxDOT Odessa DistrictHighway Projects

Page 37: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 37 OF 696

10:03:31 AM TXDOT ODESSA DISTRICT - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

ODESSA CRANE 0229-03-037 2019 US 385 C,E,R OTHER $ 30,000,000LIMITS FROM LILLEY LANE IN CRANE PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO CASTLE GAP ROADPROJECT WIDENING FROM 2-LANE TO 4-LANE DIVIDED HIGHWAY MPO PROJ NUM

DESCR FUNDING CAT(S) 4,12REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,528,800ROW PURCH $ 0 COST OF

CONSTR $ 31,200,000 APPROVEDCONST ENG $ 1,547,520 PHASES

CONTING $ 0 $ 30,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 34,276,320

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL12 $ 12,000,000 $ 3,000,000 $ 0 $ 0 $ 0 $ 15,000,0004 $ 12,000,000 $ 3,000,000 $ 0 $ 0 $ 0 $ 15,000,000TOTAL $ 24,000,000 $ 6,000,000 $ 0 $ 0 $ 0 $ 30,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 38: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

2019-2022Statewide TransportationImprovement ProgramTxDOT Paris DistrictHighway Projects

Page 39: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 39 OF 696

10:03:31 AM TXDOT PARIS DISTRICT - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PARIS RED RIVER 0901-27-053 2019 VA C,E OTHER $ 1,027,689LIMITS FROM LAMAR COUNTY LINE (RAILBANKED COOR) PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO 0.2 MI E OF FM 2120 (BAGWELL)PROJECT 10-FOOT WIDE SHARED USE PATH ON RAILBANKED CORRIDOR (NORTHEAST TEXAS TRAIL) MPO PROJ NUM

DESCR FUNDING CAT(S) 3LCREMARKS RED RIVER COUNTY, ST-SELECTED 2017 TASA, $34,000 IN PROJECT TXDOT 2017 TASA SELECTION; COMMISSION APPROVED 10/26/17 M

P7 -KIND HISTORY O 115076 TOTAL PROJECT COST INFORMATION

PREL ENG $ 52,887ROW PURCH $ 0 COST OF

CONSTR $ 1,079,327 APPROVEDCONST ENG $ 52,779 PHASES

CONTING $ 12,196 $ 1,027,689INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,197,189

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 1 $ 0 $ 1TOTAL $ 0 $ 0 $ 0 $ 1 $ 0 $ 1

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PARIS LAMAR 0901-29-090 2019 VA C,E OTHER $ 1,304,001LIMITS FROM BOIS D’’ARC ST (ON RAILROAD CORR) PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO RRCR 2113 (LAMAR/RED RIVER CL)PROJECT 10-FOOT WIDE SHARED USE PATH ON RAILBANKED CORRIDOR (NORTHEAST TEXAS TRAIL) MPO PROJ NUM

DESCR FUNDING CAT(S) 3LCREMARKS LAMAR COUNTY, ST-SELECTED 2017 TASA, $69,000 IN-KIN PROJECT TXDOT 2017 TASA SELECTION; COMMISSION APPROVED 10/26/17 M

P7 D HISTORY O 115076 TOTAL PROJECT COST INFORMATION

PREL ENG $ 67,317ROW PURCH $ 0 COST OF

CONSTR $ 1,373,826 APPROVEDCONST ENG $ 67,180 PHASES

CONTING $ 15,524 $ 1,304,001INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,523,847

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 1 $ 0 $ 1TOTAL $ 0 $ 0 $ 0 $ 1 $ 0 $ 1

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PARIS RED RIVER 0901-27-052 2019 VA C,E OTHER $ 570,812LIMITS FROM 0.2 MI E OF FM 2120 (RAILBANKED COR PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO US 82 / SH 37 (CAPT STOUT BYPASS)PROJECT 10-FOOT WIDE SHARED USE PATH ON RAILBANKED CORRIDOR (NORTHEAST TEXAS TRAIL) MPO PROJ NUM

DESCR FUNDING CAT(S) 3LCREMARKS RED RIVER COUNTY, ST-SELECTED 2017 TASA, $21,500 IN PROJECT TXDOT 2017 TASA SELECTION; COMMISSION APPROVED 10/26/17 M

P7 -KIND HISTORY O 115076 TOTAL PROJECT COST INFORMATION

PREL ENG $ 29,375ROW PURCH $ 0 COST OF

CONSTR $ 599,493 APPROVEDCONST ENG $ 29,315 PHASES

CONTING $ 6,774 $ 570,812INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 664,957

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 1 $ 0 $ 1TOTAL $ 0 $ 0 $ 0 $ 1 $ 0 $ 1

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 40: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 40 OF 696

10:03:31 AM TXDOT PARIS DISTRICT - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PARIS HOPKINS 0083-02-051 2019 SH 11 C,E,R OTHER $ 5,318,382LIMITS FROM 6.19 MI EAST OF FM 2653 PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO SH 19PROJECT REHAB WITH SHOULDERS MPO PROJ NUM

DESCR FUNDING CAT(S) 1,11REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 264,825ROW PURCH $ 2,089,831 COST OF

CONSTR $ 5,404,596 APPROVEDCONST ENG $ 264,825 PHASES

CONTING $ 2,702 $ 5,318,382INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 8,026,779

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL11 $ 800,000 $ 200,000 $ 0 $ 0 $ 0 $ 1,000,0001 $ 3,454,706 $ 863,676 $ 0 $ 0 $ 0 $ 4,318,382TOTAL $ 4,254,706 $ 1,063,676 $ 0 $ 0 $ 0 $ 5,318,382

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 41: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 41 OF 696

10:03:31 AM TXDOT PARIS DISTRICT - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PARIS FRANKLIN 0901-21-021 2020 VA C,E OTHER $ 192,824LIMITS FROM MILLER ST TO LEFTWICH ST ON EASMNT PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO ON LEFTWICH ST (S OF S KAUFMAN ST)PROJECT 5-FOOT SIDEWALK AND ADA RAMP CONSTRUCTION MPO PROJ NUM

DESCR FUNDING CAT(S) 3LCREMARKS CITY OF MT. VERNON, ST-SELECTED 2017 TASA, $20,632 PROJECT TXDOT 2017 TASA SELECTION; COMMISSION APPROVED 10/26/17 M

P7 IN-KIND HISTORY O 115076 TOTAL PROJECT COST INFORMATION

PREL ENG $ 9,985ROW PURCH $ 0 COST OF

CONSTR $ 203,787 APPROVEDCONST ENG $ 9,965 PHASES

CONTING $ 2,302 $ 192,824INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 226,039

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 1 $ 0 $ 1TOTAL $ 0 $ 0 $ 0 $ 1 $ 0 $ 1

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 42: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

2019-2022Statewide TransportationImprovement ProgramTxDOT San Angelo DistrictHighway Projects

Page 43: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 43 OF 696

10:03:31 AM TXDOT SAN ANGELO DISTRICT - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANGELO GLASSCOCK 0463-04-024 2020 SH 158 C OTHER $ 17,109,352LIMITS FROM AT SH 137 PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO .PROJECT Construct Overpass MPO PROJ NUM

DESCR FUNDING CAT(S) 4REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 838,358ROW PURCH $ 2,443,455 COST OF

CONSTR $ 17,109,352 APPROVEDCONST ENG $ 764,788 PHASES

CONTING $ 0 $ 17,109,352INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 532,101TOTAL CST $ 21,155,953

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 15,398,417 $ 1,710,935 $ 0 $ 0 $ 0 $ 17,109,352TOTAL $ 15,398,417 $ 1,710,935 $ 0 $ 0 $ 0 $ 17,109,352

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 44: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

2019-2022Statewide TransportationImprovement ProgramTxDOT San Antonio DistrictHighway Projects

Page 45: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 45 OF 696

10:03:31 AM TXDOT SAN ANTONIO DISTRICT - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO KENDALL 0142-15-026 2019 IH 10 C OTHER $ 5,267,740LIMITS FROM NORTH CREEK RD. PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO US 87PROJECT COMPLETE EB/WB FRONTAGE RDS & CONVERT TO ONE WAY OPERATION, RECONFIGURE RAMPS & MPO PROJ NUM

DESCR INTERSECTION OPERATIONAL IMPROVEMENTS FUNDING CAT(S) 1,4REMARKS PROJECT Added to the 17-20 in Feb 2018

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 258,119ROW PURCH $ 0 COST OF

CONSTR $ 5,267,740 APPROVEDCONST ENG $ 257,592 PHASES

CONTING $ 59,525 $ 5,267,740INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 5,842,976

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 4,000,000 $ 1,000,000 $ 0 $ 0 $ 0 $ 5,000,0001 $ 214,192 $ 53,548 $ 0 $ 0 $ 0 $ 267,740TOTAL $ 4,214,192 $ 1,053,548 $ 0 $ 0 $ 0 $ 5,267,740

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 46: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

2019-2022Statewide TransportationImprovement ProgramTxDOT Tyler DistrictHighway Projects

Page 47: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 47 OF 696

10:03:31 AM TXDOT TYLER DISTRICT - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

TYLER HENDERSON 0697-02-039 2019 SH 334 C,E,R GUN BARREL CITY $ 42,000,000LIMITS FROM KNOB HILL IN 7 PT,1 MI E OF SH274,E PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO SOUTHLAND IN GBC(2.5 MI W OF SH198)PROJECT CONSTRUCT 2 LN STRUCTURE TO COMPLETE 4 LN FACILITY OPERATIONAL IMPROVEMENT TO EL MPO PROJ NUM

DESCR IMINATE BOTTLENECK FUNDING CAT(S) 1,12REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,126,096ROW PURCH $ 201,466 COST OF

CONSTR $ 43,389,731 APPROVEDCONST ENG $ 2,152,130 PHASES

CONTING $ 863,455 $ 42,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 1,622,775TOTAL CST $ 48,732,878

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL12 $ 21,600,000 $ 5,400,000 $ 0 $ 0 $ 0 $ 27,000,0001 $ 12,000,000 $ 3,000,000 $ 0 $ 0 $ 0 $ 15,000,000TOTAL $ 33,600,000 $ 8,400,000 $ 0 $ 0 $ 0 $ 42,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 48: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 48 OF 696

10:03:31 AM TXDOT TYLER DISTRICT - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

TYLER CHEROKEE 0198-04-042 2021 US 175 C,E,R OTHER $ 4,500,000LIMITS FROM ANDERSON C/L, SE PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO 0.5 MI E OF ANDERSON C/L (CR3509)PROJECT ROADWORK TO TIE BACK INTO EXISTING ROADWAY MPO PROJ NUM

DESCR FUNDING CAT(S) 4REMARKS PROJECT GROUPED FOR PE IN 2017-2020 STIP

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 251,263ROW PURCH $ 0 COST OF

CONSTR $ 5,127,828 APPROVEDCONST ENG $ 250,750 PHASES

CONTING $ 57,944 $ 4,500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 213,317TOTAL CST $ 5,687,785

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 3,600,000 $ 900,000 $ 0 $ 0 $ 0 $ 4,500,000TOTAL $ 3,600,000 $ 900,000 $ 0 $ 0 $ 0 $ 4,500,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

TYLER ANDERSON 0198-03-026 2021 US 175 C,E,R OTHER $ 44,000,000LIMITS FROM 0.4 MI SE OF SH 155, SE PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO CHEROKEE C/L AT NECHES RIVERPROJECT WIDEN 2 LANE ROAD TO 4 LANE DIVIDED HWY W/DEPRESSED MEDIAN MPO PROJ NUM

DESCR FUNDING CAT(S) 4REMARKS PROJECT GROUPED FOR PE IN 2017-2020 STIP

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,456,799ROW PURCH $ 3,479,751 COST OF

CONSTR $ 50,138,772 APPROVEDCONST ENG $ 2,486,883 PHASES

CONTING $ 997,761 $ 44,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 1,875,190TOTAL CST $ 59,559,966

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 35,200,000 $ 8,800,000 $ 0 $ 0 $ 0 $ 44,000,000TOTAL $ 35,200,000 $ 8,800,000 $ 0 $ 0 $ 0 $ 44,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 49: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 49 OF 696

10:03:31 AM TXDOT TYLER DISTRICT - HIGHWAY PROJECTS

FY 2022

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

TYLER CHEROKEE 0198-04-029 2022 US 175 C,E,R OTHER $ 125,000,000LIMITS FROM 0.5 MI E OF ANDERSON C/L(CR3509),SE PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO FM 347, IN JACKSONVILLEPROJECT WIDEN FROM 2 LANES TO 4 LANES W/DEPRESSED MEDIAN MPO PROJ NUM

DESCR FUNDING CAT(S) 4REMARKS PROJECT GROUPED FOR PE IN 2017-2020 STIP

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 7,258,726ROW PURCH $ 6,481,868 COST OF

CONSTR $ 148,137,282 APPROVEDCONST ENG $ 7,347,609 PHASES

CONTING $ 2,947,931 $ 125,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 5,540,334TOTAL CST $ 172,173,416

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 100,000,000 $ 25,000,000 $ 0 $ 0 $ 0 $ 125,000,000TOTAL $ 100,000,000 $ 25,000,000 $ 0 $ 0 $ 0 $ 125,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

TYLER SMITH 0165-02-061 2022 US 271 C,E OTHER $ 31,300,000LIMITS FROM SMITH C/L, SW PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO FM 16PROJECT WIDEN 2 LN ROAD TO 4 LN DIVIDED HWY WITH DEPRESSED MEDIAN MPO PROJ NUM

DESCR FUNDING CAT(S) 4REMARKS PROJECT GROUPED FOR PE IN 2017-2020 STIP

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,805,506ROW PURCH $ 0 COST OF

CONSTR $ 36,847,075 APPROVEDCONST ENG $ 1,827,614 PHASES

CONTING $ 733,256 $ 31,300,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 1,378,080TOTAL CST $ 41,213,451

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 25,040,000 $ 6,260,000 $ 0 $ 0 $ 0 $ 31,300,000TOTAL $ 25,040,000 $ 6,260,000 $ 0 $ 0 $ 0 $ 31,300,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 50: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

2019-2022Statewide TransportationImprovement ProgramTxDOT Waco DistrictHighway Projects

Page 51: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 51 OF 696

10:03:31 AM TXDOT WACO DISTRICT - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

WACO HILL 0048-09-029 2019 IH 35E C OTHER $ 100,000,000LIMITS FROM IH 35W PROJECT SPONSOR Waco

REVISION DATE 07/2018LIMITS TO Ellis Co LinePROJECT Reconstruct and widen from 4 lanes to 6 lanes. Reconstruct and realign ramps. MPO PROJ NUM

DESCR FUNDING CAT(S) 4REMARKS Connectivity and Safety Initiative Funding PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 5,333,200ROW PURCH $ 0 COST OF

CONSTR $ 100,000,000 APPROVEDCONST ENG $ 4,681,200 PHASES

CONTING $ 195,900 $ 100,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 110,210,300

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 80,000,000 $ 20,000,000 $ 0 $ 0 $ 0 $ 100,000,000TOTAL $ 80,000,000 $ 20,000,000 $ 0 $ 0 $ 0 $ 100,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 52: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

2019-2022Statewide TransportationImprovement ProgramTxDOT Yoakum DistrictHighway Projects

Page 53: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 53 OF 696

10:03:31 AM TXDOT YOAKUM DISTRICT - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

YOAKUM AUSTIN 0271-02-049 2019 IH 10 C OTHER $ 113,800,000LIMITS FROM COLORADO C/L PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO FM 3538PROJECT ADD LANES FOR 6-LANE FACILITY MPO PROJ NUM

DESCR FUNDING CAT(S) 4,12REMARKS PROJECT ADD LANES FOR 6-LANE FACILITY

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 6,049,161ROW PURCH $ 0 COST OF

CONSTR $ 113,800,000 APPROVEDCONST ENG $ 5,308,447 PHASES

CONTING $ 222,214 $ 113,800,000INDIRECT $ 7,086,160BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 132,465,982

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL12 $ 45,520,000 $ 11,380,000 $ 0 $ 0 $ 0 $ 56,900,0004 $ 45,520,000 $ 11,380,000 $ 0 $ 0 $ 0 $ 56,900,000TOTAL $ 91,040,000 $ 22,760,000 $ 0 $ 0 $ 0 $ 113,800,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

YOAKUM WHARTON 0913-09-101 2019 CS C,E EL CAMPO $ 161,801LIMITS FROM ON E. NORRIS ST. FROM MECHANIC ST PROJECT SPONSOR CITY OF EL CAMPO

REVISION DATE 07/2018LIMITS TO N. WHARTON ST (FM 653)PROJECT CONSTRUCT SIDEWALKS, CURBS, DRIVEWAYS AND ACCESSIBILITY RAMPS MPO PROJ NUM

DESCR FUNDING CAT(S) 9TAPREMARKS PROJECT NAME: EL CAMPO - WEST AND EAST NORRIS STREE PROJECT 2017 TASA state-selected; Commission approved 10/26/17 MO

P7 T SIDEWALKS HISTORY 115076 TOTAL PROJECT COST INFORMATION

PREL ENG $ 6,331ROW PURCH $ 0 COST OF

CONSTR $ 153,359 APPROVEDCONST ENG $ 2,110 PHASES

CONTING $ 1,653 $ 161,801INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 163,453

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 129,441 $ 0 $ 0 $ 32,360 $ 0 $ 161,801TOTAL $ 129,441 $ 0 $ 0 $ 32,360 $ 0 $ 161,801

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

YOAKUM LAVACA 0913-29-054 2019 CS C,E HALLETSVILLE $ 358,750LIMITS FROM ON 2ND ST FROM US 77 TO NORTH RIDGE ST PROJECT SPONSOR CITY OF HALLETTSVILLE

REVISION DATE 07/2018LIMITS TO ON NORTH RIDGE ST FROM 2ND TO US 90APROJECT CONSTRUCT SIDEWALKS, CURBS, DRIVEWAYS AND ACCESSIBILITY RAMPS MPO PROJ NUM

DESCR FUNDING CAT(S) 9TAPREMARKS PROJECT NAME: HALLETTSVILLE - SCHOOL TO SQUARE SIDE PROJECT 2017 TASA state-selected; Commission approved 10/26/17 MO

P7 WALKS, IN-KIND CONTRIBUTION $54,000 HISTORY 115076 TOTAL PROJECT COST INFORMATION

PREL ENG $ 65,925ROW PURCH $ 0 COST OF

CONSTR $ 288,850 APPROVEDCONST ENG $ 3,975 PHASES

CONTING $ 3,133 $ 358,750INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 361,883

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 287,000 $ 0 $ 0 $ 71,750 $ 0 $ 358,750TOTAL $ 287,000 $ 0 $ 0 $ 71,750 $ 0 $ 358,750

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 54: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 54 OF 696

10:03:31 AM TXDOT YOAKUM DISTRICT - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

YOAKUM AUSTIN 0271-02-055 2019 IH 10 C OTHER $ 59,418,347LIMITS FROM 0.85 MI WEST OF FM 3538 PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO SH 36PROJECT UPGRADING OF A FREEWAY FACILITY CONSISTING OF WIDENING 4 MAIN LANES TO SIX MAIN MPO PROJ NUM

DESCR LANES, 2-LANE FRONTAGE ROADS, SAFETY LIGHTING, AND ITS FUNDING CAT(S) 12,4,1REMARKS TPC=$16,533,000; SPLIT BETWEEN 0271-02-049__CXL 5-2 PROJECT ADD 4 MANAGED LANES FOR 8-LANE FACILITY NOT AN H-GAC PROJ

P7 7-15 HISTORY ECT TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,911,499ROW PURCH $ 501,000 COST OF

CONSTR $ 59,418,347 APPROVEDCONST ENG $ 7,902,640 PHASES

CONTING $ 8,912,752 $ 59,418,347INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 79,646,238

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL12 $ 18,528,000 $ 4,632,000 $ 0 $ 0 $ 0 $ 23,160,0004 $ 27,792,000 $ 6,948,000 $ 0 $ 0 $ 0 $ 34,740,0001 $ 1,214,678 $ 303,669 $ 0 $ 0 $ 0 $ 1,518,347TOTAL $ 47,534,678 $ 11,883,669 $ 0 $ 0 $ 0 $ 59,418,347

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

YOAKUM AUSTIN 0271-03-060 2019 IH 10 C OTHER $ 77,685,129LIMITS FROM EAST OF KERSTEN RD PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO MANAK RDPROJECT UPGRADING OF A FREEWAY FACILITY CONSISTING OF WIDENING 4 MAIN LANES TO SIX MAIN MPO PROJ NUM

DESCR LANES, 2-LANE FRONTAGE ROADS, SAFETY LIGHTING, AND ITS FUNDING CAT(S) 4,1REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 3,806,571ROW PURCH $ 6,001,000 COST OF

CONSTR $ 77,685,129 APPROVEDCONST ENG $ 3,340,461 PHASES

CONTING $ 139,833 $ 77,685,129INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 90,972,994

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 60,560,000 $ 15,140,000 $ 0 $ 0 $ 0 $ 75,700,0001 $ 1,588,103 $ 397,026 $ 0 $ 0 $ 0 $ 1,985,129TOTAL $ 62,148,103 $ 15,537,026 $ 0 $ 0 $ 0 $ 77,685,129

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

YOAKUM AUSTIN 0271-03-046 2019 IH 10 C OTHER $ 85,792,295LIMITS FROM MANAK ROAD PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO EAST OF BRAZOS RIVERPROJECT UPGRADING OF A FREEWAY FACILITY CONSISTING OF WIDENING TO SIX MAIN LANES, 2-LANE MPO PROJ NUM

DESCR FRONTAGE ROADS, SAFETY LIGHTING, AND ITS FUNDING CAT(S) 1,4REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 4,289,615ROW PURCH $ 142,950 COST OF

CONSTR $ 85,792,295 APPROVEDCONST ENG $ 11,410,375 PHASES

CONTING $ 12,868,844 $ 85,792,295INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 114,504,079

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 66,880,000 $ 16,720,000 $ 0 $ 0 $ 0 $ 83,600,0001 $ 1,753,836 $ 438,459 $ 0 $ 0 $ 0 $ 2,192,295TOTAL $ 68,633,836 $ 17,158,459 $ 0 $ 0 $ 0 $ 85,792,295

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 55: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 55 OF 696

10:03:31 AM TXDOT YOAKUM DISTRICT - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

YOAKUM AUSTIN 0271-03-061 2019 IH 10 C OTHER $ 16,727,445LIMITS FROM SH 36 PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO EAST OF KERSTEN RDPROJECT UPGRADING OF A FREEWAY FACILITY CONSISTING OF WIDENING TO SIX MAIN LANES, 2-LANE MPO PROJ NUM

DESCR FRONTAGE ROADS,SFTY LIGHTING, AND ITS FUNDING CAT(S) 1,4REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 819,644ROW PURCH $ 1,112,100 COST OF

CONSTR $ 16,727,444 APPROVEDCONST ENG $ 719,280 PHASES

CONTING $ 30,109 $ 16,727,445INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 19,408,577

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 13,040,000 $ 3,260,000 $ 0 $ 0 $ 0 $ 16,300,0001 $ 341,956 $ 85,489 $ 0 $ 0 $ 0 $ 427,445TOTAL $ 13,381,956 $ 3,345,489 $ 0 $ 0 $ 0 $ 16,727,445

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

YOAKUM WHARTON 0089-07-146 2019 US 59 C OTHER $ 19,752,972LIMITS FROM BU 59 North of ELCAMPO PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO SH 71PROJECT Construct 2-Lane Frontage Roads, upgrade to Rural Freeway. I-69 System Project ( MPO PROJ NUM

DESCR Projects F, H, G,) FUNDING CAT(S) 4,11REMARKS PROJECT Added to 17-20, 11/2017

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 967,896ROW PURCH $ 4,605,903 COST OF

CONSTR $ 19,752,972 APPROVEDCONST ENG $ 1,183,203 PHASES

CONTING $ 513,577 $ 19,752,972INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 27,023,551

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 14,999,200 $ 3,749,800 $ 0 $ 0 $ 0 $ 18,749,00011 $ 803,178 $ 200,794 $ 0 $ 0 $ 0 $ 1,003,972TOTAL $ 15,802,378 $ 3,950,594 $ 0 $ 0 $ 0 $ 19,752,972

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 56: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 56 OF 696

10:03:31 AM TXDOT YOAKUM DISTRICT - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

YOAKUM WHARTON 0089-08-098 2020 US 59 C OTHER $ 208,000,000LIMITS FROM FORT BEND C/L PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO SH 60PROJECT UPGRADE TO RURAL FREEWAY MPO PROJ NUM

DESCR FUNDING CAT(S) 1,2M,4,12REMARKS CONSULTANT TO PREPARE PS&E PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 10,950,411ROW PURCH $ 20,277,955 COST OF

CONSTR $ 223,477,778 APPROVEDCONST ENG $ 10,928,063 PHASES

CONTING $ 2,525,298 $ 208,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 268,159,505

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL12 $ 80,000,000 $ 20,000,000 $ 0 $ 0 $ 0 $ 100,000,0004 $ 61,600,000 $ 15,400,000 $ 0 $ 0 $ 0 $ 77,000,0002M $ 24,800,000 $ 6,200,000 $ 0 $ 0 $ 0 $ 31,000,0001 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0TOTAL $ 166,400,000 $ 41,600,000 $ 0 $ 0 $ 0 $ 208,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 57: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

2019-2022Statewide TransportationImprovement ProgramAbilene MPOHighway Projects

Page 58: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 58 OF 696

10:03:31 AM ABILENE MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

ABILENE ABILENE TAYLOR 0908-33-099 2020 US 277/US83C,E ABILENE $ 1,008,258LIMITS FROM US 83/84 TO CATCLAW ROAD PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO US277 TO TEXAS AVENUEPROJECT CONSTRUCT SIDEWALKS, SIGNAL ENHANCEMENTS AND ADA RAMPS SIDEWALKS, SIGNAL ENHANCE MPO PROJ NUM MVAR-XSR-BP

DESCR MENTS, ADA RAMPS FUNDING CAT(S) 3LC,9TAPREMARKS PROJECT NAME - ABILENE US83/84 BIKEPED IMPROVEMENTS PROJECT TXDOT 2017 TASA SELECTION; COMMISSION APPROVED 10/26/2017

P7 HISTORY MO#115076 TOTAL PROJECT COST INFORMATION

PREL ENG $ 39,454ROW PURCH $ 0 COST OF

CONSTR $ 955,654 APPROVEDCONST ENG $ 13,151 PHASES

CONTING $ 10,962 $ 1,008,258INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,019,221

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 504,129 $ 0 $ 0 $ 126,032 $ 0 $ 630,1613LC $ 0 $ 0 $ 0 $ 0 $ 378,097 $ 378,097TOTAL $ 504,129 $ 0 $ 0 $ 126,032 $ 378,097 $ 1,008,258

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

ABILENE ABILENE TAYLOR 0699-01-051 2020 FM89 C ABILENE $ 10,000,000LIMITS FROM NEAR BETTES LANE PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO REBECCA LANEPROJECT FARM TO MARKET ROAD 89 (BUFFALO GAP ROAD) PHASE II ACCESS MANAGEMENT MPO PROJ NUM S0089-CI-CA

DESCR FUNDING CAT(S) 2UREMARKS PROJECTED LET DATE 7-0-2020 PROJECT PROJECT IN MTP, UPDATE TO INCORPORATE EXPANDED LIMITS.

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,000,000ROW PURCH $ 1,500,000 COST OF

CONSTR $ 10,000,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 10,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 12,500,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2U $ 8,000,000 $ 2,000,000 $ 0 $ 0 $ 0 $ 10,000,000TOTAL $ 8,000,000 $ 2,000,000 $ 0 $ 0 $ 0 $ 10,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

ABILENE ABILENE TAYLOR 0699-01-052 2020 FM89 C ABILENE $ 11,650,000LIMITS FROM REBECCA LANE PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO JUST NORTH OF US 83PROJECT FARM TO MARKET ROAD 89 (BUFFALO GAP ROAD) PHASE I ACCESS MANAGEMENT AND INTERSEC MPO PROJ NUM S0089-3-CA

DESCR TION IMPROVEMENTS FUNDING CAT(S) 2UREMARKS PROJECTED LET DATE 7-1-2020 PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,165,000ROW PURCH $ 3,600,000 COST OF

CONSTR $ 11,650,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 11,650,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 16,415,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2U $ 9,320,000 $ 2,330,000 $ 0 $ 0 $ 0 $ 11,650,000TOTAL $ 9,320,000 $ 2,330,000 $ 0 $ 0 $ 0 $ 11,650,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 59: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 59 OF 696

10:03:31 AM ABILENE MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

ABILENE ABILENE TAYLOR 0699-01-056 2020 FM 89 C ABILENE $ 2,000,000LIMITS FROM ANTILLEY ROAD INTERSECTION PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO ANTILLEY ROAD INTERSECTIONPROJECT FARM TO MARKET ROAD 89 (BUFFALO GAP ROAD) LOWER PROFILE AND OTHER IMPROVEMENTS T MPO PROJ NUM S0089-E21-RM

DESCR O THE INTERSECTION FUNDING CAT(S) 2UREMARKS PROJECTED LET DATE 7-1-2020 PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 200,000ROW PURCH $ 0 COST OF

CONSTR $ 2,000,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 2,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,200,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2U $ 1,600,000 $ 400,000 $ 0 $ 0 $ 0 $ 2,000,000TOTAL $ 1,600,000 $ 400,000 $ 0 $ 0 $ 0 $ 2,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 60: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 60 OF 696

10:03:31 AM ABILENE MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

ABILENE ABILENE TAYLOR 0033-05-089 2021 US 83 C ABILENE $ 13,000,000LIMITS FROM .67 MILES NORTH OF FM 3034 PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO .28 MILES SOUTH OF FM 3034PROJECT US 83 CONSTRUCT NEW OVERPASS MPO PROJ NUM S0083-B2-01

DESCR FUNDING CAT(S) 4REMARKS PROJECT LET DATE 9-2021 PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 13,000,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 13,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 13,000,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 10,400,000 $ 2,600,000 $ 0 $ 0 $ 0 $ 13,000,000TOTAL $ 10,400,000 $ 2,600,000 $ 0 $ 0 $ 0 $ 13,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

ABILENE ABILENE TAYLOR 3068-01-012 2021 FM 3034 C ABILENE $ 2,500,000LIMITS FROM US 83 PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO FM 600PROJECT FARM TO MARKET 3034 REHAB AND WIDEN MPO PROJ NUM S3034-E22-RM

DESCR FUNDING CAT(S) 2UREMARKS PROJECT LET DATE 9-2021 PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 2,500,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 2,500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,500,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2U $ 2,000,000 $ 500,000 $ 0 $ 0 $ 0 $ 2,500,000TOTAL $ 2,000,000 $ 500,000 $ 0 $ 0 $ 0 $ 2,500,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 61: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

2019-2022Statewide TransportationImprovement ProgramAlamo Area MPOHighway Projects

Page 62: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 62 OF 696

10:03:31 AM ALAMO AREA MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA COMAL 0915-17-069 2019 VA C NEW BRAUNFELS $ 200,000LIMITS FROM Various locations in New Braunfels PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO .PROJECT Install advanced signal controllers, networking equipment and control software f MPO PROJ NUM 5539.2

DESCR or traffic signals FUNDING CAT(S) 7REMARKS 4/18 - add project to FY 2019-2022 TIP PROJECT 4/18 - funded through the 19-22 STP-MM Call for Projects

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 200,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 200,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 200,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 160,000 $ 0 $ 0 $ 40,000 $ 0 $ 200,000TOTAL $ 160,000 $ 0 $ 0 $ 40,000 $ 0 $ 200,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA COMAL 0915-17-068 2019 VA C NEW BRAUNFELS $ 200,000LIMITS FROM Various locations in New Braunfels PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO .PROJECT Purchase of control software for traffic signals MPO PROJ NUM 5539.1

DESCR FUNDING CAT(S) 7REMARKS 4/18 - add project to FY 2019-2022 TIP PROJECT 4/18 - funded through the 19-22 STP-MM Call for Projects

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 200,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 200,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 200,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 160,000 $ 0 $ 0 $ 40,000 $ 0 $ 200,000TOTAL $ 160,000 $ 0 $ 0 $ 40,000 $ 0 $ 200,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0915-12-610 2019 CS C SAN ANTONIO $ 1,000,000LIMITS FROM In San Antonio PROJECT SPONSOR CoSA

REVISION DATE 07/2018LIMITS TO Along San Pedro AvenuePROJECT Construct sidewalks and pedestrian infrastructure MPO PROJ NUM 5536.1

DESCR FUNDING CAT(S) 7REMARKS 4/18 - add project to FY 2019-2022 TIP PROJECT 4/18 - funded through the 19-22 STP-MM Call for Projects

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 49,000ROW PURCH $ 0 COST OF

CONSTR $ 1,000,000 APPROVEDCONST ENG $ 60,000 PHASES

CONTING $ 70,000 $ 1,000,000INDIRECT $ 50,000BOND FIN $ 0

PT CHG ORD $ 40,000TOTAL CST $ 1,269,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 800,000 $ 0 $ 0 $ 200,000 $ 0 $ 1,000,000TOTAL $ 800,000 $ 0 $ 0 $ 200,000 $ 0 $ 1,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 63: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 63 OF 696

10:03:31 AM ALAMO AREA MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0915-12-609 2019 CS C SAN ANTONIO $ 1,000,000LIMITS FROM In San Antonio PROJECT SPONSOR CoSA

REVISION DATE 07/2018LIMITS TO .PROJECT Multimodal planning study on one arterial to accommodate travel modes including MPO PROJ NUM 5545.1

DESCR higher capacity transit FUNDING CAT(S) 7REMARKS 4/18 - add project to FY 2019-2022 TIP PROJECT 4/18 - funded through the 19-22 STP-MM Call for Projects

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 1,000,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 1,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,000,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 800,000 $ 0 $ 0 $ 200,000 $ 0 $ 1,000,000TOTAL $ 800,000 $ 0 $ 0 $ 200,000 $ 0 $ 1,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0915-12-576 2019 VA C OTHER $ 8,000,000LIMITS FROM Various locations in Bexar County PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO on state systemPROJECT Construct curb ramps, sidewalks and other pedestrian related infrastructure MPO PROJ NUM 5316.3

DESCR FUNDING CAT(S) 3LC,7REMARKS 3rd Qtr 18 - move from FY 2022 to FY 2019 PROJECT 4/18 - move from FY 2022 to FY 2019; 4/16 - funded throug

P7 HISTORY h STP-MM project selection process TOTAL PROJECT COST INFORMATION

PREL ENG $ 392,000ROW PURCH $ 0 COST OF

CONSTR $ 8,000,000 APPROVEDCONST ENG $ 396,800 PHASES

CONTING $ 159,200 $ 8,000,000INDIRECT $ 459,200BOND FIN $ 0

PT CHG ORD $ 299,200TOTAL CST $ 9,706,400

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 5,760,000 $ 1,440,000 $ 0 $ 0 $ 0 $ 7,200,0003LC $ 0 $ 0 $ 0 $ 0 $ 800,000 $ 800,000TOTAL $ 5,760,000 $ 1,440,000 $ 0 $ 0 $ 800,000 $ 8,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0915-00-211 2019 VA C OTHER $ 1,617,950LIMITS FROM Various locations in Comal PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO and Bexar CountiesPROJECT Install advanced signal controllers, networking equipment and control software f MPO PROJ NUM 5539.3

DESCR or traffic signals FUNDING CAT(S) 7REMARKS 4/18 - add project to FY 2019-2022 TIP PROJECT 4/18 - funded through the 19-22 STP-MM Call for Projects

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 1,617,950 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 1,617,950INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,617,950

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 1,294,360 $ 323,590 $ 0 $ 0 $ 0 $ 1,617,950TOTAL $ 1,294,360 $ 323,590 $ 0 $ 0 $ 0 $ 1,617,950

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 64: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 64 OF 696

10:03:31 AM ALAMO AREA MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0915-00-212 2019 VA C OTHER $ 2,500,000LIMITS FROM Various locations within PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO Bexar, Comal and Kendall CountiesPROJECT Safety Service Patrol on controlled access highways in Bexar, Comal and Kendall MPO PROJ NUM 5544.1

DESCR Counties-FY 2019 FUNDING CAT(S) 7REMARKS 4/18 - add project to FY 2019-2022 TIP PROJECT 4/18 - funded through the 19-22 STP-MM Call for Projects

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 2,500,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 2,500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,500,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 2,000,000 $ 500,000 $ 0 $ 0 $ 0 $ 2,500,000TOTAL $ 2,000,000 $ 500,000 $ 0 $ 0 $ 0 $ 2,500,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0521-04-279 2019 IH 410 C SAN ANTONIO $ 10,000,000LIMITS FROM SH 151 PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO US 90PROJECT Expand from 6 lane to 8 lane expressway MPO PROJ NUM 5374

DESCR FUNDING CAT(S) 12CREMARKS 3rd Qtr 18 - move from FY 2021 to FY 2019 PROJECT 4/18 - move from FY 2021 to FY 2019; 3/18 - revise fundin

P7 HISTORY g distribution; 4/17 - add project TOTAL PROJECT COST INFORMATION

PREL ENG $ 490,000ROW PURCH $ 0 COST OF

CONSTR $ 10,000,000 APPROVEDCONST ENG $ 400,000 PHASES

CONTING $ 700,000 $ 10,000,000INDIRECT $ 200,000BOND FIN $ 0

PT CHG ORD $ 400,000TOTAL CST $ 12,190,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL12C $ 9,000,000 $ 1,000,000 $ 0 $ 0 $ 0 $ 10,000,000TOTAL $ 9,000,000 $ 1,000,000 $ 0 $ 0 $ 0 $ 10,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0521-04-275 2019 IH 410 C SAN ANTONIO $ 40,000,000LIMITS FROM at SH 151 PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO InterchangePROJECT Reconstruct interchange - Phase 2 MPO PROJ NUM 5373

DESCR FUNDING CAT(S) 12CREMARKS 3rd Qtr 18 - move from FY 2021 to FY 2019 PROJECT 4/18 - move from FY 2021 to FY 2019; 3/18 - revise fundin

P7 HISTORY g distribution; 4/17 - add project TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,960,000ROW PURCH $ 0 COST OF

CONSTR $ 40,000,000 APPROVEDCONST ENG $ 1,600,000 PHASES

CONTING $ 2,800,000 $ 40,000,000INDIRECT $ 800,000BOND FIN $ 0

PT CHG ORD $ 1,600,000TOTAL CST $ 48,760,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL12C $ 36,000,000 $ 4,000,000 $ 0 $ 0 $ 0 $ 40,000,000TOTAL $ 36,000,000 $ 4,000,000 $ 0 $ 0 $ 0 $ 40,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 65: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 65 OF 696

10:03:31 AM ALAMO AREA MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0521-04-204 2019 IH 410 C SAN ANTONIO $ 50,000,000LIMITS FROM Ingram Rd PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO SH 151PROJECT Expand from 8 to 10 lane expressway MPO PROJ NUM 5372

DESCR FUNDING CAT(S) 12CREMARKS 3rd Qtr 18 - move from FY 2021 to FY 2019 PROJECT 4/18 - move from FY 2021 to FY 2019; 3/18 - revise fundin

P7 HISTORY g distribution; 4/17 - add project TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,450,000ROW PURCH $ 0 COST OF

CONSTR $ 50,000,000 APPROVEDCONST ENG $ 2,000,000 PHASES

CONTING $ 3,500,000 $ 50,000,000INDIRECT $ 1,000,000BOND FIN $ 0

PT CHG ORD $ 2,000,000TOTAL CST $ 60,950,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL12C $ 40,000,000 $ 10,000,000 $ 0 $ 0 $ 0 $ 50,000,000TOTAL $ 40,000,000 $ 10,000,000 $ 0 $ 0 $ 0 $ 50,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0915-12-603 2019 CS C SAN ANTONIO $ 1,000,000LIMITS FROM In City of San Antonio on Judson Road PROJECT SPONSOR CoSA

REVISION DATE 07/2018LIMITS TO from Independence to IH 35PROJECT Construct sidewalk along west side of Judson Road MPO PROJ NUM 5428

DESCR FUNDING CAT(S) 7REMARKS 3rd Qtr 18 - move from FY 2018 to FY 2019 PROJECT 4/18 - move from FY 2018 to FY 2019; 10/17 - add project;

P7 HISTORY configured from $1M from 0915-12-579 TOTAL PROJECT COST INFORMATION

PREL ENG $ 49,000ROW PURCH $ 0 COST OF

CONSTR $ 1,000,000 APPROVEDCONST ENG $ 60,000 PHASES

CONTING $ 30,000 $ 1,000,000INDIRECT $ 50,000BOND FIN $ 0

PT CHG ORD $ 60,000TOTAL CST $ 1,249,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 800,000 $ 0 $ 0 $ 200,000 $ 0 $ 1,000,000TOTAL $ 800,000 $ 0 $ 0 $ 200,000 $ 0 $ 1,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0915-12-602 2019 VA C SAN ANTONIO $ 4,000,000LIMITS FROM In San Antonio PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO at TransGuide CenterPROJECT Upgrade TransGuide Facility MPO PROJ NUM 5426

DESCR FUNDING CAT(S) 7REMARKS 1st Qtr 18 - add project; created from 0915-12-577 PROJECT 10/17 - add project; created from 0915-12-577 ($3M) and 0

P7 ($3M) and 0915-12-580 ($1M) HISTORY 915-12-580 ($1M) TOTAL PROJECT COST INFORMATION

PREL ENG $ 196,000ROW PURCH $ 0 COST OF

CONSTR $ 4,000,000 APPROVEDCONST ENG $ 240,000 PHASES

CONTING $ 120,000 $ 4,000,000INDIRECT $ 200,000BOND FIN $ 0

PT CHG ORD $ 240,000TOTAL CST $ 4,996,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 3,200,000 $ 800,000 $ 0 $ 0 $ 0 $ 4,000,000TOTAL $ 3,200,000 $ 800,000 $ 0 $ 0 $ 0 $ 4,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 66: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 66 OF 696

10:03:31 AM ALAMO AREA MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0915-12-601 2019 VA C SAN ANTONIO $ 1,500,000LIMITS FROM In City of San Antonio PROJECT SPONSOR CoSA

REVISION DATE 07/2018LIMITS TO .PROJECT Intelligent Transportation Systems - Enhancements; Upgrade Traffic Signal Contro MPO PROJ NUM 5425

DESCR llers FUNDING CAT(S) 7REMARKS 3rd Qtr 18 - move from FY 2018 to FY 2019 PROJECT 4/18 - move from FY 2018 to FY 2019; 1/18 - update projec

P7 HISTORY t description; 10/17 - add project; created from 0915-12-580

TOTAL PROJECT COST INFORMATIONPREL ENG $ 73,500

ROW PURCH $ 0 COST OFCONSTR $ 1,500,000 APPROVED

CONST ENG $ 90,000 PHASESCONTING $ 45,000 $ 1,500,000INDIRECT $ 75,000BOND FIN $ 0

PT CHG ORD $ 90,000TOTAL CST $ 1,873,500

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 1,200,000 $ 0 $ 0 $ 300,000 $ 0 $ 1,500,000TOTAL $ 1,200,000 $ 0 $ 0 $ 300,000 $ 0 $ 1,500,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA GUADALUPE 0915-46-046 2019 VA C SEGUIN $ 2,801,246LIMITS FROM In Seguin from Vaughan Bridge PROJECT SPONSOR Seguin

REVISION DATE 07/2018LIMITS TO to Max Starcke Park EastPROJECT Extend Walnut Springs multi use trail, including retaining walls, hand and guard MPO PROJ NUM 4976

DESCR rails and below grade crossing FUNDING CAT(S) 3LC,9TAPREMARKS 4th Qtr 17 - add project PROJECT 6/17 - add TA project

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 137,300ROW PURCH $ 0 COST OF

CONSTR $ 2,801,246 APPROVEDCONST ENG $ 178,700 PHASES

CONTING $ 36,100 $ 2,801,246INDIRECT $ 135,300BOND FIN $ 0

PT CHG ORD $ 162,000TOTAL CST $ 3,450,646

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 2,218,587 $ 0 $ 0 $ 554,647 $ 0 $ 2,773,2343LC $ 0 $ 0 $ 0 $ 0 $ 28,012 $ 28,012TOTAL $ 2,218,587 $ 0 $ 0 $ 554,647 $ 28,012 $ 2,801,246

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA COMAL 0915-17-066 2019 CS C NEW BRAUNFELS $ 1,516,711LIMITS FROM In New Braunfels on San Antonio St. PROJECT SPONSOR New Braunfels

REVISION DATE 07/2018LIMITS TO Walnut, McQueeney, near Seele ElemPROJECT Construct sidewalks, ramps & other pedestrian related infrastructure MPO PROJ NUM 4973

DESCR FUNDING CAT(S) 9TAPREMARKS 4th Qtr 17 - add project PROJECT 6/17 - add TA project

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 74,300ROW PURCH $ 0 COST OF

CONSTR $ 1,516,711 APPROVEDCONST ENG $ 96,800 PHASES

CONTING $ 19,500 $ 1,516,711INDIRECT $ 73,300BOND FIN $ 0

PT CHG ORD $ 87,700TOTAL CST $ 1,868,311

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 1,213,369 $ 0 $ 0 $ 303,342 $ 0 $ 1,516,711TOTAL $ 1,213,369 $ 0 $ 0 $ 303,342 $ 0 $ 1,516,711

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 67: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 67 OF 696

10:03:31 AM ALAMO AREA MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0915-12-595 2019 VA C SAN ANTONIO $ 6,000,000LIMITS FROM In San Antonio, from Lombrano St PROJECT SPONSOR SARA

REVISION DATE 07/2018LIMITS TO Laredo StPROJECT Extend the Alazan Creek section of the Greenway Trail System MPO PROJ NUM 4977

DESCR FUNDING CAT(S) 3LC,9TAPREMARKS 3rd Qtr 18 - move from FY 2018 to FY 2019 PROJECT 4/18 - move from FY 2018 to FY 2019; 6/17 - add TA projec

P7 HISTORY t TOTAL PROJECT COST INFORMATION

PREL ENG $ 294,000ROW PURCH $ 0 COST OF

CONSTR $ 6,000,000 APPROVEDCONST ENG $ 382,800 PHASES

CONTING $ 77,400 $ 6,000,000INDIRECT $ 289,800BOND FIN $ 0

PT CHG ORD $ 346,800TOTAL CST $ 7,390,800

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 2,500,000 $ 0 $ 0 $ 625,000 $ 0 $ 3,125,0003LC $ 0 $ 0 $ 0 $ 0 $ 2,875,000 $ 2,875,000TOTAL $ 2,500,000 $ 0 $ 0 $ 625,000 $ 2,875,000 $ 6,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA GUADALUPE 0915-17-065 2019 CS C SCHERTZ $ 1,158,266LIMITS FROM In Schertz on Woodland Oaks Dr, PROJECT SPONSOR Schertz

REVISION DATE 07/2018LIMITS TO Savannah Dr & Live Oak RdPROJECT Construct sidewalks, bike lanes and off-road trail MPO PROJ NUM 4975

DESCR FUNDING CAT(S) 9TAPREMARKS 3rd Qtr 18 - move from FY 2018 to FY 2019 PROJECT 4/18 - move from FY 2018 to FY 2019; 6/17 - add TA projec

P7 HISTORY t TOTAL PROJECT COST INFORMATION

PREL ENG $ 56,800ROW PURCH $ 0 COST OF

CONSTR $ 1,158,266 APPROVEDCONST ENG $ 73,900 PHASES

CONTING $ 15,000 $ 1,158,266INDIRECT $ 56,000BOND FIN $ 0

PT CHG ORD $ 67,000TOTAL CST $ 1,426,966

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 926,613 $ 0 $ 0 $ 231,653 $ 0 $ 1,158,266TOTAL $ 926,613 $ 0 $ 0 $ 231,653 $ 0 $ 1,158,266

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0915-12-594 2019 VA C CONVERSE $ 1,382,725LIMITS FROM In Converse, from Converse Park N PROJECT SPONSOR Converse

REVISION DATE 07/2018LIMITS TO to FM 78PROJECT Construct multi use path MPO PROJ NUM 4972

DESCR FUNDING CAT(S) 3LC,9TAPREMARKS 3rd Qtr 18 - move from FY 2018 to FY 2019 PROJECT 4/18 - move from FY 2018 to FY 2019; 6/17 - add TA projec

P7 HISTORY t TOTAL PROJECT COST INFORMATION

PREL ENG $ 67,800ROW PURCH $ 0 COST OF

CONSTR $ 1,382,725 APPROVEDCONST ENG $ 88,200 PHASES

CONTING $ 17,800 $ 1,382,725INDIRECT $ 66,800BOND FIN $ 0

PT CHG ORD $ 79,900TOTAL CST $ 1,703,225

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 1,092,352 $ 0 $ 0 $ 273,088 $ 0 $ 1,365,4403LC $ 0 $ 0 $ 0 $ 0 $ 17,285 $ 17,285TOTAL $ 1,092,352 $ 0 $ 0 $ 273,088 $ 17,285 $ 1,382,725

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 68: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 68 OF 696

10:03:31 AM ALAMO AREA MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA GUADALUPE 0915-46-047 2019 CS C CIBOLO $ 125,000,000LIMITS FROM In Cibolo from FM 1103-Weil Road PROJECT SPONSOR Cibolo

REVISION DATE 07/2018LIMITS TO To IH 10 EPROJECT Construct Cibolo Parkway toll road on new location within the City of Cibolo MPO PROJ NUM 5406

DESCR FUNDING CAT(S) 3LCREMARKS 3rd Qtr 18 - move from FY 2018 to FY 2019 PROJECT 4/18 - move from FY 2018 to FY 2019; 5/17 - add project p

P7 HISTORY er City of Cibolo TOTAL PROJECT COST INFORMATION

PREL ENG $ 6,125,000ROW PURCH $ 0 COST OF

CONSTR $ 125,000,000 APPROVEDCONST ENG $ 5,000,000 PHASES

CONTING $ 8,750,000 $ 125,000,000INDIRECT $ 2,500,000BOND FIN $ 0

PT CHG ORD $ 5,000,000TOTAL CST $ 152,375,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 125,000,000 $ 125,000,000TOTAL $ 0 $ 0 $ 0 $ 0 $ 125,000,000 $ 125,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0915-12-585 2019 CR C OTHER $ 14,661,235LIMITS FROM In Bexar County, on Blanco Road PROJECT SPONSOR ARMA

REVISION DATE 07/2018LIMITS TO From West Oaks Estates to BorgfeldPROJECT Expand from a 2 to 4 lane divided roadway with raised median, bike lanes, sidewa MPO PROJ NUM 5317

DESCR lks, curbs and drainage FUNDING CAT(S) 7,12SREMARKS 3rd Qtr 17 - revise funding PROJECT 4/17 - revise funding; 1/17 - TIP: add project; MTP: move

P7 HISTORY from FY 2023 to FY 2019; 4/16 - funded through STP-MM project selection process

TOTAL PROJECT COST INFORMATIONPREL ENG $ 718,401

ROW PURCH $ 0 COST OFCONSTR $ 14,661,235 APPROVED

CONST ENG $ 727,197 PHASESCONTING $ 291,759 $ 14,661,235INDIRECT $ 841,555BOND FIN $ 0

PT CHG ORD $ 548,330TOTAL CST $ 17,788,477

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 11,728,988 $ 0 $ 0 $ 2,932,247 $ 0 $ 14,661,23512S $ 824,000 $ 0 $ 0 $ 206,000 $ 0 $ 1,030,000TOTAL $ 12,552,988 $ 0 $ 0 $ 3,138,247 $ 0 $ 15,691,235

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0915-12-580 2019 VA C SAN ANTONIO $ 1,500,000LIMITS FROM In City of San Antonio PROJECT SPONSOR CoSA

REVISION DATE 07/2018LIMITS TO .PROJECT Intelligent Transportation System - Enhancements MPO PROJ NUM 5306

DESCR FUNDING CAT(S) 7REMARKS 1st Qtr 18 - reduce cost and move from FY 2020 to F PROJECT 10/17 - reduce cost from $4M to $1.5M and move from FY 20

P7 Y 2019 HISTORY 20 to FY 2019; 4/16 - funded through STP-MM project selection process

TOTAL PROJECT COST INFORMATIONPREL ENG $ 73,500

ROW PURCH $ 0 COST OFCONSTR $ 1,500,000 APPROVED

CONST ENG $ 90,000 PHASESCONTING $ 45,000 $ 1,500,000INDIRECT $ 75,000BOND FIN $ 0

PT CHG ORD $ 90,000TOTAL CST $ 1,873,500

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 1,200,000 $ 0 $ 0 $ 300,000 $ 0 $ 1,500,000TOTAL $ 1,200,000 $ 0 $ 0 $ 300,000 $ 0 $ 1,500,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 69: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 69 OF 696

10:03:31 AM ALAMO AREA MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0915-12-579 2019 VA C SAN ANTONIO $ 2,000,000LIMITS FROM In City of San Antonio PROJECT SPONSOR CoSA

REVISION DATE 07/2018LIMITS TO .PROJECT Construct citywide pedestrian and bicycle improvements MPO PROJ NUM 5305

DESCR FUNDING CAT(S) 7REMARKS 1st Qtr 18 - reduce cost by $1M PROJECT 10/17 - reduce project cost by $1M to fund 0915-12-603; 4

P7 HISTORY /16 - funded through STP-MM project selection process TOTAL PROJECT COST INFORMATION

PREL ENG $ 98,000ROW PURCH $ 0 COST OF

CONSTR $ 2,000,000 APPROVEDCONST ENG $ 99,000 PHASES

CONTING $ 40,000 $ 2,000,000INDIRECT $ 115,000BOND FIN $ 0

PT CHG ORD $ 75,000TOTAL CST $ 2,427,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 1,600,000 $ 0 $ 0 $ 400,000 $ 0 $ 2,000,000TOTAL $ 1,600,000 $ 0 $ 0 $ 400,000 $ 0 $ 2,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0915-12-562 2019 CR C OTHER $ 4,886,116LIMITS FROM On Watson Road from FM 2790-Somerset Road PROJECT SPONSOR BxCo

REVISION DATE 07/2018LIMITS TO 0.62 Miles East to Watson RoadPROJECT Expand from 2 to 4 lanes, including drainage improvements, bike and pedestrian a MPO PROJ NUM 5106

DESCR menities FUNDING CAT(S) 7REMARKS 3rd Qtr 14 - new project in FY 2015-2018 TIP PROJECT 4/14 - funded through STP-MM project selection process

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 239,420ROW PURCH $ 0 COST OF

CONSTR $ 4,886,116 APPROVEDCONST ENG $ 195,445 PHASES

CONTING $ 342,028 $ 4,886,116INDIRECT $ 97,722BOND FIN $ 0

PT CHG ORD $ 195,445TOTAL CST $ 5,956,175

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 3,908,893 $ 0 $ 0 $ 977,223 $ 0 $ 4,886,116TOTAL $ 3,908,893 $ 0 $ 0 $ 977,223 $ 0 $ 4,886,116

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0915-12-550 2019 CS C SAN ANTONIO $ 17,177,000LIMITS FROM Harry Wurzbach PROJECT SPONSOR CoSA

REVISION DATE 07/2018LIMITS TO at Austin HighwayPROJECT Construct entrance & exit ramps between Harry Wurzbach and Austin Highway MPO PROJ NUM 5110

DESCR FUNDING CAT(S) 7REMARKS 3rd Qtr 18 - move from FY 2018 to FY 2019 PROJECT 4/18 - move from FY 18 to FY 19; 4/17 - rev limits and fu

P7 HISTORY nding; 1/17 - move from 19 to 18 and rev funding distr; 4/16 - comb with new STP-MM project and rev match (EDCP project); 10/15 - rev funding; 4/14 - funded through STP-MMproject selection process

TOTAL PROJECT COST INFORMATIONPREL ENG $ 842,000

ROW PURCH $ 0 COST OFCONSTR $ 17,177,000 APPROVED

CONST ENG $ 852,000 PHASESCONTING $ 342,000 $ 17,177,000INDIRECT $ 986,000BOND FIN $ 0

PT CHG ORD $ 642,000TOTAL CST $ 20,841,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 13,741,600 $ 1,477,222 $ 0 $ 1,958,178 $ 0 $ 17,177,000TOTAL $ 13,741,600 $ 1,477,222 $ 0 $ 1,958,178 $ 0 $ 17,177,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 70: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 70 OF 696

10:03:31 AM ALAMO AREA MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0915-12-546 2019 NR C OTHER $ 100,000LIMITS FROM Alamo Area MPO: In Bexar, Comal PROJECT SPONSOR AAMPO

REVISION DATE 07/2018LIMITS TO Guadalupe & partial Kendall CountyPROJECT Alamo Area Commute Solutions Pgm - FY 2019 MPO PROJ NUM 5103

DESCR FUNDING CAT(S) 7REMARKS 3rd Qtr 18 - change agency and reduce cost PROJECT 4/18 - change agency and reduce cost; 10/15 - project has

P7 HISTORY $53,400 in TDCs which are not calculated in the fundingtotal; 4/14 - funded through STP-MM project selection process; fixed amount

TOTAL PROJECT COST INFORMATIONPREL ENG $ 0

ROW PURCH $ 0 COST OFCONSTR $ 100,000 APPROVED

CONST ENG $ 0 PHASESCONTING $ 0 $ 100,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 100,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 80,000 $ 0 $ 0 $ 20,000 $ 0 $ 100,000TOTAL $ 80,000 $ 0 $ 0 $ 20,000 $ 0 $ 100,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0915-12-578 2019 CS C $ 8,632,561LIMITS FROM In Universal City, on E. Aviation PROJECT SPONSOR UC

REVISION DATE 07/2018LIMITS TO From Houston Drive to Aztec WayPROJECT Widen to provide operational improvements, bike lanes, sidewalks and drainage MPO PROJ NUM 5325

DESCR FUNDING CAT(S) 3LC,7REMARKS 3rd Qtr 18 - move from FY 2018 to FY 2019; 2nd Qtr PROJECT 4/18 - move from FY 2018 to FY 2019; 1/17 - revise limits

P7 17 - revise limits and description; 3rd Qtr 16 - ne HISTORY and description; 4/16 - funded through STP-MM project sew project in FY 2017-2020 TIP lection process

TOTAL PROJECT COST INFORMATIONPREL ENG $ 422,995

ROW PURCH $ 0 COST OFCONSTR $ 8,632,561 APPROVED

CONST ENG $ 428,175 PHASESCONTING $ 171,788 $ 8,632,561INDIRECT $ 495,509BOND FIN $ 0

PT CHG ORD $ 322,858TOTAL CST $ 10,473,886

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 5,955,339 $ 0 $ 0 $ 1,488,835 $ 0 $ 7,444,1743LC $ 0 $ 0 $ 0 $ 0 $ 1,188,387 $ 1,188,387TOTAL $ 5,955,339 $ 0 $ 0 $ 1,488,835 $ 1,188,387 $ 8,632,561

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA COMAL 0016-04-113 2019 IH 35 C OTHER $ 1,200,000LIMITS FROM Hays County Line PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO 0.5 Mi S. of Hays County LinePROJECT Revise ramps and convert frontage roads from two way to one way operation MPO PROJ NUM 5339

DESCR FUNDING CAT(S) 12REMARKS 3rd Qtr 18 - move from FY 2018 to FY 2019 PROJECT 4/18 - move from FY 2018 to FY 2019; 4/17 - move from FY

P7 HISTORY 2017 to FY 2018; 6/16 - Austin TxDOT District to develop,fund and let to contract in Hays County

TOTAL PROJECT COST INFORMATIONPREL ENG $ 58,800

ROW PURCH $ 0 COST OFCONSTR $ 1,200,000 APPROVED

CONST ENG $ 76,560 PHASESCONTING $ 15,480 $ 1,200,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 69,360TOTAL CST $ 1,420,200

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL12 $ 1,080,000 $ 120,000 $ 0 $ 0 $ 0 $ 1,200,000TOTAL $ 1,080,000 $ 120,000 $ 0 $ 0 $ 0 $ 1,200,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 71: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 71 OF 696

10:03:31 AM ALAMO AREA MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0073-08-183 2019 IH 37 C SAN ANTONIO $ 2,900,000LIMITS FROM LP 13 PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO IH 410PROJECT Construction of a partial frontage road, ramps, and intersection improvements MPO PROJ NUM 4969

DESCR FUNDING CAT(S) 3LC,11REMARKS 3rd Qtr 18 - move from FY 2018 to FY 2019 PROJECT 4/18 - move from FY 2018 to FY 2019; 10/17 - move from FY

P7 HISTORY 2017 to FY 2018; 10/15 - add project TOTAL PROJECT COST INFORMATION

PREL ENG $ 142,100ROW PURCH $ 0 COST OF

CONSTR $ 2,900,000 APPROVEDCONST ENG $ 185,020 PHASES

CONTING $ 37,410 $ 2,900,000INDIRECT $ 166,460BOND FIN $ 0

PT CHG ORD $ 167,620TOTAL CST $ 3,598,610

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 2,175,000 $ 2,175,00011 $ 652,500 $ 72,500 $ 0 $ 0 $ 0 $ 725,000TOTAL $ 652,500 $ 72,500 $ 0 $ 0 $ 2,175,000 $ 2,900,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0915-12-544 2019 CS C OTHER $ 7,323,351LIMITS FROM On Galm Road, from FM 471 (Culebra Road) PROJECT SPONSOR BxCo

REVISION DATE 07/2018LIMITS TO Government Canyon State ParkPROJECT Expand from 2 to 4 lanes, including drainage improvements, bike & pedestrian ame MPO PROJ NUM 5105

DESCR nities FUNDING CAT(S) 7,12SREMARKS 3rd Qtr 18 - move from FY 2018 to FY 2019 PROJECT 4/18 - move from FY 2018 to FY 2019; 1/16 - revise fundin

P7 HISTORY g; 4/14 - funded through STP-MM project selection process TOTAL PROJECT COST INFORMATION

PREL ENG $ 358,844ROW PURCH $ 0 COST OF

CONSTR $ 7,323,351 APPROVEDCONST ENG $ 363,238 PHASES

CONTING $ 145,735 $ 7,323,351INDIRECT $ 353,718BOND FIN $ 0

PT CHG ORD $ 273,893TOTAL CST $ 8,818,779

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 2,578,681 $ 0 $ 0 $ 644,670 $ 0 $ 3,223,35112S $ 3,280,000 $ 0 $ 0 $ 820,000 $ 0 $ 4,100,000TOTAL $ 5,858,681 $ 0 $ 0 $ 1,464,670 $ 0 $ 7,323,351

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0915-12-543 2019 NR C OTHER $ 100,000LIMITS FROM Alamo Area MPO: In Bexar, Comal PROJECT SPONSOR AAMPO

REVISION DATE 07/2018LIMITS TO Guadalupe & partial Kendall CountyPROJECT Alamo Area Commute Solutions Pgm - FY 2018 MPO PROJ NUM 5102

DESCR FUNDING CAT(S) 7REMARKS 3rd Qtr 18 - move from FY 2018 to FY 2019 PROJECT 4/18 - move from FY 2018 to FY 2019, change agency and re

P7 HISTORY duce cost; 10/15 - project has $53,400 in TDCs which arenot calculated in the funding total; 4/14 - funded through STP-MM project selection process; fixed amount

TOTAL PROJECT COST INFORMATIONPREL ENG $ 0

ROW PURCH $ 0 COST OFCONSTR $ 100,000 APPROVED

CONST ENG $ 0 PHASESCONTING $ 0 $ 100,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 100,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 80,000 $ 0 $ 0 $ 20,000 $ 0 $ 100,000TOTAL $ 80,000 $ 0 $ 0 $ 20,000 $ 0 $ 100,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 72: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 72 OF 696

10:03:31 AM ALAMO AREA MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0915-12-547 2019 NR C OTHER $ 100,000LIMITS FROM Alamo Area MPO: In Bexar, Comal PROJECT SPONSOR AACOG

REVISION DATE 07/2018LIMITS TO Guadalupe & partial Kendall CountyPROJECT Alamo Area Commute Solutions Pgm - FY 2017 MPO PROJ NUM 5101

DESCR FUNDING CAT(S) 7REMARKS 3rd Qtr 18 - move from FY 2018 to FY 2019 PROJECT 4/18 - move from FY 2018 to FY 2019 and reduce cost; 10/1

P7 HISTORY 7 - move from 17 to 18; 10/15 - project has $53,400 in TDCs which are not calculated in the funding total; 4/14 -funded through STP-MM project selection process; fixed amount

TOTAL PROJECT COST INFORMATIONPREL ENG $ 0

ROW PURCH $ 0 COST OFCONSTR $ 100,000 APPROVED

CONST ENG $ 0 PHASESCONTING $ 0 $ 100,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 100,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 80,000 $ 0 $ 0 $ 20,000 $ 0 $ 100,000TOTAL $ 80,000 $ 0 $ 0 $ 20,000 $ 0 $ 100,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0915-12-509 2019 CR C OTHER $ 8,097,480LIMITS FROM On Bulverde Road from Marshall Road PROJECT SPONSOR ARMA

REVISION DATE 07/2018LIMITS TO Wilderness OakPROJECT Reconstruct and widen to 4 lanes with shoulder, pedestrian ramps, curb, bridge c MPO PROJ NUM 3988

DESCR onstruction and drainage improvements FUNDING CAT(S) 7REMARKS 3rd Qtr 18 - move from FY 2018 to FY 2019 PROJECT 4/18 - move from FY 18 to FY 19; 1/17 - move from 17 to 1

P7 HISTORY 8; 4/15 - move from 15 to 16 and update description; 1/14- move from 14 to 15; 4/13- move from FY 13 to FY 14 andrevise funding categories; 4/12 - funded through STP-MMproject selection process

TOTAL PROJECT COST INFORMATIONPREL ENG $ 396,777

ROW PURCH $ 0 COST OFCONSTR $ 8,097,480 APPROVED

CONST ENG $ 401,635 PHASESCONTING $ 463,986 $ 8,097,480INDIRECT $ 554,677BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 9,914,555

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 6,477,984 $ 0 $ 0 $ 1,619,496 $ 0 $ 8,097,480TOTAL $ 6,477,984 $ 0 $ 0 $ 1,619,496 $ 0 $ 8,097,480

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0915-12-520 2019 CS C,E,R SAN ANTONIO $ 7,800,000LIMITS FROM On Quintana Road from Harmon Avenue PROJECT SPONSOR Port SA

REVISION DATE 07/2018LIMITS TO McKenna AvenuePROJECT Rehab and realign roadway, intersection and flood control improvements MPO PROJ NUM 4005

DESCR FUNDING CAT(S) 7REMARKS 3rd Qtr 18 - move from FY 2018 to FY 2019 PROJECT 4/18 - move from FY 2018 to FY 2019; 1/17 - move from FY

P7 HISTORY 2017 to FY 2018; 4/16 - revise match (EDCP project); 1/16- move from FY 16 to FY 17; 1/14 - included PE and ROW as funded phases; 4/12 - funded through STP-MM project selection process

TOTAL PROJECT COST INFORMATIONPREL ENG $ 353,200

ROW PURCH $ 1,600,000 COST OFCONSTR $ 5,846,800 APPROVED

CONST ENG $ 286,500 PHASESCONTING $ 267,200 $ 7,800,000INDIRECT $ 282,400BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 8,636,100

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 6,240,000 $ 670,800 $ 0 $ 889,200 $ 0 $ 7,800,000TOTAL $ 6,240,000 $ 670,800 $ 0 $ 889,200 $ 0 $ 7,800,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 73: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 73 OF 696

10:03:31 AM ALAMO AREA MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 2230-01-013 2019 FM 1560 C SAN ANTONIO $ 12,325,004LIMITS FROM SH 16 PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO Loop 1604PROJECT Expand from 2 to 4 lanes with raised medians, bike lanes and sidewalks MPO PROJ NUM 3997

DESCR FUNDING CAT(S) 1,7,12SREMARKS 3rd Qtr 18 - move from FY 2018 to FY 2019 PROJECT 4/18 - move from 18 to 19; 4/17 - move from 17 to 18; 4/1

P7 HISTORY 6 - move from 16 to 17; 4/15 - move from 15 to 16; 4/12 -funded through STP-MM project selection process

TOTAL PROJECT COST INFORMATIONPREL ENG $ 592,900

ROW PURCH $ 0 COST OFCONSTR $ 12,325,004 APPROVED

CONST ENG $ 600,160 PHASESCONTING $ 693,330 $ 12,325,004INDIRECT $ 828,850BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 15,040,244

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 8,856,000 $ 2,214,000 $ 0 $ 0 $ 0 $ 11,070,00012S $ 824,000 $ 206,000 $ 0 $ 0 $ 0 $ 1,030,0001 $ 180,003 $ 45,001 $ 0 $ 0 $ 0 $ 225,004TOTAL $ 9,860,003 $ 2,465,001 $ 0 $ 0 $ 0 $ 12,325,004

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0915-12-514 2019 CS C LEON VALLEY $ 933,000LIMITS FROM SH 16 - Bandera Road PROJECT SPONSOR LV

REVISION DATE 07/2018LIMITS TO Crystal Hills ParkPROJECT Construction of a hike and bike trail along Huebner Creek MPO PROJ NUM 3992

DESCR FUNDING CAT(S) 7REMARKS 3rd Qtr 17 - move from FY 2017 to FY 2019 PROJECT 4/17 - move from FY 2017 to FY 2019; 10/15 - move from FY

P7 HISTORY 2015 to FY 2017 and revise limits; 4/14 - revise limitsand move from FY 2014 to FY 2015; 4/12 - funded through STP-MM project selection process

TOTAL PROJECT COST INFORMATIONPREL ENG $ 45,717

ROW PURCH $ 0 COST OFCONSTR $ 933,000 APPROVED

CONST ENG $ 59,525 PHASESCONTING $ 65,963 $ 933,000INDIRECT $ 63,911BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,168,116

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 746,400 $ 0 $ 0 $ 186,600 $ 0 $ 933,000TOTAL $ 746,400 $ 0 $ 0 $ 186,600 $ 0 $ 933,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA MEDINA 3544-06-001 2019 SH 211 C OTHER $ 4,100,000LIMITS FROM Bexar C/L, 2.9 MI N of FM 1957, N PROJECT SPONSOR BxCo

REVISION DATE 07/2018LIMITS TO Bexar C/L, 4.5 MI N of FM 1957PROJECT Construct two lane rural highway on new location MPO PROJ NUM 3155

DESCR FUNDING CAT(S) 3PTFREMARKS 3rd Qtr 18 - move from FY 2018 to FY 2019 PROJECT 4/18 - move from FY 2018 to FY 2019; 10/17 - move from FY

P7 HISTORY 2017 to FY 2018; 4/15 - move from FY 2015 to FY 2016; Pass through financing project to be reimbursed from Cat 12

TOTAL PROJECT COST INFORMATIONPREL ENG $ 217,293

ROW PURCH $ 1,000,000 COST OFCONSTR $ 4,100,000 APPROVED

CONST ENG $ 199,555 PHASESCONTING $ 288,246 $ 4,100,000INDIRECT $ 224,832BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 6,029,926

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3PTF $ 0 $ 0 $ 0 $ 0 $ 4,100,000 $ 4,100,000TOTAL $ 0 $ 0 $ 0 $ 0 $ 4,100,000 $ 4,100,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 74: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 74 OF 696

10:03:31 AM ALAMO AREA MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 3544-05-001 2019 SH 211 C OTHER $ 2,600,000LIMITS FROM Medina Co. Line, 4.5 Mi N of FM 1957, N PROJECT SPONSOR BxCo

REVISION DATE 07/2018LIMITS TO Medina Co. Line, 2.0 Mi S of FM 471PROJECT Construct two lane rural highway on new location MPO PROJ NUM 3154

DESCR FUNDING CAT(S) 3PTFREMARKS 3rd Qtr 18 - move from FY 2018 to FY 2019 PROJECT 4/18 - move from FY 2018 to FY 2019; 10/17 - move from FY

P7 HISTORY 2017 to FY 2018; 4/15 - move from FY 2015 to FY 2016; Pass through financing project to be reimbursed from Cat 12

TOTAL PROJECT COST INFORMATIONPREL ENG $ 137,796

ROW PURCH $ 700,000 COST OFCONSTR $ 2,600,000 APPROVED

CONST ENG $ 126,547 PHASESCONTING $ 182,790 $ 2,600,000INDIRECT $ 142,577BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 3,889,710

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3PTF $ 0 $ 0 $ 0 $ 0 $ 2,600,000 $ 2,600,000TOTAL $ 0 $ 0 $ 0 $ 0 $ 2,600,000 $ 2,600,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 3544-04-002 2019 SH 211 C OTHER $ 7,000,000LIMITS FROM FM 1957 (Potranco Rd), N 2.9 Mi PROJECT SPONSOR BxCo

REVISION DATE 07/2018LIMITS TO Medina County LinePROJECT Construct two lane rural highway on new location MPO PROJ NUM 3153

DESCR FUNDING CAT(S) 3PTFREMARKS 3rd Qtr 18 - move from FY 2018 to FY 2019 PROJECT 4/18 - move from FY 2018 to FY 2019; 10/17 - move from FY

P7 HISTORY 2017 to FY 2018; 4/15 - move from FY 2015 to FY 2016; Pass through financing project to be reimbursed from Cat 12

TOTAL PROJECT COST INFORMATIONPREL ENG $ 370,989

ROW PURCH $ 1,780,000 COST OFCONSTR $ 7,000,000 APPROVED

CONST ENG $ 340,704 PHASESCONTING $ 492,128 $ 7,000,000INDIRECT $ 383,860BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 10,367,681

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3PTF $ 0 $ 0 $ 0 $ 0 $ 7,000,000 $ 7,000,000TOTAL $ 0 $ 0 $ 0 $ 0 $ 7,000,000 $ 7,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA MEDINA 3544-03-002 2019 SH 211 C OTHER $ 4,400,000LIMITS FROM Bexar CL, 2.0 MI S of FM 471, N PROJECT SPONSOR BxCo

REVISION DATE 07/2018LIMITS TO FM 471 (Culebra Rd)PROJECT Construct two lane rural highway on new location MPO PROJ NUM 3152

DESCR FUNDING CAT(S) 3PTFREMARKS 3rd Qtr 18 - move from FY 2018 to FY 2019 PROJECT 4/18 - move from FY 2018 to FY 2019; 10/17 - move from FY

P7 HISTORY 2017 to FY 2018; 4/15 - move from FY 2015 to FY 2016; Pass through financing project to be reimbursed from Cat 12

TOTAL PROJECT COST INFORMATIONPREL ENG $ 233,193

ROW PURCH $ 1,100,000 COST OFCONSTR $ 4,400,000 APPROVED

CONST ENG $ 214,157 PHASESCONTING $ 309,338 $ 4,400,000INDIRECT $ 241,283BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 6,497,971

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3PTF $ 0 $ 0 $ 0 $ 0 $ 4,400,000 $ 4,400,000TOTAL $ 0 $ 0 $ 0 $ 0 $ 4,400,000 $ 4,400,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 75: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 75 OF 696

10:03:31 AM ALAMO AREA MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0915-00-213 2020 VA C OTHER $ 4,500,000LIMITS FROM Various locations within PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO Bexar, Comal and Kendall CountiesPROJECT Safety Service Patrol on controlled access highways in Bexar, Comal and Kendall MPO PROJ NUM 5544.2

DESCR Counties-FY 2020 FUNDING CAT(S) 7REMARKS 4/18 - add project to FY 2019-2022 TIP PROJECT 4/18 - funded through the 19-22 STP-MM Call for Projects

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 4,500,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 4,500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 4,500,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 3,600,000 $ 900,000 $ 0 $ 0 $ 0 $ 4,500,000TOTAL $ 3,600,000 $ 900,000 $ 0 $ 0 $ 0 $ 4,500,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0658-01-044 2020 FM 1535 C SAN ANTONIO $ 7,500,000LIMITS FROM Shavano Ranch Road PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO Lp 1604PROJECT Expand from 2 to 4 lanes with raised median, or center turn lane, bike lanes and MPO PROJ NUM 5310

DESCR sidewalks FUNDING CAT(S) 7REMARKS 3rd Qtr 16 - new project in FY 2017-2020 TIP PROJECT 4/18 - move from FY 2021 to FY 2020; 4/16 - funded throug

P7 HISTORY h STP-MM project selection process TOTAL PROJECT COST INFORMATION

PREL ENG $ 367,500ROW PURCH $ 0 COST OF

CONSTR $ 7,500,000 APPROVEDCONST ENG $ 372,000 PHASES

CONTING $ 149,250 $ 7,500,000INDIRECT $ 430,500BOND FIN $ 0

PT CHG ORD $ 280,500TOTAL CST $ 9,099,750

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 6,000,000 $ 1,500,000 $ 0 $ 0 $ 0 $ 7,500,000TOTAL $ 6,000,000 $ 1,500,000 $ 0 $ 0 $ 0 $ 7,500,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0521-05-148 2020 IH 410 C SAN ANTONIO $ 8,100,000LIMITS FROM FM 2536 - Old Pearsall Road PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO Valley Hi DrivePROJECT Operational improvements, including ramp revisions and intersection improvements MPO PROJ NUM 5542

DESCR FUNDING CAT(S) 7REMARKS 4/18 - add project to FY 2019-2022 TIP PROJECT 4/18 - funded through the 19-22 STP-MM Call for Projects

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 396,900ROW PURCH $ 0 COST OF

CONSTR $ 8,100,000 APPROVEDCONST ENG $ 486,000 PHASES

CONTING $ 567,000 $ 8,100,000INDIRECT $ 405,000BOND FIN $ 0

PT CHG ORD $ 324,000TOTAL CST $ 10,278,900

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 6,480,000 $ 1,620,000 $ 0 $ 0 $ 0 $ 8,100,000TOTAL $ 6,480,000 $ 1,620,000 $ 0 $ 0 $ 0 $ 8,100,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 76: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 76 OF 696

10:03:31 AM ALAMO AREA MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA COMAL 0216-01-057 2020 SL 337 C NEW BRAUNFELS $ 10,400,000LIMITS FROM at River Road PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO .PROJECT Construct grade separation MPO PROJ NUM 5543

DESCR FUNDING CAT(S) 7REMARKS 4/18 - add project to FY 2019-2022 TIP PROJECT 4/18 - funded through the 19-22 STP-MM Call for Projects

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 509,600ROW PURCH $ 0 COST OF

CONSTR $ 10,400,000 APPROVEDCONST ENG $ 624,000 PHASES

CONTING $ 728,000 $ 10,400,000INDIRECT $ 520,000BOND FIN $ 0

PT CHG ORD $ 416,000TOTAL CST $ 13,197,600

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 8,320,000 $ 2,080,000 $ 0 $ 0 $ 0 $ 10,400,000TOTAL $ 8,320,000 $ 2,080,000 $ 0 $ 0 $ 0 $ 10,400,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0915-12-596 2020 CS C SAN ANTONIO $ 5,000,000LIMITS FROM In San Antonio, on Zarzamora PROJECT SPONSOR CoSA

REVISION DATE 07/2018LIMITS TO From Fredericksburg Rd to Loop 13PROJECT Construct sidewalks, remove unused utility poles, and implement pedestian detect MPO PROJ NUM 4974

DESCR ion ITS FUNDING CAT(S) 3LC,9TAPREMARKS 4th Qtr 17 - add project PROJECT 6/17 - add TA project

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 245,000ROW PURCH $ 0 COST OF

CONSTR $ 5,000,000 APPROVEDCONST ENG $ 319,000 PHASES

CONTING $ 64,500 $ 5,000,000INDIRECT $ 241,500BOND FIN $ 0

PT CHG ORD $ 289,000TOTAL CST $ 6,159,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 3,600,000 $ 0 $ 0 $ 900,000 $ 0 $ 4,500,0003LC $ 0 $ 0 $ 0 $ 0 $ 500,000 $ 500,000TOTAL $ 3,600,000 $ 0 $ 0 $ 900,000 $ 500,000 $ 5,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 2452-03-113 2020 SL 1604 C,E,R SAN ANTONIO $ 47,808,839LIMITS FROM US 281 PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO Redland RoadPROJECT Expand to 8 lane expressway - construct 4 new managed lanes MPO PROJ NUM 3786

DESCR FUNDING CAT(S) 3LCREMARKS 3rd Qtr 17 - revise cost PROJECT 4/17 - revise cost; 4/14 - rev limits, year (’’15 to ’’20

P7 HISTORY ), description and funding distribution TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,434,266ROW PURCH $ 0 COST OF

CONSTR $ 47,808,839 APPROVEDCONST ENG $ 1,195,221 PHASES

CONTING $ 1,673,310 $ 47,808,839INDIRECT $ 478,088BOND FIN $ 0

PT CHG ORD $ 4,780,884TOTAL CST $ 57,370,607

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 47,808,839 $ 47,808,839TOTAL $ 0 $ 0 $ 0 $ 0 $ 47,808,839 $ 47,808,839

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 77: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 77 OF 696

10:03:31 AM ALAMO AREA MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0915-12-581 2020 CR C OTHER $ 20,917,924LIMITS FROM In Bexar County, on Talley Road PROJECT SPONSOR BxCo

REVISION DATE 07/2018LIMITS TO From Wiseman Blvd to Tamaron PassPROJECT Widen to provide operational improvements including a continuous left turn lane; MPO PROJ NUM 5304

DESCR construct 10 ft. shared use path FUNDING CAT(S) 3LC,7REMARKS 3rd Qtr 18 - funded through 2016 and 2018 STP-MM PROJECT 4/18 and 4/16 - funded through STP-MM project selection p

P7 HISTORY rocesses TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,025,000ROW PURCH $ 0 COST OF

CONSTR $ 20,917,924 APPROVEDCONST ENG $ 1,255,000 PHASES

CONTING $ 1,464,000 $ 20,917,924INDIRECT $ 1,046,000BOND FIN $ 0

PT CHG ORD $ 837,000TOTAL CST $ 26,544,924

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 15,534,339 $ 0 $ 0 $ 3,883,585 $ 0 $ 19,417,9243LC $ 0 $ 0 $ 0 $ 0 $ 1,500,000 $ 1,500,000TOTAL $ 15,534,339 $ 0 $ 0 $ 3,883,585 $ 1,500,000 $ 20,917,924

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0915-00-195 2020 NR C OTHER $ 100,000LIMITS FROM Alamo Area MPO: Bexar, Comal PROJECT SPONSOR AAMPO

REVISION DATE 07/2018LIMITS TO Guadalupe & partial Kendall CountyPROJECT Alamo Area Commute Solutions Pgm - FY 2020 MPO PROJ NUM 5301

DESCR FUNDING CAT(S) 7REMARKS 3rd Qtr 18 - change agency and reduce cost PROJECT 4/18 - change agency and reduce cost; 4/16 - funded throu

P7 HISTORY gh STP-MM project selection process; fixed amount TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 100,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 100,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 100,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 80,000 $ 0 $ 0 $ 20,000 $ 0 $ 100,000TOTAL $ 80,000 $ 0 $ 0 $ 20,000 $ 0 $ 100,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0016-08-034 2020 SL 368 C SAN ANTONIO $ 14,000,000LIMITS FROM Burr Road PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO IH 35PROJECT Roadway rehabilitation and complete streets improvements MPO PROJ NUM 5313

DESCR FUNDING CAT(S) 1,7REMARKS 3rd Qtr 17 - revise funding PROJECT 4/17 - revise funding; 4/16 - funded through STP-MM proje

P7 HISTORY ct selection process TOTAL PROJECT COST INFORMATION

PREL ENG $ 686,000ROW PURCH $ 0 COST OF

CONSTR $ 14,000,000 APPROVEDCONST ENG $ 694,400 PHASES

CONTING $ 278,600 $ 14,000,000INDIRECT $ 803,600BOND FIN $ 0

PT CHG ORD $ 523,600TOTAL CST $ 16,986,200

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 7,200,000 $ 1,800,000 $ 0 $ 0 $ 0 $ 9,000,0001 $ 4,000,000 $ 1,000,000 $ 0 $ 0 $ 0 $ 5,000,000TOTAL $ 11,200,000 $ 2,800,000 $ 0 $ 0 $ 0 $ 14,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 78: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 78 OF 696

10:03:31 AM ALAMO AREA MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 7774-01-001 2020 PA 1502 C SAN ANTONIO $ 9,000,000LIMITS FROM Lockhill Selma Road PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO FM 1535-NW MilitaryPROJECT Intersection and operational improvements MPO PROJ NUM 5315.3

DESCR FUNDING CAT(S) 2M,3LC,7,7REMARKS 2nd Qtr 18 - revise CSJ from 1502-03-003 and decrea PROJECT 3/18 - revise CSJ from 1502-03-003 and decrease cost; 4/1

P7 se cost HISTORY 7 - move from FY 18 to FY 20, revise funding and limits;4/16 - funded through STP-MM project selection process

TOTAL PROJECT COST INFORMATIONPREL ENG $ 441,000

ROW PURCH $ 0 COST OFCONSTR $ 9,000,000 APPROVED

CONST ENG $ 360,000 PHASESCONTING $ 630,000 $ 9,000,000INDIRECT $ 180,000BOND FIN $ 0

PT CHG ORD $ 360,000TOTAL CST $ 10,971,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 6,400,000 $ 1,600,000 $ 0 $ 0 $ 0 $ 8,000,0002M $ 800,000 $ 200,000 $ 0 $ 0 $ 0 $ 1,000,0007 $ 6,400,000 $ 1,600,000 $ 0 $ 0 $ 0 $ 8,000,0003LC $ 0 $ 0 $ 0 $ 0 $ 3,000,000 $ 3,000,000TOTAL $ 13,600,000 $ 3,400,000 $ 0 $ 0 $ 3,000,000 $ 20,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA GUADALUPE 1268-02-027 2020 FM 1103 C OTHER $ 22,500,000LIMITS FROM Comal C/L PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO Rodeo WayPROJECT Expand to 4 lanes with medians, turn lanes, sidewalk and bike lanes MPO PROJ NUM 4971

DESCR FUNDING CAT(S) 1,3LC,11REMARKS 3rd Qtr 17 - move from FY 2019 to FY 2020 and revis PROJECT 4/17 - move from FY 2019 to FY 2020 and revise funding; 1

P7 e funding HISTORY /17 - move from FY 2018 to FY 2019 and revise funding; 10/15 - add project

TOTAL PROJECT COST INFORMATIONPREL ENG $ 1,102,500

ROW PURCH $ 3,285,000 COST OFCONSTR $ 22,500,000 APPROVED

CONST ENG $ 1,116,000 PHASESCONTING $ 447,750 $ 22,500,000INDIRECT $ 1,291,500BOND FIN $ 0

PT CHG ORD $ 841,500TOTAL CST $ 30,584,250

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL1 $ 7,307,482 $ 1,826,870 $ 0 $ 0 $ 0 $ 9,134,35211 $ 4,720,000 $ 1,180,000 $ 0 $ 0 $ 0 $ 5,900,0003LC $ 0 $ 0 $ 0 $ 0 $ 7,465,648 $ 7,465,648TOTAL $ 12,027,482 $ 3,006,870 $ 0 $ 0 $ 7,465,648 $ 22,500,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA COMAL 1268-01-013 2020 FM 1103 C OTHER $ 1,500,000LIMITS FROM IH 35 PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO Guadalupe C/LPROJECT Expand to 4 lanes with medians, turn lanes, sidewalk and bike lanes MPO PROJ NUM 4970

DESCR FUNDING CAT(S) 1,3LCREMARKS 3rd Qtr 17 - move from FY 2019 to FY 2020 PROJECT 4/17 - move from FY 2019 to FY 2020; 1/17 - move from FY

P7 HISTORY 2018 to FY 2019; 10/15 - add project TOTAL PROJECT COST INFORMATION

PREL ENG $ 73,500ROW PURCH $ 870,000 COST OF

CONSTR $ 1,500,000 APPROVEDCONST ENG $ 74,400 PHASES

CONTING $ 29,850 $ 1,500,000INDIRECT $ 86,100BOND FIN $ 0

PT CHG ORD $ 56,100TOTAL CST $ 2,689,950

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL1 $ 800,000 $ 200,000 $ 0 $ 0 $ 0 $ 1,000,0003LC $ 0 $ 0 $ 0 $ 0 $ 500,000 $ 500,000TOTAL $ 800,000 $ 200,000 $ 0 $ 0 $ 500,000 $ 1,500,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 79: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 79 OF 696

10:03:31 AM ALAMO AREA MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0915-00-172 2020 VA T SAN ANTONIO $ 2,000,000LIMITS FROM Rapid Transit Corridor Study PROJECT SPONSOR VIA

REVISION DATE 07/2018LIMITS TO .PROJECT Rapid Transit Corridor Study - FY 2020 MPO PROJ NUM 3768.1

DESCR FUNDING CAT(S) 7REMARKS 3rd Qtr 18 - move from FY 2018 to FY 2019; split of PROJECT 4/18 - move from 18 to 20, split off $2M, change name; 10

P7 f $2M, change name HISTORY /17 - move from 17 to 18; 1/17 - rev limit,cost,agency,descr; 4/15 - move from 16 to 17, correct limits; 1/13 - move from 13 to 15; fixed amount; portion of $20M for PassRail

TOTAL PROJECT COST INFORMATIONPREL ENG $ 0

ROW PURCH $ 0 COST OFCONSTR $ 2,000,000 APPROVED

CONST ENG $ 0 PHASESCONTING $ 0 $ 2,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,000,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 1,600,000 $ 0 $ 0 $ 400,000 $ 0 $ 2,000,000TOTAL $ 1,600,000 $ 0 $ 0 $ 400,000 $ 0 $ 2,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 2452-02-083 2020 SL 1604 C,E,R SAN ANTONIO $ 507,705,768LIMITS FROM SH 16 PROJECT SPONSOR ARMA

REVISION DATE 07/2018LIMITS TO US 281PROJECT Expand to 8 lane expressway - construct 4 new managed lanes; including managed l MPO PROJ NUM 3913

DESCR ane direct connectors at IH 10 FUNDING CAT(S) 2M,3LCREMARKS 3rd Qtr 17 - revise limits, description and cost PROJECT 4/17 - revise limits, descr, cost (has $398.3M in Cat 2:

P7 HISTORY ’’17-’’24); 4/14 - rev year (’’15 to ’’20), description and funding distribution; 7/13 - project had $53M in Category 2 funding (yrs 2016-2020)

TOTAL PROJECT COST INFORMATIONPREL ENG $ 15,231,173

ROW PURCH $ 0 COST OFCONSTR $ 507,705,768 APPROVED

CONST ENG $ 12,692,644 PHASESCONTING $ 17,769,702 $ 507,705,768INDIRECT $ 5,077,058BOND FIN $ 0

PT CHG ORD $ 50,770,577TOTAL CST $ 609,246,922

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 102,311,515 $ 25,577,879 $ 0 $ 0 $ 0 $ 127,889,3943LC $ 0 $ 0 $ 0 $ 0 $ 379,816,374 $ 379,816,374TOTAL $ 102,311,515 $ 25,577,879 $ 0 $ 0 $ 379,816,374 $ 507,705,768

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 80: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 80 OF 696

10:03:31 AM ALAMO AREA MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA COMAL 1433-02-044 2021 FM 2252 C OTHER $ 19,000,000LIMITS FROM Bexar/Comal County Line PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO FM 3009PROJECT Expand from 2 lanes to 4 lanes with raised median or continuous left turn lane, MPO PROJ NUM 9115

DESCR bike lanes and sidewalk FUNDING CAT(S) 2MREMARKS 2nd Qtr 18 - reverse lmits and revised funding dist PROJECT 3/18 - reverse limits and revise funding distribution; 4/

P7 ribution (MTP only) HISTORY 17 - move from FY 2023 to FY 2021; added w/ 12/8/14 adoption of the MTP

TOTAL PROJECT COST INFORMATIONPREL ENG $ 931,000

ROW PURCH $ 0 COST OFCONSTR $ 19,000,000 APPROVED

CONST ENG $ 760,000 PHASESCONTING $ 1,330,000 $ 19,000,000INDIRECT $ 380,000BOND FIN $ 0

PT CHG ORD $ 760,000TOTAL CST $ 23,161,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 15,200,000 $ 3,800,000 $ 0 $ 0 $ 0 $ 19,000,000TOTAL $ 15,200,000 $ 3,800,000 $ 0 $ 0 $ 0 $ 19,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 1433-01-028 2021 FM 2252 C SAN ANTONIO $ 6,000,000LIMITS FROM Evans Road PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO Comal/Bexar County LinePROJECT Expand from 2 lanes to 4 lanes with raised median or continuous left turn lane, MPO PROJ NUM 5329

DESCR bike lanes and sidewalk FUNDING CAT(S) 2MREMARKS 2nd Qtr 18 - revise funding distribution PROJECT 3/18 - revise funding distribution; 4/17 - move from FY 2

P7 HISTORY 027 to FY 2021 TOTAL PROJECT COST INFORMATION

PREL ENG $ 294,000ROW PURCH $ 0 COST OF

CONSTR $ 6,000,000 APPROVEDCONST ENG $ 240,000 PHASES

CONTING $ 420,000 $ 6,000,000INDIRECT $ 120,000BOND FIN $ 0

PT CHG ORD $ 240,000TOTAL CST $ 7,314,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 4,800,000 $ 1,200,000 $ 0 $ 0 $ 0 $ 6,000,000TOTAL $ 4,800,000 $ 1,200,000 $ 0 $ 0 $ 0 $ 6,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA GUADALUPE 0915-46-045 2021 CS C SEGUIN $ 6,316,658LIMITS FROM In Seguin, on Rudeloff Rd PROJECT SPONSOR Seguin

REVISION DATE 07/2018LIMITS TO From SH 46 to Huber Rd.PROJECT Expand from 2 to 4 lanes with center turn lane, bicycle and pedestian facilities MPO PROJ NUM 5322

DESCR FUNDING CAT(S) 7REMARKS 3rd Qtr 16 - new project in FY 2017-2020 TIP PROJECT 4/16 - funded through STP-MM project selection process

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 309,516ROW PURCH $ 0 COST OF

CONSTR $ 6,316,658 APPROVEDCONST ENG $ 313,306 PHASES

CONTING $ 125,701 $ 6,316,658INDIRECT $ 263,576BOND FIN $ 0

PT CHG ORD $ 236,243TOTAL CST $ 7,565,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 5,053,326 $ 0 $ 0 $ 1,263,332 $ 0 $ 6,316,658TOTAL $ 5,053,326 $ 0 $ 0 $ 1,263,332 $ 0 $ 6,316,658

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 81: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 81 OF 696

10:03:31 AM ALAMO AREA MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0915-12-612 2021 NR T SAN ANTONIO $ 2,000,000LIMITS FROM Rapid Transit Corridor Stidy PROJECT SPONSOR VIA

REVISION DATE 07/2018LIMITS TO .PROJECT Rapid Transit Corridor Study - FY 2021 MPO PROJ NUM 3768.3

DESCR FUNDING CAT(S) 7REMARKS 4/18 - new project created from 0915-00-172 PROJECT 4/18 - new project created from 0915-00-172

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 2,000,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 2,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,000,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 1,600,000 $ 0 $ 0 $ 400,000 $ 0 $ 2,000,000TOTAL $ 1,600,000 $ 0 $ 0 $ 400,000 $ 0 $ 2,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0915-12-611 2021 VA C SAN ANTONIO $ 3,000,000LIMITS FROM In San Antonio PROJECT SPONSOR CoSA

REVISION DATE 07/2018LIMITS TO at various locationsPROJECT Multimodal planning study on three arterials to accommodate travel modes includi MPO PROJ NUM 5545.2

DESCR ng higher capacity transit FUNDING CAT(S) 7REMARKS 4/18 - add project to FY 2019-2022 TIP PROJECT 4/18 - funded through the 19-22 STP-MM Call for Projects

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 3,000,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 3,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 3,000,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 2,400,000 $ 0 $ 0 $ 600,000 $ 0 $ 3,000,000TOTAL $ 2,400,000 $ 0 $ 0 $ 600,000 $ 0 $ 3,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0915-00-214 2021 VA C OTHER $ 4,500,000LIMITS FROM Various locations within PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO Bexar, Comal and Kendall CountiesPROJECT Safety Service Patrol on controlled access highways in Bexar, Comal and Kendall MPO PROJ NUM 5544.3

DESCR Counties-FY 2021 FUNDING CAT(S) 7REMARKS 4/18 - add project to FY 2019-2022 TIP PROJECT 4/18 - funded through the 19-22 STP-MM Call for Projects

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 4,500,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 4,500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 4,500,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 3,600,000 $ 900,000 $ 0 $ 0 $ 0 $ 4,500,000TOTAL $ 3,600,000 $ 900,000 $ 0 $ 0 $ 0 $ 4,500,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 82: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 82 OF 696

10:03:31 AM ALAMO AREA MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0915-00-196 2021 NR C OTHER $ 100,000LIMITS FROM Alamo Area MPO: Bexar, Comal PROJECT SPONSOR AAMPO

REVISION DATE 07/2018LIMITS TO Guadalupe & partial Kendall CountyPROJECT Alamo Area Commute Solutions Pgm - FY 2021 MPO PROJ NUM 5302

DESCR FUNDING CAT(S) 7REMARKS 3rd Qtr 18 - change agency and reduce cost PROJECT 4/18 - change agency and reduce cost; 4/16 - funded throu

P7 HISTORY gh STP-MM project selection process; project has $53,400in TDCs which are not calculated in the funding total; fixed amount

TOTAL PROJECT COST INFORMATIONPREL ENG $ 0

ROW PURCH $ 0 COST OFCONSTR $ 100,000 APPROVED

CONST ENG $ 0 PHASESCONTING $ 0 $ 100,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 100,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 80,000 $ 0 $ 0 $ 20,000 $ 0 $ 100,000TOTAL $ 80,000 $ 0 $ 0 $ 20,000 $ 0 $ 100,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0521-06-138 2021 IH 410 C SAN ANTONIO $ 100,000,000LIMITS FROM at IH 10 E PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO .PROJECT Construct direct connectors: Phase 1 - Priority Connectors MPO PROJ NUM 5371

DESCR FUNDING CAT(S) 2M,4,12CREMARKS 2nd Qtr 18 - revise funding distribution (MTP only) PROJECT 3/18 - revise funding distribution; 4/17 - add project

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 4,800,000ROW PURCH $ 0 COST OF

CONSTR $ 100,000,000 APPROVEDCONST ENG $ 4,000,000 PHASES

CONTING $ 7,000,000 $ 100,000,000INDIRECT $ 2,000,000BOND FIN $ 0

PT CHG ORD $ 4,000,000TOTAL CST $ 121,800,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 45,000,000 $ 5,000,000 $ 0 $ 0 $ 0 $ 50,000,0004 $ 22,500,000 $ 2,500,000 $ 0 $ 0 $ 0 $ 25,000,00012C $ 22,500,000 $ 2,500,000 $ 0 $ 0 $ 0 $ 25,000,000TOTAL $ 90,000,000 $ 10,000,000 $ 0 $ 0 $ 0 $ 100,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0253-06-037 2021 C SAN ANTONIO $ 2,000,000LIMITS FROM at San Antonio River PROJECT SPONSOR CoSA

REVISION DATE 07/2018LIMITS TO .PROJECT Construct bicycle and pedestrian bridge MPO PROJ NUM 5536.2

DESCR FUNDING CAT(S) 7REMARKS 4/18 - add project to FY 2019-2022 TIP PROJECT 4/18 - funded through the 19-22 STP-MM Call for Projects

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 98,000ROW PURCH $ 0 COST OF

CONSTR $ 2,000,000 APPROVEDCONST ENG $ 120,000 PHASES

CONTING $ 140,000 $ 2,000,000INDIRECT $ 100,000BOND FIN $ 0

PT CHG ORD $ 80,000TOTAL CST $ 2,538,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 1,600,000 $ 0 $ 0 $ 400,000 $ 0 $ 2,000,000TOTAL $ 1,600,000 $ 0 $ 0 $ 400,000 $ 0 $ 2,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 83: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 83 OF 696

10:03:31 AM ALAMO AREA MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0025-02-215 2021 IH 10 C OTHER $ 171,000,000LIMITS FROM Loop 1604 PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO Guadalupe/Bexar County LinePROJECT Expand from 4 lane to 6 lane expressway MPO PROJ NUM 5396

DESCR FUNDING CAT(S) 12REMARKS 2nd Qtr 18 - MTP Amendment only PROJECT 3/18 - move from FY 2029 to FY 2021 and revise funding di

P7 HISTORY stribution; 4/17 - add project to MTP with Prop 1/Prop 7;portion of project may have already been in the MTP

TOTAL PROJECT COST INFORMATIONPREL ENG $ 8,379,000

ROW PURCH $ 0 COST OFCONSTR $ 171,000,000 APPROVED

CONST ENG $ 6,840,000 PHASESCONTING $ 11,970,000 $ 171,000,000INDIRECT $ 3,420,000BOND FIN $ 0

PT CHG ORD $ 6,840,000TOTAL CST $ 208,449,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL12 $ 153,900,000 $ 17,100,000 $ 0 $ 0 $ 0 $ 171,000,000TOTAL $ 153,900,000 $ 17,100,000 $ 0 $ 0 $ 0 $ 171,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA COMAL 0016-04-112 2021 IH 35 C OTHER $ 75,000,000LIMITS FROM Guadalupe River PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO Hays/Comal County LinePROJECT Operational improvements including ramp revisions and intersection improvements MPO PROJ NUM 5375

DESCR - convert frontage road to one way FUNDING CAT(S) 4REMARKS 2nd Qtr 18 - MTP Amendment only PROJECT 3/18 - revise funding distribution; 1/18 - move from FY 2

P7 HISTORY 022 to FY 2021 and increase cost from $50M to $75M in Cat4; 4/17 - add project

TOTAL PROJECT COST INFORMATIONPREL ENG $ 3,675,000

ROW PURCH $ 0 COST OFCONSTR $ 75,000,000 APPROVED

CONST ENG $ 3,000,000 PHASESCONTING $ 5,250,000 $ 75,000,000INDIRECT $ 1,500,000BOND FIN $ 0

PT CHG ORD $ 3,000,000TOTAL CST $ 91,425,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 67,500,000 $ 7,500,000 $ 0 $ 0 $ 0 $ 75,000,000TOTAL $ 67,500,000 $ 7,500,000 $ 0 $ 0 $ 0 $ 75,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0915-12-604 2021 CS C SAN ANTONIO $ 10,000,000LIMITS FROM In San Antonio on Presa Street PROJECT SPONSOR CoSA

REVISION DATE 07/2018LIMITS TO from W. Boyer to SE Military Drive (Lp 13)PROJECT Bike and Pedestrian Corridor enhancements to implement Complete Streets MPO PROJ NUM 5434

DESCR FUNDING CAT(S) 3LC,7REMARKS 1st Qtr 18 - add project PROJECT 4/18 - move from FY 2019 to FY 2021; 10/17 - add project

P7 HISTORY per CoSA, funding is from 0025-02-204; 4/16 - revise match (EDCP project); 4/14 - funded through STP-MM project selection process

TOTAL PROJECT COST INFORMATIONPREL ENG $ 490,000

ROW PURCH $ 0 COST OFCONSTR $ 10,000,000 APPROVED

CONST ENG $ 600,000 PHASESCONTING $ 300,000 $ 10,000,000INDIRECT $ 500,000BOND FIN $ 0

PT CHG ORD $ 600,000TOTAL CST $ 12,490,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 7,200,000 $ 0 $ 0 $ 1,800,000 $ 0 $ 9,000,0003LC $ 0 $ 0 $ 0 $ 0 $ 1,000,000 $ 1,000,000TOTAL $ 7,200,000 $ 0 $ 0 $ 1,800,000 $ 1,000,000 $ 10,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 84: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 84 OF 696

10:03:31 AM ALAMO AREA MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0915-12-582 2021 CS C CONVERSE $ 5,430,481LIMITS FROM On Rocket/Schaeffer, from E. Norris PROJECT SPONSOR Converse

REVISION DATE 07/2018LIMITS TO Lp 1604PROJECT Expand from 2 to 4 lane roadway with continuous center turn lane, sidewalks and MPO PROJ NUM 5319

DESCR bike lanes FUNDING CAT(S) 7REMARKS 3rd Qtr 18 - move from FY 2020 to FY 2021 PROJECT 4/18 - move from FY 2020 to FY 2021; 4/16 - funded throug

P7 HISTORY h STP-MM project selection process TOTAL PROJECT COST INFORMATION

PREL ENG $ 266,094ROW PURCH $ 0 COST OF

CONSTR $ 5,430,481 APPROVEDCONST ENG $ 269,352 PHASES

CONTING $ 108,067 $ 5,430,481INDIRECT $ 311,710BOND FIN $ 0

PT CHG ORD $ 203,100TOTAL CST $ 6,588,804

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 4,344,385 $ 0 $ 0 $ 1,086,096 $ 0 $ 5,430,481TOTAL $ 4,344,385 $ 0 $ 0 $ 1,086,096 $ 0 $ 5,430,481

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0915-12-574 2021 VA C OTHER $ 4,000,000LIMITS FROM Various locations in Bexar County PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO on state systemPROJECT Construct curb ramps, sidewalks and other pedestrian related infrastructure MPO PROJ NUM 5316.1

DESCR FUNDING CAT(S) 3LC,7REMARKS 2nd Qtr 17 - revise description and reduce cost fro PROJECT 1/17 - revise description and reduce cost from $5M to $4M

P7 m $5M to $4M and move $1M to 0915-12-586 HISTORY and move $1M to 0915-12-586; 3rd Qtr 16 - new project inFY 2017-2020 TIP

TOTAL PROJECT COST INFORMATIONPREL ENG $ 196,000

ROW PURCH $ 0 COST OFCONSTR $ 4,000,000 APPROVED

CONST ENG $ 240,000 PHASESCONTING $ 280,000 $ 4,000,000INDIRECT $ 226,800BOND FIN $ 0

PT CHG ORD $ 149,600TOTAL CST $ 5,092,400

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 2,800,000 $ 700,000 $ 0 $ 0 $ 0 $ 3,500,0003LC $ 0 $ 0 $ 0 $ 0 $ 500,000 $ 500,000TOTAL $ 2,800,000 $ 700,000 $ 0 $ 0 $ 500,000 $ 4,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0658-01-045 2021 FM 1535 C SAN ANTONIO $ 6,500,000LIMITS FROM Lp 1604 PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO Huebner RoadPROJECT Construct 2 way left turn lane, bike lanes and sidewalks MPO PROJ NUM 5323

DESCR FUNDING CAT(S) 7,12SREMARKS 3rd Qtr 18 - move from FY 2020 to FY 2021 PROJECT 4/18 - move from FY 2020 to FY 2021; 4/16 - funded throug

P7 HISTORY h STP-MM project selection process TOTAL PROJECT COST INFORMATION

PREL ENG $ 318,500ROW PURCH $ 0 COST OF

CONSTR $ 6,500,000 APPROVEDCONST ENG $ 322,400 PHASES

CONTING $ 129,350 $ 6,500,000INDIRECT $ 373,100BOND FIN $ 0

PT CHG ORD $ 243,100TOTAL CST $ 7,886,450

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 5,200,000 $ 1,300,000 $ 0 $ 0 $ 0 $ 6,500,00012S $ 816,000 $ 204,000 $ 0 $ 0 $ 0 $ 1,020,000TOTAL $ 6,016,000 $ 1,504,000 $ 0 $ 0 $ 0 $ 7,520,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 85: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 85 OF 696

10:03:31 AM ALAMO AREA MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 1433-01-029 2021 FM 2252 C OTHER $ 4,200,000LIMITS FROM at Evans Road PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO .PROJECT Construct intersection operational improvements, including widening of Cibolo Cr MPO PROJ NUM 5324

DESCR eek bridge FUNDING CAT(S) 7,12SREMARKS 3rd Qtr 17 - move from FY 2019 to FY 2021 and revis PROJECT 4/17 - move from FY 2019 to FY 2021 and revise funding; 1

P7 e funding HISTORY /17 - revise funding distribution; 4/16 - funded throughSTP-MM project selection process

TOTAL PROJECT COST INFORMATIONPREL ENG $ 205,800

ROW PURCH $ 0 COST OFCONSTR $ 4,200,000 APPROVED

CONST ENG $ 208,320 PHASESCONTING $ 83,580 $ 4,200,000INDIRECT $ 241,080BOND FIN $ 0

PT CHG ORD $ 157,080TOTAL CST $ 5,095,860

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 3,360,000 $ 840,000 $ 0 $ 0 $ 0 $ 4,200,00012S $ 824,000 $ 206,000 $ 0 $ 0 $ 0 $ 1,030,000TOTAL $ 4,184,000 $ 1,046,000 $ 0 $ 0 $ 0 $ 5,230,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 86: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 86 OF 696

10:03:31 AM ALAMO AREA MPO - HIGHWAY PROJECTS

FY 2022

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 2452-01-066 2022 SL 1604 C OTHER $ 26,000,000LIMITS FROM 0.7 Mi North of FM 2536 PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO US 90 WPROJECT Expand from 2 lanes to 4 lane divided MPO PROJ NUM 9110.2

DESCR FUNDING CAT(S) 2MREMARKS 2nd Qtr 18 - revise funding distribution (MTP only) PROJECT 3/18 - revise funding distribution; 4/17 - revise project

P7 HISTORY ; added w/ 12/8/14 adoption of the MTP TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,274,000ROW PURCH $ 0 COST OF

CONSTR $ 26,000,000 APPROVEDCONST ENG $ 1,040,000 PHASES

CONTING $ 1,820,000 $ 26,000,000INDIRECT $ 520,000BOND FIN $ 0

PT CHG ORD $ 1,040,000TOTAL CST $ 31,694,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 20,800,000 $ 5,200,000 $ 0 $ 0 $ 0 $ 26,000,000TOTAL $ 20,800,000 $ 5,200,000 $ 0 $ 0 $ 0 $ 26,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 2230-01-020 2022 FM 1560 C OTHER $ 12,100,000LIMITS FROM Galm/Schaenfield PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO FM 471PROJECT Expand from 2 to 4 lanes with raised median, or center turn lane, bike lanes and MPO PROJ NUM 5311

DESCR sidewalks FUNDING CAT(S) 3LC,7REMARKS 3rd Qtr 16 - new project in FY 2017-2020 TIP PROJECT 4/16 - funded through STP-MM project selection process

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 592,900ROW PURCH $ 0 COST OF

CONSTR $ 12,100,000 APPROVEDCONST ENG $ 600,160 PHASES

CONTING $ 240,790 $ 12,100,000INDIRECT $ 694,540BOND FIN $ 0

PT CHG ORD $ 452,540TOTAL CST $ 14,680,930

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 8,464,000 $ 2,116,000 $ 0 $ 0 $ 0 $ 10,580,0003LC $ 0 $ 0 $ 0 $ 0 $ 1,520,000 $ 1,520,000TOTAL $ 8,464,000 $ 2,116,000 $ 0 $ 0 $ 1,520,000 $ 12,100,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 2020-02-031 2022 SL 1604 C OTHER $ 14,000,000LIMITS FROM IH 35 S PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO 0.7 Mi North of FM 2536PROJECT Expand from 2 lanes to 4 lane divided MPO PROJ NUM 9110.1

DESCR FUNDING CAT(S) 2MREMARKS 2nd Qtr 18 - revise funding distribution (MTP only) PROJECT 3/18 - revise funding distribution; 4/17 - add project; a

P7 HISTORY dded w/ 12/8/14 adoption of the MTP TOTAL PROJECT COST INFORMATION

PREL ENG $ 686,000ROW PURCH $ 0 COST OF

CONSTR $ 14,000,000 APPROVEDCONST ENG $ 560,000 PHASES

CONTING $ 980,000 $ 14,000,000INDIRECT $ 280,000BOND FIN $ 0

PT CHG ORD $ 560,000TOTAL CST $ 17,066,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 11,200,000 $ 2,800,000 $ 0 $ 0 $ 0 $ 14,000,000TOTAL $ 11,200,000 $ 2,800,000 $ 0 $ 0 $ 0 $ 14,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 87: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 87 OF 696

10:03:31 AM ALAMO AREA MPO - HIGHWAY PROJECTS

FY 2022

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 1477-01-043 2022 FM 1516 C OTHER $ 23,500,000LIMITS FROM FM 78 PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO IH 10PROJECT Expand 2 to 4 lane divided with bike lanes and sidewalks MPO PROJ NUM 5379

DESCR FUNDING CAT(S) 2M,3LCREMARKS 2nd Qtr 18 - revise funding distribution (MTP only) PROJECT 3/18 - revise funding distribution; 4/17 - add project

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,151,000ROW PURCH $ 0 COST OF

CONSTR $ 23,500,000 APPROVEDCONST ENG $ 940,000 PHASES

CONTING $ 1,645,000 $ 23,500,000INDIRECT $ 470,000BOND FIN $ 0

PT CHG ORD $ 940,000TOTAL CST $ 28,646,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 9,400,000 $ 2,350,000 $ 0 $ 0 $ 0 $ 11,750,0003LC $ 0 $ 0 $ 0 $ 0 $ 11,750,000 $ 11,750,000TOTAL $ 9,400,000 $ 2,350,000 $ 0 $ 0 $ 11,750,000 $ 23,500,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0915-12-613 2022 VA T SAN ANTONIO $ 2,000,000LIMITS FROM Rapid Transit Corridor Study PROJECT SPONSOR VIA

REVISION DATE 07/2018LIMITS TO .PROJECT Rapid Transit Corridor Study - FY 2022 MPO PROJ NUM 3768.4

DESCR FUNDING CAT(S) 7REMARKS 4/18 - add project PROJECT 4/18 - new project created from 0915-00-173

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 2,000,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 2,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,000,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 1,600,000 $ 0 $ 0 $ 400,000 $ 0 $ 2,000,000TOTAL $ 1,600,000 $ 0 $ 0 $ 400,000 $ 0 $ 2,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0915-12-584 2022 CS C OTHER $ 7,791,571LIMITS FROM In Bexar County, on Crestway PROJECT SPONSOR BxCo

REVISION DATE 07/2018LIMITS TO From Kitty Hawk Rd to FM 1976PROJECT Widen to provide operational improvements including bike lanes; construct 6 ft. MPO PROJ NUM 5318

DESCR sidewalk FUNDING CAT(S) 7REMARKS 3rd Qtr 16 - new project in FY 2017-2020 TIP PROJECT 4/16 - funded through STP-MM project selection process

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 381,787ROW PURCH $ 0 COST OF

CONSTR $ 7,791,571 APPROVEDCONST ENG $ 386,462 PHASES

CONTING $ 155,052 $ 7,791,571INDIRECT $ 447,236BOND FIN $ 0

PT CHG ORD $ 291,405TOTAL CST $ 9,453,513

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 6,233,257 $ 0 $ 0 $ 1,558,314 $ 0 $ 7,791,571TOTAL $ 6,233,257 $ 0 $ 0 $ 1,558,314 $ 0 $ 7,791,571

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 88: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 88 OF 696

10:03:31 AM ALAMO AREA MPO - HIGHWAY PROJECTS

FY 2022

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0915-00-215 2022 VA C OTHER $ 2,000,000LIMITS FROM Various locations within PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO Bexar, Comal and Kendall CountiesPROJECT Safety Service Patrol on controlled access highways in Bexar, Comal and Kendall MPO PROJ NUM 5544.4

DESCR Counties-FY 2022 FUNDING CAT(S) 7REMARKS 4/18 - add project to FY 2019-2022 TIP PROJECT 4/18 - funded through the 19-22 STP-MM Call for Projects

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 2,000,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 2,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,000,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 1,600,000 $ 400,000 $ 0 $ 0 $ 0 $ 2,000,000TOTAL $ 1,600,000 $ 400,000 $ 0 $ 0 $ 0 $ 2,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0915-00-197 2022 NR C OTHER $ 100,000LIMITS FROM Alamo Area MPO: Bexar, Comal PROJECT SPONSOR AAMPO

REVISION DATE 07/2018LIMITS TO Guadalupe & partial Kendall CountyPROJECT Alamo Area Commute Solutions Pgm - FY 2022 MPO PROJ NUM 5303.1

DESCR FUNDING CAT(S) 7REMARKS 3rd Qtr 18 - change agency and reduce cost PROJECT 4/18 - change agency and reduce cost; 4/16 - funded throu

P7 HISTORY gh STP-MM project selection process; project has $53,400in TDCs which are not calculated in the funding total; fixed amount

TOTAL PROJECT COST INFORMATIONPREL ENG $ 0

ROW PURCH $ 0 COST OFCONSTR $ 100,000 APPROVED

CONST ENG $ 0 PHASESCONTING $ 0 $ 100,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 100,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 80,000 $ 0 $ 0 $ 20,000 $ 0 $ 100,000TOTAL $ 80,000 $ 0 $ 0 $ 20,000 $ 0 $ 100,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA MEDINA 0849-02-045 2022 FM 471 C OTHER $ 375,000LIMITS FROM Medina County Line PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO SH 211PROJECT Expand 2 to 4 lane divided with bike lanes and sidewalks MPO PROJ NUM 5378

DESCR FUNDING CAT(S) 2MREMARKS 2nd Qtr 18 - revise funding distribution (MTP only) PROJECT 3/18 - revise funding distribution

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 18,000ROW PURCH $ 0 COST OF

CONSTR $ 375,000 APPROVEDCONST ENG $ 15,000 PHASES

CONTING $ 26,000 $ 375,000INDIRECT $ 8,000BOND FIN $ 0

PT CHG ORD $ 15,000TOTAL CST $ 457,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 300,000 $ 75,000 $ 0 $ 0 $ 0 $ 375,000TOTAL $ 300,000 $ 75,000 $ 0 $ 0 $ 0 $ 375,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 89: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 89 OF 696

10:03:31 AM ALAMO AREA MPO - HIGHWAY PROJECTS

FY 2022

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0849-01-055 2022 FM 471 C OTHER $ 21,000,000LIMITS FROM Old FM 471 PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO Medina County LinePROJECT Expand 2 to 4 lane divided with bike lanes and sidewalks MPO PROJ NUM 5377

DESCR FUNDING CAT(S) 2M,3LCREMARKS 2nd Qtr 18 - revise funding distribution (MTP only) PROJECT 3/18 - revise funding distribution

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,029,000ROW PURCH $ 0 COST OF

CONSTR $ 21,000,000 APPROVEDCONST ENG $ 840,000 PHASES

CONTING $ 1,470,000 $ 21,000,000INDIRECT $ 420,000BOND FIN $ 0

PT CHG ORD $ 840,000TOTAL CST $ 25,599,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 8,400,000 $ 2,100,000 $ 0 $ 0 $ 0 $ 10,500,0003LC $ 0 $ 0 $ 0 $ 0 $ 10,500,000 $ 10,500,000TOTAL $ 8,400,000 $ 2,100,000 $ 0 $ 0 $ 10,500,000 $ 21,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 0521-04-285 2022 IH 410 C SAN ANTONIO $ 34,000,000LIMITS FROM at US 281/San Pedro PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO .PROJECT Interchange and operational improvements MPO PROJ NUM 5376

DESCR FUNDING CAT(S) 2M,7REMARKS 3rd Qtr 18 - move from FY 2021 to FY 2019 PROJECT 4/18 - revise project (STP-MM project selection process);

P7 HISTORY 3/18 - increase cost and revise funding distribution; 4/17 - add project

TOTAL PROJECT COST INFORMATIONPREL ENG $ 1,666,000

ROW PURCH $ 0 COST OFCONSTR $ 34,000,000 APPROVED

CONST ENG $ 2,040,000 PHASESCONTING $ 2,380,000 $ 34,000,000INDIRECT $ 1,700,000BOND FIN $ 0

PT CHG ORD $ 1,360,000TOTAL CST $ 43,146,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 19,200,000 $ 4,800,000 $ 0 $ 0 $ 0 $ 24,000,0007 $ 8,000,000 $ 2,000,000 $ 0 $ 0 $ 0 $ 10,000,000TOTAL $ 27,200,000 $ 6,800,000 $ 0 $ 0 $ 0 $ 34,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA GUADALUPE 0215-09-029 2022 FM 725 C NEW BRAUNFELS $ 10,600,000LIMITS FROM Comal/Guadalupe County Line PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO Zipp RdPROJECT Expand from 2 to 4 lanes with median, sidewalks and bike lanes MPO PROJ NUM 5308

DESCR FUNDING CAT(S) 7REMARKS 3rd Qtr 16 - new project in FY 2017-2020 TIP PROJECT 4/16 - funded through STP-MM project selection process

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 519,400ROW PURCH $ 0 COST OF

CONSTR $ 10,600,000 APPROVEDCONST ENG $ 525,760 PHASES

CONTING $ 210,940 $ 10,600,000INDIRECT $ 608,440BOND FIN $ 0

PT CHG ORD $ 396,440TOTAL CST $ 12,860,980

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 8,480,000 $ 2,120,000 $ 0 $ 0 $ 0 $ 10,600,000TOTAL $ 8,480,000 $ 2,120,000 $ 0 $ 0 $ 0 $ 10,600,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 90: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 90 OF 696

10:03:31 AM ALAMO AREA MPO - HIGHWAY PROJECTS

FY 2022

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA BEXAR 2452-02-117 2022 SL 1604 C SAN ANTONIO $ 43,000,000LIMITS FROM at FM 2696 - Blanco Road PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO .PROJECT Intersection operational improvements MPO PROJ NUM 5332

DESCR FUNDING CAT(S) 2MREMARKS 2nd Qtr 18 - increase cost from $30M PROJECT 3/18 - increase cost from $30M; 10/17 - move from FY 2020

P7 HISTORY to FY 2022; 4/17 - TIP: add project; MTP - move from FY2027 to FY 2020; 4/16 - funded through 17-20 TIP Call forProjects (P1/P7); temporarily placed in FY 2027

TOTAL PROJECT COST INFORMATIONPREL ENG $ 2,107,000

ROW PURCH $ 0 COST OFCONSTR $ 43,000,000 APPROVED

CONST ENG $ 1,720,000 PHASESCONTING $ 3,010,000 $ 43,000,000INDIRECT $ 860,000BOND FIN $ 0

PT CHG ORD $ 1,720,000TOTAL CST $ 52,417,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 34,400,000 $ 8,600,000 $ 0 $ 0 $ 0 $ 43,000,000TOTAL $ 34,400,000 $ 8,600,000 $ 0 $ 0 $ 0 $ 43,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA COMAL 0215-07-027 2022 SH 46 C OTHER $ 26,000,000LIMITS FROM Farhills Dr PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO US 281PROJECT Expand from 2 lanes to 6 lanes with raised median or CLTL MPO PROJ NUM 9114.1

DESCR FUNDING CAT(S) 4REMARKS 2nd Qtr 18 - move from FY 2020 to FY 2022 and revis PROJECT 3/18 - move from FY 2020 to FY 2022 and revise funding di

P7 e funding distribution HISTORY stribution; 4/17 - revise limits and funding; added w/ 12/8/14 adoption of the MTP

TOTAL PROJECT COST INFORMATIONPREL ENG $ 1,274,000

ROW PURCH $ 0 COST OFCONSTR $ 26,000,000 APPROVED

CONST ENG $ 1,040,000 PHASESCONTING $ 1,820,000 $ 26,000,000INDIRECT $ 520,000BOND FIN $ 0

PT CHG ORD $ 1,040,000TOTAL CST $ 31,694,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 20,800,000 $ 5,200,000 $ 0 $ 0 $ 0 $ 26,000,000TOTAL $ 20,800,000 $ 5,200,000 $ 0 $ 0 $ 0 $ 26,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANTONIO ALAMO AREA COMAL 0215-01-044 2022 SH 46 C OTHER $ 14,000,000LIMITS FROM US 281 PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO Bentwood DrPROJECT Expand from 2 lanes to 6 lanes with raised median or CLTL MPO PROJ NUM 9114.2

DESCR FUNDING CAT(S) 4REMARKS 2nd Qtr 18 - move from FY 2020 to FY 2022 and revis PROJECT 3/18 - move from FY 2020 to FY 2022 and revise funding di

P7 e funding distribution HISTORY stribution; 4/17 - revise limits and funding; added w/ 12/8/14 adoption of the MTP

TOTAL PROJECT COST INFORMATIONPREL ENG $ 686,000

ROW PURCH $ 0 COST OFCONSTR $ 14,000,000 APPROVED

CONST ENG $ 560,000 PHASESCONTING $ 980,000 $ 14,000,000INDIRECT $ 280,000BOND FIN $ 0

PT CHG ORD $ 560,000TOTAL CST $ 17,066,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 11,200,000 $ 2,800,000 $ 0 $ 0 $ 0 $ 14,000,000TOTAL $ 11,200,000 $ 2,800,000 $ 0 $ 0 $ 0 $ 14,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 91: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

2019-2022Statewide TransportationImprovement ProgramAmarillo MPOHighway Projects

Page 92: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 92 OF 696

10:03:31 AM AMARILLO MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AMARILLO AMARILLO RANDALL 2635-05-001 2019 SL 335 C,E AMARILLO $ 40,495,636LIMITS FROM FM 2186 PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO Potter County LinePROJECT B-2 Phase I: Construct Frt rds for Future Freeway MPO PROJ NUM A15164-001

DESCR FUNDING CAT(S) 1,2U,12REMARKS CSJ 0904-11-061 has been split into CSJs 2494-02-01 PROJECT B-2 Full Build 0904-11-058,0904-02-038, and 0275-01-178 B

P7 0 and and 2635-05-001 HISTORY -2 Phase I Construct Frontage Roads for Freeway Replaces0904-11-061

TOTAL PROJECT COST INFORMATIONPREL ENG $ 1,807,182

ROW PURCH $ 0 COST OFCONSTR $ 36,881,272 APPROVED

CONST ENG $ 1,807,182 PHASESCONTING $ 461,016 $ 40,495,636INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 2,013,718TOTAL CST $ 42,970,370

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL1 $ 3,836,509 $ 959,127 $ 0 $ 0 $ 0 $ 4,795,6362U $ 4,560,000 $ 1,140,000 $ 0 $ 0 $ 0 $ 5,700,00012 $ 24,000,000 $ 6,000,000 $ 0 $ 0 $ 0 $ 30,000,000TOTAL $ 32,396,509 $ 8,099,127 $ 0 $ 0 $ 0 $ 40,495,636

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AMARILLO AMARILLO POTTER 2635-06-001 2019 SL 335 C,E AMARILLO $ 1,179,705LIMITS FROM RANDALL COUNTY LINE PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO IH 40PROJECT B-2 FRT RDS PHASE I: CONSTRUCT FRONTAGE ROADS FOR FUTURE FREEWAY MPO PROJ NUM A15165-000

DESCR FUNDING CAT(S) 1,2U,12REMARKS Project is being proposed as SL 335 Segment B-2; CS PROJECT B-2 full build 0904-11-058, 0904-02-038, and 0275-01-178

P7 J change from 0904-02-040 HISTORY B-2 Phase I construct Frontage roads for freeway. Replaces 0904-02-040

TOTAL PROJECT COST INFORMATIONPREL ENG $ 52,646

ROW PURCH $ 0 COST OFCONSTR $ 1,074,412 APPROVED

CONST ENG $ 52,646 PHASESCONTING $ 13,430 $ 1,179,705INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 58,664TOTAL CST $ 1,251,798

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL1 $ 111,764 $ 27,941 $ 0 $ 0 $ 0 $ 139,7052U $ 32,000 $ 8,000 $ 0 $ 0 $ 0 $ 40,00012 $ 800,000 $ 200,000 $ 0 $ 0 $ 0 $ 1,000,000TOTAL $ 943,764 $ 235,941 $ 0 $ 0 $ 0 $ 1,179,705

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AMARILLO AMARILLO RANDALL 2494-02-010 2019 SL 335 C,E AMARILLO $ 12,477,647LIMITS FROM FM 2590 PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO FM 2186PROJECT B-2 PHASE I: CONSTRUCT FRONTAGE ROADS FOR FUTURE FREEWAY MPO PROJ NUM A15164-000

DESCR FUNDING CAT(S) 1,2UREMARKS Project is being proposed as SL 335 Segment B-2; CS PROJECT B-2 Full build 0904-11-058, 0904-02-038, and 0275-010178

P7 J 0904-11-061 has been split into CSJs 2494-02-010 HISTORY B-2 Phase I Construct frontage rds for freeway Replacesand 2635-05-001 0904-11-061

TOTAL PROJECT COST INFORMATIONPREL ENG $ 556,835

ROW PURCH $ 0 COST OFCONSTR $ 11,363,977 APPROVED

CONST ENG $ 556,835 PHASESCONTING $ 142,050 $ 12,477,647INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 620,473TOTAL CST $ 13,240,170

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL1 $ 1,182,118 $ 295,529 $ 0 $ 0 $ 0 $ 1,477,6472U $ 8,800,000 $ 2,200,000 $ 0 $ 0 $ 0 $ 11,000,000TOTAL $ 9,982,118 $ 2,495,529 $ 0 $ 0 $ 0 $ 12,477,647

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 93: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 93 OF 696

10:03:31 AM AMARILLO MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AMARILLO AMARILLO POTTER 2635-04-037 2020 SL 335 C,E AMARILLO $ 10,699,923LIMITS FROM FM 2590 NORTH PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO SW 9THPROJECT B-2 PHASE II: CONSTRUCT FRT RDS FOR FUTURE FREEWAY MPO PROJ NUM A15169-001

DESCR FUNDING CAT(S) 1,2UREMARKS CSJ 0904-02-041 has changed and split to CSJs 2635- PROJECT B-2 FULL BUILD 0904-11-058, 0904-02-038, and 0275-01-178

P7 06-002 and 2364-04-037 HISTORY B-2 PHASE II CONSTRUCT FRONTAGE RDS FOR FREEWAY REPLACES0904-02-041

TOTAL PROJECT COST INFORMATIONPREL ENG $ 477,501

ROW PURCH $ 0 COST OFCONSTR $ 9,744,920 APPROVED

CONST ENG $ 477,501 PHASESCONTING $ 121,812 $ 10,699,923INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 532,073TOTAL CST $ 11,353,807

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL1 $ 1,303,938 $ 325,985 $ 0 $ 0 $ 0 $ 1,629,9232U $ 7,256,000 $ 1,814,000 $ 0 $ 0 $ 0 $ 9,070,000TOTAL $ 8,559,938 $ 2,139,985 $ 0 $ 0 $ 0 $ 10,699,923

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AMARILLO AMARILLO POTTER 2635-06-002 2020 SL 335 C,E AMARILLO $ 15,489,524LIMITS FROM IH 40 PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO FM 2590 NORTHPROJECT B-2 PHASE II: CONSTRUCT FRT RDS FOR FUTURE FREEWAY MPO PROJ NUM A15169-000

DESCR FUNDING CAT(S) 1,2U,4,12REMARKS CSJ 0904-02-041 has changed and split to CSJs 2635- PROJECT B-2 FULL BUILD 0904-11-058,0904-02-038, and 0275-01-178 B

P7 06-002 and 2364-04-037 HISTORY -2 PHASE II CONSTRUCT FRONTAGE RDS FOR FREEWAY REPLACES 0904-02-041

TOTAL PROJECT COST INFORMATIONPREL ENG $ 691,245

ROW PURCH $ 0 COST OFCONSTR $ 14,107,035 APPROVED

CONST ENG $ 691,245 PHASESCONTING $ 176,338 $ 15,489,524INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 770,243TOTAL CST $ 16,436,106

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL1 $ 1,887,619 $ 471,905 $ 0 $ 0 $ 0 $ 2,359,5242U $ 2,504,000 $ 626,000 $ 0 $ 0 $ 0 $ 3,130,0004 $ 2,400,000 $ 600,000 $ 0 $ 0 $ 0 $ 3,000,00012 $ 5,600,000 $ 1,400,000 $ 0 $ 0 $ 0 $ 7,000,000TOTAL $ 12,391,619 $ 3,097,905 $ 0 $ 0 $ 0 $ 15,489,524

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AMARILLO AMARILLO POTTER 0275-01-199 2020 IH 40 C,E AMARILLO $ 27,369,151LIMITS FROM BIH 40-D PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO FM 2590 (Soncy Road)PROJECT B-2 PHASE II: RECONSTRUCT IH 40 2ND LEVEL MAINLANE BRIDGE AT SL 335 AND FRONTAGE MPO PROJ NUM A15168-000

DESCR ROAD BOX FUNDING CAT(S) 1,2U,4,12REMARKS PROJECT PHASE II OF II B-2 FRONTAGE ROADS B-2 FULL BUILD 0904-11-

P7 HISTORY 058, 0904-02-038, and 0275-01-178 PHASE CONST: FRT RDS-MAINLANES

TOTAL PROJECT COST INFORMATIONPREL ENG $ 1,221,392

ROW PURCH $ 0 COST OFCONSTR $ 24,926,368 APPROVED

CONST ENG $ 1,221,392 PHASESCONTING $ 12,463 $ 27,369,151INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 1,126,672TOTAL CST $ 28,508,287

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL1 $ 3,335,321 $ 833,830 $ 0 $ 0 $ 0 $ 4,169,1512U $ 5,580,000 $ 620,000 $ 0 $ 0 $ 0 $ 6,200,0004 $ 9,900,000 $ 1,100,000 $ 0 $ 0 $ 0 $ 11,000,00012 $ 5,400,000 $ 600,000 $ 0 $ 0 $ 0 $ 6,000,000TOTAL $ 24,215,321 $ 3,153,830 $ 0 $ 0 $ 0 $ 27,369,151

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 94: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 94 OF 696

10:03:31 AM AMARILLO MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AMARILLO AMARILLO RANDALL 2635-03-024 2021 SL 335 C,E AMARILLO $ 31,978,161LIMITS FROM FM 2590 PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO WEST OF COULTERPROJECT B-1 PHASE II: (TIE IN) CONSTRUCT MAINLANES, GRADE SEP, RAMPS, AND FRONTAGE ROADS MPO PROJ NUM A15159-000

DESCR FUNDING CAT(S) 1,2U,12REMARKS PROJECT PHASE II OF III OF A MULTI PHASE PROJECT 2635-03-018, ETC

P7 HISTORY (B-1) PHASE I 2635-03-018,2635-02-029, 0168-09-161 PHASEIII 2635-02-900,2635-03-901

TOTAL PROJECT COST INFORMATIONPREL ENG $ 1,429,029

ROW PURCH $ 0 COST OFCONSTR $ 29,163,850 APPROVED

CONST ENG $ 1,385,283 PHASESCONTING $ 804,922 $ 31,978,161INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 1,924,814TOTAL CST $ 32,783,084

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL1 $ 4,702,529 $ 1,175,632 $ 0 $ 0 $ 0 $ 5,878,1612U $ 15,280,000 $ 3,820,000 $ 0 $ 0 $ 0 $ 19,100,00012 $ 5,600,000 $ 1,400,000 $ 0 $ 0 $ 0 $ 7,000,000TOTAL $ 25,582,529 $ 6,395,632 $ 0 $ 0 $ 0 $ 31,978,161

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 95: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

2019-2022Statewide TransportationImprovement ProgramBrownsville MPOHighway Projects

Page 96: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 96 OF 696

10:03:31 AM BROWNSVILLE MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR BROWNSVILLE CAMERON 0921-06-314 2019 OLD ALICE RD.E BROWNSVILLE $ 350,000LIMITS FROM S.H. 550 PROJECT SPONSOR Cameron County

REVISION DATE 07/2018LIMITS TO Intersection of Old Alice Rd. @ Sports Park Blvd.PROJECT Roadway study for a 4 lane uran roadway (Phase II) MPO PROJ NUM BMPO-E22

DESCR FUNDING CAT(S) 7REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 350,000ROW PURCH $ 0 COST OF

CONSTR $ 5,000,000 APPROVEDCONST ENG $ 110,000 PHASES

CONTING $ 50,000 $ 350,000INDIRECT $ 20,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 5,530,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 280,000 $ 0 $ 0 $ 70,000 $ 0 $ 350,000TOTAL $ 280,000 $ 0 $ 0 $ 70,000 $ 0 $ 350,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR BROWNSVILLE CAMERON 0921-06-315 2019 S.H. 32 E BROWNSVILLE $ 1,786,515LIMITS FROM I-69E PROJECT SPONSOR CCRMA

REVISION DATE 07/2018LIMITS TO S.H. 4PROJECT Preliminary Engineering & Acquisition of ROW MPO PROJ NUM BMPO-E4

DESCR FUNDING CAT(S) 7,10REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,500,000ROW PURCH $ 286,515 COST OF

CONSTR $ 0 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 1,786,515INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,786,515

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 700,000 $ 0 $ 0 $ 175,000 $ 0 $ 875,00010 $ 911,515 $ 0 $ 0 $ 0 $ 0 $ 911,515TOTAL $ 1,611,515 $ 0 $ 0 $ 175,000 $ 0 $ 1,786,515

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR BROWNSVILLE CAMERON 0220-05-075 2019 S.H. 48 C BROWNSVILLE $ 3,000,000LIMITS FROM I-69E PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO S.H. 4PROJECT Install raised center median MPO PROJ NUM BMPO-F3

DESCR FUNDING CAT(S) 2MREMARKS S.H. 48 is known as Boca Chica Blvd. PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 147,000ROW PURCH $ 0 COST OF

CONSTR $ 3,000,000 APPROVEDCONST ENG $ 148,800 PHASES

CONTING $ 171,900 $ 3,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 3,467,700

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 2,400,000 $ 600,000 $ 0 $ 0 $ 0 $ 3,000,000TOTAL $ 2,400,000 $ 600,000 $ 0 $ 0 $ 0 $ 3,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 97: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 97 OF 696

10:03:31 AM BROWNSVILLE MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR BROWNSVILLE CAMERON 0921-06-304 2019 CS C,E BROWNSVILLE $ 812,862LIMITS FROM Bmetro Eastside Transfer Station PROJECT SPONSOR City of Brownsville

REVISION DATE 07/2018LIMITS TO at Jose Colunga Jr. & Billy MitchellPROJECT Construct Bus Facility Consisting of Paving, Curb & Gutter, Drainage Structures, MPO PROJ NUM BMPO-TE14

DESCR Canopy, Lighting & Striping, Landscape & Irrigation. FUNDING CAT(S) 3,9TAPREMARKS The Construction Cost includes the Engineering Serv PROJECT

P7 ices. HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 39,830ROW PURCH $ 0 COST OF

CONSTR $ 812,862 APPROVEDCONST ENG $ 51,861 PHASES

CONTING $ 10,486 $ 812,862INDIRECT $ 51,861BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 966,899

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 407,486 $ 0 $ 0 $ 101,872 $ 0 $ 509,3583 $ 0 $ 0 $ 0 $ 303,504 $ 0 $ 303,504TOTAL $ 407,486 $ 0 $ 0 $ 405,376 $ 0 $ 812,862

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR BROWNSVILLE CAMERON 0921-06-293 2019 E BROWNSVILLE $ 1,000,000LIMITS FROM Palm Blvd. @ where railroad tracks used to be present PROJECT SPONSOR City of Brownsville

REVISION DATE 07/2018LIMITS TO I-69E Southbound Frontage Road, west of Old Alice RoadPROJECT Proposed multimodal corridor (study phase I, II, III, IV) MPO PROJ NUM BMPO-E7

DESCR FUNDING CAT(S) 7REMARKS E= Preliminary Engineering (Study Phase) PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,000,000ROW PURCH $ 0 COST OF

CONSTR $ 1,000,000 APPROVEDCONST ENG $ 110,000 PHASES

CONTING $ 50,000 $ 1,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,160,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 800,000 $ 0 $ 0 $ 200,000 $ 0 $ 1,000,000TOTAL $ 800,000 $ 0 $ 0 $ 200,000 $ 0 $ 1,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR BROWNSVILLE CAMERON 0921-06-303 2019 VA C,E BROWNSVILLE $ 300,803LIMITS FROM Brownsville Bike/Ped Improvements PROJECT SPONSOR City of Brownsville

REVISION DATE 07/2018LIMITS TO Various RoadsPROJECT Construction of sidewalks, crosswalks, shared use paths for trails for pedestria MPO PROJ NUM BMPO-TE13

DESCR ns & bicycle facilities FUNDING CAT(S) 9TAPREMARKS The Construction Cost includes the Engineering Serv PROJECT

P7 ices. Project entails safety improvements in three HISTORYBrownsville Areas

TOTAL PROJECT COST INFORMATIONPREL ENG $ 14,739

ROW PURCH $ 0 COST OFCONSTR $ 300,803 APPROVED

CONST ENG $ 19,191 PHASESCONTING $ 19,191 $ 300,803INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 353,925

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 240,642 $ 0 $ 0 $ 60,161 $ 0 $ 300,803TOTAL $ 240,642 $ 0 $ 0 $ 60,161 $ 0 $ 300,803

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 98: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 98 OF 696

10:03:31 AM BROWNSVILLE MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR BROWNSVILLE CAMERON 0684-01-068 2019 SH 550 C,E BROWNSVILLE $ 18,911,266LIMITS FROM .203 Mile South of F.M. 1847 PROJECT SPONSOR CCRMA

REVISION DATE 07/2018LIMITS TO 1.13 Miles Southeast of UPRR Overpass F.M. 3248PROJECT Construct controlled access tolled facility; length approximately 3.9 Miles. MPO PROJ NUM BMPO-RM6

DESCR FUNDING CAT(S) 3LC,7,12REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 950,602ROW PURCH $ 0 COST OF

CONSTR $ 17,039,266 APPROVEDCONST ENG $ 921,398 PHASES

CONTING $ 1,186,000 $ 18,911,266INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 20,097,266

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL12 $ 3,283,680 $ 820,920 $ 0 $ 0 $ 0 $ 4,104,6007 $ 7,600,000 $ 1,900,000 $ 0 $ 0 $ 0 $ 9,500,0003LC $ 0 $ 0 $ 0 $ 0 $ 5,306,666 $ 5,306,666TOTAL $ 10,883,680 $ 2,720,920 $ 0 $ 0 $ 5,306,666 $ 18,911,266

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR BROWNSVILLE CAMERON 0921-06-280 2019 N/A C BROWNSVILLE $ 356,250LIMITS FROM Manzano St. PROJECT SPONSOR City of Brownsville

REVISION DATE 07/2018LIMITS TO La Posada Dr. near Montezuma Cypress PreservePROJECT Establish a concrete 10’’ wide trail; (Length 0.8 miles). Phase I MPO PROJ NUM BMPO-ST1

DESCR FUNDING CAT(S) 7REMARKS Southmost Nature Trail Phase I PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 356,250 APPROVEDCONST ENG $ 18,750 PHASES

CONTING $ 26,250 $ 356,250INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 401,250

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 285,000 $ 0 $ 0 $ 71,250 $ 0 $ 356,250TOTAL $ 285,000 $ 0 $ 0 $ 71,250 $ 0 $ 356,250

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR BROWNSVILLE CAMERON 0921-06-292 2019 CS E BROWNSVILLE $ 380,300LIMITS FROM F.M. 1575 PROJECT SPONSOR CCRMA

REVISION DATE 07/2018LIMITS TO F.M. 1847PROJECT Proposed 2 lane roadway with continuous left turn lane. E= Preliminary Engineeri MPO PROJ NUM BMPO-E5

DESCR ng (Study Phase) FUNDING CAT(S) 7REMARKS CS: Whipple Rd. PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 380,300ROW PURCH $ 0 COST OF

CONSTR $ 1,600,000 APPROVEDCONST ENG $ 48,000 PHASES

CONTING $ 18,000 $ 380,300INDIRECT $ 20,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,066,300

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 304,200 $ 0 $ 0 $ 76,100 $ 0 $ 380,300TOTAL $ 304,200 $ 0 $ 0 $ 76,100 $ 0 $ 380,300

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 99: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 99 OF 696

10:03:31 AM BROWNSVILLE MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR BROWNSVILLE CAMERON 0921-06-291 2019 CS E BROWNSVILLE $ 300,000LIMITS FROM F.M. 1847 PROJECT SPONSOR CCRMA

REVISION DATE 07/2018LIMITS TO F.M. 511PROJECT Construct 4 lane urban roadway. Roadway study (Phase III- Additional funding) MPO PROJ NUM BMPO-E3

DESCR FUNDING CAT(S) 7REMARKS CS- Morrison Rd. PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 300,000ROW PURCH $ 150,000 COST OF

CONSTR $ 21,000,000 APPROVEDCONST ENG $ 900,000 PHASES

CONTING $ 200,000 $ 300,000INDIRECT $ 150,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 22,700,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 240,000 $ 0 $ 0 $ 60,000 $ 0 $ 300,000TOTAL $ 240,000 $ 0 $ 0 $ 60,000 $ 0 $ 300,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR BROWNSVILLE CAMERON 0921-06-275 2019 VA C BROWNSVILLE $ 1,629,889LIMITS FROM Within the Port of Brownsville PROJECT SPONSOR BND

REVISION DATE 07/2018LIMITS TO Within the Port of BrownsvillePROJECT Construction of Internal Port Roads-Phase II MPO PROJ NUM BMPO-PP2

DESCR FUNDING CAT(S) 3LC,10,11REMARKS Also called Internal Port Roads. Category 11(Rider PROJECT

P7 11B) - $876,028 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 30,000ROW PURCH $ 0 COST OF

CONSTR $ 1,629,889 APPROVEDCONST ENG $ 200,000 PHASES

CONTING $ 0 $ 1,629,889INDIRECT $ 111,114BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,971,003

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL10 $ 166,715 $ 0 $ 0 $ 41,679 $ 0 $ 208,39411 $ 700,823 $ 0 $ 0 $ 175,205 $ 0 $ 876,0283LC $ 0 $ 0 $ 0 $ 0 $ 545,467 $ 545,467TOTAL $ 867,538 $ 0 $ 0 $ 216,884 $ 545,467 $ 1,629,889

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 100: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 100 OF 696

10:03:31 AM BROWNSVILLE MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR BROWNSVILLE CAMERON 1140-02-038 2020 F.M. 802 C,E BROWNSVILLE $ 14,000,000LIMITS FROM F.M. 1847 PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO Old Port Isabel Rd.PROJECT Proposed 6 lanes with raised center median. MPO PROJ NUM BMPO-TT1

DESCR FUNDING CAT(S) 2MREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 686,000ROW PURCH $ 0 COST OF

CONSTR $ 14,000,000 APPROVEDCONST ENG $ 694,400 PHASES

CONTING $ 278,600 $ 14,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 15,659,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 11,200,000 $ 2,800,000 $ 0 $ 0 $ 0 $ 14,000,000TOTAL $ 11,200,000 $ 2,800,000 $ 0 $ 0 $ 0 $ 14,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR BROWNSVILLE CAMERON 0921-06-288 2020 S.H. 32 C,E BROWNSVILLE $ 16,500,000LIMITS FROM S.H. 4 PROJECT SPONSOR BND

REVISION DATE 07/2018LIMITS TO Ostos Rd.PROJECT Construct direct connector at Port of Brownsville MPO PROJ NUM BMPO-P1

DESCR FUNDING CAT(S) 7,OtherREMARKS Project is known as the "South Port Connector". The PROJECT

P7 South Port Connector will terminate at a Port gate HISTORY, near Ostos Rd.

TOTAL PROJECT COST INFORMATIONPREL ENG $ 513,700

ROW PURCH $ 0 COST OFCONSTR $ 16,500,000 APPROVED

CONST ENG $ 600,000 PHASESCONTING $ 640,000 $ 16,500,000INDIRECT $ 1,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 18,254,700

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 8,958,400 $ 0 $ 0 $ 2,239,600 $ 0 $ 11,198,000Other $ 4,241,600 $ 0 $ 0 $ 1,060,400 $ 0 $ 5,302,000TOTAL $ 13,200,000 $ 0 $ 0 $ 3,300,000 $ 0 $ 16,500,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 101: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 101 OF 696

10:03:31 AM BROWNSVILLE MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR BROWNSVILLE CAMERON 0921-06-313 2021 N/A C,E BROWNSVILLE $ 12,000,000LIMITS FROM Port of Entry PROJECT SPONSOR CCRMA

REVISION DATE 07/2018LIMITS TO Port of EntryPROJECT Expansion of primary inspection lanes for passenger vehicles at the Veterans Int MPO PROJ NUM BMPO-AA1

DESCR ernational Bridge at Los Tomates. FUNDING CAT(S) 3LC,7REMARKS These lanes are within the General Service Administ PROJECT

P7 ration (GSA) Facility at the international bridge. HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 11,300,000 APPROVEDCONST ENG $ 700,000 PHASES

CONTING $ 108,000 $ 12,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 12,108,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 5,479,829 $ 0 $ 0 $ 1,369,957 $ 0 $ 6,849,7863LC $ 0 $ 0 $ 0 $ 0 $ 5,150,214 $ 5,150,214TOTAL $ 5,479,829 $ 0 $ 0 $ 1,369,957 $ 5,150,214 $ 12,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR BROWNSVILLE CAMERON 0220-04-049 2021 U.S. 281 C,E BROWNSVILLE $ 12,500,000LIMITS FROM F.M. 1421 PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO 0.5 Miles West of F.M. 1577PROJECT Widen to 4 lane rural MPO PROJ NUM BMPO-D3

DESCR FUNDING CAT(S) 2M,7REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 612,500ROW PURCH $ 1,800,000 COST OF

CONSTR $ 12,500,000 APPROVEDCONST ENG $ 62,000 PHASES

CONTING $ 716,250 $ 12,500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 16,248,750

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 6,032,000 $ 1,508,000 $ 0 $ 0 $ 0 $ 7,540,0007 $ 3,968,000 $ 992,000 $ 0 $ 0 $ 0 $ 4,960,000TOTAL $ 10,000,000 $ 2,500,000 $ 0 $ 0 $ 0 $ 12,500,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 102: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 102 OF 696

10:03:31 AM BROWNSVILLE MPO - HIGHWAY PROJECTS

FY 2022

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR BROWNSVILLE CAMERON 0921-06-289 2022 N/A C,E BROWNSVILLE $ 6,968,000LIMITS FROM F.M. 1847 near Los Ebanos Blvd. PROJECT SPONSOR City of Brownsville

REVISION DATE 07/2018LIMITS TO La Posada Dr./ Monsees Rd.PROJECT Construct 10’’ concrete Hike and Bike Trail MPO PROJ NUM BMPO-ST2

DESCR FUNDING CAT(S) 7REMARKS Southmost Nature Trail Phase II PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 6,968,000 APPROVEDCONST ENG $ 341,432 PHASES

CONTING $ 139,360 $ 6,968,000INDIRECT $ 2,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 7,450,792

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 5,574,400 $ 0 $ 0 $ 1,393,600 $ 0 $ 6,968,000TOTAL $ 5,574,400 $ 0 $ 0 $ 1,393,600 $ 0 $ 6,968,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR BROWNSVILLE CAMERON 0684-03-019 2022 F.M. 1732 C,E BROWNSVILLE $ 22,560,000LIMITS FROM U.S. 281 PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO I-69EPROJECT Widen to 4 lane rural MPO PROJ NUM BMPO-BB1

DESCR FUNDING CAT(S) 2MREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,105,440ROW PURCH $ 3,384,000 COST OF

CONSTR $ 22,560,000 APPROVEDCONST ENG $ 1,118,976 PHASES

CONTING $ 448,944 $ 22,560,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 28,617,360

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 18,048,000 $ 4,512,000 $ 0 $ 0 $ 0 $ 22,560,000TOTAL $ 18,048,000 $ 4,512,000 $ 0 $ 0 $ 0 $ 22,560,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR BROWNSVILLE CAMERON 0921-06-305 2022 F.M. 511 E BROWNSVILLE $ 312,500LIMITS FROM 0.1 Mile North of California Rd. PROJECT SPONSOR City of Brownsville

REVISION DATE 07/2018LIMITS TO 0.62 Mile North of F.M. 1419 (Southmost Rd.)PROJECT Realignment, construct 2 lane rural roadway MPO PROJ NUM BMPO-E11

DESCR FUNDING CAT(S) 7REMARKS Preliminary Engineering-study phase. FM 511 is also PROJECT

P7 known as Indiana Ave. HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 312,500ROW PURCH $ 0 COST OF

CONSTR $ 2,000,000 APPROVEDCONST ENG $ 100,000 PHASES

CONTING $ 90,000 $ 312,500INDIRECT $ 20,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,522,500

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 250,000 $ 0 $ 0 $ 62,500 $ 0 $ 312,500TOTAL $ 250,000 $ 0 $ 0 $ 62,500 $ 0 $ 312,500

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 103: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 103 OF 696

10:03:31 AM BROWNSVILLE MPO - HIGHWAY PROJECTS

FY 2022

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR BROWNSVILLE CAMERON 0921-06-207 2022 N/A C BROWNSVILLE $ 9,555,000LIMITS FROM Vicinity of GSA Facility at Brownsville PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO Veterans International Bridge at Los TomatesPROJECT Construction of Border Safety Inspection Facility MPO PROJ NUM BMPO-LS17

DESCR FUNDING CAT(S) 3LC,10,10REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 1,950,000 COST OF

CONSTR $ 6,696,802 APPROVEDCONST ENG $ 600,000 PHASES

CONTING $ 530,000 $ 9,555,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 9,776,802

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL10 $ 910,797 $ 227,699 $ 0 $ 0 $ 0 $ 1,138,49610 $ 5,361,504 $ 0 $ 0 $ 0 $ 0 $ 5,361,5043LC $ 0 $ 3,055,000 $ 0 $ 0 $ 0 $ 3,055,000TOTAL $ 6,272,301 $ 3,282,699 $ 0 $ 0 $ 0 $ 9,555,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 104: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

2019-2022Statewide TransportationImprovement ProgramBryan-College Station MPOHighway Projects

Page 105: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 105 OF 696

10:03:31 AM BRYAN-COLLEGE STATION MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

BRYAN BRYAN-COLLEGE STATIONBRAZOS 2399-01-074 2019 FM 2818 C OTHER $ 33,210,000LIMITS FROM .05 MILES NORTH OF FM60 PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO FM2154PROJECT WIDEN NON-FREEWAY FACILITY CONSISTING OF GRADING, BASE, STRUCTURES, SURFACE AND MPO PROJ NUM 81

DESCR CONC MEDIAN BARRIERS FUNDING CAT(S) 2UREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,454,886ROW PURCH $ 0 COST OF

CONSTR $ 29,691,551 APPROVEDCONST ENG $ 1,472,701 PHASES

CONTING $ 590,862 $ 33,210,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 33,210,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2U $ 26,568,000 $ 6,642,000 $ 0 $ 0 $ 0 $ 33,210,000TOTAL $ 26,568,000 $ 6,642,000 $ 0 $ 0 $ 0 $ 33,210,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 106: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 106 OF 696

10:03:31 AM BRYAN-COLLEGE STATION MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

BRYAN BRYAN-COLLEGE STATIONBRAZOS 0049-12-115 2020 SH 6 C,E BRYAN $ 1,242,901LIMITS FROM FM 158 (BOONVILLE ROAD) PROJECT SPONSOR CITY OF BRYAN

REVISION DATE 07/2018LIMITS TO OLD RELIANCE ROADPROJECT CONSTRUCTION OF 12’ SHARED USE PATH ALONG NORTHBOUND FRONTAGE ROAD MPO PROJ NUM

DESCR FUNDING CAT(S) 9TAP,3LCREMARKS PROJECT NAME: BRYAN - N EARL RUDDER FWY SH 6) E FRO PROJECT 2017 TASA state-selected; Commission approved 10/26/17 MO

P7 NTAGE ROAD SUP HISTORY 115076 TOTAL PROJECT COST INFORMATION

PREL ENG $ 54,450ROW PURCH $ 0 COST OF

CONSTR $ 1,111,221 APPROVEDCONST ENG $ 55,117 PHASES

CONTING $ 22,113 $ 1,242,901INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,242,901

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 932,176 $ 0 $ 0 $ 233,044 $ 0 $ 1,165,2203LC $ 0 $ 0 $ 0 $ 0 $ 77,681 $ 77,681TOTAL $ 932,176 $ 0 $ 0 $ 233,044 $ 77,681 $ 1,242,901

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

BRYAN BRYAN-COLLEGE STATIONBRAZOS 0917-29-133 2020 CS C,E BRYAN $ 1,373,146LIMITS FROM ON COULTER DRIVE FROM WILLIAM J. BRYAN PKWY (FM 158) PROJECT SPONSOR CITY OF BRYAN

REVISION DATE 07/2018LIMITS TO SOUTH COLLEGE AVEPROJECT INSTALLATION OF 6-FOOT-WIDE SIDEWALKS AND BIKE LANES ON BOTH SIDES OF COULTER DR MPO PROJ NUM

DESCR FUNDING CAT(S) 3LC,9TAPREMARKS PROJECT NAME: BRYAN-COULTER DRIVE SIDEWALKS & BIKE PROJECT 2017 TASA state-selected; Commission approved 10/26/17 MO

P7 LANES HISTORY 115076 TOTAL PROJECT COST INFORMATION

PREL ENG $ 60,156ROW PURCH $ 0 COST OF

CONSTR $ 1,227,665 APPROVEDCONST ENG $ 60,892 PHASES

CONTING $ 24,431 $ 1,373,146INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,373,144

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 1,029,860 $ 0 $ 0 $ 257,465 $ 0 $ 1,287,3253LC $ 0 $ 0 $ 0 $ 0 $ 85,821 $ 85,821TOTAL $ 1,029,860 $ 0 $ 0 $ 257,465 $ 85,821 $ 1,373,146

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

BRYAN BRYAN-COLLEGE STATIONBRAZOS 0212-03-050 2020 FM 158 C,E OTHER $ 11,000,000LIMITS FROM BS 6-R PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO SH 6PROJECT MISCELLANEOUS WORK CONSISTING OF CONSTRUCTION OF RAISED MEDIANS TURN LANES AND P MPO PROJ NUM 24

DESCR EDESTRIAN FACILITIES. FUNDING CAT(S) 2UREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 481,895ROW PURCH $ 0 COST OF

CONSTR $ 9,834,600 APPROVEDCONST ENG $ 487,796 PHASES

CONTING $ 195,709 $ 11,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 11,000,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2U $ 8,800,000 $ 2,200,000 $ 0 $ 0 $ 0 $ 11,000,000TOTAL $ 8,800,000 $ 2,200,000 $ 0 $ 0 $ 0 $ 11,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 107: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 107 OF 696

10:03:31 AM BRYAN-COLLEGE STATION MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

BRYAN BRYAN-COLLEGE STATIONBRAZOS 0049-12-110 2021 SH 6 OTHER $ 60,920,000LIMITS FROM SH 21 PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO BS 6-RPROJECT WIDEN FREEWAY FACILITY MPO PROJ NUM 49

DESCR FUNDING CAT(S) 2U,4REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,668,824ROW PURCH $ 0 COST OF

CONSTR $ 54,465,803 APPROVEDCONST ENG $ 2,701,504 PHASES

CONTING $ 1,083,869 $ 60,920,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 60,920,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2U $ 9,600,000 $ 2,400,000 $ 0 $ 0 $ 0 $ 12,000,0004 $ 39,136,000 $ 9,784,000 $ 0 $ 0 $ 0 $ 48,920,000TOTAL $ 48,736,000 $ 12,184,000 $ 0 $ 0 $ 0 $ 60,920,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 108: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 108 OF 696

10:03:31 AM BRYAN-COLLEGE STATION MPO - HIGHWAY PROJECTS

FY 2022

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

BRYAN BRYAN-COLLEGE STATIONBRAZOS 0050-01-083 2022 BS 6-R OTHER $ 4,000,000LIMITS FROM FM 158 PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO FM 60PROJECT RAISED MEDIANS AND SIDEWALKS MPO PROJ NUM 1

DESCR FUNDING CAT(S) 2UREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 175,235ROW PURCH $ 0 COST OF

CONSTR $ 3,576,218 APPROVEDCONST ENG $ 177,380 PHASES

CONTING $ 71,167 $ 4,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 4,000,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2U $ 3,200,000 $ 800,000 $ 0 $ 0 $ 0 $ 4,000,000TOTAL $ 3,200,000 $ 800,000 $ 0 $ 0 $ 0 $ 4,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

BRYAN BRYAN-COLLEGE STATIONBRAZOS 0049-09-076 2022 BS 6-R OTHER $ 6,000,000LIMITS FROM SH 21 PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO FM 158PROJECT RAISED MEDIANS AND SIDEWALKS MPO PROJ NUM 1

DESCR FUNDING CAT(S) 2UREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 262,852ROW PURCH $ 0 COST OF

CONSTR $ 5,364,327 APPROVEDCONST ENG $ 266,071 PHASES

CONTING $ 106,750 $ 6,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 6,000,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2U $ 4,800,000 $ 1,200,000 $ 0 $ 0 $ 0 $ 6,000,000TOTAL $ 4,800,000 $ 1,200,000 $ 0 $ 0 $ 0 $ 6,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 109: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

2019-2022Statewide TransportationImprovement ProgramCAMPOHighway Projects

Page 110: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 110 OF 696

10:03:31 AM CAMPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO TRAVIS 1535-01-012 2019 FM 1625 C,E OTHER $ 860,000LIMITS FROM 0.22 Miles South of Mckenzie Road PROJECT SPONSOR Travis County

REVISION DATE 07/2018LIMITS TO US 183 and Mckenzie Rd. IntersectionPROJECT Realign roadway and relocate intersection MPO PROJ NUM 51-00199-00

DESCR FUNDING CAT(S) 3LCREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 58,183ROW PURCH $ 0 COST OF

CONSTR $ 1,187,410 APPROVEDCONST ENG $ 58,183 PHASES

CONTING $ 14,842 $ 860,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 64,832TOTAL CST $ 1,318,618

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 860,000 $ 0 $ 860,000TOTAL $ 0 $ 0 $ 0 $ 860,000 $ 0 $ 860,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO WILLIAMSON 0151-05-115 2019 US 183 C OTHER $ 10,710,000LIMITS FROM Cedar Park Dr PROJECT SPONSOR City of Cedar Park

REVISION DATE 07/2018LIMITS TO South of Buttercup Creek BlvdPROJECT Realignment Of Existing Us 183 To Old Hwy 183. Old 183 To Be Widened And Realign MPO PROJ NUM 61-00116-00

DESCR ed Include Relocation FUNDING CAT(S) 3LCREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 645,686ROW PURCH $ 0 COST OF

CONSTR $ 13,177,280 APPROVEDCONST ENG $ 645,686 PHASES

CONTING $ 164,716 $ 10,710,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 719,479TOTAL CST $ 14,633,368

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 10,710,000 $ 0 $ 10,710,000TOTAL $ 0 $ 0 $ 0 $ 10,710,000 $ 0 $ 10,710,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO WILLIAMSON 0015-08-152 2019 IH 35 C,E OTHER $ 2,500,000LIMITS FROM At Northwest Blvd. PROJECT SPONSOR Georgetown

REVISION DATE 07/2018LIMITS TOPROJECT Construct New Overpass Crossing IH 35 At Northwest Boulevard MPO PROJ NUM 61-00112-00

DESCR FUNDING CAT(S) 3LCREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 125,318ROW PURCH $ 0 COST OF

CONSTR $ 2,557,521 APPROVEDCONST ENG $ 125,318 PHASES

CONTING $ 31,969 $ 2,500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 139,640TOTAL CST $ 2,840,126

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 2,500,000 $ 0 $ 2,500,000TOTAL $ 0 $ 0 $ 0 $ 2,500,000 $ 0 $ 2,500,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 111: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 111 OF 696

10:03:31 AM CAMPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO TRAVIS 0000-00-000 2019 VA C OTHER $ 4,716,250LIMITS FROM Decker and Lindell Lane PROJECT SPONSOR City of Austin

REVISION DATE 07/2018LIMITS TO Ben E. Fisher ParkPROJECT Austin to Manor Phase II Urban Trail: Construct 12-foot concrete trail from Lind MPO PROJ NUM 51-00224-00

DESCR ell Ln to Manor, Texas (approximately 2.9 miles) FUNDING CAT(S) 9TAPREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,150,000ROW PURCH $ 50,000 COST OF

CONSTR $ 4,716,250 APPROVEDCONST ENG $ 250,000 PHASES

CONTING $ 900,000 $ 4,716,250INDIRECT $ 800,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 7,866,250

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 3,773,000 $ 0 $ 0 $ 943,250 $ 0 $ 4,716,250TOTAL $ 3,773,000 $ 0 $ 0 $ 943,250 $ 0 $ 4,716,250

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO WILLIAMSON 0000-00-000 2019 S. West DriveC,E OTHER $ 305,762LIMITS FROM Horseshoe Dr. PROJECT SPONSOR City of Leander

REVISION DATE 07/2018LIMITS TO Lion DrPROJECT Construct .23 mile sidewalk on South West Drive MPO PROJ NUM 62-00005-00

DESCR FUNDING CAT(S) 9TAPREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 80,210ROW PURCH $ 0 COST OF

CONSTR $ 158,400 APPROVEDCONST ENG $ 4,500 PHASES

CONTING $ 0 $ 305,762INDIRECT $ 1,500BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 244,610

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 244,610 $ 0 $ 0 $ 61,152 $ 0 $ 305,762TOTAL $ 244,610 $ 0 $ 0 $ 61,152 $ 0 $ 305,762

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO TRAVIS 0000-00-000 2019 VA C,E AUSTIN $ 1,459,500LIMITS FROM PROJECT SPONSOR City of Austin

REVISION DATE 07/2018LIMITS TOPROJECT Construct 10 pedestrian hybrid beacons within the City of Austin MPO PROJ NUM 51-00226-00

DESCR FUNDING CAT(S) 9TAPREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 300,000ROW PURCH $ 0 COST OF

CONSTR $ 1,000,000 APPROVEDCONST ENG $ 100,000 PHASES

CONTING $ 100,000 $ 1,459,500INDIRECT $ 168,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,668,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 1,167,600 $ 0 $ 0 $ 291,900 $ 0 $ 1,459,500TOTAL $ 1,167,600 $ 0 $ 0 $ 291,900 $ 0 $ 1,459,500

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 112: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 112 OF 696

10:03:31 AM CAMPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO BASTROP 0000-00-000 2019 VA C OTHER $ 594,000LIMITS FROM Old Austin Highway PROJECT SPONSOR City of Bastrop

REVISION DATE 07/2018LIMITS TO Walnut StreetPROJECT Complete 1.8 mile ’’River Loop’’ shared-use path along Loop 150, SH 71, Water St MPO PROJ NUM 12-00002-00

DESCR , and Main St FUNDING CAT(S) 7REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 70,000ROW PURCH $ 0 COST OF

CONSTR $ 594,000 APPROVEDCONST ENG $ 119,000 PHASES

CONTING $ 29,000 $ 594,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 812,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 475,200 $ 0 $ 0 $ 118,800 $ 0 $ 594,000TOTAL $ 475,200 $ 0 $ 0 $ 118,800 $ 0 $ 594,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO TRAVIS 0000-00-000 2019 VA C OTHER $ 1,471,250LIMITS FROM Home Depot Boulevard PROJECT SPONSOR City of Austin

REVISION DATE 07/2018LIMITS TO MoPac Expressway and William Cannon DrivePROJECT Violet Crown Trail North: Construct 1.2 mile 12-foot wide natural composite trai MPO PROJ NUM 51-00223-00

DESCR l FUNDING CAT(S) 9TAPREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 520,000ROW PURCH $ 0 COST OF

CONSTR $ 1,471,250 APPROVEDCONST ENG $ 160,000 PHASES

CONTING $ 300,000 $ 1,471,250INDIRECT $ 280,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,731,250

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 1,177,000 $ 0 $ 0 $ 294,250 $ 0 $ 1,471,250TOTAL $ 1,177,000 $ 0 $ 0 $ 294,250 $ 0 $ 1,471,250

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO TRAVIS 0000-00-000 2019 VA C AUSTIN $ 3,850,000LIMITS FROM Shady at E. Cesar Chavez PROJECT SPONSOR CARTS

REVISION DATE 07/2018LIMITS TOPROJECT Construction of bus plaza and passenger terminal MPO PROJ NUM 73-00001-00

DESCR FUNDING CAT(S) 7REMARKS Awarded 750,000 TDCs PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 650,000ROW PURCH $ 0 COST OF

CONSTR $ 3,850,000 APPROVEDCONST ENG $ 100,000 PHASES

CONTING $ 350,000 $ 3,850,000INDIRECT $ 50,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 5,000,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 3,000,000 $ 0 $ 0 $ 0 $ 850,000 $ 3,850,000TOTAL $ 3,000,000 $ 0 $ 0 $ 0 $ 850,000 $ 3,850,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 113: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 113 OF 696

10:03:31 AM CAMPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO 0000-00-000 2019 FM 734 C OTHER $ 7,740,281LIMITS FROM SH 45-N PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO US 290-EPROJECT ITS Deployment MPO PROJ NUM 74-00012-00

DESCR FUNDING CAT(S) 2M,3LCREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 928,418ROW PURCH $ 0 COST OF

CONSTR $ 7,121,337 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 618,945 $ 7,740,281INDIRECT $ 475,400BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 9,144,100

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 0 $ 6,192,225 $ 0 $ 0 $ 0 $ 6,192,2253LC $ 0 $ 1,548,056 $ 0 $ 0 $ 0 $ 1,548,056TOTAL $ 0 $ 7,740,281 $ 0 $ 0 $ 0 $ 7,740,281

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO 0000-00-000 2019 VA C OTHER $ 30,576,703LIMITS FROM N/A PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO N/APROJECT Continue and expand the HERO Program within Hays, Travis and Williamson Counties MPO PROJ NUM 74-00007-00

DESCR FUNDING CAT(S) 2M,3LCREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 30,576,704 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 30,576,703INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 30,576,704

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 0 $ 24,461,363 $ 0 $ 0 $ 0 $ 24,461,3633LC $ 0 $ 6,115,340 $ 0 $ 0 $ 0 $ 6,115,340TOTAL $ 0 $ 30,576,703 $ 0 $ 0 $ 0 $ 30,576,703

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO WILLIAMSON 0000-00-000 2019 Williams DriveC,E GEORGETOWN $ 1,576,600LIMITS FROM IH-35 PROJECT SPONSOR City of Georgetown

REVISION DATE 07/2018LIMITS TO Jim Hogg DrivePROJECT Intersection improvements and access management MPO PROJ NUM 61-00129-00

DESCR FUNDING CAT(S) 7REMARKS Awarded 148,400 TDC PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 500,000ROW PURCH $ 0 COST OF

CONSTR $ 1,000,000 APPROVEDCONST ENG $ 76,600 PHASES

CONTING $ 0 $ 1,576,600INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,576,600

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 1,380,000 $ 0 $ 0 $ 196,600 $ 0 $ 1,576,600TOTAL $ 1,380,000 $ 0 $ 0 $ 196,600 $ 0 $ 1,576,600

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 114: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 114 OF 696

10:03:31 AM CAMPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO HAYS 0000-00-000 2019 US 290 C OTHER $ 1,311,250LIMITS FROM Intersection at Trautwein Rd. PROJECT SPONSOR Hays County

REVISION DATE 07/2018LIMITS TOPROJECT Intersection improvements MPO PROJ NUM 41-00191-00

DESCR FUNDING CAT(S) 2M,3LCREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 225,000ROW PURCH $ 100,000 COST OF

CONSTR $ 1,311,250 APPROVEDCONST ENG $ 87,000 PHASES

CONTING $ 150,000 $ 1,311,250INDIRECT $ 79,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,952,250

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 0 $ 1,049,000 $ 0 $ 0 $ 0 $ 1,049,0003LC $ 0 $ 262,250 $ 0 $ 0 $ 0 $ 262,250TOTAL $ 0 $ 1,311,250 $ 0 $ 0 $ 0 $ 1,311,250

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO WILLIAMSON 0000-00-000 2019 Kenny Fort BvdC ROUND ROCK $ 17,500,000LIMITS FROM Forest Creek Drive PROJECT SPONSOR City of Round Rock

REVISION DATE 07/2018LIMITS TO SH 45 NorthPROJECT Construction of a new limited access six-lane divided major arterial with shared MPO PROJ NUM 61-00131-00

DESCR use path FUNDING CAT(S) 7REMARKS Segments 2&3 PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,900,000ROW PURCH $ 5,455,180 COST OF

CONSTR $ 17,500,000 APPROVEDCONST ENG $ 200,000 PHASES

CONTING $ 1,500,000 $ 17,500,000INDIRECT $ 875,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 27,430,180

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 12,250,000 $ 0 $ 0 $ 3,062,500 $ 2,187,500 $ 17,500,000TOTAL $ 12,250,000 $ 0 $ 0 $ 3,062,500 $ 2,187,500 $ 17,500,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO TRAVIS 0000-00-000 2019 William CannonC,E AUSTIN $ 14,687,500LIMITS FROM Running Water Drive PROJECT SPONSOR City of Austin

REVISION DATE 07/2018LIMITS TO McKinney Falls PkwyPROJECT Convert existing two-lane to four-lane divided roadway with shared use path and MPO PROJ NUM 51-00221-00

DESCR intersection improvements FUNDING CAT(S) 7REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,720,000ROW PURCH $ 0 COST OF

CONSTR $ 11,520,000 APPROVEDCONST ENG $ 1,590,000 PHASES

CONTING $ 1,730,000 $ 14,687,500INDIRECT $ 4,804,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 21,364,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 11,750,000 $ 0 $ 0 $ 2,937,500 $ 0 $ 14,687,500TOTAL $ 11,750,000 $ 0 $ 0 $ 2,937,500 $ 0 $ 14,687,500

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 115: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 115 OF 696

10:03:31 AM CAMPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO TRAVIS 0000-00-000 2019 Slaughter LaneC,E OTHER $ 15,726,250LIMITS FROM Mopac Expressway PROJECT SPONSOR City of Austin

REVISION DATE 07/2018LIMITS TO Brodie LanePROJECT Convert existing four-lane to six-lane divided roadway with shared use path and MPO PROJ NUM 51-00227-00

DESCR intersection improvements FUNDING CAT(S) 7REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,850,000ROW PURCH $ 0 COST OF

CONSTR $ 12,400,000 APPROVEDCONST ENG $ 1,710,000 PHASES

CONTING $ 1,860,000 $ 15,726,250INDIRECT $ 5,055,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 22,875,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 12,581,000 $ 0 $ 0 $ 3,145,250 $ 0 $ 15,726,250TOTAL $ 12,581,000 $ 0 $ 0 $ 3,145,250 $ 0 $ 15,726,250

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO HAYS 0000-00-000 2019 FM 110 C OTHER $ 78,000,000LIMITS FROM East of SH 123 PROJECT SPONSOR Hays County

REVISION DATE 07/2018LIMITS TO East of I-35 at YarringtonPROJECT Construct new two-lane roadway MPO PROJ NUM 41-00192-00

DESCR FUNDING CAT(S) 2MREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 4,740,000ROW PURCH $ 22,140,000 COST OF

CONSTR $ 78,000,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 11,840,000 $ 78,000,000INDIRECT $ 1,660,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 118,380,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 0 $ 30,000,000 $ 0 $ 0 $ 48,000,000 $ 78,000,000TOTAL $ 0 $ 30,000,000 $ 0 $ 0 $ 48,000,000 $ 78,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO HAYS 0000-00-000 2019 Lime Kiln RoadC OTHER $ 5,222,500LIMITS FROM Post Road PROJECT SPONSOR Hays County

REVISION DATE 07/2018LIMITS TO Hilliard RoadPROJECT Realignment and Intersection Improvements at Windermere Road MPO PROJ NUM 41-00189-00

DESCR FUNDING CAT(S) 7REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 747,000ROW PURCH $ 400,000 COST OF

CONSTR $ 5,222,500 APPROVEDCONST ENG $ 345,000 PHASES

CONTING $ 580,000 $ 5,222,500INDIRECT $ 261,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 7,555,500

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 4,178,000 $ 0 $ 0 $ 1,044,500 $ 0 $ 5,222,500TOTAL $ 4,178,000 $ 0 $ 0 $ 1,044,500 $ 0 $ 5,222,500

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 116: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 116 OF 696

10:03:31 AM CAMPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO HAYS 0000-00-000 2019 FM 110 C OTHER $ 5,217,000LIMITS FROM Intersection at SH 123 PROJECT SPONSOR Hays County

REVISION DATE 07/2018LIMITS TOPROJECT New Grade Seperated Overpass MPO PROJ NUM 41-00193-00

DESCR FUNDING CAT(S) 2MREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 600,000ROW PURCH $ 0 COST OF

CONSTR $ 5,217,000 APPROVEDCONST ENG $ 522,000 PHASES

CONTING $ 730,000 $ 5,217,000INDIRECT $ 210,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 7,279,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 0 $ 5,217,000 $ 0 $ 0 $ 0 $ 5,217,000TOTAL $ 0 $ 5,217,000 $ 0 $ 0 $ 0 $ 5,217,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO HAYS 0000-00-000 2019 RM 967 C OTHER $ 5,315,000LIMITS FROM FM 1626 PROJECT SPONSOR Hays County

REVISION DATE 07/2018LIMITS TO Oak Forest DrivePROJECT Widen roadway with center turn lane and shoulder enhancements MPO PROJ NUM 41-00190-00

DESCR FUNDING CAT(S) 7REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 600,000ROW PURCH $ 180,000 COST OF

CONSTR $ 5,315,000 APPROVEDCONST ENG $ 387,000 PHASES

CONTING $ 582,000 $ 5,315,000INDIRECT $ 210,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 7,274,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 4,252,000 $ 0 $ 0 $ 1,063,000 $ 0 $ 5,315,000TOTAL $ 4,252,000 $ 0 $ 0 $ 1,063,000 $ 0 $ 5,315,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO TRAVIS 0000-00-000 2019 Lakeline BlvdC,E OTHER $ 17,125,000LIMITS FROM Lyndhurst Blvd PROJECT SPONSOR City of Austin

REVISION DATE 07/2018LIMITS TO Parmer LanePROJECT Expand Current 2-Lane Roadway with 2 Additional Travel Lanes and Upgrade Bicycle MPO PROJ NUM 51-00225-00

DESCR Facilities and Sidewalks FUNDING CAT(S) 7REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,700,000ROW PURCH $ 0 COST OF

CONSTR $ 13,400,000 APPROVEDCONST ENG $ 400,000 PHASES

CONTING $ 4,000,000 $ 17,125,000INDIRECT $ 2,600,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 23,100,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 13,700,000 $ 0 $ 0 $ 3,425,000 $ 0 $ 17,125,000TOTAL $ 13,700,000 $ 0 $ 0 $ 3,425,000 $ 0 $ 17,125,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 117: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 117 OF 696

10:03:31 AM CAMPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO HAYS 0000-00-000 2019 FM 621 C OTHER $ 5,100,000LIMITS FROM De Zavala Drive PROJECT SPONSOR Hays County

REVISION DATE 07/2018LIMITS TO CR 266/ Old Bastrop HwyPROJECT Widen 2-Lane Roadway to Include a Center Turn Lane and Shoulder Enhancements MPO PROJ NUM 41-00194-00

DESCR FUNDING CAT(S) 7REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 537,000ROW PURCH $ 200,000 COST OF

CONSTR $ 5,100,000 APPROVEDCONST ENG $ 337,000 PHASES

CONTING $ 510,000 $ 5,100,000INDIRECT $ 188,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 6,872,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 4,080,000 $ 0 $ 0 $ 1,020,000 $ 0 $ 5,100,000TOTAL $ 4,080,000 $ 0 $ 0 $ 1,020,000 $ 0 $ 5,100,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO TRAVIS 0000-00-000 2019 West RundbergC OTHER $ 11,000,000LIMITS FROM Burnet Road PROJECT SPONSOR City of Austin

REVISION DATE 07/2018LIMITS TO Metric Blvd.PROJECT Extend current roadway as a four-lane major divided arterial with sidewalks, bik MPO PROJ NUM 51-00222-00

DESCR e lanes, and new signalized intersection FUNDING CAT(S) 7REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 1,720,000 COST OF

CONSTR $ 11,000,000 APPROVEDCONST ENG $ 1,246,823 PHASES

CONTING $ 1,992,665 $ 11,000,000INDIRECT $ 831,180BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 16,790,668

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 8,800,000 $ 0 $ 0 $ 2,200,000 $ 0 $ 11,000,000TOTAL $ 8,800,000 $ 0 $ 0 $ 2,200,000 $ 0 $ 11,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO HAYS 0000-00-000 2019 RM 967 C OTHER $ 1,730,000LIMITS FROM Austin St. PROJECT SPONSOR City of Buda

REVISION DATE 07/2018LIMITS TO China/Ash StPROJECT Intersection improvements MPO PROJ NUM 41-00187-00

DESCR FUNDING CAT(S) 7REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 315,000ROW PURCH $ 0 COST OF

CONSTR $ 1,730,000 APPROVEDCONST ENG $ 45,000 PHASES

CONTING $ 150,000 $ 1,730,000INDIRECT $ 20,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,260,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 1,384,000 $ 0 $ 0 $ 346,000 $ 0 $ 1,730,000TOTAL $ 1,384,000 $ 0 $ 0 $ 346,000 $ 0 $ 1,730,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 118: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 118 OF 696

10:03:31 AM CAMPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO WILLIAMSON 0000-00-000 2019 University BvdC ROUND ROCK $ 9,000,000LIMITS FROM A.W. Grimes (FM 1460) PROJECT SPONSOR City of Round Rock

REVISION DATE 07/2018LIMITS TO Co. Rd. 110PROJECT Reconstruct two-lane facility with shoulders to four-lane divided roadway with l MPO PROJ NUM 61-00130-00

DESCR eft-turn lanes FUNDING CAT(S) 7REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,000,000ROW PURCH $ 300,000 COST OF

CONSTR $ 9,000,000 APPROVEDCONST ENG $ 250,000 PHASES

CONTING $ 900,000 $ 9,000,000INDIRECT $ 450,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 11,900,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 6,300,000 $ 0 $ 0 $ 1,575,000 $ 1,125,000 $ 9,000,000TOTAL $ 6,300,000 $ 0 $ 0 $ 1,575,000 $ 1,125,000 $ 9,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO HAYS 0000-00-000 2019 FM 2001 C OTHER $ 7,260,000LIMITS FROM Sun Bright Blvd. PROJECT SPONSOR Hays County

REVISION DATE 07/2018LIMITS TO FM 2001PROJECT Upgrade from a 2-Lane to a 4-Lane Divided Roadway with New Traffic Signals and B MPO PROJ NUM 41-00195-00

DESCR icycle/Pedestrian Improvements FUNDING CAT(S) 7REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 450,000ROW PURCH $ 2,050,000 COST OF

CONSTR $ 7,260,000 APPROVEDCONST ENG $ 480,000 PHASES

CONTING $ 880,000 $ 7,260,000INDIRECT $ 158,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 11,278,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 5,808,000 $ 0 $ 0 $ 1,452,000 $ 0 $ 7,260,000TOTAL $ 5,808,000 $ 0 $ 0 $ 1,452,000 $ 0 $ 7,260,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO TRAVIS 0000-00-000 2019 VA C OTHER $ 7,280,000LIMITS FROM N/A PROJECT SPONSOR City of Austin

REVISION DATE 07/2018LIMITS TO N/APROJECT Emergency Vehicle Preemption (EVP) and Transit Signal Priority (TSP) MPO PROJ NUM 54-00100-00

DESCR FUNDING CAT(S) 7REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 7,280,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 7,280,000INDIRECT $ 780,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 8,060,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 5,824,000 $ 0 $ 0 $ 1,456,000 $ 0 $ 7,280,000TOTAL $ 5,824,000 $ 0 $ 0 $ 1,456,000 $ 0 $ 7,280,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 119: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 119 OF 696

10:03:31 AM CAMPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO 0000-00-000 2019 RM 2222 C OTHER $ 4,918,628LIMITS FROM Loop 360 PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO I-35PROJECT ITS Deployment MPO PROJ NUM 74-00010-00

DESCR FUNDING CAT(S) 2M,3LCREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 589,971ROW PURCH $ 0 COST OF

CONSTR $ 4,525,315 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 393,314 $ 4,918,628INDIRECT $ 301,200BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 5,809,800

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 0 $ 3,934,903 $ 0 $ 0 $ 0 $ 3,934,9033LC $ 0 $ 983,725 $ 0 $ 0 $ 0 $ 983,725TOTAL $ 0 $ 4,918,628 $ 0 $ 0 $ 0 $ 4,918,628

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO 0000-00-000 2019 SH 71 C OTHER $ 1,033,062LIMITS FROM SH 130 PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO Norwood LanePROJECT ITS Deployment MPO PROJ NUM 74-00011-00

DESCR FUNDING CAT(S) 2M,3LCREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 123,925ROW PURCH $ 0 COST OF

CONSTR $ 950,558 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 82,617 $ 1,033,062INDIRECT $ 66,100BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,223,200

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 0 $ 826,450 $ 0 $ 0 $ 0 $ 826,4503LC $ 0 $ 206,612 $ 0 $ 0 $ 0 $ 206,612TOTAL $ 0 $ 1,033,062 $ 0 $ 0 $ 0 $ 1,033,062

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO TRAVIS 0000-00-000 2019 VA C AUSTIN $ 1,400,000LIMITS FROM N/A PROJECT SPONSOR City of Austin

REVISION DATE 07/2018LIMITS TO N/APROJECT Expand the Traffic Monitoring System including 275 CCTV cameras and video manage MPO PROJ NUM 54-00099-00

DESCR ment system within the City of Austin FUNDING CAT(S) 7REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 1,400,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 1,400,000INDIRECT $ 150,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,550,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 1,120,000 $ 0 $ 0 $ 280,000 $ 0 $ 1,400,000TOTAL $ 1,120,000 $ 0 $ 0 $ 280,000 $ 0 $ 1,400,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 120: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 120 OF 696

10:03:31 AM CAMPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO 0000-00-000 2019 RM 620/ SH 71C OTHER $ 13,180,283LIMITS FROM US 183 PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO US 290PROJECT ITS Deployment MPO PROJ NUM 74-00009-00

DESCR FUNDING CAT(S) 2M,3LCREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,580,926ROW PURCH $ 0 COST OF

CONSTR $ 12,126,334 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 1,053,950 $ 13,180,283INDIRECT $ 819,963BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 15,581,173

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 0 $ 10,544,227 $ 0 $ 0 $ 0 $ 10,544,2273LC $ 0 $ 2,636,056 $ 0 $ 0 $ 0 $ 2,636,056TOTAL $ 0 $ 13,180,283 $ 0 $ 0 $ 0 $ 13,180,283

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO TRAVIS 0000-00-000 2019 VA C AUSTIN $ 11,200,000LIMITS FROM N/A PROJECT SPONSOR City of Austin

REVISION DATE 07/2018LIMITS TO N/APROJECT Procure and install vehicle detection at 400 signalized intersections within the MPO PROJ NUM 54-00098-00

DESCR City of Austin FUNDING CAT(S) 7REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 11,200,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 11,200,000INDIRECT $ 1,200,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 12,400,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 8,960,000 $ 0 $ 0 $ 2,240,000 $ 0 $ 11,200,000TOTAL $ 8,960,000 $ 0 $ 0 $ 2,240,000 $ 0 $ 11,200,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO HAYS 3545-02-007 2019 FM 110 C,E,R OTHER $ 7,549,278LIMITS FROM SH 123 PROJECT SPONSOR Hays County, TxDOT

REVISION DATE 07/2018LIMITS TO CR 245 (Redwood Road)PROJECT Construct Two Lanes And Shoulders MPO PROJ NUM 41-00173-00

DESCR FUNDING CAT(S) 3LCREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 461,855ROW PURCH $ 0 COST OF

CONSTR $ 9,425,619 APPROVEDCONST ENG $ 461,855 PHASES

CONTING $ 117,820 $ 7,549,278INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 514,638TOTAL CST $ 10,467,149

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 7,549,278 $ 0 $ 7,549,278TOTAL $ 0 $ 0 $ 0 $ 7,549,278 $ 0 $ 7,549,278

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 121: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 121 OF 696

10:03:31 AM CAMPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO HAYS 3210-01-014 2019 FM 2770 C,E BUDA $ 2,250,001LIMITS FROM .955 Miles South of SL 4 PROJECT SPONSOR Hays County

REVISION DATE 07/2018LIMITS TO 1.414 Miles South of SL 4PROJECT Add left turn lane and shoulders. MPO PROJ NUM 41-00011-00

DESCR FUNDING CAT(S) 12REMARKS Linked to CSJ 0914-33-068 PROJECT TTC MO 144417

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 47,245ROW PURCH $ 0 COST OF

CONSTR $ 964,181 APPROVEDCONST ENG $ 61,515 PHASES

CONTING $ 12,438 $ 2,250,001INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 52,644TOTAL CST $ 1,085,379

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL12 $ 1,800,000 $ 450,000 $ 0 $ 0 $ 0 $ 2,250,000TOTAL $ 1,800,000 $ 450,000 $ 0 $ 0 $ 0 $ 2,250,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO TRAVIS 2689-01-023 2019 FM 2304 C,E OTHER $ 9,500,000LIMITS FROM Ravenscroft Drive PROJECT SPONSOR Travis County

REVISION DATE 07/2018LIMITS TO FM 1626PROJECT Reconstruct an existing 2-lane divided arterial to a four‐lane divided art MPO PROJ NUM 51-00202-00

DESCR erial with bicycle lanes and sidewalks. FUNDING CAT(S) 7REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 516,238ROW PURCH $ 0 COST OF

CONSTR $ 10,535,481 APPROVEDCONST ENG $ 522,559 PHASES

CONTING $ 209,656 $ 9,500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 394,027TOTAL CST $ 11,783,934

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 7,600,000 $ 0 $ 0 $ 1,900,000 $ 0 $ 9,500,000TOTAL $ 7,600,000 $ 0 $ 0 $ 1,900,000 $ 0 $ 9,500,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO HAYS 1776-02-018 2019 FM 2001 C,E,R BUDA $ 46,010,498LIMITS FROM IH 35 PROJECT SPONSOR Hays County, TxDOT

REVISION DATE 07/2018LIMITS TO SH 21PROJECT Widen To 4-Lane Divided Roadway By Adding Two Lanes And Shoulders MPO PROJ NUM 41-00171-00

DESCR FUNDING CAT(S) 12REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,052,170ROW PURCH $ 0 COST OF

CONSTR $ 41,881,029 APPROVEDCONST ENG $ 2,077,299 PHASES

CONTING $ 833,432 $ 46,010,498INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 1,566,350TOTAL CST $ 46,843,930

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL12 $ 12,800,000 $ 3,200,000 $ 0 $ 30,010,498 $ 0 $ 46,010,498TOTAL $ 12,800,000 $ 3,200,000 $ 0 $ 30,010,498 $ 0 $ 46,010,498

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 122: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 122 OF 696

10:03:31 AM CAMPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO TRAVIS 1539-02-026 2019 FM 1626 C,E,R OTHER $ 14,000,000LIMITS FROM West of Brodie Lane PROJECT SPONSOR Travis County

REVISION DATE 07/2018LIMITS TO Manchaca Rd. (FM 2304)PROJECT Reconstruct an existing 2-lane arterial to a 4-lane arterial with a continuous l MPO PROJ NUM 51-00200-00

DESCR eft turn lane with 5 foot wide shoulders and 6 foot wide sidewalks on both sides FUNDING CAT(S) 2M,3LC.

REMARKS Cancelled PTF, Awarded Funding in 19-22 Project Cal PROJECTP7 l HISTORY

TOTAL PROJECT COST INFORMATIONPREL ENG $ 1,586,400

ROW PURCH $ 2,600,000 COST OFCONSTR $ 11,660,000 APPROVED

CONST ENG $ 0 PHASESCONTING $ 966,000 $ 14,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 16,812,400

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 0 $ 11,200,000 $ 0 $ 0 $ 0 $ 11,200,0003LC $ 0 $ 2,800,000 $ 0 $ 0 $ 0 $ 2,800,000TOTAL $ 0 $ 14,000,000 $ 0 $ 0 $ 0 $ 14,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO HAYS 0914-33-078 2019 VA C,E OTHER $ 2,244,357LIMITS FROM East of Hopkins St. PROJECT SPONSOR City of San Marcos

REVISION DATE 07/2018LIMITS TO West of IH 35 SBFRPROJECT San Marcos River Shared Use Path MPO PROJ NUM 41-00169-00

DESCR FUNDING CAT(S) 9TAPREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 116,637ROW PURCH $ 0 COST OF

CONSTR $ 2,380,356 APPROVEDCONST ENG $ 116,399 PHASES

CONTING $ 26,898 $ 2,244,357INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 99,022TOTAL CST $ 2,640,290

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 1,683,267 $ 0 $ 0 $ 561,089 $ 0 $ 2,244,356TOTAL $ 1,683,267 $ 0 $ 0 $ 561,089 $ 0 $ 2,244,356

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO HAYS 0914-33-077 2019 VA C,E OTHER $ 178,145LIMITS FROM Nine Intersections On_Guadalupe, PROJECT SPONSOR City of San Marcos

REVISION DATE 07/2018LIMITS TO Hopkins, Gary & LBJ StreetsPROJECT Downtown San Marcos Pedestrian Improvements MPO PROJ NUM 41-00168-00

DESCR FUNDING CAT(S) 9TAPREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 8,901ROW PURCH $ 0 COST OF

CONSTR $ 181,672 APPROVEDCONST ENG $ 8,883 PHASES

CONTING $ 2,052 $ 178,145INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 7,557TOTAL CST $ 201,508

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 142,516 $ 0 $ 0 $ 35,629 $ 0 $ 178,145TOTAL $ 142,516 $ 0 $ 0 $ 35,629 $ 0 $ 178,145

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 123: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 123 OF 696

10:03:31 AM CAMPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO HAYS 0914-33-074 2019 CS C,E OTHER $ 5,500,000LIMITS FROM Moore Street PROJECT SPONSOR City of San Marcos

REVISION DATE 07/2018LIMITS TO Bishop StreetPROJECT Reconstuct Roadway With Multi-Use Path, Sidewalks, And Curb And Gutter MPO PROJ NUM 41-00166-00

DESCR FUNDING CAT(S) 7REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 507,239ROW PURCH $ 0 COST OF

CONSTR $ 10,351,829 APPROVEDCONST ENG $ 506,204 PHASES

CONTING $ 116,975 $ 5,500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 430,636TOTAL CST $ 11,482,247

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 4,400,000 $ 0 $ 0 $ 1,100,000 $ 0 $ 5,500,000TOTAL $ 4,400,000 $ 0 $ 0 $ 1,100,000 $ 0 $ 5,500,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO HAYS 0914-33-068 2019 CR C,E,R OTHER $ 8,637,863LIMITS FROM RM 967 at Robert S. Light Blvd. PROJECT SPONSOR TxDOT, Hays County

REVISION DATE 07/2018LIMITS TO FM 1626PROJECT Construct A Single-Lane Two Way Roadway And A Grade-Separated Crossing With The MPO PROJ NUM 41-00165-00

DESCR Union Pacific Railroad FUNDING CAT(S) 3LC,10,12REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 789,136ROW PURCH $ 1 COST OF

CONSTR $ 16,104,818 APPROVEDCONST ENG $ 789,136 PHASES

CONTING $ 201,310 $ 8,637,863INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 879,323TOTAL CST $ 17,884,401

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL10 $ 110,291 $ 27,572 $ 0 $ 0 $ 0 $ 137,86312 $ 3,640,000 $ 910,000 $ 0 $ 0 $ 0 $ 4,550,0003LC $ 0 $ 0 $ 0 $ 3,950,000 $ 0 $ 3,950,000TOTAL $ 3,750,291 $ 937,572 $ 0 $ 3,950,000 $ 0 $ 8,637,863

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO WILLIAMSON 0914-05-191 2019 VA C,E ROUND ROCK $ 1,449,837LIMITS FROM Heritage Trail at Creekside Plaza PROJECT SPONSOR Williamson County

REVISION DATE 07/2018LIMITS TO 1.1 Miles NW Along Brushy CreekPROJECT Construct 10-Ft Wide Shared Use Path In Round Rock With Pedestrian Bridge MPO PROJ NUM 61-00121-00

DESCR FUNDING CAT(S) 9TAPREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 72,448ROW PURCH $ 0 COST OF

CONSTR $ 1,478,550 APPROVEDCONST ENG $ 72,301 PHASES

CONTING $ 16,707 $ 1,449,837INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 61,507TOTAL CST $ 1,640,006

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 826,407 $ 0 $ 0 $ 623,430 $ 0 $ 1,449,837TOTAL $ 826,407 $ 0 $ 0 $ 623,430 $ 0 $ 1,449,837

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 124: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 124 OF 696

10:03:31 AM CAMPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO WILLIAMSON 0914-05-190 2019 VA C,E OTHER $ 418,715LIMITS FROM 800’’ West of US 183 PROJECT SPONSOR City of Cedar Park

REVISION DATE 07/2018LIMITS TO 500’’ East of Parmer LanePROJECT Shared Use Path: Adjacent To Roadway MPO PROJ NUM 61-00120-00

DESCR FUNDING CAT(S) 9TAPREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 20,887ROW PURCH $ 0 COST OF

CONSTR $ 426,278 APPROVEDCONST ENG $ 20,845 PHASES

CONTING $ 4,816 $ 418,715INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 17,733TOTAL CST $ 472,826

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 334,972 $ 0 $ 0 $ 83,743 $ 0 $ 418,715TOTAL $ 334,972 $ 0 $ 0 $ 83,743 $ 0 $ 418,715

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO TRAVIS 0914-04-273 2019 C,E OTHER $ 2,520,500LIMITS FROM Proposed Wildhorse Connector PROJECT SPONSOR Travis County

REVISION DATE 07/2018LIMITS TO Travis County East Metro ParkPROJECT Construct a new shared use path MPO PROJ NUM 51-00197-00

DESCR FUNDING CAT(S) 7REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 135,265ROW PURCH $ 0 COST OF

CONSTR $ 2,760,500 APPROVEDCONST ENG $ 134,988 PHASES

CONTING $ 31,194 $ 2,520,500INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 114,837TOTAL CST $ 3,061,947

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 2,016,400 $ 0 $ 0 $ 504,100 $ 0 $ 2,520,500TOTAL $ 2,016,400 $ 0 $ 0 $ 504,100 $ 0 $ 2,520,500

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO WILLIAMSON 0683-01-056 2019 RM 620 C,E,R OTHER $ 21,538,000LIMITS FROM Deepwood Drive PROJECT SPONSOR TxDOT, City of Round Rock

REVISION DATE 07/2018LIMITS TO IH 35 (Dot No. 439705H)PROJECT Construct New 4-Ln Overpass At Georgetown Rr And Lake Creek With Roundabout And MPO PROJ NUM 61-00119-00

DESCR Collector Roads FUNDING CAT(S) 2MREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,369,817ROW PURCH $ 8,769,339 COST OF

CONSTR $ 27,955,452 APPROVEDCONST ENG $ 1,367,021 PHASES

CONTING $ 315,896 $ 21,538,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 1,162,946TOTAL CST $ 39,777,525

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 17,230,400 $ 4,307,600 $ 0 $ 0 $ 0 $ 21,538,000TOTAL $ 17,230,400 $ 4,307,600 $ 0 $ 0 $ 0 $ 21,538,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 125: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 125 OF 696

10:03:31 AM CAMPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO CALDWELL 0286-02-034 2019 SH 80 C,E OTHER $ 750,000LIMITS FROM CR 266 PROJECT SPONSOR Hays County

REVISION DATE 07/2018LIMITS TO .215 Mi E of CR 266PROJECT Install left turn lane MPO PROJ NUM 31-00001-00

DESCR FUNDING CAT(S) 7REMARKS Linked to 0286-01-057 PROJECT TPB Resolution 2014-11-4.

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 38,597ROW PURCH $ 0 COST OF

CONSTR $ 787,686 APPROVEDCONST ENG $ 50,254 PHASES

CONTING $ 45,528 $ 750,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 10,161TOTAL CST $ 922,065

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 600,000 $ 0 $ 0 $ 150,000 $ 0 $ 750,000TOTAL $ 600,000 $ 0 $ 0 $ 150,000 $ 0 $ 750,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO HAYS 0286-01-057 2019 SH 80 C,E OTHER $ 750,001LIMITS FROM .215 Mi W of CR 266 PROJECT SPONSOR Hays County

REVISION DATE 07/2018LIMITS TO CR 266PROJECT Install left turn lane MPO PROJ NUM 41-00006-00

DESCR FUNDING CAT(S) 7REMARKS Linked to 0286-02-034 PROJECT TPB Resolution 2014-11-4.

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 38,597ROW PURCH $ 0 COST OF

CONSTR $ 787,686 APPROVEDCONST ENG $ 50,254 PHASES

CONTING $ 10,161 $ 750,001INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 45,528TOTAL CST $ 886,698

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 600,000 $ 0 $ 0 $ 150,000 $ 0 $ 750,000TOTAL $ 600,000 $ 0 $ 0 $ 150,000 $ 0 $ 750,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO WILLIAMSON 0151-08-010 2019 SL 332 C,E OTHER $ 1,348,482LIMITS FROM SH 29 PROJECT SPONSOR City of Liberty Hill

REVISION DATE 07/2018LIMITS TO CR 279PROJECT Liberty Hill Downtown Bike/Ped Loop MPO PROJ NUM 61-00117-00

DESCR FUNDING CAT(S) 9TAPREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 70,079ROW PURCH $ 0 COST OF

CONSTR $ 1,430,194 APPROVEDCONST ENG $ 69,936 PHASES

CONTING $ 16,161 $ 1,348,482INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 59,496TOTAL CST $ 1,586,370

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 1,011,361 $ 0 $ 0 $ 337,120 $ 0 $ 1,348,481TOTAL $ 1,011,361 $ 0 $ 0 $ 337,120 $ 0 $ 1,348,481

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 126: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 126 OF 696

10:03:31 AM CAMPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO WILLIAMSON 0151-05-113 2019 US 183 C,E,R OTHER $ 60,000,001LIMITS FROM RM 620/SH 45 PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO Travis County LinePROJECT Widen From 3 To 4 General Purpose Lanes MPO PROJ NUM 61-00114-00

DESCR FUNDING CAT(S) 12REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 3,107,165ROW PURCH $ 0 COST OF

CONSTR $ 63,411,533 APPROVEDCONST ENG $ 2,726,695 PHASES

CONTING $ 114,140 $ 60,000,001INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 2,986,683TOTAL CST $ 69,359,533

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL12 $ 48,000,000 $ 12,000,000 $ 0 $ 0 $ 0 $ 60,000,000TOTAL $ 48,000,000 $ 12,000,000 $ 0 $ 0 $ 0 $ 60,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO BASTROP 0114-06-039 2019 US 290 C OTHER $ 1,800,000LIMITS FROM 8.864 Miles East of FM 696 PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO 9.12 Miles East of FM 696PROJECT Reconstruct existing 4-Lane undivided roadway to a 4-Lane divided roadway MPO PROJ NUM 11-00029-00

DESCR FUNDING CAT(S) 4REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 90,229ROW PURCH $ 0 COST OF

CONSTR $ 1,841,415 APPROVEDCONST ENG $ 90,045 PHASES

CONTING $ 20,808 $ 1,800,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 76,602TOTAL CST $ 2,042,497

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 1,440,000 $ 360,000 $ 0 $ 0 $ 0 $ 1,800,000TOTAL $ 1,440,000 $ 360,000 $ 0 $ 0 $ 0 $ 1,800,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO BASTROP 0114-06-029 2019 US 290 C OTHER $ 17,000,000LIMITS FROM FM 2104 PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO Lee C/LPROJECT Reconstruct existing 4-Lane undivided roadway to a 4-Lane divided roadway MPO PROJ NUM 11-00028-00

DESCR FUNDING CAT(S) 4REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 850,075ROW PURCH $ 9,036,255 COST OF

CONSTR $ 17,348,471 APPROVEDCONST ENG $ 848,340 PHASES

CONTING $ 196,037 $ 17,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 721,696TOTAL CST $ 28,279,178

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 13,600,000 $ 3,400,000 $ 0 $ 0 $ 0 $ 17,000,000TOTAL $ 13,600,000 $ 3,400,000 $ 0 $ 0 $ 0 $ 17,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 127: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 127 OF 696

10:03:31 AM CAMPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO BASTROP 0114-05-037 2019 US 290 C OTHER $ 38,200,000LIMITS FROM 1.0 Miles East of FM 696 PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO 8.864 Miles East of FM 696PROJECT Reconstruct existing 4-Lane undivided roadway to a 4-Lane divided roadway MPO PROJ NUM 11-00027-00

DESCR FUNDING CAT(S) 2M,4REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,744,240ROW PURCH $ 3,491,829 COST OF

CONSTR $ 35,596,740 APPROVEDCONST ENG $ 1,740,680 PHASES

CONTING $ 402,243 $ 38,200,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 1,480,824TOTAL CST $ 42,975,732

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 16,320,000 $ 4,080,000 $ 0 $ 0 $ 0 $ 20,400,0004 $ 14,240,000 $ 3,560,000 $ 0 $ 0 $ 0 $ 17,800,000TOTAL $ 30,560,000 $ 7,640,000 $ 0 $ 0 $ 0 $ 38,200,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO HAYS 0016-16-029 2019 RM 967 C OTHER $ 1,200,001LIMITS FROM 0.130 Miles North of Robert S Light PROJECT SPONSOR TxDOT, Hays County

REVISION DATE 07/2018LIMITS TO 0.141 Miles South of Robert S LightPROJECT Add Left Turn Lane And Shoulders MPO PROJ NUM 41-00163-00

DESCR FUNDING CAT(S) 12REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 29,883ROW PURCH $ 0 COST OF

CONSTR $ 609,857 APPROVEDCONST ENG $ 29,822 PHASES

CONTING $ 6,891 $ 1,200,001INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 33,298TOTAL CST $ 676,453

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL12 $ 960,000 $ 240,000 $ 0 $ 0 $ 0 $ 1,200,000TOTAL $ 960,000 $ 240,000 $ 0 $ 0 $ 0 $ 1,200,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO TRAVIS 0015-13-396 2019 IH 35 C OTHER $ 32,500,000LIMITS FROM At Parmer Lane PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TOPROJECT Reconstruct Intersection MPO PROJ NUM 51-00184-00

DESCR FUNDING CAT(S) 2M,4REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,174,777ROW PURCH $ 2,304,000 COST OF

CONSTR $ 23,975,051 APPROVEDCONST ENG $ 1,124,429 PHASES

CONTING $ 716,854 $ 32,500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 1,076,479TOTAL CST $ 29,295,111

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 14,625,000 $ 1,625,000 $ 0 $ 0 $ 0 $ 16,250,0002M $ 14,625,000 $ 1,625,000 $ 0 $ 0 $ 0 $ 16,250,000TOTAL $ 29,250,000 $ 3,250,000 $ 0 $ 0 $ 0 $ 32,500,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 128: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 128 OF 696

10:03:31 AM CAMPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO WILLIAMSON 0015-09-193 2019 IH 35 C,E OTHER $ 10,427,210LIMITS FROM FM 3406 PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO RM 1431PROJECT Widen NB Frontage Rd To 3 Lanes With Associated Paving, Grading, Drainage And Dr MPO PROJ NUM 61-00113-00

DESCR iveway Improvements FUNDING CAT(S) 2MREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 455,241ROW PURCH $ 426,900 COST OF

CONSTR $ 9,290,646 APPROVEDCONST ENG $ 454,312 PHASES

CONTING $ 104,984 $ 10,427,210INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 386,490TOTAL CST $ 10,732,083

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 8,341,768 $ 2,085,442 $ 0 $ 0 $ 0 $ 10,427,210TOTAL $ 8,341,768 $ 2,085,442 $ 0 $ 0 $ 0 $ 10,427,210

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO WILLIAMSON 0015-08-142 2019 IH 35 C,E,R OTHER $ 10,969,480LIMITS FROM Corn Hill (Bud Stockton Lp) Underpass PROJECT SPONSOR TxDOT, Williamson County

REVISION DATE 07/2018LIMITS TO FM 972 OverpassPROJECT Convert Existing 2-Lane NB and SB 2-Way Frontage Roads To 2-LN One-Way Frontage MPO PROJ NUM 61-00109-00

DESCR Roads And Replace Existing Ramps FUNDING CAT(S) 2MREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 567,748ROW PURCH $ 0 COST OF

CONSTR $ 11,586,699 APPROVEDCONST ENG $ 566,589 PHASES

CONTING $ 579,334 $ 10,969,480INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 482,006TOTAL CST $ 13,300,370

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 8,775,584 $ 2,193,896 $ 0 $ 0 $ 0 $ 10,969,480TOTAL $ 8,775,584 $ 2,193,896 $ 0 $ 0 $ 0 $ 10,969,480

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO WILLIAMSON 0015-08-141 2019 IH 35 C OTHER $ 12,653,670LIMITS FROM At Theon Road (Ronald Reagan Blvd) PROJECT SPONSOR TxDOT, Williamson County

REVISION DATE 07/2018LIMITS TOPROJECT Replace Bridge Overpass and Tie-In Approaches MPO PROJ NUM 61-00108-00

DESCR FUNDING CAT(S) 2MREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 648,354ROW PURCH $ 0 COST OF

CONSTR $ 13,231,732 APPROVEDCONST ENG $ 985,764 PHASES

CONTING $ 661,586 $ 12,653,670INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 316,238TOTAL CST $ 15,527,436

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 10,122,936 $ 2,530,734 $ 0 $ 0 $ 0 $ 12,653,670TOTAL $ 10,122,936 $ 2,530,734 $ 0 $ 0 $ 0 $ 12,653,670

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 129: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 129 OF 696

10:03:31 AM CAMPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO TRAVIS 0151-06-142 2019 US 183 N C,E,R OTHER $ 60,000,000LIMITS FROM Williamson County Line PROJECT SPONSOR CTRMA/TxDOT

REVISION DATE 07/2018LIMITS TO SL 1PROJECT Widen from 3 to 4 general purpose lanes MPO PROJ NUM 51-00001-02

DESCR FUNDING CAT(S) 12REMARKS PROJECT TPB Resolution 2017-5-7. Administrative Amendment: Amende

P7 HISTORY d YOE/TPC TOTAL PROJECT COST INFORMATION

PREL ENG $ 3,107,165ROW PURCH $ 0 COST OF

CONSTR $ 63,411,533 APPROVEDCONST ENG $ 2,726,695 PHASES

CONTING $ 114,140 $ 60,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 2,986,683TOTAL CST $ 69,359,533

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL12 $ 48,000,000 $ 12,000,000 $ 0 $ 0 $ 0 $ 60,000,000TOTAL $ 48,000,000 $ 12,000,000 $ 0 $ 0 $ 0 $ 60,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO BASTROP 0265-05-076 2019 SH 21 C BASTROP $ 18,697,936LIMITS FROM 0.668 MI W OF SH 95 PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO .268 MI W OF SH 95PROJECT Convert Existing 2-Lane Two-Way Frontage Roads To 2-Lane One Way Frontage Roads MPO PROJ NUM 11-00034-00

DESCR FUNDING CAT(S) 2M,3LCREMARKS Administratively Amended 10/26/2017: Amended YOE/TP PROJECT

P7 C HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 744,098ROW PURCH $ 0 COST OF

CONSTR $ 15,185,675 APPROVEDCONST ENG $ 742,579 PHASES

CONTING $ 171,598 $ 18,697,936INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 631,724TOTAL CST $ 16,843,950

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 14,932,269 $ 3,733,067 $ 0 $ 0 $ 0 $ 18,665,3363LC $ 0 $ 0 $ 0 $ 32,600 $ 0 $ 32,600TOTAL $ 14,932,269 $ 3,733,067 $ 0 $ 32,600 $ 0 $ 18,697,936

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO BASTROP 0265-04-062 2019 SH 21 C BASTROP $ 29,762,005LIMITS FROM 1.187 MI W OF SH 95 PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO 0.668 MI W of SH 95PROJECT Convert existing 2-lane 2-way frontage road to a 2-lane one-way frontage road ov MPO PROJ NUM 11-00005-00

DESCR er the Colorado river FUNDING CAT(S) 2MREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,181,346ROW PURCH $ 2,435,000 COST OF

CONSTR $ 24,109,116 APPROVEDCONST ENG $ 1,178,935 PHASES

CONTING $ 272,443 $ 29,762,005INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 1,002,939TOTAL CST $ 29,176,840

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 23,809,604 $ 5,952,401 $ 0 $ 0 $ 0 $ 29,762,005TOTAL $ 23,809,604 $ 5,952,401 $ 0 $ 0 $ 0 $ 29,762,005

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 130: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 130 OF 696

10:03:31 AM CAMPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO HAYS 0000-00-002 2019 VA C,E AUSTIN $ 1,278,030LIMITS FROM Various Locations PROJECT SPONSOR Travis County

REVISION DATE 07/2018LIMITS TOPROJECT Construct new sidewalk on both sides of Elroy Road within SH 130 right-of-way an MPO PROJ NUM 51-00029-00

DESCR d a shared use path on FM 973 from Moores Bridge Road to Elroy Road. FUNDING CAT(S) 9TAPREMARKS PROJECT TPB Resolution 2015-10-6.

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 185,300ROW PURCH $ 0 COST OF

CONSTR $ 850,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 76,500 $ 1,278,030INDIRECT $ 166,770BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,278,570

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 1,022,856 $ 0 $ 0 $ 255,174 $ 0 $ 1,278,030TOTAL $ 1,022,856 $ 0 $ 0 $ 255,174 $ 0 $ 1,278,030

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO HAYS 3545-02-009 2019 FM 110 C,E,R SAN MARCOS $ 1,210,329LIMITS FROM CR 245 (REDWOOD ROAD) PROJECT SPONSOR Hays County

REVISION DATE 07/2018LIMITS TO FM 621PROJECT Construct Two Lanes And Shoulders MPO PROJ NUM 41-00175-00

DESCR FUNDING CAT(S) 3LCREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 163,770ROW PURCH $ 0 COST OF

CONSTR $ 3,342,252 APPROVEDCONST ENG $ 163,770 PHASES

CONTING $ 41,778 $ 1,210,329INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 182,486TOTAL CST $ 3,711,570

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 1,210,329 $ 0 $ 1,210,329TOTAL $ 0 $ 0 $ 0 $ 1,210,329 $ 0 $ 1,210,329

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO HAYS 3545-02-008 2019 FM 110 C,E SAN MARCOS $ 12,024,474LIMITS FROM FM 621 PROJECT SPONSOR Hays County

REVISION DATE 07/2018LIMITS TO CALDWELL COUNTY LINEPROJECT Construct Two Lanes And Shoulders MPO PROJ NUM 41-00174-00

DESCR FUNDING CAT(S) 3LCREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 585,531ROW PURCH $ 0 COST OF

CONSTR $ 11,949,628 APPROVEDCONST ENG $ 585,531 PHASES

CONTING $ 149,370 $ 12,024,474INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 652,449TOTAL CST $ 13,270,060

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 12,024,474 $ 0 $ 12,024,474TOTAL $ 0 $ 0 $ 0 $ 12,024,474 $ 0 $ 12,024,474

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 131: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 131 OF 696

10:03:31 AM CAMPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO HAYS 3545-03-004 2019 FM 110 C,E,R SAN MARCOS $ 2,000,000LIMITS FROM HAYS COUNTY LINE PROJECT SPONSOR Hays County, TxDOT

REVISION DATE 07/2018LIMITS TO SH 80PROJECT Construct Two Lanes And Shoulders MPO PROJ NUM 31-00030-00

DESCR FUNDING CAT(S) 3LCREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 332,394ROW PURCH $ 0 COST OF

CONSTR $ 6,783,559 APPROVEDCONST ENG $ 332,394 PHASES

CONTING $ 84,794 $ 2,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 370,382TOTAL CST $ 7,533,141

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 2,000,000 $ 0 $ 2,000,000TOTAL $ 0 $ 0 $ 0 $ 2,000,000 $ 0 $ 2,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO HAYS 3545-03-003 2019 FM 110 C,E SAN MARCOS $ 5,884,100LIMITS FROM SH 80 PROJECT SPONSOR Hays County, TxDOT

REVISION DATE 07/2018LIMITS TO SH 21PROJECT Construct Two Lanes And Shoulders MPO PROJ NUM 31-00028-00

DESCR FUNDING CAT(S) 3LCREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,260,210ROW PURCH $ 0 COST OF

CONSTR $ 25,718,574 APPROVEDCONST ENG $ 1,260,210 PHASES

CONTING $ 321,482 $ 5,884,100INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 1,404,234TOTAL CST $ 28,560,476

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 5,884,100 $ 0 $ 5,884,100TOTAL $ 0 $ 0 $ 0 $ 5,884,100 $ 0 $ 5,884,100

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO HAYS 3545-01-005 2019 FM 110 C,E SAN MARCOS $ 18,650,900LIMITS FROM SH 21 PROJECT SPONSOR Hays County, TxDOT

REVISION DATE 07/2018LIMITS TO 800’ EAST OF IH 35 NBFRPROJECT Construct Two Lanes And Shoulders MPO PROJ NUM 41-00172-00

DESCR FUNDING CAT(S) 3LCREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,201,237ROW PURCH $ 0 COST OF

CONSTR $ 24,515,045 APPROVEDCONST ENG $ 1,201,237 PHASES

CONTING $ 306,438 $ 18,650,900INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 1,338,521TOTAL CST $ 27,223,957

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 18,650,900 $ 0 $ 18,650,900TOTAL $ 0 $ 0 $ 0 $ 18,650,900 $ 0 $ 18,650,900

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 132: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 132 OF 696

10:03:31 AM CAMPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO TRAVIS 1186-01-091 2019 FM 969 C,E,R AUSTIN $ 10,917,185LIMITS FROM FM 973 PROJECT SPONSOR Travis County

REVISION DATE 07/2018LIMITS TO Hunters Bend RoadPROJECT Widen FM 969, an existing 2-lane undivided arterial, to provide for two addition MPO PROJ NUM 51-00022-01

DESCR al travel lanes, a continuous left turn lane, shoulders, and a sidewalk on one s FUNDING CAT(S) 3LC,3PTFide of the roadway

REMARKS Approved in the Pass Through Finance Program for $5 PROJECTP7 ,274,846 HISTORY

TOTAL PROJECT COST INFORMATIONPREL ENG $ 952,946

ROW PURCH $ 2,000,000 COST OFCONSTR $ 6,311,383 APPROVED

CONST ENG $ 43,664 PHASESCONTING $ 1,609,192 $ 10,917,185INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 10,917,185

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3PTF $ 0 $ 5,274,846 $ 0 $ 0 $ 0 $ 5,274,8463LC $ 0 $ 0 $ 0 $ 0 $ 5,642,339 $ 5,642,339TOTAL $ 0 $ 5,274,846 $ 0 $ 0 $ 5,642,339 $ 10,917,185

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO TRAVIS 1186-01-090 2019 FM 969 C,E,R AUSTIN $ 18,128,600LIMITS FROM FM 3177 PROJECT SPONSOR Travis County

REVISION DATE 07/2018LIMITS TO FM 973PROJECT Widen FM 969, an existing 4-lane undivided arterial, to provide for a continuous MPO PROJ NUM 51-00022-00

DESCR left-turn lane, shoulders, and a sidewalk on one side of the roadway. FUNDING CAT(S) 3LC,3PTFREMARKS Approved for the Pass Through Finance Program for $ PROJECT

P7 9,538,600.00 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,140,000ROW PURCH $ 1,580,000 COST OF

CONSTR $ 13,538,600 APPROVEDCONST ENG $ 470,000 PHASES

CONTING $ 1,400,000 $ 18,128,600INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 18,128,600

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3PTF $ 0 $ 9,538,600 $ 0 $ 0 $ 0 $ 9,538,6003LC $ 0 $ 0 $ 0 $ 0 $ 8,590,000 $ 8,590,000TOTAL $ 0 $ 9,538,600 $ 0 $ 0 $ 8,590,000 $ 18,128,600

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 133: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 133 OF 696

10:03:31 AM CAMPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO WILLIAMSON 2690-01-037 2020 FM 971 C,E OTHER $ 3,292,000LIMITS FROM SS 158 (Austin Avenue) PROJECT SPONSOR City of Georgetown

REVISION DATE 07/2018LIMITS TO Gann Street/River Haven DrivePROJECT Upgrade From 2 Lane To 4 Lane Urban Section MPO PROJ NUM 61-00125-00

DESCR FUNDING CAT(S) 3LCREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 172,768ROW PURCH $ 0 COST OF

CONSTR $ 3,525,885 APPROVEDCONST ENG $ 174,883 PHASES

CONTING $ 70,165 $ 3,292,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 131,868TOTAL CST $ 3,943,701

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 3,292,000 $ 0 $ 3,292,000TOTAL $ 0 $ 0 $ 0 $ 3,292,000 $ 0 $ 3,292,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO TRAVIS 0000-00-000 2020 Braker Lane N.C,R OTHER $ 21,340,000LIMITS FROM Samsung Blvd. PROJECT SPONSOR Travis County

REVISION DATE 07/2018LIMITS TO Harris Branch ParkwayPROJECT Widen current and extend roadway as a four-lane divided roadway with bicycle and MPO PROJ NUM 51-00229-00

DESCR pedestrian facilities FUNDING CAT(S) 7REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,375,790ROW PURCH $ 2,400,000 COST OF

CONSTR $ 18,940,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 21,340,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 22,715,790

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 11,737,000 $ 0 $ 0 $ 2,934,250 $ 6,668,750 $ 21,340,000TOTAL $ 11,737,000 $ 0 $ 0 $ 2,934,250 $ 6,668,750 $ 21,340,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO HAYS 0000-00-000 2020 VA C,E,R OTHER $ 19,011,292LIMITS FROM Burleson Street PROJECT SPONSOR City of Kyle

REVISION DATE 07/2018LIMITS TO Kohlers CrossingPROJECT Center Street Rail Siding Relocation MPO PROJ NUM 41-00196-00

DESCR FUNDING CAT(S) 7REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 300,000ROW PURCH $ 2,014,105 COST OF

CONSTR $ 9,239,394 APPROVEDCONST ENG $ 888,000 PHASES

CONTING $ 2,489,839 $ 19,011,292INDIRECT $ 277,696BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 15,209,034

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 15,209,034 $ 0 $ 0 $ 3,802,258 $ 0 $ 19,011,292TOTAL $ 15,209,034 $ 0 $ 0 $ 3,802,258 $ 0 $ 19,011,292

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 134: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 134 OF 696

10:03:31 AM CAMPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO HAYS 0000-00-000 2020 FM 2001 C,E OTHER $ 500,000LIMITS FROM Overpass Road/FM 2001 PROJECT SPONSOR City of Buda

REVISION DATE 07/2018LIMITS TO FM 119/Old Goforth RoadPROJECT Construct a 10-foot wide multi-use path for pedestrian and bicycle traffic along MPO PROJ NUM 41-00188-00

DESCR the east side of FM 2001 and Overpass Road FUNDING CAT(S) 9TAPREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 50,000ROW PURCH $ 0 COST OF

CONSTR $ 357,500 APPROVEDCONST ENG $ 10,000 PHASES

CONTING $ 75,000 $ 500,000INDIRECT $ 7,500BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 500,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 400,000 $ 0 $ 0 $ 100,000 $ 0 $ 500,000TOTAL $ 400,000 $ 0 $ 0 $ 100,000 $ 0 $ 500,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO TRAVIS 0000-00-000 2020 Loop 360 C OTHER $ 6,999,130LIMITS FROM Loop 1 (MoPac) PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO SH 71PROJECT ITS Deployment Including ITS Surveillance, Weather and Travel Information Dessim MPO PROJ NUM 74-00008-00

DESCR ination and Connections to Regional ITS Communication Network FUNDING CAT(S) 2M,3LCREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 839,519ROW PURCH $ 0 COST OF

CONSTR $ 6,439,450 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 559,680 $ 6,999,130INDIRECT $ 435,395BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 8,274,044

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 0 $ 5,599,304 $ 0 $ 0 $ 0 $ 5,599,3043LC $ 0 $ 1,399,826 $ 0 $ 0 $ 0 $ 1,399,826TOTAL $ 0 $ 6,999,130 $ 0 $ 0 $ 0 $ 6,999,130

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO WILLIAMSON 0000-00-000 2020 New Hope DriveC OTHER $ 12,403,200LIMITS FROM Ronald Reagan Blvd. PROJECT SPONSOR City of Cedar Park

REVISION DATE 07/2018LIMITS TO CR 175/Sam Bass Rd.PROJECT Widen existing roadway and extend as a new four-lane divided roadway with bicycl MPO PROJ NUM 61-00127-00

DESCR e and pedestrian facilities FUNDING CAT(S) 7REMARKS Awarded 3,100,800 TDCs PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,718,300ROW PURCH $ 3,000,000 COST OF

CONSTR $ 12,403,200 APPROVEDCONST ENG $ 171,800 PHASES

CONTING $ 2,022,000 $ 12,403,200INDIRECT $ 384,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 19,699,300

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 12,403,200 $ 0 $ 0 $ 0 $ 0 $ 12,403,200TOTAL $ 12,403,200 $ 0 $ 0 $ 0 $ 0 $ 12,403,200

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 135: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 135 OF 696

10:03:31 AM CAMPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO TRAVIS 0000-00-000 2020 Braker LaneC OTHER $ 14,050,000LIMITS FROM Dawes Place PROJECT SPONSOR City of Austin

REVISION DATE 07/2018LIMITS TO Samsung Blvd.PROJECT Extend roadway as a four-lane divided roadway with bicycle and pedestrian facili MPO PROJ NUM 51-00228-00

DESCR ties FUNDING CAT(S) 7REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,300,000ROW PURCH $ 1,000,000 COST OF

CONSTR $ 14,050,000 APPROVEDCONST ENG $ 400,000 PHASES

CONTING $ 3,400,000 $ 14,050,000INDIRECT $ 2,200,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 23,350,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 11,240,000 $ 0 $ 0 $ 2,810,000 $ 0 $ 14,050,000TOTAL $ 11,240,000 $ 0 $ 0 $ 2,810,000 $ 0 $ 14,050,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO WILLIAMSON 0000-00-000 2020 Gattis SchoolC OTHER $ 13,000,000LIMITS FROM Sonoma Trail PROJECT SPONSOR City of Round Rock

REVISION DATE 07/2018LIMITS TO Red Bud LanePROJECT Widen from four to six-lanes including intersection improvements, raised median MPO PROJ NUM 61-00132-00

DESCR and turn-lanes FUNDING CAT(S) 7REMARKS Seg. 6 PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,560,000ROW PURCH $ 5,360,000 COST OF

CONSTR $ 13,000,000 APPROVEDCONST ENG $ 250,000 PHASES

CONTING $ 1,300,000 $ 13,000,000INDIRECT $ 650,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 22,120,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 9,100,000 $ 0 $ 0 $ 2,275,000 $ 1,625,000 $ 13,000,000TOTAL $ 9,100,000 $ 0 $ 0 $ 2,275,000 $ 1,625,000 $ 13,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO HAYS 0914-33-075 2020 CS C,E OTHER $ 2,000,000LIMITS FROM CM Allen Parkway PROJECT SPONSOR City of San Marcos

REVISION DATE 07/2018LIMITS TO Thorpe Rd.PROJECT Construct Multi-Use Bike/Ped. Facility MPO PROJ NUM 41-00167-00

DESCR FUNDING CAT(S) 7REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 107,041ROW PURCH $ 0 COST OF

CONSTR $ 2,184,514 APPROVEDCONST ENG $ 106,822 PHASES

CONTING $ 24,685 $ 2,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 90,875TOTAL CST $ 2,423,062

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 1,600,000 $ 0 $ 0 $ 400,000 $ 0 $ 2,000,000TOTAL $ 1,600,000 $ 0 $ 0 $ 400,000 $ 0 $ 2,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 136: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 136 OF 696

10:03:31 AM CAMPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO BASTROP 0914-18-109 2020 CS C OTHER $ 1,300,000LIMITS FROM Bastrop State Park PROJECT SPONSOR City of Bastrop

REVISION DATE 07/2018LIMITS TO Chestnut Street at Loop 150PROJECT Construct Multi-Use Path MPO PROJ NUM 11-00035-00

DESCR FUNDING CAT(S) 7REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 69,331ROW PURCH $ 0 COST OF

CONSTR $ 1,414,931 APPROVEDCONST ENG $ 69,190 PHASES

CONTING $ 15,988 $ 1,300,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 58,861TOTAL CST $ 1,569,440

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 1,040,000 $ 0 $ 0 $ 260,000 $ 0 $ 1,300,000TOTAL $ 1,040,000 $ 0 $ 0 $ 260,000 $ 0 $ 1,300,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO HAYS 0366-01-077 2020 SH 123 C,E OTHER $ 700,000LIMITS FROM IH 35 PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO Dezavalla DrPROJECT Construct Sidewalks MPO PROJ NUM 41-00164-00

DESCR FUNDING CAT(S) 7REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 3,733ROW PURCH $ 0 COST OF

CONSTR $ 76,188 APPROVEDCONST ENG $ 3,725 PHASES

CONTING $ 860 $ 700,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 3,169TOTAL CST $ 84,506

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 560,000 $ 140,000 $ 0 $ 0 $ 0 $ 700,000TOTAL $ 560,000 $ 140,000 $ 0 $ 0 $ 0 $ 700,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO HAYS 0286-01-058 2020 SH 80 C,E,R OTHER $ 5,000,001LIMITS FROM SH 21 PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO FM 1984PROJECT Complete Gap in Shoulder For Bicycle Travel MPO PROJ NUM 71-00008-00

DESCR FUNDING CAT(S) 7REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 266,660ROW PURCH $ 0 COST OF

CONSTR $ 5,442,043 APPROVEDCONST ENG $ 266,115 PHASES

CONTING $ 61,495 $ 5,000,001INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 226,389TOTAL CST $ 6,036,313

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 4,000,000 $ 1,000,000 $ 0 $ 0 $ 0 $ 5,000,000TOTAL $ 4,000,000 $ 1,000,000 $ 0 $ 0 $ 0 $ 5,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 137: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 137 OF 696

10:03:31 AM CAMPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO BASTROP 0265-03-043 2020 SH 71 C OTHER $ 19,000,000LIMITS FROM Travis / Bastrop County Line PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO .65 Miles East of Tucker Hill LanePROJECT Construct Overpass and Add 2 Lane One-Way Eastbound And Westbound Frontage Roads MPO PROJ NUM 11-00032-00

DESCR FUNDING CAT(S) 4REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,026,911ROW PURCH $ 1,000 COST OF

CONSTR $ 20,957,378 APPROVEDCONST ENG $ 982,901 PHASES

CONTING $ 626,625 $ 19,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 940,986TOTAL CST $ 23,594,815

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 15,200,000 $ 3,800,000 $ 0 $ 0 $ 0 $ 19,000,000TOTAL $ 15,200,000 $ 3,800,000 $ 0 $ 0 $ 0 $ 19,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO BASTROP 0265-03-042 2020 SH 71 C OTHER $ 25,000,000LIMITS FROM At Pope Bend Rd. PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TOPROJECT Construct 2-Lane Overpass MPO PROJ NUM 11-00031-00

DESCR FUNDING CAT(S) 4REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,393,487ROW PURCH $ 1,000 COST OF

CONSTR $ 28,438,519 APPROVEDCONST ENG $ 1,333,766 PHASES

CONTING $ 850,311 $ 25,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 1,276,889TOTAL CST $ 32,017,083

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 20,000,000 $ 5,000,000 $ 0 $ 0 $ 0 $ 25,000,000TOTAL $ 20,000,000 $ 5,000,000 $ 0 $ 0 $ 0 $ 25,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO TRAVIS 0265-02-036 2020 SH 71 C,E OTHER $ 48,000,000LIMITS FROM At Ross Road and Kellam Road PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TOPROJECT Construct 2-Lane Overpass MPO PROJ NUM 51-00193-00

DESCR FUNDING CAT(S) 4REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,559,138ROW PURCH $ 5,176,828 COST OF

CONSTR $ 52,227,320 APPROVEDCONST ENG $ 2,449,461 PHASES

CONTING $ 1,561,596 $ 48,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 2,345,006TOTAL CST $ 63,974,343

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 38,400,000 $ 9,600,000 $ 0 $ 0 $ 0 $ 48,000,000TOTAL $ 38,400,000 $ 9,600,000 $ 0 $ 0 $ 0 $ 48,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 138: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 138 OF 696

10:03:31 AM CAMPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO HAYS 0016-03-110 2020 IH 35 C OTHER $ 1,020,000LIMITS FROM Loop 82 PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO South of Loop 82PROJECT Reconstruct Ramps MPO PROJ NUM 41-00161-00

DESCR FUNDING CAT(S) 2MREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 54,058ROW PURCH $ 742,000 COST OF

CONSTR $ 1,103,231 APPROVEDCONST ENG $ 53,948 PHASES

CONTING $ 12,466 $ 1,020,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 45,894TOTAL CST $ 1,965,703

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 918,000 $ 102,000 $ 0 $ 0 $ 0 $ 1,020,000TOTAL $ 918,000 $ 102,000 $ 0 $ 0 $ 0 $ 1,020,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO HAYS 0016-03-103 2020 IH 35 C OTHER $ 29,000,000LIMITS FROM .741 Miles N. of Posey Road PROJECT SPONSOR Hays County

REVISION DATE 07/2018LIMITS TO Comal County LinePROJECT Replace Bridges and Approaches MPO PROJ NUM 41-00002-00

DESCR FUNDING CAT(S) 4,12REMARKS 2017 Prop 1 Candidate List PROJECT TTC MO 114264. TTC MO 114417. TPB 2017-5-7

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,492,707ROW PURCH $ 5,000 COST OF

CONSTR $ 29,000,000 APPROVEDCONST ENG $ 1,428,733 PHASES

CONTING $ 910,856 $ 29,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 1,367,807TOTAL CST $ 32,837,296

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL12 $ 12,420,000 $ 1,380,000 $ 0 $ 0 $ 0 $ 13,800,0004 $ 13,680,000 $ 1,520,000 $ 0 $ 0 $ 0 $ 15,200,000TOTAL $ 26,100,000 $ 2,900,000 $ 0 $ 0 $ 0 $ 29,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO TRAVIS 0015-10-063 2020 IH 35 C OTHER $ 5,320,000LIMITS FROM Grand Ave Parkway PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO SH 45NPROJECT Reverse NB Ramps and Add Auxilary Lanes MPO PROJ NUM 51-00182-00

DESCR FUNDING CAT(S) 2MREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 360,519ROW PURCH $ 400,000 COST OF

CONSTR $ 7,357,533 APPROVEDCONST ENG $ 359,783 PHASES

CONTING $ 83,140 $ 5,320,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 306,073TOTAL CST $ 8,560,975

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 4,788,000 $ 532,000 $ 0 $ 0 $ 0 $ 5,320,000TOTAL $ 4,788,000 $ 532,000 $ 0 $ 0 $ 0 $ 5,320,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 139: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 139 OF 696

10:03:31 AM CAMPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO WILLIAMSON 0015-08-147 2020 IH 35 C,E,R OTHER $ 52,000,000LIMITS FROM At Williams Dr PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TOPROJECT Reconstruct Interchange MPO PROJ NUM 61-00111-00

DESCR FUNDING CAT(S) 2M,4REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 3,291,556ROW PURCH $ 1,000 COST OF

CONSTR $ 67,174,627 APPROVEDCONST ENG $ 3,150,490 PHASES

CONTING $ 2,008,521 $ 52,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 3,016,140TOTAL CST $ 75,626,194

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 23,400,000 $ 2,600,000 $ 0 $ 0 $ 0 $ 26,000,0002M $ 23,400,000 $ 2,600,000 $ 0 $ 0 $ 0 $ 26,000,000TOTAL $ 46,800,000 $ 5,200,000 $ 0 $ 0 $ 0 $ 52,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO WILLIAMSON 0015-08-144 2020 IH 35 C,E,R OTHER $ 18,000,000LIMITS FROM South of Lakeway Drive PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO South of Williams DrivePROJECT Add 3-Lane One-Way NB Frontage Road MPO PROJ NUM 61-00110-00

DESCR FUNDING CAT(S) 2MREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 888,703ROW PURCH $ 20,827,989 COST OF

CONSTR $ 18,136,797 APPROVEDCONST ENG $ 886,889 PHASES

CONTING $ 204,945 $ 18,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 754,490TOTAL CST $ 40,945,323

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 16,200,000 $ 1,800,000 $ 0 $ 0 $ 0 $ 18,000,000TOTAL $ 16,200,000 $ 1,800,000 $ 0 $ 0 $ 0 $ 18,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO TRAVIS 0015-10-064 2020 IH 35 C,E,R OTHER $ 29,246,500LIMITS FROM At Wells Branch Parkway PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TOPROJECT Operational improvements-interchange MPO PROJ NUM 51-00006-00

DESCR FUNDING CAT(S) 2M,4REMARKS PROJECT TPB Resolution 2017-5-7

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,766,629ROW PURCH $ 3,485,628 COST OF

CONSTR $ 36,053,670 APPROVEDCONST ENG $ 1,690,917 PHASES

CONTING $ 1,078,004 $ 29,246,500INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 1,618,809TOTAL CST $ 44,074,848

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 13,160,925 $ 1,462,325 $ 0 $ 0 $ 0 $ 14,623,2504 $ 13,160,925 $ 1,462,325 $ 0 $ 0 $ 0 $ 14,623,250TOTAL $ 26,321,850 $ 2,924,650 $ 0 $ 0 $ 0 $ 29,246,500

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 140: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 140 OF 696

10:03:31 AM CAMPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO WILLIAMSON 1566-02-020 2020 FM 1660 C,E HUTTO $ 12,588,857LIMITS FROM US 79 PROJECT SPONSOR Williamson Couty/TxDOT

REVISION DATE 07/2018LIMITS TO FM 3349PROJECT Construct New Location Roadway MPO PROJ NUM 61-00013-00

DESCR FUNDING CAT(S) 3LCREMARKS Linked to 1566-01-009 PROJECT TPB Resolution 2014-5-14

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 654,232ROW PURCH $ 0 COST OF

CONSTR $ 13,351,692 APPROVEDCONST ENG $ 654,232 PHASES

CONTING $ 166,896 $ 12,588,857INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 729,002TOTAL CST $ 14,827,052

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 12,588,857 $ 0 $ 12,588,857TOTAL $ 0 $ 0 $ 0 $ 12,588,857 $ 0 $ 12,588,857

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO WILLIAMSON 1566-01-009 2020 FM 1660 C,E HUTTO $ 13,720,145LIMITS FROM CR 101 North of Hutto PROJECT SPONSOR Williamson County/TxDOT

REVISION DATE 07/2018LIMITS TO US 79PROJECT Upgrade roadway from 2-lane undivided to a 4-lane undivided MPO PROJ NUM 61-00012-00

DESCR FUNDING CAT(S) 3LCREMARKS Approved in the Pass Through Finance Program. Linke PROJECT

P7 d to CSJ 1566-02-020 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 713,025ROW PURCH $ 0 COST OF

CONSTR $ 14,551,531 APPROVEDCONST ENG $ 713,025 PHASES

CONTING $ 181,894 $ 13,720,145INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 794,513TOTAL CST $ 16,159,475

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 13,720,145 $ 0 $ 13,720,145TOTAL $ 0 $ 0 $ 0 $ 13,720,145 $ 0 $ 13,720,145

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 141: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 141 OF 696

10:03:31 AM CAMPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO WILLIAMSON 0000-00-000 2021 VA C OTHER $ 2,672,408LIMITS FROM Parmer Lane PROJECT SPONSOR City of Cedar Park

REVISION DATE 07/2018LIMITS TO Brush Creek RoadPROJECT Construct 3-mile shared-use path along Brushy Creek North Fork MPO PROJ NUM 62-00004-00

DESCR FUNDING CAT(S) 9TAPREMARKS Awarded 668,102 TDCs PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 387,000ROW PURCH $ 300,000 COST OF

CONSTR $ 2,672,408 APPROVEDCONST ENG $ 43,000 PHASES

CONTING $ 430,110 $ 2,672,408INDIRECT $ 125,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 3,957,518

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 2,672,408 $ 0 $ 0 $ 0 $ 0 $ 2,672,408TOTAL $ 2,672,408 $ 0 $ 0 $ 0 $ 0 $ 2,672,408

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO BASTROP 0000-00-000 2021 SH 95 C OTHER $ 6,537,686LIMITS FROM LP 230 PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO FM 535PROJECT Upgrade from a 2-lane rural to a 3-lane urban roadway with continuous left-turn MPO PROJ NUM 11-00036-00

DESCR lane FUNDING CAT(S) 2MREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 882,588ROW PURCH $ 0 COST OF

CONSTR $ 6,537,686 APPROVEDCONST ENG $ 523,015 PHASES

CONTING $ 653,769 $ 6,537,686INDIRECT $ 388,339BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 8,985,397

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 0 $ 6,537,686 $ 0 $ 0 $ 0 $ 6,537,686TOTAL $ 0 $ 6,537,686 $ 0 $ 0 $ 0 $ 6,537,686

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO BURNET 0000-00-000 2021 US 281 C OTHER $ 1,350,000LIMITS FROM Nature Heights Drive PROJECT SPONSOR Burnet County

REVISION DATE 07/2018LIMITS TO Lantana DrivePROJECT Construct curb and gutter, sidewalks and shoulders MPO PROJ NUM 21-00008-00

DESCR FUNDING CAT(S) 7REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 1,350,000 APPROVEDCONST ENG $ 80,000 PHASES

CONTING $ 0 $ 1,350,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,430,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 1,080,000 $ 0 $ 0 $ 270,000 $ 0 $ 1,350,000TOTAL $ 1,080,000 $ 0 $ 0 $ 270,000 $ 0 $ 1,350,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 142: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 142 OF 696

10:03:31 AM CAMPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO BURNET 0000-00-000 2021 SH 29 C OTHER $ 5,184,000LIMITS FROM RM 243 North PROJECT SPONSOR Burnet County

REVISION DATE 07/2018LIMITS TO Williamson County LinePROJECT Reconstruct from 4-lane to four 11-foot lanes, 12-foot continuous turn lane and MPO PROJ NUM 21-00006-00

DESCR 5-foot shoulders FUNDING CAT(S) 2MREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 4,800,000 APPROVEDCONST ENG $ 384,000 PHASES

CONTING $ 0 $ 5,184,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 5,184,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 0 $ 5,184,000 $ 0 $ 0 $ 0 $ 5,184,000TOTAL $ 0 $ 5,184,000 $ 0 $ 0 $ 0 $ 5,184,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO BURNET 0000-00-000 2021 SH 71 C OTHER $ 9,720,000LIMITS FROM Spur 191 PROJECT SPONSOR Burnet County

REVISION DATE 07/2018LIMITS TO Blanco County LinePROJECT Reconstruct from 4-lane to four 12-foot lanes, 14-foot continuous turn lane and MPO PROJ NUM 21-00010-00

DESCR 10-foot shoulders FUNDING CAT(S) 2MREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 9,000,000 APPROVEDCONST ENG $ 720,000 PHASES

CONTING $ 0 $ 9,720,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 9,720,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 0 $ 9,720,000 $ 0 $ 0 $ 0 $ 9,720,000TOTAL $ 0 $ 9,720,000 $ 0 $ 0 $ 0 $ 9,720,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO BURNET 0000-00-000 2021 US 281 C OTHER $ 5,616,000LIMITS FROM SH 71 PROJECT SPONSOR Burnet County

REVISION DATE 07/2018LIMITS TO Blanco County LinePROJECT Reconstruct from 4-lane to four 12-foot lanes, 14-foot continuous turn lane and MPO PROJ NUM 21-00007-00

DESCR 10-foot shoulders FUNDING CAT(S) 2MREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 5,200,000 APPROVEDCONST ENG $ 416,000 PHASES

CONTING $ 0 $ 5,616,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 5,616,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 0 $ 5,616,000 $ 0 $ 0 $ 0 $ 5,616,000TOTAL $ 0 $ 5,616,000 $ 0 $ 0 $ 0 $ 5,616,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 143: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 143 OF 696

10:03:31 AM CAMPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO WILLIAMSON 0000-00-000 2021 RM 2243 C OTHER $ 6,850,000LIMITS FROM Norwood Drive PROJECT SPONSOR City of Georgetown

REVISION DATE 07/2018LIMITS TO SW BypassPROJECT Upgrade to a four-lane divided with new traffic signals and pedestrian improveme MPO PROJ NUM 61-00128-00

DESCR nts FUNDING CAT(S) 2MREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,200,000ROW PURCH $ 748,000 COST OF

CONSTR $ 6,850,000 APPROVEDCONST ENG $ 120,000 PHASES

CONTING $ 665,000 $ 6,850,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 9,583,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 0 $ 4,500,000 $ 0 $ 2,350,000 $ 0 $ 6,850,000TOTAL $ 0 $ 4,500,000 $ 0 $ 2,350,000 $ 0 $ 6,850,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO BASTROP 0265-03-041 2021 SH 71 C OTHER $ 35,000,000LIMITS FROM At FM 1209 PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TOPROJECT Construct 2-Lane Overpass MPO PROJ NUM 11-00030-00

DESCR FUNDING CAT(S) 4REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,941,285ROW PURCH $ 1,000 COST OF

CONSTR $ 39,618,077 APPROVEDCONST ENG $ 1,858,087 PHASES

CONTING $ 1,184,580 $ 35,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 1,778,851TOTAL CST $ 46,381,880

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 28,000,000 $ 7,000,000 $ 0 $ 0 $ 0 $ 35,000,000TOTAL $ 28,000,000 $ 7,000,000 $ 0 $ 0 $ 0 $ 35,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO TRAVIS 0265-02-042 2021 SH 71 C,E,R OTHER $ 11,000,000LIMITS FROM .85 Miles West ef Tucker Hill Lane PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO Travis / Bastrop County LinePROJECT Construct Overpass and Add 2 Lane One-Way Eastbound And Westbound Frontage Roads MPO PROJ NUM 51-00194-00

DESCR FUNDING CAT(S) 4REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 594,527ROW PURCH $ 0 COST OF

CONSTR $ 12,133,218 APPROVEDCONST ENG $ 569,047 PHASES

CONTING $ 362,783 $ 11,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 544,781TOTAL CST $ 14,204,356

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 8,800,000 $ 2,200,000 $ 0 $ 0 $ 0 $ 11,000,000TOTAL $ 8,800,000 $ 2,200,000 $ 0 $ 0 $ 0 $ 11,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 144: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 144 OF 696

10:03:31 AM CAMPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO TRAVIS 0265-01-116 2021 US 183 C OTHER $ 4,750,000LIMITS FROM 0.46 Miles South of Thompson Ln PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO 0.07 Miles SW of Airport Commerce DrPROJECT Construct New Frontage Road MPO PROJ NUM 51-00192-00

DESCR FUNDING CAT(S) 11REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 262,634ROW PURCH $ 0 COST OF

CONSTR $ 5,359,895 APPROVEDCONST ENG $ 262,634 PHASES

CONTING $ 66,998 $ 4,750,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 292,650TOTAL CST $ 6,244,811

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL11 $ 3,800,000 $ 950,000 $ 0 $ 0 $ 0 $ 4,750,000TOTAL $ 3,800,000 $ 950,000 $ 0 $ 0 $ 0 $ 4,750,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO TRAVIS 0265-01-113 2021 SH 71 C OTHER $ 26,000,000LIMITS FROM SH 71/US 183 Interchange PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO Presidential Blvd.PROJECT Construct Frontage Road, Ramps And Direct Connects MPO PROJ NUM 51-00191-00

DESCR FUNDING CAT(S) 4REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,302,923ROW PURCH $ 5,451,733 COST OF

CONSTR $ 26,590,280 APPROVEDCONST ENG $ 1,247,084 PHASES

CONTING $ 795,049 $ 26,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 1,193,903TOTAL CST $ 36,580,972

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 20,800,000 $ 5,200,000 $ 0 $ 0 $ 0 $ 26,000,000TOTAL $ 20,800,000 $ 5,200,000 $ 0 $ 0 $ 0 $ 26,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO HAYS 0016-03-114 2021 IH 35 C OTHER $ 107,000,000LIMITS FROM South of SH 80 PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO North of RM 12PROJECT Add Shoulders, Aux Lns, Ramp Imprvmts, Pvmt Rehab, Frtg Rd Inter MPO PROJ NUM 41-00162-00

DESCR FUNDING CAT(S) 2MREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 4,039,200ROW PURCH $ 1,000 COST OF

CONSTR $ 82,432,668 APPROVEDCONST ENG $ 3,866,092 PHASES

CONTING $ 2,464,736 $ 107,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 3,701,226TOTAL CST $ 96,504,922

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 96,300,000 $ 10,700,000 $ 0 $ 0 $ 0 $ 107,000,000TOTAL $ 96,300,000 $ 10,700,000 $ 0 $ 0 $ 0 $ 107,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 145: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 145 OF 696

10:03:31 AM CAMPO - HIGHWAY PROJECTS

FY 2022

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO TRAVIS 0000-00-000 2022 RM 620 C OTHER $ 18,000,000LIMITS FROM SH 71 PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO Aria Dr/Cavalier Dr.PROJECT Upgrade existing four-lane roadway to a six-lane divided roadway MPO PROJ NUM 51-00232-00

DESCR FUNDING CAT(S) 2MREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,430,000ROW PURCH $ 12,300,000 COST OF

CONSTR $ 18,000,000 APPROVEDCONST ENG $ 1,440,000 PHASES

CONTING $ 1,800,000 $ 18,000,000INDIRECT $ 1,069,200BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 37,039,200

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 0 $ 18,000,000 $ 0 $ 0 $ 0 $ 18,000,000TOTAL $ 0 $ 18,000,000 $ 0 $ 0 $ 0 $ 18,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO WILLIAMSON 0000-00-000 2022 FM 734 C OTHER $ 45,800,000LIMITS FROM RM 1431 PROJECT SPONSOR TxDOT, City of Austin

REVISION DATE 07/2018LIMITS TO SH 45PROJECT Upgrade to a six-lane divided roadway MPO PROJ NUM 61-00133-00

DESCR FUNDING CAT(S) 2M,3LCREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 5,719,573ROW PURCH $ 0 COST OF

CONSTR $ 45,756,586 APPROVEDCONST ENG $ 3,660,527 PHASES

CONTING $ 4,575,659 $ 45,800,000INDIRECT $ 2,717,941BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 62,430,286

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 0 $ 28,800,000 $ 0 $ 0 $ 0 $ 28,800,0003LC $ 0 $ 0 $ 0 $ 17,000,000 $ 0 $ 17,000,000TOTAL $ 0 $ 28,800,000 $ 0 $ 17,000,000 $ 0 $ 45,800,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO TRAVIS 0000-00-000 2022 Pearce LaneC OTHER $ 22,000,000LIMITS FROM Kellam Road PROJECT SPONSOR Travis County

REVISION DATE 07/2018LIMITS TO Travis/Bastrop County LinePROJECT Widen existing two-lane facility to a four-lane divided arterial with bike lanes MPO PROJ NUM 51-00230-00

DESCR and sidewalks FUNDING CAT(S) 7REMARKS Awarded 5,500,000 TDCs PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,870,000ROW PURCH $ 1,650,000 COST OF

CONSTR $ 22,000,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 22,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 25,520,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 22,000,000 $ 0 $ 0 $ 0 $ 0 $ 22,000,000TOTAL $ 22,000,000 $ 0 $ 0 $ 0 $ 0 $ 22,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 146: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 146 OF 696

10:03:31 AM CAMPO - HIGHWAY PROJECTS

FY 2022

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO TRAVIS 0000-00-000 2022 RM 620 C OTHER $ 41,000,000LIMITS FROM Aria Dr/Cavalier Dr. PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO Oak Grove Blvd.PROJECT Upgrade existing four-lane roadway to a six-lane divided roadway MPO PROJ NUM 51-00233-00

DESCR FUNDING CAT(S) 2MREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 4,612,500ROW PURCH $ 5,400,000 COST OF

CONSTR $ 41,000,000 APPROVEDCONST ENG $ 3,280,000 PHASES

CONTING $ 4,100,000 $ 41,000,000INDIRECT $ 2,435,400BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 60,827,900

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 0 $ 41,000,000 $ 0 $ 0 $ 0 $ 41,000,000TOTAL $ 0 $ 41,000,000 $ 0 $ 0 $ 0 $ 41,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO WILLIAMSON 0204-01-063 2022 US 79 C,E,R OTHER $ 28,000,000LIMITS FROM IH 35 PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO East of FM 1460PROJECT Add One Lane In Each Direction MPO PROJ NUM 61-00118-00

DESCR FUNDING CAT(S) 2MREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,605,045ROW PURCH $ 212,000 COST OF

CONSTR $ 32,756,039 APPROVEDCONST ENG $ 1,624,699 PHASES

CONTING $ 651,845 $ 28,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 1,225,075TOTAL CST $ 38,074,703

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 22,400,000 $ 5,600,000 $ 0 $ 0 $ 0 $ 28,000,000TOTAL $ 22,400,000 $ 5,600,000 $ 0 $ 0 $ 0 $ 28,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO TRAVIS 0113-13-167 2022 C OTHER $ 45,000,000LIMITS FROM At Spicewood Springs Road PROJECT SPONSOR TxDOT, City of Austin

REVISION DATE 07/2018LIMITS TOPROJECT Grade Separate Intersection MPO PROJ NUM 51-00188-00

DESCR FUNDING CAT(S) 3LC,2MREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,621,353ROW PURCH $ 0 COST OF

CONSTR $ 53,497,013 APPROVEDCONST ENG $ 2,509,009 PHASES

CONTING $ 1,599,560 $ 45,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 2,402,015TOTAL CST $ 62,628,950

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 12,000,000 $ 0 $ 12,000,0002M $ 26,400,000 $ 6,600,000 $ 0 $ 0 $ 0 $ 33,000,000TOTAL $ 26,400,000 $ 6,600,000 $ 0 $ 12,000,000 $ 0 $ 45,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 147: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 147 OF 696

10:03:31 AM CAMPO - HIGHWAY PROJECTS

FY 2022

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO TRAVIS 0113-13-166 2022 C OTHER $ 48,000,000LIMITS FROM At Westlake Drive PROJECT SPONSOR TxDOT, City of Austin

REVISION DATE 07/2018LIMITS TOPROJECT Grade Separate Intersection MPO PROJ NUM 51-00187-00

DESCR FUNDING CAT(S) 3LC,2MREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,796,110ROW PURCH $ 0 COST OF

CONSTR $ 57,063,481 APPROVEDCONST ENG $ 2,676,277 PHASES

CONTING $ 1,706,198 $ 48,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 2,562,150TOTAL CST $ 66,804,216

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 14,000,000 $ 0 $ 14,000,0002M $ 27,200,000 $ 6,800,000 $ 0 $ 0 $ 0 $ 34,000,000TOTAL $ 27,200,000 $ 6,800,000 $ 0 $ 14,000,000 $ 0 $ 48,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

AUSTIN CAMPO TRAVIS 0113-13-163 2022 SH 71 C,E,R BUDA $ 3,000,000LIMITS FROM East of Riverside Dr. PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO US 183PROJECT Construct Frontage Road And Ramp MPO PROJ NUM 51-00186-00

DESCR FUNDING CAT(S) 4REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 158,840ROW PURCH $ 0 COST OF

CONSTR $ 3,241,650 APPROVEDCONST ENG $ 158,516 PHASES

CONTING $ 36,630 $ 3,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 145,550TOTAL CST $ 3,741,186

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 2,400,000 $ 600,000 $ 0 $ 0 $ 0 $ 3,000,000TOTAL $ 2,400,000 $ 600,000 $ 0 $ 0 $ 0 $ 3,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 148: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

2019-2022Statewide TransportationImprovement ProgramCorpus Christi MPOHighway Projects

Page 149: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 149 OF 696

10:03:31 AM CORPUS CHRISTI MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

CORPUS CHRISTI CORPUS CHRISTI NUECES 0916-35-218 2019 VA C CORPUS CHRISTI $ 590,000LIMITS FROM At Garcia Park on Trojan Dr PROJECT SPONSOR Corpus Christi

REVISION DATE 07/2018LIMITS TO Horne RoadPROJECT Construct & design Hike & Bike Trail MPO PROJ NUM 286-18

DESCR FUNDING CAT(S) 9TAPREMARKS Project Name: Dr Hector P Garcia Park Hike & Bike T PROJECT

P7 rail: Phase II HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 32,089ROW PURCH $ 0 COST OF

CONSTR $ 590,000 APPROVEDCONST ENG $ 32,024 PHASES

CONTING $ 7,400 $ 590,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 661,513

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 472,000 $ 0 $ 0 $ 118,000 $ 0 $ 590,000TOTAL $ 472,000 $ 0 $ 0 $ 118,000 $ 0 $ 590,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

CORPUS CHRISTI CORPUS CHRISTI NUECES 0916-35-206 2019 VA C CORPUS CHRISTI $ 522,500LIMITS FROM At Various Locations in Corpus Christi and Portland PROJECT SPONSOR Corpus Christi

REVISION DATE 07/2018LIMITS TOPROJECT Designation of bicycle boulevards with pavement markings and signage MPO PROJ NUM B-222-C9-17

DESCR FUNDING CAT(S) 9TAPREMARKS Project Name: Region-wide Bike Blvd Wayfinding Init PROJECT

P7 iative HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 26,449ROW PURCH $ 0 COST OF

CONSTR $ 522,500 APPROVEDCONST ENG $ 26,395 PHASES

CONTING $ 6,099 $ 522,500INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 22,455TOTAL CST $ 603,898

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 418,000 $ 0 $ 0 $ 104,500 $ 0 $ 522,500TOTAL $ 418,000 $ 0 $ 0 $ 104,500 $ 0 $ 522,500

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 150: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 150 OF 696

10:03:31 AM CORPUS CHRISTI MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

CORPUS CHRISTI CORPUS CHRISTI NUECES 0916-35-219 2020 VA C CORPUS CHRISTI $ 330,000LIMITS FROM Along Schanen Ditch Killarmet Dr PROJECT SPONSOR Corpus Christi

REVISION DATE 07/2018LIMITS TO Holly RoadPROJECT Construct & design Hike & Bike Trail MPO PROJ NUM 287-18

DESCR FUNDING CAT(S) 9TAPREMARKS Project Name: Schanen Ditch Hike & Bike Trail: Phas PROJECT

P7 e IV HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 17,948ROW PURCH $ 0 COST OF

CONSTR $ 330,000 APPROVEDCONST ENG $ 17,911 PHASES

CONTING $ 4,139 $ 330,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 369,998

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 264,000 $ 0 $ 0 $ 66,000 $ 0 $ 330,000TOTAL $ 264,000 $ 0 $ 0 $ 66,000 $ 0 $ 330,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

CORPUS CHRISTI CORPUS CHRISTI SAN PATRICIO 1209-01-030 2020 FM 893 C PORTLAND $ 7,000,000LIMITS FROM CR 3685 (STARK RD) PROJECT SPONSOR TXDOT-CRP

REVISION DATE 07/2018LIMITS TO 0.2 MI. W OF CR 79 (GUM HOLLOW)PROJECT Upgrade from 2-LN Roadway to 5-LN urban Roadway by constructing additional 2-LN MPO PROJ NUM 233-17

DESCR and CLTL FUNDING CAT(S) 1,2MREMARKS Project Name: FM 893 (MOORE AVE) PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 383,264ROW PURCH $ 0 COST OF

CONSTR $ 7,000,000 APPROVEDCONST ENG $ 387,957 PHASES

CONTING $ 155,652 $ 7,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 292,532TOTAL CST $ 8,219,405

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL1 $ 1,600,000 $ 400,000 $ 0 $ 0 $ 0 $ 2,000,0002M $ 4,000,000 $ 1,000,000 $ 0 $ 0 $ 0 $ 5,000,000TOTAL $ 5,600,000 $ 1,400,000 $ 0 $ 0 $ 0 $ 7,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

CORPUS CHRISTI CORPUS CHRISTI NUECES 0074-06-241 2020 IH 37 C CORPUS CHRISTI $ 35,000,000LIMITS FROM Redbird Ln. (Overpass) PROJECT SPONSOR TxDOT-CRP

REVISION DATE 07/2018LIMITS TO Nueces River_(CB)PROJECT Widen freeway by constructing additional 2 travel lanes NB & 1 additional travel MPO PROJ NUM 235-17

DESCR lane SB FUNDING CAT(S) 2M,4,12REMARKS Project Name: IH 37 PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,929,141ROW PURCH $ 0 COST OF

CONSTR $ 35,000,000 APPROVEDCONST ENG $ 1,692,920 PHASES

CONTING $ 70,866 $ 35,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 38,692,927

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 8,000,000 $ 2,000,000 $ 0 $ 0 $ 0 $ 10,000,0004 $ 8,000,000 $ 2,000,000 $ 0 $ 0 $ 0 $ 10,000,00012 $ 12,000,000 $ 3,000,000 $ 0 $ 0 $ 0 $ 15,000,000TOTAL $ 28,000,000 $ 7,000,000 $ 0 $ 0 $ 0 $ 35,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 151: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 151 OF 696

10:03:31 AM CORPUS CHRISTI MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

CORPUS CHRISTI CORPUS CHRISTI NUECES 0617-01-177 2021 SH 358 C CORPUS CHRISTI $ 35,000,000LIMITS FROM Nile Drive PROJECT SPONSOR TxDOT-CRP

REVISION DATE 07/2018LIMITS TO Staples StreetPROJECT Ramp reversal Phase II-B MPO PROJ NUM 269-17

DESCR FUNDING CAT(S) 2MREMARKS Project Name: SH 358 (SPID) Ramp Reversal PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,006,307ROW PURCH $ 0 COST OF

CONSTR $ 35,000,000 APPROVEDCONST ENG $ 1,760,637 PHASES

CONTING $ 73,701 $ 35,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 38,840,645

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 28,000,000 $ 7,000,000 $ 0 $ 0 $ 0 $ 35,000,000TOTAL $ 28,000,000 $ 7,000,000 $ 0 $ 0 $ 0 $ 35,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

CORPUS CHRISTI CORPUS CHRISTI NUECES 0326-01-056 2021 SH 286 C CORPUS CHRISTI $ 16,000,000LIMITS FROM FM 43 (Weber Rd) PROJECT SPONSOR State/TxDOT

REVISION DATE 07/2018LIMITS TO S of FM 2444PROJECT Construct freeway extension by upgrading existing 2- Lane roadway to 4-lane div MPO PROJ NUM S089C2000

DESCR ided freeway by constructing mainlanes, overpasses, and frontage roads FUNDING CAT(S) 2MREMARKS Project Name: SH 286 (Crosstown) PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 908,220ROW PURCH $ 0 COST OF

CONSTR $ 16,000,000 APPROVEDCONST ENG $ 1,110,252 PHASES

CONTING $ 481,912 $ 16,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 18,500,384

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 12,800,000 $ 3,200,000 $ 0 $ 0 $ 0 $ 16,000,000TOTAL $ 12,800,000 $ 3,200,000 $ 0 $ 0 $ 0 $ 16,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 152: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

2019-2022Statewide TransportationImprovement ProgramEl Paso MPOHighway Projects

Page 153: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 153 OF 696

10:03:31 AM EL PASO MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 0924-06-552 2019 N/A T EL PASO $ 1,000,000LIMITS FROM FATHER RAHM PROJECT SPONSOR SUN METRO

REVISION DATE 07/2018LIMITS TO GLORY ROADPROJECT EL PASO STREETCAR SYSTEM 1ST YEAR OPERATING ASSISTANCE: OPERATING ASSISTANCE FOR MPO PROJ NUM T108X-1

DESCR FIRST YEAR OF NEW TRANSIT SERVICE INTENDED TO REDUCE CONGESTION AND CO EMISSION FUNDING CAT(S) 5S.

REMARKS PROGRAM D2045 MTP, D19-22 TIP, 19-22 STIP, IN FY 20 PROJECT Amend H2040 MTP, H17-20 TIP, 17-20 STIP to program in FYP7 19. HISTORY 2019. EXEMPT

TOTAL PROJECT COST INFORMATIONPREL ENG $ 0

ROW PURCH $ 0 COST OFCONSTR $ 1,000,000 APPROVED

CONST ENG $ 0 PHASESCONTING $ 0 $ 1,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,000,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 800,000 $ 0 $ 0 $ 200,000 $ 0 $ 1,000,000TOTAL $ 800,000 $ 0 $ 0 $ 200,000 $ 0 $ 1,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 0924-06-564 2019 CS E,ENV,ENG EL PASO $ 2,555,280LIMITS FROM PELLICANO PROJECT SPONSOR EP COUNTY

REVISION DATE 07/2018LIMITS TO MONTWOODPROJECT JOHN HAYES (DARRINGTON/BERRYVILLE) PE PHASE: BUILD 6 LANE DIVIDED WITH BIKE LANE MPO PROJ NUM P004X-PE

DESCR S FUNDING CAT(S) 3LC,7REMARKS PROGRAM D2045 MTP, D19-22 TIP, 19-22 STIP, IN FY 20 PROJECT

P7 19. HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,555,280ROW PURCH $ 0 COST OF

CONSTR $ 28,744,689 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 2,555,280INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 31,299,969

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 695,280 $ 695,2807 $ 1,488,000 $ 0 $ 0 $ 372,000 $ 0 $ 1,860,000TOTAL $ 1,488,000 $ 0 $ 0 $ 372,000 $ 695,280 $ 2,555,280

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 0924-06-560 2019 CS C,E,ENV,ENG EL PASO $ 2,465,500LIMITS FROM ON O.T. SMITH RD/SH 20 (ALAMEDA AVE) PROJECT SPONSOR EP COUNTY

REVISION DATE 07/2018LIMITS TO IH-10PROJECT TORNILLO - SUP: CONSTRUCTION OF SHARED USE PEDESTRIAN AND BICYCLE FACILITY A LON MPO PROJ NUM E502X

DESCR G OT SMITH ROAD FUNDING CAT(S) 9TAPREMARKS PROGRAM D2045 MTP, D19-22 TIP, 19-22 STIP, IN FY 20 PROJECT Amend H2040 MTP, H17-20 TIP, 17-20 STIP to program in FY

P7 19. HISTORY 2019. 2017 TASA state-selected; Commission approved 10/26/17 MO 115076.

TOTAL PROJECT COST INFORMATIONPREL ENG $ 96,476

ROW PURCH $ 0 COST OFCONSTR $ 2,336,865 APPROVED

CONST ENG $ 32,159 PHASESCONTING $ 25,523 $ 2,465,500INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,491,023

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 1,972,400 $ 300,148 $ 0 $ 192,952 $ 0 $ 2,465,500TOTAL $ 1,972,400 $ 300,148 $ 0 $ 192,952 $ 0 $ 2,465,500

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 154: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 154 OF 696

10:03:31 AM EL PASO MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 0924-06-064 2019 CS C EL PASO $ 1,482,914LIMITS FROM STARTING AT A DISTANCE OF 1,035 FEET IN A SOUTHWESTERLY DIRECTION ON UNIVE PROJECT SPONSOR UTEP

REVISION DATE 07/2018RSITY AVE FROM THE REFERENCED CITY MONUMENT ATLIMITS TO TO A POINT SOUTHWESTERLY 450 FEET LONG UNIVERSITY AVEPROJECT UNIVERSITY AVENUE PEDESTRIAN AND BIKE ENHANCEMENT - PHASE III: PEDESTRIAN AND BI MPO PROJ NUM E108X-3

DESCR KE ENHANCEMENTS WITH RECONSTRUCTED AND WIDENED SIDEWALKS, BIKE LANES, LANSCAPE P FUNDING CAT(S) 3LC,9TAPARKWAYS AND STREET LANES.

REMARKS PROGRAM D2045 MTP, D19-22 TIP, 19-22 STIP, IN FY 20 PROJECT Amend H2040 MTP, H17-20 TIP, 17-20 STIP to program in FYP7 19. HISTORY 2019.

TOTAL PROJECT COST INFORMATIONPREL ENG $ 158,147

ROW PURCH $ 0 COST OFCONSTR $ 1,190,007 APPROVED

CONST ENG $ 65,000 PHASESCONTING $ 69,761 $ 1,482,914INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,482,915

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 530,645 $ 0 $ 0 $ 132,661 $ 0 $ 663,3063LC $ 0 $ 0 $ 0 $ 0 $ 819,608 $ 819,608TOTAL $ 530,645 $ 0 $ 0 $ 132,661 $ 819,608 $ 1,482,914

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 0000-00-000 2019 CS C HORIZON $ 0LIMITS FROM DARRINGTON RD. PROJECT SPONSOR HORIZON

REVISION DATE 07/2018LIMITS TO HORIZON BLVD.PROJECT EASTLAKE BLVD. PHASE 2: WIDEN/RESTRIPE FROM 4 TO 6 LANE DIVIDED ROADWAY. MPO PROJ NUM P463X-MOD

DESCR FUNDING CAT(S) 3TRZ,OtherREMARKS AMEND TO PROGRAM AMENDED H2040 MTP, H17-20 TIP, 17- PROJECT 2013 EPC CMP projects; Amend H2040 MTP, H15-18, and 15-18

P7 20 STIP FY 2019 NONEXEMPT HISTORY STIP to change funding source from EP County TRZ to EP County VRF

TOTAL PROJECT COST INFORMATIONPREL ENG $ 0

ROW PURCH $ 0 COST OFCONSTR $ 60,000 APPROVED

CONST ENG $ 0 PHASESCONTING $ 0 $ 0INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 60,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALOther $ 0 $ 0 $ 0 $ 0 $ 0 $ 03TRZ $ 0 $ 0 $ 0 $ 0 $ 0 $ 0TOTAL $ 0 $ 0 $ 0 $ 0 $ 0 $ 0

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 2552-02-028 2019 LP 375 C EL PASO $ 44,663,725LIMITS FROM SPUR 601 PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO US 62/180 (MONTANA AVE.)PROJECT LOOP 375 (PURPLE HEART) WIDENING AND CONSTRUCTION OF FRONTAGE ROADS: WIDEN 4 TO MPO PROJ NUM F057X-CAP

DESCR 6 LANES ON MAINLANES AND CONSTRUCT 2 LANE FRONTAGE ROADS IN EACH DIRECTION. FUNDING CAT(S) 2M,4REMARKS PROGRAM D2045 MTP, D19-22 TIP, 19-22 STIP, IN FY 20 PROJECT Amend to program into amended H2040 MTP, H17-20 TIP, 17-2

P7 19. HISTORY 0 STIP in FY 2019. TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,421,570ROW PURCH $ 7,626,000 COST OF

CONSTR $ 44,663,725 APPROVEDCONST ENG $ 2,125,051 PHASES

CONTING $ 88,955 $ 44,663,725INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 2,327,672TOTAL CST $ 59,252,973

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 13,911,780 $ 3,477,945 $ 0 $ 0 $ 0 $ 17,389,7252M $ 21,819,200 $ 5,454,800 $ 0 $ 0 $ 0 $ 27,274,000TOTAL $ 35,730,980 $ 8,932,745 $ 0 $ 0 $ 0 $ 44,663,725

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 155: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 155 OF 696

10:03:31 AM EL PASO MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 1281-01-017 2019 FM 1110 C N/A $ 0LIMITS FROM SH 20(ALAMEDA AVE) PROJECT SPONSOR COUNTYEP

REVISION DATE 07/2018LIMITS TO FM 76 (NORTH LOOP DR.).PROJECT FM 1110 CLINT CONNECTION RD - PHASE 2: CONSTRUCT A NEW 4 LANE DIVIDED ROADWAY WI MPO PROJ NUM P520B-2-15A

DESCR TH INTERSECTION IMPROVEMENTS (RECONSTRUCTION OF INTERSECTIONS AND ADDITIONAL TUR FUNDING CAT(S) 3LCN LANES) AT FM 76 (NORTH LOOP DR) AND SH 20 (ALAMEDA AVE).

REMARKS AMEND TO PROGRAM INTO AMENDED H2040 MTP, H17-20 TIP PROJECTP7 , 17-20 STIP IN FY 2019 NONEXEMPT HISTORY

TOTAL PROJECT COST INFORMATIONPREL ENG $ 1,000,000

ROW PURCH $ 0 COST OFCONSTR $ 29,500,000 APPROVED

CONST ENG $ 0 PHASESCONTING $ 0 $ 0INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 30,500,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 0 $ 0TOTAL $ 0 $ 0 $ 0 $ 0 $ 0 $ 0

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 0374-02-097 2019 US 62/180 C EL PASO $ 121,733,894LIMITS FROM ON US 62/180 (MONTANA AVE.) EXPRESSWAY & FRONTAGE ROADS, PHASE I AT GLOBAL PROJECT SPONSOR TXDOT

REVISION DATE 07/2018REACH DR.LIMITS TO FM 659 (ZARAGOZA RD.)PROJECT BUILDWB3LN FRONTAGE ROAD(FR)GLOBAL REACHDR(GR)TOTIERRA ESTERD(TE). ANCILLARYWORK MPO PROJ NUM F407A-CAP

DESCR GR TO TE TO CONVERTEXISTING3LN EB ML TO 3LN EB FR.CONSTRUCT6LN EXWY EB/WB MLSW/A FUNDING CAT(S) 2M,4,12UXILIARYLNS&GRADESEPARATIONSATINTERSECTIONSLEETREVINODR TO TE. INCIDENTAL WORK TO ZARAGOZA DR.

REMARKS PROGRAM D2045 MTP, D19-22 TIP, 19-22 STIP, IN FY 20 PROJECT Amend to program into amended H2040 MTP, H17-20 TIP, 17-2P7 19. HISTORY 0 STIP in FY 2019.

TOTAL PROJECT COST INFORMATIONPREL ENG $ 6,366,239

ROW PURCH $ 38,600,000 COST OFCONSTR $ 121,733,894 APPROVED

CONST ENG $ 0 PHASESCONTING $ 2,585,472 $ 121,733,894INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 4,859,129TOTAL CST $ 174,144,734

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL12 $ 32,000,000 $ 8,000,000 $ 0 $ 0 $ 0 $ 40,000,0004 $ 52,717,288 $ 13,179,322 $ 0 $ 0 $ 0 $ 65,896,6102M $ 12,669,827 $ 3,167,457 $ 0 $ 0 $ 0 $ 15,837,284TOTAL $ 97,387,115 $ 24,346,779 $ 0 $ 0 $ 0 $ 121,733,894

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 0924-06-548 2019 CS C,E,ENV,ENG EL PASO $ 1,013,700LIMITS FROM S. PIEDRAS (PLEASE SEE REMARKS FOR COMPLETE STREET NAMES) PROJECT SPONSOR COEP

REVISION DATE 07/2018LIMITS TO S. GAMA (PLEASE SEE REMARKS FOR COMPLETE STREET NAMES)PROJECT CHAMIZAL NEIGHBORHOOD PEDESTRIAN ENHANCEMENTS PHASE I: CONSTRUCTION OF SIDEWALKS MPO PROJ NUM E302X-1

DESCR , ADA PEDESTRIAN RAMPS AND CROSSWALKS. THE PURPOSE OF THE PROJECT IS TO PROVIDE FUNDING CAT(S) 3LC,9TAPCONNECTIVITY TO FIX BUS STOP ROUTES AND RAPID TRANSIT STOPS WITHIN NEIGHBORHOOD.

REMARKS PROGRAM D2045 MTP, D19-22 TIP, 19-22 STIP, IN FY 20 PROJECT Amend to program H2040 MTP, H17-20 TIP, 17-20 STIP, in FYP7 19. HISTORY 2019. EXEMPT

TOTAL PROJECT COST INFORMATIONPREL ENG $ 277,022

ROW PURCH $ 0 COST OFCONSTR $ 736,678 APPROVED

CONST ENG $ 0 PHASESCONTING $ 0 $ 1,013,700INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,013,700

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 677,743 $ 0 $ 0 $ 169,436 $ 0 $ 847,1793LC $ 0 $ 0 $ 0 $ 0 $ 166,521 $ 166,521TOTAL $ 677,743 $ 0 $ 0 $ 169,436 $ 166,521 $ 1,013,700

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 156: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 156 OF 696

10:03:31 AM EL PASO MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 0924-06-537 2019 N/A T EL PASO $ 1,000,000LIMITS FROM DOWNTOWN TERMINAL - SANTA FE AND FOURTH PROJECT SPONSOR SUN METRO

REVISION DATE 07/2018LIMITS TO NORTHGATE TERMINAL - DYER AT WRENPROJECT DYER RTS OPERATING ASSISTANCE YR1 - 2019: 1ST YEAR OF DYER BRT-RTS OPERATIONS. MPO PROJ NUM T065X

DESCR FUNDING CAT(S) 5REMARKS PROGRAM D2045 MTP, D19-22 TIP, 19-22 STIP, IN FY 20 PROJECT Amend H2040 MTP, H17-20 TIP, 17-20 STIP to program in FY

P7 19. HISTORY 2019 EXEMPT TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 1,000,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 1,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,000,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 800,000 $ 0 $ 0 $ 200,000 $ 0 $ 1,000,000TOTAL $ 800,000 $ 0 $ 0 $ 200,000 $ 0 $ 1,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 0924-06-542 2019 CS C,E,ENV,ENG EL PASO $ 1,500,260LIMITS FROM CITYWIDE (PLEASE SEE TIP HISTORY FOR COMPLETE STREET NAMES) PROJECT SPONSOR COEP

REVISION DATE 07/2018LIMITS TO CITYWIDE (PLEASE SEE TIP HISTORY FOR COMPLETE STREET NAMES)PROJECT BICYCLE CONNECTIVITY INFRASTRUCTURE IMPROVEMENTS PHASE I: CONSTRUCT BIKE FACILI MPO PROJ NUM M087A

DESCR TIES CITYWIDE TO INCLUDE: BUFFERED BIKE LANES, CONVENTIONAL BIKE LANES, BIKE BLV FUNDING CAT(S) 5DS, SHARED LANE MARKINGS, AND PROTECTED BIKE LANES.

REMARKS PROGRAM D2045 MTP, D19-22 TIP, 19-22 STIP, IN FY 20 PROJECT Amend H2040 MTP, H17-20 TIP, 17-20 STIP to program in FYP7 19. HISTORY 2019. EXEMPT

TOTAL PROJECT COST INFORMATIONPREL ENG $ 240,345

ROW PURCH $ 0 COST OFCONSTR $ 1,259,914 APPROVED

CONST ENG $ 0 PHASESCONTING $ 0 $ 1,500,260INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,500,259

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 1,200,208 $ 0 $ 0 $ 300,052 $ 0 $ 1,500,260TOTAL $ 1,200,208 $ 0 $ 0 $ 300,052 $ 0 $ 1,500,260

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 0374-02-107 2019 US 62/180 C,E,ENV,ENG EL PASO $ 502,914LIMITS FROM GERONIMO DRIVE PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO SIOUX DRIVEPROJECT INTERSECTION OPERATIONAL IMPROVEMENTS AT MONTANA AVE./AIRPORT RD./MESCALERO DR. MPO PROJ NUM P333X

DESCR FUNDING CAT(S) 5REMARKS PROGRAM D2045 MTP, D19-22 TIP, 19-22 STIP, IN FY 20 PROJECT Amend H2040 MTP, H17-20 TIP, 17-20 STIP to program in FY

P7 19. HISTORY 2019 TOTAL PROJECT COST INFORMATION

PREL ENG $ 15,595ROW PURCH $ 0 COST OF

CONSTR $ 487,319 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 502,914INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 502,914

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 402,331 $ 100,583 $ 0 $ 0 $ 0 $ 502,914TOTAL $ 402,331 $ 100,583 $ 0 $ 0 $ 0 $ 502,914

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 157: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 157 OF 696

10:03:31 AM EL PASO MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 0924-06-538 2019 N/A T EL PASO $ 1,800,000LIMITS FROM SANTA FE DOWNTOWN TERMINAL (2 BUSES) MCA-TTU-UMC AREAS (1 BUS) PROJECT SPONSOR SUN METRO

REVISION DATE 07/2018LIMITS TO SUNLAND PAR-SHADOW MOUNTAIN (2 BUSES) FLOWER STREETS (1 BUS)PROJECT PROCUREMENT OF 3 BUSES: SUN METRO SEEKS TO PROCURE THREE BUSES IN ANTICIPATION O MPO PROJ NUM BP006

DESCR F INCREASED FREQUENCY AND RIDERSHIP DEMAND FOR SERVICES AROUND THE MONTECILLO DE FUNDING CAT(S) 5VELOPMENT AND THE MCA-TTU-UMC AREAS.

REMARKS PROGRAM D2045 MTP, D19-22 TIP, 19-22 STIP, IN FY 20 PROJECT Amend H2040 MTP, H17-20 TIP, 17-20 STIP to program in FYP7 19. HISTORY 2019.

TOTAL PROJECT COST INFORMATIONPREL ENG $ 0

ROW PURCH $ 0 COST OFCONSTR $ 1,800,000 APPROVED

CONST ENG $ 0 PHASESCONTING $ 0 $ 1,800,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,800,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 1,440,000 $ 0 $ 0 $ 360,000 $ 0 $ 1,800,000TOTAL $ 1,440,000 $ 0 $ 0 $ 360,000 $ 0 $ 1,800,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 0924-06-539 2019 CS C,E,ENV,ENG EL PASO $ 1,489,645LIMITS FROM EL PASO ST. AT 6TH. AVE. PROJECT SPONSOR COEP

REVISION DATE 07/2018LIMITS TOPROJECT PASO DEL NORTE PDN-POE ROUNDABOUT: DESIGN AND CONSTRUCT A ROUNDABOUT TO ACCOMMODMPO PROJ NUM C035X

DESCR ATE 1 LANE AND PARAMETERS AS DESCRIBED IN THE FHWA NCHRP REPORT 672, TO INCLUDE FUNDING CAT(S) 5BUT NOT LIMITED TO CONCRETE AND ASPHALT ROADWAY INTERSECTION, SIGNAGE, MARKINGSAND STRIPING.

REMARKS PROGRAM D2045 MTP, D19-22 TIP, 19-22 STIP, IN FY 20 PROJECT Amend H2040 MTP, H17-20 TIP, 17-20 STIP to program in FYP7 19. HISTORY 2019 EXEMPT

TOTAL PROJECT COST INFORMATIONPREL ENG $ 192,645

ROW PURCH $ 0 COST OFCONSTR $ 1,297,000 APPROVED

CONST ENG $ 0 PHASESCONTING $ 0 $ 1,489,645INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,489,645

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 1,191,716 $ 0 $ 0 $ 297,929 $ 0 $ 1,489,645TOTAL $ 1,191,716 $ 0 $ 0 $ 297,929 $ 0 $ 1,489,645

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 0924-06-550 2019 N/A T EL PASO $ 1,000,000LIMITS FROM DOWNTOWN TERMINAL - SANTA FE AND FOURTH PROJECT SPONSOR SUN METRO

REVISION DATE 07/2018LIMITS TO MISSION VALLEY TERMINAL - ALAMEDA AND ZARAGOZAPROJECT ALAMEDA RTS OPERATING ASSISTANCE YR1 - 2019: 1ST YEAR OF ALAMEDA BRT-RTS OPERATI MPO PROJ NUM T064X

DESCR ONS. FUNDING CAT(S) 5REMARKS PROGRAM D2045 MTP, D19-22 TIP, 19-22 STIP, IN FY 20 PROJECT Amend H2040 MTP, H17-20 TIP, 17-20 STIP to program in FY

P7 19. HISTORY 2019 EXEMPT TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 1,000,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 1,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,000,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 800,000 $ 0 $ 0 $ 200,000 $ 0 $ 1,000,000TOTAL $ 800,000 $ 0 $ 0 $ 200,000 $ 0 $ 1,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 158: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 158 OF 696

10:03:31 AM EL PASO MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 0000-00-000 2019 VA C,E EL PASO $ 0LIMITS FROM SOUTH TERMINUS OF US 110 AT BRIDGE OF THE AMERICAS (BOTA) PROJECT SPONSOR COEP

REVISION DATE 07/2018LIMITS TO 1 MI NORTH OF SOUTH TERMINUS OF US 110 AT BOTAPROJECT BRIDGE OF THE AMERICAS (BOTA) FAST SECURE LANE: IMPROVE SHOULDERS AND ADD 1 SOUT MPO PROJ NUM C029X

DESCR HBOUND DEDICATED LANE FOR FAST SECURE LANE (FSL) COMMUTERS FUNDING CAT(S) 3LCREMARKS PER COEP PRR; PROJECT IS NOT FUNDED. PROJECT WILL B PROJECT Amend to program into H2040 MTP, H17-20 TIP, 17-20 STIP i

P7 E MOVED OUT OF TIP AS PART OF THE 2045 HORIZON MTP HISTORY n FY 2019.NONEXEMPT.

TOTAL PROJECT COST INFORMATIONPREL ENG $ 150,000

ROW PURCH $ 0 COST OFCONSTR $ 884,000 APPROVED

CONST ENG $ 0 PHASESCONTING $ 0 $ 0INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,034,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 0 $ 0TOTAL $ 0 $ 0 $ 0 $ 0 $ 0 $ 0

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 0924-06-534 2019 CS C,E EL PASO $ 18,000,000LIMITS FROM JOE BATTLE (LOOP 375) PROJECT SPONSOR COUNTY EP

REVISION DATE 07/2018LIMITS TO DARRINGTON (BERRYVILLE ST.)PROJECT PELLICANO DR. WIDENING/BUILD: WIDENING/BUILD FROM 2 TO 6-LANES DIVIDED, WITH 5’’ MPO PROJ NUM P410X-15A

DESCR BIKE LANE AND 5’’ MULTI-PURPOSE PATH AND LANDSCAPING FUNDING CAT(S) 5,7,10REMARKS PROGRAM D2045 MTP, D19-22 TIP, 19-22 STIP, IN FY 20 PROJECT Amend to add $8,000,000 in CAT 10 CBI (please see amend h

P7 19. HISTORY istory). TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,700,000ROW PURCH $ 0 COST OF

CONSTR $ 18,000,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 18,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 20,700,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL10 $ 6,400,000 $ 0 $ 0 $ 1,600,000 $ 0 $ 8,000,0007 $ 6,576,000 $ 0 $ 0 $ 1,644,000 $ 0 $ 8,220,0005 $ 1,424,000 $ 0 $ 0 $ 356,000 $ 0 $ 1,780,000TOTAL $ 14,400,000 $ 0 $ 0 $ 3,600,000 $ 0 $ 18,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 0000-00-000 2019 CS C EL PASO $ 0LIMITS FROM LOOP 375 (JOE BATTLE) PROJECT SPONSOR COEP

REVISION DATE 07/2018LIMITS TO EL PASO CITY LIMITS/APPROX. 0.63 M NW OF EASTLAKE BLVD.PROJECT ROJAS DR WIDENING: STRIPE FROM 4 TO 6 LANE DIVIDED WITHIN EXISTING ROW MPO PROJ NUM P447X-CAP

DESCR FUNDING CAT(S) 3LCREMARKS PER COEP PRR; PROJECT IS NOT FUNDED. PROJECT WILL B PROJECT Amend to program into amended H2040 MTP, H17-20 TIP, 17-2

P7 E MOVED OUT OF TIP AS PART OF THE 2045 HORIZON MTP HISTORY 0 STIP, FY 2019 NONEXEMPT.

TOTAL PROJECT COST INFORMATIONPREL ENG $ 8,918

ROW PURCH $ 0 COST OFCONSTR $ 182,000 APPROVED

CONST ENG $ 0 PHASESCONTING $ 0 $ 0INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 190,918

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 0 $ 0TOTAL $ 0 $ 0 $ 0 $ 0 $ 0 $ 0

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 159: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 159 OF 696

10:03:31 AM EL PASO MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 0374-02-097 2019 US 62/180 C,E,R EL PASO $ 0LIMITS FROM GLOBAL REACH DR. PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO LOOP 375 (JOE BATTLE)PROJECT US 62/180 (MONTANA AVE) FRONTAGE ROADS: BUILD 2 LANE FRONTAGE ROADS MPO PROJ NUM P457X-CAP

DESCR FUNDING CAT(S) 2M,11REMARKS Amend the amended H2040 MTP, H17-20 TIP, 17-20 STIP PROJECT AMEND TO PROGRAM INTO AMENDED H2040 MTP, H17-20 TIP, 17-2

P7 to deprogram from FY 2019 NONEXEMPT HISTORY 0 STIP, FY 2019 TOTAL PROJECT COST INFORMATION

PREL ENG $ 764,400ROW PURCH $ 1,092,000 COST OF

CONSTR $ 15,600,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 0INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 17,456,400

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL11 $ 0 $ 0 $ 0 $ 0 $ 0 $ 02M $ 0 $ 0 $ 0 $ 0 $ 0 $ 0TOTAL $ 0 $ 0 $ 0 $ 0 $ 0 $ 0

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 0000-00-000 2019 CS C,E,R EL PASO $ 0LIMITS FROM RENE DR. PROJECT SPONSOR COUNTY EP

REVISION DATE 07/2018LIMITS TO VISTA DEL ESTE RD.PROJECT GREG DR./EDGEMERE EXTENSION: BUILD/WIDEN FROM 4 TO 6 LANES MPO PROJ NUM P450X-CAP

DESCR FUNDING CAT(S) 3LCREMARKS PER SAL FROM COUNTY EP: PROJECT WILL BE STRIPED TO PROJECT Amend to program into H2040 MTP, H17-20 TIP, 17-20 STIP i

P7 4 LANES IN THE 2016 PROJECT. PROJECT WILL NOT MAKE HISTORY n FY 2019.THE 2045 MTP/2019-2022 TIP

TOTAL PROJECT COST INFORMATIONPREL ENG $ 119,756

ROW PURCH $ 171,080 COST OFCONSTR $ 2,444,000 APPROVED

CONST ENG $ 0 PHASESCONTING $ 0 $ 0INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,734,836

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 0 $ 0TOTAL $ 0 $ 0 $ 0 $ 0 $ 0 $ 0

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 2552-02-028 2019 LP 375 C,E EL PASO $ 0LIMITS FROM US 62/180 MONTANA PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO SPUR 601PROJECT LOOP 375 PURPLE HEART WIDENING:WIDENING 4 TO 6 LANES MPO PROJ NUM F053A-CAP

DESCR FUNDING CAT(S) 2MREMARKS Amend the amended H2040 MTP, H17-20 TIP, 17-20 STIP PROJECT AMEND TO PROGRAM H2040 MTP, H17-20 TIP, 17-20 STIP, IN FY

P7 to deprogram from FY 2019 NONEXEMPT HISTORY 2019 NONEXEMPT TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,274,000ROW PURCH $ 0 COST OF

CONSTR $ 26,000,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 0INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 27,274,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 0 $ 0 $ 0 $ 0 $ 0 $ 0TOTAL $ 0 $ 0 $ 0 $ 0 $ 0 $ 0

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 160: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 160 OF 696

10:03:31 AM EL PASO MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 0167-01-113 2019 US 54 C EL PASO $ 90,416,143LIMITS FROM LOOP 375 (CESAR CHAVEZ BORDER HIGHWAY) PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO YANDELL DR.PROJECT I-10 CONNECT: US54/IH10/IH110/LOOP 375 INTERCHANGE IMPROVEMENTS (FOR EXAMPLE IMP MPO PROJ NUM I034X-MOD

DESCR ROVEMENTS TO EXISTING RAMPS AND ADDING AUXILIARY LANES). FUNDING CAT(S) 4,7,10,11,12REMARKS PROGRAM D2045 MTP, D19-22 TIP, 19-22 STIP, IN FY 20 PROJECT Admin amend to reduce CAT 4(3c) to $42,830,269, add $10,0

P7 19. HISTORY 00,000 to CAT 11 Rider 11B, and add $7,600,000 of CAT 12 TOTAL PROJECT COST INFORMATION

PREL ENG $ 4,588,721ROW PURCH $ 1,500,000 COST OF

CONSTR $ 90,416,143 APPROVEDCONST ENG $ 4,279,685 PHASES

CONTING $ 7,754,002 $ 90,416,143INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 5,506,465TOTAL CST $ 108,538,551

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL11 $ 8,000,000 $ 2,000,000 $ 0 $ 0 $ 0 $ 10,000,0004 $ 34,264,215 $ 8,566,054 $ 0 $ 0 $ 0 $ 42,830,2697 $ 7,200,000 $ 1,800,000 $ 0 $ 0 $ 0 $ 9,000,00012 $ 19,144,000 $ 4,786,000 $ 0 $ 0 $ 0 $ 23,930,00010 $ 3,724,699 $ 931,175 $ 0 $ 0 $ 0 $ 4,655,874TOTAL $ 72,332,914 $ 18,083,229 $ 0 $ 0 $ 0 $ 90,416,143

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 161: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 161 OF 696

10:03:31 AM EL PASO MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 2552-03-049 2020 LP 375 C EL PASO $ 34,500,000LIMITS FROM BOB HOPE DR. PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO ZARAGOZA RD.PROJECT LOOP 375 (AMERICAS/JOE BATTLE) WIDENING: WIDEN FROM 4 TO 6 LANES DIVIDED FROM BO MPO PROJ NUM F056X-CAP

DESCR B HOPE TO ZARAGOZA RD. FUNDING CAT(S) 2M,4REMARKS PROGRAM D2045 MTP, D19-22 TIP, 19-22 STIP, IN FY 20 PROJECT Amend to program into amended H2040 MTP, H17-20 TIP, 17-2

P7 20. HISTORY 0 STIP in FY 2018. TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 34,500,000 APPROVEDCONST ENG $ 1,814,892 PHASES

CONTING $ 728,152 $ 34,500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 1,368,487TOTAL CST $ 38,411,531

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 17,780,304 $ 4,445,076 $ 0 $ 0 $ 0 $ 22,225,3804 $ 9,819,696 $ 2,454,924 $ 0 $ 0 $ 0 $ 12,274,620TOTAL $ 27,600,000 $ 6,900,000 $ 0 $ 0 $ 0 $ 34,500,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 0924-06-540 2020 N/A T EL PASO $ 1,000,000LIMITS FROM DOWNTOWN TERMINAL - SANTA FE AND FOURTH PROJECT SPONSOR SUN METRO

REVISION DATE 07/2018LIMITS TO NORTHGATE TERMINAL - DYER AT WRENPROJECT DYER RTS OPERATING ASSISTANCE YR2 - 2020: 2ND YEAR OF DYER BRT-RTS OPERATIONS. MPO PROJ NUM T065X-2

DESCR FUNDING CAT(S) 5REMARKS PROGRAM D2045 MTP, D19-22 TIP, 19-22 STIP, IN FY 20 PROJECT Amend H2040 MTP, H17-20 TIP, 17-20 STIP to program in FY

P7 20. HISTORY 2020 EXEMPT TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 1,000,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 1,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,000,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 800,000 $ 0 $ 0 $ 200,000 $ 0 $ 1,000,000TOTAL $ 800,000 $ 0 $ 0 $ 200,000 $ 0 $ 1,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 0924-06-549 2020 CS C,E,ENV,ENG EL PASO $ 972,830LIMITS FROM VARIOUS LOCATIONS (PLEASE SEE TIP HISTORY FOR COMPLETE STREET NAMES) PROJECT SPONSOR COEP

REVISION DATE 07/2018LIMITS TO VARIOUS LOCATIONS (PLEASE SEE TIP HISTORY FOR COMPLETE STREET NAMES)PROJECT CHAMIZAL NEIGHBORHOOD PEDESTRIAN ENHANCEMENTS PHASE II: CONSTRUCTION OF SIDEWALK MPO PROJ NUM E302X-2

DESCR S, ADA PEDESTRIAN RAMPS AND CROSSWALKS. THE PURPOSE OF THE PROJECT IS TO PROVIDE FUNDING CAT(S) 3LC,9TAPCONNECTIVITY TO FIX ROUTE AND RAPID TRANSIT.

REMARKS PROGRAM D2045 MTP, D19-22 TIP, 19-22 STIP, IN FY 20 PROJECT Amend to program H2040 MTP, H17-20 TIP, 17-20 STIP, in FYP7 20. HISTORY 2020 EXEMPT

TOTAL PROJECT COST INFORMATIONPREL ENG $ 256,723

ROW PURCH $ 0 COST OFCONSTR $ 716,107 APPROVED

CONST ENG $ 0 PHASESCONTING $ 0 $ 972,830INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 972,830

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 149,307 $ 149,3079TAP $ 658,818 $ 0 $ 0 $ 164,705 $ 0 $ 823,523TOTAL $ 658,818 $ 0 $ 0 $ 164,705 $ 149,307 $ 972,830

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 162: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 162 OF 696

10:03:31 AM EL PASO MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 0924-06-553 2020 N/A T EL PASO $ 1,000,000LIMITS FROM FATHER RAHM PROJECT SPONSOR SUN METRO

REVISION DATE 07/2018LIMITS TO GLORY ROADPROJECT EL PASO STREETCAR SYSTEM 2ND YEAR OPERATING ASSISTANCE: OPERATING ASSISTANCE FOR MPO PROJ NUM T108X-2

DESCR 2ND YEAR OF NEW TRANSIT SERVICE INTENDED TO REDUCE CONGESTION AND CO EMISSIONS. FUNDING CAT(S) 5REMARKS PROGRAM D2045 MTP, D19-22 TIP, 19-22 STIP, IN FY 20 PROJECT Amend H2040 MTP, H17-20 TIP, 17-20 STIP to program in FY

P7 20. HISTORY 2020 EXEMPT TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 1,000,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 1,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,000,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 800,000 $ 0 $ 0 $ 200,000 $ 0 $ 1,000,000TOTAL $ 800,000 $ 0 $ 0 $ 200,000 $ 0 $ 1,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 0002-12-026 2020 US 62/180 C,E EL PASO $ 595,056LIMITS FROM AT MONTANA AVE PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TOPROJECT INTERSECTION OPERATIONAL IMPROVEMENTS AT MONTANA AVE./PAISANO DR. MPO PROJ NUM P334X

DESCR FUNDING CAT(S) 5REMARKS PROGRAM D2045 MTP, D19-22 TIP, 19-22 STIP, IN FY 20 PROJECT Admin amend H2040 MTP, H17-20 TIP, 17-20 STIP to change t

P7 20. HISTORY he CSJ from 0002-12-029 to CSJ 0002-12-026. TOTAL PROJECT COST INFORMATION

PREL ENG $ 18,451ROW PURCH $ 0 COST OF

CONSTR $ 576,605 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 595,056INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 595,056

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 476,045 $ 119,011 $ 0 $ 0 $ 0 $ 595,056TOTAL $ 476,045 $ 119,011 $ 0 $ 0 $ 0 $ 595,056

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 0167-01-115 2020 US 54 C,E EL PASO $ 730,000LIMITS FROM LOOP 375 (TRANSMOUNTAIN) PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO FM 2529 (MCCOMBS)PROJECT BLUETOOTH DETECTORS AND RADAR VEHICLE SENSING DEVICES (RVSDS) ON US 54: INSTALLA MPO PROJ NUM F201X

DESCR TION OF BLUETOOTH DETECTORS AND RADAR VEHICLE SENSING DEVICES (RVSDS) ALONG US 5 FUNDING CAT(S) 54 FOR DATA GATHERING TO DISPLAY TRAVEL TIME MESSAGES ON US 54 DYNAMIC MESSAGE SIGNS (DMS).

REMARKS PROGRAM D2045 MTP, D19-22 TIP, 19-22 STIP, IN FY 20 PROJECT Amend H2040 MTP, H17-20 TIP, 17-20 STIP to program in FYP7 20. HISTORY 2020 EXEMPT

TOTAL PROJECT COST INFORMATIONPREL ENG $ 36,532

ROW PURCH $ 0 COST OFCONSTR $ 693,468 APPROVED

CONST ENG $ 0 PHASESCONTING $ 0 $ 730,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 730,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 584,000 $ 146,000 $ 0 $ 0 $ 0 $ 730,000TOTAL $ 584,000 $ 146,000 $ 0 $ 0 $ 0 $ 730,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 163: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 163 OF 696

10:03:31 AM EL PASO MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 0924-06-541 2020 N/A T EL PASO $ 1,300,000LIMITS FROM FIVE POINTS TERMINAL - 2830 MONTANA PROJECT SPONSOR SUN METRO

REVISION DATE 07/2018LIMITS TO FAR EAST TERMINAL - R.C. POE - EDGEMEREPROJECT MONTANA RTS 1ST YEAR SERVICE OPERATING ASSISTANCE: 1ST YEAR OF MONTANA BRT-RTS O MPO PROJ NUM T093X

DESCR PERATIONS. FUNDING CAT(S) 5REMARKS PROGRAM D2045 MTP, D19-22 TIP, 19-22 STIP, IN FY 20 PROJECT Amend H2040 MTP, H17-20 TIP, 17-20 STIP to program in FY

P7 20. HISTORY 2020 EXEMPT TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 1,300,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 1,300,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,300,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 1,040,000 $ 0 $ 0 $ 260,000 $ 0 $ 1,300,000TOTAL $ 1,040,000 $ 0 $ 0 $ 260,000 $ 0 $ 1,300,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 0924-06-551 2020 N/A T EL PASO $ 1,000,000LIMITS FROM DOWNTOWN TERMINAL - SANTA FE AND FOURTH PROJECT SPONSOR SUN METRO

REVISION DATE 07/2018LIMITS TO MISSION VALLEY TERMINAL - ALAMEDA AND ZARAGOZAPROJECT ALAMEDA RTS OPERATING ASSISTANCE YR2 - 2020: 2ND YEAR OF ALAMEDA BRT-RTS OPERATI MPO PROJ NUM T091X-2

DESCR ONS. FUNDING CAT(S) 5REMARKS PROGRAM D2045 MTP, D19-22 TIP, 19-22 STIP, IN FY 20 PROJECT Amend H2040 MTP, H17-20 TIP, 17-20 STIP to program in FY

P7 20. HISTORY 2020 EXEMPT TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 1,000,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 1,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,000,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 800,000 $ 0 $ 0 $ 200,000 $ 0 $ 1,000,000TOTAL $ 800,000 $ 0 $ 0 $ 200,000 $ 0 $ 1,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 0924-06-544 2020 US 62/180 C,E EL PASO $ 3,241,465LIMITS FROM 5 POINTS TRANSFER CENTER ON MONTANA AND PIEDRAS PROJECT SPONSOR COEP

REVISION DATE 07/2018LIMITS TO FAR EAST TRANSFER CENTER AT EDGEMERE AND RC POEPROJECT MONTANA RTS PEDESTRIAN ENHANCEMENTS: DESIGN AND CONSTRUCTION OF PEDESTRIAN ENHAN MPO PROJ NUM T069X

DESCR CEMENTS ALONG THE MONTANA RTS ROUTE TO INCLUDE INSTALLATION OF SIDEWALKS AND LAN FUNDING CAT(S) 5DSCAPING.

REMARKS PROGRAM D2045 MTP, D19-22 TIP, 19-22 STIP, IN FY 20 PROJECT Amend H2040 MTP, H17-20 TIP, 17-20 STIP to program in FYP7 20. HISTORY 2020 EXEMPT

TOTAL PROJECT COST INFORMATIONPREL ENG $ 427,693

ROW PURCH $ 0 COST OFCONSTR $ 2,813,772 APPROVED

CONST ENG $ 0 PHASESCONTING $ 0 $ 3,241,465INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 3,241,465

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 2,593,172 $ 0 $ 0 $ 648,293 $ 0 $ 3,241,465TOTAL $ 2,593,172 $ 0 $ 0 $ 648,293 $ 0 $ 3,241,465

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 164: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 164 OF 696

10:03:31 AM EL PASO MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 0924-06-543 2020 CS C,E,ENV,ENG EL PASO $ 1,800,411LIMITS FROM CITYWIDE (PLEASE SEE TIP HISTORY FOR COMPLETE STREET NAMES) PROJECT SPONSOR COEP

REVISION DATE 07/2018LIMITS TO CITYWIDE (PLEASE SEE TIP HISTORY FOR COMPLETE STREET NAMES)PROJECT BICYCLE CONNECTIVITY INFRASTRUCTURE IMPROVEMENTS PHASE II: CONSTRUCT BICYCLE FAC MPO PROJ NUM M087B

DESCR ILITIES CITYWIDE TO INCLUDE: BUFFERED BIKE LANES, CONVENTIONAL BIKE LANES, BICYC FUNDING CAT(S) 5LE BOULEVARDS, SHARED LANE MARKINGS, AND PROTECTED BICYCLE LANES.

REMARKS PROGRAM D2045 MTP, D19-22 TIP, 19-22 STIP, IN FY 20 PROJECT Amend H2040 MTP, H17-20 TIP, 17-20 STIP to program in FYP7 20. HISTORY 2020 EXEMPT

TOTAL PROJECT COST INFORMATIONPREL ENG $ 233,592

ROW PURCH $ 0 COST OFCONSTR $ 1,566,820 APPROVED

CONST ENG $ 0 PHASESCONTING $ 0 $ 1,800,411INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,800,412

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 1,440,329 $ 0 $ 0 $ 360,082 $ 0 $ 1,800,411TOTAL $ 1,440,329 $ 0 $ 0 $ 360,082 $ 0 $ 1,800,411

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 0000-00-000 2020 CS C EL PASO $ 0LIMITS FROM ZARAGOZA RD PROJECT SPONSOR COEP

REVISION DATE 07/2018LIMITS TO MONTWOOD DR. EXTENSIONPROJECT RICH BEEM WIDENING: STRIPE FROM 4 TO 6-LANE DIVIDED WITHIN EXISTING ROW MPO PROJ NUM P446X-CAP

DESCR FUNDING CAT(S) 3LCREMARKS PER COEP PRR; PROJECT IS NOT FUNDED. PROJECT WILL B PROJECT Amend to program into amended H2040 MTP, H17-20 TIP, 17-2

P7 E MOVED OUT OF TIP AS PART OF THE 2045 HORIZON MTP HISTORY 0 STIP, FY 2020 NONEXEMPT.

TOTAL PROJECT COST INFORMATIONPREL ENG $ 0

ROW PURCH $ 0 COST OFCONSTR $ 305,119 APPROVED

CONST ENG $ 0 PHASESCONTING $ 0 $ 0INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 305,119

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 0 $ 0TOTAL $ 0 $ 0 $ 0 $ 0 $ 0 $ 0

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 0000-00-000 2020 CS C,E EL PASO $ 0LIMITS FROM FM 76 - NORTH LOOP DR PROJECT SPONSOR COEP

REVISION DATE 07/2018LIMITS TO CASTNER DRPROJECT PENDALE RD. WIDENING: WIDEN TO 4-LANE UNDIVIDED MPO PROJ NUM A424X-CAP

DESCR FUNDING CAT(S) 3LCREMARKS PER COEP PRR; PROJECT IS NOT FUNDED. PROJECT WILL B PROJECT Amend to program H2040 MTP, H17-20 TIP, 17-20 STIP, in FY

P7 E MOVED OUT OF TIP AS PART OF THE 2045 HORIZON MTP. HISTORY 2020 TOTAL PROJECT COST INFORMATION

PREL ENG $ 15,900ROW PURCH $ 0 COST OF

CONSTR $ 324,480 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 0INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 340,380

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 0 $ 0TOTAL $ 0 $ 0 $ 0 $ 0 $ 0 $ 0

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 165: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 165 OF 696

10:03:31 AM EL PASO MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 0000-00-000 2020 CS C EL PASO $ 0LIMITS FROM ZARAGOZA RD PROJECT SPONSOR COEP

REVISION DATE 07/2018LIMITS TO JOHN HAYES ST.PROJECT PEBBLE HILLS BLVD. WIDENING: STRIPE FROM 4 TO 6-LANE DIVIDED WITHIN EXISTING RO MPO PROJ NUM A421X-CAP

DESCR W FUNDING CAT(S) 3LCREMARKS PER COEP PRR; PROJECT IS NOT FUNDED. PROJECT WILL B PROJECT Amend to program H2040 MTP, H17-20 TIP, 17-20 STIP, in FY

P7 E MOVED OUT OF TIP AS PART OF THE 2045 HORIZON MTP HISTORY 2020 NONEXEMPT.

TOTAL PROJECT COST INFORMATIONPREL ENG $ 0

ROW PURCH $ 0 COST OFCONSTR $ 324,804 APPROVED

CONST ENG $ 0 PHASESCONTING $ 0 $ 0INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 324,804

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 0 $ 0TOTAL $ 0 $ 0 $ 0 $ 0 $ 0 $ 0

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 0000-00-000 2020 CS C,E,R EL PASO $ 0LIMITS FROM UPPER VALLEY RD PROJECT SPONSOR COEP

REVISION DATE 07/2018LIMITS TO GOMEZ RD AT MONTOYAPROJECT REDD RD. EXTENSION: BUILD 2-LANE DIVIDED MPO PROJ NUM A124X-MOD

DESCR FUNDING CAT(S) 3LCREMARKS PER COEP PRR; PROJECT IS NOT FUNDED. PROJECT WILL B PROJECT Amend to program into H2040 MTP, H17-20 TIP, 17-20 STIP i

P7 E MOVED OUT OF TIP AS PART OF THE 2045 HORIZON MTP. HISTORY n FY 2020 NONEXEMPT TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,642,950ROW PURCH $ 2,347,072 COST OF

CONSTR $ 33,529,600 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 0INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 37,519,622

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 0 $ 0TOTAL $ 0 $ 0 $ 0 $ 0 $ 0 $ 0

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 0000-00-000 2020 CS C EL PASO $ 0LIMITS FROM ZARAGOZA RD PROJECT SPONSOR COEP

REVISION DATE 07/2018LIMITS TO COZY COVEPROJECT TIERRA ESTE RD. WIDENING: STRIPE FROM 4 TO 6-LANE DIVIDED WITHIN EXISTING ROW MPO PROJ NUM P455X-CAP

DESCR FUNDING CAT(S) 3LCREMARKS PER COEP PRR; PROJECT IS NOT FUNDED. PROJECT WILL B PROJECT Amend to program into amended 2040 MTP, H17-20 TIP, 17-20

P7 E MOVED OUT OF TIP AS PART OF THE 2045 HORIZON MTP HISTORY STIP in FY2020 NONEXEMP.

TOTAL PROJECT COST INFORMATIONPREL ENG $ 0

ROW PURCH $ 0 COST OFCONSTR $ 98,426 APPROVED

CONST ENG $ 0 PHASESCONTING $ 0 $ 0INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 98,426

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 0 $ 0TOTAL $ 0 $ 0 $ 0 $ 0 $ 0 $ 0

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 166: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 166 OF 696

10:03:31 AM EL PASO MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 0000-00-000 2020 CS C EL PASO $ 0LIMITS FROM MONTWOOD DR PROJECT SPONSOR COEP

REVISION DATE 07/2018LIMITS TO EDGEMERE BLVD.PROJECT JOHN HAYES ST./BERRYVILLE RD. WIDENING: STRIPE FROM 4 TO 6-LANE DIVIDED WITHIN E MPO PROJ NUM A422X-CAP

DESCR XISTING ROW FUNDING CAT(S) 3LCREMARKS PER COEP PRR; PROJECT IS NOT FUNDED. PROJECT WILL B PROJECT Amend to program H2040 MTP, H17-20 TIP, 17-20 STIP, in FY

P7 E MOVED OUT OF TIP AS PART OF THE 2045 HORIZON MTP. HISTORY 2020 NONEXEMPT TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 374,017 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 0INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 374,017

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 0 $ 0TOTAL $ 0 $ 0 $ 0 $ 0 $ 0 $ 0

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 2121-02-147 2020 IH 10 C EL PASO $ 0LIMITS FROM RAYNOR ST. (AT ON/OFF RAMP 22) PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO AIRWAY BLVD.PROJECT I-10 WIDENING: ADD 1 LANE EACH DIRECTION (STRIPING AND SHOULDERS) MPO PROJ NUM I059X-CAP

DESCR FUNDING CAT(S) 2MREMARKS PER TXDOT NOTES FOR TPAC MEETING ON 10-26-17: CONFI PROJECT Amend to program into H2040 MTP, H17-20 TIP, 17-20 STIP i

P7 RM CSJ 2121-02-147 IH-10 RAYNOR TO US 62 PAISANO IS HISTORY n FY 2019.REMOVED FROM THE 2045 MTP.

TOTAL PROJECT COST INFORMATIONPREL ENG $ 0

ROW PURCH $ 0 COST OFCONSTR $ 5,200,000 APPROVED

CONST ENG $ 0 PHASESCONTING $ 0 $ 0INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 5,200,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 0 $ 0 $ 0 $ 0 $ 0 $ 0TOTAL $ 0 $ 0 $ 0 $ 0 $ 0 $ 0

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 0000-00-000 2020 CS C,E EL PASO $ 0LIMITS FROM ZARAGOZA PROJECT SPONSOR COEP

REVISION DATE 07/2018LIMITS TO RENE DR.PROJECT GREG DR./EDGEMERE EXTENSION WIDENING: STRIPE FROM 4 TO 6-LANE DIVIDED WITHIN EX MPO PROJ NUM P451X-CAP

DESCR ISTING ROW FUNDING CAT(S) 3LCREMARKS PER COEP PRR; PROJECT IS NOT FUNDED. PROJECT WILL B PROJECT Amend to program into H2040 MTP, H17-20 TIP, 17-20 STIP i

P7 E MOVED OUT OF TIP AS PART OF THE 2045 HORIZON MTP HISTORY n FY 2020.NONEXEMPT.

TOTAL PROJECT COST INFORMATIONPREL ENG $ 14,469

ROW PURCH $ 0 COST OFCONSTR $ 295,277 APPROVED

CONST ENG $ 0 PHASESCONTING $ 0 $ 0INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 309,746

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 0 $ 0TOTAL $ 0 $ 0 $ 0 $ 0 $ 0 $ 0

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 167: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 167 OF 696

10:03:31 AM EL PASO MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 0000-00-000 2020 CS C,E EL PASO $ 0LIMITS FROM ROJAS PROJECT SPONSOR COEP

REVISION DATE 07/2018LIMITS TO MONTANA AVE (US 62/180)PROJECT GEORGE DIETER : RESTRIPE TO 6 LANES MPO PROJ NUM M404B-15A

DESCR FUNDING CAT(S) 3LCREMARKS PER COEP PRR; PROJECT IS NOT FUNDED. PROJECT WILL B PROJECT

P7 E MOVED OUT OF TIP AS PART OF THE 2045 HORIZON MTP. HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 19,079ROW PURCH $ 0 COST OF

CONSTR $ 389,376 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 0INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 408,455

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 0 $ 0TOTAL $ 0 $ 0 $ 0 $ 0 $ 0 $ 0

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 1046-01-021 2020 FM 659 C,E,R EL PASO $ 0LIMITS FROM SUN FIRE PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO US 62/180 (MONTANA)PROJECT FM 659 (Zaragoza Road) Widening: WIDEN 4 LANE TO 6 LANES DIVIDED, TO INCLUDE TRA MPO PROJ NUM P428X-MOD

DESCR NSITIONAL WORK FROM LP 375 TO SUNFIRE. FUNDING CAT(S) 2MREMARKS PER TXDOT NOTES FOR TPAC MEETING ON 10-26-17:CSJ 10 PROJECT Amend to program into H2040 MTP, H17-20 TIP, 17-20 STIP i

P7 46-01-021 MOVE INTO 2030 NETWORK IN YOE 2029 HISTORY n FY 2020. TOTAL PROJECT COST INFORMATION

PREL ENG $ 755,481ROW PURCH $ 1,079,258 COST OF

CONSTR $ 15,417,977 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 0INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 17,252,716

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 0 $ 0 $ 0 $ 0 $ 0 $ 0TOTAL $ 0 $ 0 $ 0 $ 0 $ 0 $ 0

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 0000-00-000 2020 CS C,E,R EL PASO $ 0LIMITS FROM IVEY RD PROJECT SPONSOR COEP

REVISION DATE 07/2018LIMITS TO AMERICAS AVE (LOOP 375)PROJECT BETEL RD: BUILD 4-LANES UNDIVIDED MPO PROJ NUM A502X-15A

DESCR FUNDING CAT(S) 3LCREMARKS PER COEP PRR; PROJECT IS NOT FUNDED. PROJECT WILL B PROJECT Amend to program into H2040 MTP, H17-20 TIP, 17-20 STIP i

P7 E MOVED OUT OF TIP AS PART OF THE 2045 HORIZON MTP. HISTORY n FY 2020. NONEXEMPT TOTAL PROJECT COST INFORMATION

PREL ENG $ 79,498ROW PURCH $ 1,000,000 COST OF

CONSTR $ 1,622,400 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 0INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,701,898

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 0 $ 0TOTAL $ 0 $ 0 $ 0 $ 0 $ 0 $ 0

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 168: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 168 OF 696

10:03:31 AM EL PASO MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 1046-03-005 2020 SS 601 C EL PASO $ 23,931,284LIMITS FROM SPUR 601 LIBERTY EXPY AT LOOP 375 (PURPLE HEART) PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TOPROJECT SPUR 601 AT LP 375 DIRECT CONNECTORS NB/WB AND EB/SB: CONSTRUCT NORTHBOUND TO WE MPO PROJ NUM P448X-CAP

DESCR STBOUND AND EASTBOUND TO SOUTHBOUND DIRECT CONNECTORS FUNDING CAT(S) 2M,7,11REMARKS PROGRAM D2045 MTP, D19-22 TIP, 19-22 STIP, IN FY 20 PROJECT Amend to revise the project name and project description

P7 20. HISTORY to include EB/SB. Reduce CAT 11 to from $5,820,000 to $3,400,000.

TOTAL PROJECT COST INFORMATIONPREL ENG $ 0

ROW PURCH $ 0 COST OFCONSTR $ 23,931,284 APPROVED

CONST ENG $ 0 PHASESCONTING $ 0 $ 23,931,284INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 23,931,284

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL11 $ 2,720,000 $ 680,000 $ 0 $ 0 $ 0 $ 3,400,0002M $ 10,117,827 $ 2,529,457 $ 0 $ 0 $ 0 $ 12,647,2847 $ 6,307,200 $ 1,576,800 $ 0 $ 0 $ 0 $ 7,884,000TOTAL $ 19,145,027 $ 4,786,257 $ 0 $ 0 $ 0 $ 23,931,284

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 0924-06-562 2020 CS C,E,ENV,ENG EL PASO $ 12,016,000LIMITS FROM CENTRAL BUSINESS DISTRICT PROJECT SPONSOR COEP

REVISION DATE 07/2018LIMITS TOPROJECT CENTRAL BUSINESS DISTRICT PHASE IV (CBD 4): RECONSTRUCTION OF DOWNTOWN STREETS: MPO PROJ NUM R307D

DESCR OREGON, MESA, CAMPBELL & KANSAS FROM PAISANO TO BORDER HWY AND SIXTH FROM CAMPBE FUNDING CAT(S) 7LL TO EL PASO ST.; CONVERSION OF KANSAS AND CAMPBELL FROM ONE-WAY TO TWO-WAY

REMARKS PROGRAM D2045 MTP, D19-22 TIP, 19-22 STIP, IN FY 20 PROJECT Administratively amend H2040 MTP, H17-20 TIP, 17-20 STIPP7 20. COST OF APPROVED PHASES: PE $1802400 PLUS CON HISTORY to change CSJ from 0924-06-190 to 0924-06-562. EXEMPT

ST $10213600 =$12016000 TOTAL PROJECT COST INFORMATION

PREL ENG $ 3,680,785ROW PURCH $ 0 COST OF

CONSTR $ 10,213,600 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 12,016,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 13,894,385

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 9,612,800 $ 0 $ 0 $ 2,403,200 $ 0 $ 12,016,000TOTAL $ 9,612,800 $ 0 $ 0 $ 2,403,200 $ 0 $ 12,016,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 169: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 169 OF 696

10:03:31 AM EL PASO MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 0924-06-572 2021 N/A T EL PASO $ 2,288,542LIMITS FROM DOWNTOWN TERMINAL - SANTA FE PROJECT SPONSOR SUN METRO

REVISION DATE 07/2018LIMITS TO MISSION VALLEY TERMINAL - ALAMEDA @ ZARAGOZAPROJECT ALAMEDA RTS 3RD YEAR OPERATING ASSISTANCE: 3RD YEAR OF ALAMEDA RTS OPERATIONS MPO PROJ NUM T096X

DESCR FUNDING CAT(S) 3LC,5REMARKS PROGRAM D2045 MTP, D19-22 TIP, 19-22 STIP, IN FY 20 PROJECT

P7 21. HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 2,288,542 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 2,288,542INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,288,542

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 911,887 $ 0 $ 0 $ 227,972 $ 0 $ 1,139,8593LC $ 0 $ 0 $ 0 $ 0 $ 1,148,683 $ 1,148,683TOTAL $ 911,887 $ 0 $ 0 $ 227,972 $ 1,148,683 $ 2,288,542

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 0924-06-573 2021 N/A T EL PASO $ 1,538,029LIMITS FROM DOWNTOWN TERMINAL - SANTA FE PROJECT SPONSOR SUN METRO

REVISION DATE 07/2018LIMITS TO NORTHEAST TERMINAL - DYER @ DIANAPROJECT DYER RTS 3RD YEAR OPERATING ASSISTANCE: 3RD YEAR OF DYER RTS OPERATIONS MPO PROJ NUM T095X

DESCR FUNDING CAT(S) 3LC,5REMARKS PROGRAM D2045 MTP, D19-22 TIP, 19-22 STIP, IN FY 20 PROJECT

P7 21. HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 1,538,029 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 1,538,029INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,538,029

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 911,887 $ 0 $ 0 $ 227,972 $ 0 $ 1,139,8593LC $ 0 $ 0 $ 0 $ 0 $ 398,170 $ 398,170TOTAL $ 911,887 $ 0 $ 0 $ 227,972 $ 398,170 $ 1,538,029

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 0924-06-574 2021 N/A T EL PASO $ 2,288,542LIMITS FROM DOWNTOWN TERMINAL - SANTA FE PROJECT SPONSOR SUN METRO

REVISION DATE 07/2018LIMITS TO FAR EAST TERMINAL - RC POE & EDGEMEREPROJECT MONTANA RTS 2ND YEAR OPERATING ASSISTANCE: 2ND YEAR OF MONTANA RTS OPERATIONS MPO PROJ NUM T092X

DESCR FUNDING CAT(S) 3LC,5REMARKS PROGRAM D2045 MTP, D19-22 TIP, 19-22 STIP, IN FY 20 PROJECT

P7 21. HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 2,288,542 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 2,288,542INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,288,542

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 911,887 $ 0 $ 0 $ 227,972 $ 0 $ 1,139,8593LC $ 0 $ 0 $ 0 $ 0 $ 1,148,683 $ 1,148,683TOTAL $ 911,887 $ 0 $ 0 $ 227,972 $ 1,148,683 $ 2,288,542

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 170: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 170 OF 696

10:03:31 AM EL PASO MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 0924-06-576 2021 N/A T EL PASO $ 2,117,901LIMITS FROM FATHER RAHM - DOWNTOWN TERMINAL PROJECT SPONSOR SUN METRO

REVISION DATE 07/2018LIMITS TO GLORY ROADPROJECT EL PASO STREETCAR 3RD YEAR OPERATING ASSISTANCE: 3RD YEAR OF STREETCAR OPERATION MPO PROJ NUM T108X-3

DESCR S FUNDING CAT(S) 3LC,5REMARKS PROGRAM D2045 MTP, D19-22 TIP, 19-22 STIP, IN FY 20 PROJECT

P7 21. HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 2,117,901 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 2,117,901INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,117,901

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 911,887 $ 0 $ 0 $ 227,972 $ 0 $ 1,139,8593LC $ 0 $ 0 $ 0 $ 0 $ 978,042 $ 978,042TOTAL $ 911,887 $ 0 $ 0 $ 227,972 $ 978,042 $ 2,117,901

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 0924-06-577 2021 CS C,E,ENV,ENG EL PASO $ 6,830,453LIMITS FROM CITYWIDE (PLEASE SEE TIP HISTORY FOR COMPLETE STREET NAMES) PROJECT SPONSOR COEP

REVISION DATE 07/2018LIMITS TO CITYWIDE (PLEASE SEE TIP HISTORY FOR COMPLETE STREET NAMES)PROJECT BICYCLE INFRASTRUCTURE CITYWIDE: CONSTRUCT BICYCLE FACILITIES CITYWIDE TO INCLUD MPO PROJ NUM M090X

DESCR E: BUFFERED BIKE LANES, CONVENTIONAL BIKE LANES, BICYCLE BOULEVARDS, SHARED LANE FUNDING CAT(S) 5MARKINGS, AND PROTECTED BICYCLE LANES.

REMARKS PROGRAM D2045 MTP, D19-22 TIP, 19-22 STIP, IN FY 20 PROJECTP7 21. HISTORY

TOTAL PROJECT COST INFORMATIONPREL ENG $ 415,286

ROW PURCH $ 0 COST OFCONSTR $ 6,415,167 APPROVED

CONST ENG $ 0 PHASESCONTING $ 0 $ 6,830,453INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 6,830,453

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 5,464,363 $ 0 $ 0 $ 1,366,090 $ 0 $ 6,830,453TOTAL $ 5,464,363 $ 0 $ 0 $ 1,366,090 $ 0 $ 6,830,453

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 2121-01-094 2021 IH 10 C EL PASO $ 60,418,920LIMITS FROM 0.25 MI EAST OF FM 1905 (TX/NM STATELINE) PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO SH 20 (MESA ST)PROJECT IH 10 WIDENING: WIDEN FROM 4 TO 6 LANES DIVIDED MPO PROJ NUM I405X-CAP

DESCR FUNDING CAT(S) 2M,7,11REMARKS PROGRAM D2045 MTP, D19-22 TIP, 19-22 STIP, IN FY 20 PROJECT

P7 21. HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 3,591,774ROW PURCH $ 0 COST OF

CONSTR $ 60,418,920 APPROVEDCONST ENG $ 3,151,965 PHASES

CONTING $ 131,943 $ 60,418,920INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 3,452,501TOTAL CST $ 70,747,103

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 29,584,000 $ 7,396,000 $ 0 $ 0 $ 0 $ 36,980,00011 $ 2,631,136 $ 657,784 $ 0 $ 0 $ 0 $ 3,288,9207 $ 16,120,000 $ 4,030,000 $ 0 $ 0 $ 0 $ 20,150,000TOTAL $ 48,335,136 $ 12,083,784 $ 0 $ 0 $ 0 $ 60,418,920

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 171: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 171 OF 696

10:03:31 AM EL PASO MPO - HIGHWAY PROJECTS

FY 2022

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 0924-06-570 2022 CS C,E,ENV,ENG EL PASO $ 4,272,273LIMITS FROM VARIOUS (PLEASE SEE TIP HISTORY FOR COMPLETE STREET NAMES) PROJECT SPONSOR COEP

REVISION DATE 07/2018LIMITS TO VARIOUS (PLEASE SEE TIP HISTORY FOR COMPLETE STREET NAMES)PROJECT DOWNTOWN BICYCLE IMPROVEMENTS PHASE I: CONSTRUCT BIKE FACILITIES DOWNTOWN TO INC MPO PROJ NUM M089A

DESCR LUDE: BUFFERED/CONVENTIONAL/PROTECTED BIKE LANES, BIKE BLVDS, SHARED LANE MARKIN FUNDING CAT(S) 5GS. PROJECT WILL INCLUDE ASSOCIATED SIGNAGE, WAYFINDING, STRIPING, INTERSECTIONTREATMENTS.

REMARKS PROGRAM D2045 MTP, D19-22 TIP, 19-22 STIP, IN FY 20 PROJECTP7 22 HISTORY

TOTAL PROJECT COST INFORMATIONPREL ENG $ 199,563

ROW PURCH $ 0 COST OFCONSTR $ 4,072,710 APPROVED

CONST ENG $ 0 PHASESCONTING $ 0 $ 4,272,273INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 4,272,273

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 3,417,819 $ 0 $ 0 $ 854,454 $ 0 $ 4,272,273TOTAL $ 3,417,819 $ 0 $ 0 $ 854,454 $ 0 $ 4,272,273

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 0924-06-575 2022 N/A T EL PASO $ 2,411,283LIMITS FROM DOWNTOWN TERMINAL - SANTA FE PROJECT SPONSOR SUN METRO

REVISION DATE 07/2018LIMITS TO FAR EAST TERMINAL - RC POE & EDGEMEREPROJECT MONTANA RTS 3RD YEAR OPERATING ASSISTANCE: 3RD YEAR OF MONTANA RTS OPERATIONS MPO PROJ NUM T097X

DESCR FUNDING CAT(S) 3LC,5REMARKS PROGRAM D2045 MTP, D19-22 TIP, 19-22 STIP, IN FY 20 PROJECT

P7 22. HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 2,411,283 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 2,411,283INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,411,283

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 973,322 $ 0 $ 0 $ 243,331 $ 0 $ 1,216,6533LC $ 0 $ 0 $ 0 $ 0 $ 1,194,630 $ 1,194,630TOTAL $ 973,322 $ 0 $ 0 $ 243,331 $ 1,194,630 $ 2,411,283

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 0924-06-566 2022 N/A E,ENV,ENG EL PASO $ 5,360,329LIMITS FROM CITY OF EL PASO CITY LIMITS. PROJECT SPONSOR COEP

REVISION DATE 07/2018LIMITS TO CITY OF EL PASO CITY LIMITS.PROJECT TRAFFIC MANAGEMENT CENTER UPGRADE PHASE 1: PROJECT INCLUDES THE UPGRADE OF THE C MPO PROJ NUM S301D

DESCR OEP TMC AND TRAFFIC SIGNAL CONTROLLER EQUIPMENT CITY WIDE. 1ST PHASE IS THE DESI FUNDING CAT(S) 5GN PHASE. PHASES 2-5 ARE THE IMPLEMENT AND CONSTRUCTION OF THE DESIGN.

REMARKS PROGRAM D2045 MTP, D19-22 TIP, 19-22 STIP, IN FY 20 PROJECTP7 22. HISTORY

TOTAL PROJECT COST INFORMATIONPREL ENG $ 5,360,329

ROW PURCH $ 0 COST OFCONSTR $ 18,845,200 APPROVED

CONST ENG $ 2,129,397 PHASESCONTING $ 0 $ 5,360,329INDIRECT $ 319,404BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 26,654,330

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 4,288,263 $ 0 $ 0 $ 1,072,066 $ 0 $ 5,360,329TOTAL $ 4,288,263 $ 0 $ 0 $ 1,072,066 $ 0 $ 5,360,329

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 172: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 172 OF 696

10:03:31 AM EL PASO MPO - HIGHWAY PROJECTS

FY 2022

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 2121-02-160 2022 IH 10 C EL PASO $ 60,540,000LIMITS FROM SH 20 (MESA ST) PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO IH 10/US 85/SUNLAND PARK INTERCHANGEPROJECT IH 10 WIDENING: WIDEN FROM 6 TO 8 LANES DIVIDED MPO PROJ NUM I406X-CAP

DESCR FUNDING CAT(S) 2M,7,11REMARKS PROGRAM D2045 MTP, D19-22 TIP, 19-22 STIP, IN FY 20 PROJECT

P7 22. HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 3,148,554ROW PURCH $ 0 COST OF

CONSTR $ 60,540,000 APPROVEDCONST ENG $ 3,128,710 PHASES

CONTING $ 130,969 $ 60,540,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 3,427,029TOTAL CST $ 70,375,262

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 29,248,000 $ 7,312,000 $ 0 $ 0 $ 0 $ 36,560,0007 $ 16,336,000 $ 4,084,000 $ 0 $ 0 $ 0 $ 20,420,00011 $ 2,848,000 $ 712,000 $ 0 $ 0 $ 0 $ 3,560,000TOTAL $ 48,432,000 $ 12,108,000 $ 0 $ 0 $ 0 $ 60,540,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

EL PASO EL PASO EL PASO 0924-06-571 2022 CS C,E,ENV,ENG EL PASO $ 597,282LIMITS FROM SAN ANTONIO AVENUE PROJECT SPONSOR COEP

REVISION DATE 07/2018LIMITS TO RIO GRANDE AVENUEPROJECT STANTON TWO-WAY CYCLE TRACK ROADWAY IMPROVEMENTS: PROJECT INCLUDES INSTALLATION MPO PROJ NUM E303X

DESCR OF TWO-WAY CYCLE TRACK FACILITIES. FUNDING CAT(S) 5REMARKS PROGRAM D2045 MTP, D19-22 TIP, 19-22 STIP, IN FY 20 PROJECT

P7 22. HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 27,900ROW PURCH $ 0 COST OF

CONSTR $ 569,382 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 597,282INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 597,282

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 477,826 $ 0 $ 0 $ 119,456 $ 0 $ 597,282TOTAL $ 477,826 $ 0 $ 0 $ 119,456 $ 0 $ 597,282

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 173: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

2019-2022Statewide TransportationImprovement ProgramHarlingen-San Benito MPOHighway Projects

Page 174: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 174 OF 696

10:03:31 AM HARLINGEN-SAN BENITO MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HARLINGEN-SAN BENITO CAMERON 0039-20-008 2019 SPUR 54 C HARLINGEN $ 7,341,446LIMITS FROM CHESTER PARK ROAD PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO I-69E SB FRONTAGE ROADPROJECT WIDEN ROADWAY TO SIX LANES W/ RAISED MEDIAN MPO PROJ NUM PHR-HSB-112

DESCR FUNDING CAT(S) 2UREMARKS ENVIRONMENTAL BY CCRMA PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 359,731ROW PURCH $ 0 COST OF

CONSTR $ 7,341,446 APPROVEDCONST ENG $ 468,384 PHASES

CONTING $ 94,705 $ 7,341,446INDIRECT $ 468,384BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 8,732,650

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2U $ 5,873,157 $ 1,468,289 $ 0 $ 0 $ 0 $ 7,341,446TOTAL $ 5,873,157 $ 1,468,289 $ 0 $ 0 $ 0 $ 7,341,446

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 175: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 175 OF 696

10:03:31 AM HARLINGEN-SAN BENITO MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HARLINGEN-SAN BENITO CAMERON 0921-06-312 2020 Loop 499 C,E HARLINGEN $ 519,019LIMITS FROM Rio Hondo Road PROJECT SPONSOR CITY OF HARLINGEN

REVISION DATE 07/2018LIMITS TO FM 106 (Harrison Ave)PROJECT Construction of 1.48 mi of ADA-accessible 6-ft wide sidewalks MPO PROJ NUM PHR-HSB-127

DESCR FUNDING CAT(S) 9TAPREMARKS Project Name: Harlingen - Loop 499 Sidewalks PROJECT TxDOT 2017 TSA selection 10/26/17

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 19,463ROW PURCH $ 0 COST OF

CONSTR $ 432,516 APPROVEDCONST ENG $ 45,414 PHASES

CONTING $ 0 $ 519,019INDIRECT $ 21,626BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 519,019

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 415,215 $ 69,203 $ 0 $ 34,601 $ 0 $ 519,019TOTAL $ 415,215 $ 69,203 $ 0 $ 34,601 $ 0 $ 519,019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HARLINGEN-SAN BENITO CAMERON 0921-06-311 2020 CS C,E PRIMERA $ 578,412LIMITS FROM 1000 feet north of Primera Road PROJECT SPONSOR CITY OF PRIMERA

REVISION DATE 07/2018LIMITS TO On Sturart Plce Rd from FM 2994/Wilson RoadPROJECT Construction of 1.2 mi of ADA-accessible 5 to 6 foot wide sidewalk MPO PROJ NUM PHR-HSB-128

DESCR FUNDING CAT(S) 9TAPREMARKS Project Name: Primera Stuart Place Road Sidewalks PROJECT TxDOT 2017 TASA selection 10/26/17

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 21,690ROW PURCH $ 0 COST OF

CONSTR $ 482,010 APPROVEDCONST ENG $ 50,611 PHASES

CONTING $ 0 $ 578,412INDIRECT $ 24,101BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 578,412

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 462,730 $ 77,122 $ 0 $ 38,560 $ 0 $ 578,412TOTAL $ 462,730 $ 77,122 $ 0 $ 38,560 $ 0 $ 578,412

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 176: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 176 OF 696

10:03:31 AM HARLINGEN-SAN BENITO MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HARLINGEN-SAN BENITO CAMERON 0921-06-252 2021 SPC C,E,R Harlingen/San Benito $ 8,855,400LIMITS FROM FM 509 PROJECT SPONSOR CAMERON COUNTY

REVISION DATE 07/2018LIMITS TO FM 2520PROJECT NEW LOCATION - 2 LANE RURAL ROADWAY IN A PROPOSED 120 FOOT ROW MPO PROJ NUM PHR-HSB-133

DESCR FUNDING CAT(S) 10,OtherREMARKS PROJECT NAME: South Parallel Corridor PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 525,000ROW PURCH $ 1,355,400 COST OF

CONSTR $ 7,500,000 APPROVEDCONST ENG $ 607,500 PHASES

CONTING $ 121,679 $ 8,855,400INDIRECT $ 465,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 10,574,579

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL10 $ 6,000,000 $ 1,500,000 $ 0 $ 0 $ 0 $ 7,500,000Other $ 0 $ 0 $ 0 $ 1,355,400 $ 0 $ 1,355,400TOTAL $ 6,000,000 $ 1,500,000 $ 0 $ 1,355,400 $ 0 $ 8,855,400

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HARLINGEN-SAN BENITO CAMERON 0342-03-037 2021 SH 107 C SANTA ROSA $ 10,185,300LIMITS FROM Louisiana St. PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO Hooks E. Hodges Rd.PROJECT Reconstruct to 4 lanes C&G and add ADA sidewalk MPO PROJ NUM PHR-HSB-118

DESCR FUNDING CAT(S) 2UREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 499,080ROW PURCH $ 0 COST OF

CONSTR $ 10,185,300 APPROVEDCONST ENG $ 649,822 PHASES

CONTING $ 131,390 $ 10,185,300INDIRECT $ 649,822BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 12,115,414

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2U $ 8,148,240 $ 2,037,060 $ 0 $ 0 $ 0 $ 10,185,300TOTAL $ 8,148,240 $ 2,037,060 $ 0 $ 0 $ 0 $ 10,185,300

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HARLINGEN-SAN BENITO CAMERON 0327-08-092 2021 I69 C HARLINGEN $ 2,758,554LIMITS FROM Industrial Blvd PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO Loop 499 / Primera RdPROJECT NB and SB Ramps Reversal MPO PROJ NUM PHR-HSB-115

DESCR FUNDING CAT(S) 2UREMARKS Project Name: I69E / US 77 Ramp Reversals PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 135,169ROW PURCH $ 0 COST OF

CONSTR $ 2,758,554 APPROVEDCONST ENG $ 175,996 PHASES

CONTING $ 35,585 $ 2,758,554INDIRECT $ 175,996BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 3,281,300

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2U $ 2,206,843 $ 551,711 $ 0 $ 0 $ 0 $ 2,758,554TOTAL $ 2,206,843 $ 551,711 $ 0 $ 0 $ 0 $ 2,758,554

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 177: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 177 OF 696

10:03:31 AM HARLINGEN-SAN BENITO MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HARLINGEN-SAN BENITO CAMERON 0921-06-254 2021 FM 509 C,E,R HARLINGEN $ 9,686,000LIMITS FROM FM 508 PROJECT SPONSOR CAMERON COUNTY RMA

REVISION DATE 07/2018LIMITS TO FM 1599PROJECT New Location 2 Lane Rural Roadway MPO PROJ NUM PHR-HSB-024

DESCR FUNDING CAT(S) 2U,10,OtherREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 686,000ROW PURCH $ 2,000,000 COST OF

CONSTR $ 7,000,000 APPROVEDCONST ENG $ 617,967 PHASES

CONTING $ 124,949 $ 9,686,000INDIRECT $ 617,967BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 11,046,883

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2U $ 5,600,000 $ 1,400,000 $ 0 $ 0 $ 0 $ 7,000,00010 $ 686,000 $ 0 $ 0 $ 0 $ 0 $ 686,000Other $ 0 $ 0 $ 0 $ 2,000,000 $ 0 $ 2,000,000TOTAL $ 6,286,000 $ 1,400,000 $ 0 $ 2,000,000 $ 0 $ 9,686,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 178: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

2019-2022Statewide TransportationImprovement ProgramHidalgo County MPOHighway Projects

Page 179: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 179 OF 696

10:03:31 AM HIDALGO COUNTY MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-395 2019 Inspiration RdE MISSION $ 1,276,483LIMITS FROM US 83 ON INSPIRATION PROJECT SPONSOR HIDALGO COUNTY

REVISION DATE 07/2018LIMITS TO MILITARY RD E TO FM 1016PROJECT WIDEN TO 4 LANE DIVIDED MPO PROJ NUM HC-341

DESCR FUNDING CAT(S) 3LCREMARKS E = PRELIMINARY ENGINEERING PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,276,483ROW PURCH $ 3,000,000 COST OF

CONSTR $ 17,651,200 APPROVEDCONST ENG $ 1,602,000 PHASES

CONTING $ 0 $ 1,276,483INDIRECT $ 1,094,374BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 24,624,057

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 1,276,483 $ 1,276,483TOTAL $ 0 $ 0 $ 0 $ 0 $ 1,276,483 $ 1,276,483

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-360 2019 MILE 10 N E HIDALGO COUNTY $ 992,840LIMITS FROM WESTGATE PROJECT SPONSOR HIDALGO COUNTY

REVISION DATE 07/2018LIMITS TO FM 1015PROJECT WIDEN TO 4 LANE URBAN MPO PROJ NUM HC-264

DESCR FUNDING CAT(S) 3LCREMARKS E = PRELIMINARY ENGINEERING PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 992,840ROW PURCH $ 2,200,000 COST OF

CONSTR $ 12,130,000 APPROVEDCONST ENG $ 1,579,775 PHASES

CONTING $ 0 $ 992,840INDIRECT $ 1,341,328BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 18,243,943

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 992,840 $ 992,840TOTAL $ 0 $ 0 $ 0 $ 0 $ 992,840 $ 992,840

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-338 2019 SHARP RD E HIDALGO COUNTY $ 119,473LIMITS FROM FM 1925 PROJECT SPONSOR HIDALGO COUNTY

REVISION DATE 07/2018LIMITS TO 0.46m NPROJECT ROAD REALIGNMENT 2 LANE RURAL ROADWAY MPO PROJ NUM HC-12ab

DESCR FUNDING CAT(S) 3LCREMARKS E = PRELIMINARY ENGINEERING PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 119,473ROW PURCH $ 650,000 COST OF

CONSTR $ 1,137,217 APPROVEDCONST ENG $ 125,750 PHASES

CONTING $ 0 $ 119,473INDIRECT $ 70,507BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,102,947

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 119,473 $ 119,473TOTAL $ 0 $ 0 $ 0 $ 0 $ 119,473 $ 119,473

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 180: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 180 OF 696

10:03:31 AM HIDALGO COUNTY MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-380 2019 MILE 5 N E MCALLEN $ 671,870LIMITS FROM TAYLOR RD PROJECT SPONSOR HIDALGO COUNTY

REVISION DATE 07/2018LIMITS TO FM 2220PROJECT WIDEN TO 4 LANE DIVIDED WITH SIPHON AND BOXES MPO PROJ NUM HC-144

DESCR FUNDING CAT(S) 3LCREMARKS E = PRELIMINARY ENGINEERING PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 671,870ROW PURCH $ 1,000,000 COST OF

CONSTR $ 4,500,000 APPROVEDCONST ENG $ 500,000 PHASES

CONTING $ 0 $ 671,870INDIRECT $ 279,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 6,950,870

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 671,870 $ 671,870TOTAL $ 0 $ 0 $ 0 $ 0 $ 671,870 $ 671,870

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-405 2019 CESAR CHAVEZE VARIOUS $ 1,151,217LIMITS FROM NOLANA LOOP PROJECT SPONSOR HIDALGO COUNTY

REVISION DATE 07/2018LIMITS TO BUSINESS 83PROJECT DIVIDED URBAN SECTION MPO PROJ NUM HC-326

DESCR FUNDING CAT(S) 3LCREMARKS E = PRELIMINARY ENGINEERING PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,151,217ROW PURCH $ 4,570,000 COST OF

CONSTR $ 18,064,345 APPROVEDCONST ENG $ 2,567,723 PHASES

CONTING $ 0 $ 1,151,217INDIRECT $ 2,004,892BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 28,358,177

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 1,151,217 $ 1,151,217TOTAL $ 0 $ 0 $ 0 $ 0 $ 1,151,217 $ 1,151,217

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-399 2019 CESAR CHAVEZE VARIOUS $ 249,994LIMITS FROM BUSINESS 83 PROJECT SPONSOR HIDALGO COUNTY

REVISION DATE 07/2018LIMITS TO RIDGE RDPROJECT DIVIDED URBAN SECTION MPO PROJ NUM HC-344

DESCR FUNDING CAT(S) 3LCREMARKS E = PRELIMINARY ENGINEERING PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 249,994ROW PURCH $ 1,000,000 COST OF

CONSTR $ 6,193,200 APPROVEDCONST ENG $ 655,000 PHASES

CONTING $ 0 $ 249,994INDIRECT $ 383,978BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 8,482,172

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 249,994 $ 249,994TOTAL $ 0 $ 0 $ 0 $ 0 $ 249,994 $ 249,994

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 181: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 181 OF 696

10:03:31 AM HIDALGO COUNTY MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-321 2019 MILE 3 N E HIDALGO COUNTY $ 526,451LIMITS FROM TOM GILL RD PROJECT SPONSOR HIDALGO COUNTY

REVISION DATE 07/2018LIMITS TO FM 492PROJECT WIDEN TO 4 LANE DIVIDED - CURB & GUTTER SECTION MPO PROJ NUM HC-286a

DESCR FUNDING CAT(S) 3LCREMARKS E = PRELIMINARY ENGINEERING PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 526,451ROW PURCH $ 1,186,754 COST OF

CONSTR $ 14,389,614 APPROVEDCONST ENG $ 1,637,306 PHASES

CONTING $ 0 $ 526,451INDIRECT $ 613,156BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 18,353,281

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 526,451 $ 526,451TOTAL $ 0 $ 0 $ 0 $ 0 $ 526,451 $ 526,451

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-403 2019 ELDORA RDR,ACQ,UTL PHARR $ 1,200,000LIMITS FROM FM 3362 PROJECT SPONSOR HIDALGO COUNTY

REVISION DATE 07/2018LIMITS TO VETERANS BLVDPROJECT DIVIDED URBAN SECTION MPO PROJ NUM HC-322r

DESCR FUNDING CAT(S) 7REMARKS PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 893,159ROW PURCH $ 1,200,000 COST OF

CONSTR $ 12,204,142 APPROVEDCONST ENG $ 1,518,417 PHASES

CONTING $ 0 $ 1,200,000INDIRECT $ 856,847BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 16,672,565

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 960,000 $ 0 $ 0 $ 240,000 $ 0 $ 1,200,000TOTAL $ 960,000 $ 0 $ 0 $ 240,000 $ 0 $ 1,200,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-403 2019 ELDORA RDE PHARR $ 893,159LIMITS FROM FM 3362 PROJECT SPONSOR HIDALGO COUNTY

REVISION DATE 07/2018LIMITS TO VETERANS BLVDPROJECT DIVIDED URBAN SECTION MPO PROJ NUM HC-322

DESCR FUNDING CAT(S) 3LCREMARKS E = PRELIMINARY ENGINEERING PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 893,159ROW PURCH $ 1,200,000 COST OF

CONSTR $ 12,204,142 APPROVEDCONST ENG $ 1,518,417 PHASES

CONTING $ 0 $ 893,159INDIRECT $ 856,847BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 16,672,565

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 893,159 $ 893,159TOTAL $ 0 $ 0 $ 0 $ 0 $ 893,159 $ 893,159

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 182: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 182 OF 696

10:03:31 AM HIDALGO COUNTY MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-322 2019 LIBERTY BLVDR,ACQ,UTL HIDALGO COUNTY $ 2,030,000LIMITS FROM MILE 3 RD PROJECT SPONSOR HIDALGO COUNTY

REVISION DATE 07/2018LIMITS TO FM 2221PROJECT CONSTRUCT 2 LANES WITH SHOULDERS MPO PROJ NUM HC-284br

DESCR FUNDING CAT(S) 7REMARKS PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 347,988ROW PURCH $ 2,030,000 COST OF

CONSTR $ 8,598,629 APPROVEDCONST ENG $ 1,576,755 PHASES

CONTING $ 0 $ 2,030,000INDIRECT $ 784,583BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 13,337,955

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 1,624,000 $ 0 $ 0 $ 406,000 $ 0 $ 2,030,000TOTAL $ 1,624,000 $ 0 $ 0 $ 406,000 $ 0 $ 2,030,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-312 2019 DICKER RDC,E,R MCALLEN $ 18,358,500LIMITS FROM SPUR 115 (23RD ST) PROJECT SPONSOR HIDALGO COUNTY

REVISION DATE 07/2018LIMITS TO FM 2061 (JACKSON RD)PROJECT WIDEN TO 4 LANE WITH CONTINUOUS LEFT TURN MPO PROJ NUM HC-291

DESCR FUNDING CAT(S) 7REMARKS CAT 7 $1,400,000 FOR ROW, $1,460,500 FOR CE, AND $1 PROJECT NEW PROJECT

P7 5,498,000 FOR CONSTRUCTION HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,667,175ROW PURCH $ 1,400,000 COST OF

CONSTR $ 15,498,000 APPROVEDCONST ENG $ 1,460,500 PHASES

CONTING $ 0 $ 18,358,500INDIRECT $ 787,400BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 20,813,075

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 14,686,800 $ 0 $ 0 $ 3,671,700 $ 0 $ 18,358,500TOTAL $ 14,686,800 $ 0 $ 0 $ 3,671,700 $ 0 $ 18,358,500

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-155 2019 SIGNAL IMPC VARIOUS $ 1,000,000LIMITS FROM WITHIN HIDALGO COUNTY PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO WITHIN HIDALGO COUNTYPROJECT TRAFFIC SIGNAL HARDWARE IMPROVEMENTS MPO PROJ NUM HC-363

DESCR FUNDING CAT(S) 7REMARKS PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 49,000ROW PURCH $ 0 COST OF

CONSTR $ 1,000,000 APPROVEDCONST ENG $ 75,000 PHASES

CONTING $ 70,000 $ 1,000,000INDIRECT $ 62,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,256,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 800,000 $ 0 $ 0 $ 200,000 $ 0 $ 1,000,000TOTAL $ 800,000 $ 0 $ 0 $ 200,000 $ 0 $ 1,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 183: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 183 OF 696

10:03:31 AM HIDALGO COUNTY MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-389 2019 PED SAFETY PLAE PHARR $ 254,000LIMITS FROM CITY LIMITS PROJECT SPONSOR PHARR

REVISION DATE 07/2018LIMITS TO CITY LIMITSPROJECT PLANNING STUDY FOR NEW CONSTRUCTION PEDESTRIAN SAFETY IMPROVEMENTS MPO PROJ NUM HC-357

DESCR FUNDING CAT(S) 3LC,9TAPREMARKS E = PRELIMINARY ENGINEERING PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 254,000ROW PURCH $ 0 COST OF

CONSTR $ 0 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 254,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 254,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 134,000 $ 0 $ 0 $ 33,500 $ 0 $ 167,5003LC $ 0 $ 0 $ 0 $ 0 $ 86,500 $ 86,500TOTAL $ 134,000 $ 0 $ 0 $ 33,500 $ 86,500 $ 254,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-390 2019 VISION ZERO STE MCALLEN $ 150,000LIMITS FROM CITY LIMITS PROJECT SPONSOR MCALLEN

REVISION DATE 07/2018LIMITS TO CITY LIMITSPROJECT VISION ZERO PLANNING STUDY MPO PROJ NUM HC-356

DESCR FUNDING CAT(S) 9TAPREMARKS E = PRELIMINARY ENGINEERING PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 150,000ROW PURCH $ 0 COST OF

CONSTR $ 0 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 150,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 150,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 120,000 $ 0 $ 0 $ 30,000 $ 0 $ 150,000TOTAL $ 120,000 $ 0 $ 0 $ 30,000 $ 0 $ 150,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-383 2019 PHARR POEC,E PHARR $ 2,715,370LIMITS FROM PHARR INT’L BRIDGE PROJECT SPONSOR PHARR

REVISION DATE 07/2018LIMITS TOPROJECT CONSTRUCTION OF ADDITIONAL EXIT LANE AND RELATED CANOPIES AND BOOTHS OUT OF PHAR MPO PROJ NUM HC-355

DESCR R POE BSIF FUNDING CAT(S) 3LC,10REMARKS E = CONSTRUCTION ENGINEERING PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 255,000ROW PURCH $ 0 COST OF

CONSTR $ 2,500,370 APPROVEDCONST ENG $ 215,000 PHASES

CONTING $ 164,000 $ 2,715,370INDIRECT $ 155,023BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 3,289,393

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL10 $ 2,000,296 $ 0 $ 0 $ 500,074 $ 0 $ 2,500,3703LC $ 0 $ 0 $ 0 $ 0 $ 215,000 $ 215,000TOTAL $ 2,000,296 $ 0 $ 0 $ 500,074 $ 215,000 $ 2,715,370

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 184: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 184 OF 696

10:03:31 AM HIDALGO COUNTY MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-385 2019 PHARR POEC,E PHARR $ 2,692,462LIMITS FROM PHARR INT’L BRIDGE PROJECT SPONSOR PHARR

REVISION DATE 07/2018LIMITS TOPROJECT CONSTRUCTION OF ADDITIONAL NORTHBOUND LANE AND RELATED CANOPIES AND BOOTHS INTO MPO PROJ NUM HC-354

DESCR THE PHARR POE INSPECTION AREA FUNDING CAT(S) 3LC,10REMARKS E = CONSTRUCTION ENGINEERING PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 165,000ROW PURCH $ 0 COST OF

CONSTR $ 2,564,250 APPROVEDCONST ENG $ 128,212 PHASES

CONTING $ 256,425 $ 2,692,462INDIRECT $ 158,984BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 3,272,871

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL10 $ 2,101,270 $ 0 $ 0 $ 525,318 $ 0 $ 2,626,5883LC $ 0 $ 0 $ 0 $ 0 $ 65,874 $ 65,874TOTAL $ 2,101,270 $ 0 $ 0 $ 525,318 $ 65,874 $ 2,692,462

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-382 2019 DONNA INTL POER,ACQ,UTL DONNA $ 3,300,000LIMITS FROM DONNA BSIF PROJECT SPONSOR DONNA

REVISION DATE 07/2018LIMITS TO FUTURE IBTC / FM 493 INTERSECTIONPROJECT CONSTRUCT 4 LANE CONTROLLED ACCESS TOLLED FACILITY MPO PROJ NUM HC-275r

DESCR FUNDING CAT(S) 3LCREMARKS PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 3,300,000 COST OF

CONSTR $ 51,821,636 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 3,300,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 55,121,636

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 3,300,000 $ 3,300,000TOTAL $ 0 $ 0 $ 0 $ 0 $ 3,300,000 $ 3,300,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0342-01-074 2019 SH 107 C EDINBURG $ 15,216,588LIMITS FROM US 281 MILITARY PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO FM 493PROJECT CONSTRUCT 6 LANE DIVIDED RURAL MPO PROJ NUM HC-227

DESCR FUNDING CAT(S) 2MREMARKS PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 168,000ROW PURCH $ 0 COST OF

CONSTR $ 15,216,588 APPROVEDCONST ENG $ 200,000 PHASES

CONTING $ 260,000 $ 15,216,588INDIRECT $ 248,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 16,092,588

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 0 $ 15,216,588 $ 0 $ 0 $ 0 $ 15,216,588TOTAL $ 0 $ 15,216,588 $ 0 $ 0 $ 0 $ 15,216,588

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 185: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 185 OF 696

10:03:31 AM HIDALGO COUNTY MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-352 2019 BICENTENNIAL BC MCALLEN $ 14,679,967LIMITS FROM SH 107 PROJECT SPONSOR MCALLEN

REVISION DATE 07/2018LIMITS TO TRENTON RDPROJECT CONSTRUCT NEW 4 LANE URBAN ROADWAY MPO PROJ NUM HC-91

DESCR FUNDING CAT(S) 3LC,7,10REMARKS CAT 10 = EARMARK FUNDING PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,444,700ROW PURCH $ 200,000 COST OF

CONSTR $ 14,679,967 APPROVEDCONST ENG $ 660,599 PHASES

CONTING $ 1,415,033 $ 14,679,967INDIRECT $ 366,999BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 18,767,298

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 6,996,400 $ 1,539,208 $ 0 $ 209,892 $ 0 $ 8,745,50010 $ 600,885 $ 132,194 $ 0 $ 18,027 $ 0 $ 751,1063LC $ 0 $ 0 $ 0 $ 0 $ 5,183,361 $ 5,183,361TOTAL $ 7,597,285 $ 1,671,402 $ 0 $ 227,919 $ 5,183,361 $ 14,679,967

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-374 2019 OWASSA R,ACQ,UTL HIDALGO COUNTY $ 800,000LIMITS FROM I RD PROJECT SPONSOR HIDALGO COUNTY

REVISION DATE 07/2018LIMITS TO CESAR CHAVEZPROJECT CONSTRUCT A 4 LANE URBAN ROADWAY MPO PROJ NUM HC-335r

DESCR FUNDING CAT(S) 7REMARKS NEW PROJECT PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 800,000 COST OF

CONSTR $ 0 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 800,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 800,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 640,000 $ 0 $ 0 $ 160,000 $ 0 $ 800,000TOTAL $ 640,000 $ 0 $ 0 $ 160,000 $ 0 $ 800,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 1064-01-027 2019 FM 676 R,ACQ,UTL HIDALGO COUNTY $ 500,738LIMITS FROM SH 107 PROJECT SPONSOR HIDALGO COUNTY

REVISION DATE 07/2018LIMITS TO TAYLOR RDPROJECT WIDEN TO 4 LANE DIVIDED MPO PROJ NUM HC-117r

DESCR FUNDING CAT(S) 10REMARKS EARMARK FUNDING PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 493,693ROW PURCH $ 918,775 COST OF

CONSTR $ 10,075,374 APPROVEDCONST ENG $ 453,392 PHASES

CONTING $ 654,899 $ 500,738INDIRECT $ 624,673BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 13,220,806

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL10 $ 400,590 $ 0 $ 0 $ 100,148 $ 0 $ 500,738TOTAL $ 400,590 $ 0 $ 0 $ 100,148 $ 0 $ 500,738

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 186: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 186 OF 696

10:03:31 AM HIDALGO COUNTY MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-368 2019 365 TOLLWAYC,E HCRMA $ 192,073,995LIMITS FROM US 281 MILITARY PROJECT SPONSOR HCRMA

REVISION DATE 07/2018LIMITS TO FM 396PROJECT A TOLL IMPROVEMENT BEING A 4 LANE CONTROLLED ACCESS FACILITY MPO PROJ NUM RMA-1aa

DESCR FUNDING CAT(S) 3LC,12,OtherREMARKS E = CONSTRUCTION ENGINEERING, OTHER FUNDING = VEHIC PROJECT NEW PROJECT

P7 LE REGISTRATION FEES HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 16,757,371ROW PURCH $ 36,242,588 COST OF

CONSTR $ 174,178,506 APPROVEDCONST ENG $ 8,925,296 PHASES

CONTING $ 0 $ 192,073,995INDIRECT $ 8,970,193BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 245,073,954

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALOther $ 0 $ 14,386,688 $ 0 $ 0 $ 0 $ 14,386,68812 $ 89,644,588 $ 22,411,147 $ 0 $ 0 $ 0 $ 112,055,7353LC $ 0 $ 0 $ 0 $ 0 $ 65,631,572 $ 65,631,572TOTAL $ 89,644,588 $ 36,797,835 $ 0 $ 0 $ 65,631,572 $ 192,073,995

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-194 2019 LIBERTY BLVDR,ACQ,UTL PENITAS $ 1,185,242LIMITS FROM US 83 PROJECT SPONSOR HIDALGO COUNTY

REVISION DATE 07/2018LIMITS TO MILE 3 RDPROJECT WIDEN TO 4 LANES WITH DEDICATED LEFT TURN LANE MPO PROJ NUM HC-284ar

DESCR FUNDING CAT(S) 3LC,7,10REMARKS CAT 10=EARMARK FUNDING PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 219,782ROW PURCH $ 1,185,242 COST OF

CONSTR $ 9,448,858 APPROVEDCONST ENG $ 1,086,619 PHASES

CONTING $ 0 $ 1,185,242INDIRECT $ 585,829BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 12,526,330

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL10 $ 560,826 $ 0 $ 0 $ 140,206 $ 0 $ 701,0323LC $ 0 $ 0 $ 0 $ 0 $ 84,210 $ 84,2107 $ 320,000 $ 0 $ 0 $ 80,000 $ 0 $ 400,000TOTAL $ 880,826 $ 0 $ 0 $ 220,206 $ 84,210 $ 1,185,242

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-361 2019 NOLANA LOOPR,ACQ,UTL MCALLEN $ 2,000,000LIMITS FROM FM 1426 PROJECT SPONSOR HIDALGO COUNTY

REVISION DATE 07/2018LIMITS TO 0.25m E FM 907PROJECT WIDEN TO 4 LANE DIVIDED MPO PROJ NUM HC-152ar

DESCR FUNDING CAT(S) 10REMARKS CAT 10 = EARMARK FUNDING PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 230,275ROW PURCH $ 2,000,000 COST OF

CONSTR $ 10,792,787 APPROVEDCONST ENG $ 1,200,000 PHASES

CONTING $ 701,531 $ 2,000,000INDIRECT $ 669,153BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 15,593,746

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL10 $ 1,600,000 $ 0 $ 0 $ 400,000 $ 0 $ 2,000,000TOTAL $ 1,600,000 $ 0 $ 0 $ 400,000 $ 0 $ 2,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 187: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 187 OF 696

10:03:31 AM HIDALGO COUNTY MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-346 2019 HIKE BIKE C,E VARIOUS $ 6,440,000LIMITS FROM S SAN ANTONIO AVE PROJECT SPONSOR HIDALGO COUNTY

REVISION DATE 07/2018LIMITS TO S 2ND STPROJECT PROPOSED LOCATION OF HIKE & BIKE TRAIL CONNECTIVITY MPO PROJ NUM HC-329

DESCR FUNDING CAT(S) 7,9TAPREMARKS PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 5,600,000 APPROVEDCONST ENG $ 840,000 PHASES

CONTING $ 0 $ 6,440,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 6,440,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 4,520,000 $ 1,063,500 $ 0 $ 56,500 $ 0 $ 5,640,0007 $ 640,000 $ 0 $ 0 $ 160,000 $ 0 $ 800,000TOTAL $ 5,160,000 $ 1,063,500 $ 0 $ 216,500 $ 0 $ 6,440,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0621-01-106 2019 SH 336 C MCALLEN $ 77,958LIMITS FROM INTERSECTION BUSINESS US 83 PROJECT SPONSOR MCALLEN

REVISION DATE 07/2018LIMITS TO 135ft S INTERSECTION US BUSINESS 83PROJECT ADDITION OF NORTHBOUND RIGHT TURN LANE MPO PROJ NUM HC-312

DESCR FUNDING CAT(S) 7REMARKS PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 3,587ROW PURCH $ 31,000 COST OF

CONSTR $ 73,200 APPROVEDCONST ENG $ 3,660 PHASES

CONTING $ 4,758 $ 77,958INDIRECT $ 4,538BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 120,743

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 62,366 $ 0 $ 0 $ 15,592 $ 0 $ 77,958TOTAL $ 62,366 $ 0 $ 0 $ 15,592 $ 0 $ 77,958

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 1804-01-072 2019 FM 1926 C MCALLEN $ 116,618LIMITS FROM FM 1926 & JACKSON AVE PROJECT SPONSOR MCALLEN

REVISION DATE 07/2018LIMITS TOPROJECT ADDITION OF NORTH AND SOUTHBOUND CENTER TURN LANES MPO PROJ NUM HC-314

DESCR FUNDING CAT(S) 7REMARKS PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 5,366ROW PURCH $ 31,000 COST OF

CONSTR $ 109,500 APPROVEDCONST ENG $ 5,475 PHASES

CONTING $ 7,118 $ 116,618INDIRECT $ 6,789BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 165,248

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 93,294 $ 0 $ 0 $ 23,324 $ 0 $ 116,618TOTAL $ 93,294 $ 0 $ 0 $ 23,324 $ 0 $ 116,618

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 188: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 188 OF 696

10:03:31 AM HIDALGO COUNTY MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 1804-01-071 2019 FM 1926 C MCALLEN $ 141,219LIMITS FROM FM 1926 & EBONY AVE PROJECT SPONSOR MCALLEN

REVISION DATE 07/2018LIMITS TOPROJECT ADDITION OF EAST, NORTH, AND SOUTHBOUND CENTER TURN LANES MPO PROJ NUM HC-313

DESCR FUNDING CAT(S) 7REMARKS PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 6,497ROW PURCH $ 21,000 COST OF

CONSTR $ 132,600 APPROVEDCONST ENG $ 6,630 PHASES

CONTING $ 8,619 $ 141,219INDIRECT $ 8,221BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 183,567

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 112,975 $ 0 $ 0 $ 28,244 $ 0 $ 141,219TOTAL $ 112,975 $ 0 $ 0 $ 28,244 $ 0 $ 141,219

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 1804-01-069 2019 FM 1926 C MCALLEN $ 94,785LIMITS FROM FM 1926 & KENDLEWOOD AVE PROJECT SPONSOR MCALLEN

REVISION DATE 07/2018LIMITS TOPROJECT ADDITION OF NORTH AND SOUTHBOUND CENTER TURN LANES MPO PROJ NUM HC-311

DESCR FUNDING CAT(S) 7REMARKS PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 4,361ROW PURCH $ 16,000 COST OF

CONSTR $ 89,000 APPROVEDCONST ENG $ 4,450 PHASES

CONTING $ 5,785 $ 94,785INDIRECT $ 5,518BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 125,114

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 75,828 $ 0 $ 0 $ 18,957 $ 0 $ 94,785TOTAL $ 75,828 $ 0 $ 0 $ 18,957 $ 0 $ 94,785

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 1804-01-068 2019 FM 1926 C MCALLEN $ 86,265LIMITS FROM FM 1926 & HACKBERRY AVE PROJECT SPONSOR MCALLEN

REVISION DATE 07/2018LIMITS TOPROJECT ADDITION OF NORTH AND SOUTHBOUND CENTER TURN LANES MPO PROJ NUM HC-310

DESCR FUNDING CAT(S) 7REMARKS PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 3,969ROW PURCH $ 16,000 COST OF

CONSTR $ 81,000 APPROVEDCONST ENG $ 4,050 PHASES

CONTING $ 5,265 $ 86,265INDIRECT $ 5,022BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 115,306

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 69,012 $ 0 $ 0 $ 17,253 $ 0 $ 86,265TOTAL $ 69,012 $ 0 $ 0 $ 17,253 $ 0 $ 86,265

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 189: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 189 OF 696

10:03:31 AM HIDALGO COUNTY MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0865-01-108 2019 VETERANS SH495R,ACQ,UTL PALMVIEW $ 2,699,360LIMITS FROM IH-2/US 83 PROJECT SPONSOR HIDALGO COUNTY

REVISION DATE 07/2018LIMITS TO SH 364 (LA HOMA RD)PROJECT 4 LANES DIVIDED URBAN FROM ABRAM RD TO SH 364 AND OVERLAY ABRAM RD FROM IH-2 TO MPO PROJ NUM HC-50r

DESCR VETERANS BLVD FUNDING CAT(S) 7REMARKS PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 843,140ROW PURCH $ 2,699,360 COST OF

CONSTR $ 11,360,000 APPROVEDCONST ENG $ 511,200 PHASES

CONTING $ 738,400 $ 2,699,360INDIRECT $ 704,320BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 16,856,420

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 2,159,488 $ 0 $ 0 $ 539,872 $ 0 $ 2,699,360TOTAL $ 2,159,488 $ 0 $ 0 $ 539,872 $ 0 $ 2,699,360

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-328 2019 TAYLOR RDR,ACQ,UTL MISSION $ 2,011,852LIMITS FROM BUSINESS 83 PROJECT SPONSOR HIDALGO COUNTY

REVISION DATE 07/2018LIMITS TO MILE 2 NPROJECT 4 LANE DIVIDED URBAN SECTION WITH 1 BRIDGE WIDENING AND 1 BRIDGE CLASS IRRIGATIO MPO PROJ NUM HC-257r

DESCR N SIPHON FUNDING CAT(S) 7REMARKS PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 743,333ROW PURCH $ 2,011,852 COST OF

CONSTR $ 6,006,390 APPROVEDCONST ENG $ 887,802 PHASES

CONTING $ 376,725 $ 2,011,852INDIRECT $ 359,337BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 10,385,439

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 1,609,482 $ 0 $ 0 $ 402,370 $ 0 $ 2,011,852TOTAL $ 1,609,482 $ 0 $ 0 $ 402,370 $ 0 $ 2,011,852

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-327 2019 TAYLOR RDR,ACQ,UTL MISSION $ 1,192,488LIMITS FROM BUSINESS 83 PROJECT SPONSOR HIDALGO COUNTY

REVISION DATE 07/2018LIMITS TO I-2 (US 83)PROJECT WIDEN TO 4 LANES WITH LEFT TURN LANE MPO PROJ NUM HC-256r

DESCR FUNDING CAT(S) 7REMARKS PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 371,667ROW PURCH $ 1,192,488 COST OF

CONSTR $ 4,500,000 APPROVEDCONST ENG $ 500,000 PHASES

CONTING $ 365,050 $ 1,192,488INDIRECT $ 348,202BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 7,277,407

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 953,990 $ 0 $ 0 $ 238,498 $ 0 $ 1,192,488TOTAL $ 953,990 $ 0 $ 0 $ 238,498 $ 0 $ 1,192,488

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 190: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 190 OF 696

10:03:31 AM HIDALGO COUNTY MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-311 2019 N ALAMO RDC HIDALGO COUNTY $ 804,981LIMITS FROM 0.5m NORTH PROJECT SPONSOR HIDALGO COUNTY

REVISION DATE 07/2018LIMITS TO FM 1925PROJECT NEW LOCATION 2 LANE RURAL ROADWAY MPO PROJ NUM HC-289

DESCR FUNDING CAT(S) 7REMARKS PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 34,449ROW PURCH $ 200,000 COST OF

CONSTR $ 703,040 APPROVEDCONST ENG $ 52,728 PHASES

CONTING $ 49,213 $ 804,981INDIRECT $ 43,588BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,083,018

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 643,985 $ 0 $ 0 $ 160,996 $ 0 $ 804,981TOTAL $ 643,985 $ 0 $ 0 $ 160,996 $ 0 $ 804,981

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-169 2019 NOLANA E HIDALGO COUNTY $ 230,275LIMITS FROM FM 1426 (RAUL LONGORIA) PROJECT SPONSOR HIDALGO COUNTY

REVISION DATE 07/2018LIMITS TO FM 88PROJECT RECONSTRUCT & WIDEN TO 2 LANES WITH SHOULDERS MPO PROJ NUM HC-152

DESCR FUNDING CAT(S) 3LCREMARKS E = PRELIMINARY ENGINEERING PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 230,275ROW PURCH $ 2,573,503 COST OF

CONSTR $ 16,000,000 APPROVEDCONST ENG $ 720,000 PHASES

CONTING $ 1,040,000 $ 230,275INDIRECT $ 992,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 21,555,778

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 230,275 $ 230,275TOTAL $ 0 $ 0 $ 0 $ 0 $ 230,275 $ 230,275

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-322 2019 LIBERTY BLVDE HIDALGO COUNTY $ 347,988LIMITS FROM MILE 3 RD PROJECT SPONSOR HIDALGO COUNTY

REVISION DATE 07/2018LIMITS TO FM 2221PROJECT CONSTRUCT 2 LANES WITH SHOULDERS MPO PROJ NUM HC-284b

DESCR FUNDING CAT(S) 3LCREMARKS E = PRELIMINARY ENGINEERING PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 347,988ROW PURCH $ 2,030,000 COST OF

CONSTR $ 8,598,629 APPROVEDCONST ENG $ 1,576,755 PHASES

CONTING $ 0 $ 347,988INDIRECT $ 784,583BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 13,337,955

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 347,988 $ 347,988TOTAL $ 0 $ 0 $ 0 $ 0 $ 347,988 $ 347,988

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 191: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 191 OF 696

10:03:31 AM HIDALGO COUNTY MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-332 2019 MILE 3 N E HIDALGO COUNTY $ 346,349LIMITS FROM TOM GILL RD PROJECT SPONSOR HIDALGO COUNTY

REVISION DATE 07/2018LIMITS TO FM 2221PROJECT NEW LOCATION 2 LANE RURAL ROADWAY MPO PROJ NUM HC-286b

DESCR FUNDING CAT(S) 3LCREMARKS E = PRELIMINARY ENGINEERING PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 346,349ROW PURCH $ 750,000 COST OF

CONSTR $ 5,750,000 APPROVEDCONST ENG $ 690,000 PHASES

CONTING $ 0 $ 346,349INDIRECT $ 356,500BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 7,892,849

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 346,349 $ 346,349TOTAL $ 0 $ 0 $ 0 $ 0 $ 346,349 $ 346,349

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-312 2019 DICKER RDE MCALLEN $ 1,667,175LIMITS FROM SPUR 115 (23RD ST) PROJECT SPONSOR HIDALGO COUNTY

REVISION DATE 07/2018LIMITS TO FM 2061 (JACKSON RD)PROJECT WIDEN TO 4 LANE WITH CONTINUOUS LEFT TURN MPO PROJ NUM HC-291

DESCR FUNDING CAT(S) 3LCREMARKS E = PRELIMINARY ENGINEERING PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,667,175ROW PURCH $ 1,400,000 COST OF

CONSTR $ 15,498,000 APPROVEDCONST ENG $ 1,460,500 PHASES

CONTING $ 0 $ 1,667,175INDIRECT $ 787,400BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 20,813,075

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 1,667,175 $ 1,667,175TOTAL $ 0 $ 0 $ 0 $ 0 $ 1,667,175 $ 1,667,175

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 3629-01-001 2019 SH 68 R,ACQ,UTL HIDALGO COUNTY $ 23,500,000LIMITS FROM US 83 PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO FM 1925PROJECT CONSTRUCT NEW 4 LANE DIVIDED RURAL HIGHWAY FACILITY MPO PROJ NUM HC-295b

DESCR FUNDING CAT(S) 12REMARKS PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 6,500,000ROW PURCH $ 23,500,000 COST OF

CONSTR $ 55,000,000 APPROVEDCONST ENG $ 2,475,000 PHASES

CONTING $ 3,850,000 $ 23,500,000INDIRECT $ 3,410,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 94,735,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL12 $ 18,800,000 $ 4,700,000 $ 0 $ 0 $ 0 $ 23,500,000TOTAL $ 18,800,000 $ 4,700,000 $ 0 $ 0 $ 0 $ 23,500,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 192: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 192 OF 696

10:03:31 AM HIDALGO COUNTY MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-254 2019 Mile 1 East E MERCEDES $ 778,050LIMITS FROM BUSINESS 83 PROJECT SPONSOR MERCEDES

REVISION DATE 07/2018LIMITS TO MILE 8 NPROJECT RECONSTRUCT AND WIDEN TO URBAN 2 LANES & SHOULDERS MPO PROJ NUM HC-269

DESCR FUNDING CAT(S) 10REMARKS E = PRELIMINARY ENGINEERING, CAT 10 = EARMARK FUNDI PROJECT NEW PROJECT

P7 NG HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 778,050ROW PURCH $ 502,000 COST OF

CONSTR $ 9,053,611 APPROVEDCONST ENG $ 756,800 PHASES

CONTING $ 588,485 $ 778,050INDIRECT $ 561,324BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 12,240,270

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL10 $ 622,440 $ 0 $ 0 $ 155,610 $ 0 $ 778,050TOTAL $ 622,440 $ 0 $ 0 $ 155,610 $ 0 $ 778,050

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 193: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 193 OF 696

10:03:31 AM HIDALGO COUNTY MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 1803-01-092 2020 FM 1925 R,ACQ,UTL EDINBURG $ 630,000LIMITS FROM 10TH ST PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO MCCOLL RDPROJECT WIDEN TO 6 LANE WITH RAISED MEDIAN MPO PROJ NUM HC-290r

DESCR FUNDING CAT(S) 2MREMARKS PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 403,760ROW PURCH $ 630,000 COST OF

CONSTR $ 8,240,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 535,600 $ 630,000INDIRECT $ 510,880BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 10,320,240

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 0 $ 630,000 $ 0 $ 0 $ 0 $ 630,000TOTAL $ 0 $ 630,000 $ 0 $ 0 $ 0 $ 630,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-399 2020 CESAR CHAVEZR,ACQ,UTL VARIOUS $ 1,000,000LIMITS FROM BUSINESS 83 PROJECT SPONSOR HIDALGO COUNTY

REVISION DATE 07/2018LIMITS TO RIDGE RDPROJECT DIVIDED URBAN SECTION MPO PROJ NUM HC-344r

DESCR FUNDING CAT(S) 7REMARKS PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 249,994ROW PURCH $ 1,000,000 COST OF

CONSTR $ 6,193,200 APPROVEDCONST ENG $ 655,000 PHASES

CONTING $ 0 $ 1,000,000INDIRECT $ 383,978BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 8,482,172

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 800,000 $ 0 $ 0 $ 200,000 $ 0 $ 1,000,000TOTAL $ 800,000 $ 0 $ 0 $ 200,000 $ 0 $ 1,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-405 2020 CESAR CHAVEZR,ACQ,UTL VARIOUS $ 4,570,000LIMITS FROM NOLANA LOOP PROJECT SPONSOR HIDALGO COUNTY

REVISION DATE 07/2018LIMITS TO BUSINESS 83PROJECT DIVIDED URBAN SECTION MPO PROJ NUM HC-326r

DESCR FUNDING CAT(S) 7REMARKS PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,151,217ROW PURCH $ 4,570,000 COST OF

CONSTR $ 18,064,345 APPROVEDCONST ENG $ 2,567,723 PHASES

CONTING $ 0 $ 4,570,000INDIRECT $ 2,004,892BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 28,358,177

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 3,656,000 $ 0 $ 0 $ 914,000 $ 0 $ 4,570,000TOTAL $ 3,656,000 $ 0 $ 0 $ 914,000 $ 0 $ 4,570,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 194: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 194 OF 696

10:03:31 AM HIDALGO COUNTY MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-400 2020 ANAYA EASTC,R,ACQ,UTL PHARR $ 5,930,000LIMITS FROM CAGE BLVD PROJECT SPONSOR PHARR

REVISION DATE 07/2018LIMITS TO VETERANS BLVDPROJECT WIDEN TO 5 LANES MPO PROJ NUM HC-340

DESCR FUNDING CAT(S) 7REMARKS CAT 7 FOR ROW = $700,000, CAT 7 FOR CONSTRUCTION = PROJECT NEW PROJECT

P7 $5,230,000 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 256,270ROW PURCH $ 700,000 COST OF

CONSTR $ 5,230,000 APPROVEDCONST ENG $ 261,500 PHASES

CONTING $ 339,950 $ 5,930,000INDIRECT $ 324,260BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 7,111,980

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 4,744,000 $ 0 $ 0 $ 1,186,000 $ 0 $ 5,930,000TOTAL $ 4,744,000 $ 0 $ 0 $ 1,186,000 $ 0 $ 5,930,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-327 2020 TAYLOR RDC,E,ENG MISSION $ 5,000,000LIMITS FROM BUSINESS 83 PROJECT SPONSOR HIDALGO COUNTY

REVISION DATE 07/2018LIMITS TO I-2 / US 83PROJECT WIDEN TO 4 LANES WITH LEFT TURN LANE MPO PROJ NUM HC-256

DESCR FUNDING CAT(S) 7REMARKS PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 371,667ROW PURCH $ 1,192,488 COST OF

CONSTR $ 4,500,000 APPROVEDCONST ENG $ 500,000 PHASES

CONTING $ 365,050 $ 5,000,000INDIRECT $ 348,202BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 7,277,407

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 4,000,000 $ 0 $ 0 $ 1,000,000 $ 0 $ 5,000,000TOTAL $ 4,000,000 $ 0 $ 0 $ 1,000,000 $ 0 $ 5,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0528-01-114 2020 BUS 281 C HIDALGO COUNTY $ 19,000,000LIMITS FROM BUSINESS 281 W PROJECT SPONSOR HIDALGO COUNTY

REVISION DATE 07/2018LIMITS TO I-69C (US 281)PROJECT BUSINESS 281 W ONE-WAY TRAFFIC OPERATIONS $ RECONSTRUCTION OF SH 107 MPO PROJ NUM HC-337

DESCR FUNDING CAT(S) 2MREMARKS PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 931,000ROW PURCH $ 1,000,000 COST OF

CONSTR $ 19,000,000 APPROVEDCONST ENG $ 855,000 PHASES

CONTING $ 1,235,000 $ 19,000,000INDIRECT $ 1,178,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 24,199,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 0 $ 19,000,000 $ 0 $ 0 $ 0 $ 19,000,000TOTAL $ 0 $ 19,000,000 $ 0 $ 0 $ 0 $ 19,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 195: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 195 OF 696

10:03:31 AM HIDALGO COUNTY MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-376 2020 HI LINE WESTC,R,ACQ,UTL PHARR $ 5,860,000LIMITS FROM CAGE BLVD PROJECT SPONSOR PHARR

REVISION DATE 07/2018LIMITS TO JACKSON RDPROJECT WIDEN TO 5 LANE CURB AND GUTTER MPO PROJ NUM HC-339

DESCR FUNDING CAT(S) 7REMARKS CAT 7 FOR ROW = $660,000, CAT 7 FOR CONSTRUCTION = PROJECT NEW PROJECT

P7 $5,200,000 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 254,800ROW PURCH $ 660,000 COST OF

CONSTR $ 5,200,000 APPROVEDCONST ENG $ 260,000 PHASES

CONTING $ 338,000 $ 5,860,000INDIRECT $ 322,400BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 7,035,200

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 4,688,000 $ 0 $ 0 $ 1,172,000 $ 0 $ 5,860,000TOTAL $ 4,688,000 $ 0 $ 0 $ 1,172,000 $ 0 $ 5,860,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-382 2020 DONNA POEC DONNA $ 51,821,636LIMITS FROM DONNA BSIF PROJECT SPONSOR DONNA

REVISION DATE 07/2018LIMITS TO FUTURE IBTC / FM 493 INTERSECTIONPROJECT CONSTRUCT A 4 LANE CONTROLLED ACCESS TOLLED FACILITY MPO PROJ NUM HC-275

DESCR FUNDING CAT(S) 3LC,10REMARKS CAT 10 = CBI FUNDING PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 3,300,000 COST OF

CONSTR $ 51,821,636 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 51,821,636INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 55,121,636

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 49,821,636 $ 49,821,63610 $ 1,600,000 $ 0 $ 0 $ 400,000 $ 0 $ 2,000,000TOTAL $ 1,600,000 $ 0 $ 0 $ 400,000 $ 49,821,636 $ 51,821,636

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-375 2020 HI LINE EASTC,R,ACQ,UTL PHARR $ 4,523,551LIMITS FROM CAGE BLVD PROJECT SPONSOR PHARR

REVISION DATE 07/2018LIMITS TO VETERANSPROJECT WIDEN TO 5 LANE CURB AND GUTTER MPO PROJ NUM HC-336

DESCR FUNDING CAT(S) 7REMARKS CAT 7 FOR ROW = $350,000, CAT 7 FOR CONSTRUCTION = PROJECT NEW PROJECT

P7 $4,173,551 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 204,504ROW PURCH $ 350,000 COST OF

CONSTR $ 4,173,551 APPROVEDCONST ENG $ 208,678 PHASES

CONTING $ 271,281 $ 4,523,551INDIRECT $ 258,760BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 5,466,774

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 3,618,841 $ 0 $ 0 $ 904,710 $ 0 $ 4,523,551TOTAL $ 3,618,841 $ 0 $ 0 $ 904,710 $ 0 $ 4,523,551

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 196: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 196 OF 696

10:03:31 AM HIDALGO COUNTY MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 1064-01-032 2020 FM 676 C ALTON $ 15,000,000LIMITS FROM SH 364 PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO SH 107PROJECT WIDEN TO 4 LANE DIVIDED MPO PROJ NUM HC-117b

DESCR FUNDING CAT(S) 2M,11REMARKS PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 423,987ROW PURCH $ 1,200,000 COST OF

CONSTR $ 15,000,000 APPROVEDCONST ENG $ 450,000 PHASES

CONTING $ 650,000 $ 15,000,000INDIRECT $ 620,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 18,343,987

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 0 $ 10,000,000 $ 0 $ 0 $ 0 $ 10,000,00011 $ 4,000,000 $ 1,000,000 $ 0 $ 0 $ 0 $ 5,000,000TOTAL $ 4,000,000 $ 11,000,000 $ 0 $ 0 $ 0 $ 15,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-379 2020 Anzalduas POEC MISSION $ 4,668,185LIMITS FROM ANZALDUAS POE PROJECT SPONSOR ANZALDUAS BOARD

REVISION DATE 07/2018LIMITS TOPROJECT INBOUND COMMERCIAL INSPECTION PREPRIMARY INSPECTION PRECLEARED CARGO TRAFFIC MPO PROJ NUM HC-352

DESCR FUNDING CAT(S) 3LC,10REMARKS PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 217,070ROW PURCH $ 0 COST OF

CONSTR $ 4,668,185 APPROVEDCONST ENG $ 163,386 PHASES

CONTING $ 163,386 $ 4,668,185INDIRECT $ 163,386BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 5,375,413

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL10 $ 3,360,000 $ 0 $ 0 $ 840,000 $ 0 $ 4,200,0003LC $ 0 $ 0 $ 0 $ 0 $ 468,185 $ 468,185TOTAL $ 3,360,000 $ 0 $ 0 $ 840,000 $ 468,185 $ 4,668,185

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-142 2020 IBTC R,ACQ,UTL HCRMA $ 35,688,406LIMITS FROM INTERCHANGE TO SH 365 TO I-2 PROJECT SPONSOR HCRMA

REVISION DATE 07/2018LIMITS TO VALLEY VIEW INTERCHANGE TO FM 493PROJECT 4 LANE DIVIDED AT-GRADE NON-TOLL FACILITY MPO PROJ NUM RMA-3

DESCR FUNDING CAT(S) 3LC,12REMARKS PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 5,435,921ROW PURCH $ 35,688,406 COST OF

CONSTR $ 80,812,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 35,688,406INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 121,936,327

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 23,619,994 $ 23,619,99412 $ 9,654,730 $ 0 $ 0 $ 2,413,682 $ 0 $ 12,068,412TOTAL $ 9,654,730 $ 0 $ 0 $ 2,413,682 $ 23,619,994 $ 35,688,406

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 197: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 197 OF 696

10:03:31 AM HIDALGO COUNTY MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 3629-01-001 2020 SH 68 C HIDALGO COUNTY $ 55,000,000LIMITS FROM US 83 PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO FM 1925PROJECT CONSTRUCT NEW 4 LANE DIVIDED RURAL HIGHWAY FACILITY MPO PROJ NUM HC-295c

DESCR FUNDING CAT(S) 12REMARKS PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 6,500,000ROW PURCH $ 23,500,000 COST OF

CONSTR $ 55,000,000 APPROVEDCONST ENG $ 2,475,000 PHASES

CONTING $ 3,850,000 $ 55,000,000INDIRECT $ 3,410,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 94,735,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL12 $ 44,000,000 $ 11,000,000 $ 0 $ 0 $ 0 $ 55,000,000TOTAL $ 44,000,000 $ 11,000,000 $ 0 $ 0 $ 0 $ 55,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-303 2020 Anzalduas POEC MISSION $ 7,241,012LIMITS FROM ANZALDUAS INT’L PORT OF ENTRY PROJECT SPONSOR ANZALDUAS INT’’L BRIDGE BOARD

REVISION DATE 07/2018LIMITS TOPROJECT CONSTRUCTION OF SOUTHBOUND INSPECTION STATION MPO PROJ NUM HC-277

DESCR FUNDING CAT(S) 3LC,10REMARKS CAT 10 = CBI FUNDING PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 354,810ROW PURCH $ 0 COST OF

CONSTR $ 7,241,012 APPROVEDCONST ENG $ 362,051 PHASES

CONTING $ 470,666 $ 7,241,012INDIRECT $ 448,943BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 8,877,482

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL10 $ 80,000 $ 0 $ 0 $ 20,000 $ 0 $ 100,0003LC $ 0 $ 0 $ 0 $ 0 $ 7,141,012 $ 7,141,012TOTAL $ 80,000 $ 0 $ 0 $ 20,000 $ 7,141,012 $ 7,241,012

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 198: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 198 OF 696

10:03:31 AM HIDALGO COUNTY MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-142 2021 IBTC C HCRMA $ 80,812,000LIMITS FROM INTERCHANGE TO SH 365 TO I-2 PROJECT SPONSOR HCRMA

REVISION DATE 07/2018LIMITS TO VALLEY VIEW INTERCHANGE TO FM 493PROJECT 4 LANE DIVIDED AT GRADE NON TOLL FACILITY MPO PROJ NUM RMA-3

DESCR FUNDING CAT(S) 3LCREMARKS PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 5,435,921ROW PURCH $ 35,688,406 COST OF

CONSTR $ 80,812,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 80,812,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 121,936,327

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 80,812,000 $ 80,812,000TOTAL $ 0 $ 0 $ 0 $ 0 $ 80,812,000 $ 80,812,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0255-08-107 2021 I-2 / I-69C C PHARR $ 9,884,128LIMITS FROM I-2 PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO 1.8m N I-2PROJECT CONSTRUCT INTERCHANGE MPO PROJ NUM HC-366

DESCR FUNDING CAT(S) 2MREMARKS PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 484,322ROW PURCH $ 0 COST OF

CONSTR $ 9,884,128 APPROVEDCONST ENG $ 463,566 PHASES

CONTING $ 0 $ 9,884,128INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 10,832,016

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 0 $ 9,884,128 $ 0 $ 0 $ 0 $ 9,884,128TOTAL $ 0 $ 9,884,128 $ 0 $ 0 $ 0 $ 9,884,128

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 2094-01-062 2021 FM 2220 C MCALLEN $ 17,470,000LIMITS FROM MILE 5 N PROJECT SPONSOR HIDALGO COUNTY

REVISION DATE 07/2018LIMITS TO SH 107PROJECT 6 LANES DIVIDED URBAN SECTION MPO PROJ NUM HC-19a

DESCR FUNDING CAT(S) 2MREMARKS PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 856,030ROW PURCH $ 4,100,000 COST OF

CONSTR $ 17,470,000 APPROVEDCONST ENG $ 786,150 PHASES

CONTING $ 1,135,550 $ 17,470,000INDIRECT $ 1,083,140BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 25,430,870

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 0 $ 17,470,000 $ 0 $ 0 $ 0 $ 17,470,000TOTAL $ 0 $ 17,470,000 $ 0 $ 0 $ 0 $ 17,470,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 199: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 199 OF 696

10:03:31 AM HIDALGO COUNTY MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 2621-01-008 2021 FM 1925 C HCRMA $ 15,000,000LIMITS FROM FM 491 PROJECT SPONSOR HCRMA

REVISION DATE 07/2018LIMITS TO CAMERON CTY LINEPROJECT WIDEN TO 4 LANE DIVIDED MPO PROJ NUM HC-14

DESCR FUNDING CAT(S) 2MREMARKS PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 735,000ROW PURCH $ 5,000,000 COST OF

CONSTR $ 15,000,000 APPROVEDCONST ENG $ 675,000 PHASES

CONTING $ 975,000 $ 15,000,000INDIRECT $ 930,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 23,315,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 0 $ 15,000,000 $ 0 $ 0 $ 0 $ 15,000,000TOTAL $ 0 $ 15,000,000 $ 0 $ 0 $ 0 $ 15,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 2699-01-014 2021 SH 364 C HIDALGO COUNTY $ 4,470,000LIMITS FROM FM 676 PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO FM 2221PROJECT CONSTRUCT 4 LANE DIVIDED URBAN MPO PROJ NUM HC-182ab

DESCR FUNDING CAT(S) 2MREMARKS PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 219,030ROW PURCH $ 536,400 COST OF

CONSTR $ 4,470,000 APPROVEDCONST ENG $ 223,500 PHASES

CONTING $ 290,550 $ 4,470,000INDIRECT $ 277,140BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 6,016,620

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 0 $ 4,470,000 $ 0 $ 0 $ 0 $ 4,470,000TOTAL $ 0 $ 4,470,000 $ 0 $ 0 $ 0 $ 4,470,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-395 2021 Inspiration RdR,ACQ,UTL MISSION $ 3,000,000LIMITS FROM US 83 ON INSPIRATION RD PROJECT SPONSOR HIDALGO COUNTY

REVISION DATE 07/2018LIMITS TO MILITARY RD E TO FM 1016PROJECT WIDEN TO 4 LANE DIVIDED MPO PROJ NUM HC-341r

DESCR FUNDING CAT(S) 7REMARKS PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,276,483ROW PURCH $ 3,000,000 COST OF

CONSTR $ 17,651,200 APPROVEDCONST ENG $ 1,602,000 PHASES

CONTING $ 0 $ 3,000,000INDIRECT $ 1,094,374BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 24,624,057

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 2,400,000 $ 0 $ 0 $ 600,000 $ 0 $ 3,000,000TOTAL $ 2,400,000 $ 0 $ 0 $ 600,000 $ 0 $ 3,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 200: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 200 OF 696

10:03:31 AM HIDALGO COUNTY MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-360 2021 MILE 10 N R,ACQ,UTL WESLACO $ 2,200,000LIMITS FROM WESTGATE PROJECT SPONSOR HIDALGO COUNTY

REVISION DATE 07/2018LIMITS TO FM 1015PROJECT WIDEN TO 4 LANES URBAN MPO PROJ NUM HC-264r

DESCR FUNDING CAT(S) 7REMARKS PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 992,840ROW PURCH $ 2,200,000 COST OF

CONSTR $ 12,130,000 APPROVEDCONST ENG $ 1,579,775 PHASES

CONTING $ 0 $ 2,200,000INDIRECT $ 1,341,328BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 18,243,943

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 1,760,000 $ 0 $ 0 $ 440,000 $ 0 $ 2,200,000TOTAL $ 1,760,000 $ 0 $ 0 $ 440,000 $ 0 $ 2,200,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-394 2021 DONNA INTL POEC,E DONNA $ 43,398,084LIMITS FROM DONNA INT’L BRIDGE PROJECT SPONSOR DONNA

REVISION DATE 07/2018LIMITS TOPROJECT CONSTRUCTION OF COMMERCIAL FACILITIES FOR NORTHBOUND LOADED / EMPTY AND SOUTHBOU MPO PROJ NUM HC-361

DESCR ND LOADED TRUCKS FUNDING CAT(S) 3LC,10REMARKS E = CONSTRUCTION ENGINEERING, CAT 10 = CBI FUNDING PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 4,545,234ROW PURCH $ 0 COST OF

CONSTR $ 37,352,850 APPROVEDCONST ENG $ 1,500,000 PHASES

CONTING $ 0 $ 43,398,084INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 43,398,084

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 36,398,084 $ 36,398,08410 $ 5,600,000 $ 0 $ 0 $ 1,400,000 $ 0 $ 7,000,000TOTAL $ 5,600,000 $ 0 $ 0 $ 1,400,000 $ 36,398,084 $ 43,398,084

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-393 2021 DONNA SIDEWALKC DONNA $ 340,741LIMITS FROM S INTERNATIONAL BLVD PROJECT SPONSOR DONNA

REVISION DATE 07/2018LIMITS TO S INTERNATIONAL BLVDPROJECT REHABILITATION OF DETERIORATED SIDEWALKS AND CONSTRUCTION OF NEW SIDEWALKS MPO PROJ NUM HC-360

DESCR FUNDING CAT(S) 9TAPREMARKS PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 340,741 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 340,741INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 340,741

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 272,593 $ 0 $ 0 $ 68,148 $ 0 $ 340,741TOTAL $ 272,593 $ 0 $ 0 $ 68,148 $ 0 $ 340,741

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 201: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 201 OF 696

10:03:31 AM HIDALGO COUNTY MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-392 2021 CANO HIKE BIKEC EDINBURG $ 534,400LIMITS FROM CANO PROJECT SPONSOR EDINBURG

REVISION DATE 07/2018LIMITS TO FREDDY GONZALEZPROJECT INSTALLATION OF SOLAR POWERED LIGHTING ALONG THE CANO WALKING TRAIL MPO PROJ NUM HC-359

DESCR FUNDING CAT(S) 3LC,9TAPREMARKS PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 534,400 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 534,400INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 534,400

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 422,400 $ 0 $ 0 $ 105,600 $ 0 $ 528,0003LC $ 0 $ 0 $ 0 $ 0 $ 6,400 $ 6,400TOTAL $ 422,400 $ 0 $ 0 $ 105,600 $ 6,400 $ 534,400

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-391 2021 PSJA PED SAFETC VARIOUS $ 2,286,000LIMITS FROM CITY PHARR PROJECT SPONSOR PHARR

REVISION DATE 07/2018LIMITS TO CITY ALAMOPROJECT NEW CONSTRUCTION PEDESTRIAN SAFETY IMPROVEMENTS MPO PROJ NUM HC-358

DESCR FUNDING CAT(S) 3LC,9TAPREMARKS PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 2,286,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 2,286,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,286,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 1,577,340 $ 0 $ 0 $ 394,335 $ 0 $ 1,971,6753LC $ 0 $ 0 $ 0 $ 0 $ 314,325 $ 314,325TOTAL $ 1,577,340 $ 0 $ 0 $ 394,335 $ 314,325 $ 2,286,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0864-01-069 2021 FM 494 C HIDALGO COUNTY $ 9,000,000LIMITS FROM FM 1924 (MILE 3) PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO FM 676 (MILE 5)PROJECT WIDEN TO 4 LANE MPO PROJ NUM HC-292b

DESCR FUNDING CAT(S) 11REMARKS PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 392,000ROW PURCH $ 500,000 COST OF

CONSTR $ 9,000,000 APPROVEDCONST ENG $ 450,000 PHASES

CONTING $ 585,000 $ 9,000,000INDIRECT $ 558,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 11,485,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL11 $ 7,200,000 $ 1,800,000 $ 0 $ 0 $ 0 $ 9,000,000TOTAL $ 7,200,000 $ 1,800,000 $ 0 $ 0 $ 0 $ 9,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 202: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 202 OF 696

10:03:31 AM HIDALGO COUNTY MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-321 2021 MILE 3 N C,E,R,ACQ,UTL HIDALGO COUNTY $ 17,213,674LIMITS FROM TOM GILL PROJECT SPONSOR HIDALGO COUNTY

REVISION DATE 07/2018LIMITS TO FM 492 (GOODWIN RD)PROJECT WIDEN TO 4 LANE DIVIDED CURB & GUTTER SECTION MPO PROJ NUM HC-286a

DESCR FUNDING CAT(S) 7,12SREMARKS E = CONSTRUCTION ENGINEERING, CAT 7 ROW = $1,186,75 PROJECT NEW PROJECT

P7 4, CAT 7 CONST AND CE = $15,626,920, CAT 12S CONST HISTORY= $400,000

TOTAL PROJECT COST INFORMATIONPREL ENG $ 526,451

ROW PURCH $ 1,186,754 COST OFCONSTR $ 14,389,614 APPROVED

CONST ENG $ 1,637,306 PHASESCONTING $ 0 $ 17,213,674INDIRECT $ 613,156BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 18,353,281

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 13,450,939 $ 0 $ 0 $ 3,362,735 $ 0 $ 16,813,67412S $ 360,000 $ 0 $ 0 $ 40,000 $ 0 $ 400,000TOTAL $ 13,810,939 $ 0 $ 0 $ 3,402,735 $ 0 $ 17,213,674

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-341 2021 DOVE AVE C MCALLEN $ 1,495,500LIMITS FROM BENTSEN RD PROJECT SPONSOR MCALLEN

REVISION DATE 07/2018LIMITS TO 41ST STREETPROJECT CONSTRUCT 4 LANE URBAN ROADWAY MPO PROJ NUM HC-315

DESCR FUNDING CAT(S) 3LCREMARKS PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 68,807ROW PURCH $ 0 COST OF

CONSTR $ 1,404,225 APPROVEDCONST ENG $ 70,211 PHASES

CONTING $ 91,275 $ 1,495,500INDIRECT $ 87,062BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,721,580

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 1,495,500 $ 1,495,500TOTAL $ 0 $ 0 $ 0 $ 0 $ 1,495,500 $ 1,495,500

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0039-17-175 2021 I-2 / I-69C C PHARR $ 140,115,872LIMITS FROM US 83/US 281 INTERCHANGE PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TOPROJECT INTERCHANGE IMPROVEMENTS MPO PROJ NUM HC-362

DESCR FUNDING CAT(S) 2M,4,12REMARKS PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 6,865,677ROW PURCH $ 1,100,000 COST OF

CONSTR $ 140,115,872 APPROVEDCONST ENG $ 6,571,434 PHASES

CONTING $ 0 $ 140,115,872INDIRECT $ 8,042,651BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 162,695,634

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 0 $ 70,000,000 $ 0 $ 0 $ 0 $ 70,000,0002M $ 0 $ 10,115,872 $ 0 $ 0 $ 0 $ 10,115,87212 $ 0 $ 60,000,000 $ 0 $ 0 $ 0 $ 60,000,000TOTAL $ 0 $ 140,115,872 $ 0 $ 0 $ 0 $ 140,115,872

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 203: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 203 OF 696

10:03:31 AM HIDALGO COUNTY MPO - HIGHWAY PROJECTS

FY 2022

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0528-01-112 2022 SH 107 C ALTON $ 15,000,000LIMITS FROM FM 676 PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO SH 107PROJECT CONSTRUCT 6 LANE DIVIDED URBAN MPO PROJ NUM HC-343

DESCR FUNDING CAT(S) 2MREMARKS PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 735,000ROW PURCH $ 0 COST OF

CONSTR $ 15,000,000 APPROVEDCONST ENG $ 675,000 PHASES

CONTING $ 975,000 $ 15,000,000INDIRECT $ 930,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 18,315,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 0 $ 15,000,000 $ 0 $ 0 $ 0 $ 15,000,000TOTAL $ 0 $ 15,000,000 $ 0 $ 0 $ 0 $ 15,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 1427-01-033 2022 FM 1423 C DONNA $ 6,000,000LIMITS FROM BUSINESS 83 PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO I-2/US 83PROJECT PROPOSED 4 LANES CURB AND GUTTER MPO PROJ NUM HC-342

DESCR FUNDING CAT(S) 2MREMARKS PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 294,000ROW PURCH $ 0 COST OF

CONSTR $ 6,000,000 APPROVEDCONST ENG $ 300,000 PHASES

CONTING $ 390,000 $ 6,000,000INDIRECT $ 372,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 7,356,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 0 $ 6,000,000 $ 0 $ 0 $ 0 $ 6,000,000TOTAL $ 0 $ 6,000,000 $ 0 $ 0 $ 0 $ 6,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 1803-02-035 2022 FM 1925 C,R,ACQ,UTL HIDALGO COUNTY $ 11,010,000LIMITS FROM FM 907 PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO SHARP RDPROJECT WIDEN TO 4 LANE DIVIDED MPO PROJ NUM HC-12aa

DESCR FUNDING CAT(S) 2MREMARKS CAT 2 ROW = $1,010,000, CAT 2 CONST = $10,000,000 PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 490,000ROW PURCH $ 1,010,000 COST OF

CONSTR $ 10,000,000 APPROVEDCONST ENG $ 450,000 PHASES

CONTING $ 549,543 $ 11,010,000INDIRECT $ 620,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 13,119,543

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 0 $ 11,010,000 $ 0 $ 0 $ 0 $ 11,010,000TOTAL $ 0 $ 11,010,000 $ 0 $ 0 $ 0 $ 11,010,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 204: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 204 OF 696

10:03:31 AM HIDALGO COUNTY MPO - HIGHWAY PROJECTS

FY 2022

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 1064-01-027 2022 FM 676 C ALTON $ 10,075,374LIMITS FROM SH 107 PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO TAYLOR RDPROJECT WIDEN TO 4 LANE DIVIDED MPO PROJ NUM HC-117c

DESCR FUNDING CAT(S) 2M,11REMARKS PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 493,693ROW PURCH $ 918,775 COST OF

CONSTR $ 10,075,374 APPROVEDCONST ENG $ 453,392 PHASES

CONTING $ 654,899 $ 10,075,374INDIRECT $ 624,673BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 13,220,806

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 0 $ 5,200,000 $ 0 $ 0 $ 0 $ 5,200,00011 $ 3,900,299 $ 975,075 $ 0 $ 0 $ 0 $ 4,875,374TOTAL $ 3,900,299 $ 6,175,075 $ 0 $ 0 $ 0 $ 10,075,374

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-194 2022 LIBERTY BLVDC,E PENITAS $ 10,535,477LIMITS FROM US 83 PROJECT SPONSOR HIDALGO COUNTY

REVISION DATE 07/2018LIMITS TO MILE 3 RDPROJECT WIDEN TO 4 LANES WITH DEDICATED LEFT TURN LANE MPO PROJ NUM HC-284a

DESCR FUNDING CAT(S) 7,12SREMARKS E = CONSTRUCTION ENGINEERING PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 219,782ROW PURCH $ 1,185,242 COST OF

CONSTR $ 9,448,858 APPROVEDCONST ENG $ 1,086,619 PHASES

CONTING $ 0 $ 10,535,477INDIRECT $ 585,829BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 12,526,330

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 8,108,382 $ 0 $ 0 $ 2,027,095 $ 0 $ 10,135,47712S $ 320,000 $ 0 $ 0 $ 80,000 $ 0 $ 400,000TOTAL $ 8,428,382 $ 0 $ 0 $ 2,107,095 $ 0 $ 10,535,477

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 1803-01-094 2022 FM 1925 C HIDALGO COUNTY $ 20,000,000LIMITS FROM 10TH ST PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO WALLACEPROJECT 6 LANE WITH RAISED MEDIAN MPO PROJ NUM HC-338

DESCR FUNDING CAT(S) 2MREMARKS PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 980,000ROW PURCH $ 3,000,000 COST OF

CONSTR $ 20,000,000 APPROVEDCONST ENG $ 900,000 PHASES

CONTING $ 1,300,000 $ 20,000,000INDIRECT $ 1,240,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 27,420,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 0 $ 20,000,000 $ 0 $ 0 $ 0 $ 20,000,000TOTAL $ 0 $ 20,000,000 $ 0 $ 0 $ 0 $ 20,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 205: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 205 OF 696

10:03:31 AM HIDALGO COUNTY MPO - HIGHWAY PROJECTS

FY 2022

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0865-01-108 2022 VETERANS SH495C PALMVIEW $ 11,360,000LIMITS FROM IH-2/US 83 PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO SH 364 (LA HOMA RD)PROJECT 4 LANES DIVIDED URBAN FROM ABRAM RD TO SH 364 AND OVERLAY ABRAM RD FROM IH-2 TO MPO PROJ NUM HC-50

DESCR VETERANS BLVD FUNDING CAT(S) 2MREMARKS PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 843,140ROW PURCH $ 2,699,360 COST OF

CONSTR $ 11,360,000 APPROVEDCONST ENG $ 511,200 PHASES

CONTING $ 738,400 $ 11,360,000INDIRECT $ 704,320BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 16,856,420

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 0 $ 11,360,000 $ 0 $ 0 $ 0 $ 11,360,000TOTAL $ 0 $ 11,360,000 $ 0 $ 0 $ 0 $ 11,360,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 2094-01-063 2022 FM 2220 C MCALLEN $ 17,000,000LIMITS FROM SH 107 PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO FM 1925PROJECT 6 LANE DIVIDED URBAN SECTION MPO PROJ NUM HC-20

DESCR FUNDING CAT(S) 1,2M,11REMARKS CAT 11 = RIDER 11 FUNDING PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 833,000ROW PURCH $ 2,640,000 COST OF

CONSTR $ 17,000,000 APPROVEDCONST ENG $ 765,000 PHASES

CONTING $ 1,105,000 $ 17,000,000INDIRECT $ 1,054,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 23,397,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL1 $ 2,016,000 $ 504,000 $ 0 $ 0 $ 0 $ 2,520,0002M $ 0 $ 8,000,000 $ 0 $ 0 $ 0 $ 8,000,00011 $ 5,184,000 $ 1,296,000 $ 0 $ 0 $ 0 $ 6,480,000TOTAL $ 7,200,000 $ 9,800,000 $ 0 $ 0 $ 0 $ 17,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 1803-02-038 2022 FM 1925 C HCRMA $ 15,700,000LIMITS FROM FM 88 E PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO FM 491PROJECT WIDEN TO 4 LANE DIVIDED MPO PROJ NUM HC-13

DESCR FUNDING CAT(S) 2MREMARKS PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 769,300ROW PURCH $ 5,200,000 COST OF

CONSTR $ 15,700,000 APPROVEDCONST ENG $ 706,500 PHASES

CONTING $ 1,020,500 $ 15,700,000INDIRECT $ 973,400BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 24,369,700

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 0 $ 15,700,000 $ 0 $ 0 $ 0 $ 15,700,000TOTAL $ 0 $ 15,700,000 $ 0 $ 0 $ 0 $ 15,700,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 206: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 206 OF 696

10:03:31 AM HIDALGO COUNTY MPO - HIGHWAY PROJECTS

FY 2022

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 1803-01-092 2022 FM 1925 C EDINBURG $ 8,240,000LIMITS FROM 10TH ST PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO MCCOLL RDPROJECT WIDEN TO 6 LANE WITH RAISED MEDIAN MPO PROJ NUM HC-290

DESCR FUNDING CAT(S) 2MREMARKS PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 403,760ROW PURCH $ 630,000 COST OF

CONSTR $ 8,240,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 535,600 $ 8,240,000INDIRECT $ 510,880BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 10,320,240

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 0 $ 8,240,000 $ 0 $ 0 $ 0 $ 8,240,000TOTAL $ 0 $ 8,240,000 $ 0 $ 0 $ 0 $ 8,240,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-286 2022 Mile 6 W R,ACQ,UTL HIDALGO COUNTY $ 5,000,000LIMITS FROM MILE 11 N PROJECT SPONSOR HIDALGO COUNTY

REVISION DATE 07/2018LIMITS TO SH 107PROJECT WIDEN TO 4 LANE MPO PROJ NUM HC-148bbr

DESCR FUNDING CAT(S) 7,10REMARKS CAT 10 = EARMARK FUNDING PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 992,000ROW PURCH $ 5,000,000 COST OF

CONSTR $ 33,701,489 APPROVEDCONST ENG $ 911,000 PHASES

CONTING $ 1,316,000 $ 5,000,000INDIRECT $ 1,255,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 43,175,489

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL10 $ 482,950 $ 0 $ 0 $ 120,737 $ 0 $ 603,6877 $ 3,517,050 $ 0 $ 0 $ 879,263 $ 0 $ 4,396,313TOTAL $ 4,000,000 $ 0 $ 0 $ 1,000,000 $ 0 $ 5,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-328 2022 TAYLOR RDC,E VARIOUS $ 6,894,192LIMITS FROM BUSINESS 83 PROJECT SPONSOR HIDALGO COUNTY

REVISION DATE 07/2018LIMITS TO MILE 2 NPROJECT 4 LANE DIVIDED URBAN SECTION WITH 1 BRIDGE WIDENING AND 1 BRIDGE CLASS IRRIGATIO MPO PROJ NUM HC-257

DESCR N SIPHON FUNDING CAT(S) 7REMARKS E = CONSTRUCTION ENGINEERING PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 743,333ROW PURCH $ 2,011,852 COST OF

CONSTR $ 6,006,390 APPROVEDCONST ENG $ 887,802 PHASES

CONTING $ 376,725 $ 6,894,192INDIRECT $ 359,337BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 10,385,439

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 5,515,354 $ 0 $ 0 $ 1,378,838 $ 0 $ 6,894,192TOTAL $ 5,515,354 $ 0 $ 0 $ 1,378,838 $ 0 $ 6,894,192

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 207: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 207 OF 696

10:03:31 AM HIDALGO COUNTY MPO - HIGHWAY PROJECTS

FY 2022

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0864-01-068 2022 FM 494 C HIDALGO COUNTY $ 8,657,966LIMITS FROM FM 676 (MILE 5) PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO SH 107PROJECT WIDEN TO 4 LANE MPO PROJ NUM HC-292a

DESCR FUNDING CAT(S) 2MREMARKS PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 392,000ROW PURCH $ 2,957,145 COST OF

CONSTR $ 8,657,966 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 8,657,966INDIRECT $ 536,794BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 12,543,905

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 0 $ 8,657,966 $ 0 $ 0 $ 0 $ 8,657,966TOTAL $ 0 $ 8,657,966 $ 0 $ 0 $ 0 $ 8,657,966

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-168 2022 Mile 6 W C,E WESLACO $ 12,000,000LIMITS FROM Mile 9 N PROJECT SPONSOR HIDALGO COUNTY

REVISION DATE 07/2018LIMITS TO Mile 11 NPROJECT Widen to 4 Lane MPO PROJ NUM HC-148ba

DESCR FUNDING CAT(S) 7,12SREMARKS E = CONSTRUCTION ENGINEERING PROJECT NEW PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,614,606ROW PURCH $ 1,800,000 COST OF

CONSTR $ 10,800,000 APPROVEDCONST ENG $ 1,200,000 PHASES

CONTING $ 0 $ 12,000,000INDIRECT $ 708,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 16,122,606

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 9,280,000 $ 0 $ 0 $ 2,320,000 $ 0 $ 11,600,00012S $ 320,000 $ 0 $ 0 $ 80,000 $ 0 $ 400,000TOTAL $ 9,600,000 $ 0 $ 0 $ 2,400,000 $ 0 $ 12,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 208: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 208 OF 696

10:03:31 AM HIDALGO COUNTY MPO - HIGHWAY PROJECTS

FY 2040

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PHARR HIDALGO COUNTY HIDALGO 0921-02-407 2040 CESAR CHAVEZ HIDALGO COUNTY $ 0LIMITS FROM 0.25m South SH 107 PROJECT SPONSOR HIDALGO COUNTY

REVISION DATE 07/2018LIMITS TO SH 107PROJECT ROAD REALIGNMENT AT SH 107 MPO PROJ NUM HC-364

DESCR FUNDING CAT(S) 7REMARKS PROJECT HAS BEEN UNFUNDED PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 0 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 0INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 0

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0TOTAL $ 0 $ 0 $ 0 $ 0 $ 0 $ 0

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 209: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

2019-2022Statewide TransportationImprovement ProgramHouston-Galveston MPOHighway Projects

Page 210: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 210 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON MONTGOMERY 3538-01-036 2019 SH 242 C PATTON VILLAGE $ 40,632,000LIMITS FROM FM 1314 PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO US 59PROJECT WIDEN FROM 2-LANE TO 4-LANE DIVIDED RURAL ROADWAY WITH BICYCLE ACCOMMODATIONS MPO PROJ NUM 17104

DESCR FUNDING CAT(S) 2MREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,990,968ROW PURCH $ 2,700,000 COST OF

CONSTR $ 40,632,000 APPROVEDCONST ENG $ 1,625,280 PHASES

CONTING $ 4,063,200 $ 40,632,000INDIRECT $ 2,064,106BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 53,075,554

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 32,505,600 $ 8,126,400 $ 0 $ 0 $ 0 $ 40,632,000TOTAL $ 32,505,600 $ 8,126,400 $ 0 $ 0 $ 0 $ 40,632,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0720-03-141 2019 SH 249 C NONE $ 2,774,883LIMITS FROM SPRING CYPRESS RD PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO CHASEWOOD PARK DRPROJECT RAMP REVERSAL AT SPRING CYPRESS ROAD MPO PROJ NUM 6067

DESCR FUNDING CAT(S) 1REMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 135,969ROW PURCH $ 0 COST OF

CONSTR $ 2,774,883 APPROVEDCONST ENG $ 166,493 PHASES

CONTING $ 277,488 $ 2,774,883INDIRECT $ 140,964BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 3,495,798

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL1 $ 2,219,906 $ 554,977 $ 0 $ 0 $ 0 $ 2,774,883TOTAL $ 2,219,906 $ 554,977 $ 0 $ 0 $ 0 $ 2,774,883

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON MONTGOMERY 3538-01-035 2019 SH 242 C NONE $ 38,100,000LIMITS FROM NEEDHAM DR PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO FM 1314PROJECT WIDEN FROM 2-LANE TO 4-LANE DIVIDED RURAL ROADWAY WITH BICYCLE ACCOMMODATIONS MPO PROJ NUM 968

DESCR FUNDING CAT(S) 2MREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,866,900ROW PURCH $ 3,811,000 COST OF

CONSTR $ 38,100,000 APPROVEDCONST ENG $ 1,524,000 PHASES

CONTING $ 3,810,000 $ 38,100,000INDIRECT $ 1,935,480BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 51,047,380

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 30,480,000 $ 7,620,000 $ 0 $ 0 $ 0 $ 38,100,000TOTAL $ 30,480,000 $ 7,620,000 $ 0 $ 0 $ 0 $ 38,100,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 211: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 211 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON FORT BEND 3510-04-054 2019 SH 99 C NONE $ 10,000,000LIMITS FROM S FRY ROAD PROJECT SPONSOR FORT BEND COUNTY

REVISION DATE 07/2018LIMITS TO FM 1093PROJECT ADD 2 LANE SOUTH BOUND FRONTAGE ROAD MPO PROJ NUM 455

DESCR FUNDING CAT(S) 3LCREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 490,000ROW PURCH $ 0 COST OF

CONSTR $ 10,000,000 APPROVEDCONST ENG $ 500,000 PHASES

CONTING $ 1,000,000 $ 10,000,000INDIRECT $ 508,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 12,498,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 10,000,000 $ 10,000,000TOTAL $ 0 $ 0 $ 0 $ 0 $ 10,000,000 $ 10,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON FORT BEND 3510-04-055 2019 SH 99 C NONE $ 4,000,000LIMITS FROM CINCO RANCH BLVD PROJECT SPONSOR FORT BEND COUNTY

REVISION DATE 07/2018LIMITS TO WESTHEIMER PKWYPROJECT ADD 2 LANE SOUTH BOUND FRONTAGE ROAD MPO PROJ NUM 451

DESCR FUNDING CAT(S) 3LCREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 196,000ROW PURCH $ 0 COST OF

CONSTR $ 4,000,000 APPROVEDCONST ENG $ 240,000 PHASES

CONTING $ 400,000 $ 4,000,000INDIRECT $ 203,200BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 5,039,200

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 4,000,000 $ 4,000,000TOTAL $ 0 $ 0 $ 0 $ 0 $ 4,000,000 $ 4,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0720-03-133 2019 SH 249 C NONE $ 425,117LIMITS FROM S OF CHASEWOOD PARK DR PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO N OF GREGSON RDPROJECT RESTRIPE EXISTING PAVEMENT FROM 6 TO 8 LANES MPO PROJ NUM 16342

DESCR FUNDING CAT(S) 1REMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 20,831ROW PURCH $ 0 COST OF

CONSTR $ 425,117 APPROVEDCONST ENG $ 38,261 PHASES

CONTING $ 42,512 $ 425,117INDIRECT $ 21,596BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 548,316

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL1 $ 340,094 $ 85,023 $ 0 $ 0 $ 0 $ 425,117TOTAL $ 340,094 $ 85,023 $ 0 $ 0 $ 0 $ 425,117

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 212: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 212 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON BRAZORIA 0111-08-100 2019 SH 36 C FREEPORT $ 8,500,000LIMITS FROM S OF BRAZOS RIVER PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO FM 1495PROJECT WIDEN FROM 2 TO 4 LANES (SEG 15) MPO PROJ NUM 251

DESCR FUNDING CAT(S) 4REMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 416,500ROW PURCH $ 0 COST OF

CONSTR $ 8,500,000 APPROVEDCONST ENG $ 425,000 PHASES

CONTING $ 850,000 $ 8,500,000INDIRECT $ 431,800BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 10,623,300

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 6,800,000 $ 1,700,000 $ 0 $ 0 $ 0 $ 8,500,000TOTAL $ 6,800,000 $ 1,700,000 $ 0 $ 0 $ 0 $ 8,500,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0912-72-900 2019 CR C HOUSTON $ 3,538,360LIMITS FROM SOUTH LANDING PROJECT SPONSOR HARRIS COUNTY

REVISION DATE 07/2018LIMITS TO NORTH LANDINGPROJECT REHABILITATION OF EXISTING FERRY AND BERTHING FACILITIES. INTEGRATE NEW MATERIAL MPO PROJ NUM 17149

DESCR S/SYSTEMS TO EXTEND SERVICE LIFE OF COMPONENTS. FUNDING CAT(S) 10REMARKS Facility: INDEPENDENCE PKWY PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 173,380ROW PURCH $ 0 COST OF

CONSTR $ 3,538,360 APPROVEDCONST ENG $ 212,302 PHASES

CONTING $ 353,836 $ 3,538,360INDIRECT $ 179,749BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 4,457,626

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL10 $ 2,830,688 $ 0 $ 0 $ 707,672 $ 0 $ 3,538,360TOTAL $ 2,830,688 $ 0 $ 0 $ 707,672 $ 0 $ 3,538,360

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

BEAUMONT HOUSTON-GALVESTON CHAMBERS 0920-39-024 2019 VA C,E MONT BELVIEU $ 1,233,241LIMITS FROM FM 565, EAGLE DR TO FISHER’’S LANDING PROJECT SPONSOR CITY OF MONT BELVIEU

REVISION DATE 07/2018LIMITS TO EAGLE DR, CHERRY PT TO FM 565PROJECT CONSTRUCTION OF SIDEWALK ILLUMINATION MPO PROJ NUM 15467

DESCR FUNDING CAT(S) 9TAPREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 48,257ROW PURCH $ 0 COST OF

CONSTR $ 1,168,898 APPROVEDCONST ENG $ 16,086 PHASES

CONTING $ 12,807 $ 1,233,241INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,246,048

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 986,593 $ 0 $ 0 $ 246,648 $ 0 $ 1,233,241TOTAL $ 986,593 $ 0 $ 0 $ 246,648 $ 0 $ 1,233,241

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 213: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 213 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON MONTGOMERY 3538-01-045 2019 SH 242 C NONE $ 20,000,000LIMITS FROM AT FM 1314 PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TOPROJECT CONSTRUCT GRADE SEPARATION MPO PROJ NUM 17147

DESCR FUNDING CAT(S) 2MREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 980,000ROW PURCH $ 2,000,000 COST OF

CONSTR $ 20,000,000 APPROVEDCONST ENG $ 1,000,000 PHASES

CONTING $ 2,000,000 $ 20,000,000INDIRECT $ 1,016,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 26,996,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 16,000,000 $ 4,000,000 $ 0 $ 0 $ 0 $ 20,000,000TOTAL $ 16,000,000 $ 4,000,000 $ 0 $ 0 $ 0 $ 20,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON MONTGOMERY 1259-01-042 2019 FM 1097 C WILLIS $ 15,800,000LIMITS FROM ANDERSON RD PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO IH 45 NPROJECT RECONSTRUCT AND WIDEN TO 4-LANES WITH CONTINUOUS LEFT TURN LANE MPO PROJ NUM 17091

DESCR FUNDING CAT(S) 2M,3LCREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 774,200ROW PURCH $ 4,920,000 COST OF

CONSTR $ 15,800,000 APPROVEDCONST ENG $ 790,000 PHASES

CONTING $ 1,580,000 $ 15,800,000INDIRECT $ 802,640BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 24,666,840

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 6,240,000 $ 1,560,000 $ 0 $ 0 $ 0 $ 7,800,0003LC $ 0 $ 0 $ 0 $ 0 $ 8,000,000 $ 8,000,000TOTAL $ 6,240,000 $ 1,560,000 $ 0 $ 0 $ 8,000,000 $ 15,800,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON MONTGOMERY 0177-05-113 2019 IH 69 C NONE $ 800,000LIMITS FROM FOSTORIA RD N PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO LIBERTY C/LPROJECT CONSTRUCT DETENTION POND MPO PROJ NUM 16352

DESCR FUNDING CAT(S) 4REMARKS Facility: IH 69 N PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 39,200ROW PURCH $ 0 COST OF

CONSTR $ 800,000 APPROVEDCONST ENG $ 72,000 PHASES

CONTING $ 80,000 $ 800,000INDIRECT $ 40,640BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,031,840

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 640,000 $ 160,000 $ 0 $ 0 $ 0 $ 800,000TOTAL $ 640,000 $ 160,000 $ 0 $ 0 $ 0 $ 800,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 214: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 214 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON MONTGOMERY 3050-02-034 2019 FM 2978 C NONE $ 5,000,000LIMITS FROM AT SPRING CREEK PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TOPROJECT REPLACE BRIDGE AND APPROACHES MPO PROJ NUM 16318

DESCR FUNDING CAT(S) 2MREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 245,000ROW PURCH $ 0 COST OF

CONSTR $ 5,000,000 APPROVEDCONST ENG $ 250,000 PHASES

CONTING $ 500,000 $ 5,000,000INDIRECT $ 254,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 6,249,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 4,000,000 $ 1,000,000 $ 0 $ 0 $ 0 $ 5,000,000TOTAL $ 4,000,000 $ 1,000,000 $ 0 $ 0 $ 0 $ 5,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 3050-03-021 2019 FM 2978 C NONE $ 5,000,000LIMITS FROM AT SPRING CREEK PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TOPROJECT REPLACE BRIDGE AND APPROACHES MPO PROJ NUM 16317

DESCR FUNDING CAT(S) 2MREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 245,000ROW PURCH $ 0 COST OF

CONSTR $ 5,000,000 APPROVEDCONST ENG $ 250,000 PHASES

CONTING $ 500,000 $ 5,000,000INDIRECT $ 254,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 6,249,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 4,000,000 $ 1,000,000 $ 0 $ 0 $ 0 $ 5,000,000TOTAL $ 4,000,000 $ 1,000,000 $ 0 $ 0 $ 0 $ 5,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

BEAUMONT HOUSTON-GALVESTON CHAMBERS 0508-03-099 2019 SH 73 C NONE $ 115,000LIMITS FROM W OF JEFFERSON C/L PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO JEFFERSON C/LPROJECT GRADE SEPARATION & CLOSE CROSSOVER MPO PROJ NUM 12235

DESCR FUNDING CAT(S) 8REMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 5,635ROW PURCH $ 0 COST OF

CONSTR $ 115,000 APPROVEDCONST ENG $ 10,350 PHASES

CONTING $ 11,500 $ 115,000INDIRECT $ 5,842BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 148,327

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL8 $ 103,500 $ 11,500 $ 0 $ 0 $ 0 $ 115,000TOTAL $ 103,500 $ 11,500 $ 0 $ 0 $ 0 $ 115,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 215: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 215 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

BEAUMONT HOUSTON-GALVESTON CHAMBERS 0508-03-098 2019 SH 73 C NONE $ 5,000,000LIMITS FROM FM 1663, EAST PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO W OF JEFFERSON C/LPROJECT REHAB AND EXTEND EXISTING FRONTAGE ROADS MPO PROJ NUM 12234

DESCR FUNDING CAT(S) 1REMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 245,000ROW PURCH $ 0 COST OF

CONSTR $ 5,000,000 APPROVEDCONST ENG $ 250,000 PHASES

CONTING $ 500,000 $ 5,000,000INDIRECT $ 254,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 6,249,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL1 $ 4,000,000 $ 1,000,000 $ 0 $ 0 $ 0 $ 5,000,000TOTAL $ 4,000,000 $ 1,000,000 $ 0 $ 0 $ 0 $ 5,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON MONTGOMERY 3158-01-032 2019 FM 3083 C CONROE $ 7,800,000LIMITS FROM UP RR PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO LP 336 NPROJECT RECONSTRUCT AND WIDEN TO 4-LANE DIVIDED ROADWAY WITH RAISED MEDIAN AND INTERSECT MPO PROJ NUM 7551

DESCR ION IMPROVEMENTS FUNDING CAT(S) 2MREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 382,200ROW PURCH $ 2,200,000 COST OF

CONSTR $ 7,800,000 APPROVEDCONST ENG $ 390,000 PHASES

CONTING $ 780,000 $ 7,800,000INDIRECT $ 396,240BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 11,948,440

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 6,240,000 $ 1,560,000 $ 0 $ 0 $ 0 $ 7,800,000TOTAL $ 6,240,000 $ 1,560,000 $ 0 $ 0 $ 0 $ 7,800,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON BRAZORIA 0188-03-019 2019 SH 36 C WEST COLUMBIA $ 45,000,000LIMITS FROM FORT BEND C/L PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO N OF CR 467/HOGG RANCH RDPROJECT WIDEN TO 4-LANE DIVIDED ROADWAY (CONTINUOUS LEFT TURN LANE AND RURAL IN SECTIONS MPO PROJ NUM 253

DESCR ) WITH INTERSECTION IMPROVEMENTS AND BICYCLE ACCOMMODATIONS FUNDING CAT(S) 2MREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,205,000ROW PURCH $ 35,020,000 COST OF

CONSTR $ 45,000,000 APPROVEDCONST ENG $ 1,800,000 PHASES

CONTING $ 4,500,000 $ 45,000,000INDIRECT $ 2,286,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 90,811,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 36,000,000 $ 9,000,000 $ 0 $ 0 $ 0 $ 45,000,000TOTAL $ 36,000,000 $ 9,000,000 $ 0 $ 0 $ 0 $ 45,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 216: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 216 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON MONTGOMERY 0000-00-000 2019 CS C CONROE $ 2,208,770LIMITS FROM VA PROJECT SPONSOR CITY OF CONROE

REVISION DATE 07/2018LIMITS TO VAPROJECT CONSTRUCT SIDEWALKS ALONG SILVERDALE DR, SGT. ED HOLCOMB BLVD, RIVER POINTE DR, MPO PROJ NUM 17132

DESCR CAMELOT ST AND WESTVIEW BLVD. FUNDING CAT(S) 3LCREMARKS Facility: CITY OF CONROE PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 108,230ROW PURCH $ 0 COST OF

CONSTR $ 2,208,770 APPROVEDCONST ENG $ 132,526 PHASES

CONTING $ 220,877 $ 2,208,770INDIRECT $ 112,206BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,782,609

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 2,208,770 $ 0 $ 2,208,770TOTAL $ 0 $ 0 $ 0 $ 2,208,770 $ 0 $ 2,208,770

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON 0912-00-563 2019 VA C NONE $ 1,250,000LIMITS FROM VA PROJECT SPONSOR H-GAC

REVISION DATE 07/2018LIMITS TO VAPROJECT REGIONAL VANPOOL PROGRAM: CMAQ FY 2019 MPO PROJ NUM 17135

DESCR FUNDING CAT(S) 5REMARKS Facility: HOUSTON-GALVESTON TMA PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 1,250,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 1,250,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,250,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 1,250,000 $ 0 $ 0 $ 0 $ 0 $ 1,250,000TOTAL $ 1,250,000 $ 0 $ 0 $ 0 $ 0 $ 1,250,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON 0912-00-562 2019 VA C NONE $ 3,750,000LIMITS FROM VA PROJECT SPONSOR H-GAC

REVISION DATE 07/2018LIMITS TO VAPROJECT REGIONAL VANPOOL PROGRAM: STP FY 2019 MPO PROJ NUM 17134

DESCR FUNDING CAT(S) 7REMARKS Facility: HOUSTON-GALVESTON TMA PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 3,750,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 3,750,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 3,750,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 3,000,000 $ 0 $ 0 $ 750,000 $ 0 $ 3,750,000TOTAL $ 3,000,000 $ 0 $ 0 $ 750,000 $ 0 $ 3,750,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 217: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 217 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0508-01-359 2019 IH 10 C BAYTOWN $ 4,000,000LIMITS FROM JOHN MARTIN RD PROJECT SPONSOR CITY OF BAYTOWN

REVISION DATE 07/2018LIMITS TO GARTH RDPROJECT EB RAMPS REVERSAL MPO PROJ NUM 1099

DESCR FUNDING CAT(S) 1,3LCREMARKS Facility: IH 10 E PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 196,000ROW PURCH $ 0 COST OF

CONSTR $ 4,000,000 APPROVEDCONST ENG $ 240,000 PHASES

CONTING $ 400,000 $ 4,000,000INDIRECT $ 203,200BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 5,039,200

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL1 $ 800,000 $ 200,000 $ 0 $ 0 $ 0 $ 1,000,0003LC $ 0 $ 0 $ 0 $ 0 $ 3,000,000 $ 3,000,000TOTAL $ 800,000 $ 200,000 $ 0 $ 0 $ 3,000,000 $ 4,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0912-72-373 2019 CS C,E HOUSTON $ 14,302,000LIMITS FROM LONG POINT RD PROJECT SPONSOR MEMORIAL CITY REDEVELOPMENT AUTHORITY

REVISION DATE 07/2018LIMITS TO IH 10 WPROJECT RECONSTRUCT ROADWAY TO INCLUDE DRAINAGE IMPROVEMENTS, ROADWAY REHABILITATION AND MPO PROJ NUM 17129

DESCR SIDEWALK RECONSTRUCTION FUNDING CAT(S) 3LC,7REMARKS Facility: GESSNER DR PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 668,063ROW PURCH $ 0 COST OF

CONSTR $ 13,633,937 APPROVEDCONST ENG $ 681,697 PHASES

CONTING $ 1,363,394 $ 14,302,000INDIRECT $ 692,604BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 17,039,695

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 3,441,600 $ 0 $ 0 $ 860,400 $ 0 $ 4,302,0003LC $ 0 $ 0 $ 0 $ 0 $ 10,000,000 $ 10,000,000TOTAL $ 3,441,600 $ 0 $ 0 $ 860,400 $ 10,000,000 $ 14,302,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON 0912-00-552 2019 VA C NONE $ 15,000,000LIMITS FROM VA PROJECT SPONSOR H-GAC

REVISION DATE 07/2018LIMITS TO VAPROJECT CLEAN CITIES/CLEAN VEHICLES PROGRAM (ENGINE/VEHICLE REPLACEMENT, ALTERNATE FUELS MPO PROJ NUM 17127

DESCR , EDUCATION): FY 2018 FUNDING CAT(S) 5REMARKS Facility: HOUSTON - GALVESTON TMA PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 15,000,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 15,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 15,000,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 12,000,000 $ 0 $ 0 $ 3,000,000 $ 0 $ 15,000,000TOTAL $ 12,000,000 $ 0 $ 0 $ 3,000,000 $ 0 $ 15,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 218: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 218 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON 0912-00-549 2019 VA C NONE $ 4,438,000LIMITS FROM VA PROJECT SPONSOR H-GAC

REVISION DATE 07/2018LIMITS TO VAPROJECT TRAVEL DEMAND MANAGEMENT, MARKETING, OUTREACH AND PUBLIC EDUCATION MPO PROJ NUM 17124

DESCR FUNDING CAT(S) 5REMARKS Facility: HOUSTON - GALVESTON TMA PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. 887,600 TDCs as non-federal match. TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 4,438,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 4,438,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 4,438,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 4,438,000 $ 0 $ 0 $ 0 $ 0 $ 4,438,000TOTAL $ 4,438,000 $ 0 $ 0 $ 0 $ 0 $ 4,438,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0912-72-397 2019 CS C SOUTH HOUSTON $ 1,552,000LIMITS FROM VA PROJECT SPONSOR CITY OF SOUTH HOUSTON

REVISION DATE 07/2018LIMITS TO VAPROJECT CONSTRUCT NEW 5 FT CONCRETE SIDEWALKS ALONG CITY OWNED ROADWAYS (APPROX 33,000 L MPO PROJ NUM 17119

DESCR INEAR FT) FUNDING CAT(S) 5REMARKS Facility: SOUTH HOUSTON ROADWAYS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 76,048ROW PURCH $ 0 COST OF

CONSTR $ 1,552,000 APPROVEDCONST ENG $ 93,120 PHASES

CONTING $ 155,200 $ 1,552,000INDIRECT $ 78,842BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,955,210

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 1,241,600 $ 0 $ 0 $ 310,400 $ 0 $ 1,552,000TOTAL $ 1,241,600 $ 0 $ 0 $ 310,400 $ 0 $ 1,552,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0980-02-018 2019 FM 526 C HOUSTON $ 2,459,000LIMITS FROM WOODFOREST BLVD TO IH 10 PROJECT SPONSOR CITY OF HOUSTON

REVISION DATE 07/2018LIMITS TO AND FM 526 TO GREENS BAYOU ALONG IH 10 AND NORMANDY STPROJECT CONSTRUCT 10 FT SHARED USED PATH AND 5-6 FT SIDEWALKS IN SECTIONS MPO PROJ NUM 17074

DESCR FUNDING CAT(S) 9TAPREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 120,491ROW PURCH $ 0 COST OF

CONSTR $ 2,459,000 APPROVEDCONST ENG $ 147,540 PHASES

CONTING $ 245,900 $ 2,459,000INDIRECT $ 124,917BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 3,097,848

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 1,967,200 $ 491,800 $ 0 $ 0 $ 0 $ 2,459,000TOTAL $ 1,967,200 $ 491,800 $ 0 $ 0 $ 0 $ 2,459,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 219: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 219 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON GALVESTON 0912-73-207 2019 CS C GALVESTON $ 1,756,000LIMITS FROM BODDECKER DR PROJECT SPONSOR CITY OF GALVESTON

REVISION DATE 07/2018LIMITS TO SH 87PROJECT MILL AND OVERLAY MPO PROJ NUM 17072

DESCR FUNDING CAT(S) 7REMARKS Facility: SEAWALL BLVD PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 86,044ROW PURCH $ 0 COST OF

CONSTR $ 1,756,000 APPROVEDCONST ENG $ 105,360 PHASES

CONTING $ 175,600 $ 1,756,000INDIRECT $ 89,205BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,212,209

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 1,404,800 $ 0 $ 0 $ 351,200 $ 0 $ 1,756,000TOTAL $ 1,404,800 $ 0 $ 0 $ 351,200 $ 0 $ 1,756,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0912-72-360 2019 CS C WEST UNIVERSITY PLACE$ 10,075,000LIMITS FROM BISSONNET ST PROJECT SPONSOR West Univ Place

REVISION DATE 07/2018LIMITS TO HOLCOMBE STPROJECT RECONSTRUCT ROADWAY INCLUDING INTERSECTION AND DRAINAGE IMPROVEMENTS MPO PROJ NUM 17070

DESCR FUNDING CAT(S) 7REMARKS Facility: BUFFALO SPEEDWAY PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 493,675ROW PURCH $ 0 COST OF

CONSTR $ 10,075,000 APPROVEDCONST ENG $ 503,750 PHASES

CONTING $ 1,007,500 $ 10,075,000INDIRECT $ 511,810BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 12,591,735

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 8,060,000 $ 0 $ 0 $ 2,015,000 $ 0 $ 10,075,000TOTAL $ 8,060,000 $ 0 $ 0 $ 2,015,000 $ 0 $ 10,075,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON FORT BEND 0188-09-042 2019 FM 723 C ROSENBERG $ 10,000,000LIMITS FROM AVENUE D PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO N OF BRAZOS RIVERPROJECT WIDEN FROM 2-LANE TO 4-LANE DIVIDED ROADWAY WITH SHOULDERS AND SIDEWALKS MPO PROJ NUM 17068

DESCR FUNDING CAT(S) 2MREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 490,000ROW PURCH $ 3,001,000 COST OF

CONSTR $ 10,000,000 APPROVEDCONST ENG $ 500,000 PHASES

CONTING $ 1,000,000 $ 10,000,000INDIRECT $ 508,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 15,499,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 8,000,000 $ 2,000,000 $ 0 $ 0 $ 0 $ 10,000,000TOTAL $ 8,000,000 $ 2,000,000 $ 0 $ 0 $ 0 $ 10,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 220: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 220 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0912-72-340 2019 CR C,E SEABROOK $ 19,892,000LIMITS FROM KIRBY BLVD PROJECT SPONSOR HARRIS COUNTY

REVISION DATE 07/2018LIMITS TO SH 146PROJECT WIDEN TO 4-LANE DIVIDED ROADWAY INCLUDING BRIDGE AGROSS TAYLOR LAKE AND PEDESTRI MPO PROJ NUM 17066

DESCR AN AND BICYCLE ACCOMODATIONS FUNDING CAT(S) 7REMARKS Facility: RED BLUFF RD PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP.(Engineering phase authorized for design review costs only)

TOTAL PROJECT COST INFORMATIONPREL ENG $ 1,049,708

ROW PURCH $ 0 COST OFCONSTR $ 19,817,000 APPROVED

CONST ENG $ 994,600 PHASESCONTING $ 1,989,200 $ 19,892,000INDIRECT $ 1,010,514BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 24,861,022

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 15,913,600 $ 0 $ 0 $ 3,978,400 $ 0 $ 19,892,000TOTAL $ 15,913,600 $ 0 $ 0 $ 3,978,400 $ 0 $ 19,892,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0912-72-387 2019 CS T HOUSTON $ 1,989,000LIMITS FROM SOUTH ST PROJECT SPONSOR GREATER NORTHSIDE MANAGEMENT DISTRICT

REVISION DATE 07/2018LIMITS TO GANO STPROJECT RECONSTRUCT BACK OF CURB INFRASTRUCTURE (SIDEWALKS, CURBS, ADA RAMPS, PEDESTRIAN MPO PROJ NUM 17065

DESCR LIGHTING AND LANDSCAPING) FUNDING CAT(S) 9TAPREMARKS Facility: QUITMAN ST PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 1,989,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 1,989,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,989,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 1,591,200 $ 0 $ 0 $ 397,800 $ 0 $ 1,989,000TOTAL $ 1,591,200 $ 0 $ 0 $ 397,800 $ 0 $ 1,989,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0720-03-134 2019 SH 249 C HOUSTON $ 4,300,000LIMITS FROM SL 8 PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO IH 45 NPROJECT INSTALL ITS EQUIPMENT AND INFRASTRUCTURE (144-STRAND FIBER TRUNK LINE, CLOSED-CI MPO PROJ NUM 17063

DESCR RCUIT CAMERAS, DYNAMIC MESSAGE SIGNS RADAR-BASED VEHICLES SENSING DEVICES AND TR FUNDING CAT(S) 2MAVEL TIME READERS)

REMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2P7 HISTORY 019-2022 TIP.

TOTAL PROJECT COST INFORMATIONPREL ENG $ 210,700

ROW PURCH $ 0 COST OFCONSTR $ 4,300,000 APPROVED

CONST ENG $ 258,000 PHASESCONTING $ 430,000 $ 4,300,000INDIRECT $ 218,440BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 5,417,140

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 3,440,000 $ 860,000 $ 0 $ 0 $ 0 $ 4,300,000TOTAL $ 3,440,000 $ 860,000 $ 0 $ 0 $ 0 $ 4,300,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 221: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 221 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON FORT BEND 0912-34-192 2019 VA C,E NONE $ 6,740,000LIMITS FROM VA PROJECT SPONSOR FORT BEND COUNTY

REVISION DATE 07/2018LIMITS TO VAPROJECT CONSTRUCT WIRELESS TRAFFIC SIGNAL COMMUNICATION SYSTEM MPO PROJ NUM 17062

DESCR FUNDING CAT(S) 5REMARKS Facility: FORT BEND COUNTY PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 314,833ROW PURCH $ 0 COST OF

CONSTR $ 6,425,167 APPROVEDCONST ENG $ 321,258 PHASES

CONTING $ 642,517 $ 6,740,000INDIRECT $ 326,398BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 8,030,173

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 5,392,000 $ 0 $ 0 $ 1,348,000 $ 0 $ 6,740,000TOTAL $ 5,392,000 $ 0 $ 0 $ 1,348,000 $ 0 $ 6,740,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0000-00-000 2019 SS 548 C,E,R NONE $ 71,000,000LIMITS FROM AT SL 8 PROJECT SPONSOR HCTRA

REVISION DATE 07/2018LIMITS TOPROJECT Construct EB-SB and NB-WB direct connectors MPO PROJ NUM 16076

DESCR FUNDING CAT(S) 3RTRREMARKS Facility: HARDY TOLL RD PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,335,213ROW PURCH $ 11,914,351 COST OF

CONSTR $ 47,657,404 APPROVEDCONST ENG $ 1,906,296 PHASES

CONTING $ 4,765,740 $ 71,000,000INDIRECT $ 2,420,996BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 71,000,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3RTR $ 0 $ 0 $ 0 $ 71,000,000 $ 0 $ 71,000,000TOTAL $ 0 $ 0 $ 0 $ 71,000,000 $ 0 $ 71,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON MONTGOMERY 0000-00-000 2019 CS C CONROE $ 2,000,000LIMITS FROM LP 336 N PROJECT SPONSOR CITY OF CONROE

REVISION DATE 07/2018LIMITS TO LP 336 SPROJECT CONSTRUCT BIKE FACILITY MPO PROJ NUM 15503

DESCR FUNDING CAT(S) 3LCREMARKS Facility: LONGMIRE RD PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 98,000ROW PURCH $ 0 COST OF

CONSTR $ 2,000,000 APPROVEDCONST ENG $ 120,000 PHASES

CONTING $ 200,000 $ 2,000,000INDIRECT $ 101,600BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,519,600

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 2,000,000 $ 0 $ 2,000,000TOTAL $ 0 $ 0 $ 0 $ 2,000,000 $ 0 $ 2,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 222: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 222 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON FORT BEND 0000-00-000 2019 FM 2759 C ROSENBERG $ 30,918,888LIMITS FROM 1000’’ N OF BNSF RR TO 1000’’ S PROJECT SPONSOR FORT BEND COUNTY

REVISION DATE 07/2018LIMITS TOPROJECT PHASE 2: CONSTRUCT ELEVATED INTERSECTION OF CRABB RIVER ROAD AND THOMPSON’’S HIG MPO PROJ NUM 15382

DESCR HWAY OVER BNSF RR FUNDING CAT(S) 3LCREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,515,026ROW PURCH $ 0 COST OF

CONSTR $ 30,918,888 APPROVEDCONST ENG $ 1,236,756 PHASES

CONTING $ 3,091,889 $ 30,918,888INDIRECT $ 1,570,680BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 38,333,237

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 30,918,888 $ 30,918,888TOTAL $ 0 $ 0 $ 0 $ 0 $ 30,918,888 $ 30,918,888

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0000-00-000 2019 SS 548 C HOUSTON $ 250,000,000LIMITS FROM IH 610/SS 548 PROJECT SPONSOR HCTRA

REVISION DATE 07/2018LIMITS TO US 59PROJECT CONSTRUCT 4-LANE TOLL ROAD TO COMPLETE HARDY "TOLL" ROAD MPO PROJ NUM 15208

DESCR FUNDING CAT(S) 3RTRREMARKS Facility: HARDY TOLL RD PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 12,250,000ROW PURCH $ 0 COST OF

CONSTR $ 250,000,000 APPROVEDCONST ENG $ 10,000,000 PHASES

CONTING $ 25,000,000 $ 250,000,000INDIRECT $ 12,700,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 309,950,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3RTR $ 0 $ 0 $ 0 $ 250,000,000 $ 0 $ 250,000,000TOTAL $ 0 $ 0 $ 0 $ 250,000,000 $ 0 $ 250,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON GALVESTON 0389-06-095 2019 SH 146 C KEMAH $ 70,000,000LIMITS FROM HARRIS/GALVESTON C/L PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO FM 518PROJECT WIDEN TO 6-LANES ARTERIAL WITH 4-LANE EXPRESS LANES MPO PROJ NUM 13842

DESCR FUNDING CAT(S) 2MREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 3,430,000ROW PURCH $ 39,300,000 COST OF

CONSTR $ 70,000,000 APPROVEDCONST ENG $ 2,800,000 PHASES

CONTING $ 7,000,000 $ 70,000,000INDIRECT $ 3,556,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 126,086,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 56,000,000 $ 14,000,000 $ 0 $ 0 $ 0 $ 70,000,000TOTAL $ 56,000,000 $ 14,000,000 $ 0 $ 0 $ 0 $ 70,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 223: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 223 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON 0912-00-558 2019 VA C NONE $ 8,000,000LIMITS FROM VA PROJECT SPONSOR H-GAC

REVISION DATE 07/2018LIMITS TO VAPROJECT REGIONAL FREEWAY INCIDENT MANAGEMENT - TOWING (FY2019) MPO PROJ NUM 11916

DESCR FUNDING CAT(S) 7REMARKS Facility: HOUSTON-GALVESTON TMA PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. 1,600,000 TDCs as non-federal match. TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 8,000,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 8,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 8,000,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 8,000,000 $ 0 $ 0 $ 0 $ 0 $ 8,000,000TOTAL $ 8,000,000 $ 0 $ 0 $ 0 $ 0 $ 8,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON 0912-00-556 2019 VA C NONE $ 8,000,000LIMITS FROM VA PROJECT SPONSOR H-GAC

REVISION DATE 07/2018LIMITS TO VAPROJECT REGIONAL FREEWAY INCIDENT MANAGEMENT - MOTORIST ASSISTANCE, SURVEILLANCE AND PRO MPO PROJ NUM 11914

DESCR GRAM ADMINISTRATION (FYs 2019 & 2020) FUNDING CAT(S) 7REMARKS Facility: HOUSTON-GALVESTON TMA PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. 1,600,000 TDCs as non-fedral match. TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 8,000,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 8,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 8,000,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 8,000,000 $ 0 $ 0 $ 0 $ 0 $ 8,000,000TOTAL $ 8,000,000 $ 0 $ 0 $ 0 $ 0 $ 8,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON 0912-00-547 2019 VA C HOUSTON $ 2,400,000LIMITS FROM VA PROJECT SPONSOR METRO

REVISION DATE 07/2018LIMITS TO VAPROJECT METRO STAR VANPOOL (CMAQ): FY 2018 MPO PROJ NUM 11717

DESCR FUNDING CAT(S) 5REMARKS Facility: METRO SERVICE AREA PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 2,400,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 2,400,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,400,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 2,400,000 $ 0 $ 0 $ 0 $ 0 $ 2,400,000TOTAL $ 2,400,000 $ 0 $ 0 $ 0 $ 0 $ 2,400,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 224: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 224 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON 0912-00-546 2019 VA C HOUSTON $ 3,750,000LIMITS FROM VA PROJECT SPONSOR METRO

REVISION DATE 07/2018LIMITS TO VAPROJECT METRO STAR VANPOOL (STP): FY 2019 MPO PROJ NUM 11716

DESCR FUNDING CAT(S) 7REMARKS Facility: METRO SERVICE AREA PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 3,750,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 3,750,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 3,750,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 3,000,000 $ 0 $ 0 $ 750,000 $ 0 $ 3,750,000TOTAL $ 3,000,000 $ 0 $ 0 $ 750,000 $ 0 $ 3,750,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON FORT BEND 0188-02-036 2019 SH 36 C $ 38,300,000LIMITS FROM S OF NEEDVILLE FAIRCHILDS RD PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO BRAZORIA C/LPROJECT WIDEN TO 4-LANE DIVIDED ROADWAY (CONTINUOUS LEFT TURN LANE AND RURAL IN SECTIONS MPO PROJ NUM 11562

DESCR ) WITH INTERSECTION IMPROVEMENTS AND BICYCLE ACCOMMODATIONS FUNDING CAT(S) 2MREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,876,700ROW PURCH $ 15,810,000 COST OF

CONSTR $ 38,300,000 APPROVEDCONST ENG $ 1,532,000 PHASES

CONTING $ 3,830,000 $ 38,300,000INDIRECT $ 1,945,640BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 63,294,340

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 30,640,000 $ 7,660,000 $ 0 $ 0 $ 0 $ 38,300,000TOTAL $ 30,640,000 $ 7,660,000 $ 0 $ 0 $ 0 $ 38,300,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON 0912-00-554 2019 VA C HOUSTON $ 2,000,000LIMITS FROM VA PROJECT SPONSOR HOUSTON TRANSTAR

REVISION DATE 07/2018LIMITS TO VAPROJECT REGIONAL ITS INFRASTRUCTURE - HARDWARE/SOFTWARE, UTILITIES AND COMMUNICATIONS: F MPO PROJ NUM 11080

DESCR Y 2019 FUNDING CAT(S) 7REMARKS Facility: HOUSTON TRANSTAR PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 98,000ROW PURCH $ 0 COST OF

CONSTR $ 2,000,000 APPROVEDCONST ENG $ 120,000 PHASES

CONTING $ 200,000 $ 2,000,000INDIRECT $ 101,600BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,519,600

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 1,600,000 $ 0 $ 0 $ 400,000 $ 0 $ 2,000,000TOTAL $ 1,600,000 $ 0 $ 0 $ 400,000 $ 0 $ 2,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 225: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 225 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON FORT BEND 0912-34-194 2019 VA T ROSENBERG $ 3,500,000LIMITS FROM AT COTTONWOOD SCHOOL RD PROJECT SPONSOR FORT BEND COUNTY

REVISION DATE 07/2018LIMITS TOPROJECT REIMBURSEMENT FOR FORT BEND COUNTY TRANSIT ADMINISTRATION AND OPERATIONS FACILIT MPO PROJ NUM 11028

DESCR Y (1 OF 2) FUNDING CAT(S) 5 FLEXREMARKS Facility: FORT BEND COUNTY TRANSIT ADMINISTRATION A PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 ND OPERATIONS FACILITY HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 21,500,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 3,500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 21,500,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 FLEX $ 2,800,000 $ 0 $ 0 $ 700,000 $ 0 $ 3,500,000TOTAL $ 2,800,000 $ 0 $ 0 $ 700,000 $ 0 $ 3,500,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON GALVESTON 0500-04-105 2019 IH 45 C LA MARQUE $ 121,600,000LIMITS FROM N OF FM 1764 PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO N OF FM 519PROJECT RECONSTRUCT AND WIDEN TO 8 MAIN LANES AND TWO 2-LANE FRONTAGE ROADS MPO PROJ NUM 6045

DESCR FUNDING CAT(S) 4REMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 5,958,400ROW PURCH $ 42,560,000 COST OF

CONSTR $ 121,600,000 APPROVEDCONST ENG $ 4,864,000 PHASES

CONTING $ 12,160,000 $ 121,600,000INDIRECT $ 6,177,280BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 193,319,680

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 97,280,000 $ 24,320,000 $ 0 $ 0 $ 0 $ 121,600,000TOTAL $ 97,280,000 $ 24,320,000 $ 0 $ 0 $ 0 $ 121,600,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON FORT BEND 0188-02-029 2019 SH 36 C $ 59,400,000LIMITS FROM FM 2218 PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO S OF NEEDVILLE FAIRCHILDS RDPROJECT WIDEN TO 4-LANE DIVIDED ROADWAY (CONTINUOUS LEFT TURN LANE AND RURAL IN SECTIONS MPO PROJ NUM 262

DESCR ) WITH INTERSECTION IMPROVEMENTS AND BICYCLE ACCOMMODATIONS FUNDING CAT(S) 4REMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,910,600ROW PURCH $ 21,400,000 COST OF

CONSTR $ 59,400,000 APPROVEDCONST ENG $ 2,376,000 PHASES

CONTING $ 5,940,000 $ 59,400,000INDIRECT $ 3,017,520BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 95,044,120

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 47,520,000 $ 11,880,000 $ 0 $ 0 $ 0 $ 59,400,000TOTAL $ 47,520,000 $ 11,880,000 $ 0 $ 0 $ 0 $ 59,400,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 226: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 226 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

BEAUMONT HOUSTON-GALVESTON LIBERTY 0177-03-096 2019 US 59 N C CLEVELAND $ 112,000,000LIMITS FROM S END OF CLEVELAND BY-PASS PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO MONTGOMERY C/LPROJECT RECONSTRUCT AND WIDEN TO 6 MAIN LANES WITH FRONTAGE ROADS MPO PROJ NUM 223

DESCR FUNDING CAT(S) 4,12REMARKS Facility: US 59 PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 5,488,000ROW PURCH $ 2,002,000 COST OF

CONSTR $ 112,000,000 APPROVEDCONST ENG $ 4,480,000 PHASES

CONTING $ 11,200,000 $ 112,000,000INDIRECT $ 5,689,600BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 140,859,600

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 41,600,000 $ 10,400,000 $ 0 $ 0 $ 0 $ 52,000,00012 $ 48,000,000 $ 12,000,000 $ 0 $ 0 $ 0 $ 60,000,000TOTAL $ 89,600,000 $ 22,400,000 $ 0 $ 0 $ 0 $ 112,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON MONTGOMERY 1400-04-037 2019 FM 1774 C MAGNOLIA $ 15,000,000LIMITS FROM FM 1486 PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO WALLER C/LPROJECT WIDEN TO 4-LANE DIVIDED RURAL MPO PROJ NUM 10159

DESCR FUNDING CAT(S) 2M,7REMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 735,000ROW PURCH $ 0 COST OF

CONSTR $ 15,000,000 APPROVEDCONST ENG $ 750,000 PHASES

CONTING $ 1,500,000 $ 15,000,000INDIRECT $ 762,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 18,747,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 4,385,600 $ 1,096,400 $ 0 $ 0 $ 0 $ 5,482,0007 $ 7,614,400 $ 1,903,600 $ 0 $ 0 $ 0 $ 9,518,000TOTAL $ 12,000,000 $ 3,000,000 $ 0 $ 0 $ 0 $ 15,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON GALVESTON 0500-04-106 2019 IH 45 C TEXAS CITY $ 146,464,000LIMITS FROM S OF FM 1764 PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO N OF FM 517PROJECT RECONSTRUCT AND WIDEN TO 8 MAIN LANES AND TWO 2-LANE FRONTAGE ROADS MPO PROJ NUM 6044

DESCR FUNDING CAT(S) 2M,11REMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 7,176,736ROW PURCH $ 25,990,000 COST OF

CONSTR $ 146,464,000 APPROVEDCONST ENG $ 5,858,560 PHASES

CONTING $ 14,646,400 $ 146,464,000INDIRECT $ 7,440,371BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 207,576,067

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 85,171,200 $ 21,292,800 $ 0 $ 0 $ 0 $ 106,464,00011 $ 32,000,000 $ 8,000,000 $ 0 $ 0 $ 0 $ 40,000,000TOTAL $ 117,171,200 $ 29,292,800 $ 0 $ 0 $ 0 $ 146,464,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 227: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 227 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON GALVESTON 0912-73-207 2019 CS E GALVESTON $ 187,000LIMITS FROM BODDECKER DR PROJECT SPONSOR CITY OF GALVESTON

REVISION DATE 07/2018LIMITS TO SH 87PROJECT ENGINEERING FOR MILL AND OVERLAY MPO PROJ NUM 17071

DESCR FUNDING CAT(S) 7REMARKS Facility: SEAWALL BLVD PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 86,044ROW PURCH $ 0 COST OF

CONSTR $ 105,360 APPROVEDCONST ENG $ 1,756,000 PHASES

CONTING $ 175,600 $ 187,000INDIRECT $ 89,205BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,212,209

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 149,600 $ 0 $ 0 $ 37,400 $ 0 $ 187,000TOTAL $ 149,600 $ 0 $ 0 $ 37,400 $ 0 $ 187,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON 0051-02-101 2019 SH 3 C WEBSTER $ 8,426,000LIMITS FROM RICHEY ST S PROJECT SPONSOR CITY OF WEBSTER

REVISION DATE 07/2018LIMITS TO FM 518PROJECT MILL AND ASPHALT OVERLAY OF SHOULDERS, SHOULDER WIDENING, PAVEMENT MARKINGS, STR MPO PROJ NUM 17061

DESCR IPING AND SIGNAGE FOR BIKE FACILITY FUNDING CAT(S) 9TAPREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 412,874ROW PURCH $ 0 COST OF

CONSTR $ 8,426,000 APPROVEDCONST ENG $ 421,300 PHASES

CONTING $ 842,600 $ 8,426,000INDIRECT $ 428,041BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 10,530,815

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 6,740,800 $ 1,685,200 $ 0 $ 0 $ 0 $ 8,426,000TOTAL $ 6,740,800 $ 1,685,200 $ 0 $ 0 $ 0 $ 8,426,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

BEAUMONT HOUSTON-GALVESTON CHAMBERS 0508-02-120 2019 IH 10 C NONE $ 27,584,000LIMITS FROM AT FM 3180 PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TOPROJECT CONSTRUCT OVERPASS AND RECONFIGURE INTERCHANGE MPO PROJ NUM 17059

DESCR FUNDING CAT(S) 2MREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,351,616ROW PURCH $ 0 COST OF

CONSTR $ 27,584,000 APPROVEDCONST ENG $ 1,103,360 PHASES

CONTING $ 2,758,400 $ 27,584,000INDIRECT $ 1,401,267BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 34,198,643

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 22,067,200 $ 5,516,800 $ 0 $ 0 $ 0 $ 27,584,000TOTAL $ 22,067,200 $ 5,516,800 $ 0 $ 0 $ 0 $ 27,584,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 228: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 228 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

BEAUMONT HOUSTON-GALVESTON CHAMBERS 3271-01-015 2019 FM 3180 C NONE $ 3,815,000LIMITS FROM IH 10 PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO 0.60 MI S OF FM 565PROJECT WIDEN TO 4-LANES WITH CLTL AND 10FT SHOULDERS MPO PROJ NUM 17058

DESCR FUNDING CAT(S) 7REMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 186,935ROW PURCH $ 0 COST OF

CONSTR $ 3,815,000 APPROVEDCONST ENG $ 228,900 PHASES

CONTING $ 381,500 $ 3,815,000INDIRECT $ 193,802BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 4,806,137

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 3,052,000 $ 763,000 $ 0 $ 0 $ 0 $ 3,815,000TOTAL $ 3,052,000 $ 763,000 $ 0 $ 0 $ 0 $ 3,815,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

BEAUMONT HOUSTON-GALVESTON CHAMBERS 2242-02-022 2019 FM 2354 C BEACH CITY $ 5,709,997LIMITS FROM FM 3180 PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO S OF FISHER RDPROJECT ADD CENTER LEFT TURN LANE AND WIDEN SHOULDERS. ADD NB LEFT TURN LANE AT FISHER R MPO PROJ NUM 17057

DESCR OAD. FUNDING CAT(S) 1,7REMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 279,790ROW PURCH $ 0 COST OF

CONSTR $ 5,709,997 APPROVEDCONST ENG $ 285,500 PHASES

CONTING $ 571,000 $ 5,709,997INDIRECT $ 290,068BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 7,136,354

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL1 $ 2,650,398 $ 662,599 $ 0 $ 0 $ 0 $ 3,312,9977 $ 1,917,600 $ 479,400 $ 0 $ 0 $ 0 $ 2,397,000TOTAL $ 4,567,998 $ 1,141,999 $ 0 $ 0 $ 0 $ 5,709,997

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0912-72-363 2019 CS C,E HOUSTON $ 11,507,000LIMITS FROM N OF WESTHEIMER ST PROJECT SPONSOR WESTCHASE MD

REVISION DATE 07/2018LIMITS TO WESTPARK DRPROJECT RECONSTRUCT ROADWAY INCLUDING CURB, GUTTER, SIDEWALKS, LANDSCAPING ADA RAMPS, PE MPO PROJ NUM 17056

DESCR DESTRIAN LIGHTING AND REPLACE WATER AND STORM WATER INFRASTRUCTURE FUNDING CAT(S) 7REMARKS Facility: WALNUT BEND ST PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP.(Engineering phase authorized for design review costs only)

TOTAL PROJECT COST INFORMATIONPREL ENG $ 638,843

ROW PURCH $ 0 COST OFCONSTR $ 11,432,000 APPROVED

CONST ENG $ 575,350 PHASESCONTING $ 1,150,700 $ 11,507,000INDIRECT $ 584,556BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 14,381,449

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 9,205,600 $ 0 $ 0 $ 2,301,400 $ 0 $ 11,507,000TOTAL $ 9,205,600 $ 0 $ 0 $ 2,301,400 $ 0 $ 11,507,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 229: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 229 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0912-72-371 2019 VA C,E NONE $ 9,417,000LIMITS FROM VA PROJECT SPONSOR HARRIS COUNTY

REVISION DATE 07/2018LIMITS TO VAPROJECT CONSTRUCT TURN LANES, AUXILIARY LANES, RAISED MEDIANS AND OTHER GEOMETRIC IMPROV MPO PROJ NUM 17053

DESCR EMENTS AT ARTERIAL AND MAJOR COLLECTOR SIGNALIZED INTERSECTIONS FUNDING CAT(S) 7REMARKS Facility: HARRIS COUNTY PRECINCT 4 PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP.(Engineering phase authorized for design review costs only)

TOTAL PROJECT COST INFORMATIONPREL ENG $ 536,433

ROW PURCH $ 0 COST OFCONSTR $ 9,342,000 APPROVED

CONST ENG $ 470,850 PHASESCONTING $ 941,700 $ 9,417,000INDIRECT $ 478,384BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 11,769,367

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 7,533,600 $ 237,500 $ 0 $ 1,645,900 $ 0 $ 9,417,000TOTAL $ 7,533,600 $ 237,500 $ 0 $ 1,645,900 $ 0 $ 9,417,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON FORT BEND 1257-01-049 2019 FM 1092 C STAFFORD $ 1,795,000LIMITS FROM AT WEST AIRPORT BLVD PROJECT SPONSOR CITY OF STAFFORD

REVISION DATE 07/2018LIMITS TOPROJECT CONSTRUCT DEDICATED TURN LANES, UPGRADE TRAFFIC SIGNALS AND CROSSWALKS WITH WHEE MPO PROJ NUM 17052

DESCR LCHAIR RAMPS AND CONNECT EXISTING SIDEWALKS TO THE INTERSECTION FUNDING CAT(S) 7REMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 87,955ROW PURCH $ 0 COST OF

CONSTR $ 1,795,000 APPROVEDCONST ENG $ 107,700 PHASES

CONTING $ 179,500 $ 1,795,000INDIRECT $ 91,186BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,261,341

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 1,436,000 $ 0 $ 0 $ 359,000 $ 0 $ 1,795,000TOTAL $ 1,436,000 $ 0 $ 0 $ 359,000 $ 0 $ 1,795,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 1062-04-058 2019 FM 2100 C NONE $ 22,000,000LIMITS FROM FM 1960 PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO S OF ANTELOPE DRPROJECT WIDEN TO 4-LANE DIVIDED MPO PROJ NUM 17049

DESCR FUNDING CAT(S) 2MREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,078,000ROW PURCH $ 16,960,000 COST OF

CONSTR $ 22,000,000 APPROVEDCONST ENG $ 1,100,000 PHASES

CONTING $ 2,200,000 $ 22,000,000INDIRECT $ 1,117,600BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 44,455,600

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 17,600,000 $ 4,400,000 $ 0 $ 0 $ 0 $ 22,000,000TOTAL $ 17,600,000 $ 4,400,000 $ 0 $ 0 $ 0 $ 22,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 230: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 230 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 1062-04-057 2019 FM 2100 C NONE $ 19,500,000LIMITS FROM S OF ANTELOPE DR PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO N OF HARE COOK RDPROJECT WIDEN TO 4-LANE DIVIDED MPO PROJ NUM 17048

DESCR FUNDING CAT(S) 2MREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 955,500ROW PURCH $ 28,580,000 COST OF

CONSTR $ 19,500,000 APPROVEDCONST ENG $ 975,000 PHASES

CONTING $ 1,950,000 $ 19,500,000INDIRECT $ 990,600BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 52,951,100

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 15,600,000 $ 3,900,000 $ 0 $ 0 $ 0 $ 19,500,000TOTAL $ 15,600,000 $ 3,900,000 $ 0 $ 0 $ 0 $ 19,500,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0912-72-365 2019 CS C,E HOUSTON $ 4,031,000LIMITS FROM VA PROJECT SPONSOR CITY OF HOUSTON

REVISION DATE 07/2018LIMITS TO VAPROJECT IMPLEMENTATION OF AUTOMATED PARKING GUIDANCE SYSTEM (AGPS) INCLUDING DYNAMIC MES MPO PROJ NUM 17047

DESCR SAGE SIGNS AND INFORMATION SYSTEMS FUNDING CAT(S) 5REMARKS Facility: HOUSTON CBD PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP.(Engineering phase authorized for design review costs only)

TOTAL PROJECT COST INFORMATIONPREL ENG $ 272,519

ROW PURCH $ 0 COST OFCONSTR $ 3,956,000 APPROVED

CONST ENG $ 241,860 PHASESCONTING $ 403,100 $ 4,031,000INDIRECT $ 204,775BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 5,078,254

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 3,224,800 $ 0 $ 0 $ 806,200 $ 0 $ 4,031,000TOTAL $ 3,224,800 $ 0 $ 0 $ 806,200 $ 0 $ 4,031,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0028-02-092 2019 US 90 C HOUSTON $ 4,573,000LIMITS FROM IH 610 E PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO SL 8PROJECT INSTALL ITS EQUIPMENT AND INFRASTRUCTURE (144-STRAND FIBER TRUNK LINE, CLOSED-CI MPO PROJ NUM 17043

DESCR RCUIT CAMERAS, DYNAMIC MESSAGE SIGNS RADAR-BASED VEHICLES SENSING DEVICES AND TR FUNDING CAT(S) 5AVEL TIME READERS)

REMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2P7 HISTORY 019-2022 TIP.

TOTAL PROJECT COST INFORMATIONPREL ENG $ 224,077

ROW PURCH $ 0 COST OFCONSTR $ 4,573,000 APPROVED

CONST ENG $ 274,380 PHASESCONTING $ 457,300 $ 4,573,000INDIRECT $ 232,308BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 5,761,065

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 3,658,400 $ 914,600 $ 0 $ 0 $ 0 $ 4,573,000TOTAL $ 3,658,400 $ 914,600 $ 0 $ 0 $ 0 $ 4,573,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 231: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 231 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0508-01-356 2019 IH 10 C BAYTOWN $ 5,734,000LIMITS FROM GARTH RD PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO SH 99PROJECT INSTALL ITS EQUIPMENT AND INFRASTRUCTURE (144-STRAND FIBER TRUNK LINE, CLOSED-CI MPO PROJ NUM 17042

DESCR RCUIT CAMERAS, DYNAMIC MESSAGE SIGNS RADAR-BASED VEHICLES SENSING DEVICES AND TR FUNDING CAT(S) 5AVEL TIME READERS)

REMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2P7 HISTORY 019-2022 TIP.

TOTAL PROJECT COST INFORMATIONPREL ENG $ 280,966

ROW PURCH $ 0 COST OFCONSTR $ 5,734,000 APPROVED

CONST ENG $ 286,700 PHASESCONTING $ 573,400 $ 5,734,000INDIRECT $ 291,287BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 7,166,353

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 4,587,200 $ 1,146,800 $ 0 $ 0 $ 0 $ 5,734,000TOTAL $ 4,587,200 $ 1,146,800 $ 0 $ 0 $ 0 $ 5,734,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 1005-02-001 2019 FM 525 C HOUSTON $ 2,209,000LIMITS FROM LEE RD PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO US 59PROJECT RECONSTRUCT AND WIDEN FROM 2 LANES TO 4 LANES DIVIDED WITH CURBS AND GUTTERS MPO PROJ NUM 17037

DESCR FUNDING CAT(S) 7REMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 108,241ROW PURCH $ 663,500 COST OF

CONSTR $ 2,209,000 APPROVEDCONST ENG $ 132,540 PHASES

CONTING $ 220,900 $ 2,209,000INDIRECT $ 112,217BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 3,446,398

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 1,767,200 $ 441,800 $ 0 $ 0 $ 0 $ 2,209,000TOTAL $ 1,767,200 $ 441,800 $ 0 $ 0 $ 0 $ 2,209,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON BRAZORIA 0912-31-303 2019 CR C,E NONE $ 17,062,000LIMITS FROM CR 90 PROJECT SPONSOR BRAZORIA COUNTY

REVISION DATE 07/2018LIMITS TO FM 1128PROJECT RECONSTRUCT AND WIDEN FROM 2 TO 4-LANES WITH RAISED MEDIAN, SIDEWALKS AND DRAINA MPO PROJ NUM 17033

DESCR GE IMPROVEMENTS FUNDING CAT(S) 7REMARKS Facility: CR 101 PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. (Engineering phase authorized for design review costs only)

TOTAL PROJECT COST INFORMATIONPREL ENG $ 911,038

ROW PURCH $ 750,000 COST OFCONSTR $ 16,987,000 APPROVED

CONST ENG $ 853,100 PHASESCONTING $ 1,706,200 $ 17,062,000INDIRECT $ 866,750BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 22,074,088

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 13,649,600 $ 0 $ 0 $ 3,412,400 $ 0 $ 17,062,000TOTAL $ 13,649,600 $ 0 $ 0 $ 3,412,400 $ 0 $ 17,062,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 232: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 232 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0912-72-370 2019 CS T HOUSTON $ 3,523,000LIMITS FROM WESTHEIMER ST PROJECT SPONSOR UPPER KIRBY DISTRICT

REVISION DATE 07/2018LIMITS TO US 59PROJECT RECONSTRUCT AND WIDEN SIDEWALKS AND ADA RAMPS AND INSTALLATION OF LIGHTING, BENC MPO PROJ NUM 17030

DESCR HES AND BUS SHELTERS FUNDING CAT(S) 9TAPREMARKS Facility: SHEPHERD ST, FARNHAM ST PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 3,523,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 3,523,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 3,523,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 2,818,400 $ 0 $ 0 $ 704,600 $ 0 $ 3,523,000TOTAL $ 2,818,400 $ 0 $ 0 $ 704,600 $ 0 $ 3,523,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 1258-04-065 2019 CS C,E HOUSTON $ 12,901,000LIMITS FROM KIRKWOOD DR S PROJECT SPONSOR WESTCHASE MD

REVISION DATE 07/2018LIMITS TO WESTERLAND DRPROJECT RECONSTRUCT BACK OF CURB INFRASTRUCTURE (WIDER SIDEWALKS, STREET FURNITURE, BOLL MPO PROJ NUM 17028

DESCR ARDS, PEDESTRIAN LIGHTING AND ENHANCED TRANSIT STOPS) FUNDING CAT(S) 9TAPREMARKS Facility: WESTHEIMER ST PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP.(Engineering phase authorized for design review costs only)

TOTAL PROJECT COST INFORMATIONPREL ENG $ 707,149

ROW PURCH $ 0 COST OFCONSTR $ 12,826,000 APPROVED

CONST ENG $ 645,050 PHASESCONTING $ 1,290,100 $ 12,901,000INDIRECT $ 655,371BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 16,123,670

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 10,320,800 $ 0 $ 0 $ 2,580,200 $ 0 $ 12,901,000TOTAL $ 10,320,800 $ 0 $ 0 $ 2,580,200 $ 0 $ 12,901,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0912-72-372 2019 CR C,E NONE $ 17,160,000LIMITS FROM TELGE RD to FM 2920, HOLZWARTH RD to FM 1960 PROJECT SPONSOR HARRIS COUNTY

REVISION DATE 07/2018LIMITS TO and CLAY RD to FM 1960 & GRANT RD to SPRING CYPRESS RDPROJECT CONSTRUCT GEOMETRIC IMPROVEMENTS AND TRAFFIC SIGNAL AND COMMUNICATION UPGRADES AMPO PROJ NUM 17026

DESCR T 77 INTERSECTIONS FUNDING CAT(S) 7REMARKS Facility: SPRING CYPRESS RD, CYPRESSWOOD DR, ELDRID PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 GE PKWY N HISTORY 019-2022 TIP.(Engineering phase authorized for design review costs only)

TOTAL PROJECT COST INFORMATIONPREL ENG $ 915,840

ROW PURCH $ 0 COST OFCONSTR $ 17,085,000 APPROVED

CONST ENG $ 858,000 PHASESCONTING $ 1,716,000 $ 17,160,000INDIRECT $ 871,728BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 21,446,568

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 13,728,000 $ 0 $ 0 $ 3,432,000 $ 0 $ 17,160,000TOTAL $ 13,728,000 $ 0 $ 0 $ 3,432,000 $ 0 $ 17,160,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 233: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 233 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON GALVESTON 0912-73-206 2019 CS C,E GALVESTON $ 503,118LIMITS FROM VA PROJECT SPONSOR CITY OF GALVESTON

REVISION DATE 07/2018LIMITS TO VAPROJECT DOWNTOWN PEDESTRIAN TRANSIT CONNECTIVITY IMPROVEMENTS MPO PROJ NUM 17006

DESCR FUNDING CAT(S) 9TAPREMARKS Facility: CITY OF GALVESTON PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP.(Engineering phase authorized for design review costs only)

TOTAL PROJECT COST INFORMATIONPREL ENG $ 99,653

ROW PURCH $ 0 COST OFCONSTR $ 428,118 APPROVED

CONST ENG $ 45,281 PHASESCONTING $ 50,312 $ 503,118INDIRECT $ 25,558BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 648,922

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 402,494 $ 0 $ 0 $ 100,624 $ 0 $ 503,118TOTAL $ 402,494 $ 0 $ 0 $ 100,624 $ 0 $ 503,118

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON GALVESTON 0912-73-208 2019 VA T TEXAS CITY $ 2,454,000LIMITS FROM VA PROJECT SPONSOR GULF COAST CENTER

REVISION DATE 07/2018LIMITS TO VAPROJECT CONSTRUCT PARK & RIDE WITH 400 AUTO AND 40 BUS PARKING SPACES AND PASSENGER TERM MPO PROJ NUM 16222

DESCR INAL FUNDING CAT(S) 5REMARKS Facility: TEXAS CITY PARK & RIDE PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 2,454,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 2,454,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,454,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 1,963,200 $ 0 $ 0 $ 490,800 $ 0 $ 2,454,000TOTAL $ 1,963,200 $ 0 $ 0 $ 490,800 $ 0 $ 2,454,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON 0912-00-541 2019 VA C $ 2,000,000LIMITS FROM VA PROJECT SPONSOR HOUSTON TRANSTAR

REVISION DATE 07/2018LIMITS TO VAPROJECT REGIONAL ITS INFRASTRUCTURE - HARDWARE/SOFTWARE, UTILITIES AND COMMUNICATIONS (F MPO PROJ NUM 17023

DESCR Y 2018) FUNDING CAT(S) 7REMARKS Facility: HOUSTON TRANSTAR PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 2,000,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 2,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,000,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 1,600,000 $ 0 $ 0 $ 400,000 $ 0 $ 2,000,000TOTAL $ 1,600,000 $ 0 $ 0 $ 400,000 $ 0 $ 2,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 234: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 234 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON 0912-00-539 2019 VA C NONE $ 8,000,000LIMITS FROM VA PROJECT SPONSOR H-GAC

REVISION DATE 07/2018LIMITS TO VAPROJECT REGIONAL FREEWAY INCIDENT MANAGEMENT - TOWING (FY2017/2018) MPO PROJ NUM 17020

DESCR FUNDING CAT(S) 7REMARKS Facility: HOUSTON-GALVESTON TMA PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. 1,600,000 TDCs as non-federal match. TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 8,000,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 8,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 8,000,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 8,000,000 $ 0 $ 0 $ 0 $ 0 $ 8,000,000TOTAL $ 8,000,000 $ 0 $ 0 $ 0 $ 0 $ 8,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0912-72-359 2019 CS E BAYTOWN $ 1,566,000LIMITS FROM IH 10 PROJECT SPONSOR CITY OF BAYTOWN

REVISION DATE 07/2018LIMITS TO SH 146PROJECT DESIGN CONGESTION AND SAFETY IMPROVEMENTS (ACCESS MANAGEMENT AND WIDENING FROM 4 MPO PROJ NUM 17015

DESCR TO 6 LANES IN SECTIONS) FUNDING CAT(S) 7REMARKS Facility: GARTH RD PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,566,000ROW PURCH $ 1,090,000 COST OF

CONSTR $ 15,937,000 APPROVEDCONST ENG $ 800,600 PHASES

CONTING $ 1,601,200 $ 1,566,000INDIRECT $ 813,410BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 21,808,210

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 1,252,800 $ 0 $ 0 $ 313,200 $ 0 $ 1,566,000TOTAL $ 1,252,800 $ 0 $ 0 $ 313,200 $ 0 $ 1,566,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON GALVESTON 0000-00-000 2019 CS C,E,R GALVESTON $ 17,300,000LIMITS FROM BROADWAY ST/SH 87 PROJECT SPONSOR CITY OF GALVESTON

REVISION DATE 07/2018LIMITS TO HARBORSIDE DR/SH 275PROJECT 61st Street 4-LANE extension to Harborside Final Design & Construction MPO PROJ NUM 9403

DESCR FUNDING CAT(S) 3LCREMARKS Facility: 61ST ST PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 565,209ROW PURCH $ 2,883,718 COST OF

CONSTR $ 11,534,871 APPROVEDCONST ENG $ 576,744 PHASES

CONTING $ 1,153,487 $ 17,300,000INDIRECT $ 585,971BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 17,300,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 17,300,000 $ 0 $ 17,300,000TOTAL $ 0 $ 0 $ 0 $ 17,300,000 $ 0 $ 17,300,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 235: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 235 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON WALLER 1400-03-006 2019 FM 1774 C NONE $ 11,000,000LIMITS FROM GRIMES C/L PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO MONTGOMERY C/ LPROJECT WIDEN TO 4-LANE DIVIDED RURAL MPO PROJ NUM 7407

DESCR FUNDING CAT(S) 2MREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 539,000ROW PURCH $ 2,300,000 COST OF

CONSTR $ 11,000,000 APPROVEDCONST ENG $ 550,000 PHASES

CONTING $ 1,100,000 $ 11,000,000INDIRECT $ 558,800BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 16,047,800

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 8,800,000 $ 2,200,000 $ 0 $ 0 $ 0 $ 11,000,000TOTAL $ 8,800,000 $ 2,200,000 $ 0 $ 0 $ 0 $ 11,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON BRAZORIA 0912-31-311 2019 CR C,E PEARLAND $ 33,184,000LIMITS FROM SMITH RANCH RD PROJECT SPONSOR CITY OF PEARLAND

REVISION DATE 07/2018LIMITS TO CULLEN BLVDPROJECT RECONSTRUCT AND WIDEN FROM 2-LANES TO 4-LANES, ADD MEDIAN & SHOULDERS, ADD SIDEW MPO PROJ NUM 671

DESCR ALKS FUNDING CAT(S) 7REMARKS Facility: HUGHES RANCH RD PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP.(Engineering phase authorized for design review costs only)

TOTAL PROJECT COST INFORMATIONPREL ENG $ 1,701,016

ROW PURCH $ 0 COST OFCONSTR $ 33,109,000 APPROVED

CONST ENG $ 1,327,360 PHASESCONTING $ 3,318,400 $ 33,184,000INDIRECT $ 1,685,747BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 41,141,523

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 26,547,200 $ 0 $ 0 $ 6,636,800 $ 0 $ 33,184,000TOTAL $ 26,547,200 $ 0 $ 0 $ 6,636,800 $ 0 $ 33,184,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON FORT BEND 0000-00-000 2019 CR C,E,R MISSOURI CITY $ 5,800,000LIMITS FROM FORT BEND PARKWAY TOLL RD PROJECT SPONSOR FORT BEND COUNTY

REVISION DATE 07/2018LIMITS TO CHIMNEY ROCK RDPROJECT CONSTRUCT 4-LANE UNDIVIDED ROAD MPO PROJ NUM 652

DESCR FUNDING CAT(S) 3LCREMARKS Facility: LAKE OLYMPIA PKWY PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 189,492ROW PURCH $ 966,796 COST OF

CONSTR $ 3,867,182 APPROVEDCONST ENG $ 193,359 PHASES

CONTING $ 386,718 $ 5,800,000INDIRECT $ 196,453BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 5,800,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 5,800,000 $ 5,800,000TOTAL $ 0 $ 0 $ 0 $ 0 $ 5,800,000 $ 5,800,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 236: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 236 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 1062-04-022 2019 FM 2100 C NONE $ 19,500,000LIMITS FROM N OF HARE COOK RD PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO S DIAMONDHEAD BLVDPROJECT WIDEN TO 4-LANE DIVIDED MPO PROJ NUM 538

DESCR FUNDING CAT(S) 2MREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 955,500ROW PURCH $ 5,280,000 COST OF

CONSTR $ 19,500,000 APPROVEDCONST ENG $ 975,000 PHASES

CONTING $ 1,950,000 $ 19,500,000INDIRECT $ 990,600BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 29,651,100

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 15,600,000 $ 3,900,000 $ 0 $ 0 $ 0 $ 19,500,000TOTAL $ 15,600,000 $ 3,900,000 $ 0 $ 0 $ 0 $ 19,500,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON MONTGOMERY 0177-14-010 2019 LP 494 C NONE $ 22,600,000LIMITS FROM N OF KINGWOOD DR PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO HARRIS C/LPROJECT RECONSTRUCT AND WIDEN TO 4-LANE DIVIDED URBAN SECTION (FLUSH MEDIAN) MPO PROJ NUM 188

DESCR FUNDING CAT(S) 2MREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,107,400ROW PURCH $ 1,421,000 COST OF

CONSTR $ 22,600,000 APPROVEDCONST ENG $ 1,130,000 PHASES

CONTING $ 2,260,000 $ 22,600,000INDIRECT $ 1,148,080BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 29,666,480

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 18,080,000 $ 4,520,000 $ 0 $ 0 $ 0 $ 22,600,000TOTAL $ 18,080,000 $ 4,520,000 $ 0 $ 0 $ 0 $ 22,600,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0177-15-003 2019 LP 494 C HOUSTON $ 5,046,000LIMITS FROM N OF SORTERS-MCCLELLAN RD PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO MONTGOMERY C/LPROJECT RECONSTRUCT AND WIDEN TO 4-LANE DIVIDED URBAN SECTION (RAISED MEDIAN) MPO PROJ NUM 114

DESCR FUNDING CAT(S) 2M,10REMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 247,254ROW PURCH $ 251,000 COST OF

CONSTR $ 5,046,000 APPROVEDCONST ENG $ 252,300 PHASES

CONTING $ 504,600 $ 5,046,000INDIRECT $ 256,337BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 6,557,491

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 3,716,854 $ 929,214 $ 0 $ 0 $ 0 $ 4,646,06810 $ 399,932 $ 0 $ 0 $ 0 $ 0 $ 399,932TOTAL $ 4,116,786 $ 929,214 $ 0 $ 0 $ 0 $ 5,046,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 237: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 237 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0389-05-116 2019 SH 146 C SEABROOK $ 73,000,000LIMITS FROM NASA RD 1 PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO HARRIS/GALVESTON C/LPROJECT WIDEN TO 6-LANE ARTERIAL WITH 4-LANE EXPRESS LANES MPO PROJ NUM 14632

DESCR FUNDING CAT(S) 2MREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 3,577,000ROW PURCH $ 0 COST OF

CONSTR $ 73,000,000 APPROVEDCONST ENG $ 2,920,000 PHASES

CONTING $ 7,300,000 $ 73,000,000INDIRECT $ 3,708,400BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 90,505,400

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 58,400,000 $ 14,600,000 $ 0 $ 0 $ 0 $ 73,000,000TOTAL $ 58,400,000 $ 14,600,000 $ 0 $ 0 $ 0 $ 73,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0389-05-088 2019 SH 146 C SEABROOK $ 35,430,000LIMITS FROM RED BLUFF RD PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO NASA 1PROJECT WIDEN TO 8-LANES, GS AT MAJOR INTERSECTIONS AND 2 2-LANE FRONTAGE ROADS MPO PROJ NUM 139

DESCR FUNDING CAT(S) 2MREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,736,070ROW PURCH $ 40,779,606 COST OF

CONSTR $ 35,430,000 APPROVEDCONST ENG $ 1,417,200 PHASES

CONTING $ 3,543,000 $ 35,430,000INDIRECT $ 1,799,844BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 84,705,720

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 28,344,000 $ 7,086,000 $ 0 $ 0 $ 0 $ 35,430,000TOTAL $ 28,344,000 $ 7,086,000 $ 0 $ 0 $ 0 $ 35,430,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0271-16-140 2019 IH 610 C HOUSTON $ 75,000,000LIMITS FROM W OF CAMBRIDGE ST PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO W OF SCOTT STPROJECT RECONSTRUCT MAINLANES, FRONTAGE ROAD, AND CONSTRUCT OVERPASS AT CAMBRIDGE/ALMEDAMPO PROJ NUM 16025

DESCR /UPRR FUNDING CAT(S) 12REMARKS Facility: IH 610 S PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 3,675,000ROW PURCH $ 7,280,000 COST OF

CONSTR $ 75,000,000 APPROVEDCONST ENG $ 3,000,000 PHASES

CONTING $ 7,500,000 $ 75,000,000INDIRECT $ 3,810,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 100,265,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL12 $ 60,000,000 $ 15,000,000 $ 0 $ 0 $ 0 $ 75,000,000TOTAL $ 60,000,000 $ 15,000,000 $ 0 $ 0 $ 0 $ 75,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 238: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 238 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON BRAZORIA 0912-31-293 2019 CS C PEARLAND $ 3,839,019LIMITS FROM HUGHES RANCH RD PROJECT SPONSOR CITY OF PEARLAND

REVISION DATE 07/2018LIMITS TO N OF BROADWAY (FM 518)PROJECT WIDEN FROM 2 TO 4-LANE DIVIDED CURB AND GUTTER MPO PROJ NUM 11654

DESCR FUNDING CAT(S) 7REMARKS Facility: SMITH RANCH RD PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 188,112ROW PURCH $ 0 COST OF

CONSTR $ 3,839,019 APPROVEDCONST ENG $ 230,341 PHASES

CONTING $ 383,902 $ 3,839,019INDIRECT $ 195,022BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 4,836,396

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 3,071,215 $ 0 $ 0 $ 767,804 $ 0 $ 3,839,019TOTAL $ 3,071,215 $ 0 $ 0 $ 767,804 $ 0 $ 3,839,019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON BRAZORIA 0912-31-291 2019 VA C PEARLAND $ 3,632,816LIMITS FROM VA PROJECT SPONSOR CITY OF PEARLAND

REVISION DATE 07/2018LIMITS TO VAPROJECT CONSTRUCT GREEN TEE TERRACE BIKE/PED TRAIL MPO PROJ NUM 16171

DESCR FUNDING CAT(S) 7,9TAPREMARKS Facility: GREEN TEE TERRACE BIKE/PED TRAIL PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 435,938ROW PURCH $ 105,184 COST OF

CONSTR $ 3,632,816 APPROVEDCONST ENG $ 217,969 PHASES

CONTING $ 363,282 $ 3,632,816INDIRECT $ 184,547BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 4,939,736

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 567,884 $ 0 $ 0 $ 141,971 $ 0 $ 709,8559TAP $ 2,338,369 $ 0 $ 0 $ 584,592 $ 0 $ 2,922,961TOTAL $ 2,906,253 $ 0 $ 0 $ 726,563 $ 0 $ 3,632,816

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON BRAZORIA 0912-31-292 2019 VA C PEARLAND $ 1,624,756LIMITS FROM VA PROJECT SPONSOR CITY OF PEARLAND

REVISION DATE 07/2018LIMITS TO VAPROJECT CONSTRUCT SHADOW CREEK RANCH BIKE/PED TRAIL MPO PROJ NUM 16169

DESCR FUNDING CAT(S) 7,9TAPREMARKS Facility: SHADOW CREEK BIKE/PED TRAIL PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 194,970ROW PURCH $ 115,732 COST OF

CONSTR $ 1,624,756 APPROVEDCONST ENG $ 97,485 PHASES

CONTING $ 162,476 $ 1,624,756INDIRECT $ 82,538BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,277,957

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 208,214 $ 0 $ 0 $ 52,054 $ 0 $ 260,2689TAP $ 1,091,590 $ 0 $ 0 $ 272,898 $ 0 $ 1,364,488TOTAL $ 1,299,804 $ 0 $ 0 $ 324,952 $ 0 $ 1,624,756

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 239: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 239 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON WALLER 0912-56-052 2019 CS C $ 1,598,660LIMITS FROM VA PROJECT SPONSOR CITY OF WALLER

REVISION DATE 07/2018LIMITS TO VAPROJECT CITY OF WALLER LCI - CONSTRUCT INTERSECTION IMPROVEMENTS, SIDEWALKS, PEDESTRIAN/ MPO PROJ NUM 16164

DESCR BICYCLE AMENITIES (LIGHTING, SIGNAGE, BENCHES,PLANTED BUFFERS, BIKE RACKS) AND C FUNDING CAT(S) 3LC,3TMF,9TAPURB AND GUTTER DRAINAGE IMPROVEMENTS

REMARKS Facility: DOWNTOWN CITY OF WALLER PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2P7 HISTORY 019-2022 TIP.

TOTAL PROJECT COST INFORMATIONPREL ENG $ 399,665

ROW PURCH $ 0 COST OFCONSTR $ 1,598,660 APPROVED

CONST ENG $ 95,920 PHASESCONTING $ 159,866 $ 1,598,660INDIRECT $ 81,212BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,335,323

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3TMF $ 0 $ 694,813 $ 0 $ 0 $ 0 $ 694,8133LC $ 0 $ 0 $ 0 $ 0 $ 173,703 $ 173,7039TAP $ 584,115 $ 0 $ 0 $ 146,029 $ 0 $ 730,144TOTAL $ 584,115 $ 694,813 $ 0 $ 146,029 $ 173,703 $ 1,598,660

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0912-72-314 2019 VA C,E HOUSTON $ 3,978,230LIMITS FROM JENSEN DR TO HIRSH RD PROJECT SPONSOR HOUSTON PARKS BOARD

REVISION DATE 07/2018LIMITS TO BRETSHIRE DR TO TIDWELL/WAYSIDE DRPROJECT CONSTRUCT MULTI-USE PATH MPO PROJ NUM 16126

DESCR FUNDING CAT(S) 5REMARKS Facility: HALLS BAYOU TRAIL PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. (Engineering phase authorized for design review costs only)

TOTAL PROJECT COST INFORMATIONPREL ENG $ 269,933

ROW PURCH $ 0 COST OFCONSTR $ 3,903,230 APPROVED

CONST ENG $ 238,694 PHASESCONTING $ 397,823 $ 3,978,230INDIRECT $ 202,094BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 5,011,774

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 3,182,584 $ 0 $ 0 $ 795,646 $ 0 $ 3,978,230TOTAL $ 3,182,584 $ 0 $ 0 $ 795,646 $ 0 $ 3,978,230

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON 0912-00-500 2019 VA C NONE $ 1,380,000LIMITS FROM VA PROJECT SPONSOR H-GAC

REVISION DATE 07/2018LIMITS TO VAPROJECT COMMUTE SOLUTIONS STAFF AND OUTREACH (C.S. STAFF FUNDING AND INCLUDING 2 ADDITIO MPO PROJ NUM 16088

DESCR NAL TASKS FOR RIDESHARING ACTIVITIES) FUNDING CAT(S) 5REMARKS Facility: HOUSTON-GALVESTON TMA PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 1,380,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 1,380,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,380,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 1,380,000 $ 0 $ 0 $ 0 $ 0 $ 1,380,000TOTAL $ 1,380,000 $ 0 $ 0 $ 0 $ 0 $ 1,380,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 240: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 240 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON FORT BEND 0192-01-093 2019 SH 6 C SUGAR LAND $ 7,500,000LIMITS FROM N OF BROOKS ST PROJECT SPONSOR CITY OF SUGAR LAND

REVISION DATE 07/2018LIMITS TO LEXINGTON BLVDPROJECT WIDEN FROM 6 TO 8-LANES MPO PROJ NUM 15383

DESCR FUNDING CAT(S) 7REMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 628,000ROW PURCH $ 1,000,000 COST OF

CONSTR $ 4,500,000 APPROVEDCONST ENG $ 270,000 PHASES

CONTING $ 450,000 $ 7,500,000INDIRECT $ 228,600BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 7,076,600

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 5,100,000 $ 0 $ 0 $ 2,400,000 $ 0 $ 7,500,000TOTAL $ 5,100,000 $ 0 $ 0 $ 2,400,000 $ 0 $ 7,500,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON 0912-00-476 2019 VA C NONE $ 5,503,750LIMITS FROM VA PROJECT SPONSOR H-GAC

REVISION DATE 07/2018LIMITS TO VAPROJECT COMMUTE SOLUTIONS PROGRAM IMPLEMENTATION (COMMUTER AND TRANSIT PILOT PROGRAM): F MPO PROJ NUM 14727

DESCR Y 2018 FUNDING CAT(S) 5REMARKS Facility: HOUSTON-GALVESTON TMA PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 5,503,750 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 5,503,750INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 5,503,750

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 4,500,000 $ 0 $ 0 $ 1,003,750 $ 0 $ 5,503,750TOTAL $ 4,500,000 $ 0 $ 0 $ 1,003,750 $ 0 $ 5,503,750

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON BRAZORIA 0912-31-290 2019 CS C PEARLAND $ 34,650,000LIMITS FROM CULLEN BLVD PROJECT SPONSOR CITY OF PEARLAND

REVISION DATE 07/2018LIMITS TO MYKAWA RDPROJECT CONSTRUCT 4-LANE DIVIDED ON NEW LOCATION MPO PROJ NUM 7874

DESCR FUNDING CAT(S) 7REMARKS Facility: MCHARD RD PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,650,195ROW PURCH $ 3,855,469 COST OF

CONSTR $ 34,650,000 APPROVEDCONST ENG $ 1,386,000 PHASES

CONTING $ 3,465,000 $ 34,650,000INDIRECT $ 1,760,220BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 47,766,884

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 27,720,000 $ 0 $ 0 $ 6,930,000 $ 0 $ 34,650,000TOTAL $ 27,720,000 $ 0 $ 0 $ 6,930,000 $ 0 $ 34,650,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 241: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 241 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON FORT BEND 1258-02-034 2019 FM 1093 C FULSHEAR $ 5,700,000LIMITS FROM JAMES LN PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO FM 1093/FM 359PROJECT WIDEN TO 4 LANES ARTERIAL, NON-TOLL MPO PROJ NUM 14738

DESCR FUNDING CAT(S) 2MREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 279,300ROW PURCH $ 802,244 COST OF

CONSTR $ 5,700,000 APPROVEDCONST ENG $ 285,000 PHASES

CONTING $ 570,000 $ 5,700,000INDIRECT $ 289,560BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 7,926,104

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 0 $ 5,700,000 $ 0 $ 0 $ 0 $ 5,700,000TOTAL $ 0 $ 5,700,000 $ 0 $ 0 $ 0 $ 5,700,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

BEAUMONT HOUSTON-GALVESTON CHAMBERS 0762-03-018 2019 FM 1409 C COVE $ 19,938,257LIMITS FROM FM 565 N OF IH 10 PROJECT SPONSOR CHAMBERS COUNTY

REVISION DATE 07/2018LIMITS TO FM 565 S OF IH 10PROJECT CONSTRUCTION OF 2-LANE NEW LOCATION FM ROADWAY EXTENSION AND BRIDGE/INTERCHANGE MPO PROJ NUM 14573

DESCR FUNDING CAT(S) 3PTFREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 976,975ROW PURCH $ 0 COST OF

CONSTR $ 19,938,257 APPROVEDCONST ENG $ 996,913 PHASES

CONTING $ 1,993,826 $ 19,938,257INDIRECT $ 1,012,863BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 24,918,834

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3PTF $ 0 $ 0 $ 0 $ 0 $ 19,938,257 $ 19,938,257TOTAL $ 0 $ 0 $ 0 $ 0 $ 19,938,257 $ 19,938,257

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0912-72-075 2019 CS C,E HOUSTON $ 19,058,000LIMITS FROM PORT OF HOUSTON GATE 8 PROJECT SPONSOR CITY OF HOUSTON

REVISION DATE 07/2018LIMITS TO IH 610PROJECT RECONSTRUCT CLINTON DRIVE MPO PROJ NUM 11179

DESCR FUNDING CAT(S) 3LC,10REMARKS Facility: CLINTON DR PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 890,221ROW PURCH $ 0 COST OF

CONSTR $ 18,167,779 APPROVEDCONST ENG $ 908,389 PHASES

CONTING $ 1,816,778 $ 19,058,000INDIRECT $ 922,923BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 22,706,090

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL10 $ 8,973,217 $ 0 $ 0 $ 2,243,304 $ 0 $ 11,216,5213LC $ 0 $ 0 $ 0 $ 0 $ 7,841,479 $ 7,841,479TOTAL $ 8,973,217 $ 0 $ 0 $ 2,243,304 $ 7,841,479 $ 19,058,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 242: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 242 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON MONTGOMERY 0720-02-074 2019 SH 249 C,E,R NONE $ 110,000,000LIMITS FROM FM 1774/FM 149 IN PINEHURST PROJECT SPONSOR MONTGOMERY COUNTY

REVISION DATE 07/2018LIMITS TO SPRING CREEK/HARRIS C/LPROJECT CONSTRUCT 4 LANE TOLLWAY WITH GRADE SEPARATIONS AT STAGECOACH RD AND WOODLANDS P MPO PROJ NUM 914

DESCR ARKWAY FUNDING CAT(S) 3RTRREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 3,539,272ROW PURCH $ 0 COST OF

CONSTR $ 93,138,739 APPROVEDCONST ENG $ 11,968,328 PHASES

CONTING $ 14,790,432 $ 110,000,000INDIRECT $ 6,491,770BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 129,928,541

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3RTR $ 0 $ 0 $ 0 $ 110,000,000 $ 0 $ 110,000,000TOTAL $ 0 $ 0 $ 0 $ 110,000,000 $ 0 $ 110,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 243: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 243 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0000-00-000 2020 VA C HOUSTON $ 2,400,000LIMITS FROM VA PROJECT SPONSOR METRO

REVISION DATE 07/2018LIMITS TO VAPROJECT METRO STAR VANPOOL (CMAQ): FY 2020 MPO PROJ NUM 11760

DESCR FUNDING CAT(S) 5REMARKS Facility: METRO SERVICE AREA PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 2,400,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 2,400,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,400,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 2,400,000 $ 0 $ 0 $ 0 $ 0 $ 2,400,000TOTAL $ 2,400,000 $ 0 $ 0 $ 0 $ 0 $ 2,400,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0912-72-535 2020 C,E NONE $ 3,327,000LIMITS FROM US 59 PROJECT SPONSOR HARRIS COUNTY

REVISION DATE 07/2018LIMITS TO TOWNSEN PARK AND RIDEPROJECT CONSTRUCT MULTIUSE TRAIL MPO PROJ NUM 7814

DESCR FUNDING CAT(S) 5REMARKS Facility: SPRING CREEK HIKE & BIKE TRAIL PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 238,023ROW PURCH $ 0 COST OF

CONSTR $ 3,252,000 APPROVEDCONST ENG $ 199,620 PHASES

CONTING $ 332,700 $ 3,327,000INDIRECT $ 169,012BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 4,191,355

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 2,661,600 $ 0 $ 0 $ 665,400 $ 0 $ 3,327,000TOTAL $ 2,661,600 $ 0 $ 0 $ 665,400 $ 0 $ 3,327,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 3256-03-096 2020 SL 8 C NONE $ 500,000LIMITS FROM US 90 PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO S OF IH 10 EPROJECT WIDEN FROM 6 TO 8 LANES (RE-STRIPE EXISTING PAVEMENT) MPO PROJ NUM 16344

DESCR FUNDING CAT(S) 11REMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 24,500ROW PURCH $ 0 COST OF

CONSTR $ 500,000 APPROVEDCONST ENG $ 45,000 PHASES

CONTING $ 50,000 $ 500,000INDIRECT $ 25,400BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 644,900

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL11 $ 400,000 $ 100,000 $ 0 $ 0 $ 0 $ 500,000TOTAL $ 400,000 $ 100,000 $ 0 $ 0 $ 0 $ 500,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 244: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 244 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0027-13-221 2020 IH 69 C HOUSTON $ 55,800,000LIMITS FROM AT MCGOWEN, TUAM AND ELGIN PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TOPROJECT RECONSTRUCT 3 BRIDGES MPO PROJ NUM 16337

DESCR FUNDING CAT(S) 12REMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,734,200ROW PURCH $ 4,500,000 COST OF

CONSTR $ 55,800,000 APPROVEDCONST ENG $ 2,232,000 PHASES

CONTING $ 5,580,000 $ 55,800,000INDIRECT $ 2,834,640BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 73,680,840

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL12 $ 44,640,000 $ 11,160,000 $ 0 $ 0 $ 0 $ 55,800,000TOTAL $ 44,640,000 $ 11,160,000 $ 0 $ 0 $ 0 $ 55,800,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0027-13-201 2020 IH 69 C HOUSTON $ 192,000,000LIMITS FROM SH 288 PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO SP 527PROJECT RECONSTRUCT TO 10 MAIN LANES MPO PROJ NUM 155

DESCR FUNDING CAT(S) 12REMARKS Facility: IH 69 S PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 9,408,000ROW PURCH $ 55,200,000 COST OF

CONSTR $ 192,000,000 APPROVEDCONST ENG $ 7,680,000 PHASES

CONTING $ 19,200,000 $ 192,000,000INDIRECT $ 9,753,600BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 293,241,600

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL12 $ 153,600,000 $ 38,400,000 $ 0 $ 0 $ 0 $ 192,000,000TOTAL $ 153,600,000 $ 38,400,000 $ 0 $ 0 $ 0 $ 192,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON WALLER 0912-00-580 2020 CS C,E $ 1,383,770LIMITS FROM FARR ST, CHERRY ST TO BRAZEAL ST & PROJECT SPONSOR CITY OF WALLER

REVISION DATE 07/2018LIMITS TO WALLER ST, FM 362 TO FARR STPROJECT SIDEWALK AND ADA RAMP CONSTRUCTION MPO PROJ NUM 5055

DESCR FUNDING CAT(S) 9TAPREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 122,685ROW PURCH $ 0 COST OF

CONSTR $ 1,243,966 APPROVEDCONST ENG $ 17,119 PHASES

CONTING $ 14,578 $ 1,383,770INDIRECT $ 63,558BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,461,906

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 1,107,016 $ 171,188 $ 0 $ 105,566 $ 0 $ 1,383,770TOTAL $ 1,107,016 $ 171,188 $ 0 $ 105,566 $ 0 $ 1,383,770

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 245: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 245 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON GALVESTON 0912-73-214 2020 CS C,E TEXAS CITY $ 512,692LIMITS FROM BAY STREET, FROM 5TH AVE TO DIKE RD PROJECT SPONSOR GULF COAST CENTER

REVISION DATE 07/2018LIMITS TO AND BETWEEN BAY ST AND SKYLINE DRPROJECT CONSTRUCT SHARED USE PATH AND ENHANCE EXISTING PATH MPO PROJ NUM 5054

DESCR FUNDING CAT(S) 9TAPREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 20,062ROW PURCH $ 0 COST OF

CONSTR $ 485,943 APPROVEDCONST ENG $ 6,687 PHASES

CONTING $ 5,359 $ 512,692INDIRECT $ 24,819BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 542,870

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 410,154 $ 0 $ 0 $ 102,538 $ 0 $ 512,692TOTAL $ 410,154 $ 0 $ 0 $ 102,538 $ 0 $ 512,692

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 1685-03-098 2020 FM 1960 C NONE $ 44,000,000LIMITS FROM E OF TWIGSWORTH LN PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO W OF SAN JACINTO RIVER BRIDGEPROJECT WIDEN FROM 4 TO 6 LANES AND CONSTRUCT 4 LANE OVERPASS AT THE WEST LAKE HOUSTON P MPO PROJ NUM 16316

DESCR KWY FUNDING CAT(S) 2MREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,156,000ROW PURCH $ 24,090,000 COST OF

CONSTR $ 44,000,000 APPROVEDCONST ENG $ 1,760,000 PHASES

CONTING $ 4,400,000 $ 44,000,000INDIRECT $ 2,235,200BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 78,641,200

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 35,200,000 $ 8,800,000 $ 0 $ 0 $ 0 $ 44,000,000TOTAL $ 35,200,000 $ 8,800,000 $ 0 $ 0 $ 0 $ 44,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0912-72-401 2020 RR C,R HOUSTON $ 36,530,369LIMITS FROM AT YORK ST PROJECT SPONSOR CITY OF HOUSTON

REVISION DATE 07/2018LIMITS TOPROJECT CONSTRUCT RAILROAD UNDERPASS AT YORK STREET AND CLOSE AT-GRADE CROSSINGS AT SAMP MPO PROJ NUM 11380

DESCR SON, MCKINNEY AND MILBY STREETS. THE YORK STREET CROSSING AT GH&H WILL ALSO BE C FUNDING CAT(S) 5LOSED.

REMARKS Facility: WEST BELT RR PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2P7 HISTORY 019-2022 TIP.

TOTAL PROJECT COST INFORMATIONPREL ENG $ 1,733,148

ROW PURCH $ 1,160,000 COST OFCONSTR $ 35,370,369 APPROVED

CONST ENG $ 1,414,815 PHASESCONTING $ 3,537,037 $ 36,530,369INDIRECT $ 1,796,815BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 45,012,183

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 29,224,295 $ 0 $ 0 $ 7,306,074 $ 0 $ 36,530,369TOTAL $ 29,224,295 $ 0 $ 0 $ 7,306,074 $ 0 $ 36,530,369

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 246: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 246 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON 0912-00-568 2020 VA C NONE $ 1,250,000LIMITS FROM VA PROJECT SPONSOR H-GAC

REVISION DATE 07/2018LIMITS TO VAPROJECT REGIONAL VANPOOL: CMAQ FY 2020 MPO PROJ NUM 17141

DESCR FUNDING CAT(S) 5REMARKS Facility: HOUSTON-GALVESTON TMA PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 1,250,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 1,250,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,250,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 1,250,000 $ 0 $ 0 $ 0 $ 0 $ 1,250,000TOTAL $ 1,250,000 $ 0 $ 0 $ 0 $ 0 $ 1,250,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON 0912-00-569 2020 VA C NONE $ 3,750,000LIMITS FROM VA PROJECT SPONSOR H-GAC

REVISION DATE 07/2018LIMITS TO VAPROJECT REGIONAL VANPOOL: STP FY 2020 MPO PROJ NUM 17140

DESCR FUNDING CAT(S) 7REMARKS Facility: HOUSTON-GALVESTON TMA PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 3,750,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 3,750,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 3,750,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 3,000,000 $ 0 $ 0 $ 750,000 $ 0 $ 3,750,000TOTAL $ 3,000,000 $ 0 $ 0 $ 750,000 $ 0 $ 3,750,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON 0912-00-566 2020 VA C NONE $ 2,500,000LIMITS FROM VA PROJECT SPONSOR H-GAC

REVISION DATE 07/2018LIMITS TO VAPROJECT RIDESHARE PROGRAM: FY 2020 MPO PROJ NUM 17138

DESCR FUNDING CAT(S) 5REMARKS Facility: HOUSTON-GALVESTON TMA PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 2,500,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 2,500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,500,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 2,500,000 $ 0 $ 0 $ 0 $ 0 $ 2,500,000TOTAL $ 2,500,000 $ 0 $ 0 $ 0 $ 0 $ 2,500,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 247: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 247 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON BRAZORIA 0912-00-560 2020 VA E PEARLAND $ 985,000LIMITS FROM UH CLEAR LAKE PEARLAND CAMPUS PROJECT SPONSOR CITY OF PEARLAND

REVISION DATE 07/2018LIMITS TO N OF HUGHES RDPROJECT ENGINEERING FOR CONSTRUCTION OF 10 FT MULTIUSE TRAIL MPO PROJ NUM 7127

DESCR FUNDING CAT(S) 9TAPREMARKS Facility: CLEAR CREEK TRAIL PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 985,000ROW PURCH $ 0 COST OF

CONSTR $ 8,023,000 APPROVEDCONST ENG $ 404,900 PHASES

CONTING $ 809,800 $ 985,000INDIRECT $ 411,378BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 10,634,078

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 788,000 $ 0 $ 0 $ 197,000 $ 0 $ 985,000TOTAL $ 788,000 $ 0 $ 0 $ 197,000 $ 0 $ 985,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON 0912-00-550 2020 VA C NONE $ 1,380,000LIMITS FROM VA PROJECT SPONSOR H-GAC

REVISION DATE 07/2018LIMITS TO VAPROJECT COMMUTE SOLUTIONS STAFF AND OUTREACH (C.S. STAFF FUNDING AND INCLUDING 2 ADDITIO MPO PROJ NUM 17125

DESCR NAL TASKS FOR RIDESHARING ACTIVITIES) FUNDING CAT(S) 5REMARKS Facility: HOUSTON - GALVESTON TMA PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 1,380,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 1,380,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,380,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 1,380,000 $ 0 $ 0 $ 0 $ 0 $ 1,380,000TOTAL $ 1,380,000 $ 0 $ 0 $ 0 $ 0 $ 1,380,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0912-72-398 2020 VA E HOUSTON $ 439,000LIMITS FROM DAIRY ASHFORD RD S PROJECT SPONSOR CITY OF HOUSTON

REVISION DATE 07/2018LIMITS TO BW 8/ARTHUR STOREY PARKPROJECT DESIGN FOR 10-FOOT MULTIUSE TRAIL AND ASSOCIATED INTERSECTION, SAFETY, SIGNAGE, MPO PROJ NUM 17123

DESCR AND AMENITIES (LANDSCAPING, BENCHES, ETC.) FUNDING CAT(S) 9TAPREMARKS Facility: HCFCD CHANNEL PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 439,000ROW PURCH $ 0 COST OF

CONSTR $ 2,564,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 439,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 3,003,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 351,200 $ 0 $ 0 $ 87,800 $ 0 $ 439,000TOTAL $ 351,200 $ 0 $ 0 $ 87,800 $ 0 $ 439,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 248: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 248 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON BRAZORIA 0912-31-304 2020 R NONE $ 1,022,000LIMITS FROM SAVANNAH DEVELOPMENT PROJECT SPONSOR BRAZORIA COUNTY

REVISION DATE 07/2018LIMITS TO CR 48PROJECT ROW FOR RECONSTRUCTION AND WIDENING TO 4-LANE DIVIDED CONCRETE BLVD WITH RAISED MPO PROJ NUM 17108

DESCR MEDIANS AND CURB AND GUTTERS. FUNDING CAT(S) 7REMARKS Facility: CR 58 PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 366,000ROW PURCH $ 1,022,000 COST OF

CONSTR $ 4,728,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 1,022,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 6,116,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 817,600 $ 0 $ 0 $ 204,400 $ 0 $ 1,022,000TOTAL $ 817,600 $ 0 $ 0 $ 204,400 $ 0 $ 1,022,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON BRAZORIA 0912-31-305 2020 CR R MANVEL $ 1,363,000LIMITS FROM CR 48 PROJECT SPONSOR BRAZORIA COUNTY

REVISION DATE 07/2018LIMITS TO KIRBY DRPROJECT ROW FOR RENCONSTRUCT AND WIDEN TO 4-LANE DIVIDED CONCRETE BLVD WITH RAISED MEDIA MPO PROJ NUM 17106

DESCR NS AND CURB AND GUTTERS. FUNDING CAT(S) 7REMARKS Facility: CR 59 PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,096,000ROW PURCH $ 1,363,000 COST OF

CONSTR $ 7,311,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 1,363,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 9,770,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 1,090,400 $ 0 $ 0 $ 272,600 $ 0 $ 1,363,000TOTAL $ 1,090,400 $ 0 $ 0 $ 272,600 $ 0 $ 1,363,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0912-72-359 2020 CS R BAYTOWN $ 1,090,000LIMITS FROM IH 10 PROJECT SPONSOR CITY OF BAYTOWN

REVISION DATE 07/2018LIMITS TO SH 146PROJECT ROW ACQUISITION FOR CONGESTION AND SAFETY IMPROVEMENTS (ACCESS MANAGEMENT AND WI MPO PROJ NUM 17095

DESCR DENING FROM 4 TO 6 LANES IN SECTIONS) FUNDING CAT(S) 7REMARKS Facility: GARTH RD PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,566,000ROW PURCH $ 1,090,000 COST OF

CONSTR $ 15,937,000 APPROVEDCONST ENG $ 800,600 PHASES

CONTING $ 1,601,200 $ 1,090,000INDIRECT $ 813,410BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 21,808,210

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 872,000 $ 0 $ 0 $ 218,000 $ 0 $ 1,090,000TOTAL $ 872,000 $ 0 $ 0 $ 218,000 $ 0 $ 1,090,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 249: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 249 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 1685-01-107 2020 FM 1960 C HOUSTON $ 530,000LIMITS FROM MILLS RD PROJECT SPONSOR CITY OF HOUSTON

REVISION DATE 07/2018LIMITS TO SH 249PROJECT CONSTRUCT SHARED USE PATH MPO PROJ NUM 17087

DESCR FUNDING CAT(S) 9TAPREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 25,970ROW PURCH $ 0 COST OF

CONSTR $ 530,000 APPROVEDCONST ENG $ 47,700 PHASES

CONTING $ 53,000 $ 530,000INDIRECT $ 26,924BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 683,594

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 424,000 $ 106,000 $ 0 $ 0 $ 0 $ 530,000TOTAL $ 424,000 $ 106,000 $ 0 $ 0 $ 0 $ 530,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON BRAZORIA 0912-31-310 2020 VA C LAKE JACKSON $ 4,033,000LIMITS FROM VA PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO VAPROJECT CONSTRUCT BRAZORIA COUNTY BICYCLE LOOP BY WIDENING SHOULDERS, MODIFYING TRAFFIC MPO PROJ NUM 17086

DESCR SIGNALS AND REMOVING SOME RAISED MEDIANS FUNDING CAT(S) 9TAPREMARKS Facility: FM 1462, FM 2403, FM 2917, FM 762, SH 332 PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 , FM 521, FM 2004, FM 523, FM 528 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 197,617ROW PURCH $ 0 COST OF

CONSTR $ 4,033,000 APPROVEDCONST ENG $ 241,980 PHASES

CONTING $ 403,300 $ 4,033,000INDIRECT $ 204,876BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 5,080,773

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 3,226,400 $ 806,600 $ 0 $ 0 $ 0 $ 4,033,000TOTAL $ 3,226,400 $ 806,600 $ 0 $ 0 $ 0 $ 4,033,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 2941-02-056 2020 FM 2920 C,R TOMBALL $ 28,613,000LIMITS FROM BS 249 PROJECT SPONSOR CITY OF TOMBALL

REVISION DATE 07/2018LIMITS TO WILLOW STPROJECT RECONSTRUCT 4-LANE ROADWAY WITH RAISED MEDIANS, DRAINAGE, SIGNAL IMPROVEMENTS AN MPO PROJ NUM 17085

DESCR D SIDEWALKS FUNDING CAT(S) 2MREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,335,275ROW PURCH $ 1,362,500 COST OF

CONSTR $ 27,250,500 APPROVEDCONST ENG $ 1,090,020 PHASES

CONTING $ 2,725,050 $ 28,613,000INDIRECT $ 1,384,325BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 35,147,670

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 22,890,400 $ 5,722,600 $ 0 $ 0 $ 0 $ 28,613,000TOTAL $ 22,890,400 $ 5,722,600 $ 0 $ 0 $ 0 $ 28,613,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 250: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 250 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON BRAZORIA 0912-00-543 2020 CS R PEARLAND $ 1,858,000LIMITS FROM BW 8 PROJECT SPONSOR CITY OF PEARLAND

REVISION DATE 07/2018LIMITS TO FM 518PROJECT ROW ACQUISITION FOR WIDENING TO 4-LANE BLVD SECTION MPO PROJ NUM 17082

DESCR FUNDING CAT(S) 7REMARKS Facility: MYKAWA RD PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,044,000ROW PURCH $ 1,858,000 COST OF

CONSTR $ 40,033,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 1,858,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 42,935,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 1,486,400 $ 0 $ 0 $ 371,600 $ 0 $ 1,858,000TOTAL $ 1,486,400 $ 0 $ 0 $ 371,600 $ 0 $ 1,858,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0981-01-109 2020 CS C WEBSTER $ 5,105,000LIMITS FROM FM 528 PROJECT SPONSOR CITY OF WEBSTER

REVISION DATE 07/2018LIMITS TO LANDING BLVD/NASA 1 BYPASS AT IH 45SPROJECT CONSTRUCT 4-LANE DIVIDED ROADWAY ON NEW ALIGNMENT WITH PEDESTRIAN/BICYCLE ACCOMO MPO PROJ NUM 17081

DESCR DATIONS FUNDING CAT(S) 7REMARKS Facility: NASA RD 1 BYPASS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 250,145ROW PURCH $ 0 COST OF

CONSTR $ 5,105,000 APPROVEDCONST ENG $ 255,250 PHASES

CONTING $ 510,500 $ 5,105,000INDIRECT $ 259,334BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 6,380,229

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 4,084,000 $ 0 $ 0 $ 1,021,000 $ 0 $ 5,105,000TOTAL $ 4,084,000 $ 0 $ 0 $ 1,021,000 $ 0 $ 5,105,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0912-00-519 2020 CS C LEAGUE CITY $ 21,902,000LIMITS FROM NASA 1 BYPASS AT IH 45 S PROJECT SPONSOR CITY OF LEAGUE CITY

REVISION DATE 07/2018LIMITS TO FM 518PROJECT CONSTRUCT 4-LANE DIVIDED ROADWAY ON NEW ALIGNMENT WITH PEDESTRIAN/BICYCLE ACCOMO MPO PROJ NUM 17080

DESCR DATIONS FUNDING CAT(S) 7REMARKS Facility: LANDING BLVD/NASA RD 1 BYPASS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,073,198ROW PURCH $ 0 COST OF

CONSTR $ 21,902,000 APPROVEDCONST ENG $ 1,095,100 PHASES

CONTING $ 2,190,200 $ 21,902,000INDIRECT $ 1,112,622BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 27,373,120

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 17,521,600 $ 0 $ 0 $ 4,380,400 $ 0 $ 21,902,000TOTAL $ 17,521,600 $ 0 $ 0 $ 4,380,400 $ 0 $ 21,902,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 251: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 251 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0912-72-386 2020 CS C,E HOUSTON $ 3,032,000LIMITS FROM AT JENSEN DR/RUNNELS ST PROJECT SPONSOR GR EAST END MD

REVISION DATE 07/2018LIMITS TOPROJECT RECONSTRUCT INTERSECTION AS URBAN ROUNDABOUT INCLUDING PEDESTRIAN STREETSCAPE AN MPO PROJ NUM 17079

DESCR D BUS STOP IMPROVEMENTS FUNDING CAT(S) 7REMARKS Facility: NAVIGATION BLVD PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 141,628ROW PURCH $ 0 COST OF

CONSTR $ 2,890,372 APPROVEDCONST ENG $ 173,422 PHASES

CONTING $ 289,037 $ 3,032,000INDIRECT $ 146,831BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 3,641,290

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 2,425,600 $ 0 $ 0 $ 606,400 $ 0 $ 3,032,000TOTAL $ 2,425,600 $ 0 $ 0 $ 606,400 $ 0 $ 3,032,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0912-72-394 2020 CS T HOUSTON $ 2,743,000LIMITS FROM HOLLISTER DR PROJECT SPONSOR NEAR NORTHWEST MANAGEMENT DISTRICT

REVISION DATE 07/2018LIMITS TO HOUSTON-ROSSLYN NPROJECT RECONSTRUCT BACK OF CURB INFRASTRUCTURE (SIDEWALKS, CURBS, ADA RAMPS, PEDESTRIAN MPO PROJ NUM 17078

DESCR LIGHTING AND LANDSCAPING) AND MULTIUSE TRAIL CONNECTOR TO WHITE OAK BAYOU TRAIL FUNDING CAT(S) 5REMARKS Facility: LITTLE YORK RD W PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 2,743,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 2,743,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,743,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 2,194,400 $ 0 $ 0 $ 548,600 $ 0 $ 2,743,000TOTAL $ 2,194,400 $ 0 $ 0 $ 548,600 $ 0 $ 2,743,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0912-72-391 2020 CS C,E HOUSTON $ 17,132,000LIMITS FROM BW 8 PROJECT SPONSOR MEMORIAL CITY REDEVELOPMENT AUTHORITY

REVISION DATE 07/2018LIMITS TO TALLOWOOD RDPROJECT RECONSTRUCT ROADWAY INCLUDING DRAINAGE, ACCESS MANAGEMENT AND BICYCLE/PEDESTRIANMPO PROJ NUM 17073

DESCR ACCOMMODATIONS FUNDING CAT(S) 7REMARKS Facility: MEMORIAL DR PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP.(Engineering phase authorized for design review costs only)

TOTAL PROJECT COST INFORMATIONPREL ENG $ 914,468

ROW PURCH $ 0 COST OFCONSTR $ 17,057,000 APPROVED

CONST ENG $ 856,600 PHASESCONTING $ 1,713,200 $ 17,132,000INDIRECT $ 870,306BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 21,411,574

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 13,705,600 $ 0 $ 0 $ 3,426,400 $ 0 $ 17,132,000TOTAL $ 13,705,600 $ 0 $ 0 $ 3,426,400 $ 0 $ 17,132,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 252: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 252 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON MONTGOMERY 0675-08-111 2020 IH 45 C CONROE $ 7,333,000LIMITS FROM WALKER C/L PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO LEAGUE LINE RDPROJECT INSTALL ITS EQUIPMENT AND INFRASTRUCTURE (144-STRAND FIBER TRUNK LINE, CLOSED-CI MPO PROJ NUM 17064

DESCR RCUIT CAMERAS, DYNAMIC MESSAGE SIGNS RADAR-BASED VEHICLES SENSING DEVICES AND TR FUNDING CAT(S) 2MAVEL TIME READERS)

REMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2P7 HISTORY 019-2022 TIP.

TOTAL PROJECT COST INFORMATIONPREL ENG $ 359,317

ROW PURCH $ 0 COST OFCONSTR $ 7,333,000 APPROVED

CONST ENG $ 366,650 PHASESCONTING $ 733,300 $ 7,333,000INDIRECT $ 372,516BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 9,164,783

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 5,866,400 $ 1,466,600 $ 0 $ 0 $ 0 $ 7,333,000TOTAL $ 5,866,400 $ 1,466,600 $ 0 $ 0 $ 0 $ 7,333,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON MONTGOMERY 0000-00-000 2020 FM 3083 C CONROE $ 2,000,000LIMITS FROM FM 105 PROJECT SPONSOR CITY OF CONROE

REVISION DATE 07/2018LIMITS TO FM 1484PROJECT CONSTRUCT BIKE FACILITY MPO PROJ NUM 15504

DESCR FUNDING CAT(S) 3LCREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 98,000ROW PURCH $ 0 COST OF

CONSTR $ 2,000,000 APPROVEDCONST ENG $ 120,000 PHASES

CONTING $ 200,000 $ 2,000,000INDIRECT $ 101,600BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,519,600

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 2,000,000 $ 0 $ 2,000,000TOTAL $ 0 $ 0 $ 0 $ 2,000,000 $ 0 $ 2,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON GALVESTON 0000-00-000 2020 CS C,E,R GALVESTON $ 17,000,000LIMITS FROM 51st St PROJECT SPONSOR CITY OF GALVESTON

REVISION DATE 07/2018LIMITS TO Harborside DrPROJECT Port of Galveston 51st Street Flyover to Harborside Drive MPO PROJ NUM 15492

DESCR FUNDING CAT(S) 3LCREMARKS Facility: Port of Galveston PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 555,407ROW PURCH $ 2,833,711 COST OF

CONSTR $ 11,334,845 APPROVEDCONST ENG $ 566,742 PHASES

CONTING $ 1,133,484 $ 17,000,000INDIRECT $ 575,810BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 16,999,999

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 17,000,000 $ 0 $ 17,000,000TOTAL $ 0 $ 0 $ 0 $ 17,000,000 $ 0 $ 17,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 253: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 253 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON 0912-00-559 2020 VA C NONE $ 8,000,000LIMITS FROM VA PROJECT SPONSOR H-GAC

REVISION DATE 07/2018LIMITS TO VAPROJECT REGIONAL FREEWAY INCIDENT MANAGEMENT - TOWING (FY 2020) MPO PROJ NUM 11917

DESCR FUNDING CAT(S) 7REMARKS Facility: HOUSTON-GALVESTON TMA PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. 1,600,000 TDCs as non-fedral match. TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 8,000,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 8,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 8,000,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 8,000,000 $ 0 $ 0 $ 0 $ 0 $ 8,000,000TOTAL $ 8,000,000 $ 0 $ 0 $ 0 $ 0 $ 8,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON 0912-00-548 2020 VA C HOUSTON $ 3,750,000LIMITS FROM VA PROJECT SPONSOR METRO

REVISION DATE 07/2018LIMITS TO VAPROJECT METRO STAR VANPOOL (STP): FY 2020 MPO PROJ NUM 11718

DESCR FUNDING CAT(S) 7REMARKS Facility: METRO SERVICE AREA PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 3,750,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 3,750,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 3,750,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 3,000,000 $ 0 $ 0 $ 750,000 $ 0 $ 3,750,000TOTAL $ 3,000,000 $ 0 $ 0 $ 750,000 $ 0 $ 3,750,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON FORT BEND 0912-34-195 2020 VA T ROSENBERG $ 18,000,000LIMITS FROM AT COTTONWOOD SCHOOL RD PROJECT SPONSOR FORT BEND COUNTY

REVISION DATE 07/2018LIMITS TOPROJECT REIMBURSEMENT FOR FORT BEND COUNTY TRANSIT ADMINISTRATION AND OPERATIONS FACILIT MPO PROJ NUM 11715

DESCR Y (2 OF 2) FUNDING CAT(S) 5 FLEXREMARKS Facility: FORT BEND COUNTY TRANSIT ADMINISTRATION A PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 ND OPERATIONS FACILITY HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 21,500,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 18,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 21,500,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 FLEX $ 14,400,000 $ 0 $ 0 $ 3,600,000 $ 0 $ 18,000,000TOTAL $ 14,400,000 $ 0 $ 0 $ 3,600,000 $ 0 $ 18,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 254: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 254 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON BRAZORIA 0000-00-000 2020 CS C,E,R ANGLETON $ 32,058,040LIMITS FROM SH 35 PROJECT SPONSOR CITY OF ANGLETON

REVISION DATE 07/2018LIMITS TO SH 288BPROJECT RECONSTRUCT & WIDEN TO A 3-LANE URBAN SECTION MPO PROJ NUM 11611

DESCR FUNDING CAT(S) 3LCREMARKS Facility: HENDERSON RD PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,217,897ROW PURCH $ 1,242,752 COST OF

CONSTR $ 24,855,047 APPROVEDCONST ENG $ 994,202 PHASES

CONTING $ 2,485,505 $ 32,058,040INDIRECT $ 1,262,636BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 32,058,039

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 32,058,040 $ 0 $ 32,058,040TOTAL $ 0 $ 0 $ 0 $ 32,058,040 $ 0 $ 32,058,040

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON BRAZORIA 0000-00-000 2020 CS C,E,R ANGLETON $ 6,839,048LIMITS FROM CEMENTARY RD PROJECT SPONSOR CITY OF ANGLETON

REVISION DATE 07/2018LIMITS TO SH 288B/AIRPORT RDPROJECT RECONSTRUCT TO 3-LANE URBAN SECTION MPO PROJ NUM 11599

DESCR FUNDING CAT(S) 3LCREMARKS Facility: SHANKS RD PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 223,439ROW PURCH $ 1,139,993 COST OF

CONSTR $ 4,559,973 APPROVEDCONST ENG $ 227,999 PHASES

CONTING $ 455,997 $ 6,839,048INDIRECT $ 231,647BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 6,839,048

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 6,839,048 $ 0 $ 6,839,048TOTAL $ 0 $ 0 $ 0 $ 6,839,048 $ 0 $ 6,839,048

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON 0912-00-555 2020 VA C NONE $ 2,000,000LIMITS FROM VA PROJECT SPONSOR HOUSTON TRANSTAR

REVISION DATE 07/2018LIMITS TO VAPROJECT REGIONAL ITS INFRASTRUCTURE - HARDWARE/SOFTWARE, UTILITIES AND COMMUNICATIONS: F MPO PROJ NUM 11081

DESCR Y 2020 FUNDING CAT(S) 7REMARKS Facility: HOUSTON TRANSTAR PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 98,000ROW PURCH $ 0 COST OF

CONSTR $ 2,000,000 APPROVEDCONST ENG $ 120,000 PHASES

CONTING $ 200,000 $ 2,000,000INDIRECT $ 101,600BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,519,600

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 1,600,000 $ 0 $ 0 $ 400,000 $ 0 $ 2,000,000TOTAL $ 1,600,000 $ 0 $ 0 $ 400,000 $ 0 $ 2,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 255: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 255 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON FORT BEND 0000-00-000 2020 CS C,E,R RICHMOND $ 10,939,400LIMITS FROM BRAZOS RIVER NORTH BANK PROJECT SPONSOR CITY OF RICHMOND

REVISION DATE 07/2018LIMITS TO US 90APROJECT CONSTRUCT 2-LANE CONCRETE DIVIDED W/ CURB & GUTTER (IN SECTIONS) MPO PROJ NUM 7741

DESCR FUNDING CAT(S) 3LCREMARKS Facility: 10TH ST PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 357,401ROW PURCH $ 1,823,476 COST OF

CONSTR $ 7,293,906 APPROVEDCONST ENG $ 364,695 PHASES

CONTING $ 729,391 $ 10,939,400INDIRECT $ 370,530BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 10,939,399

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 10,939,400 $ 0 $ 10,939,400TOTAL $ 0 $ 0 $ 0 $ 10,939,400 $ 0 $ 10,939,400

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0912-72-393 2020 CS C HOUSTON $ 1,562,000LIMITS FROM SS 527 PROJECT SPONSOR MIDTOWN MD

REVISION DATE 07/2018LIMITS TO CAROLINE STPROJECT RECONSTRUCT BACK OF CURB INFRASTRUCTURE (SIDEWALKS, CURBS, ADA RAMPS, PEDESTRIAN MPO PROJ NUM 5050

DESCR LIGHTING AND LANDSCAPING) FUNDING CAT(S) 5REMARKS Facility: WHEELER ST PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 76,538ROW PURCH $ 0 COST OF

CONSTR $ 1,562,000 APPROVEDCONST ENG $ 93,720 PHASES

CONTING $ 156,200 $ 1,562,000INDIRECT $ 79,350BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,967,808

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 1,249,600 $ 0 $ 0 $ 312,400 $ 0 $ 1,562,000TOTAL $ 1,249,600 $ 0 $ 0 $ 312,400 $ 0 $ 1,562,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON FORT BEND 0188-09-040 2020 FM 723 C ROSENBERG $ 80,000,000LIMITS FROM N OF BRAZOS RIVER PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO FM 1093PROJECT WIDEN FROM 2-LANE TO 4-LANE DIVIDED ROADWAY WITH SHOULDERS AND SIDEWALKS MPO PROJ NUM 981

DESCR FUNDING CAT(S) 2MREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 3,920,000ROW PURCH $ 24,000,000 COST OF

CONSTR $ 80,000,000 APPROVEDCONST ENG $ 3,200,000 PHASES

CONTING $ 8,000,000 $ 80,000,000INDIRECT $ 4,064,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 123,184,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 64,000,000 $ 16,000,000 $ 0 $ 0 $ 0 $ 80,000,000TOTAL $ 64,000,000 $ 16,000,000 $ 0 $ 0 $ 0 $ 80,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 256: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 256 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0389-13-039 2020 SH 146 C,E,R BAYTOWN $ 47,090,744LIMITS FROM AT BS 146E PROJECT SPONSOR CITY OF BAYTOWN

REVISION DATE 07/2018LIMITS TO FERRY RDPROJECT CONSTRUCT 4 MAINLANES AND GRADE SEPARATION MPO PROJ NUM 536

DESCR FUNDING CAT(S) 3LCREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,548,830ROW PURCH $ 7,902,192 COST OF

CONSTR $ 31,608,769 APPROVEDCONST ENG $ 1,264,351 PHASES

CONTING $ 3,160,877 $ 47,090,744INDIRECT $ 1,605,725BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 47,090,744

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 47,090,744 $ 0 $ 47,090,744TOTAL $ 0 $ 0 $ 0 $ 47,090,744 $ 0 $ 47,090,744

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 1685-03-058 2020 FM 1960 C HUMBLE $ 51,000,000LIMITS FROM BF 1960A PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO E OF TWIGSWORTH LNPROJECT WIDEN TO 6-LANE DIVIDED WITH RAISED MEDIAN, CHANNELIZED TURN LANES MPO PROJ NUM 204

DESCR FUNDING CAT(S) 2MREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,499,000ROW PURCH $ 28,350,000 COST OF

CONSTR $ 51,000,000 APPROVEDCONST ENG $ 2,040,000 PHASES

CONTING $ 5,100,000 $ 51,000,000INDIRECT $ 2,590,800BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 91,579,800

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 40,800,000 $ 10,200,000 $ 0 $ 0 $ 0 $ 51,000,000TOTAL $ 40,800,000 $ 10,200,000 $ 0 $ 0 $ 0 $ 51,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0028-01-067 2020 BU 90-U C HOUSTON $ 17,000,000LIMITS FROM IH 610 NE PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO E OF MESA RD (OLD FM 527)PROJECT WIDEN TO 6 LANE DIVIDED WITH CONTINUOUS LEFT TURN LANE AND BICYCLE ACCOMODATIONS MPO PROJ NUM 60

DESCR FUNDING CAT(S) 2MREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 833,000ROW PURCH $ 8,775,198 COST OF

CONSTR $ 17,000,000 APPROVEDCONST ENG $ 850,000 PHASES

CONTING $ 1,700,000 $ 17,000,000INDIRECT $ 863,600BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 30,021,798

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 13,600,000 $ 3,400,000 $ 0 $ 0 $ 0 $ 17,000,000TOTAL $ 13,600,000 $ 3,400,000 $ 0 $ 0 $ 0 $ 17,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 257: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 257 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 1685-01-092 2020 FM 1960 C NONE $ 14,991,000LIMITS FROM AT ELDRIDGE PKWY PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TOPROJECT RECONSTRUCT INTERSECTION AND APPROACHES TO ADD RAISED MEDIAN, DUAL LEFT AND RIGH MPO PROJ NUM 17051

DESCR T TURN LANES AND BICYCLE/PEDESTRIAN ACCOMMODATIONS FUNDING CAT(S) 2MREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 734,559ROW PURCH $ 4,166,000 COST OF

CONSTR $ 14,991,000 APPROVEDCONST ENG $ 749,550 PHASES

CONTING $ 1,499,100 $ 14,991,000INDIRECT $ 761,543BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 22,901,752

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 11,992,800 $ 2,998,200 $ 0 $ 0 $ 0 $ 14,991,000TOTAL $ 11,992,800 $ 2,998,200 $ 0 $ 0 $ 0 $ 14,991,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON FORT BEND 0188-10-021 2020 FM 1463 C KATY $ 33,400,000LIMITS FROM IH 10 PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO N OF WESTRIDGE CREEK LNPROJECT WIDEN FROM 2-LANE TO 4 AND 6-LANE DIVIDED ROADWAY WITH RAISED MEDIAN, INTERSECTI MPO PROJ NUM 17050

DESCR ON IMPROVEMENTS AND PEDESTRIAN AND BICYCLE ACCOMMODATIONS FUNDING CAT(S) 2MREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,636,600ROW PURCH $ 3,690,000 COST OF

CONSTR $ 33,400,000 APPROVEDCONST ENG $ 1,336,000 PHASES

CONTING $ 3,340,000 $ 33,400,000INDIRECT $ 1,696,720BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 45,099,320

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 26,720,000 $ 6,680,000 $ 0 $ 0 $ 0 $ 33,400,000TOTAL $ 26,720,000 $ 6,680,000 $ 0 $ 0 $ 0 $ 33,400,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 2941-02-054 2020 FM 2920 C TOMBALL $ 1,371,000LIMITS FROM SH 249 PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO WILLOW STPROJECT INSTALL ITS EQUIPMENT AND INFRASTRUCTURE (144-STRAND FIBER TRUNK LINE, CLOSED-CI MPO PROJ NUM 17045

DESCR RCUIT CAMERAS AND TRAVEL TIME READERS) FUNDING CAT(S) 5REMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 67,179ROW PURCH $ 0 COST OF

CONSTR $ 1,371,000 APPROVEDCONST ENG $ 82,260 PHASES

CONTING $ 137,100 $ 1,371,000INDIRECT $ 69,647BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,727,186

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 1,096,800 $ 274,200 $ 0 $ 0 $ 0 $ 1,371,000TOTAL $ 1,096,800 $ 274,200 $ 0 $ 0 $ 0 $ 1,371,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 258: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 258 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON FORT BEND 0192-01-099 2020 SH 6 C ARCOLA $ 5,826,000LIMITS FROM FORT BEND PARKWAY TOLLWAY PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO SH 288PROJECT INSTALL ITS EQUIPMENT AND INFRASTRUCTURE (144-STRAND FIBER TRUNK LINE, CLOSED-CI MPO PROJ NUM 17044

DESCR RCUIT CAMERAS, DYNAMIC MESSAGE SIGNS AND TRAVEL TIME READERS) FUNDING CAT(S) 5REMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 285,474ROW PURCH $ 0 COST OF

CONSTR $ 5,826,000 APPROVEDCONST ENG $ 291,300 PHASES

CONTING $ 582,600 $ 5,826,000INDIRECT $ 295,961BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 7,281,335

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 4,660,800 $ 1,165,200 $ 0 $ 0 $ 0 $ 5,826,000TOTAL $ 4,660,800 $ 1,165,200 $ 0 $ 0 $ 0 $ 5,826,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0050-06-093 2020 US 290 C,E,R NONE $ 34,169,000LIMITS FROM AT CYPRESS P&R PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TOPROJECT CONSTRUCT REVERSIBLE L-RAMP PROVIDING ACCESS TO THE US 290 HOV/HOT FACILITY MPO PROJ NUM 17041

DESCR FUNDING CAT(S) 5REMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 4,032,500ROW PURCH $ 0 COST OF

CONSTR $ 34,169,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 34,169,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 38,201,500

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 27,335,200 $ 0 $ 0 $ 6,833,800 $ 0 $ 34,169,000TOTAL $ 27,335,200 $ 0 $ 0 $ 6,833,800 $ 0 $ 34,169,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 1685-01-090 2020 FM 1960 C HOUSTON $ 16,376,000LIMITS FROM SH 249 PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO CUTTEN RDPROJECT INTERSECTION IMPROVEMENTS (RECONSTRUCT ROADWAY TO ADD TURNING LANES AND PEDESTRI MPO PROJ NUM 14173

DESCR AN AND BICYCLE ACCOMMODATIONS) FUNDING CAT(S) 5REMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 802,424ROW PURCH $ 4,550,000 COST OF

CONSTR $ 16,376,000 APPROVEDCONST ENG $ 818,800 PHASES

CONTING $ 1,637,600 $ 16,376,000INDIRECT $ 831,901BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 25,016,725

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 13,100,800 $ 3,275,200 $ 0 $ 0 $ 0 $ 16,376,000TOTAL $ 13,100,800 $ 3,275,200 $ 0 $ 0 $ 0 $ 16,376,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 259: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 259 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON FORT BEND 2093-01-010 2020 FM 2218 C ROSENBERG $ 35,228,000LIMITS FROM US 59 PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO SH 36PROJECT WIDEN FROM 2 LANES TO 4-LANE DIVIDED MPO PROJ NUM 13

DESCR FUNDING CAT(S) 2MREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,726,172ROW PURCH $ 15,280,000 COST OF

CONSTR $ 35,228,000 APPROVEDCONST ENG $ 1,409,120 PHASES

CONTING $ 3,522,800 $ 35,228,000INDIRECT $ 1,789,582BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 58,955,674

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 28,182,400 $ 7,045,600 $ 0 $ 0 $ 0 $ 35,228,000TOTAL $ 28,182,400 $ 7,045,600 $ 0 $ 0 $ 0 $ 35,228,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON GALVESTON 0912-73-202 2020 CS C GALVESTON $ 358,023LIMITS FROM VA PROJECT SPONSOR CITY OF GALVESTON

REVISION DATE 07/2018LIMITS TO VAPROJECT CONSTRUCT ON-STREET BICYCLE NETWORK (SIGNAGE, PAVEMENT MARKINGS AND STRIPING) AN MPO PROJ NUM 16203

DESCR D INSTALL 200 BICYCLE RACKS FUNDING CAT(S) 5REMARKS Facility: CITY OF GALVESTON ON-STREET BICYCLE NETWO PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 RK HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 17,543ROW PURCH $ 0 COST OF

CONSTR $ 358,023 APPROVEDCONST ENG $ 32,222 PHASES

CONTING $ 35,802 $ 358,023INDIRECT $ 18,188BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 461,778

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 286,418 $ 0 $ 0 $ 71,605 $ 0 $ 358,023TOTAL $ 286,418 $ 0 $ 0 $ 71,605 $ 0 $ 358,023

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON GALVESTON 0000-00-000 2020 CS C,E,R TEXAS CITY $ 32,000,000LIMITS FROM LP 197 PROJECT SPONSOR CITY OF TEXAS CITY

REVISION DATE 07/2018LIMITS TO SOUTHERN END TERMINAL SITEPROJECT CONSTRUCT NEW 4-LANE PRINCIPAL ARTERIAL MPO PROJ NUM 7615

DESCR FUNDING CAT(S) 3LCREMARKS Facility: SHOAL POINT ACCESS RD PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,052,490ROW PURCH $ 5,369,848 COST OF

CONSTR $ 21,479,393 APPROVEDCONST ENG $ 859,176 PHASES

CONTING $ 2,147,939 $ 32,000,000INDIRECT $ 1,091,153BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 31,999,999

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 32,000,000 $ 0 $ 32,000,000TOTAL $ 0 $ 0 $ 0 $ 32,000,000 $ 0 $ 32,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 260: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 260 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0912-71-836 2020 CS C,E HOUSTON $ 16,000,000LIMITS FROM JFK BLVD PROJECT SPONSOR CITY OF HOUSTON

REVISION DATE 07/2018LIMITS TO US 59PROJECT RECONSTRUCT AND WIDEN TO 4-LANES DIVIDED WITH INTERSECTION IMPROVEMENTS, SIGNALS MPO PROJ NUM 5030

DESCR , LIGHTING, SIDEWALKS AND UNDERGROUND UTILITIES. IMPROVE ROADWAY DRAINAGE SYSTEM FUNDING CAT(S) 7WITH DITCHES, STORM SEWERS AND DETENTION.

REMARKS Facility: GREENS RD PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2P7 HISTORY 019-2022 TIP.(Engineering phase authorized for design rev

iew costs only) TOTAL PROJECT COST INFORMATION

PREL ENG $ 859,000ROW PURCH $ 0 COST OF

CONSTR $ 15,925,000 APPROVEDCONST ENG $ 800,000 PHASES

CONTING $ 1,600,000 $ 16,000,000INDIRECT $ 812,800BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 19,996,800

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 12,800,000 $ 0 $ 0 $ 3,200,000 $ 0 $ 16,000,000TOTAL $ 12,800,000 $ 0 $ 0 $ 3,200,000 $ 0 $ 16,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON GALVESTON 0976-03-104 2020 FM 518 C,E LEAGUE CITY $ 5,244,000LIMITS FROM FM 270 PROJECT SPONSOR CITY OF LEAGUE CITY

REVISION DATE 07/2018LIMITS TO SOUTH SHORE BLVD & FM 518PROJECT CONSTRUCT 10-FT WIDE SHARED USE PATH ADJACENT TO HOT WATER CANAL WITH a "T" INTE MPO PROJ NUM 15318

DESCR RSECTION EAST OF FM 2094 AND PATH TO FM 518 FUNDING CAT(S) 9TAPREMARKS Facility: FM 518 BYPASS BIKEWAY PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 244,953ROW PURCH $ 0 COST OF

CONSTR $ 4,999,047 APPROVEDCONST ENG $ 249,952 PHASES

CONTING $ 499,905 $ 5,244,000INDIRECT $ 253,952BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 6,247,809

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 4,195,200 $ 0 $ 0 $ 1,048,800 $ 0 $ 5,244,000TOTAL $ 4,195,200 $ 0 $ 0 $ 1,048,800 $ 0 $ 5,244,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON 0912-00-543 2020 CS C PEARLAND $ 40,033,000LIMITS FROM SL 8 PROJECT SPONSOR CITY OF PEARLAND

REVISION DATE 07/2018LIMITS TO FM 518PROJECT WIDEN FROM 2 TO 4 LANES DIVIDED MPO PROJ NUM 7602

DESCR FUNDING CAT(S) 7REMARKS Facility: MYKAWA RD PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,961,617ROW PURCH $ 1,858,000 COST OF

CONSTR $ 40,033,000 APPROVEDCONST ENG $ 1,601,320 PHASES

CONTING $ 4,003,300 $ 40,033,000INDIRECT $ 2,033,676BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 51,490,913

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 32,026,400 $ 0 $ 0 $ 8,006,600 $ 0 $ 40,033,000TOTAL $ 32,026,400 $ 0 $ 0 $ 8,006,600 $ 0 $ 40,033,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 261: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 261 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON GALVESTON 0000-00-000 2021 C LEAGUE CITY $ 2,449,000LIMITS FROM ON SH 96, FM 270 AND FM 2094 PROJECT SPONSOR CITY OF LEAGUE CITY

REVISION DATE 07/2018LIMITS TO SH 146PROJECT CONSTRUCT BIKE LANE (MILLING AND ASPHALT OVERLAY OF SHOULDERS, SHOULDER WIDENING MPO PROJ NUM 17118

DESCR , PAVEMENT MARKINGS, STRIPING) WITH SIGNAGE, SIDEWALK AND ASSOCIATED INTERSECTIO FUNDING CAT(S) 9TAPN IMPROVEMENTS

REMARKS Facility: VA PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2P7 HISTORY 019-2022 TIP.

TOTAL PROJECT COST INFORMATIONPREL ENG $ 120,001

ROW PURCH $ 0 COST OFCONSTR $ 2,449,000 APPROVED

CONST ENG $ 146,940 PHASESCONTING $ 244,900 $ 2,449,000INDIRECT $ 124,409BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 3,085,250

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 1,959,200 $ 0 $ 0 $ 489,800 $ 0 $ 2,449,000TOTAL $ 1,959,200 $ 0 $ 0 $ 489,800 $ 0 $ 2,449,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON BRAZORIA 0000-00-000 2021 CS C,E PEARLAND $ 3,372,000LIMITS FROM VA PROJECT SPONSOR CITY OF PEARLAND

REVISION DATE 07/2018LIMITS TO VAPROJECT CONSTRUCT SIDEWALKS, INTERSECTION, AND SIGNAGE IMPROVEMENTS IN VICINITY OF CARLE MPO PROJ NUM 17117

DESCR STON ELEMENTARY, COCKRELL ELEMENTARY AND PEARLAND JUNIOR HIGH (SAFE ROUTES TO SC FUNDING CAT(S) 9TAPHOOL)

REMARKS Facility: CITY OF PEARLAND PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2P7 HISTORY 019-2022 TIP. (Engineering phase authorized for design re

view costs only) TOTAL PROJECT COST INFORMATION

PREL ENG $ 240,228ROW PURCH $ 0 COST OF

CONSTR $ 3,297,000 APPROVEDCONST ENG $ 202,320 PHASES

CONTING $ 337,200 $ 3,372,000INDIRECT $ 171,298BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 4,248,046

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 2,697,600 $ 0 $ 0 $ 674,400 $ 0 $ 3,372,000TOTAL $ 2,697,600 $ 0 $ 0 $ 674,400 $ 0 $ 3,372,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON MONTGOMERY 1259-01-044 2021 FM 1097 C NONE $ 14,880,000LIMITS FROM BLUEBERRY HILLS DR PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO LAKE CONROE HILLS DRPROJECT RECONSTRUCT AND WIDEN FROM 2 TO 4 LANES WITH CONTINUOUS LEFT TURN LANE MPO PROJ NUM 17115

DESCR FUNDING CAT(S) 2MREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 729,120ROW PURCH $ 3,640,000 COST OF

CONSTR $ 14,880,000 APPROVEDCONST ENG $ 744,000 PHASES

CONTING $ 1,488,000 $ 14,880,000INDIRECT $ 755,904BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 22,237,024

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 11,904,000 $ 2,976,000 $ 0 $ 0 $ 0 $ 14,880,000TOTAL $ 11,904,000 $ 2,976,000 $ 0 $ 0 $ 0 $ 14,880,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 262: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 262 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON MONTGOMERY 1259-01-043 2021 FM 1097 C NONE $ 15,900,000LIMITS FROM LAKE CONROE HILLS DR PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO ANDERSON RDPROJECT RECONSTRUCT AND WIDEN FROM 2 TO 4 LANES WITH CONTINUOUS LEFT TURN LANE MPO PROJ NUM 17114

DESCR FUNDING CAT(S) 2M,3LCREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 779,100ROW PURCH $ 3,100,000 COST OF

CONSTR $ 15,900,000 APPROVEDCONST ENG $ 795,000 PHASES

CONTING $ 1,590,000 $ 15,900,000INDIRECT $ 807,720BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 22,971,820

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 11,120,000 $ 2,780,000 $ 0 $ 0 $ 0 $ 13,900,0003LC $ 0 $ 0 $ 0 $ 0 $ 2,000,000 $ 2,000,000TOTAL $ 11,120,000 $ 2,780,000 $ 0 $ 0 $ 2,000,000 $ 15,900,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0912-00-542 2021 VA C HOUSTON $ 11,384,000LIMITS FROM MEMORIAL DR PROJECT SPONSOR CITY OF HOUSTON

REVISION DATE 07/2018LIMITS TO SAN FELIPE STPROJECT CONSTRUCT 10FT MULTI-USE TRAIL WITHIN CENTERPOINT UTILITY CORRIDOR MPO PROJ NUM 17103

DESCR FUNDING CAT(S) 9TAPREMARKS Facility: MEMORIAL TO SAN FELIPE HIKE & BIKE TRAIL PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 557,816ROW PURCH $ 0 COST OF

CONSTR $ 11,384,000 APPROVEDCONST ENG $ 569,200 PHASES

CONTING $ 1,138,400 $ 11,384,000INDIRECT $ 578,307BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 14,227,723

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 9,107,200 $ 0 $ 0 $ 2,276,800 $ 0 $ 11,384,000TOTAL $ 9,107,200 $ 0 $ 0 $ 2,276,800 $ 0 $ 11,384,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0912-72-359 2021 CS C,E BAYTOWN $ 16,012,000LIMITS FROM IH 10 PROJECT SPONSOR CITY OF BAYTOWN

REVISION DATE 07/2018LIMITS TO SH 146PROJECT CONSTRUCT ACCESS MANAGEMENT AND WIDENING FROM 4 TO 6 LANES IN SECTIONS MPO PROJ NUM 17096

DESCR FUNDING CAT(S) 7REMARKS Facility: GARTH RD PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. (Engineering phase authorized for design review costs only)

TOTAL PROJECT COST INFORMATIONPREL ENG $ 1,641,000

ROW PURCH $ 1,090,000 COST OFCONSTR $ 15,862,000 APPROVED

CONST ENG $ 800,600 PHASESCONTING $ 1,601,200 $ 16,012,000INDIRECT $ 813,410BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 21,808,210

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 12,809,600 $ 0 $ 0 $ 3,202,400 $ 0 $ 16,012,000TOTAL $ 12,809,600 $ 0 $ 0 $ 3,202,400 $ 0 $ 16,012,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 263: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 263 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0912-72-385 2021 CS C HOUSTON $ 12,176,000LIMITS FROM DAIRY ASHFORD RD PROJECT SPONSOR CITY OF HOUSTON

REVISION DATE 07/2018LIMITS TO WILCREST STPROJECT WIDEN TO 4-LANES AND REPLACE TRAFFIC SIGNALS IN CONJUNCTION WITH DRAINAGE AND PU MPO PROJ NUM 17094

DESCR BLIC UTILITY IMPROVEMENTS FUNDING CAT(S) 7REMARKS Facility: WESTPARK DR PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 596,624ROW PURCH $ 0 COST OF

CONSTR $ 12,176,000 APPROVEDCONST ENG $ 608,800 PHASES

CONTING $ 1,217,600 $ 12,176,000INDIRECT $ 618,541BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 15,217,565

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 9,740,800 $ 0 $ 0 $ 2,435,200 $ 0 $ 12,176,000TOTAL $ 9,740,800 $ 0 $ 0 $ 2,435,200 $ 0 $ 12,176,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0912-72-381 2021 CS C HOUSTON $ 25,465,000LIMITS FROM BRAESWOOD BLVD S PROJECT SPONSOR CITY OF HOUSTON

REVISION DATE 07/2018LIMITS TO AIRPORT BLVD WPROJECT WIDEN TO 6 LANES WITH TRAFFIC SIGNAL AND DRAINAGE IMPROVEMENTS MPO PROJ NUM 17093

DESCR FUNDING CAT(S) 7REMARKS Facility: FONDREN RD PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,247,785ROW PURCH $ 0 COST OF

CONSTR $ 25,465,000 APPROVEDCONST ENG $ 1,018,600 PHASES

CONTING $ 2,546,500 $ 25,465,000INDIRECT $ 1,293,622BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 31,571,507

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 20,372,000 $ 0 $ 0 $ 5,093,000 $ 0 $ 25,465,000TOTAL $ 20,372,000 $ 0 $ 0 $ 5,093,000 $ 0 $ 25,465,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0912-72-392 2021 CS C HOUSTON $ 5,144,000LIMITS FROM ELGIN ST PROJECT SPONSOR MIDTOWN MD

REVISION DATE 07/2018LIMITS TO PIERCE STPROJECT RECONSTRUCT BACK OF CURB INFRASTRUCTURE (SIDEWALKS, CURBS, ADA RAMPS, PEDESTRIAN MPO PROJ NUM 17092

DESCR LIGHTING AND LANDSCAPING) FUNDING CAT(S) 5REMARKS Facility: BRAZOS ST PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 252,056ROW PURCH $ 0 COST OF

CONSTR $ 5,144,000 APPROVEDCONST ENG $ 257,200 PHASES

CONTING $ 514,400 $ 5,144,000INDIRECT $ 261,315BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 6,428,971

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 4,115,200 $ 0 $ 0 $ 1,028,800 $ 0 $ 5,144,000TOTAL $ 4,115,200 $ 0 $ 0 $ 1,028,800 $ 0 $ 5,144,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 264: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 264 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON FORT BEND 0027-08-180 2021 US 90A C NONE $ 27,000,000LIMITS FROM AT SH 99 PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TOPROJECT CONSTRUCT GRADE SEPARATION AND INTERSECTION IMPROVEMENTS MPO PROJ NUM 16348

DESCR FUNDING CAT(S) 3LCREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,323,000ROW PURCH $ 0 COST OF

CONSTR $ 27,000,000 APPROVEDCONST ENG $ 1,080,000 PHASES

CONTING $ 2,700,000 $ 27,000,000INDIRECT $ 1,371,600BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 33,474,600

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 27,000,000 $ 0 $ 27,000,000TOTAL $ 0 $ 0 $ 0 $ 27,000,000 $ 0 $ 27,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0500-03-601 2021 IH 45 C HOUSTON $ 856,500,000LIMITS FROM AT IH 69 S PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TOPROJECT RECONSTRUCT INTERCHANGE INCLUDING IH 45 & IH 69 MAINLANES MPO PROJ NUM 16329

DESCR FUNDING CAT(S) 4,12REMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 41,968,500ROW PURCH $ 423,600,000 COST OF

CONSTR $ 856,500,000 APPROVEDCONST ENG $ 34,260,000 PHASES

CONTING $ 85,650,000 $ 856,500,000INDIRECT $ 43,510,200BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,485,488,700

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 283,824,000 $ 70,956,000 $ 0 $ 0 $ 0 $ 354,780,00012 $ 401,376,000 $ 100,344,000 $ 0 $ 0 $ 0 $ 501,720,000TOTAL $ 685,200,000 $ 171,300,000 $ 0 $ 0 $ 0 $ 856,500,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0000-00-000 2021 CS C HOUSTON $ 27,700,000LIMITS FROM POST OAK BLVD/DETERING PROJECT SPONSOR UPTOWN HOUSTON

REVISION DATE 07/2018LIMITS TO RICHMOND AVEPROJECT ON-STREET SHARED-USE LANES, SHARED-USE PATHS, IMPROVED CROSSINGS, A SHARED-USE B MPO PROJ NUM 13200

DESCR RIDGE OVER IH-10, A SHARED-USE CROSSING UNDER IH-610, A SHARED-USE BRIDGE CONNEC FUNDING CAT(S) 3LCTING SHARED-USE PATHS ALONG IH-610 AND A BRIDGE OVER BUFFALO BAYOU.

REMARKS Facility: UPTOWN HOUSTON DISTRICT PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2P7 HISTORY 019-2022 TIP.

TOTAL PROJECT COST INFORMATIONPREL ENG $ 1,357,300

ROW PURCH $ 0 COST OFCONSTR $ 27,700,000 APPROVED

CONST ENG $ 1,108,000 PHASESCONTING $ 2,770,000 $ 27,700,000INDIRECT $ 1,407,160BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 34,342,460

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 27,700,000 $ 0 $ 27,700,000TOTAL $ 0 $ 0 $ 0 $ 27,700,000 $ 0 $ 27,700,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 265: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 265 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0000-00-000 2021 VA C HOUSTON $ 3,750,000LIMITS FROM VA PROJECT SPONSOR METRO

REVISION DATE 07/2018LIMITS TO VAPROJECT METRO STAR VANPOOL (STP): FY 2021 MPO PROJ NUM 11808

DESCR FUNDING CAT(S) 7REMARKS Facility: METRO SERVICE AREA PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 3,750,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 3,750,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 3,750,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 3,000,000 $ 0 $ 0 $ 750,000 $ 0 $ 3,750,000TOTAL $ 3,000,000 $ 0 $ 0 $ 750,000 $ 0 $ 3,750,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0000-00-000 2021 VA C HOUSTON $ 2,400,000LIMITS FROM VA PROJECT SPONSOR METRO

REVISION DATE 07/2018LIMITS TO VAPROJECT METRO STAR VANPOOL (CMAQ): FY 2021 MPO PROJ NUM 11762

DESCR FUNDING CAT(S) 5REMARKS Facility: METRO SERVICE AREA PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 2,400,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 2,400,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,400,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 2,400,000 $ 0 $ 0 $ 0 $ 0 $ 2,400,000TOTAL $ 2,400,000 $ 0 $ 0 $ 0 $ 0 $ 2,400,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON MONTGOMERY 0338-04-065 2021 SH 105 C CUT AND SHOOT $ 50,600,000LIMITS FROM LP 336 PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO FM 1484PROJECT WIDEN TO 4-LANE DIVIDED ROADWAY (RAISED MEDIAN AND RURAL IN SECTIONS) WITH INTER MPO PROJ NUM 10125

DESCR SECTION IMPROVEMENTS FUNDING CAT(S) 4REMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,479,400ROW PURCH $ 13,180,000 COST OF

CONSTR $ 50,600,000 APPROVEDCONST ENG $ 2,024,000 PHASES

CONTING $ 5,060,000 $ 50,600,000INDIRECT $ 2,570,480BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 75,913,880

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 40,480,000 $ 10,120,000 $ 0 $ 0 $ 0 $ 50,600,000TOTAL $ 40,480,000 $ 10,120,000 $ 0 $ 0 $ 0 $ 50,600,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 266: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 266 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON MONTGOMERY 0338-04-066 2021 SH 105 C CONROE $ 52,200,000LIMITS FROM FM 1484 PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO SAN JACINTO C/LPROJECT WIDEN TO 4-LANE DIVIDED RURAL ROADWAY WITH INTERSECTION IMPROVEMENTS MPO PROJ NUM 10124

DESCR FUNDING CAT(S) 2MREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,557,800ROW PURCH $ 13,560,000 COST OF

CONSTR $ 52,200,000 APPROVEDCONST ENG $ 2,088,000 PHASES

CONTING $ 5,220,000 $ 52,200,000INDIRECT $ 2,651,760BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 78,277,560

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 41,760,000 $ 10,440,000 $ 0 $ 0 $ 0 $ 52,200,000TOTAL $ 41,760,000 $ 10,440,000 $ 0 $ 0 $ 0 $ 52,200,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0027-13-200 2021 IH 69 C HOUSTON $ 173,500,000LIMITS FROM IH 45 PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO SH 288PROJECT WIDEN FROM 8 TO 12 MAIN LANES AND RECONSTRUCT IH 69/SH 288 INTERCHANGE MPO PROJ NUM 7428

DESCR FUNDING CAT(S) 12REMARKS Facility: IH 69 S PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 8,501,500ROW PURCH $ 24,055,000 COST OF

CONSTR $ 173,500,000 APPROVEDCONST ENG $ 6,940,000 PHASES

CONTING $ 17,350,000 $ 173,500,000INDIRECT $ 8,813,800BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 239,160,300

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL12 $ 138,800,000 $ 34,700,000 $ 0 $ 0 $ 0 $ 173,500,000TOTAL $ 138,800,000 $ 34,700,000 $ 0 $ 0 $ 0 $ 173,500,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON MONTGOMERY 0338-04-060 2021 SH 105 C CONROE $ 21,400,000LIMITS FROM 10TH ST PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO SL 336PROJECT WIDEN TO 4-LANE DIVIDED ROADWAY WITH RAISED MEDIANS AND INTERSECTION IMPROVEMENT MPO PROJ NUM 504

DESCR S FUNDING CAT(S) 4REMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,048,600ROW PURCH $ 1,305,970 COST OF

CONSTR $ 21,400,000 APPROVEDCONST ENG $ 1,070,000 PHASES

CONTING $ 2,140,000 $ 21,400,000INDIRECT $ 1,087,120BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 28,051,690

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 17,120,000 $ 4,280,000 $ 0 $ 0 $ 0 $ 21,400,000TOTAL $ 17,120,000 $ 4,280,000 $ 0 $ 0 $ 0 $ 21,400,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 267: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 267 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON FORT BEND 0188-10-028 2021 FM 1463 C NONE $ 41,300,000LIMITS FROM N OF WESTRIDGE CREEK LN PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO FM 1093PROJECT WIDEN FROM 2-LANE TO 4 AND 6-LANE DIVIDED ROADWAY WITH RAISED MEDIAN, INTERSECTI MPO PROJ NUM 11

DESCR ON IMPROVEMENTS AND PEDESTRIAN AND BICYCLE ACCOMMODATIONS FUNDING CAT(S) 2MREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,023,700ROW PURCH $ 3,890,000 COST OF

CONSTR $ 41,300,000 APPROVEDCONST ENG $ 1,652,000 PHASES

CONTING $ 4,130,000 $ 41,300,000INDIRECT $ 2,098,040BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 55,093,740

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 33,040,000 $ 8,260,000 $ 0 $ 0 $ 0 $ 41,300,000TOTAL $ 33,040,000 $ 8,260,000 $ 0 $ 0 $ 0 $ 41,300,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0912-72-388 2021 RR C,R HOUSTON $ 40,225,631LIMITS FROM AT NAVIGATION BLVD/COMMERCE ST PROJECT SPONSOR CITY OF HOUSTON

REVISION DATE 07/2018LIMITS TOPROJECT CONSTRUCT RAILROAD UNDERPASS AT NAVIGATION/COMMERCE AND CLOSE AT-GRADE CROSSINGSMPO PROJ NUM 17067

DESCR AT HUTCHINS AND COMMERCE STREETS FUNDING CAT(S) 5REMARKS Facility: WEST BELT RR PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,971,056ROW PURCH $ 0 COST OF

CONSTR $ 40,225,631 APPROVEDCONST ENG $ 1,609,025 PHASES

CONTING $ 4,022,563 $ 40,225,631INDIRECT $ 2,043,462BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 49,871,737

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 32,180,505 $ 0 $ 0 $ 8,045,126 $ 0 $ 40,225,631TOTAL $ 32,180,505 $ 0 $ 0 $ 8,045,126 $ 0 $ 40,225,631

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON GALVESTON 0500-04-103 2021 IH 45 C LA MARQUE $ 68,000,000LIMITS FROM N OF TEXAS CITY WYE PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO S OF TEXAS CITY WYEPROJECT RECONSTRUCT IH 45/SH 146/SH 6 INTERCHANGE INCLUDING WIDEN IH 45 MAINLANES FROM 6 MPO PROJ NUM 6047

DESCR TO 8 FUNDING CAT(S) 2MREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 3,332,000ROW PURCH $ 23,800,000 COST OF

CONSTR $ 68,000,000 APPROVEDCONST ENG $ 2,720,000 PHASES

CONTING $ 6,800,000 $ 68,000,000INDIRECT $ 3,454,400BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 108,106,400

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 54,400,000 $ 13,600,000 $ 0 $ 0 $ 0 $ 68,000,000TOTAL $ 54,400,000 $ 13,600,000 $ 0 $ 0 $ 0 $ 68,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 268: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 268 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON GALVESTON 0500-04-104 2021 IH 45 C LA MARQUE $ 96,100,000LIMITS FROM N OF FM 519 PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO N OF TEXAS CITY WYEPROJECT RECONSTRUCT AND WIDEN TO 8 MAIN LANES AND TWO 2-LANE FRONTAGE ROADS MPO PROJ NUM 6046

DESCR FUNDING CAT(S) 2MREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 4,708,900ROW PURCH $ 33,640,000 COST OF

CONSTR $ 96,100,000 APPROVEDCONST ENG $ 3,844,000 PHASES

CONTING $ 9,610,000 $ 96,100,000INDIRECT $ 4,881,880BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 152,784,780

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 76,880,000 $ 19,220,000 $ 0 $ 0 $ 0 $ 96,100,000TOTAL $ 76,880,000 $ 19,220,000 $ 0 $ 0 $ 0 $ 96,100,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON GALVESTON 0500-01-107 2021 IH 45 C LA MARQUE $ 95,000,000LIMITS FROM S OF TEXAS CITY WYE PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO N OF CAUSEWAYPROJECT RECONSTRUCT AND WIDEN TO 8 MAIN LANES AND TWO 2-LANE FRONTAGE ROADS MPO PROJ NUM 280

DESCR FUNDING CAT(S) 2MREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 4,655,000ROW PURCH $ 31,186,000 COST OF

CONSTR $ 95,000,000 APPROVEDCONST ENG $ 3,800,000 PHASES

CONTING $ 9,500,000 $ 95,000,000INDIRECT $ 4,826,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 148,967,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 76,000,000 $ 19,000,000 $ 0 $ 0 $ 0 $ 95,000,000TOTAL $ 76,000,000 $ 19,000,000 $ 0 $ 0 $ 0 $ 95,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON GALVESTON 0500-04-112 2021 IH 45 C TEXAS CITY $ 69,284,000LIMITS FROM AT TEXAS CITY WYE PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TOPROJECT CONSTRUCT TWO SINGLE LANE DIRECT CONNECTORS TO LP 197 (SB TO EB AND WB TO NB) MPO PROJ NUM 10612

DESCR FUNDING CAT(S) 2MREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 3,394,916ROW PURCH $ 7,760,000 COST OF

CONSTR $ 69,284,000 APPROVEDCONST ENG $ 2,771,360 PHASES

CONTING $ 6,928,400 $ 69,284,000INDIRECT $ 3,519,627BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 93,658,303

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 55,427,200 $ 13,856,800 $ 0 $ 0 $ 0 $ 69,284,000TOTAL $ 55,427,200 $ 13,856,800 $ 0 $ 0 $ 0 $ 69,284,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 269: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 269 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0912-72-390 2021 CS C,E HOUSTON $ 2,809,000LIMITS FROM FANNIN ST PROJECT SPONSOR DOWNTOWN MD

REVISION DATE 07/2018LIMITS TO HAMILTON STPROJECT REHABILITATE, RECONSTRUCT AND WIDEN SIDEWALKS WITHIN A 56 BLOCK AREA BOUND BY PO MPO PROJ NUM 15321

DESCR LK, PIERCE, HAMILTON AND FANNIN STREETS FUNDING CAT(S) 5REMARKS Facility: COH SIDEWALKS SE CBD PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 131,212ROW PURCH $ 0 COST OF

CONSTR $ 2,677,788 APPROVEDCONST ENG $ 160,667 PHASES

CONTING $ 267,779 $ 2,809,000INDIRECT $ 136,032BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 3,373,478

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 2,247,200 $ 0 $ 0 $ 561,800 $ 0 $ 2,809,000TOTAL $ 2,247,200 $ 0 $ 0 $ 561,800 $ 0 $ 2,809,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 270: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 270 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2022

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON MONTGOMERY 0912-37-231 2022 CS C CONROE $ 97,480,000LIMITS FROM SL 336 S PROJECT SPONSOR CITY OF CONROE

REVISION DATE 07/2018LIMITS TO FM 1488PROJECT WIDEN TO 4-LANES AND EXTEND ROADWAY INCLUDING BRIDGE OVER WEST FORK OF SAN JACIN MPO PROJ NUM 17101

DESCR TO RIVER FUNDING CAT(S) 7REMARKS Facility: OLD CONROE RD PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 4,776,520ROW PURCH $ 0 COST OF

CONSTR $ 97,480,000 APPROVEDCONST ENG $ 3,899,200 PHASES

CONTING $ 9,748,000 $ 97,480,000INDIRECT $ 4,951,984BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 120,855,704

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 77,984,000 $ 0 $ 0 $ 19,496,000 $ 0 $ 97,480,000TOTAL $ 77,984,000 $ 0 $ 0 $ 19,496,000 $ 0 $ 97,480,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON BRAZORIA 0598-02-120 2022 SH 288 C IOWA COLONY $ 8,032,000LIMITS FROM SH 6 PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO FM 1462PROJECT INSTALL ITS EQUIPMENT AND INFRASTRUCTURE (144-STRAND FIBER TRUNK LINE, CLOSED-CI MPO PROJ NUM 17090

DESCR RCUIT CAMERAS, DYNAMIC MESSAGE SIGNS RADAR-BASED VEHICLES SENSING DEVICES AND TR FUNDING CAT(S) 2MAVEL TIME READERS)

REMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2P7 HISTORY 019-2022 TIP.

TOTAL PROJECT COST INFORMATIONPREL ENG $ 393,568

ROW PURCH $ 0 COST OFCONSTR $ 8,032,000 APPROVED

CONST ENG $ 401,600 PHASESCONTING $ 803,200 $ 8,032,000INDIRECT $ 408,026BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 10,038,394

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 6,425,600 $ 1,606,400 $ 0 $ 0 $ 0 $ 8,032,000TOTAL $ 6,425,600 $ 1,606,400 $ 0 $ 0 $ 0 $ 8,032,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 1685-01-108 2022 FM 1960 C NONE $ 10,904,000LIMITS FROM SH 249 PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO IH 45 NPROJECT INSTALL ITS EQUIPMENT AND INFRASTRUCTURE (144-STRAND FIBER TRUNK LINE, CLOSED-CI MPO PROJ NUM 17088

DESCR RCUIT CAMERAS, DYNAMIC MESSAGE SIGNS AND TRAVEL TIME READERS) AND INTERCONNECT 3 FUNDING CAT(S) 55 EXISTING SIGNALS

REMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2P7 HISTORY 019-2022 TIP.

TOTAL PROJECT COST INFORMATIONPREL ENG $ 534,296

ROW PURCH $ 0 COST OFCONSTR $ 10,904,000 APPROVED

CONST ENG $ 545,200 PHASESCONTING $ 1,090,400 $ 10,904,000INDIRECT $ 553,923BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 13,627,819

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 8,723,200 $ 2,180,800 $ 0 $ 0 $ 0 $ 10,904,000TOTAL $ 8,723,200 $ 2,180,800 $ 0 $ 0 $ 0 $ 10,904,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 271: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 271 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2022

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0502-01-217 2022 SH 225 C PASADENA $ 116,000,000LIMITS FROM AT SL 8 PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TOPROJECT CONSTRUCT DIRECT CONNECTORS MPO PROJ NUM 16340

DESCR FUNDING CAT(S) 3LC,4REMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 5,684,000ROW PURCH $ 0 COST OF

CONSTR $ 116,000,000 APPROVEDCONST ENG $ 4,640,000 PHASES

CONTING $ 11,600,000 $ 116,000,000INDIRECT $ 5,892,800BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 143,816,800

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 46,400,000 $ 11,600,000 $ 0 $ 0 $ 0 $ 58,000,0003LC $ 0 $ 0 $ 0 $ 58,000,000 $ 0 $ 58,000,000TOTAL $ 46,400,000 $ 11,600,000 $ 0 $ 58,000,000 $ 0 $ 116,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0000-00-000 2022 VA C HOUSTON $ 3,750,000LIMITS FROM VA PROJECT SPONSOR METRO

REVISION DATE 07/2018LIMITS TO VAPROJECT METRO STAR VANPOOL (STP): FY 2022 MPO PROJ NUM 11809

DESCR FUNDING CAT(S) 7REMARKS Facility: METRO SERVICE AREA PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 3,750,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 3,750,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 3,750,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 3,000,000 $ 0 $ 0 $ 750,000 $ 0 $ 3,750,000TOTAL $ 3,000,000 $ 0 $ 0 $ 750,000 $ 0 $ 3,750,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0000-00-000 2022 VA C HOUSTON $ 2,400,000LIMITS FROM VA PROJECT SPONSOR METRO

REVISION DATE 07/2018LIMITS TO VAPROJECT METRO STAR VANPOOL (CMAQ): FY 2022 MPO PROJ NUM 11763

DESCR FUNDING CAT(S) 5REMARKS Facility: METRO SERVICE AREA PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 2,400,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 2,400,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,400,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 2,400,000 $ 0 $ 0 $ 0 $ 0 $ 2,400,000TOTAL $ 2,400,000 $ 0 $ 0 $ 0 $ 0 $ 2,400,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 272: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 272 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2022

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

LUFKIN HOUSTON-GALVESTON SAN JACINTO 0338-06-011 2022 SH 105 C NONE $ 10,000,000LIMITS FROM MONTGOMERY C/L PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO MONTGOMERY C/LPROJECT INFORMATION ONLY (PROJECT IN SAN JACINTO CO): WIDEN TO 4-LANE DIVIDED RURAL ROAD MPO PROJ NUM 7705

DESCR WAY WITH INTERSECTION IMPROVEMENTS FUNDING CAT(S) 4REMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 490,000ROW PURCH $ 365,760 COST OF

CONSTR $ 10,000,000 APPROVEDCONST ENG $ 500,000 PHASES

CONTING $ 1,000,000 $ 10,000,000INDIRECT $ 508,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 12,863,760

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 8,000,000 $ 2,000,000 $ 0 $ 0 $ 0 $ 10,000,000TOTAL $ 8,000,000 $ 2,000,000 $ 0 $ 0 $ 0 $ 10,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON BRAZORIA 0912-00-560 2022 VA C,E PEARLAND $ 8,098,000LIMITS FROM UH CLEAR LAKE PEARLAND CAMPUS PROJECT SPONSOR CITY OF PEARLAND

REVISION DATE 07/2018LIMITS TO N OF HUGHES RDPROJECT CONSTRUCT 10 FT MULTIUSE TRAIL MPO PROJ NUM 7641

DESCR FUNDING CAT(S) 9TAPREMARKS Facility: CLEAR CREEK TRAIL PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. (Engineering phase authorized for design review costs only)

TOTAL PROJECT COST INFORMATIONPREL ENG $ 1,060,000

ROW PURCH $ 0 COST OFCONSTR $ 7,948,000 APPROVED

CONST ENG $ 404,900 PHASESCONTING $ 809,800 $ 8,098,000INDIRECT $ 411,378BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 10,634,078

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 6,478,400 $ 0 $ 0 $ 1,619,600 $ 0 $ 8,098,000TOTAL $ 6,478,400 $ 0 $ 0 $ 1,619,600 $ 0 $ 8,098,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 1062-02-009 2022 FM 2100 C NONE $ 86,000,000LIMITS FROM HUFFMAN-CLEVELAND RD PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO FM 1960PROJECT WIDEN TO 4-LANE DIVIDED ROADWAY WITH RAISED MEDIAN, INTERSECTION IMPROVEMENTS AN MPO PROJ NUM 537

DESCR D PEDESTRIAN AND BICYCLE ACCOMMODATIONS FUNDING CAT(S) 2MREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 4,214,000ROW PURCH $ 0 COST OF

CONSTR $ 86,000,000 APPROVEDCONST ENG $ 3,440,000 PHASES

CONTING $ 8,600,000 $ 86,000,000INDIRECT $ 4,368,800BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 106,622,800

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 68,800,000 $ 17,200,000 $ 0 $ 0 $ 0 $ 86,000,000TOTAL $ 68,800,000 $ 17,200,000 $ 0 $ 0 $ 0 $ 86,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 273: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 273 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2022

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON GALVESTON 3049-01-022 2022 FM 646 C LEAGUE CITY $ 31,127,000LIMITS FROM EDMUNDS WAY PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO FM 1266PROJECT WIDEN TO 4-LANE DIVIDED ROADWAY WITH RAISED MEDIAN AND RAILROAD OVERPASS MPO PROJ NUM 514

DESCR FUNDING CAT(S) 2MREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,525,223ROW PURCH $ 6,150,000 COST OF

CONSTR $ 31,127,000 APPROVEDCONST ENG $ 1,245,080 PHASES

CONTING $ 3,112,700 $ 31,127,000INDIRECT $ 1,581,252BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 44,741,255

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 24,901,600 $ 6,225,400 $ 0 $ 0 $ 0 $ 31,127,000TOTAL $ 24,901,600 $ 6,225,400 $ 0 $ 0 $ 0 $ 31,127,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON GALVESTON 0389-06-088 2022 SH 146 C KEMAH $ 85,000,000LIMITS FROM FM 518 PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO FM 517PROJECT WIDEN FROM 4 TO 6 LANES WITH GRADE SEPARATION AT SH 96 MPO PROJ NUM 468

DESCR FUNDING CAT(S) 2MREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 4,165,000ROW PURCH $ 60,705,000 COST OF

CONSTR $ 85,000,000 APPROVEDCONST ENG $ 3,400,000 PHASES

CONTING $ 8,500,000 $ 85,000,000INDIRECT $ 4,318,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 166,088,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 68,000,000 $ 17,000,000 $ 0 $ 0 $ 0 $ 85,000,000TOTAL $ 68,000,000 $ 17,000,000 $ 0 $ 0 $ 0 $ 85,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON BRAZORIA 0188-04-035 2022 SH 36 C WEST COLUMBIA $ 28,000,000LIMITS FROM S OF SH 35 PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO FM 522PROJECT RECONSTRUCT TO 4-LANE DIVIDED WITH CONTINUOUS LEFT TURN LANE, INTERSECTION IMPRO MPO PROJ NUM 256

DESCR VEMENTS AND BICYCLE ACCOMMODATIONS FUNDING CAT(S) 2MREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,372,000ROW PURCH $ 9,070,000 COST OF

CONSTR $ 28,000,000 APPROVEDCONST ENG $ 1,120,000 PHASES

CONTING $ 2,800,000 $ 28,000,000INDIRECT $ 1,422,400BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 43,784,400

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 22,400,000 $ 5,600,000 $ 0 $ 0 $ 0 $ 28,000,000TOTAL $ 22,400,000 $ 5,600,000 $ 0 $ 0 $ 0 $ 28,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 274: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 274 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2022

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON BRAZORIA 0188-04-025 2022 SH 36 C NONE $ 37,400,000LIMITS FROM FM 522 PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO ROUSTABOUT/CR 348PROJECT WIDEN TO 4-LANE DIVIDED RURAL ROADWAY WITH INTERSECTION IMPROVEMENTS AND BICYCLE MPO PROJ NUM 252

DESCR ACCOMMODATIONS FUNDING CAT(S) 2MREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,832,600ROW PURCH $ 6,160,000 COST OF

CONSTR $ 37,400,000 APPROVEDCONST ENG $ 1,496,000 PHASES

CONTING $ 3,740,000 $ 37,400,000INDIRECT $ 1,899,920BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 52,528,520

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 29,920,000 $ 7,480,000 $ 0 $ 0 $ 0 $ 37,400,000TOTAL $ 29,920,000 $ 7,480,000 $ 0 $ 0 $ 0 $ 37,400,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0027-09-104 2022 US 90A C HOUSTON $ 10,000,000LIMITS FROM FORT BEND C/L PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO IH 610 SPROJECT INSTALL ITS EQUIPMENT AND INFRASTRUCTURE (144-STRAND FIBER TRUNK LINE, CLOSED-CI MPO PROJ NUM 17076

DESCR RCUIT CAMERAS, DYNAMIC MESSAGE SIGNS RADAR-BASED VEHICLES SENSING DEVICES AND TR FUNDING CAT(S) 5AVEL TIME READERS)

REMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2P7 HISTORY 019-2022 TIP.

TOTAL PROJECT COST INFORMATIONPREL ENG $ 490,000

ROW PURCH $ 0 COST OFCONSTR $ 10,000,000 APPROVED

CONST ENG $ 500,000 PHASESCONTING $ 1,000,000 $ 10,000,000INDIRECT $ 508,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 12,498,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 8,000,000 $ 2,000,000 $ 0 $ 0 $ 0 $ 10,000,000TOTAL $ 8,000,000 $ 2,000,000 $ 0 $ 0 $ 0 $ 10,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON GALVESTON 0500-01-119 2022 IH 45 C GALVESTON $ 104,000,000LIMITS FROM S OF CAUSEWAY PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO 61ST STPROJECT RECONSTRUCT AND WIDEN TO 8 MAIN LANES AND TWO 2-LANE FRONTAGE ROADS WITH SH 275 MPO PROJ NUM 282

DESCR AND 61ST ST CONNECTIONS FUNDING CAT(S) 2MREMARKS Facility: IH 45 S PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 5,096,000ROW PURCH $ 36,400,000 COST OF

CONSTR $ 104,000,000 APPROVEDCONST ENG $ 4,160,000 PHASES

CONTING $ 10,400,000 $ 104,000,000INDIRECT $ 5,283,200BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 165,339,200

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 83,200,000 $ 20,800,000 $ 0 $ 0 $ 0 $ 104,000,000TOTAL $ 83,200,000 $ 20,800,000 $ 0 $ 0 $ 0 $ 104,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 275: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 275 OF 696

10:03:31 AM HOUSTON-GALVESTON MPO - HIGHWAY PROJECTS

FY 2022

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON HARRIS 0389-05-127 2022 SH 146 C LA PORTE $ 3,000,000LIMITS FROM FAIRMONT PKWY W PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO NASA 1PROJECT INSTALL ITS EQUIPMENT AND INFRASTRUCTURE (144-STRAND FIBER TRUNK LINE, CLOSED-CI MPO PROJ NUM 17046

DESCR RCUIT CAMERAS, DYNAMIC MESSAGE SIGNS RADAR-BASED VEHICLES SENSING DEVICES AND TR FUNDING CAT(S) 2MAVEL TIME READERS)

REMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2P7 HISTORY 019-2022 TIP.

TOTAL PROJECT COST INFORMATIONPREL ENG $ 147,000

ROW PURCH $ 0 COST OFCONSTR $ 3,000,000 APPROVED

CONST ENG $ 180,000 PHASESCONTING $ 300,000 $ 3,000,000INDIRECT $ 152,400BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 3,779,400

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 2,400,000 $ 600,000 $ 0 $ 0 $ 0 $ 3,000,000TOTAL $ 2,400,000 $ 600,000 $ 0 $ 0 $ 0 $ 3,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON BRAZORIA 0188-04-050 2022 SH 36 C WEST COLUMBIA $ 9,590,486LIMITS FROM SH 35 PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO S OF SH 35PROJECT GRADE SEPARATION OVER NEW SH 35 AND RESTRIPE PAVEMENT FROM 2 TO 4 LANES MPO PROJ NUM 14258

DESCR FUNDING CAT(S) 2M,3PTFREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 469,934ROW PURCH $ 721,750 COST OF

CONSTR $ 9,590,486 APPROVEDCONST ENG $ 479,524 PHASES

CONTING $ 959,049 $ 9,590,486INDIRECT $ 487,197BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 12,707,939

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 4,260,949 $ 1,065,237 $ 0 $ 0 $ 0 $ 5,326,1863PTF $ 3,411,440 $ 852,860 $ 0 $ 0 $ 0 $ 4,264,300TOTAL $ 7,672,389 $ 1,918,097 $ 0 $ 0 $ 0 $ 9,590,486

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

HOUSTON HOUSTON-GALVESTON BRAZORIA 0188-03-022 2022 SH 36 C WEST COLUMBIA $ 8,207,000LIMITS FROM N OF CR 467/HOGG RANCH RD PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO SH 35PROJECT GRADE SEPARATION OVER NEW SH 35 AND RESTRIPE PAVEMENT FROM 2 TO 4-LANES MPO PROJ NUM 14712

DESCR FUNDING CAT(S) 2M,3PTFREMARKS PROJECT Amendment #MAY-2018 - 5/25/18 - Program projects in the 2

P7 HISTORY 019-2022 TIP. TOTAL PROJECT COST INFORMATION

PREL ENG $ 377,643ROW PURCH $ 1,686,177 COST OF

CONSTR $ 7,707,000 APPROVEDCONST ENG $ 361,458 PHASES

CONTING $ 576,483 $ 8,207,000INDIRECT $ 364,541BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 11,073,302

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 400,000 $ 100,000 $ 0 $ 0 $ 0 $ 500,0003PTF $ 6,165,600 $ 1,541,400 $ 0 $ 0 $ 0 $ 7,707,000TOTAL $ 6,565,600 $ 1,641,400 $ 0 $ 0 $ 0 $ 8,207,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 276: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

2019-2022Statewide TransportationImprovement ProgramKilleen-Temple MPOHighway Projects

Page 277: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 277 OF 696

10:03:31 AM KILLEEN-TEMPLE MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

WACO KILLEEN-TEMPLE BELL 0909-36-161 2019 CS C KILLEEN $ 1,300,000LIMITS FROM Chaparral Rd @ Rosewood PROJECT SPONSOR Killeen

REVISION DATE 07/2018LIMITS TO USACE PropertyPROJECT Construct shared use path for pedestrians and bicyclists MPO PROJ NUM K40-21b

DESCR FUNDING CAT(S) 7REMARKS August 2017 KTMPO selected project PROJECT Heritage Oaks

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 18,000ROW PURCH $ 0 COST OF

CONSTR $ 1,300,000 APPROVEDCONST ENG $ 27,000 PHASES

CONTING $ 10,000 $ 1,300,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,355,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 1,040,000 $ 0 $ 0 $ 260,000 $ 0 $ 1,300,000TOTAL $ 1,040,000 $ 0 $ 0 $ 260,000 $ 0 $ 1,300,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

WACO KILLEEN-TEMPLE CORYELL 3131-01-007 2019 FM 3046 C COPPERAS COVE $ 156,000LIMITS FROM FM 116 PROJECT SPONSOR Copperas Cove

REVISION DATE 07/2018LIMITS TO Dennis StPROJECT Construct ADA compliant sidewalks and bike lanes MPO PROJ NUM C40-05

DESCR FUNDING CAT(S) 7REMARKS August 2017 KTMPO selected project PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 23,000ROW PURCH $ 0 COST OF

CONSTR $ 156,000 APPROVEDCONST ENG $ 23,000 PHASES

CONTING $ 5,000 $ 156,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 207,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 124,800 $ 31,200 $ 0 $ 0 $ 0 $ 156,000TOTAL $ 124,800 $ 31,200 $ 0 $ 0 $ 0 $ 156,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

WACO KILLEEN-TEMPLE CORYELL 3128-01-013 2019 FM 116 C COPPERAS COVE $ 819,000LIMITS FROM BUS HWY 190 PROJECT SPONSOR Copperas Cove

REVISION DATE 07/2018LIMITS TO FM 3046PROJECT Construct ADA compliant sidewalks and bike lanes MPO PROJ NUM C40-05

DESCR FUNDING CAT(S) 7REMARKS August 2017 KTMPO selected project PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 43,000ROW PURCH $ 0 COST OF

CONSTR $ 819,000 APPROVEDCONST ENG $ 43,000 PHASES

CONTING $ 10,000 $ 819,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 915,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 655,200 $ 163,800 $ 0 $ 0 $ 0 $ 819,000TOTAL $ 655,200 $ 163,800 $ 0 $ 0 $ 0 $ 819,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 278: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 278 OF 696

10:03:31 AM KILLEEN-TEMPLE MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

WACO KILLEEN-TEMPLE BELL 0232-01-053 2019 SH 53 C TEMPLE $ 420,870LIMITS FROM Spur 290 PROJECT SPONSOR Temple

REVISION DATE 07/2018LIMITS TO Martin Luther King Jr., BlvdPROJECT Installation of on-street bike lane and ADA compliant sidewalks traveling east o MPO PROJ NUM T40-15

DESCR n Central Avenue and west on Adams Avenue. FUNDING CAT(S) 7REMARKS August 2017 KTMPO selected project PROJECT Adams Avenue Project

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 22,000ROW PURCH $ 0 COST OF

CONSTR $ 420,870 APPROVEDCONST ENG $ 22,000 PHASES

CONTING $ 5,000 $ 420,870INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 469,870

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 336,696 $ 84,174 $ 0 $ 0 $ 0 $ 420,870TOTAL $ 336,696 $ 84,174 $ 0 $ 0 $ 0 $ 420,870

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

WACO KILLEEN-TEMPLE BELL 0184-03-039 2019 SH 53 C TEMPLE $ 1,492,174LIMITS FROM IH 35 PROJECT SPONSOR Temple

REVISION DATE 07/2018LIMITS TO Spur 290PROJECT Installation of on-street bike lane and ADA compliant sidewalks traveling east o MPO PROJ NUM T40-15

DESCR n Central Avenue and west on Adams Avenue. FUNDING CAT(S) 7REMARKS August 2017 KTMPO selected project PROJECT Adams Avenue Project

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 78,300ROW PURCH $ 0 COST OF

CONSTR $ 1,492,174 APPROVEDCONST ENG $ 78,000 PHASES

CONTING $ 18,000 $ 1,492,174INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,666,474

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 1,193,739 $ 298,435 $ 0 $ 0 $ 0 $ 1,492,174TOTAL $ 1,193,739 $ 298,435 $ 0 $ 0 $ 0 $ 1,492,174

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

WACO KILLEEN-TEMPLE BELL 0836-02-073 2019 SH 195 C KILLEEN $ 800,000LIMITS FROM 0.1 MI N of FM 3470 PROJECT SPONSOR Killeen

REVISION DATE 07/2018LIMITS TO 0.1 MI S of FM 3470PROJECT Turnaround underpass for northbound and southbound traffic on SH 195 frontage ro MPO PROJ NUM K40-27

DESCR ads and FM 3470 (Stan Schlueter) FUNDING CAT(S) 7REMARKS August 2017 KTMPO selected project PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 40,000ROW PURCH $ 0 COST OF

CONSTR $ 800,000 APPROVEDCONST ENG $ 38,000 PHASES

CONTING $ 24,000 $ 800,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 902,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 640,000 $ 160,000 $ 0 $ 0 $ 0 $ 800,000TOTAL $ 640,000 $ 160,000 $ 0 $ 0 $ 0 $ 800,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 279: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 279 OF 696

10:03:31 AM KILLEEN-TEMPLE MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

WACO KILLEEN-TEMPLE BELL 0231-04-061 2019 US 190 C OTHER $ 14,820,000LIMITS FROM 0.25 MI W of Paddy Hamilton PROJECT SPONSOR Waco

REVISION DATE 07/2018LIMITS TO FM 2410 in W BeltonPROJECT Widen main lanes from 4 to 6 lane divided freeway and ramp alignments MPO PROJ NUM W40-06

DESCR FUNDING CAT(S) 2MREMARKS August 2017 KTMPO selected project PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 785,000ROW PURCH $ 0 COST OF

CONSTR $ 14,820,000 APPROVEDCONST ENG $ 689,000 PHASES

CONTING $ 29,000 $ 14,820,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 16,323,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 11,856,000 $ 2,964,000 $ 0 $ 0 $ 0 $ 14,820,000TOTAL $ 11,856,000 $ 2,964,000 $ 0 $ 0 $ 0 $ 14,820,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

WACO KILLEEN-TEMPLE BELL 0231-03-145 2019 US 190 C OTHER $ 24,180,000LIMITS FROM FM 3423 (Indian Trail) PROJECT SPONSOR Waco

REVISION DATE 07/2018LIMITS TO 0.25 MI W of Paddy HamiltonPROJECT Widen main lanes from 4 to 6 lane divided freeway and ramp alignments MPO PROJ NUM W40-06

DESCR FUNDING CAT(S) 2MREMARKS August 2017 KTMPO selected project PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,282,000ROW PURCH $ 0 COST OF

CONSTR $ 24,180,000 APPROVEDCONST ENG $ 1,120,000 PHASES

CONTING $ 47,000 $ 24,180,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 26,629,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 19,344,000 $ 4,836,000 $ 0 $ 0 $ 0 $ 24,180,000TOTAL $ 19,344,000 $ 4,836,000 $ 0 $ 0 $ 0 $ 24,180,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

WACO KILLEEN-TEMPLE BELL 1835-02-058 2019 FM 1741 C TEMPLE $ 500,000LIMITS FROM Marlandwood Rd PROJECT SPONSOR Temple

REVISION DATE 07/2018LIMITS TO Canyon Creek RdPROJECT Installation of 6’ sidewalks on both sides of FM 1741 MPO PROJ NUM T40-12

DESCR FUNDING CAT(S) 7REMARKS August 2017 KTMPO selected project PROJECT 31st Street Project

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 26,000ROW PURCH $ 0 COST OF

CONSTR $ 500,000 APPROVEDCONST ENG $ 26,000 PHASES

CONTING $ 6,111 $ 500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 558,111

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 400,000 $ 100,000 $ 0 $ 0 $ 0 $ 500,000TOTAL $ 400,000 $ 100,000 $ 0 $ 0 $ 0 $ 500,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 280: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 280 OF 696

10:03:31 AM KILLEEN-TEMPLE MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

WACO KILLEEN-TEMPLE BELL 0909-36-162 2019 VA T OTHER $ 1,615,000LIMITS FROM Hill Country Transit PROJECT SPONSOR Transit

REVISION DATE 07/2018LIMITS TO Killeen UZAPROJECT Purchase buses MPO PROJ NUM A40-15

DESCR FUNDING CAT(S) 7REMARKS Based upon allocating 10% of overall FY18, 19, and PROJECT

P7 20 STP-MM projected amounts HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 1,615,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 1,615,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,615,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 1,292,000 $ 0 $ 0 $ 323,000 $ 0 $ 1,615,000TOTAL $ 1,292,000 $ 0 $ 0 $ 323,000 $ 0 $ 1,615,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

WACO KILLEEN-TEMPLE BELL 2136-01-020 2019 FM 2268 C Salado $ 1,616,956LIMITS FROM Salado Plaza Drive PROJECT SPONSOR Waco

REVISION DATE 07/2018LIMITS TO College Hill Dr (North End)PROJECT Construct sidewalks, lighting, and striping for bicycles MPO PROJ NUM S40-04a

DESCR FUNDING CAT(S) 7REMARKS August 2017 KTMPO selected project PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 320,000ROW PURCH $ 0 COST OF

CONSTR $ 1,616,956 APPROVEDCONST ENG $ 320,000 PHASES

CONTING $ 74,000 $ 1,616,956INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,330,956

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 1,293,565 $ 323,391 $ 0 $ 0 $ 0 $ 1,616,956TOTAL $ 1,293,565 $ 323,391 $ 0 $ 0 $ 0 $ 1,616,956

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

WACO KILLEEN-TEMPLE BELL 0909-36-157 2019 CS C BELTON $ 2,670,615LIMITS FROM University Blvd. 0.25 mile south of Crusader Way PROJECT SPONSOR Belton

REVISION DATE 07/2018LIMITS TO Tiger Drive 0.10 mile north of Sparta RoadPROJECT Construct sidewalks and shared use path-widths vary from 8ft to 10ft; includes l MPO PROJ NUM B40-04

DESCR andscaping and lighting FUNDING CAT(S) 9TAPREMARKS Chisholm Trail Corridor Hike and Bike Facility Phas PROJECT

P7 e II. Project consists of segments along five roadw HISTORYays; 4 segments (University Blvd, Crusader Way, Sparta Road, Tiger Dr.) will be constructed with thisproject; TxDOT will construct the segment along Loo

TOTAL PROJECT COST INFORMATIONPREL ENG $ 478,878

ROW PURCH $ 0 COST OFCONSTR $ 2,375,100 APPROVED

CONST ENG $ 221,637 PHASESCONTING $ 34,180 $ 2,670,615INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 3,109,795

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 2,136,492 $ 0 $ 0 $ 534,123 $ 0 $ 2,670,615TOTAL $ 2,136,492 $ 0 $ 0 $ 534,123 $ 0 $ 2,670,615

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 281: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 281 OF 696

10:03:31 AM KILLEEN-TEMPLE MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

WACO KILLEEN-TEMPLE BELL 0909-36-153 2019 CS C HARKER HEIGHTS $ 489,249LIMITS FROM Heights Dr, from Heights Dr PROJECT SPONSOR Harker Heights

REVISION DATE 07/2018LIMITS TO Commercial DrPROJECT Construction of a roundabout MPO PROJ NUM H40-02

DESCR FUNDING CAT(S) 7REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 25,000ROW PURCH $ 0 COST OF

CONSTR $ 474,249 APPROVEDCONST ENG $ 43,000 PHASES

CONTING $ 23,000 $ 489,249INDIRECT $ 6,100BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 571,349

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 391,399 $ 0 $ 0 $ 97,850 $ 0 $ 489,249TOTAL $ 391,399 $ 0 $ 0 $ 97,850 $ 0 $ 489,249

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

WACO KILLEEN-TEMPLE BELL 2057-01-099 2019 FM 439 C,E NOLANVILLE $ 596,386LIMITS FROM Avenue I PROJECT SPONSOR Nolanville

REVISION DATE 07/2018LIMITS TO East Bound Service RoadPROJECT Construct multi-use paths with curb and gutter MPO PROJ NUM N40-01

DESCR FUNDING CAT(S) 3LC,7REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 80,500ROW PURCH $ 0 COST OF

CONSTR $ 503,886 APPROVEDCONST ENG $ 12,000 PHASES

CONTING $ 6,500 $ 596,386INDIRECT $ 24,300BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 627,186

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 450,309 $ 0 $ 0 $ 112,577 $ 0 $ 562,8863LC $ 0 $ 0 $ 0 $ 0 $ 33,500 $ 33,500TOTAL $ 450,309 $ 0 $ 0 $ 112,577 $ 33,500 $ 596,386

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 282: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 282 OF 696

10:03:31 AM KILLEEN-TEMPLE MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

WACO KILLEEN-TEMPLE BELL 0909-36-163 2020 VA C,E BELTON $ 1,790,571LIMITS FROM IH-35 from FM 436 PROJECT SPONSOR Belton

REVISION DATE 07/2018LIMITS TO Confederate Park DrivePROJECT Construct 12 ft wide hike and bike trail. Project will extend along FM 436, IH 3 MPO PROJ NUM B40-05

DESCR 5 northbound frontage road and Confederate Park Drive FUNDING CAT(S) 9TAPREMARKS Belton Hike and Bike Trail Extension South (South B PROJECT

P7 elton Shared Use Path). Construct Alternate Transpo HISTORYrtation Route Consisting of Shared-Use Path for Pedestrians and Bicyclists. Minute Order #115076 dated10/26/17. Local In-Kind Participation of $194,325

TOTAL PROJECT COST INFORMATIONPREL ENG $ 256,787

ROW PURCH $ 0 COST OFCONSTR $ 1,512,963 APPROVED

CONST ENG $ 20,821 PHASESCONTING $ 20,042 $ 1,790,571INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,810,613

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 1,432,456 $ 0 $ 0 $ 358,115 $ 0 $ 1,790,571TOTAL $ 1,432,456 $ 0 $ 0 $ 358,115 $ 0 $ 1,790,571

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

WACO KILLEEN-TEMPLE CORYELL 0909-39-133 2020 CS C COPPERAS COVE $ 170,000LIMITS FROM Charles Tillman Way from Constitution Dr PROJECT SPONSOR Copperas Cove

REVISION DATE 07/2018LIMITS TO Charles Tillman Way @ RG III BlvdPROJECT Construction of sidewalks for pedestrian/bicycle use MPO PROJ NUM C40-04c

DESCR FUNDING CAT(S) 7REMARKS August 2017 KTMPO selected project PROJECT The Narrows

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 9,000ROW PURCH $ 0 COST OF

CONSTR $ 170,000 APPROVEDCONST ENG $ 9,000 PHASES

CONTING $ 2,000 $ 170,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 190,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 136,000 $ 0 $ 0 $ 34,000 $ 0 $ 170,000TOTAL $ 136,000 $ 0 $ 0 $ 34,000 $ 0 $ 170,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

WACO KILLEEN-TEMPLE CORYELL 0909-39-132 2020 CS C COPPERAS COVE $ 680,000LIMITS FROM RG III Blvd from Constitution Dr PROJECT SPONSOR Copperas Cove

REVISION DATE 07/2018LIMITS TO Old Copperas Cove Road @ ConstitutionPROJECT Construction of sidewalks for pedestrian/bicycle use MPO PROJ NUM C40-04b

DESCR FUNDING CAT(S) 9TAPREMARKS August 2017 KTMPO selected project PROJECT The Narrows

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 38,000ROW PURCH $ 0 COST OF

CONSTR $ 680,000 APPROVEDCONST ENG $ 38,000 PHASES

CONTING $ 9,000 $ 680,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 765,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 544,000 $ 0 $ 0 $ 136,000 $ 0 $ 680,000TOTAL $ 544,000 $ 0 $ 0 $ 136,000 $ 0 $ 680,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 283: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 283 OF 696

10:03:31 AM KILLEEN-TEMPLE MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

WACO KILLEEN-TEMPLE CORYELL 0909-39-131 2020 CS C COPPERAS COVE $ 850,000LIMITS FROM Constitution Dr from Bowen Ave PROJECT SPONSOR Copperas Cove

REVISION DATE 07/2018LIMITS TO 0.2 MI S Martin Luther King Jr., BlvdPROJECT Construction of sidewalks for pedestrian/bicycle use MPO PROJ NUM C40-04a

DESCR FUNDING CAT(S) 7,9TAPREMARKS August 2017 KTMPO selected project PROJECT The Narrows

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 47,000ROW PURCH $ 0 COST OF

CONSTR $ 850,000 APPROVEDCONST ENG $ 47,000 PHASES

CONTING $ 11,000 $ 850,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 955,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 288,000 $ 0 $ 0 $ 72,000 $ 0 $ 360,0009TAP $ 392,000 $ 0 $ 0 $ 98,000 $ 0 $ 490,000TOTAL $ 680,000 $ 0 $ 0 $ 170,000 $ 0 $ 850,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

WACO KILLEEN-TEMPLE BELL 0231-03-147 2020 US 190 C HARKER HEIGHTS $ 5,000,000LIMITS FROM E Central Texas Expy W PROJECT SPONSOR Harker Heights

REVISION DATE 07/2018LIMITS TO E Central Texas Expy EPROJECT Construction of a west to east turnaround at FM 2410 MPO PROJ NUM H35-01

DESCR FUNDING CAT(S) 7REMARKS August 2017 KTMPO selected project PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 278,000ROW PURCH $ 0 COST OF

CONSTR $ 5,000,000 APPROVEDCONST ENG $ 266,000 PHASES

CONTING $ 170,000 $ 5,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 5,714,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 4,000,000 $ 1,000,000 $ 0 $ 0 $ 0 $ 5,000,000TOTAL $ 4,000,000 $ 1,000,000 $ 0 $ 0 $ 0 $ 5,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

WACO KILLEEN-TEMPLE CORYELL 0231-02-062 2020 BUS 190 C COPPERAS COVE $ 10,000,000LIMITS FROM FM 1113 (Avenue D) PROJECT SPONSOR Copperas Cove

REVISION DATE 07/2018LIMITS TO Constitution DrPROJECT Construction of a raised median and conversion of one travel lane in each direct MPO PROJ NUM C30-03b

DESCR ion to a sidewalk/bicycle lane FUNDING CAT(S) 2MREMARKS August 2017 KTMPO selected project PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 544,000ROW PURCH $ 0 COST OF

CONSTR $ 10,000,000 APPROVEDCONST ENG $ 543,000 PHASES

CONTING $ 125,000 $ 10,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 11,212,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 8,000,000 $ 2,000,000 $ 0 $ 0 $ 0 $ 10,000,000TOTAL $ 8,000,000 $ 2,000,000 $ 0 $ 0 $ 0 $ 10,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 284: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

2019-2022Statewide TransportationImprovement ProgramLaredo MPOHighway Projects

Page 285: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 285 OF 696

10:03:31 AM LAREDO MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

LAREDO LAREDO WEBB 0922-33-177 2019 CS C,E LAREDO $ 815,798LIMITS FROM Anna Park PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO LCC CampusPROJECT Construction of River Vega Multiuse Alternative Transportation Trail MPO PROJ NUM

DESCR FUNDING CAT(S) 9TAPREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 19,082ROW PURCH $ 0 COST OF

CONSTR $ 777,634 APPROVEDCONST ENG $ 19,082 PHASES

CONTING $ 0 $ 815,798INDIRECT $ 81,580BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 897,378

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 652,638 $ 0 $ 0 $ 163,160 $ 0 $ 815,798TOTAL $ 652,638 $ 0 $ 0 $ 163,160 $ 0 $ 815,798

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

LAREDO LAREDO WEBB 0018-06-183 2019 IH 35 C,E LAREDO $ 34,637,499LIMITS FROM 0.50 miles south of US59-SL20 PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO 0.50 miles east of IH35/US59-SL20PROJECT Construction of Direct Connector Interchange (DC#5) MPO PROJ NUM

DESCR FUNDING CAT(S) 1,4REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,548,716ROW PURCH $ 0 COST OF

CONSTR $ 31,606,441 APPROVEDCONST ENG $ 1,482,342 PHASES

CONTING $ 945,003 $ 34,637,499INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 35,582,502

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 27,000,000 $ 3,000,000 $ 0 $ 0 $ 0 $ 30,000,0001 $ 4,173,749 $ 463,750 $ 0 $ 0 $ 0 $ 4,637,499TOTAL $ 31,173,749 $ 3,463,750 $ 0 $ 0 $ 0 $ 34,637,499

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

LAREDO LAREDO WEBB 0922-33-093 2019 CS C,E,R LAREDO $ 21,249,609LIMITS FROM 0.25 M EAST OF CALTON/SAN MARIA INT PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO 0.25 M WEST OF CALTON/SAN MARIA INTPROJECT CONSTRUCTION OF A GRADE SEPARATION INTERCHANGE MPO PROJ NUM

DESCR FUNDING CAT(S) 3LC,10REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 795,858ROW PURCH $ 3,450,000 COST OF

CONSTR $ 16,242,001 APPROVEDCONST ENG $ 761,750 PHASES

CONTING $ 485,636 $ 21,249,609INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 21,735,245

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL10 $ 11,499,829 $ 0 $ 0 $ 1,647,606 $ 0 $ 13,147,4353LC $ 0 $ 0 $ 0 $ 0 $ 8,102,174 $ 8,102,174TOTAL $ 11,499,829 $ 0 $ 0 $ 1,647,606 $ 8,102,174 $ 21,249,609

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 286: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 286 OF 696

10:03:31 AM LAREDO MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

LAREDO LAREDO WEBB 0922-33-076 2019 CS C,E LAREDO $ 1,987,857LIMITS FROM INTERSECTION OF FM 1472 AND FLECHA PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO 0.174 MILES EAST OF FM 1472PROJECT new location two lane highway MPO PROJ NUM

DESCR FUNDING CAT(S) 3LC,10REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 88,711ROW PURCH $ 1,250,000 COST OF

CONSTR $ 1,810,434 APPROVEDCONST ENG $ 88,711 PHASES

CONTING $ 22,630 $ 1,987,857INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 3,260,486

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL10 $ 1,098,378 $ 0 $ 0 $ 274,595 $ 0 $ 1,372,9733LC $ 0 $ 0 $ 0 $ 0 $ 614,884 $ 614,884TOTAL $ 1,098,378 $ 0 $ 0 $ 274,595 $ 614,884 $ 1,987,857

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 287: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 287 OF 696

10:03:31 AM LAREDO MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

LAREDO LAREDO WEBB 0018-06-136 2021 IH 35 C,E LAREDO $ 67,435,054LIMITS FROM Shiloh Drive PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO 0.25 miles North of US 59/IH69WPROJECT Widen of main lanes and RR Grade separation MPO PROJ NUM

DESCR FUNDING CAT(S) 1,2M,4,12REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 3,015,163ROW PURCH $ 0 COST OF

CONSTR $ 61,533,948 APPROVEDCONST ENG $ 2,885,942 PHASES

CONTING $ 1,839,865 $ 67,435,054INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 69,274,918

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL1 $ 10,748,043 $ 2,687,011 $ 0 $ 0 $ 0 $ 13,435,0542M $ 7,200,000 $ 1,800,000 $ 0 $ 0 $ 0 $ 9,000,0004 $ 21,600,000 $ 5,400,000 $ 0 $ 0 $ 0 $ 27,000,00012 $ 14,400,000 $ 3,600,000 $ 0 $ 0 $ 0 $ 18,000,000TOTAL $ 53,948,043 $ 13,487,011 $ 0 $ 0 $ 0 $ 67,435,054

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

LAREDO LAREDO WEBB 0922-33-178 2021 CS C,E LAREDO $ 12,067,384LIMITS FROM World Trade International Bridge PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TOPROJECT construction of inspection booths MPO PROJ NUM

DESCR FUNDING CAT(S) 10REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 538,575ROW PURCH $ 0 COST OF

CONSTR $ 10,991,333 APPROVEDCONST ENG $ 537,476 PHASES

CONTING $ 124,202 $ 12,067,384INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 12,191,586

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL10 $ 9,653,907 $ 2,413,477 $ 0 $ 0 $ 0 $ 12,067,384TOTAL $ 9,653,907 $ 2,413,477 $ 0 $ 0 $ 0 $ 12,067,384

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

LAREDO LAREDO WEBB 0086-14-078 2021 US 59 C LAREDO $ 22,438,724LIMITS FROM 0.50 mi. S. of Jacaman PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO 0.50 mi. N. of JacamanPROJECT For construction of interchange MPO PROJ NUM

DESCR FUNDING CAT(S) 2M,12REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,099,497ROW PURCH $ 0 COST OF

CONSTR $ 22,438,723 APPROVEDCONST ENG $ 1,052,376 PHASES

CONTING $ 670,916 $ 22,438,724INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 25,261,512

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 4,350,979 $ 1,087,745 $ 0 $ 0 $ 0 $ 5,438,72412 $ 13,600,000 $ 3,400,000 $ 0 $ 0 $ 0 $ 17,000,000TOTAL $ 17,950,979 $ 4,487,745 $ 0 $ 0 $ 0 $ 22,438,724

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 288: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 288 OF 696

10:03:31 AM LAREDO MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

LAREDO LAREDO WEBB 0922-33-165 2021 CS C,E LAREDO $ 32,339,796LIMITS FROM FM 1472 PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO 0.1 miles east of Beltway ParkwayPROJECT Preliminary engineering for a 5 lane rural roadway MPO PROJ NUM

DESCR FUNDING CAT(S) 7REMARKS Hachar roadway - local PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,443,215ROW PURCH $ 0 COST OF

CONSTR $ 29,453,366 APPROVEDCONST ENG $ 1,443,215 PHASES

CONTING $ 368,167 $ 32,339,796INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 32,707,963

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 25,871,837 $ 0 $ 0 $ 6,467,959 $ 0 $ 32,339,796TOTAL $ 25,871,837 $ 0 $ 0 $ 6,467,959 $ 0 $ 32,339,796

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 289: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 289 OF 696

10:03:31 AM LAREDO MPO - HIGHWAY PROJECTS

FY 2022

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

LAREDO LAREDO WEBB 0086-14-079 2022 US 59 C,E LAREDO $ 21,458,953LIMITS FROM 0.50 mi. S. of University Blvd. PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO 0.50 mi. N. of University Blvd.PROJECT construction of interchange MPO PROJ NUM

DESCR FUNDING CAT(S) 2MREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 959,475ROW PURCH $ 0 COST OF

CONSTR $ 19,581,123 APPROVEDCONST ENG $ 918,355 PHASES

CONTING $ 585,476 $ 21,458,953INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 22,044,429

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 17,167,162 $ 4,291,791 $ 0 $ 0 $ 0 $ 21,458,953TOTAL $ 17,167,162 $ 4,291,791 $ 0 $ 0 $ 0 $ 21,458,953

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

LAREDO LAREDO WEBB 0086-14-076 2022 C,E LAREDO $ 27,380,860LIMITS FROM 0.50 mi. S. of Shiloh Road PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO 0.50 mi. N. of Shiloh RoadPROJECT construction of interchange MPO PROJ NUM

DESCR FUNDING CAT(S) 2MREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,224,256ROW PURCH $ 0 COST OF

CONSTR $ 24,984,816 APPROVEDCONST ENG $ 1,171,788 PHASES

CONTING $ 747,046 $ 27,380,860INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 28,127,906

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 21,904,688 $ 5,476,172 $ 0 $ 0 $ 0 $ 27,380,860TOTAL $ 21,904,688 $ 5,476,172 $ 0 $ 0 $ 0 $ 27,380,860

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

LAREDO LAREDO WEBB 0086-14-075 2022 US 59 C,E LAREDO $ 30,692,034LIMITS FROM 0.50 mi. S. of Del Mar Blvd. PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO 0.50 mi. N. of Del Mar Blvd.PROJECT construction of interchange MPO PROJ NUM

DESCR FUNDING CAT(S) 2MREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,372,306ROW PURCH $ 0 COST OF

CONSTR $ 28,006,235 APPROVEDCONST ENG $ 1,313,492 PHASES

CONTING $ 837,386 $ 30,692,034INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 31,529,419

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 24,553,627 $ 6,138,407 $ 0 $ 0 $ 0 $ 30,692,034TOTAL $ 24,553,627 $ 6,138,407 $ 0 $ 0 $ 0 $ 30,692,034

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 290: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 290 OF 696

10:03:31 AM LAREDO MPO - HIGHWAY PROJECTS

FY 2022

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

LAREDO LAREDO WEBB 0018-05-089 2022 IH 35 C,E LAREDO $ 83,477,632LIMITS FROM 0.50 mi. S. of Uniroyal interchange PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO 0.50 mi. N. of Uniroyal interchangePROJECT replacement of existing bridge MPO PROJ NUM

DESCR FUNDING CAT(S) 1,4REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 3,640,769ROW PURCH $ 0 COST OF

CONSTR $ 74,301,408 APPROVEDCONST ENG $ 5,535,455 PHASES

CONTING $ 0 $ 83,477,632INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 83,477,632

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL1 $ 16,629,869 $ 1,847,763 $ 0 $ 0 $ 0 $ 18,477,6324 $ 58,500,000 $ 6,500,000 $ 0 $ 0 $ 0 $ 65,000,000TOTAL $ 75,129,869 $ 8,347,763 $ 0 $ 0 $ 0 $ 83,477,632

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 291: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

2019-2022Statewide TransportationImprovement ProgramLongview MPOHighway Projects

Page 292: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 292 OF 696

10:03:31 AM LONGVIEW MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

TYLER LONGVIEW GREGG 2073-01-009 2019 FM 2206 C,E,R LONGVIEW $ 22,318,330LIMITS FROM 2.05 MI E OF SH 42 (FISHER RD), E PROJECT SPONSOR TxDOT - Tyler

REVISION DATE 07/2018LIMITS TO SL 281 IN LONGVIEWPROJECT WIDEN 2 LN ROAD TO 4 LANE DIVIDED ROADWAY W/ FLUSH MEDIAN MPO PROJ NUM F 115

DESCR FUNDING CAT(S) 2U,11REMARKS ESTIMATE INFLATED TO LET DATE PROJECT WIDEN 2 LN ROAD TO 4 LANE DIVIDED ROADWAY W/ FLUSH MEDIAN

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 688,755ROW PURCH $ 6,876,163 COST OF

CONSTR $ 14,056,223 APPROVEDCONST ENG $ 697,189 PHASES

CONTING $ 279,719 $ 22,318,330INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 22,598,049

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2U $ 9,520,000 $ 2,380,000 $ 0 $ 0 $ 0 $ 11,900,00011 $ 8,334,664 $ 2,083,666 $ 0 $ 0 $ 0 $ 10,418,330TOTAL $ 17,854,664 $ 4,463,666 $ 0 $ 0 $ 0 $ 22,318,330

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

TYLER LONGVIEW GREGG 0910-07-076 2019 CS C,E LONGVIEW $ 6,056,470LIMITS FROM Along Guthrie Creek, from US 80 to Spur 63 PROJECT SPONSOR CITY OF LONGVIEW

REVISION DATE 07/2018LIMITS TO & from Johnson St. to Eden St. in LongviewPROJECT Completion of two gap sections in the Guthrie Creek Trail System. The 12 ft. wid MPO PROJ NUM F 505

DESCR e SUP will include five pedestrian bridges over creeks, crosswalks, warning sign FUNDING CAT(S) 3LC,9TAPs at surface roadway crossings, as well as pedestrian underpasses at Spur 63 andSpur 502.

REMARKS Longview - Guthrie Creek Shared Use Path (SUP) PROJECT TxDOT 2017 State Selected TASA; Commission Approved 10/26P7 HISTORY /17, MO 115076

TOTAL PROJECT COST INFORMATIONPREL ENG $ 236,992

ROW PURCH $ 0 COST OFCONSTR $ 5,740,481 APPROVED

CONST ENG $ 78,997 PHASESCONTING $ 0 $ 6,056,470INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 6,056,470

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 3,028,235 $ 0 $ 0 $ 757,059 $ 0 $ 3,785,2943LC $ 0 $ 0 $ 0 $ 0 $ 2,271,176 $ 2,271,176TOTAL $ 3,028,235 $ 0 $ 0 $ 757,059 $ 2,271,176 $ 6,056,470

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 293: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 293 OF 696

10:03:31 AM LONGVIEW MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

TYLER LONGVIEW GREGG 2073-01-010 2020 FM 2206 C,E,R LONGVIEW $ 16,142,299LIMITS FROM SH 42, E PROJECT SPONSOR TxDOT - Tyler

REVISION DATE 07/2018LIMITS TO 1.6 MI W OF SL281 (FISHER RD) IN LONGVIEWPROJECT WIDEN 2 LN ROAD TO 4 LANE DIVIDED ROADWAY W/ FLUSH MEDIAN MPO PROJ NUM F 116

DESCR FUNDING CAT(S) 1,2UREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 719,982ROW PURCH $ 0 COST OF

CONSTR $ 14,693,518 APPROVEDCONST ENG $ 728,798 PHASES

CONTING $ 292,401 $ 16,142,299INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 16,434,699

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL1 $ 2,913,839 $ 728,460 $ 0 $ 0 $ 0 $ 3,642,2992U $ 10,000,000 $ 2,500,000 $ 0 $ 0 $ 0 $ 12,500,000TOTAL $ 12,913,839 $ 3,228,460 $ 0 $ 0 $ 0 $ 16,142,299

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 294: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 294 OF 696

10:03:31 AM LONGVIEW MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

TYLER LONGVIEW GREGG 2158-01-020 2021 FM 2275 C,E LONGVIEW $ 14,897,016LIMITS FROM FM 1845 (PINE TREE RD), E PROJECT SPONSOR TxDOT - Tyler

REVISION DATE 07/2018LIMITS TO SH 300 IN LONGVIEWPROJECT WIDEN 2 LNS TO 4 LN DIVIDED ROADWAY W/ FLUSH MEDIAN MPO PROJ NUM F 246

DESCR FUNDING CAT(S) 1,2U,11REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 664,440ROW PURCH $ 0 COST OF

CONSTR $ 13,560,000 APPROVEDCONST ENG $ 672,576 PHASES

CONTING $ 269,844 $ 14,897,016INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 15,166,860

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL1 $ 2,309,613 $ 577,403 $ 0 $ 0 $ 0 $ 2,887,0162U $ 6,584,000 $ 1,646,000 $ 0 $ 0 $ 0 $ 8,230,00011 $ 3,024,000 $ 756,000 $ 0 $ 0 $ 0 $ 3,780,000TOTAL $ 11,917,613 $ 2,979,403 $ 0 $ 0 $ 0 $ 14,897,016

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 295: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 295 OF 696

10:03:31 AM LONGVIEW MPO - HIGHWAY PROJECTS

FY 2022

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

TYLER LONGVIEW GREGG 0165-03-036 2022 US 271 C,E GLADEWATER $ 29,265,872LIMITS FROM SL 485 IN GLADEWATER, SW PROJECT SPONSOR TxDOT - Tyler

REVISION DATE 07/2018LIMITS TO SMITH C/LPROJECT WIDEN 2-LN ROAD TO 4 LANES W/ FLUSH MED TO SH 135 & DEPRESSED MEDIAN FOR THE REM MPO PROJ NUM F 304

DESCR AINING PROJECT EXTENT FUNDING CAT(S) 1,4REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,305,323ROW PURCH $ 0 COST OF

CONSTR $ 26,639,243 APPROVEDCONST ENG $ 1,321,306 PHASES

CONTING $ 530,121 $ 29,265,872INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 29,795,993

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL1 $ 5,252,698 $ 1,313,174 $ 0 $ 0 $ 0 $ 6,565,8724 $ 18,160,000 $ 4,540,000 $ 0 $ 0 $ 0 $ 22,700,000TOTAL $ 23,412,698 $ 5,853,174 $ 0 $ 0 $ 0 $ 29,265,872

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

TYLER LONGVIEW GREGG 2158-01-019 2022 FM 2275 C,E LONGVIEW $ 14,831,100LIMITS FROM FM 3272 IN WHITE OAK, E PROJECT SPONSOR TxDOT - Tyler

REVISION DATE 07/2018LIMITS TO FM 1845 (PINE TREE RD) IN LONGVIEWPROJECT WIDEN 2 LNS TO 4 LN DIVIDED ROADWAY W/ FLUSH MEDIAN MPO PROJ NUM F 247

DESCR FUNDING CAT(S) 2U,4REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 661,500ROW PURCH $ 0 COST OF

CONSTR $ 13,500,000 APPROVEDCONST ENG $ 669,600 PHASES

CONTING $ 268,650 $ 14,831,100INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 15,099,750

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2U $ 7,680,880 $ 1,920,220 $ 0 $ 0 $ 0 $ 9,601,1004 $ 4,184,000 $ 1,046,000 $ 0 $ 0 $ 0 $ 5,230,000TOTAL $ 11,864,880 $ 2,966,220 $ 0 $ 0 $ 0 $ 14,831,100

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 296: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

2019-2022Statewide TransportationImprovement ProgramLubbock MPOHighway Projects

Page 297: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 297 OF 696

10:03:31 AM LUBBOCK MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

LUBBOCK LUBBOCK LUBBOCK 0880-04-032 2019 FM 179 C LUBBOCK $ 17,507,492LIMITS FROM 800 FT North of SH 114 PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO Donald Preston Dr.PROJECT Widen non-freeway; 2 main lanes to 5 main lanes MPO PROJ NUM 40-22

DESCR FUNDING CAT(S) 1,2M,11REMARKS 17-20 TIP (original) PROJECT Moving MPO 4022 from FY 2018 to 2019 minor difference in

P7 HISTORY funding. Policy Committee approved January 16, 2018. TOTAL PROJECT COST INFORMATION

PREL ENG $ 857,867ROW PURCH $ 7,218,445 COST OF

CONSTR $ 17,507,492 APPROVEDCONST ENG $ 868,372 PHASES

CONTING $ 348,399 $ 17,507,492INDIRECT $ 654,779BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 27,455,354

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL1 $ 3,488,000 $ 872,000 $ 0 $ 0 $ 0 $ 4,360,0002M $ 6,592,000 $ 3,758,000 $ 0 $ 0 $ 0 $ 10,350,00011 $ 2,237,993 $ 559,499 $ 0 $ 0 $ 0 $ 2,797,492TOTAL $ 12,317,993 $ 5,189,499 $ 0 $ 0 $ 0 $ 17,507,492

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 298: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 298 OF 696

10:03:31 AM LUBBOCK MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

LUBBOCK LUBBOCK LUBBOCK 0905-06-095 2020 CS C LUBBOCK $ 7,000,000LIMITS FROM UPLAND AVENUE, FROM 66TH STREET PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO 82ND STREETPROJECT WIDEN NON-FREEWAY 2 LANES TO 5 LANES MPO PROJ NUM MPO 40-8

DESCR FUNDING CAT(S) 7REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 343,000ROW PURCH $ 0 COST OF

CONSTR $ 7,000,000 APPROVEDCONST ENG $ 347,200 PHASES

CONTING $ 139,300 $ 7,000,000INDIRECT $ 261,800BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 8,091,300

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 5,600,000 $ 0 $ 0 $ 1,400,000 $ 0 $ 7,000,000TOTAL $ 5,600,000 $ 0 $ 0 $ 1,400,000 $ 0 $ 7,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 299: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 299 OF 696

10:03:31 AM LUBBOCK MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

LUBBOCK LUBBOCK LUBBOCK 1502-01-030 2021 SL 88 C LUBBOCK $ 54,956,663LIMITS FROM CHICAGO PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO MEMPHIS AVEPROJECT CONVERT NON-FREEWAY TO FREEWAY MPO PROJ NUM 4021.3B

DESCR FUNDING CAT(S) 2M,11REMARKS OUTER LOOP PHASE 3B PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,692,876ROW PURCH $ 39,730,425 COST OF

CONSTR $ 54,956,663 APPROVEDCONST ENG $ 2,610,441 PHASES

CONTING $ 1,516,804 $ 54,956,663INDIRECT $ 3,627,140BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 105,134,349

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 37,112,000 $ 9,278,000 $ 0 $ 0 $ 0 $ 46,390,00011 $ 6,853,330 $ 1,713,333 $ 0 $ 0 $ 0 $ 8,566,663TOTAL $ 43,965,330 $ 10,991,333 $ 0 $ 0 $ 0 $ 54,956,663

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

LUBBOCK LUBBOCK LUBBOCK 1502-01-029 2021 SL 88 C LUBBOCK $ 54,967,654LIMITS FROM Memphis Ave PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO CR 2240 (Ave U)PROJECT Covert Non-freeway to freeway, 2 Lanes to 4 Lanes MPO PROJ NUM 4021.3A

DESCR FUNDING CAT(S) 11,2M,7REMARKS Phase 3A PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,693,415ROW PURCH $ 58,201,458 COST OF

CONSTR $ 54,967,654 APPROVEDCONST ENG $ 2,610,964 PHASES

CONTING $ 1,517,107 $ 54,967,654INDIRECT $ 3,627,865BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 123,618,463

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL11 $ 2,160,000 $ 540,000 $ 0 $ 0 $ 0 $ 2,700,0002M $ 32,896,000 $ 8,224,000 $ 0 $ 0 $ 0 $ 41,120,0007 $ 8,918,123 $ 2,229,531 $ 0 $ 0 $ 0 $ 11,147,654TOTAL $ 43,974,123 $ 10,993,531 $ 0 $ 0 $ 0 $ 54,967,654

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

LUBBOCK LUBBOCK LUBBOCK 0905-06-096 2021 CS C LUBBOCK $ 7,150,000LIMITS FROM UPLAND AVENUE, FROM 82ND STREET PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO 98TH STREETPROJECT WIDEN NON-FREEWAY 2 LANES TO 5 LANES MPO PROJ NUM MPO 40-9

DESCR FUNDING CAT(S) 7,12REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 343,000ROW PURCH $ 0 COST OF

CONSTR $ 7,000,000 APPROVEDCONST ENG $ 347,200 PHASES

CONTING $ 139,300 $ 7,150,000INDIRECT $ 261,800BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 8,091,300

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 5,600,000 $ 0 $ 0 $ 1,400,000 $ 0 $ 7,000,00012 $ 120,000 $ 0 $ 0 $ 30,000 $ 0 $ 150,000TOTAL $ 5,720,000 $ 0 $ 0 $ 1,430,000 $ 0 $ 7,150,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 300: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 300 OF 696

10:03:31 AM LUBBOCK MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

LUBBOCK LUBBOCK LUBBOCK 0905-06-097 2021 CS C LUBBOCK $ 7,150,000LIMITS FROM UPLAND AVENUE, FROM 98TH STREET PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO 114TH STREETPROJECT WIDEN NON-FREEWAY 2 LANES TO 5 LANES MPO PROJ NUM MPO 4067

DESCR FUNDING CAT(S) 7,12REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 350,350ROW PURCH $ 0 COST OF

CONSTR $ 7,150,000 APPROVEDCONST ENG $ 354,640 PHASES

CONTING $ 142,285 $ 7,150,000INDIRECT $ 267,410BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 8,264,685

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 5,600,000 $ 0 $ 0 $ 1,400,000 $ 0 $ 7,000,00012 $ 120,000 $ 0 $ 0 $ 30,000 $ 0 $ 150,000TOTAL $ 5,720,000 $ 0 $ 0 $ 1,430,000 $ 0 $ 7,150,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 301: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 301 OF 696

10:03:31 AM LUBBOCK MPO - HIGHWAY PROJECTS

FY 2022

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

LUBBOCK LUBBOCK LUBBOCK 0783-01-102 2022 SL 289 C LUBBOCK $ 22,107,526LIMITS FROM 2000 FT East of US 84 PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO 5000 Ft West of US 84PROJECT New Interchange MPO PROJ NUM 4023

DESCR FUNDING CAT(S) 4,1REMARKS Companion project with MPO 4063 PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,083,269ROW PURCH $ 0 COST OF

CONSTR $ 22,107,527 APPROVEDCONST ENG $ 1,036,843 PHASES

CONTING $ 661,015 $ 22,107,526INDIRECT $ 992,627BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 25,881,281

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 15,472,000 $ 3,868,000 $ 0 $ 0 $ 0 $ 19,340,0001 $ 2,214,021 $ 553,505 $ 0 $ 0 $ 0 $ 2,767,526TOTAL $ 17,686,021 $ 4,421,505 $ 0 $ 0 $ 0 $ 22,107,526

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

LUBBOCK LUBBOCK LUBBOCK 0053-18-046 2022 US 84 C LUBBOCK $ 22,107,526LIMITS FROM 2500 FT West of Loop 289 PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO Zenith AvePROJECT New Interchange MPO PROJ NUM 4063

DESCR FUNDING CAT(S) 4,1REMARKS Companion project with MPO 4023 PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,083,269ROW PURCH $ 0 COST OF

CONSTR $ 22,107,527 APPROVEDCONST ENG $ 1,036,843 PHASES

CONTING $ 661,015 $ 22,107,526INDIRECT $ 992,627BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 25,881,281

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 15,472,000 $ 3,868,000 $ 0 $ 0 $ 0 $ 19,340,0001 $ 2,214,021 $ 553,505 $ 0 $ 0 $ 0 $ 2,767,526TOTAL $ 17,686,021 $ 4,421,505 $ 0 $ 0 $ 0 $ 22,107,526

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 302: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

2019-2022Statewide TransportationImprovement ProgramNctcog MPOHighway Projects

Page 303: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 303 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG COLLIN 0047-06-158 2019 US 75 E,ENG VARIOUS $ 1,500,000LIMITS FROM DALLAS COUNTY LINE PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO BETHANY DRIVEPROJECT REMOVE HOV LANES AND ADD PEAK HOUR TRAVEL LANES MPO PROJ NUM 30006

DESCR FUNDING CAT(S) SBPEREMARKS PROJECT PART OF THE EASTERN SUBREGION SUPPLEMENTAL PROJECT COMMIT

P7 HISTORY MENTS FOR THE TXDOT CONGESTION RELIEF PROGRAM APPROVED BYTHE RTC JANUARY 20, 2016

TOTAL PROJECT COST INFORMATIONPREL ENG $ 1,500,000

ROW PURCH $ 0 COST OFCONSTR $ 15,000,000 APPROVED

CONST ENG $ 355,790 PHASESCONTING $ 3,631 $ 1,500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 16,859,421

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 1,500,000 $ 0 $ 0 $ 0 $ 1,500,000TOTAL $ 0 $ 1,500,000 $ 0 $ 0 $ 0 $ 1,500,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-242 2019 VA C,R,UTL DALLAS $ 8,860,395LIMITS FROM ON NORTHAVEN TRAIL FROM WEST OF US 75 AT NORTHAVEN ROAD TO US 75 BRIDGE PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO AND FROM EAST OF US 75 TO WHITE ROCK CREEK TRAIL/COTTONWOOD TRAIL JUNCTIONPROJECT CONSTRUCT APPROACHES TO A BICYCLE/PEDESTRIAN FACILITY OVER US 75 AND CONSTRUCT A MPO PROJ NUM 55108.2

DESCR BICYCLE/PEDESTRIAN BRIDGE OVER WHITE ROCK CREEK (OFF SYSTEM SECTION) FUNDING CAT(S) 3LC,5REMARKS LOCAL CONTRIBUTION PAID BY DALLAS COUNTY; CHANGE CS PROJECT R IN 2019 IS FOR UTIL ($500,000); REMAINDER OF R TOTAL PR

P7 J FROM 0918-47-963 TO 0918-47-242 HISTORY OJECT COST IS FOR ROW IN 2018 TOTAL PROJECT COST INFORMATION

PREL ENG $ 742,946ROW PURCH $ 2,361,555 COST OF

CONSTR $ 8,360,395 APPROVEDCONST ENG $ 459,423 PHASES

CONTING $ 106,165 $ 8,860,395INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 12,030,484

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 7,351,085 $ 7,351,0855 $ 1,207,448 $ 0 $ 0 $ 301,862 $ 0 $ 1,509,310TOTAL $ 1,207,448 $ 0 $ 0 $ 301,862 $ 7,351,085 $ 8,860,395

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 2964-10-009 2019 SL 9 R,ACQ VARIOUS $ 15,500,000LIMITS FROM ELLIS/DALLAS COUNTY LINE PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO IH 45PROJECT CONSTRUCT 0 TO 2 LANE FRONTAGE ROADS (ULTIMATE 6) INCLUDING ITS, SIDEWALKS, AND MPO PROJ NUM 54119.2

DESCR TURN LANES FUNDING CAT(S) S102REMARKS PROJECT BREAKOUT OF TIP 54119/CSJ 2964-10-005; 10-YEAR PLAN PROJE

P7 HISTORY CT TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,000,000ROW PURCH $ 15,500,000 COST OF

CONSTR $ 45,838,440 APPROVEDCONST ENG $ 2,939,193 PHASES

CONTING $ 749,794 $ 15,500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 67,027,427

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALS102 $ 12,400,000 $ 1,550,000 $ 0 $ 1,550,000 $ 0 $ 15,500,000TOTAL $ 12,400,000 $ 1,550,000 $ 0 $ 1,550,000 $ 0 $ 15,500,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 304: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 304 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 2964-10-008 2019 SL 9 R,ACQ VARIOUS $ 45,000,000LIMITS FROM IH 35E PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO DALLAS/ELLIS COUNTY LINEPROJECT CONSTRUCT 0 TO 2 LANE FRONTAGE ROADS (ULTIMATE 6) INCLUDING ITS, SIDEWALKS, AND MPO PROJ NUM 54119.1

DESCR TURN LANES FUNDING CAT(S) S102REMARKS PROJECT BREAKOUT OF TIP 54119/CSJ 2694-10-005; 10-YEAR PLAN PROJE

P7 HISTORY CT TOTAL PROJECT COST INFORMATION

PREL ENG $ 4,000,000ROW PURCH $ 45,000,000 COST OF

CONSTR $ 74,220,340 APPROVEDCONST ENG $ 4,636,870 PHASES

CONTING $ 1,182,875 $ 45,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 129,040,085

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALS102 $ 36,000,000 $ 4,500,000 $ 0 $ 4,500,000 $ 0 $ 45,000,000TOTAL $ 36,000,000 $ 4,500,000 $ 0 $ 4,500,000 $ 0 $ 45,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 2374-02-153 2019 IH 635 C,E,ENG,R,UTL MESQUITE $ 325,458,379LIMITS FROM AT IH 30 PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TOPROJECT RECONSTRUCT INTERCHANGE MPO PROJ NUM 55075.3

DESCR FUNDING CAT(S) 2M,3LC,7,S102REMARKS LBJ EAST CORRIDOR; SPLIT FROM TIP 55075; S102 FUNDS PROJECT 10-YEAR PLAN PROJECT

P7 INCLUDED IN THE CONSTRUCTION PHASE DUE TO DESIGN-B HISTORYUILD PROCESS; LOCAL CONTRIBUTION BEING PAID BY CDAPARTNER

TOTAL PROJECT COST INFORMATIONPREL ENG $ 41,996,523

ROW PURCH $ 4,841,000 COST OFCONSTR $ 278,620,856 APPROVED

CONST ENG $ 0 PHASESCONTING $ 0 $ 325,458,379INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 325,458,379

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 47,037,805 $ 11,759,452 $ 0 $ 0 $ 0 $ 58,797,2573LC $ 0 $ 0 $ 0 $ 0 $ 150,000,000 $ 150,000,0007 $ 20,000,000 $ 5,000,000 $ 0 $ 0 $ 0 $ 25,000,000S102 $ 0 $ 91,661,122 $ 0 $ 0 $ 0 $ 91,661,122TOTAL $ 67,037,805 $ 108,420,574 $ 0 $ 0 $ 150,000,000 $ 325,458,379

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 2374-02-152 2019 IH 635 C,E,ENG GARLAND $ 186,119,772LIMITS FROM WEST OF THE KCS RR (WEST OF SH 78) PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO IH 30PROJECT RECONSTRUCT EXISTING 2 EXPRESS TO 2 MANAGED LANES MPO PROJ NUM 55075.2

DESCR FUNDING CAT(S) 2M,7REMARKS SPLIT FROM TIP 55075; MAINLANES AND FRONTAGE ROAD L PROJECT

P7 ANES ARE IN TIP 55075.1/CSJ 2374-02-053 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 24,276,492ROW PURCH $ 0 COST OF

CONSTR $ 161,843,280 APPROVEDCONST ENG $ 8,710,698 PHASES

CONTING $ 364,634 $ 186,119,772INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 195,195,104

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 143,181,532 $ 35,795,382 $ 0 $ 0 $ 0 $ 178,976,9147 $ 5,714,286 $ 1,428,572 $ 0 $ 0 $ 0 $ 7,142,858TOTAL $ 148,895,818 $ 37,223,954 $ 0 $ 0 $ 0 $ 186,119,772

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 305: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 305 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 2374-02-053 2019 IH 635 C,E,ENG,R,ACQ,UTLGARLAND $ 266,411,557LIMITS FROM WEST OF THE KCS RR (WEST OF SH 78) PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO IH 30PROJECT WIDEN 8 TO 10 GENERAL PURPOSE LANES AND RECONSTRUCT 4/6 LANE DISCONTINUOUS TO 4/ MPO PROJ NUM 55075.1

DESCR 8 LANE CONTINUOUS FRONTAGE ROADS FUNDING CAT(S) 2M,7,11,12,S102REMARKS LBJ EAST CORRIDOR; CHANGE TIP CODE FROM 55075 TO 55 PROJECT 10-YEAR PLAN PROJECT; ADDITIONAL $15,000,000 IN ENG FUNDI

P7 075.1; S102 FUNDS INCLUDED IN CON. PHASE DUE TO THE HISTORY NG IN FY 1994DESIGN-BUILD PROCESS; MANAGED LN IN TIP 55075.2/CSJ 2374-02-152; DUE TO FINANCIAL CONSTRAINT, $95M FOR THIS PROJECT IS IN FY20 W/ BAL. IN THIS ENTRY

TOTAL PROJECT COST INFORMATIONPREL ENG $ 57,177,195

ROW PURCH $ 55,137,064 COST OFCONSTR $ 264,097,298 APPROVED

CONST ENG $ 15,133,687 PHASESCONTING $ 633,503 $ 266,411,557INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 392,178,747

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 47,037,806 $ 11,759,451 $ 0 $ 0 $ 0 $ 58,797,2577 $ 18,285,714 $ 4,571,428 $ 0 $ 0 $ 0 $ 22,857,14211 $ 5,611,890 $ 1,402,973 $ 0 $ 0 $ 0 $ 7,014,86312 $ 25,080,282 $ 6,270,071 $ 0 $ 0 $ 0 $ 31,350,353S102 $ 30,442,451 $ 115,949,491 $ 0 $ 0 $ 0 $ 146,391,942TOTAL $ 126,458,143 $ 139,953,414 $ 0 $ 0 $ 0 $ 266,411,557

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 2374-01-191 2019 IH 635 C,E,ENG DALLAS $ 35,650,161LIMITS FROM MILLER ROAD PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO WEST OF THE KCS RR (WEST OF SH 78)PROJECT RECONSTRUCT EXISTING 2 EXPRESS TO 2 MANAGED LANES MPO PROJ NUM 55060.2

DESCR FUNDING CAT(S) 2MREMARKS LBJ EAST CORRIDOR; SPLIT FROM TIP 55060; MAINLANES PROJECT 10-YEAR PLAN PROJECT

P7 AND FRONTAGE ROAD LANES ARE UNDER TIP 55060.1/CSJ 2 HISTORY374-01-137

TOTAL PROJECT COST INFORMATIONPREL ENG $ 4,650,021

ROW PURCH $ 0 COST OFCONSTR $ 31,000,140 APPROVED

CONST ENG $ 1,668,484 PHASESCONTING $ 69,844 $ 35,650,161INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 37,388,489

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 28,520,129 $ 7,130,032 $ 0 $ 0 $ 0 $ 35,650,161TOTAL $ 28,520,129 $ 7,130,032 $ 0 $ 0 $ 0 $ 35,650,161

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 2374-01-190 2019 IH 635 C,E,ENG DALLAS $ 50,956,661LIMITS FROM EAST OF US 75 PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO MILLER ROADPROJECT RECONSTRUCT EXISTING 2 TO 2 MANAGED LANES MPO PROJ NUM 55165.2

DESCR FUNDING CAT(S) 2MREMARKS LBJ EAST CORRIDOR; SPLIT FROM TIP 55165; MAINLANES PROJECT 10-YEAR PLAN PROJECT

P7 AND FRONTAGE ROAD LANES IN TIP 55165.1/CSJ 2374-01- HISTORY183

TOTAL PROJECT COST INFORMATIONPREL ENG $ 6,646,521

ROW PURCH $ 0 COST OFCONSTR $ 44,310,140 APPROVED

CONST ENG $ 2,384,852 PHASESCONTING $ 99,831 $ 50,956,661INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 53,441,344

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 40,765,329 $ 10,191,332 $ 0 $ 0 $ 0 $ 50,956,661TOTAL $ 40,765,329 $ 10,191,332 $ 0 $ 0 $ 0 $ 50,956,661

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 306: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 306 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 2374-01-183 2019 IH 635 C,E,ENG,R,ACQ,UTLDALLAS $ 445,988,661LIMITS FROM EAST OF US 75 PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO MILLER ROADPROJECT WIDEN 8 TO 10 GENERAL PURPOSE LANES AND RECONSTRUCT 4/8 LANE DISCONTINUOUS TO 4/ MPO PROJ NUM 55165.1

DESCR 6 LANE CONTINUOUS FRONTAGE ROADS FUNDING CAT(S) 12,S102,SBPEREMARKS LBJ EAST CORRIDOR; CHANGE TIP CODE FROM 55165 TO 55 PROJECT 10-YEAR PLAN PROJECT

P7 165.1; REDUCE SBPE FROM $12,000,000 TO $10,000,000 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 60,346,347ROW PURCH $ 62,725,000 COST OF

CONSTR $ 322,917,314 APPROVEDCONST ENG $ 16,597,512 PHASES

CONTING $ 694,780 $ 445,988,661INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 463,280,953

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL12 $ 308,790,929 $ 77,197,732 $ 0 $ 0 $ 0 $ 385,988,661S102 $ 40,000,000 $ 10,000,000 $ 0 $ 0 $ 0 $ 50,000,000SBPE $ 0 $ 10,000,000 $ 0 $ 0 $ 0 $ 10,000,000TOTAL $ 348,790,929 $ 97,197,732 $ 0 $ 0 $ 0 $ 445,988,661

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 2374-01-137 2019 IH 635 C,E,ENG,R,ACQ,UTLDALLAS $ 260,580,095LIMITS FROM MILLER ROAD PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO WEST OF THE KCS RR (WEST OF SH 78)PROJECT WIDEN 8 TO 10 GENERAL PURPOSE LANES AND RECONSTRUCT 4/6 LANE DISCONTINUOUS TO 4/ MPO PROJ NUM 55060.1

DESCR 6 LANE CONTINUOUS FRONTAGE ROADS FUNDING CAT(S) 2M,4,12,S102,SBPEREMARKS LBJ EAST CORRIDOR; CHANGE TIP CODE FROM 55060 TO 55 PROJECT 10-YEAR PLAN PROJECT

P7 060.1; MANAGED LANES IN TIP 55060.2/CSJ 2374-01-191 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 38,028,896ROW PURCH $ 29,196,059 COST OF

CONSTR $ 193,355,140 APPROVEDCONST ENG $ 10,774,730 PHASES

CONTING $ 451,035 $ 260,580,095INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 271,805,860

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 27,857,400 $ 6,964,350 $ 0 $ 0 $ 0 $ 34,821,7504 $ 140,000,000 $ 35,000,000 $ 0 $ 0 $ 0 $ 175,000,00012 $ 16,319,829 $ 4,079,957 $ 0 $ 0 $ 0 $ 20,399,786S102 $ 17,886,847 $ 4,471,712 $ 0 $ 0 $ 0 $ 22,358,559SBPE $ 0 $ 8,000,000 $ 0 $ 0 $ 0 $ 8,000,000TOTAL $ 202,064,076 $ 58,516,019 $ 0 $ 0 $ 0 $ 260,580,095

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 1068-04-909 2019 IH 30 C VARIOUS $ 1,500,000LIMITS FROM SH 161 PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO SYLVAN AVENUEPROJECT INSTALL ACCESS GATES ALONG THE IH 30 MANAGED LANE CORRIDOR MPO PROJ NUM 14035

DESCR FUNDING CAT(S) 7REMARKS CHANGE CSJ FROM 0000-18-093 TO 1068-04-909 PROJECT 2017-2018 CMAQ/STBG PROJECT SELECTION/SAFETY, INNOVATIVE

P7 HISTORY CONSTRUCTION, AND EMERGENCY PROJECTS; PRIOR CSJ 0000-18-093

TOTAL PROJECT COST INFORMATIONPREL ENG $ 150,000

ROW PURCH $ 0 COST OFCONSTR $ 1,500,000 APPROVED

CONST ENG $ 52,500 PHASESCONTING $ 22,500 $ 1,500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,575,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 1,200,000 $ 300,000 $ 0 $ 0 $ 0 $ 1,500,000TOTAL $ 1,200,000 $ 300,000 $ 0 $ 0 $ 0 $ 1,500,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 307: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 307 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-970 2019 CS E,ENG DALLAS $ 208,443LIMITS FROM ON MOCKINGBIRD LANE FROM US 75 PROJECT SPONSOR DALLAS

REVISION DATE 07/2018LIMITS TO GREENVILLE AVENUEPROJECT PEDESTRIAN AND BICYCLE ENHANCEMENTS INCLUDING TRAFFIC SIGNALS, SIDEWALKS, CROSSW MPO PROJ NUM 14018

DESCR ALKS, AND LIGHTING FUNDING CAT(S) 5REMARKS CHANGE CSJ FROM 0000-18-094 TO 0918-47-970 PROJECT PRIOR CSJ 0000-18-094

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 208,443ROW PURCH $ 3,846,250 COST OF

CONSTR $ 1,638,455 APPROVEDCONST ENG $ 57,346 PHASES

CONTING $ 24,577 $ 208,443INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 5,775,071

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 166,754 $ 0 $ 0 $ 41,689 $ 0 $ 208,443TOTAL $ 166,754 $ 0 $ 0 $ 41,689 $ 0 $ 208,443

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-939 2019 IH 635 C DALLAS $ 9,019,204LIMITS FROM HOV 2 AND 3+ SUBSIDY FOR IH 635 (LBJ) PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TOPROJECT HOV 2 AND 3+ SUBSIDY FOR IH 635 (LBJ) MPO PROJ NUM 20263

DESCR FUNDING CAT(S) 3RTR121REMARKS RTR 121-DA1; CHANGE CSJ FROM 0918-47-978 TO 0918-47 PROJECT PRIOR FUNDS IN FY15, FY16, FY17, AND FY18

P7 -939 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 9,019,204 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 9,019,204INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 9,019,204

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3RTR121 $ 0 $ 0 $ 9,019,204 $ 0 $ 0 $ 9,019,204TOTAL $ 0 $ 0 $ 9,019,204 $ 0 $ 0 $ 9,019,204

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-920 2019 CS E,ENG,R,ACQ IRVING $ 2,187,410LIMITS FROM ON SH 356/IRVING BLVD FROM O’CONNOR ROAD PROJECT SPONSOR IRVING

REVISION DATE 07/2018LIMITS TO STRICKLAND PLAZAPROJECT RECONSTRUCT FROM 3 TO 2 LANES WITH A BICYCLE LANE, SIDEWALK IMPROVEMENTS, AND ON MPO PROJ NUM 14029

DESCR -STREET PARKING FROM O’CONNOR TO BRITAIN FUNDING CAT(S) 3LCREMARKS LOCAL CONTRIBUTION PAID BY THE CITY OF IRVING; CITY PROJECT R IN FY2019 IS ROW ($400,000); REMAINDER OF R IN TOTAL PR

P7 IS MATCHING THE RTR FUNDS FOR CONSTRUCTION BY FUND HISTORY OJECT COST IS UTIL IN FY2020; 2017-2018 CMAQ/STBG PROJECTING THE PRE-CONSTRUCTION PHASES; CHANGE CSJ FROM 00 SELECTION/SUSTAINABLE DEVELOPMENT PHASE 4; PRIOR CSJ 00000-18-088 TO 0918-47-920 0-18-088

TOTAL PROJECT COST INFORMATIONPREL ENG $ 1,787,410

ROW PURCH $ 5,518,640 COST OFCONSTR $ 12,755,460 APPROVED

CONST ENG $ 446,441 PHASESCONTING $ 191,332 $ 2,187,410INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 20,699,283

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 2,187,410 $ 2,187,410TOTAL $ 0 $ 0 $ 0 $ 0 $ 2,187,410 $ 2,187,410

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 308: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 308 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-916 2019 CS E,ENG VARIOUS $ 1,250,000LIMITS FROM ON WYCLIFF AVENUE FROM WEST OF LAKESIDE DRIVE PROJECT SPONSOR HIGHLAND PARK

REVISION DATE 07/2018LIMITS TO WEST OF GLENWOOD AVENUEPROJECT RECONSTRUCTION OF A TWO-LANE ROADWAY THAT WILL INCLUDE A NEW BRIDGE STRUCTURE TO MPO PROJ NUM 14034

DESCR RAISE ROADWAY OUT OF THE 100-YEAR FLOODPLAIN AS WELL AS DRAINAGE IMPROVEMENTS A FUNDING CAT(S) 3LCT TRIBUTARY 1 IN ORDER TO REDUCE/ELIMINATE FLOOD FREQUENCY

REMARKS LOCAL CONTRIBUTION TO BE PAID BY THE TOWN OF HIGHLA PROJECT 2017-2018 CMAQ/STBG PROJECT SELECTION/SAFETY, INNOVATIVEP7 ND PARK AND THE CITY OF DALLAS; CHANGE CSJ FROM 000 HISTORY CONSTRUCTION, AND EMERGENCY PROJECTS; PRIOR CSJ 0000-18-0

0-18-092 TO 0918-47-916 92 TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,250,000ROW PURCH $ 200,000 COST OF

CONSTR $ 8,000,000 APPROVEDCONST ENG $ 280,000 PHASES

CONTING $ 120,000 $ 1,250,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 9,850,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 1,250,000 $ 1,250,000TOTAL $ 0 $ 0 $ 0 $ 0 $ 1,250,000 $ 1,250,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-913 2019 VA C DALLAS $ 1,500,000LIMITS FROM CITYWIDE PROJECT SPONSOR DALLAS

REVISION DATE 07/2018LIMITS TOPROJECT DEVELOP A STRATEGIC MOBILITY PLAN FOR THE CITY OF DALLAS MPO PROJ NUM 25049

DESCR FUNDING CAT(S) 3LC,3RTR161REMARKS LOCAL CONTRIBUTION PAID BY THE CITY OF DALLAS; RTR PROJECT PRIOR CSJ 0000-18-100

P7 161-DA1 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 1,500,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 1,500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,500,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 250,000 $ 250,0003RTR161 $ 0 $ 0 $ 1,000,000 $ 250,000 $ 0 $ 1,250,000TOTAL $ 0 $ 0 $ 1,000,000 $ 250,000 $ 250,000 $ 1,500,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-912 2019 CS E,ENG CEDAR HILL $ 35,000LIMITS FROM ON WINTERGREEN ROAD PROJECT SPONSOR CEDAR HILL

REVISION DATE 07/2018LIMITS TO AT NEW CLARK ROADPROJECT NEW SIGNAL IMPROVEMENTS, INCLUDING RETIMING MPO PROJ NUM 14027

DESCR FUNDING CAT(S) 5REMARKS CHANGE CSJ FROM 0000-18-086 TO 0918-47-912 PROJECT 2017-2018 CMAQ/STBG PROJECT SELECTION/LOCAL BOND PROGRAM;

P7 HISTORY PRIOR CSJ 0000-18-086 TOTAL PROJECT COST INFORMATION

PREL ENG $ 35,000ROW PURCH $ 0 COST OF

CONSTR $ 315,000 APPROVEDCONST ENG $ 11,025 PHASES

CONTING $ 4,725 $ 35,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 365,750

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 28,000 $ 0 $ 0 $ 7,000 $ 0 $ 35,000TOTAL $ 28,000 $ 0 $ 0 $ 7,000 $ 0 $ 35,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 309: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 309 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-45-999 2019 CS E,ENG GLENN HEIGHTS $ 2,000,000LIMITS FROM ON EAST BEAR CREEK ROAD FROM HAMPTON ROAD PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO IH 35EPROJECT RECONSTRUCT AND WIDEN FROM 2 LANES RURAL UNDIVIDED TO 4 LANES URBAN DIVIDED (ULT MPO PROJ NUM 14032

DESCR IMATE 6) WITH BICYCLE/PEDESTRIAN ACCOMMODATIONS AND INTERSECTION IMPROVEMENTS FUNDING CAT(S) 7,SBPEREMARKS PROJECT 2017-2018 CMAQ/STBG PROJECT SELECTION/STRATEGIC PARTNERSH

P7 HISTORY IPS (ROUND 2) TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,000,000ROW PURCH $ 3,600,000 COST OF

CONSTR $ 20,000,000 APPROVEDCONST ENG $ 160,891 PHASES

CONTING $ 64,551 $ 2,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 25,825,442

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 1,000,000 $ 0 $ 0 $ 0 $ 1,000,0007 $ 800,000 $ 0 $ 0 $ 200,000 $ 0 $ 1,000,000TOTAL $ 800,000 $ 1,000,000 $ 0 $ 200,000 $ 0 $ 2,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0095-02-107 2019 US 80 E,ENG,R,ACQ,UTLMESQUITE $ 87,000,000LIMITS FROM EAST OF TOWN EAST BLVD PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO BELT LINE RDPROJECT RECONSTRUCT AND WIDEN 4 TO 6/8 MAINLANES AND 2/6 TO 4/6 LANE FRONTAGE ROADS AND MPO PROJ NUM 53109

DESCR RECONSTRUCT IH 635 INTERCHANGE FUNDING CAT(S) S102,SBPEREMARKS PROJECT 10-YEAR PLAN PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 20,000,000ROW PURCH $ 67,000,000 COST OF

CONSTR $ 105,000,000 APPROVEDCONST ENG $ 16,659,411 PHASES

CONTING $ 697,371 $ 87,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 209,356,782

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 20,000,000 $ 0 $ 0 $ 0 $ 20,000,000S102 $ 53,600,000 $ 6,700,000 $ 0 $ 6,700,000 $ 0 $ 67,000,000TOTAL $ 53,600,000 $ 26,700,000 $ 0 $ 6,700,000 $ 0 $ 87,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0095-02-096 2019 US 80 E,ENG SUNNYVALE $ 10,000,000LIMITS FROM BELT LINE RD PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO LAWSON RDPROJECT RECONSTRUCT AND WIDEN 4 TO 6 MAINLANES AND 2/4 TO 4/6 LANE CONTINUOUS FRONTAGE R MPO PROJ NUM 53110

DESCR OADS FUNDING CAT(S) SBPEREMARKS PROJECT 10-YEAR PLAN PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 10,000,000ROW PURCH $ 42,000,000 COST OF

CONSTR $ 100,000,000 APPROVEDCONST ENG $ 7,072,474 PHASES

CONTING $ 296,057 $ 10,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 159,368,531

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 10,000,000 $ 0 $ 0 $ 0 $ 10,000,000TOTAL $ 0 $ 10,000,000 $ 0 $ 0 $ 0 $ 10,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 310: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 310 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0094-03-060 2019 SS 482 E,ENG,R,ACQ IRVING $ 17,118,564LIMITS FROM AT SH 114 & SH 183 PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TOPROJECT RECONSTRUCT INTERCHANGE (PH 2) MPO PROJ NUM 53003

DESCR FUNDING CAT(S) 3P14,S102REMARKS PROJECT 10-YEAR PLAN PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 8,923,507ROW PURCH $ 8,195,057 COST OF

CONSTR $ 128,049,000 APPROVEDCONST ENG $ 5,103,974 PHASES

CONTING $ 3,253,919 $ 17,118,564INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 153,525,457

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3P14 $ 0 $ 8,923,507 $ 0 $ 0 $ 0 $ 8,923,507S102 $ 6,556,046 $ 1,639,011 $ 0 $ 0 $ 0 $ 8,195,057TOTAL $ 6,556,046 $ 10,562,518 $ 0 $ 0 $ 0 $ 17,118,564

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0047-07-232 2019 US 75 E,ENG RICHARDSON $ 1,000,000LIMITS FROM IH 635 PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO COLLIN COUNTY LINEPROJECT REMOVE HOV LANES AND ADD PEAK HOUR TRAVEL LANES MPO PROJ NUM 30005

DESCR FUNDING CAT(S) SBPEREMARKS PROJECT PLANNING CSJ 0047-07-990; PART OF THE EASTERN SUBREGION S

P7 HISTORY UPPLEMENTAL PROJECT COMMITMENTS FOR THE TXDOT CONGESTIONRELIEF PROGRAM APPROVED BY THE RTC JANUARY 20, 2016

TOTAL PROJECT COST INFORMATIONPREL ENG $ 1,000,000

ROW PURCH $ 0 COST OFCONSTR $ 15,000,000 APPROVED

CONST ENG $ 240,097 PHASESCONTING $ 10,051 $ 1,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 16,250,148

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 1,000,000 $ 0 $ 0 $ 0 $ 1,000,000TOTAL $ 0 $ 1,000,000 $ 0 $ 0 $ 0 $ 1,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0009-11-241 2019 IH 30 R,ACQ VARIOUS $ 3,000,000LIMITS FROM BASS PRO DRIVE PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO DALROCK RDPROJECT CONSTRUCT 0 TO 6 LANE FRONTAGE ROADS, BAYSIDE BRIDGE, AND RAMP MODIFICATIONS; RE MPO PROJ NUM 55169

DESCR CONSTRUCT DALROCK INTERCHANGE FUNDING CAT(S) S102REMARKS PROJECT 10-YEAR PLAN PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 8,000,000ROW PURCH $ 3,000,000 COST OF

CONSTR $ 127,574,879 APPROVEDCONST ENG $ 6,338,649 PHASES

CONTING $ 4,041,058 $ 3,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 148,954,586

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALS102 $ 2,400,000 $ 600,000 $ 0 $ 0 $ 0 $ 3,000,000TOTAL $ 2,400,000 $ 600,000 $ 0 $ 0 $ 0 $ 3,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 311: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 311 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0009-11-181 2019 IH 30 E,ENG DALLAS $ 10,000,000LIMITS FROM IH 35E PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO IH 45PROJECT RECONSTRUCT AND WIDEN 6 TO 12 MAINLANES AND RECONSTRUCT AND WIDEN 0/2 LANE DISCO MPO PROJ NUM 13030

DESCR NTINUOUS TO 2/8 LANE DISCONTINUOUS FRONTAGE ROADS FUNDING CAT(S) SBPEREMARKS PROJECT 10-YEAR PLAN PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 10,000,000ROW PURCH $ 50,000,000 COST OF

CONSTR $ 143,739,595 APPROVEDCONST ENG $ 6,200,226 PHASES

CONTING $ 259,544 $ 10,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 210,199,365

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 10,000,000 $ 0 $ 0 $ 0 $ 10,000,000TOTAL $ 0 $ 10,000,000 $ 0 $ 0 $ 0 $ 10,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0009-11-129 2019 IH 30 E,ENG VARIOUS $ 50,000,000LIMITS FROM IH 45 PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO BASS PRO DRIVEPROJECT RECONST 4/6/8 LN DISCONT TO 4/6 LN CONT FRTG RDS; IH 45 TO US 80: RECONST & WIDE MPO PROJ NUM 13043

DESCR N 8 TO 10 MAINLANES W/1 REV HOV TO 2 REV MGD LNS; US 80 TO IH 635: RECONST 6 TO FUNDING CAT(S) SBPE6 MAINLANES W/1 REV HOV LN TO 1 REV MANAGED LN; IH 635 TO BASS PRO: OPERATIONALIMPROVEMENTS

REMARKS PROJECT 10-YEAR PLAN PROJECTP7 HISTORY

TOTAL PROJECT COST INFORMATIONPREL ENG $ 50,000,000

ROW PURCH $ 100,000,000 COST OFCONSTR $ 1,286,138,854 APPROVED

CONST ENG $ 55,477,768 PHASESCONTING $ 2,322,325 $ 50,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,493,938,947

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 50,000,000 $ 0 $ 0 $ 0 $ 50,000,000TOTAL $ 0 $ 50,000,000 $ 0 $ 0 $ 0 $ 50,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0009-02-069 2019 SH 78 C DALLAS $ 6,447,482LIMITS FROM ON GARLAND RD FROM SOUTH OF TRANQUILLA PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO SP 244 (NORTHWEST HIGHWAY)PROJECT 9 INTERSECTION IMPROVEMENTS MPO PROJ NUM 2814.2

DESCR FUNDING CAT(S) 5REMARKS PROJECT RE-BID OF TIP 2814/CSJ 0009-02-045

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 388,560ROW PURCH $ 0 COST OF

CONSTR $ 6,447,482 APPROVEDCONST ENG $ 387,767 PHASES

CONTING $ 89,607 $ 6,447,482INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 7,313,416

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 5,157,986 $ 1,289,496 $ 0 $ 0 $ 0 $ 6,447,482TOTAL $ 5,157,986 $ 1,289,496 $ 0 $ 0 $ 0 $ 6,447,482

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 312: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 312 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0000-18-101 2019 VA E,ENG VARIOUS $ 300,000LIMITS FROM FM 1382 AND CEDAR HILL ROAD IN CEDAR HILL PROJECT SPONSOR NCTCOG

REVISION DATE 07/2018LIMITS TO PLEASANT RUN ROAD AND LANCASTER HUTCHINS ROAD IN LANCASTERPROJECT CONDUCT A REGIONAL VELOWEB FEASIBILITY & ALIGNMENT STUDY CONNECTING CEDAR HILL, MPO PROJ NUM 11651.2

DESCR DESOTO, DUNCANVILLE, & LANCASTER INCLUDING DEVELOPMENT OF SCHEMATICS, COST ESTIM FUNDING CAT(S) 7ATES, & CONSTRUCTION PHASING BY JURISDICTION; PROJECT WILL INCLUDE CONSULTANT ASSISTANCE

REMARKS PROJECTP7 HISTORY

TOTAL PROJECT COST INFORMATIONPREL ENG $ 300,000

ROW PURCH $ 0 COST OFCONSTR $ 0 APPROVED

CONST ENG $ 0 PHASESCONTING $ 0 $ 300,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 300,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 240,000 $ 0 $ 0 $ 60,000 $ 0 $ 300,000TOTAL $ 240,000 $ 0 $ 0 $ 60,000 $ 0 $ 300,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DENTON 0918-46-952 2019 CS E,ENG SHADY SHORES $ 1,400,000LIMITS FROM ON SOUTH SHADY SHORES ROAD FROM WEST SHADY SHORES ROAD PROJECT SPONSOR DENTON CO

REVISION DATE 07/2018LIMITS TO SWISHER ROADPROJECT RECONSTRUCT ROAD FROM 2 TO 2 LANES TO ELEVATE OUT OF FLOOD PLAIN WITH DRAINAGE I MPO PROJ NUM 14033

DESCR MPROVEMENTS FUNDING CAT(S) 3LCREMARKS LOCAL CONTRIBUTION PAID BY DENTON COUNTY, LAKE DALL PROJECT 2017-2018 CMAQ/STBG PROJECT SELECTION - SAFETY, INNOVATIV

P7 AS, AND SHADY SHORES; CHANGE CSJ FROM 0000-18-091 T HISTORY E CONSTRUCTION, AND EMERGENCY PROJECTS; PRIOR CSJ 0000-18O 0918-46-952 -091

TOTAL PROJECT COST INFORMATIONPREL ENG $ 1,400,000

ROW PURCH $ 2,800,000 COST OFCONSTR $ 14,000,000 APPROVED

CONST ENG $ 637,000 PHASESCONTING $ 273,000 $ 1,400,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 19,110,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 1,400,000 $ 1,400,000TOTAL $ 0 $ 0 $ 0 $ 0 $ 1,400,000 $ 1,400,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG PARKER 0717-01-025 2019 FM 113 C MILLSAP $ 600,000LIMITS FROM OLD MILLSAP ROAD PROJECT SPONSOR PARKER CO

REVISION DATE 07/2018LIMITS TO NORTH OF OLD MILLSAP ROADPROJECT REALIGN FM 113 (2 TO 2 LANES) MPO PROJ NUM 14042

DESCR FUNDING CAT(S) 7REMARKS PROJECT 2017-2018 CMAQ/STBG PROJECT SELECTION/LOCAL BOND PROGRAM;

P7 HISTORY PRIOR CSJ 0000-02-022 TOTAL PROJECT COST INFORMATION

PREL ENG $ 128,225ROW PURCH $ 645,000 COST OF

CONSTR $ 600,000 APPROVEDCONST ENG $ 21,000 PHASES

CONTING $ 9,000 $ 600,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,403,225

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 480,000 $ 120,000 $ 0 $ 0 $ 0 $ 600,000TOTAL $ 480,000 $ 120,000 $ 0 $ 0 $ 0 $ 600,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 313: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 313 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 1068-01-214 2019 IH 30 E,ENG FORT WORTH $ 4,700,000LIMITS FROM SS 580 (E OF LINKCREST DR) PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO IH 820PROJECT RECONSTRUCT 4 TO 6 MAIN LANES; RECONSTRUCT 4 LANE DISCONTINUOUS FRONTAGE TO 4/6 MPO PROJ NUM 13003

DESCR LANE CONTINUOUS FRONTAGE ROADS; RECONSTRUCT SS 580 INTERCHANGE FUNDING CAT(S) SBPEREMARKS PROJECT 10 YEAR PLAN PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 4,700,000ROW PURCH $ 500,000 COST OF

CONSTR $ 72,000,000 APPROVEDCONST ENG $ 4,196,254 PHASES

CONTING $ 175,657 $ 4,700,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 81,571,911

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 4,700,000 $ 0 $ 0 $ 0 $ 4,700,000TOTAL $ 0 $ 4,700,000 $ 0 $ 0 $ 0 $ 4,700,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0902-90-944 2019 VA C VARIOUS $ 2,530,383LIMITS FROM REGIONAL MOBILITY ASSISTANCE PATROL PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO FORT WORTH DISTRICTPROJECT MOBILITY ASSISTANCE PATROL THAT PROVIDES ASSISTANCE TO STRANDED MOTORISTS DUE TO MPO PROJ NUM 11619

DESCR VEHICLE PROBLEMS OR NON-INJURY ACCIDENTS FUNDING CAT(S) 7REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 2,530,383 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 2,530,383INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,530,383

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 2,024,306 $ 506,077 $ 0 $ 0 $ 0 $ 2,530,383TOTAL $ 2,024,306 $ 506,077 $ 0 $ 0 $ 0 $ 2,530,383

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0902-90-046 2019 CS C VARIOUS $ 15,000,000LIMITS FROM MEANDERING ROAD FROM SH 183 TO GILLHAM RD PROJECT SPONSOR FORT WORTH

REVISION DATE 07/2018LIMITS TO LTJG BARNETT ROAD FROM GILLHAM ROAD TO MILITARY PARKWAYPROJECT REALIGN INTERSECTION AND ADD TRAFFIC SIGNAL AT ROBERTS CUT OFF, CONSTRUCT ROUNDA MPO PROJ NUM 25013

DESCR BOUT AT LTJG BARNETT, RECONSTRUCT MEANDERING ROAD FROM 4 TO 3 LANES, AND ADD SID FUNDING CAT(S) 5,7,OtherEWALKS AND BICYCLE LANES

REMARKS CMAQ FOR ROUNDABOUT, INTERSECTION IMPROVEMENTS, ANDPROJECT 3,000,000 OF TRANSPORTATION DEVELOPMENT CREDITS (CAT 3- TP7 SIGNAL IMPROVEMENTS ONLY HISTORY DC [MPO]) UTILIZED IN LIEU OF A LOCAL MATCH ARE NOT CALCU

LATED IN FUNDING TOTAL; 2017-2018 CMAQ/STBG SAFETY, INNOVATIVE CONSTRUCTION, AND EMERGENCY PROJECT SELECTION

TOTAL PROJECT COST INFORMATIONPREL ENG $ 1,584,010

ROW PURCH $ 0 COST OFCONSTR $ 15,000,000 APPROVED

CONST ENG $ 525,000 PHASESCONTING $ 225,000 $ 15,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 17,334,010

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 6,000,000 $ 0 $ 0 $ 0 $ 0 $ 6,000,0007 $ 9,000,000 $ 0 $ 0 $ 0 $ 0 $ 9,000,000Other $ 0 $ 0 $ 0 $ 0 $ 0 $ 0TOTAL $ 15,000,000 $ 0 $ 0 $ 0 $ 0 $ 15,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 314: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 314 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0902-48-860 2019 VA E,ENG HURST $ 45,419LIMITS FROM HURST BELLAIRE SD PROJECT; BOUNDED BY PIPELINE ON THE NORTH; BROWN TRAIL O PROJECT SPONSOR HURST

REVISION DATE 07/2018N THE WESTLIMITS TO PECAN ST ON THE SOUTH; BELLAIRE ON THE EASTPROJECT PEDESTRIAN AMENITIES; LANDSCAPING; INTERSECTION IMPROVEMENTS; SIGNALIZATION; STR MPO PROJ NUM 11385

DESCR EET CONSTRUCTION REALIGNING 4 LANE BROWN TRAIL AVE FUNDING CAT(S) 7REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 45,419ROW PURCH $ 30,000 COST OF

CONSTR $ 845,857 APPROVEDCONST ENG $ 42,314 PHASES

CONTING $ 9,778 $ 45,419INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 973,368

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 36,335 $ 0 $ 0 $ 9,084 $ 0 $ 45,419TOTAL $ 36,335 $ 0 $ 0 $ 9,084 $ 0 $ 45,419

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0172-09-037 2019 US 287 E,ENG MANSFIELD $ 300,000LIMITS FROM HERITAGE PKWY PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO JOHNSON COUNTY LINEPROJECT CONSTRUCT 0 TO 4 LANE FRONTAGE ROADS MPO PROJ NUM 13059

DESCR FUNDING CAT(S) SBPEREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 300,000ROW PURCH $ 0 COST OF

CONSTR $ 1,298,983 APPROVEDCONST ENG $ 55,856 PHASES

CONTING $ 2,338 $ 300,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,657,177

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 300,000 $ 0 $ 0 $ 0 $ 300,000TOTAL $ 0 $ 300,000 $ 0 $ 0 $ 0 $ 300,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0171-05-097 2019 SH 199 R,UTL LAKE WORTH $ 180,500LIMITS FROM SOUTH END OF LAKE WORTH BRIDGE PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO AZLE AVEPROJECT WIDEN ROADWAY FROM 4 LANES TO 6 LANES, AND RECONSTRUCT 4/6 LANE TO 4/6 LANE FRON MPO PROJ NUM 55173

DESCR TAGE ROADS FUNDING CAT(S) S102REMARKS PROJECT 10 YEAR PLAN PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,154,588ROW PURCH $ 180,500 COST OF

CONSTR $ 29,700,000 APPROVEDCONST ENG $ 1,016,394 PHASES

CONTING $ 42,547 $ 180,500INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 32,094,029

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALS102 $ 144,400 $ 0 $ 0 $ 36,100 $ 0 $ 180,500TOTAL $ 144,400 $ 0 $ 0 $ 36,100 $ 0 $ 180,500

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 315: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 315 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0171-05-068 2019 SH 199 E,ENG,R,ACQ LAKE WORTH $ 19,891,500LIMITS FROM AZLE AVENUE PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO IH 820PROJECT CONSTRUCT 0 TO 6 FREEWAY MAIN LANES, CONSTRUCT 0 TO 4/6 LANE CONTINUOUS FRONTAGE MPO PROJ NUM 13005

DESCR LANES, AND INTERCHANGE AT IH 820 FUNDING CAT(S) S102,SBPEREMARKS PROJECT 10 YEAR PLAN PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 13,891,500ROW PURCH $ 6,000,000 COST OF

CONSTR $ 200,000,000 APPROVEDCONST ENG $ 11,789,820 PHASES

CONTING $ 7,516,325 $ 19,891,500INDIRECT $ 14,429,333BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 253,626,978

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 13,891,500 $ 0 $ 0 $ 0 $ 13,891,500S102 $ 4,800,000 $ 1,200,000 $ 0 $ 0 $ 0 $ 6,000,000TOTAL $ 4,800,000 $ 15,091,500 $ 0 $ 0 $ 0 $ 19,891,500

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0171-04-050 2019 SH 199 R,UTL LAKE WORTH $ 256,000LIMITS FROM SOUTH OF FM 1886 PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO SOUTH END OF LAKE WORTH BRIDGEPROJECT RECONSTRUCT AND WIDEN 0 LANE TO 6 LANE FREEWAY, RECONSTRUCT 4 LANE TO 6 LANE FRO MPO PROJ NUM 55176

DESCR NTAGE ROADS, CONSTRUCT BRIDGES OVER LAKE WORTH & TRAFFIC MGMT SYSTEM FUNDING CAT(S) S102REMARKS PROJECT PART OF REGIONAL 10 YEAR PLAN

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 5,982,866ROW PURCH $ 256,000 COST OF

CONSTR $ 85,300,000 APPROVEDCONST ENG $ 5,266,769 PHASES

CONTING $ 220,469 $ 256,000INDIRECT $ 7,030,525BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 104,056,629

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALS102 $ 204,800 $ 0 $ 0 $ 51,200 $ 0 $ 256,000TOTAL $ 204,800 $ 0 $ 0 $ 51,200 $ 0 $ 256,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0000-02-019 2019 CS E,ENG,R,UTL VARIOUS $ 1,149,857LIMITS FROM GLADE ROAD; NORTHBOUND SH 360 FRONTAGE ROAD PROJECT SPONSOR DFW AIRPORT

REVISION DATE 07/2018LIMITS TO WEST AIRFIELD DRIVEPROJECT RECONSTRUCT FROM 2 TO 2 LANES (ADD CENTER TURN LANE AND SHOULDERS) MPO PROJ NUM 14039

DESCR FUNDING CAT(S) 3LC,7,OtherREMARKS LOCAL CONTRIBUTION PAID BY DFW AIRPORT PROJECT 104,971 OF TRANSPORTATION DEVELOPMENT CREDITS (CAT 3 - TD

P7 HISTORY C [MPO]) UTILIZED IN LIEU OF A LOCAL MATCH AND ARE NOT CALCULATED IN FUNDING TOTAL; 2017-2018 CMAQ/STBG FEDERAL/LOCAL EXCHANGE PROJECT SELECTION PROGRAM

TOTAL PROJECT COST INFORMATIONPREL ENG $ 524,857

ROW PURCH $ 625,000 COST OFCONSTR $ 4,563,980 APPROVED

CONST ENG $ 159,739 PHASESCONTING $ 68,460 $ 1,149,857INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 5,942,036

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 625,000 $ 625,0007 $ 524,857 $ 0 $ 0 $ 0 $ 0 $ 524,857Other $ 0 $ 0 $ 0 $ 0 $ 0 $ 0TOTAL $ 524,857 $ 0 $ 0 $ 0 $ 625,000 $ 1,149,857

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 316: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 316 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PARIS NCTCOG HUNT 0692-01-900 2019 FM 1570 E,ENV,ENG GREENVILLE $ 633,500LIMITS FROM IH 30 PROJECT SPONSOR TXDOT-PARIS

REVISION DATE 07/2018LIMITS TO SH 34PROJECT WIDEN 2 LANE TO 4 LANE DIVIDED ROADWAY (SOUTH PROJECT) MPO PROJ NUM 13051

DESCR FUNDING CAT(S) 3LCREMARKS LOCAL CONTRIBUTION BY HUNT COUNTY PROJECT E PHASE IN FY19 IS INITIAL DESIGN AND ENVIRONMENTAL; E PH

P7 HISTORY ASE IN FY20 IS FINAL DESIGN TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,890,000ROW PURCH $ 890,000 COST OF

CONSTR $ 18,979,785 APPROVEDCONST ENG $ 941,397 PHASES

CONTING $ 377,698 $ 633,500INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 23,078,880

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 633,500 $ 633,500TOTAL $ 0 $ 0 $ 0 $ 0 $ 633,500 $ 633,500

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PARIS NCTCOG HUNT 0009-13-170 2019 IH 30 E,ENG VARIOUS $ 1,000,000LIMITS FROM SOUTH OF CR 2509 PROJECT SPONSOR TXDOT-PARIS

REVISION DATE 07/2018LIMITS TO NORTH OF CR 2509PROJECT CONSTRUCT NEW INTERCHANGE MPO PROJ NUM 55226

DESCR FUNDING CAT(S) SBPEREMARKS PROJECT PART OF REGIONAL 10 YEAR PLAN

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,000,000ROW PURCH $ 2,616,300 COST OF

CONSTR $ 30,000,000 APPROVEDCONST ENG $ 1,656,353 PHASES

CONTING $ 1,055,969 $ 1,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 36,328,622

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 1,000,000 $ 0 $ 0 $ 0 $ 1,000,000TOTAL $ 0 $ 1,000,000 $ 0 $ 0 $ 0 $ 1,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PARIS NCTCOG HUNT 0009-13-167 2019 IH 30 E,ENV GREENVILLE $ 195,000LIMITS FROM AT FM 1570 PROJECT SPONSOR TXDOT-PARIS

REVISION DATE 07/2018LIMITS TOPROJECT CONSTRUCT INTERCHANGE MPO PROJ NUM 13050

DESCR FUNDING CAT(S) SBPEREMARKS PROJECT PART OF REGIONAL 10 YEAR PLAN; E PHASE IN FY19 IS ENVIRON

P7 HISTORY MENTAL; E PHASE IN FY20 AND FY21 ARE INITIAL DESIGN AND FINAL DESIGN

TOTAL PROJECT COST INFORMATIONPREL ENG $ 2,079,249

ROW PURCH $ 350,000 COST OFCONSTR $ 30,000,000 APPROVED

CONST ENG $ 1,791,511 PHASESCONTING $ 1,142,136 $ 195,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 35,362,896

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 195,000 $ 0 $ 0 $ 0 $ 195,000TOTAL $ 0 $ 195,000 $ 0 $ 0 $ 0 $ 195,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 317: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 317 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG 0918-00-900 2019 VA C VARIOUS $ 4,155,844LIMITS FROM REGIONAL MOBILITY ASSISTANCE PATROL PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO (DALLAS DISTRICT)PROJECT MOBILITY ASSISTANCE PATROL THAT PROVIDES ASSISTANCE TO STRANDED MOTORISTS DUE TO MPO PROJ NUM 11618

DESCR VEHICLE PROBLEMS OR NON-INJURY ACCIDENTS FUNDING CAT(S) 7REMARKS PROJECT PRIOR CSJ 0000-18-096

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 4,155,844 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 4,155,844INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 4,155,844

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 3,324,675 $ 831,169 $ 0 $ 0 $ 0 $ 4,155,844TOTAL $ 3,324,675 $ 831,169 $ 0 $ 0 $ 0 $ 4,155,844

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG 0008-08-902 2019 SH 180 E,ENG GRAND PRAIRIE $ 50,000LIMITS FROM EAST OF HENSLEY PROJECT SPONSOR GRAND PRAIRIE

REVISION DATE 07/2018LIMITS TO GREAT SOUTHWEST PKWYPROJECT INSTALLATION OF 4 NEW CCTV CAMERAS AND 5 NEW DMS ALONG SH 180 TO FACILITATE TRAF MPO PROJ NUM 11630.6

DESCR FIC MANAGEMENT BY VIEWING TRAFFIC CONDITIONS VIA CCTV AND ADJUSTING SIGNAL TIMIN FUNDING CAT(S) 5G AND PROVIDING FEEDBACK TO MOTORING PUBLIC VIA DMS

REMARKS PROJECTP7 HISTORY

TOTAL PROJECT COST INFORMATIONPREL ENG $ 50,000

ROW PURCH $ 0 COST OFCONSTR $ 500,000 APPROVED

CONST ENG $ 26,790 PHASESCONTING $ 6,191 $ 50,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 582,981

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 40,000 $ 10,000 $ 0 $ 0 $ 0 $ 50,000TOTAL $ 40,000 $ 10,000 $ 0 $ 0 $ 0 $ 50,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG HOOD 0080-04-081 2019 US 377 E,ENG GRANBURY $ 5,000,000LIMITS FROM EAST OF OLD ACTON HIGHWAY PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO END OF BRAZOS RIVER BRIDGEPROJECT WIDEN 4 LANE CONTINUOUS TWO-WAY LEFT TURN LANE TO 6 LANE DIVIDED WITH INTERCHANG MPO PROJ NUM 54019

DESCR E AT BU 377H FUNDING CAT(S) SBPEREMARKS PROJECT E PHASE CAT 10 EARMARK PREVIOUSLY OBLIGATED ($3.79M FUNDE

P7 HISTORY D IN FY2002); RELATED TO TIP 54018/CSJ 0080-03-049 AND TIP 54071/CSJ 0080-04-094

TOTAL PROJECT COST INFORMATIONPREL ENG $ 8,790,618

ROW PURCH $ 10,750,954 COST OFCONSTR $ 41,591,921 APPROVED

CONST ENG $ 2,062,959 PHASESCONTING $ 827,679 $ 5,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 64,024,131

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 4,000,000 $ 1,000,000 $ 0 $ 0 $ 0 $ 5,000,000TOTAL $ 4,000,000 $ 1,000,000 $ 0 $ 0 $ 0 $ 5,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 318: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 318 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG HOOD 0080-03-049 2019 US 377 E,ENG GRANBURY $ 5,000,000LIMITS FROM END OF BRAZOS RIVER BRIDGE PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO SOUTH OF BRAZOS RIVER BRIDGEPROJECT WIDEN 4 LANE TO 6 LANE DIVIDED WITH INTERCHANGE AT SH 144 AND FM 51 MPO PROJ NUM 54018

DESCR FUNDING CAT(S) SBPEREMARKS PROJECT RELATED TO TIP 54019/CSJ 0080-04-081 AND TIP 54071/CSJ 00

P7 HISTORY 80-04-094 TOTAL PROJECT COST INFORMATION

PREL ENG $ 5,000,000ROW PURCH $ 3,500,000 COST OF

CONSTR $ 15,389,011 APPROVEDCONST ENG $ 763,294 PHASES

CONTING $ 306,241 $ 5,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 24,958,546

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 5,000,000 $ 0 $ 0 $ 0 $ 5,000,000TOTAL $ 0 $ 5,000,000 $ 0 $ 0 $ 0 $ 5,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG PARKER 1601-01-033 2019 CS C,E,ENG AZLE $ 1,116,900LIMITS FROM FM 730 AT SH 199 PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TOPROJECT SIGNAL IMPROVEMENTS INCLUDING CORRIDOR RETIMING MPO PROJ NUM 14040

DESCR FUNDING CAT(S) 3LC,5REMARKS LOCAL CONTRIBUTION BY PARKER COUNTY PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 56,900ROW PURCH $ 0 COST OF

CONSTR $ 1,060,000 APPROVEDCONST ENG $ 53,549 PHASES

CONTING $ 12,374 $ 1,116,900INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,182,823

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 56,900 $ 56,9005 $ 848,000 $ 212,000 $ 0 $ 0 $ 0 $ 1,060,000TOTAL $ 848,000 $ 212,000 $ 0 $ 0 $ 56,900 $ 1,116,900

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG PARKER 0314-07-061 2019 IH 20 E,ENG WEATHERFORD $ 1,500,000LIMITS FROM FM 2552 PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO BANKHEAD HIGHWAYPROJECT CONSTRUCT 0 TO 4/6 WESTBOUND AND EASTBOUND FRONTAGE ROADS MPO PROJ NUM 13054

DESCR FUNDING CAT(S) SBPEREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,500,000ROW PURCH $ 1,150,000 COST OF

CONSTR $ 21,000,000 APPROVEDCONST ENG $ 1,146,191 PHASES

CONTING $ 292,396 $ 1,500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 25,088,587

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 1,200,000 $ 300,000 $ 0 $ 0 $ 0 $ 1,500,000TOTAL $ 1,200,000 $ 300,000 $ 0 $ 0 $ 0 $ 1,500,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 319: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 319 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG PARKER 0008-09-037 2019 FM 1187 E,ENG,R,ACQ,UTLALEDO $ 922,070LIMITS FROM MAVERICK ST PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO FM 5PROJECT RECONSTRUCT AND WIDEN FROM 2/3 LANES TO 5 LANE URBAN; INTERSECTION IMPROVEMENTS MPO PROJ NUM 14041

DESCR INCLUDING A ROUNDABOUT FUNDING CAT(S) 3LCREMARKS LOCAL CONTRIBUTION BY PARKER COUNTY PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 519,060ROW PURCH $ 403,010 COST OF

CONSTR $ 6,440,000 APPROVEDCONST ENG $ 354,549 PHASES

CONTING $ 142,248 $ 922,070INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 7,858,867

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 922,070 $ 922,070TOTAL $ 0 $ 0 $ 0 $ 0 $ 922,070 $ 922,070

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG PARKER 0000-01-138 2019 US 180 E,ENG WEATHERFORD $ 1,980,000LIMITS FROM FM 2552 PROJECT SPONSOR WEATHERFORD

REVISION DATE 07/2018LIMITS TO ALAMO ST.PROJECT RECONSTRUCT 2/4 LANE ROADWAY TO 4 LANE ROADWAY INCLUDING A ROUNDABOUT AT THE INT MPO PROJ NUM 14026

DESCR ERSECTION OF US 180, NEW BICYCLE LANES, NEW SIDEWALKS, AND INTERSECTION IMPROVEM FUNDING CAT(S) 7ENTS AT FM 51

REMARKS PROJECTP7 HISTORY

TOTAL PROJECT COST INFORMATIONPREL ENG $ 1,980,000

ROW PURCH $ 2,150,000 COST OFCONSTR $ 12,460,000 APPROVED

CONST ENG $ 872,200 PHASESCONTING $ 373,800 $ 1,980,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 17,836,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 1,584,000 $ 94,000 $ 0 $ 302,000 $ 0 $ 1,980,000TOTAL $ 1,584,000 $ 94,000 $ 0 $ 302,000 $ 0 $ 1,980,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG 0000-02-020 2019 VA C VARIOUS $ 500,000LIMITS FROM HIGH SPEED RAIL NEXT-GENERATION MAG-LEV FEASIBILITY STUDY FROM FORT WORTH PROJECT SPONSOR NCTCOG

REVISION DATE 07/2018LIMITS TO LAREDOPROJECT CONDUCT A FEASIBILITY STUDY FOR A HIGH-SPEED RAIL/NEXT-GEN MAG-LEV PASSENGER RAI MPO PROJ NUM 25048

DESCR L LINE FROM FORT WORTH TO LAREDO (PASSING THROUGH THE WACO, TEMPLE-KILLEEN, AUST FUNDING CAT(S) 3LC,7IN, ALAMO AREA, & LAREDO MPOS); INCLUDES NCTCOG STAFF TIME & POSSIBLE CONSULTANTASSISTANCE

REMARKS STBG FUNDS TO BE USED FOR THE PORTION OF THE STUDY PROJECTP7 WITHIN THE DFW REGION AND THE AREA OUTSIDE OF THE M HISTORY

PA THAT WILL AFFECT IT; LOCAL FUNDS TO BE PAID BY THE OTHER MPOS WITHIN THE STUDY AREA

TOTAL PROJECT COST INFORMATIONPREL ENG $ 0

ROW PURCH $ 0 COST OFCONSTR $ 500,000 APPROVED

CONST ENG $ 0 PHASESCONTING $ 0 $ 500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 500,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 125,000 $ 125,0007 $ 300,000 $ 0 $ 0 $ 75,000 $ 0 $ 375,000TOTAL $ 300,000 $ 0 $ 0 $ 75,000 $ 125,000 $ 500,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 320: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 320 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DENTON 0918-46-954 2019 CS E,ENG LEWISVILLE $ 600,000LIMITS FROM ON COLLEGE STREET; FROM MILL STREET PROJECT SPONSOR LEWISVILLE

REVISION DATE 07/2018LIMITS TO RAILROAD STREETPROJECT RECONSTRUCT FROM 2 TO 2 LANES, ADD BICYCLE LANES, WIDEN/EXPAND SIDEWALKS, AND AD MPO PROJ NUM 14030

DESCR D ON-STREET PARKING FUNDING CAT(S) 3LCREMARKS LOCAL CONTRIBUTION PAID BY CITY OF LEWISVILLE; CHAN PROJECT 2017-2018 CMAQ/STBG PROJECT SELECTION/SUSTAINABLE DEVELOP

P7 GE CSJ FROM 0000-18-089 TO 0918-46-954 HISTORY MENT PHASE 4; PRIOR CSJ 0000-18-089 TOTAL PROJECT COST INFORMATION

PREL ENG $ 600,000ROW PURCH $ 0 COST OF

CONSTR $ 3,000,000 APPROVEDCONST ENG $ 105,000 PHASES

CONTING $ 45,000 $ 600,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 3,750,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 600,000 $ 600,000TOTAL $ 0 $ 0 $ 0 $ 0 $ 600,000 $ 600,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DENTON 0918-46-942 2019 VA T LEWISVILLE $ 11,301,056LIMITS FROM DCTA INTERMODAL TRANSIT CENTER; AT EAST COLLEGE STREET AND NORTH RAILROADPROJECT SPONSOR DCTA

REVISION DATE 07/2018STREETLIMITS TOPROJECT CONSTRUCT DCTA INTERMODAL TRANSIT CENTER, BUS LANES, PARK AND RIDE TO ENHANCE AN MPO PROJ NUM 14031

DESCR D EXPAND TRANSIT SERVICE, AND PEDESTRIAN IMPROVEMENTS FUNDING CAT(S) 5,OtherREMARKS CHANGE CSJ FROM 0000-18-090 TO 0918-46-942 PROJECT 2,260,211 OF TRANSPORTATION DEVELOPMENT CREDITS (CAT 3 -

P7 HISTORY POLICY BUNDLE TDC [MPO]) UTILIZED IN LIEU OF A LOCAL MATCH AND ARE NOT CALCULATED IN FUNDING TOTAL; 2017-2018 CMAQ/STBG PROJECT SELECTION/SUSTAINABLE DEVELOPMENT PHASE 4;PRIOR CSJ 0000-18-090

TOTAL PROJECT COST INFORMATIONPREL ENG $ 192,000

ROW PURCH $ 0 COST OFCONSTR $ 11,301,056 APPROVED

CONST ENG $ 395,537 PHASESCONTING $ 169,516 $ 11,301,056INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 12,058,109

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 11,301,056 $ 0 $ 0 $ 0 $ 0 $ 11,301,056Other $ 0 $ 0 $ 0 $ 0 $ 0 $ 0TOTAL $ 11,301,056 $ 0 $ 0 $ 0 $ 0 $ 11,301,056

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG JOHNSON 0172-10-013 2019 US 287 E,ENG MANSFIELD $ 1,200,000LIMITS FROM TARRANT COUNTY LINE PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO BU 287PROJECT CONSTRUCT 0 TO 4 LANE FRONTAGE ROADS MPO PROJ NUM 13060

DESCR FUNDING CAT(S) SBPEREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,200,000ROW PURCH $ 0 COST OF

CONSTR $ 4,981,566 APPROVEDCONST ENG $ 214,965 PHASES

CONTING $ 8,999 $ 1,200,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 6,405,530

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 1,200,000 $ 0 $ 0 $ 0 $ 1,200,000TOTAL $ 0 $ 1,200,000 $ 0 $ 0 $ 0 $ 1,200,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 321: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 321 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG COLLIN 2056-01-042 2019 FM 2551 R,UTL MURPHY $ 2,750,000LIMITS FROM FM 2514 PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO FM 2170PROJECT RECONSTRUCT AND WIDEN 2 LANE RURAL TO 6 LANE URBAN DIVIDED MPO PROJ NUM 83209

DESCR FUNDING CAT(S) 3RTR121,S102REMARKS RTR 121-CC2 PROJECT R PHASE IN FY2017 IS $14.3 MILLION FOR ROW; R PHASE IN FY

P7 HISTORY 2019 IS $2.75 MILLION FOR UTILITIES; 10-YEAR PLAN PROJECT TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,200,000ROW PURCH $ 17,050,000 COST OF

CONSTR $ 44,570,571 APPROVEDCONST ENG $ 2,139,055 PHASES

CONTING $ 858,209 $ 2,750,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 65,817,835

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3RTR121 $ 0 $ 0 $ 600,000 $ 150,000 $ 0 $ 750,000S102 $ 1,600,000 $ 200,000 $ 0 $ 200,000 $ 0 $ 2,000,000TOTAL $ 1,600,000 $ 200,000 $ 600,000 $ 350,000 $ 0 $ 2,750,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG COLLIN 0549-03-024 2019 SH 121 E,ENG,R,ACQ,UTLANNA $ 26,500,000LIMITS FROM COLLIN COUNTY OUTER LOOP PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO NORTH OF FM 455PROJECT RECONSTRUCT AND WIDEN FROM 2 LANE TO 4 LANE RURAL DIVIDED; CONSTRUCT 0 TO 4 LANE MPO PROJ NUM 13015

DESCR DISCONTINUOUS ACCESS ROAD AND FM 455 INTERCHANGE FUNDING CAT(S) S102,SBPEREMARKS PROJECT 10-YEAR PLAN PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,500,000ROW PURCH $ 24,000,000 COST OF

CONSTR $ 50,329,445 APPROVEDCONST ENG $ 2,439,430 PHASES

CONTING $ 978,723 $ 26,500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 80,247,598

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 2,500,000 $ 0 $ 0 $ 0 $ 2,500,000S102 $ 19,200,000 $ 2,400,000 $ 0 $ 2,400,000 $ 0 $ 24,000,000TOTAL $ 19,200,000 $ 4,900,000 $ 0 $ 2,400,000 $ 0 $ 26,500,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG COLLIN 0451-03-013 2019 SH 205 R,ACQ VARIOUS $ 3,000,000LIMITS FROM NORTH OF JOHN KING PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO SH 78PROJECT WIDEN 2 LANE RURAL HIGHWAY TO 4 LANE DIVIDED (6 LANE ULTIMATE) MPO PROJ NUM 55073

DESCR FUNDING CAT(S) S102REMARKS PROJECT R PHASE IN FY2019 IS $3 MILLION FOR ROW; R PHASE IN FY202

P7 HISTORY 0 IS $2 MILLION FOR UTILITIES; 10-YEAR PLAN PROJECT TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,722,000ROW PURCH $ 5,000,000 COST OF

CONSTR $ 28,654,950 APPROVEDCONST ENG $ 1,610,827 PHASES

CONTING $ 646,279 $ 3,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 37,634,056

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALS102 $ 2,400,000 $ 300,000 $ 0 $ 300,000 $ 0 $ 3,000,000TOTAL $ 2,400,000 $ 300,000 $ 0 $ 300,000 $ 0 $ 3,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 322: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 322 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG ELLIS 2964-12-002 2019 SL 9 R,ACQ VARIOUS $ 15,500,000LIMITS FROM DALLAS/ELLIS COUNTY LINE PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO ELLIS/DALLAS COUNTY LINEPROJECT CONSTRUCT 0 TO 2 LANE FRONTAGE ROADS (ULTIMATE 6) INCLUDING ITS, SIDEWALKS, AND MPO PROJ NUM 54119.4

DESCR TURN LANES FUNDING CAT(S) S102REMARKS PROJECT PART OF REGIONAL 10 YEAR PLAN

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,000,000ROW PURCH $ 15,500,000 COST OF

CONSTR $ 17,655,160 APPROVEDCONST ENG $ 1,043,817 PHASES

CONTING $ 266,280 $ 15,500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 35,465,257

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALS102 $ 12,400,000 $ 1,550,000 $ 0 $ 1,550,000 $ 0 $ 15,500,000TOTAL $ 12,400,000 $ 1,550,000 $ 0 $ 1,550,000 $ 0 $ 15,500,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG ELLIS 2964-12-001 2019 SL 9 R,ACQ VARIOUS $ 26,000,000LIMITS FROM IH 35E PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO DALLAS COUNTY LINEPROJECT CONSTRUCT 0 TO 2 LANE FRONTAGE ROADS (ULTIMATE 6) INCLUDING ITS, SIDEWALKS, AND MPO PROJ NUM 54119.3

DESCR TURN LANES FUNDING CAT(S) S102REMARKS PROJECT PART OF REGIONAL 10 YEAR PLAN

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 500,000ROW PURCH $ 26,000,000 COST OF

CONSTR $ 9,014,060 APPROVEDCONST ENG $ 441,650 PHASES

CONTING $ 112,666 $ 26,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 36,068,376

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALS102 $ 20,800,000 $ 2,600,000 $ 0 $ 2,600,000 $ 0 $ 26,000,000TOTAL $ 20,800,000 $ 2,600,000 $ 0 $ 2,600,000 $ 0 $ 26,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG ELLIS 1051-01-052 2019 FM 664 E,ENG,R,ACQ MIDLOTHIAN $ 6,500,000LIMITS FROM FM 1387 PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO WESTMORELAND ROADPROJECT RECONSTRUCT AND WIDEN 2 LANE RURAL TO 4 LANE DIVIDED URBAN ROADWAY (ULTIMATE 6 L MPO PROJ NUM 13028

DESCR ANE) FUNDING CAT(S) S102,SBPEREMARKS PROJECT PART OF REGIONAL 10 YEAR PLAN

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,500,000ROW PURCH $ 5,000,000 COST OF

CONSTR $ 32,145,761 APPROVEDCONST ENG $ 1,533,106 PHASES

CONTING $ 615,097 $ 6,500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 40,793,964

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 1,500,000 $ 0 $ 0 $ 0 $ 1,500,000S102 $ 4,000,000 $ 500,000 $ 0 $ 500,000 $ 0 $ 5,000,000TOTAL $ 4,000,000 $ 2,000,000 $ 0 $ 500,000 $ 0 $ 6,500,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 323: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 323 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG ELLIS 1051-01-051 2019 FM 664 E,ENG,R,ACQ VARIOUS $ 40,000,000LIMITS FROM IH 35E PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO IH 45PROJECT WIDEN 2/4 LANE RURAL ROADWAY TO 6 LANE URBAN MPO PROJ NUM 13035

DESCR FUNDING CAT(S) S102,SBPEREMARKS PROJECT PART OF REGIONAL 10 YEAR PLAN; R PHASE IN FY 2019 IS FOR

P7 HISTORY $30,000,000 FOR ROW; R PHASE IN FY 2021 IS FOR $2,000,000FOR UTILITIES

TOTAL PROJECT COST INFORMATIONPREL ENG $ 10,000,000

ROW PURCH $ 32,000,000 COST OFCONSTR $ 182,391,982 APPROVED

CONST ENG $ 9,046,642 PHASESCONTING $ 3,629,600 $ 40,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 237,068,224

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 10,000,000 $ 0 $ 0 $ 0 $ 10,000,000S102 $ 24,000,000 $ 3,000,000 $ 0 $ 3,000,000 $ 0 $ 30,000,000TOTAL $ 24,000,000 $ 13,000,000 $ 0 $ 3,000,000 $ 0 $ 40,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG ELLIS 0172-12-902 2019 VA E,ENG ENNIS $ 4,000,000LIMITS FROM ON BUS 287/ENNIS AVE AT UP RAILROAD PROJECT SPONSOR ENNIS

REVISION DATE 07/2018LIMITS TOPROJECT CONSTRUCT GRADE SEPARATION AT THE INTERSECTION OF BUS 287/ENNIS AVE AND THE UPRR MPO PROJ NUM 14028

DESCR LINE FUNDING CAT(S) 3LCREMARKS LOCAL CONTRIBUTION BY CITY OF ENNIS; CHANGE CSJ FRO PROJECT 2017-2018 CMAQ/STBG PROJECT SELECTION/SUSTAINABLE DEVELOP

P7 M 0000-18-087 TO 0172-12-902 HISTORY MENT: PHASE 4; PRIOR CSJ 0000-18-087 TOTAL PROJECT COST INFORMATION

PREL ENG $ 4,000,000ROW PURCH $ 0 COST OF

CONSTR $ 17,000,000 APPROVEDCONST ENG $ 595,000 PHASES

CONTING $ 255,000 $ 4,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 21,850,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 4,000,000 $ 4,000,000TOTAL $ 0 $ 0 $ 0 $ 0 $ 4,000,000 $ 4,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG ELLIS 0092-03-053 2019 IH 45 E,ENG,R,ACQ FERRIS $ 7,100,000LIMITS FROM AT FM 664 PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TOPROJECT CONSTRUCT INTERCHANGE MPO PROJ NUM 13029

DESCR FUNDING CAT(S) S102,SBPEREMARKS PROJECT PART OF REGIONAL 10 YEAR PLAN

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,000,000ROW PURCH $ 5,100,000 COST OF

CONSTR $ 40,419,966 APPROVEDCONST ENG $ 1,822,785 PHASES

CONTING $ 1,162,074 $ 7,100,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 50,504,825

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 2,000,000 $ 0 $ 0 $ 0 $ 2,000,000S102 $ 4,080,000 $ 510,000 $ 0 $ 510,000 $ 0 $ 5,100,000TOTAL $ 4,080,000 $ 2,510,000 $ 0 $ 510,000 $ 0 $ 7,100,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 324: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 324 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG ELLIS 0048-04-094 2019 IH 35E E,ENG,R,ACQ,UTLWAXAHACHIE $ 19,500,000LIMITS FROM AT FM 387 (BUTCHER ROAD) PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TOPROJECT CONSTRUCT GRADE SEPARATION AND RECONSTRUCT 4/6 LANE FRONTAGE ROADS MPO PROJ NUM 13042

DESCR FUNDING CAT(S) S102,SBPEREMARKS PROJECT PART OF REGIONAL 10 YEAR PLAN

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,500,000ROW PURCH $ 17,000,000 COST OF

CONSTR $ 42,000,000 APPROVEDCONST ENG $ 2,367,755 PHASES

CONTING $ 1,509,507 $ 19,500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 65,377,262

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 2,500,000 $ 0 $ 0 $ 0 $ 2,500,000S102 $ 15,100,000 $ 1,900,000 $ 0 $ 0 $ 0 $ 17,000,000TOTAL $ 15,100,000 $ 4,400,000 $ 0 $ 0 $ 0 $ 19,500,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG KAUFMAN 2588-01-017 2019 FM 548 E,ENG FORNEY $ 3,300,000LIMITS FROM N OF US 80 AT WALMART PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO SH 205PROJECT WIDEN AND RECONSTRUCT 2 LANE RURAL TO 4 LANE URBAN DIVIDED (6 LANE ULTIMATE) MPO PROJ NUM 55111

DESCR FUNDING CAT(S) SBPEREMARKS PROJECT PART OF REGIONAL 10 YEAR PLAN

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 3,300,000ROW PURCH $ 17,000,000 COST OF

CONSTR $ 84,650,269 APPROVEDCONST ENG $ 3,318,257 PHASES

CONTING $ 1,331,317 $ 3,300,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 109,599,843

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 3,300,000 $ 0 $ 0 $ 0 $ 3,300,000TOTAL $ 0 $ 3,300,000 $ 0 $ 0 $ 0 $ 3,300,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG ROCKWALL 2588-02-008 2019 FM 548 R,ACQ VARIOUS $ 3,000,000LIMITS FROM S OF SH 205 (KAUFMAN COUNTY LINE) PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO SH 205PROJECT WIDEN AND RECONSTRUCT 2 LANE RURAL TO 4 LANE DIVIDED URBAN ROADWAY (ULTIMATE 6) MPO PROJ NUM 13017

DESCR FUNDING CAT(S) S102REMARKS PROJECT R PHASE IN FY2019 IS $3 MILLION FOR ROW; R PHASE IN FY202

P7 HISTORY 1 IS $2 MILLION FOR UTILITIES; 10 YEAR PLAN PROJECT TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,500,000ROW PURCH $ 5,000,000 COST OF

CONSTR $ 6,200,000 APPROVEDCONST ENG $ 304,688 PHASES

CONTING $ 122,244 $ 3,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 13,126,932

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALS102 $ 2,400,000 $ 300,000 $ 0 $ 300,000 $ 0 $ 3,000,000TOTAL $ 2,400,000 $ 300,000 $ 0 $ 300,000 $ 0 $ 3,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 325: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 325 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG ROCKWALL 0451-04-021 2019 SH 205 E,ENG,R,ACQ ROCKWALL $ 2,200,000LIMITS FROM JCT SH 205/ JOHN KING (N. GOLIAD ST) PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO NORTH OF JOHN KING (COLLIN COUNTY LINE)PROJECT WIDEN 2 LANE RURAL HIGHWAY TO 4 LANE DIVIDED (6 LANE ULTIMATE) MPO PROJ NUM 55074

DESCR FUNDING CAT(S) S102,SBPEREMARKS PROJECT 10 YEAR PLAN PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,200,000ROW PURCH $ 1,000,000 COST OF

CONSTR $ 5,000,000 APPROVEDCONST ENG $ 158,826 PHASES

CONTING $ 63,723 $ 2,200,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 7,422,549

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 1,200,000 $ 0 $ 0 $ 0 $ 1,200,000S102 $ 800,000 $ 100,000 $ 0 $ 100,000 $ 0 $ 1,000,000TOTAL $ 800,000 $ 1,300,000 $ 0 $ 100,000 $ 0 $ 2,200,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG ROCKWALL 0009-12-219 2019 IH 30 R,ACQ VARIOUS $ 50,000,000LIMITS FROM SH 205 PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO WEST OF FM 2642 (HUNT COUNTY LINE)PROJECT RECONSTRUCT & WIDEN 4 TO 6 MAIN LANES; RECONSTRUCT & WIDEN 4 TO 4/6 LANE FRONTAG MPO PROJ NUM 13036

DESCR E ROADS; CONSTRUCT NEW & RECONSTRUCT EXISTING INTERCHANGES; RAMP MODIFICATIONS FUNDING CAT(S) S102REMARKS PROJECT 10-YEAR PLAN PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 15,000,000ROW PURCH $ 50,000,000 COST OF

CONSTR $ 232,000,000 APPROVEDCONST ENG $ 11,674,044 PHASES

CONTING $ 488,681 $ 50,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 309,162,725

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALS102 $ 45,000,000 $ 5,000,000 $ 0 $ 0 $ 0 $ 50,000,000TOTAL $ 45,000,000 $ 5,000,000 $ 0 $ 0 $ 0 $ 50,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PARIS NCTCOG HUNT 0901-22-121 2019 VARIOUS E,ENG QUINLAN $ 41,352LIMITS FROM ON S CHURCH ST FROM E MAIN ST PROJECT SPONSOR TXDOT-PARIS

REVISION DATE 07/2018LIMITS TO D.C. CANNON ELEMENTARY SCHOOL ON SS 264 & MEYERSPROJECT S. CHURCH STREET SIDEWALK IMPROVEMENTS, INCLUDING 5-FOOT SIDEWALK AND ADA RAMP C MPO PROJ NUM 40050

DESCR ONSTRUCTION FUNDING CAT(S) 9TAPREMARKS PROJECT CITY OF QUINLAN PROVIDING $31,000 FOR IN-KIND CONTRIBUTIO

P7 HISTORY N; 2017 STATE SELECTED TA SET-ASIDE PROJECT; FUNDING SHOWN AS 9TAP IN ESTIP PER TXDOT TPP SINCE 9TA IS NOT A FUNDING CATEGORY OPTION IN THE ESTIP

TOTAL PROJECT COST INFORMATIONPREL ENG $ 41,352

ROW PURCH $ 0 COST OFCONSTR $ 332,656 APPROVED

CONST ENG $ 3,451 PHASESCONTING $ 3,739 $ 41,352INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 381,198

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 33,082 $ 0 $ 0 $ 8,270 $ 0 $ 41,352TOTAL $ 33,082 $ 0 $ 0 $ 8,270 $ 0 $ 41,352

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 326: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 326 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0364-01-148 2019 SH 121 C,E,ENV,ENG VARIOUS $ 28,100,000LIMITS FROM GLADE RD PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO SH 183PROJECT INTERIM OPERATIONAL BOTTLENECK IMPROVEMENT, ITS, AND ILLUMINATION MPO PROJ NUM 13049

DESCR FUNDING CAT(S) 2M,7,SBPEREMARKS PROJECT PART OF REGIONAL 10 YEAR PLAN; $1.1M ENGINEERING FUNDS IN

P7 HISTORY FY2019 TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,500,000ROW PURCH $ 206,280 COST OF

CONSTR $ 26,600,000 APPROVEDCONST ENG $ 1,409,728 PHASES

CONTING $ 14,385 $ 28,100,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 29,730,393

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 20,000,000 $ 5,000,000 $ 0 $ 0 $ 0 $ 25,000,0007 $ 1,280,000 $ 320,000 $ 0 $ 0 $ 0 $ 1,600,000SBPE $ 0 $ 1,500,000 $ 0 $ 0 $ 0 $ 1,500,000TOTAL $ 21,280,000 $ 6,820,000 $ 0 $ 0 $ 0 $ 28,100,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG 0902-00-901 2019 VA C VARIOUS $ 2,350,000LIMITS FROM ENTIRE MANAGED LANE SYSTEM PROJECT SPONSOR NCTCOG

REVISION DATE 07/2018LIMITS TOPROJECT DEVELOP, TEST, & IMPLEMENT TECHNOLOGY TO DETECT & VERIFY AUTO OCCUPANCY ON REGIO MPO PROJ NUM 11663

DESCR NAL MANAGED LANE SYSTEM INCLUDING PUBLIC OUTREACH, EDUCATION, & INTEGRATION INTO FUNDING CAT(S) 7EXISTING TOLLING SOFTWARE/HARDWARE; PROJECT INVOLVES CONSULTANT ASSISTANCE & NCTCOG STAFF TIME

REMARKS PROJECTP7 HISTORY

TOTAL PROJECT COST INFORMATIONPREL ENG $ 0

ROW PURCH $ 0 COST OFCONSTR $ 2,350,000 APPROVED

CONST ENG $ 0 PHASESCONTING $ 0 $ 2,350,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,350,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 1,880,000 $ 470,000 $ 0 $ 0 $ 0 $ 2,350,000TOTAL $ 1,880,000 $ 470,000 $ 0 $ 0 $ 0 $ 2,350,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0902-90-940 2019 VA T VARIOUS $ 500,000LIMITS FROM NEW TRANSIT SERVICES WITHIN THE CITIES OF FOREST HILL, CROWLEY, & EVERMAN PROJECT SPONSOR FWTA

REVISION DATE 07/2018LIMITS TO AND CONNECTING AREAS TO MAKE A SEAMLESS TRANSIT ROUTEPROJECT PILOT PROGRAM TO IMPLEMENT AND OPERATE NEW FIXED AND FLEXIBLE STOP ROUTE TRANSIT MPO PROJ NUM 11262.3

DESCR SERVICE FOR CITIZENS OF FOREST HILL, EVERMAN AND CROWLEY, INCLUDING THE PROVISI FUNDING CAT(S) 5,OtherON OF BUSES AND BUS STOPS

REMARKS RELATED TO TIP 11262.3/CSJ 0902-90-959 PROJECT 100,000 OF TRANSPORTATION DEVELOPMENT CREDITS (CAT 3 - POP7 HISTORY LICY BUNDLE TDC [MPO]) CREDITS UTILIZED IN LIEU OF A LOCA

L MATCH AND ARE NOT CALCULATED IN FUNDING TOTAL; PART OFHEMPHILL/LAMAR FUNDING PARTNERSHIP

TOTAL PROJECT COST INFORMATIONPREL ENG $ 0

ROW PURCH $ 0 COST OFCONSTR $ 500,000 APPROVED

CONST ENG $ 0 PHASESCONTING $ 0 $ 500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 500,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 500,000 $ 0 $ 0 $ 0 $ 0 $ 500,000Other $ 0 $ 0 $ 0 $ 0 $ 0 $ 0TOTAL $ 500,000 $ 0 $ 0 $ 0 $ 0 $ 500,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 327: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 327 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-240 2019 CS E,ENV,ENG,R,ACQ,UTLSACHSE $ 3,750,000LIMITS FROM ON MERRITT RD/WOODBRIDGE PKWY FROM SOUTH OF CREEK CROSSING LN PROJECT SPONSOR SACHSE

REVISION DATE 07/2018LIMITS TO PLEASANT VALLEY ROADPROJECT RECONSTRUCT AND WIDEN 2 TO 4 LANE DIVIDED URBAN; INTERSECTION, SIGNAL, AND SHARE MPO PROJ NUM 14024

DESCR D-USE PATH IMPROVEMENTS ALONG MERRITT ROAD FUNDING CAT(S) 3LC,7REMARKS LOCAL CONTRIBUTION PAID BY CITY OF SACHSE; CHANGE C PROJECT 2017-2018 CMAQ/STBG PROJECT SELECTION/STRATEGIC PARTNERSH

P7 SJ FROM 0918-47-900 TO 0918-47-240 HISTORY IPS (ROUND 2) TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,750,000ROW PURCH $ 2,000,000 COST OF

CONSTR $ 22,790,351 APPROVEDCONST ENG $ 1,130,401 PHASES

CONTING $ 453,528 $ 3,750,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 28,124,280

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 1,250,000 $ 1,250,0007 $ 2,000,000 $ 0 $ 0 $ 500,000 $ 0 $ 2,500,000TOTAL $ 2,000,000 $ 0 $ 0 $ 500,000 $ 1,250,000 $ 3,750,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-964 2019 CS C DALLAS $ 1,000,000LIMITS FROM HARRY HINES BLVD FROM AKARD STREET PROJECT SPONSOR NCTCOG

REVISION DATE 07/2018LIMITS TO SL 12 (WEST NORTHWEST HIGHWAY)PROJECT PERFORM CORRIDOR ANALYSIS & DVLP MASTER PLAN FOR HARRY HINES CORRIDOR W/ EMPHASI MPO PROJ NUM 14015

DESCR S ON SUST DEV, PROVIDING MULTIMODAL TRANS NEEDS, TECH OPTIONS FOR ADDL CAPACITY, FUNDING CAT(S) 7,OtherINT IMPRVMNTS, & LAND USE/TRANS COMPONENTS; INCL NCTCOG STAFF TIME & MAY INCL CONSULTANT ASST

REMARKS PROJECT 200,000 OF TRANSPORTATION DEVELOPMENT CREDITS (CAT 3 - POP7 HISTORY LICY BUNDLE TDC [MPO]) CREDITS UTILIZED IN LIEU OF A LOCA

L MATCH AND ARE NOT CALCULATED IN FUNDING TOTAL; 2017-2018 CMAQ/STBG PROJECT SELECTION/PLANNING AND OTHER STUDIES

TOTAL PROJECT COST INFORMATIONPREL ENG $ 0

ROW PURCH $ 0 COST OFCONSTR $ 1,000,000 APPROVED

CONST ENG $ 0 PHASESCONTING $ 0 $ 1,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,000,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 1,000,000 $ 0 $ 0 $ 0 $ 0 $ 1,000,000Other $ 0 $ 0 $ 0 $ 0 $ 0 $ 0TOTAL $ 1,000,000 $ 0 $ 0 $ 0 $ 0 $ 1,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG COLLIN 0918-24-906 2019 VA C FRISCO $ 500,000LIMITS FROM CITY OF FRISCO - AUTOMATED VEHICLE DEPLOYMENT PROJECT SPONSOR FRISCO

REVISION DATE 07/2018LIMITS TO BOUNDED BY LEBANON RD TO THE NORTH, PRESTON RD TO THE EAST, SH 121 TO THESOUTH, AND LEGACY DR TO THE WEST

PROJECT IMPLEMENT A LOW/MEDIUM SPEED AV SHUTTLE DEPLOYMENT FOR EMPLOYEES/RESIDENTS/VISIT MPO PROJ NUM 11682DESCR ORS OF $5 BILLION DOLLAR MILE, HALL PARK, FRISCO BRIDGES AND STONEBRIAR CENTRE M FUNDING CAT(S) 3LC,7

ALL; CITY WILL CONTRACT FOR SERVICES/OPERATION OF SHUTTLEREMARKS LOCAL CONTRIBUTION PAID BY CITY OF FRISCO PROJECT 100% CONTRACT FOR SERVICES/SHUTTLE OPERATIONS

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 500,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 500,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 187,500 $ 187,5007 $ 250,000 $ 0 $ 0 $ 62,500 $ 0 $ 312,500TOTAL $ 250,000 $ 0 $ 0 $ 62,500 $ 187,500 $ 500,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 328: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 328 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-243 2019 CS C DALLAS $ 1,200,000LIMITS FROM ON PARK LANE AT US 75; WALNUT ST AT GREENVILLE AVE, ABRAMS RD, RICHLAND CO PROJECT SPONSOR DALLAS

REVISION DATE 07/2018LLEGELIMITS TOPROJECT CONSTRUCT INTERSECTION IMPROVEMENTS INCLUDING TRAFFIC SIGNAL UPGRADES WITH RADAR MPO PROJ NUM 25043

DESCR DETECTION, PEDESTRIAN IMPROVEMENTS WITH CROSSWALKS AND ADA RAMPS FUNDING CAT(S) 5REMARKS CHANGE CSJ FROM 0918-47-914 TO 0918-47-243 PROJECT OFFSET BY DECREASE ON TIP 665.2/CSJ 0918-45-381 AND TIP 6

P7 HISTORY 84/CSJ 0918-45-374; PROJECT MUST LET BY END OF CY2018 ORFUNDS WILL EXPIRE

TOTAL PROJECT COST INFORMATIONPREL ENG $ 120,000

ROW PURCH $ 0 COST OFCONSTR $ 1,200,000 APPROVED

CONST ENG $ 61,822 PHASESCONTING $ 14,286 $ 1,200,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,396,108

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 960,000 $ 0 $ 0 $ 240,000 $ 0 $ 1,200,000TOTAL $ 960,000 $ 0 $ 0 $ 240,000 $ 0 $ 1,200,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG ELLIS 0092-05-051 2019 IH 45 C ENNIS $ 3,000,000LIMITS FROM AT FM 1181 PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TOPROJECT CONSTRUCT INTERSECTION IMPROVEMENTS MPO PROJ NUM 25042

DESCR FUNDING CAT(S) 7,11REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 149,911ROW PURCH $ 0 COST OF

CONSTR $ 3,000,000 APPROVEDCONST ENG $ 149,605 PHASES

CONTING $ 34,571 $ 3,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 3,334,087

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 1,200,000 $ 300,000 $ 0 $ 0 $ 0 $ 1,500,00011 $ 1,200,000 $ 300,000 $ 0 $ 0 $ 0 $ 1,500,000TOTAL $ 2,400,000 $ 600,000 $ 0 $ 0 $ 0 $ 3,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 1068-04-905 2019 IH 30 C GRAND PRAIRIE $ 425,600LIMITS FROM MACARTHUR PROJECT SPONSOR GRAND PRAIRIE

REVISION DATE 07/2018LIMITS TO SH 161PROJECT INSTALLATION OF NEW DYNAMIC MESSAGE SIGNS AND NEW CCTV CAMERAS MPO PROJ NUM 25036

DESCR FUNDING CAT(S) 3LC,5REMARKS LOCAL CONTRIBUTION PAID BY CITY OF GRAND PRAIRIE PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 75,000ROW PURCH $ 0 COST OF

CONSTR $ 425,600 APPROVEDCONST ENG $ 22,803 PHASES

CONTING $ 5,269 $ 425,600INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 528,672

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 12,600 $ 12,6005 $ 330,400 $ 82,600 $ 0 $ 0 $ 0 $ 413,000TOTAL $ 330,400 $ 82,600 $ 0 $ 0 $ 12,600 $ 425,600

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 329: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 329 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG COLLIN 0918-24-242 2019 CS E,ENG MCKINNEY $ 105,000LIMITS FROM ON STACY ROAD FROM FM 2478 PROJECT SPONSOR MCKINNEY

REVISION DATE 07/2018LIMITS TO EAST OF FM 2478PROJECT CONSTRUCT INTERSECTION IMPROVEMENT MPO PROJ NUM 19009

DESCR FUNDING CAT(S) 5,OtherREMARKS CHANGE CSJ FROM 0918-24-903 TO 0918-24-242 PROJECT 21,000 OF TRANSPORTATION DEVELOPMENT CREDITS (CAT 3- TDC

P7 HISTORY [MPO]) UTILIZED IN LIEU OF A LOCAL MATCH AND ARE NOT CALCULATED IN FUNDING TOTAL; FUNDING MOVED FROM TIP 19002/CSJ0135-03-047; PART OF COLLIN COUNTY LIRAP/LIP FUNDING PARTNERSHIP

TOTAL PROJECT COST INFORMATIONPREL ENG $ 105,000

ROW PURCH $ 0 COST OFCONSTR $ 487,872 APPROVED

CONST ENG $ 89,793 PHASESCONTING $ 5,808 $ 105,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 688,473

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 105,000 $ 0 $ 0 $ 0 $ 0 $ 105,000Other $ 0 $ 0 $ 0 $ 0 $ 0 $ 0TOTAL $ 105,000 $ 0 $ 0 $ 0 $ 0 $ 105,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-236 2019 VA E,ENV,ENG VARIOUS $ 1,100,000LIMITS FROM REGIONAL TRAIL CONNECTIONS TO THE FUTURE CYPRESS WATERS COTTON BELT RAIL SPROJECT SPONSOR DALLAS CO

REVISION DATE 07/2018TATION; MOCKINGBIRD LN TO SANDERS LOOPLIMITS TO EXISTING TRAIL NORTH OF OLYMPUS BLVD TO SOUTH OF THE FUTURE CYPRESS WATERS

RAIL STATIONPROJECT CONSTRUCT SHARED USE PATH AND RELATED PEDESTRIAN AND BICYCLE IMPROVEMENTS (PEDES MPO PROJ NUM 14013

DESCR TRIAN CROSSWALKS, SIGNAGE, LIGHTING, AND SIGNALS) IN PROXIMITY OF THE FUTURE CYP FUNDING CAT(S) 3LCRESS WATERS COTTON BELT RAIL STATION

REMARKS LOCAL CONTRIBUTION PAID BY DALLAS COUNTY; CHANGE CS PROJECT 2017-2018 CMAQ/STBG PROJECT SELECTION/TRANSIT PROGRAMP7 J FROM 0918-47-911 TO 0918-47-236 HISTORY

TOTAL PROJECT COST INFORMATIONPREL ENG $ 1,100,000

ROW PURCH $ 0 COST OFCONSTR $ 3,750,000 APPROVED

CONST ENG $ 217,317 PHASESCONTING $ 50,219 $ 1,100,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 5,117,536

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 1,100,000 $ 1,100,000TOTAL $ 0 $ 0 $ 0 $ 0 $ 1,100,000 $ 1,100,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG PARKER 0313-02-057 2019 FM 51 C SPRINGTOWN $ 16,550,000LIMITS FROM NORTH OF COTTONDALE ROAD PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO TEXAS DRIVEPROJECT WIDEN 2 LANE ROADWAY TO 3 LANES URBAN; INTERSECTION IMPROVEMENTS INCLUDING TURN MPO PROJ NUM 14012

DESCR LANES AND NEW SIGNAL IMPROVEMENTS FUNDING CAT(S) 2M,5,7REMARKS CMAQ FOR INTERSECTION & SIGNAL IMPROVEMENTS ONLY; L PROJECT PART OF A 10 YEAR PLAN PROJECT; CMAQ/STBG/LOCAL BOND PROG

P7 ENGTH OF WIDENING IS .60 MILES HISTORY RAM TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,218,000ROW PURCH $ 1,500,000 COST OF

CONSTR $ 16,550,000 APPROVEDCONST ENG $ 749,246 PHASES

CONTING $ 7,645 $ 16,550,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 20,024,891

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 9,600,000 $ 2,400,000 $ 0 $ 0 $ 0 $ 12,000,0005 $ 2,920,000 $ 730,000 $ 0 $ 0 $ 0 $ 3,650,0007 $ 720,000 $ 180,000 $ 0 $ 0 $ 0 $ 900,000TOTAL $ 13,240,000 $ 3,310,000 $ 0 $ 0 $ 0 $ 16,550,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 330: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 330 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG PARKER 0008-03-119 2019 US 180 C WEATHERFORD $ 1,380,000LIMITS FROM AT EAST LOOP PROJECT SPONSOR PARKER CO

REVISION DATE 07/2018LIMITS TOPROJECT INTERSECTION IMPROVEMENTS INCLUDING NEW TRAFFIC SIGNALS AND CONSTRUCTION OF DEDI MPO PROJ NUM 14011

DESCR CATED TURN LANES FUNDING CAT(S) 3LC,5REMARKS LOCAL CONTRIBUTION PAID BY PARKER COUNTY PROJECT 2017-2018 CMAQ/STBG PROJECT SELECTION/LOCAL BOND PROGRAM

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 250,000ROW PURCH $ 0 COST OF

CONSTR $ 1,380,000 APPROVEDCONST ENG $ 111,581 PHASES

CONTING $ 4,671 $ 1,380,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,746,252

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 155,000 $ 155,0005 $ 980,000 $ 245,000 $ 0 $ 0 $ 0 $ 1,225,000TOTAL $ 980,000 $ 245,000 $ 0 $ 0 $ 155,000 $ 1,380,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG PARKER 1601-01-032 2019 FM 730 C WEATHERFORD $ 1,380,000LIMITS FROM AT EAST LOOP PROJECT SPONSOR PARKER CO

REVISION DATE 07/2018LIMITS TOPROJECT INTERSECTION IMPROVEMENTS, INCLUDING ADDITIONAL LEFT TURN LANES AND DEDICATED RI MPO PROJ NUM 14010

DESCR GHT TURN LANES AND NEW SIGNAL IMPROVEMENTS FUNDING CAT(S) 3LC,5REMARKS LOCAL CONTRIBUTION PAID BY PARKER COUNTY PROJECT 2017-2018 CMAQ/STBG PROJECT SELECTION/LOCAL BOND PROGRAM

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 250,000ROW PURCH $ 0 COST OF

CONSTR $ 1,380,000 APPROVEDCONST ENG $ 112,163 PHASES

CONTING $ 25,919 $ 1,380,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,768,082

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 155,000 $ 155,0005 $ 980,000 $ 245,000 $ 0 $ 0 $ 0 $ 1,225,000TOTAL $ 980,000 $ 245,000 $ 0 $ 0 $ 155,000 $ 1,380,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PARIS NCTCOG HUNT 2658-01-013 2019 FM 2642 R,ACQ,UTL ROYSE CITY $ 3,747,900LIMITS FROM FM 35 PROJECT SPONSOR TXDOT-PARIS

REVISION DATE 07/2018LIMITS TO SH 66PROJECT WIDEN 2 LANE TO 4 LANE DIVIDED URBAN WITH SIDEWALKS MPO PROJ NUM 13039

DESCR FUNDING CAT(S) S102REMARKS PROJECT 10-YEAR PLAN PROJECT; 2017-2018 CMAQ/STBG PROJECT SELECTI

P7 HISTORY ON/LOCAL BOND PROGRAM TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,705,000ROW PURCH $ 3,747,900 COST OF

CONSTR $ 17,035,840 APPROVEDCONST ENG $ 884,484 PHASES

CONTING $ 354,864 $ 3,747,900INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 23,728,088

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALS102 $ 2,998,320 $ 374,790 $ 0 $ 374,790 $ 0 $ 3,747,900TOTAL $ 2,998,320 $ 374,790 $ 0 $ 374,790 $ 0 $ 3,747,900

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 331: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 331 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-206 2019 VA E,ENG DALLAS $ 963,784LIMITS FROM LAKE HIGHLANDS TRAIL NORTHERN EXTENSION & LAKE HIGHLANDS TRAIL PHASE 2A, 2 PROJECT SPONSOR DALLAS

REVISION DATE 07/2018B; FROM EXISTING WHITE ROCK CREEK TRAIL TOLIMITS TO EXISTING LAKE HIGHLANDS TRAIL AT WHITE ROCK TRAIL ROADWAY TO THE LAKE HIGH

LANDS DART STATION NEAR WALNUT HILLPROJECT CONSTRUCT NEW SHARED-USE PATH FOR BICYCLISTS AND PEDESTRIANS; BIKEWAY AND PEDEST MPO PROJ NUM 40049

DESCR RIAN IMPROVEMENTS INCLUDING SIDEWALKS, BICYCLE/PEDESTRIAN SIGNALS, CROSSWALKS, S FUNDING CAT(S) 9TAPIGNAGE, AND BICYCLE/PEDESTRIAN TRAFFIC COUNT EQUIPMENT

REMARKS LOCAL CONTRIBUTION PAID BY CITY OF DALLAS; COST OF PROJECT 2017 TA SET-ASIDE CALL FOR PROJECTS; TOTAL PROJECT FUNDINP7 APPROVED PHASES INCLUDES CE COST; CMAQ FUNDS FOR BI HISTORY G IS SPLIT IS 76%FEDERAL/24% LOCAL; FUNDING SHOWN AS 9TAP

CYCLE/PEDESTRIAN IMPROVEMENTS ONLY IN ESTIP PER TXDOT TPP SINCE 9TA IS NOT A FUNDING CATEGORY OPTION IN THE ESTIP; PLANNING CSJ 0918-45-925

TOTAL PROJECT COST INFORMATIONPREL ENG $ 963,784

ROW PURCH $ 0 COST OFCONSTR $ 6,133,882 APPROVED

CONST ENG $ 337,984 PHASESCONTING $ 91,367 $ 963,784INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 7,527,017

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 771,027 $ 0 $ 0 $ 192,757 $ 0 $ 963,784TOTAL $ 771,027 $ 0 $ 0 $ 192,757 $ 0 $ 963,784

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-205 2019 VA E,ENG DALLAS $ 806,568LIMITS FROM TRINITY STRAND TRAIL PHASE 2; EXISTING TRINITY STRAND TRAIL AT THE INTERSE PROJECT SPONSOR DALLAS

REVISION DATE 07/2018CTION OF MARKET CNTR BLVD & TURTLE CREEK BLVDLIMITS TO INWOOD/LOVE FIELD DART STATIONPROJECT CONSTRUCT BICYCLE AND PEDESTRIAN IMPROVEMENTS INCLUDING SHARED-USE PATH, ON STRE MPO PROJ NUM 40048

DESCR ET BIKEWAY, BICYCLE/PEDESTRIAN SIGNALS, CROSSWALKS, SIGNAGE, AND BICYCLE/PEDESTR FUNDING CAT(S) 9TAPIAN TRAFFIC COUNT EQUIPMENT

REMARKS PROJECT 2017 TA SET-ASIDE CALL FOR PROJECTS; TOTAL PROJECT FUNDINP7 HISTORY G IS SPLIT 71% FEDERAL/29% LOCAL; FUNDING SHOWN AS 9TAP I

N ESTIP PER TXDOT TPP SINCE 9TA IS NOT A FUNDING CATEGORYOPTION IN THE ESTIP; PLANNING CSJ 0918-45-924

TOTAL PROJECT COST INFORMATIONPREL ENG $ 806,568

ROW PURCH $ 0 COST OFCONSTR $ 5,946,360 APPROVED

CONST ENG $ 321,568 PHASESCONTING $ 80,478 $ 806,568INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 7,154,974

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 645,254 $ 0 $ 0 $ 161,314 $ 0 $ 806,568TOTAL $ 645,254 $ 0 $ 0 $ 161,314 $ 0 $ 806,568

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-204 2019 VA E,ENG DALLAS $ 104,050LIMITS FROM RIDGEWOOD TRAIL LIGHTING; ELLSWORTH AVE PROJECT SPONSOR DALLAS

REVISION DATE 07/2018LIMITS TO SKILLMAN STPROJECT INSTALL SAFETY LIGHTING ALONG EXISTING RIDGEWOOD TRAIL MPO PROJ NUM 40047

DESCR FUNDING CAT(S) 9TAPREMARKS PROJECT 2017 TA SET-ASIDE CALL FOR PROJECTS; FUNDING SHOWN AS 9TA

P7 HISTORY P IN ESTIP PER TXDOT TPP SINCE 9TA IS NOT A FUNDING CATEGORY OPTION IN THE ESTIP; PLANNING CSJ 0918-45-921

TOTAL PROJECT COST INFORMATIONPREL ENG $ 104,050

ROW PURCH $ 0 COST OFCONSTR $ 716,000 APPROVED

CONST ENG $ 39,050 PHASESCONTING $ 10,637 $ 104,050INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 869,737

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 83,240 $ 0 $ 0 $ 20,810 $ 0 $ 104,050TOTAL $ 83,240 $ 0 $ 0 $ 20,810 $ 0 $ 104,050

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 332: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 332 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG KAUFMAN 0918-11-099 2019 VA C TERRELL $ 728,700LIMITS FROM DR. BRUCE WOOD ELEMENTARY SCHOOL CONNECTION EXTENSIONS; SAFE ROUTES TO SCHPROJECT SPONSOR TERRELL

REVISION DATE 07/2018OOLLIMITS TO ALONG ROCKWALL AVE, BAKER ST, PACIFIC AVE, AND GRIFFITH AVEPROJECT SAFE ROUTES TO SCHOOL PEDESTRIAN IMPROVEMENTS IN PROXIMITY TO ELEMENTARY SCHOOL MPO PROJ NUM 40046

DESCR INCLUDING CONSTRUCT AND RECONSTRUCT SIDEWALKS, BICYCLE/PEDESTRIAN SIGNALS, SIGNA FUNDING CAT(S) 3LC,9TAPGE, AND CROSSWALKS

REMARKS LOCAL CONTRIBUTION PAID BY CITY OF TERRELL; CHANGE PROJECT 2017 TA SET-ASIDE CALL FOR PROJECTS; TOTAL PROJECT FUNDINP7 CSJ FROM 0918-11-968 TO 0918-11-099; COST OF APPROV HISTORY G IS SPLIT IS 70% FEDERAL/30% LOCAL; FUNDING SHOWN AS 9TA

ED PHASES INCLUDES CE COST P IN ESTIP PER TXDOT TPP SINCE 9TA IS NOT A FUNDING CATEGORY OPTION IN THE ESTIP; PRIOR CSJ 0918-11-968

TOTAL PROJECT COST INFORMATIONPREL ENG $ 148,700

ROW PURCH $ 0 COST OFCONSTR $ 694,000 APPROVED

CONST ENG $ 34,700 PHASESCONTING $ 7,952 $ 728,700INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 885,352

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 95,425 $ 95,4259TAP $ 506,620 $ 0 $ 0 $ 126,655 $ 0 $ 633,275TOTAL $ 506,620 $ 0 $ 0 $ 126,655 $ 95,425 $ 728,700

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-210 2019 VA E,ENG DALLAS $ 250,169LIMITS FROM UNION BIKEWAY CONNECTOR; HOUSTON ST PROJECT SPONSOR DALLAS

REVISION DATE 07/2018LIMITS TO N HARWOOD ST AT WOODALL RODGERS FWYPROJECT CONSTRUCT ON-STREET BIKEWAY FACILITIES MPO PROJ NUM 40043

DESCR FUNDING CAT(S) 3LC,9TAPREMARKS CHANGE CSJ FROM 0918-45-903 TO 0918-47-210; LOCAL C PROJECT 2017 TA SET-ASIDE CALL FOR PROJECTS; FUNDING SHOWN AS 9TA

P7 ONTRIBUTION PAID BY THE CITY OF DALLAS HISTORY P IN ESTIP PER TXDOT TPP SINCE 9TA IS NOT A FUNDING CATEGORY OPTION IN THE ESTIP

TOTAL PROJECT COST INFORMATIONPREL ENG $ 250,169

ROW PURCH $ 0 COST OFCONSTR $ 728,019 APPROVED

CONST ENG $ 17,334 PHASESCONTING $ 9,821 $ 250,169INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,005,343

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 232,835 $ 232,8359TAP $ 13,867 $ 0 $ 0 $ 3,467 $ 0 $ 17,334TOTAL $ 13,867 $ 0 $ 0 $ 3,467 $ 232,835 $ 250,169

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG COLLIN 0918-24-241 2019 VA C PLANO $ 444,730LIMITS FROM LEGACY DRIVE/DALLAS PARKWAY PEDESTRIAN/BICYCLE CROSSING PROJECT SPONSOR PLANO

REVISION DATE 07/2018LIMITS TO LEGACY DR BRIDGE AT DALLAS NORTH TOLLWAYPROJECT CONSTRUCT BICYCLE AND PEDESTRIAN WALKWAY AND IMPROVEMENTS INCLUDING CROSSWALKS, MPO PROJ NUM 40042

DESCR BICYCLE/PEDESTRIAN SIGNALS, AND SIGNAGE FUNDING CAT(S) 9TAPREMARKS COST OF APPROVED PHASES INCLUDES CE COST; CHANGE CSPROJECT 2017 TA SET-ASIDE CALL FOR PROJECTS; FUNDING SHOWN AS 9TA

P7 J FROM 0918-24-902 TO 0918-24-241 HISTORY P IN ESTIP PER TXDOT TPP SINCE 9TA IS NOT A FUNDING CATEGORY OPTION IN THE ESTIP

TOTAL PROJECT COST INFORMATIONPREL ENG $ 20,215

ROW PURCH $ 0 COST OFCONSTR $ 424,515 APPROVED

CONST ENG $ 20,215 PHASESCONTING $ 5,295 $ 444,730INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 470,240

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 355,784 $ 0 $ 0 $ 88,946 $ 0 $ 444,730TOTAL $ 355,784 $ 0 $ 0 $ 88,946 $ 0 $ 444,730

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 333: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 333 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DENTON 0918-46-306 2019 CS C,E,ENG DENTON $ 953,135LIMITS FROM SYCAMORE - WELCH ACTIVE TRANSPORTATION CONNECTION; ALONG S WELCH ST FROM EPROJECT SPONSOR DENTON

REVISION DATE 07/2018AGLE DRIVELIMITS TO TO W HICKORY ST; AND ALONG W SYCAMORE ST TO DOWNTOWN DENTON DCTA STATIONPROJECT CONSTRUCT NEW SHARED-USE PATH, BIKE LANES AND CROSSWALKS MPO PROJ NUM 40040

DESCR FUNDING CAT(S) 9TAPREMARKS CHANGE CSJ FROM 0918-46-922 TO 0918-46-306 PROJECT 2017 TA SET-ASIDE CALL FOR PROJECTS; FUNDING SHOWN AS 9TA

P7 HISTORY P IN ESTIP PER TXDOT TPP SINCE 9TA IS NOT A FUNDING CATEGORY OPTION IN THE ESTIP

TOTAL PROJECT COST INFORMATIONPREL ENG $ 122,096

ROW PURCH $ 0 COST OFCONSTR $ 787,715 APPROVED

CONST ENG $ 43,324 PHASESCONTING $ 11,347 $ 953,135INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 964,482

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 762,508 $ 0 $ 0 $ 190,627 $ 0 $ 953,135TOTAL $ 762,508 $ 0 $ 0 $ 190,627 $ 0 $ 953,135

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DENTON 0918-46-305 2019 VA C,E,ENG DENTON $ 952,888LIMITS FROM GINNINGS ELEMENTARY SCHOOL & LEE ELEMENTARY SCHOOL SIDEWALK PROJECT PROJECT SPONSOR DENTON

REVISION DATE 07/2018LIMITS TO ALONG STUART RD, MULKEY LN, AND AUDRA LNPROJECT SAFE ROUTES TO SCHOOL PEDESTRIAN IMPROVEMENTS IN PROXIMITY TO ELEMENTARY SCHOOLS MPO PROJ NUM 40039

DESCR INCLUDING NEW SIDEWALKS, PEDESTRIAN BRIDGE, AND CROSSWALKS FUNDING CAT(S) 9TAPREMARKS CHANGE CSJ FROM 0918-46-933 TO 0918-46-305 PROJECT 2017 TA SET-ASIDE CALL FOR PROJECTS; FUNDING SHOWN AS 9TA

P7 HISTORY P IN ESTIP PER TXDOT TPP SINCE 9TA IS NOT A FUNDING CATEGORY OPTION IN THE ESTIP

TOTAL PROJECT COST INFORMATIONPREL ENG $ 122,064

ROW PURCH $ 0 COST OFCONSTR $ 787,511 APPROVED

CONST ENG $ 43,313 PHASESCONTING $ 11,344 $ 952,888INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 964,232

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 762,311 $ 0 $ 0 $ 190,577 $ 0 $ 952,888TOTAL $ 762,311 $ 0 $ 0 $ 190,577 $ 0 $ 952,888

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-209 2019 VA C CEDAR HILL $ 1,671,278LIMITS FROM SIDEWALK AND CROSSWALK IMPROVEMENTS (COMBINED) - SAFE ROUTES TO SCHOOL PROJECT SPONSOR CEDAR HILL

REVISION DATE 07/2018LIMITS TO NEAR HIGH POINT ELEM, LIFE SCHOOL CEDAR HILL, JOE WILSON INT, VILLAGE TECH, WATERFORD OAKS ELEM, & HIGHLAND ELEM SCHOOLS

PROJECT SAFE ROUTES TO SCHOOL PEDESTRIAN IMPROVEMENTS IN PROXIMITY TO SCHOOLS, INCLUDING MPO PROJ NUM 40038DESCR NEW CROSSWALKS, BICYCLE/PEDESTRIAN SIGNALS, SIGNAGE, AND SIDEWALK IMPROVEMENTS FUNDING CAT(S) 9TAP

TO COMPLETE EXISTING SIDEWALK GAPSREMARKS COST OF APPROVED PHASES INCLUDES CE COST PROJECT 2017 TA SET-ASIDE CALL FOR PROJECTS; COMBINES GROUPS 1-4

P7 HISTORY APPROVED BY RTC; FUNDING SHOWN AS 9TAP IN ESTIP PER TXDOTTPP SINCE 9TA IS NOT A FUNDING CATEGORY OPTION IN THE ESTIP; PLANNING CSJ 0918-45-944

TOTAL PROJECT COST INFORMATIONPREL ENG $ 278,546

ROW PURCH $ 0 COST OFCONSTR $ 1,582,650 APPROVED

CONST ENG $ 88,628 PHASESCONTING $ 24,141 $ 1,671,278INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,973,965

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 1,337,023 $ 0 $ 0 $ 334,255 $ 0 $ 1,671,278TOTAL $ 1,337,023 $ 0 $ 0 $ 334,255 $ 0 $ 1,671,278

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 334: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 334 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG ROCKWALL 0918-25-024 2019 CS C,E,ENV,ENG HEATH $ 506,970LIMITS FROM SRTS TRAIL PROJECT - SMIRL & HUBBARD; EXISTING PATH AT FM 740 TRAIL PROJECT SPONSOR HEATH

REVISION DATE 07/2018LIMITS TO EXISTING PATH WEST OF DUNFORD DRIVEPROJECT CONSTRUCT A SHARED-USE PATH FOR BICYCLISTS AND PEDESTRIANS ALONG HUBBARD DR MPO PROJ NUM 40037

DESCR FUNDING CAT(S) 3LC,9TAPREMARKS LOCAL CONTRIBUTION PAID BY CITY OF HEATH; COST OF A PROJECT 2017 TA SET-ASIDE CALL FOR PROJECTS; TOTAL PROJECT FUNDIN

P7 PPROVED PHASES INCLUDES CE COST; CHANGE CSJ FROM 09 HISTORY G IS SPLIT IS 75% FEDERAL/25% LOCAL; FUNDING SHOWN AS 9TA18-25-962 TO 0918-25-024 P IN ESTIP PER TXDOT TPP SINCE 9TA IS NOT A FUNDING CATEG

ORY OPTION IN THE ESTIP TOTAL PROJECT COST INFORMATION

PREL ENG $ 81,353ROW PURCH $ 0 COST OF

CONSTR $ 402,573 APPROVEDCONST ENG $ 23,044 PHASES

CONTING $ 0 $ 506,970INDIRECT $ 9,996BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 516,966

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 31,684 $ 31,6849TAP $ 380,228 $ 0 $ 0 $ 95,058 $ 0 $ 475,286TOTAL $ 380,228 $ 0 $ 0 $ 95,058 $ 31,684 $ 506,970

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG COLLIN 0000-18-081 2019 MH C VARIOUS $ 20,000,000LIMITS FROM ON DNT FRTG RD FROM FM 428 PROJECT SPONSOR COLLIN CO

REVISION DATE 07/2018LIMITS TO US 380PROJECT CONSTRUCT 0 TO 2 LANE SOUTHBOUND FRONTAGE ROAD MPO PROJ NUM 84148

DESCR FUNDING CAT(S) 3LCREMARKS LOCAL CONTRIBUTION PAID BY COLLIN COUNTY PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,157,000ROW PURCH $ 4,100,000 COST OF

CONSTR $ 20,000,000 APPROVEDCONST ENG $ 700,000 PHASES

CONTING $ 300,000 $ 20,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 26,257,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 20,000,000 $ 20,000,000TOTAL $ 0 $ 0 $ 0 $ 0 $ 20,000,000 $ 20,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG COLLIN 0000-18-080 2019 MH C CELINA $ 18,000,000LIMITS FROM ON COLLIN COUNTY OUTER LOOP FROM DNT PROJECT SPONSOR COLLIN CO

REVISION DATE 07/2018LIMITS TO SH 289 (PRESTON ROAD)PROJECT CONSTRUCT 0 TO 2 LANE EASTBOUND SERVICE ROAD (STAGED WITH ULTIMATE 4 LANE SECTIO MPO PROJ NUM 84147

DESCR N OPEN BY 2027) WITH OVERPASS AT BNSF RR FUNDING CAT(S) 3LCREMARKS LOCAL CONTRIBUTION PAID BY COLLIN COUNTY PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,365,044ROW PURCH $ 16,000,000 COST OF

CONSTR $ 18,000,000 APPROVEDCONST ENG $ 630,000 PHASES

CONTING $ 270,000 $ 18,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 36,265,044

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 18,000,000 $ 18,000,000TOTAL $ 0 $ 0 $ 0 $ 0 $ 18,000,000 $ 18,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 335: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 335 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-905 2019 VA C VARIOUS $ 1,000,000LIMITS FROM DALLAS COUNTY SHERIFF PROJECT SPONSOR NCTCOG

REVISION DATE 07/2018LIMITS TO HIGHWAY TRAFFIC/MANAGEMENT OPERATIONS PROGRAM ON LIMITED ACCESS FACILITIESIN DALLAS COUNTY

PROJECT PROJECT WILL FUND A PORTION OF OPERATIONS AND CAPITAL COSTS FOR DALLAS COUNTY SH MPO PROJ NUM 20262DESCR ERIFF’’S DEPARTMENT TO IMPLEMENT QUICK CLEARANCE BEST PRACTICES TECHNIQUES TO CL FUNDING CAT(S) 7

EAR INCIDENTS MORE QUICKLY, THEREBY REDUCING NON-RECURRENT CONGESTIONREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 1,000,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 1,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,000,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 800,000 $ 200,000 $ 0 $ 0 $ 0 $ 1,000,000TOTAL $ 800,000 $ 200,000 $ 0 $ 0 $ 0 $ 1,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG 0918-00-902 2019 VA C VARIOUS $ 250,000LIMITS FROM DFW AUTOMATED VEHICLE PROVING GROUNDS PROJECT (REGION-WIDE) PROJECT SPONSOR NCTCOG

REVISION DATE 07/2018LIMITS TOPROJECT DEVELOPMENT AND DEPLOYMENT OF LOW AND HIGH SPEED AUTOMATED VEHICLE PROGRAMS THATMPO PROJ NUM 11678

DESCR ADVANCE AV-RELATED TECHNOLOGIES AND PARTNERSHIPS, INCLUDING DATA SHARING, SENSO FUNDING CAT(S) 7,OtherR AND COMMUNICATIONS INFRASTRUCTURE, AND SHARED MOBILITY COLLABORATIONS

REMARKS PROJECT 50,000 OF TRANSPORTATION DEVELOPMENT CREDITS (CAT 3 - TDCP7 HISTORY [MPO]) CREDITS UTILIZED IN LIEU OF A LOCAL MATCH AND ARE

NOT CALCULATED IN FUNDING TOTAL TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 250,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 250,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 250,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 250,000 $ 0 $ 0 $ 0 $ 0 $ 250,000Other $ 0 $ 0 $ 0 $ 0 $ 0 $ 0TOTAL $ 250,000 $ 0 $ 0 $ 0 $ 0 $ 250,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG 0918-00-285 2019 VA C VARIOUS $ 670,000LIMITS FROM IMPLEMENTATION/ADMINISTRATION OF AIR QUALITY AND TRANSPORTATION PROJECTS FPROJECT SPONSOR NCTCOG

REVISION DATE 07/2018UNDED WITH RTRLIMITS TOPROJECT IMPLEMENTATION/ADMINISTRATION OF AIR QUALITY AND TRANSPORTATION PROJECTS FUNDED MPO PROJ NUM 11635.1

DESCR WITH RTR FUNDS FUNDING CAT(S) 3RTR121REMARKS RTR 121-ES1 PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 670,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 670,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 670,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3RTR121 $ 0 $ 0 $ 670,000 $ 0 $ 0 $ 670,000TOTAL $ 0 $ 0 $ 670,000 $ 0 $ 0 $ 670,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 336: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 336 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG 0918-00-901 2019 VA C VARIOUS $ 450,000LIMITS FROM REGION-WIDE EMPLOYER TRIP REDUCTION PROGRAM (ETR) PROJECT SPONSOR NCTCOG

REVISION DATE 07/2018LIMITS TO TRACK AND IMPLEMENT ETR STRATEGIES THROUGH COMMUTER/EMPLOYER OUTREACH; MANAGEMENT/OVERSIGHT OF TRYPARKINGIT.COM

PROJECT PERFORMANCE MONITORING/TRACKING/REPORTING; DEVELOP/MAINTAIN/UPDATE THE TDM TOOLK MPO PROJ NUM 11612.1DESCR IT, TRIP REDUCTION MANUAL FOR EMPLOYERS, & OUTREACH MATERIALS; INCLUDES NCTCOG S FUNDING CAT(S) 7,Other

TAFF TIME AND CONSULTANT ASSISTANCEREMARKS PROJECT 90,000 TDC (MPO) CREDITS UTILIZED IN LIEU OF A LOCAL MATC

P7 HISTORY H AND ARE NOT CALCULATED IN FUNDING TOTAL TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 450,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 450,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 450,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 450,000 $ 0 $ 0 $ 0 $ 0 $ 450,000Other $ 0 $ 0 $ 0 $ 0 $ 0 $ 0TOTAL $ 450,000 $ 0 $ 0 $ 0 $ 0 $ 450,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0902-90-076 2019 CS C,E,ENG AZLE $ 376,395LIMITS FROM WALNUT CREEK ELEMENTARY PEDESTRIAN WALKWAY; ALONG STRIBLING DR/STRIBLING DPROJECT SPONSOR AZLE ISD

REVISION DATE 07/2018R N FROM TIMBEROAKS DR TO STRIBLING CIRLIMITS TO ALONG HIGH CREST DR FROM STRIBLING DR TO WALNUT CREEK DRPROJECT SAFE ROUTES TO SCHOOL; PEDESTRIAN IMPROVEMENTS INCLUDING SIDEWALKS AND CROSSWALK MPO PROJ NUM 40054

DESCR S FUNDING CAT(S) 5REMARKS THIS ENTRY INCLUDES CE COST PROJECT 2017 TA SET-ASIDE CALL FOR PROJECTS

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 47,359ROW PURCH $ 0 COST OF

CONSTR $ 311,927 APPROVEDCONST ENG $ 17,109 PHASES

CONTING $ 4,660 $ 376,395INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 381,055

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 301,116 $ 0 $ 0 $ 75,279 $ 0 $ 376,395TOTAL $ 301,116 $ 0 $ 0 $ 75,279 $ 0 $ 376,395

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG 0902-90-101 2019 VA E,ENG VARIOUS $ 1,720,000LIMITS FROM REGIONAL GOODS MOVMNT/CORRIDOR STDIES; CONDCT GEN CORRIDOR STUDIES & PLANNPROJECT SPONSOR NCTCOG

REVISION DATE 07/2018ING ACTIVITIES IN SUPPORT OF THE REGION’SLIMITS TO GOODS MOVEMENT INCLDNG; NCTCOG STAFF TIME & CONSLTNT ASSISTNCE TO ASSESS I

MPACT OF TRUCK, RAIL, & OTHER FREIGHTPROJECT MOVEMENT, DATA COLLECTION & ANLYSIS, SAFETY, COORDINATION W PRIVATE SECTOR PTNRS MPO PROJ NUM 11613

DESCR IN FREIGHT BUSINSSES; MONITRNG TRUCK LN CORRIDORS, HAZMAT, ECON ANLYSIS, LAND U FUNDING CAT(S) 7,OtherSE COMPATIBILTY, PASSENGER & FREIGHT RAIL INTEGRATION, PUBLIC OUTREACH & EDUCATION

REMARKS PROJECT 344,000 OF TRANSPORTATION DEVELOPMENT CREDITS (CAT 3 - TDP7 HISTORY C [MPO]) UTILIZED IN LIEU OF A LOCAL MATCH ARE NOT CALCUL

ATED IN FUNDING TOTAL TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,720,000ROW PURCH $ 0 COST OF

CONSTR $ 0 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 1,720,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,720,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 1,720,000 $ 0 $ 0 $ 0 $ 0 $ 1,720,000Other $ 0 $ 0 $ 0 $ 0 $ 0 $ 0TOTAL $ 1,720,000 $ 0 $ 0 $ 0 $ 0 $ 1,720,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 337: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 337 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0902-90-081 2019 CS E,ENG RICHLAND HILLS $ 402,291LIMITS FROM RICHLAND HILLS TRE CONNECTION; GLENVIEW DRIVE ON THE NORTH PROJECT SPONSOR RICHLAND HILLS

REVISION DATE 07/2018LIMITS TO TRE TRAIN STATION ON THE SOUTHPROJECT CONSTRUCT BICYCLE AND PEDESTRIAN IMPROVEMENTS INCLUDING SHARED-USE PATH, BIKEWAY MPO PROJ NUM 40060

DESCR S, SIDEWALKS, CROSSWALKS, AND SIGNAGE FUNDING CAT(S) 5REMARKS PROJECT 2017 TA SET-ASIDE CALL FOR PROJECTS

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 402,291ROW PURCH $ 0 COST OF

CONSTR $ 1,598,819 APPROVEDCONST ENG $ 95,291 PHASES

CONTING $ 25,956 $ 402,291INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,122,357

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 321,833 $ 0 $ 0 $ 80,458 $ 0 $ 402,291TOTAL $ 321,833 $ 0 $ 0 $ 80,458 $ 0 $ 402,291

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0902-90-078 2019 VA C KELLER $ 818,227LIMITS FROM WHITLEY ROAD SAFE ROUTES TO SCHOOLS; ALONG WHITLEY RD FROM NEAR EDENBERRYPROJECT SPONSOR KELLER

REVISION DATE 07/2018DR TO RAPP RDLIMITS TO AND ALONG RAPP RD FROM WHITLEY RD TO CONNECT NEAR EXISTING PATH NEAR INTER

SECTION OF RAPP RD AND WILLIS LNPROJECT CONSTRUCT NEW SHARED-USE PATH, CROSSWALKS, AND SIGNAGE MPO PROJ NUM 40059

DESCR FUNDING CAT(S) 5REMARKS PROJECT 2017 TA SET-ASIDE CALL FOR PROJECTS

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 150,572ROW PURCH $ 0 COST OF

CONSTR $ 774,191 APPROVEDCONST ENG $ 44,036 PHASES

CONTING $ 11,995 $ 818,227INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 980,794

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 654,582 $ 0 $ 0 $ 163,645 $ 0 $ 818,227TOTAL $ 654,582 $ 0 $ 0 $ 163,645 $ 0 $ 818,227

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0902-90-077 2019 CS C GRAPEVINE $ 6,675,496LIMITS FROM DALLAS ROAD TOD CORRIDOR/COTTON BELT EXTENSION; INTERSECTION OF W DALLAS RPROJECT SPONSOR GRAPEVINE

REVISION DATE 07/2018D AND WILLIAM D TATE AVELIMITS TO EXISTING LINKS TRAIL AT TEXAN TRAIL ROADWAYPROJECT CONSTRUCT SHARED-USE PATH, BIKE AND PEDESTRIAN IMPROVEMENTS INCLUDING SIDEWALKS, MPO PROJ NUM 40058

DESCR CROSSWALKS, BIKEWAYS, BIKE/PED SIGNALS, SIGNAGE, AND SAFETY IMPROVEMENTS FUNDING CAT(S) 3LC,9TAP,9TAPREMARKS LOCAL CONTRIBUTION PAID BY CITY OF GRAPEVINE; THIS PROJECT 2017 TA SET-ASIDE CALL FOR PROJECTS; TOTAL PROJECT FUNDIN

P7 ENTRY INCLUDES CE COST HISTORY G SPLIT IS 69% FEDERAL/31% LOCAL; $938,614 OF TA FUNDINGSHOWN AS 9TAP IN ESTIP PER TXDOT TPP SINCE 9TA IS NOT A FUNDING CATEGORY OPTION IN THE ESTIP

TOTAL PROJECT COST INFORMATIONPREL ENG $ 954,370

ROW PURCH $ 692,750 COST OFCONSTR $ 6,346,126 APPROVED

CONST ENG $ 329,370 PHASESCONTING $ 89,716 $ 6,675,496INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 8,412,332

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 754,866 $ 754,8669TAP $ 3,985,613 $ 0 $ 0 $ 996,403 $ 0 $ 4,982,0169TAP $ 750,891 $ 0 $ 0 $ 187,723 $ 0 $ 938,614TOTAL $ 4,736,504 $ 0 $ 0 $ 1,184,126 $ 754,866 $ 6,675,496

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 338: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 338 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG JOHNSON 0902-50-125 2019 VA C,E,ENG BURLESON $ 2,151,274LIMITS FROM IRENE ST & GARDENS TO JOHNSON SAFE ROUTES PROJECT BOUNDED BY SH 174 TO THEPROJECT SPONSOR BURLESON

REVISION DATE 07/2018W, SE NEWTON DR TO THE NE,LIMITS TO ARNOLD AVE TO THE SW, EXISTING BAILEY LAKE PARK TRL AT W HIDDEN CRK PKWY T

O THE SE, WARREN ST TO THE EASTPROJECT CONST BIKE/PED IMPPROVEMENTS IN PROXIMITY TO JW NORWOOD ELEM SCHOOL, KERR MIDDLE MPO PROJ NUM 40064

DESCR SCHOOL, AND CROSSROADS H.S., INCLUDING SHARED USE PATHS, BIKEWAYS, BIKE/PED SIG FUNDING CAT(S) 9TAPNALS, CROSSWALKS, BIKE/PED BRIDGE OVER TOWN CREEK, SIGNAGE, AND SIDEWALKS

REMARKS PROJECT 2017 TA SET-ASIDE CALL FOR PROJECTS; FUNDING SHOWN AS 9TAP7 HISTORY P IN ESTIP PER TXDOT TPP SINCE 9TA IS NOT A FUNDING CATEG

ORY OPTION IN THE ESTIP TOTAL PROJECT COST INFORMATION

PREL ENG $ 97,785ROW PURCH $ 0 COST OF

CONSTR $ 1,955,704 APPROVEDCONST ENG $ 97,785 PHASES

CONTING $ 31,107 $ 2,151,274INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,182,381

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 1,721,019 $ 0 $ 0 $ 430,255 $ 0 $ 2,151,274TOTAL $ 1,721,019 $ 0 $ 0 $ 430,255 $ 0 $ 2,151,274

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG 0902-00-208 2019 VA C VARIOUS $ 65,000LIMITS FROM LAND USE TRANSPORTATION CONNECTIONS TO SUSTAINABLE SCHOOLS PLANNING PROJECPROJECT SPONSOR NCTCOG

REVISION DATE 07/2018T; CREATE A REGIONAL PROGRAM ANDLIMITS TO IMPLEMENTATION PLAN FOR MULTIMODAL TRANSPORTATION OPTIONS, SCHOOL SITING,

SAFETY AND COORDINATION BETWEEN SCHOOLSPROJECT INCLUDES DATA COLLECTION & PERFORMANCE MEASURE TRACKING, COORDINATION RE. SCHOOL MPO PROJ NUM 25004

DESCR SITING, SAFE ROUTES TO SCHOOL, IMPL OF REGIONAL WORKING GROUP, SAFETY & EDUCATI FUNDING CAT(S) 7,OtherON INFO DISSEMINATION & OFFERING TRAINING OPPS FOR STAKEHOLDERS

REMARKS PROJECT 13,000 OF TRANSPORTATION DEVELOPMENT CREDITS (CAT 3 - TDCP7 HISTORY [MPO]) UTILIZED IN LIEU OF A LOCAL MATCH AND ARE NOT CAL

CULATED IN FUNDING TOTAL TOTAL PROJECT COST INFORMATION

PREL ENG $ 300,000ROW PURCH $ 0 COST OF

CONSTR $ 65,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 65,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 365,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 65,000 $ 0 $ 0 $ 0 $ 0 $ 65,000Other $ 0 $ 0 $ 0 $ 0 $ 0 $ 0TOTAL $ 65,000 $ 0 $ 0 $ 0 $ 0 $ 65,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0902-90-085 2019 VA E,ENG ARLINGTON $ 155,020LIMITS FROM JULIA BURGEN LINEAR PARK TRAIL SYSTEM; FROM THE EXISTING PATH EAST OF MARY PROJECT SPONSOR ARLINGTON

REVISION DATE 07/2018STREETLIMITS TO S. PECAN STREETPROJECT CONSTRUCT NEW SHARED-USE PATH FOR BICYCLISTS AND PEDESTRIANS OVER TRADING HORSE MPO PROJ NUM 40065

DESCR TRIBUTARY FUNDING CAT(S) 9TAPREMARKS PROJECT 2017 TA SET-ASIDE CALL FOR PROJECTS; TOTAL PROJECT FUNDIN

P7 HISTORY G SPLIT 50% FEDERAL/50% LOCAL; FUNDING SHOWN AS 9TAP IN ESTIP PER TXDOT TPP SINCE 9TA IS NOT A FUNDING CATEGORY OPTION IN THE ESTIP

TOTAL PROJECT COST INFORMATIONPREL ENG $ 155,020

ROW PURCH $ 0 COST OFCONSTR $ 880,791 APPROVED

CONST ENG $ 49,325 PHASESCONTING $ 13,133 $ 155,020INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,098,269

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 124,016 $ 0 $ 0 $ 31,004 $ 0 $ 155,020TOTAL $ 124,016 $ 0 $ 0 $ 31,004 $ 0 $ 155,020

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 339: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 339 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0902-90-084 2019 VA E,ENG FORT WORTH $ 48,986LIMITS FROM CC MOSS ELEM, BOUNDED BY MARTIN LUTHER KING JR FWY TO THE SW, PATE DR TO T PROJECT SPONSOR FORT WORTH

REVISION DATE 07/2018HE E, E BERRY ST TO THE NLIMITS TO ML PHILLIPS ELEM BOUNDED BY CAMP BOWIE BLVD TO THE SE; WINTHROP AVE TO THE

E, CALMONT AVE TO THE N, LACKLAND RD TO THE WPROJECT CONSTRUCT AND RECONSTRUCT SIDEWALKS, CROSSWALKS, SIGNAGE, BICYCLE/PEDESTRIAN SIG MPO PROJ NUM 40062

DESCR NALS, AND BIKEWAYS (SAFE ROUTES TO SCHOOLS FOR 2 SCHOOLS IN THE SOUTH DISTRICT) FUNDING CAT(S) 9TAPREMARKS PROJECT 2017 TA SET-ASIDE CALL FOR PROJECTS; FUNDING SHOWN AS 9TA

P7 HISTORY P IN ESTIP PER TXDOT TPP SINCE 9TA IS NOT A FUNDING CATEGORY OPTION IN THE ESTIP

TOTAL PROJECT COST INFORMATIONPREL ENG $ 48,986

ROW PURCH $ 0 COST OFCONSTR $ 1,279,170 APPROVED

CONST ENG $ 48,986 PHASESCONTING $ 16,556 $ 48,986INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,393,698

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 39,189 $ 0 $ 0 $ 9,797 $ 0 $ 48,986TOTAL $ 39,189 $ 0 $ 0 $ 9,797 $ 0 $ 48,986

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0902-90-083 2019 VA E,ENG FORT WORTH $ 144,819LIMITS FROM D MCRAE ELEM BOUNDED BY AVE J TO THE N, S AYERS AVE TO THE E, LITTLEJOHN A PROJECT SPONSOR FORT WORTH

REVISION DATE 07/2018VE TO THE S, THRALL ST TO THE W; DAGGETT ELEMLIMITS TO BOUNDED BY WILLING/FAIRMOUNT AVE TO THE W, W RICHMOND AVE TO THE N, HEMPHI

LL ST TO THE E, CANTEY ST TO THE SPROJECT CONSTRUCT AND RECONSTRUCT SIDEWALKS, CROSSWALKS, SIGNAGE, BICYCLE/PEDESTRIAN SIG MPO PROJ NUM 40063

DESCR NALS, AND BIKEWAYS (SAFE ROUTES TO SCHOOLS FOR 2 SCHOOLS IN THE SOUTH DISTRICT) FUNDING CAT(S) 9TAPREMARKS LOCAL CONTRIBUTION PAID BY CITY OF FORT WORTH PROJECT 2017 TA SET-ASIDE CALL FOR PROJECTS; FUNDING SHOWN AS 9TA

P7 HISTORY P IN ESTIP PER TXDOT TPP SINCE 9TA IS NOT A FUNDING CATEGORY OPTION IN THE ESTIP

TOTAL PROJECT COST INFORMATIONPREL ENG $ 144,819

ROW PURCH $ 0 COST OFCONSTR $ 1,517,494 APPROVED

CONST ENG $ 45,893 PHASESCONTING $ 17,345 $ 144,819INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,725,551

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 115,855 $ 0 $ 0 $ 28,964 $ 0 $ 144,819TOTAL $ 115,855 $ 0 $ 0 $ 28,964 $ 0 $ 144,819

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0902-90-080 2019 CS E,ENG NORTH RICHLAND HILLS$ 51,984LIMITS FROM SMITHFIELD MIDDLE SCHOOL BOUNDED BY DAVIS BLVD TO THE WEST, AMUNDSON DR TOPROJECT SPONSOR NORTH RICHLAND HILLS

REVISION DATE 07/2018THE NORTHWEST AND TO THE NORTHLIMITS TO CRANE RD TO THE EAST, AND MID CITIES BLVD TO THE SOUTHPROJECT SAFE ROUTES TO SCHOOL PEDESTRIAN IMPROVEMENTS IN PROXIMITY TO SMITHFIELD MIDDLE MPO PROJ NUM 40056

DESCR SCHOOL INCLUDING NEW CROSSWALKS, SIGNAGE, AND SIDEWALK SPOT IMPROVEMENTS TO COMP FUNDING CAT(S) 5LETE EXISTING NETWORK GAPS

REMARKS PROJECT 2017 TA SET-ASIDE CALL FOR PROJECTSP7 HISTORY

TOTAL PROJECT COST INFORMATIONPREL ENG $ 51,984

ROW PURCH $ 0 COST OFCONSTR $ 199,940 APPROVED

CONST ENG $ 11,997 PHASESCONTING $ 3,268 $ 51,984INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 267,189

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 41,587 $ 0 $ 0 $ 10,397 $ 0 $ 51,984TOTAL $ 41,587 $ 0 $ 0 $ 10,397 $ 0 $ 51,984

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 340: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 340 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0902-90-079 2019 CS E,ENG NORTH RICHLAND HILLS$ 148,574LIMITS FROM NRH ACTIVE TRANSPORTATION PROJECTS FOR TRAIL/ON-ROAD BOUNDED BY NORTH TARRPROJECT SPONSOR NORTH RICHLAND HILLS

REVISION DATE 07/2018ANT PARKWAY TO THE NORTHLIMITS TO PRECINCT LINE ROAD TO THE EAST, GLENVIEW DRIVE TO THE SOUTH, SUNCREST DRIV

E TO THE WESTPROJECT CONSTRUCT BIKE/PED SAFETY IMPROVEMENTS INCL INSTALLING FLASHING BEACONS, BIKE/PE MPO PROJ NUM 40055

DESCR D SIGNALS, CROSSWALKS, SIGNAGE, SIDEWALKS, BIKEWAYS, REFUGE ISLANDS AT INTERSECT FUNDING CAT(S) 9TAPIONS, AND SHARED USE PATH FROM EXISTING COTTON BELT TRAIL TO EXISTING JOHN BARFIELD TRAIL

REMARKS PROJECT 2017 TA SET-ASIDE CALL FOR PROJECTS; FUNDING SHOWN AS 9TAP7 HISTORY P IN ESTIP PER TXDOT TPP SINCE 9TA IS NOT A FUNDING CATEG

ORY OPTION IN THE ESTIP TOTAL PROJECT COST INFORMATION

PREL ENG $ 148,574ROW PURCH $ 0 COST OF

CONSTR $ 587,970 APPROVEDCONST ENG $ 35,074 PHASES

CONTING $ 9,554 $ 148,574INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 781,172

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 118,859 $ 0 $ 0 $ 29,715 $ 0 $ 148,574TOTAL $ 118,859 $ 0 $ 0 $ 29,715 $ 0 $ 148,574

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG PARKER 0902-38-128 2019 CS E,ENG ALEDO $ 170,978LIMITS FROM ALONG OLD ANNETTA RD AND FM 1187 FROM OLD TUNNEL RD TO VANDAGRIFF ELEM SCHPROJECT SPONSOR ALEDO

REVISION DATE 07/2018OOLLIMITS TOPROJECT SAFE ROUTES TO SCHOOL; CONSTRUCT PEDESTRIAN IMPROVEMENTS INCLUDING SIDEWALKS, CR MPO PROJ NUM 40057

DESCR OSSWALKS, PEDESTRIAN SIGNALS, AND SIGNAGE FUNDING CAT(S) 5REMARKS COST OF APPROVED PHASES INCLUDES CE COST PROJECT 2017 TA SET-ASIDE CALL FOR PROJECTS

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 170,978ROW PURCH $ 0 COST OF

CONSTR $ 823,992 APPROVEDCONST ENG $ 47,380 PHASES

CONTING $ 12,695 $ 170,978INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,055,045

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 136,782 $ 0 $ 0 $ 34,196 $ 0 $ 170,978TOTAL $ 136,782 $ 0 $ 0 $ 34,196 $ 0 $ 170,978

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0353-03-100 2019 SH 114 E,ENG VARIOUS $ 2,000,000LIMITS FROM FM 1938 PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO DOVE RDPROJECT CONSTRUCT 0 TO 2 LANE EB FRONTAGE ROAD FROM FM 1938 TO SOLANA/KIRKWOOD AND CONST MPO PROJ NUM 13006

DESCR RUCT 0 TO 2 LANE WB AND 0 TO 2 LANE EB FRONTAGE ROADS FROM SOLANA/KIRKWOOD TO DO FUNDING CAT(S) SBPEVE

REMARKS PROJECT 10 YEAR PLAN PROJECTP7 HISTORY

TOTAL PROJECT COST INFORMATIONPREL ENG $ 2,000,000

ROW PURCH $ 0 COST OFCONSTR $ 33,000,000 APPROVED

CONST ENG $ 1,869,381 PHASESCONTING $ 431,984 $ 2,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 37,301,365

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 2,000,000 $ 0 $ 0 $ 0 $ 2,000,000TOTAL $ 0 $ 2,000,000 $ 0 $ 0 $ 0 $ 2,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 341: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 341 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0171-05-094 2019 SH 199 E,ENG,R,ACQ VARIOUS $ 10,500,000LIMITS FROM IH 820 PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO WEST FORK OF TRINITY RIVERPROJECT RECONSTRUCT 4/6 TO 4/6 LANE DIVIDED URBAN MPO PROJ NUM 13037

DESCR FUNDING CAT(S) S102,SBPEREMARKS PROJECT 10 YEAR PLAN PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 10,000,000ROW PURCH $ 500,000 COST OF

CONSTR $ 100,000,000 APPROVEDCONST ENG $ 3,925,519 PHASES

CONTING $ 40,056 $ 10,500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 114,465,575

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 8,000,000 $ 2,000,000 $ 0 $ 0 $ 0 $ 10,000,000S102 $ 0 $ 500,000 $ 0 $ 0 $ 0 $ 500,000TOTAL $ 8,000,000 $ 2,500,000 $ 0 $ 0 $ 0 $ 10,500,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DENTON 0816-02-072 2019 FM 455 R,ACQ VARIOUS $ 16,100,000LIMITS FROM WEST OF FM 2450 PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO EAST OF MARION RDPROJECT RECONSTRUCT AND WIDEN TWO LANE RURAL TO FOUR LANE URBAN DIVIDED MPO PROJ NUM 83255

DESCR FUNDING CAT(S) S102REMARKS PROJECT R PHASE IN FY 2019 IS FOR $16,100,000 FOR ROW; R PHASE IN

P7 HISTORY FY 2020 IS FOR $2,000,000 FOR UTILITIES; PART OF REGIONAL 10 YEAR PLAN

TOTAL PROJECT COST INFORMATIONPREL ENG $ 3,000,000

ROW PURCH $ 18,100,000 COST OFCONSTR $ 42,817,890 APPROVED

CONST ENG $ 2,035,687 PHASESCONTING $ 816,737 $ 16,100,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 66,770,314

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALS102 $ 12,880,000 $ 1,610,000 $ 0 $ 1,610,000 $ 0 $ 16,100,000TOTAL $ 12,880,000 $ 1,610,000 $ 0 $ 1,610,000 $ 0 $ 16,100,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG KAUFMAN 0197-03-074 2019 US 175 C SEAGOVILLE $ 2,163,000LIMITS FROM DALLAS COUNTY LINE PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO WEST OF FM 1389PROJECT RAMP MODIFICATIONS MPO PROJ NUM 55134

DESCR FUNDING CAT(S) 2MREMARKS PROJECT PART OF REGIONAL 10 YEAR PLAN

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 200,000ROW PURCH $ 0 COST OF

CONSTR $ 2,163,000 APPROVEDCONST ENG $ 101,712 PHASES

CONTING $ 23,504 $ 2,163,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,488,216

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 1,730,400 $ 432,600 $ 0 $ 0 $ 0 $ 2,163,000TOTAL $ 1,730,400 $ 432,600 $ 0 $ 0 $ 0 $ 2,163,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 342: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 342 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0197-02-124 2019 US 175 C,R,UTL SEAGOVILLE $ 4,163,200LIMITS FROM EAST OF E. MALLOY BRIDGE RD PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO KAUFMAN COUNTY LINEPROJECT RAMP MODIFICATIONS MPO PROJ NUM 55120

DESCR FUNDING CAT(S) 2M,S102REMARKS PROJECT 10-YEAR PLAN PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 106,000ROW PURCH $ 2,000,000 COST OF

CONSTR $ 2,163,200 APPROVEDCONST ENG $ 101,712 PHASES

CONTING $ 23,504 $ 4,163,200INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 4,394,416

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 1,730,560 $ 432,640 $ 0 $ 0 $ 0 $ 2,163,200S102 $ 1,600,000 $ 200,000 $ 0 $ 200,000 $ 0 $ 2,000,000TOTAL $ 3,330,560 $ 632,640 $ 0 $ 200,000 $ 0 $ 4,163,200

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DENTON 0135-10-057 2019 US 377/US 380R,ACQ DENTON $ 3,000,000LIMITS FROM SL 288 PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO US 377/US 380 INTERSECTIONPROJECT ADD RAISED MEDIAN WITH LEFT TURN LANES, ADD RIGHT TURN LANES AND RESTRIPE FOR SH MPO PROJ NUM 55104

DESCR ARED USE FUNDING CAT(S) S102REMARKS LOCAL CONTRIBUTION BY CITY OF DENTON; CMAQ FOR SHAR PROJECT R PHASE IN FY 2019 IS FOR $3,000,000 FOR ROW; R PHASE IN

P7 ED-USE PATH HISTORY FY 2020 IS FOR $2,000,000 FOR UTILITIES; PART OF REGIONAL10 YEAR PLAN

TOTAL PROJECT COST INFORMATIONPREL ENG $ 904,000

ROW PURCH $ 5,000,000 COST OFCONSTR $ 18,599,014 APPROVED

CONST ENG $ 879,830 PHASESCONTING $ 352,996 $ 3,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 25,735,840

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALS102 $ 2,400,000 $ 300,000 $ 0 $ 300,000 $ 0 $ 3,000,000TOTAL $ 2,400,000 $ 300,000 $ 0 $ 300,000 $ 0 $ 3,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0092-14-088 2019 IH 45 C DALLAS $ 26,327,302LIMITS FROM LENWAY ST PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO GOOD LATIMERPROJECT RECONSTRUCT IH 45 AND SM WRIGHT INTERCHANGE (PHASE 2B) MPO PROJ NUM 55067

DESCR FUNDING CAT(S) 2MREMARKS PROJECT 0092-14-909; 10-YEAR PLAN PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,100,000ROW PURCH $ 4,200,000 COST OF

CONSTR $ 26,327,302 APPROVEDCONST ENG $ 1,141,596 PHASES

CONTING $ 727,798 $ 26,327,302INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 34,496,696

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 21,061,842 $ 5,265,460 $ 0 $ 0 $ 0 $ 26,327,302TOTAL $ 21,061,842 $ 5,265,460 $ 0 $ 0 $ 0 $ 26,327,302

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 343: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 343 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0092-01-059 2019 VA C DALLAS $ 10,100,000LIMITS FROM ON SH 310/SM WRIGHT INTERCHANGE FROM PENNSYLVANIA AVENUE PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO NORTH OF AL LIPSCOMB WAYPROJECT RECONSTRUCT IH 45 AND SM WRIGHT INTERCHANGE (PHASE 2B) MPO PROJ NUM 55065

DESCR FUNDING CAT(S) 2MREMARKS PROJECT 0092-01-919; 10-YEAR PLAN PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 500,000ROW PURCH $ 7,500,000 COST OF

CONSTR $ 10,100,000 APPROVEDCONST ENG $ 449,350 PHASES

CONTING $ 286,472 $ 10,100,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 18,835,822

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 8,080,000 $ 2,020,000 $ 0 $ 0 $ 0 $ 10,100,000TOTAL $ 8,080,000 $ 2,020,000 $ 0 $ 0 $ 0 $ 10,100,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG KAUFMAN 0197-03-054 2019 US 175 R,ACQ,UTL CRANDALL $ 3,500,000LIMITS FROM FM 148 PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO CR 4106 IN CRANDALLPROJECT CONSTRUCT NEW 2-LANE FRONTAGE ROADS; CONVERT EXISTING FRONTAGE ROAD FROM 2-LANE MPO PROJ NUM 51460

DESCR 2-WAY TO 2-LANE 1-WAY FRONTAGE ROAD & RAMP MODIFICATIONS FUNDING CAT(S) S102REMARKS PROJECT PART OF REGIONAL 10 YEAR PLAN

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,733,000ROW PURCH $ 3,500,000 COST OF

CONSTR $ 12,925,618 APPROVEDCONST ENG $ 608,995 PHASES

CONTING $ 155,356 $ 3,500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 19,922,969

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALS102 $ 2,800,000 $ 350,000 $ 0 $ 350,000 $ 0 $ 3,500,000TOTAL $ 2,800,000 $ 350,000 $ 0 $ 350,000 $ 0 $ 3,500,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG ELLIS 0172-05-115 2019 US 287 C,R,UTL WAXAHACHIE $ 28,700,000LIMITS FROM AT WALNUT GROVE ROAD PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TOPROJECT RECONSTRUCT INTERSECTION MPO PROJ NUM 35001

DESCR FUNDING CAT(S) 4,S102REMARKS PROJECT PART OF REGIONAL 10 YEAR PLAN; R PHASE IN FY 2017 IS FOR

P7 HISTORY $366,000 FOR ROW; R PHASE IN FY 2019 IS FOR $2,000,000 FOR UTILITIES

TOTAL PROJECT COST INFORMATIONPREL ENG $ 1,500,000

ROW PURCH $ 2,366,000 COST OFCONSTR $ 26,700,000 APPROVED

CONST ENG $ 1,310,824 PHASESCONTING $ 835,685 $ 28,700,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 32,712,509

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 21,360,000 $ 5,340,000 $ 0 $ 0 $ 0 $ 26,700,000S102 $ 1,600,000 $ 200,000 $ 0 $ 200,000 $ 0 $ 2,000,000TOTAL $ 22,960,000 $ 5,540,000 $ 0 $ 200,000 $ 0 $ 28,700,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 344: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 344 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0430-01-057 2019 SH 352 C SUNNYVALE $ 11,016,700LIMITS FROM NORTH OF KEARNEY STREET PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO US 80 EB FRONTAGE ROADPROJECT RECONSTRUCT 4 LANE UNDIVIDED RURAL TO 4 LANE DIVIDED URBAN ROADWAY WITH INTERSEC MPO PROJ NUM 35000

DESCR TION AND SIDEWALK IMPROVEMENTS FUNDING CAT(S) 2M,5,11,12REMARKS CMAQ FUNDS ARE FOR INTERSECTION IMPROVEMENTS AND PEPROJECT 10-YEAR PLAN PROJECT (PREVIOUSLY A PROPOSITION 1 COMMITME

P7 DESTRIAN IMPROVEMENTS HISTORY NT); CAT 12 FUNDS FROM MPO/TDC REVOLVER SWAP TOTAL PROJECT COST INFORMATION

PREL ENG $ 500,000ROW PURCH $ 3,000,000 COST OF

CONSTR $ 11,016,700 APPROVEDCONST ENG $ 546,545 PHASES

CONTING $ 219,279 $ 11,016,700INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 15,282,524

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 6,320,000 $ 1,580,000 $ 0 $ 0 $ 0 $ 7,900,0005 $ 561,360 $ 140,340 $ 0 $ 0 $ 0 $ 701,70011 $ 320,000 $ 80,000 $ 0 $ 0 $ 0 $ 400,00012 $ 1,612,000 $ 403,000 $ 0 $ 0 $ 0 $ 2,015,000TOTAL $ 8,813,360 $ 2,203,340 $ 0 $ 0 $ 0 $ 11,016,700

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG 0918-00-912 2019 VA T VARIOUS $ 12,500,000LIMITS FROM COTTON BELT RAIL LINE FROM DFW AIRPORT STATION PROJECT SPONSOR DART

REVISION DATE 07/2018LIMITS TO SHILOH STATION IN PLANOPROJECT ENGINEERING, ENVIRONMENTAL, AND CONSTRUCTION OF COTTON BELT REGIONAL RAIL PROJEC MPO PROJ NUM 14006

DESCR T (COTTON BELT PROJECT #4) FUNDING CAT(S) 5REMARKS RELATED TO TIP 14005, 14013, 83245, AND 14004 PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 12,500,000 APPROVEDCONST ENG $ 927,500 PHASES

CONTING $ 397,500 $ 12,500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 13,825,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 10,000,000 $ 0 $ 0 $ 2,500,000 $ 0 $ 12,500,000TOTAL $ 10,000,000 $ 0 $ 0 $ 2,500,000 $ 0 $ 12,500,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG 0918-00-910 2019 VA T VARIOUS $ 21,281,250LIMITS FROM COTTON BELT RAIL LINE FROM DFW AIRPORT STATION PROJECT SPONSOR DART

REVISION DATE 07/2018LIMITS TO SHILOH STATION IN PLANOPROJECT ENGINEERING, ENVIRONMENTAL, AND CONSTRUCTION FOR COTTON BELT REGIONAL RAIL PROJE MPO PROJ NUM 14005

DESCR CT (COTTON BELT PROJECT #2) FUNDING CAT(S) 5REMARKS RELATED TO TIP 14006, 14013, 83245, AND 14004 PROJECT PART OF DART/RTC TRIP FUNDING PARTNERSHIP; PHASE 1

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 21,281,250 APPROVEDCONST ENG $ 744,844 PHASES

CONTING $ 319,219 $ 21,281,250INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 22,345,313

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 17,025,000 $ 0 $ 0 $ 4,256,250 $ 0 $ 21,281,250TOTAL $ 17,025,000 $ 0 $ 0 $ 4,256,250 $ 0 $ 21,281,250

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 345: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 345 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-239 2019 CS E,ENG LANCASTER $ 1,316,563LIMITS FROM JEFFERSON ST FROM WINTERGREEN RD TO PLEASANT RUN RD AND PLEASANT RUN RD FRPROJECT SPONSOR DALLAS CO

REVISION DATE 07/2018OM JEFFERSON STLIMITS TO LANCASTER-HUTCHINS RDPROJECT WIDEN AND RECONSTRUCT 2 LANE UNDIVIDED RURAL TO 4 LANE DIVIDED URBAN MPO PROJ NUM 14003

DESCR FUNDING CAT(S) 7REMARKS CHANGE CSJ FROM 0918-45-917 TO 0918-47-239 PROJECT 2017-2018 CMAQ/STBG PROJECT SELECTION/STRATEGIC PARTNERSH

P7 HISTORY IPS; ENGINEERING INCLUDES DIRECT STATE COSTS TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,316,563ROW PURCH $ 822,882 COST OF

CONSTR $ 8,385,555 APPROVEDCONST ENG $ 549,994 PHASES

CONTING $ 220,663 $ 1,316,563INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 11,295,657

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 1,053,250 $ 0 $ 0 $ 263,313 $ 0 $ 1,316,563TOTAL $ 1,053,250 $ 0 $ 0 $ 263,313 $ 0 $ 1,316,563

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-208 2019 CS E,ENG VARIOUS $ 2,239,442LIMITS FROM ON WINTERGREEN RD FROM JEFFERSON STREET PROJECT SPONSOR DALLAS CO

REVISION DATE 07/2018LIMITS TO WEST OF CARPENTER ROADPROJECT RECONSTRUCT AND WIDEN 2 LANE UNDIVIDED RURAL TO 4 LANE DIVIDED URBAN MPO PROJ NUM 14002

DESCR FUNDING CAT(S) 7REMARKS ENGINEERING PHASE INCLUDES DIRECT STATE COSTS PROJECT PLANNING CSJ 0918-45-997; 2017-2018 CMAQ/STBG PROJECT SEL

P7 HISTORY ECTION/STRATEGIC PARTNERSHIPS TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,239,442ROW PURCH $ 1,400,000 COST OF

CONSTR $ 13,860,558 APPROVEDCONST ENG $ 989,101 PHASES

CONTING $ 396,837 $ 2,239,442INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 18,885,938

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 1,791,554 $ 0 $ 0 $ 447,888 $ 0 $ 2,239,442TOTAL $ 1,791,554 $ 0 $ 0 $ 447,888 $ 0 $ 2,239,442

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0009-02-067 2019 SH 78 E,ENG,R,ACQ,UTLDALLAS $ 3,500,000LIMITS FROM AT GASTON AVE PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TOPROJECT RECONFIGURE INTERSECTION WITH SIDEWALK IMPROVEMENTS MPO PROJ NUM 13032

DESCR FUNDING CAT(S) S102,SBPEREMARKS PROJECT 10-YEAR PLAN PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 500,000ROW PURCH $ 3,000,000 COST OF

CONSTR $ 5,500,000 APPROVEDCONST ENG $ 232,467 PHASES

CONTING $ 148,204 $ 3,500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 9,380,671

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 500,000 $ 0 $ 0 $ 0 $ 500,000S102 $ 2,400,000 $ 300,000 $ 0 $ 300,000 $ 0 $ 3,000,000TOTAL $ 2,400,000 $ 800,000 $ 0 $ 300,000 $ 0 $ 3,500,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 346: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 346 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0902-90-107 2019 VA C ARLINGTON $ 437,500LIMITS FROM TEXAS AUTOMATED VEHICLE PROVING GROUND IN ARLINGTON PROJECT SPONSOR ARLINGTON

REVISION DATE 07/2018LIMITS TOPROJECT DEPLOY AUTOMATED, ELECTRIC, SHUTTLE SERVICE IN UNIVERSITY AND RESIDENTIAL/COMMER MPO PROJ NUM 11676

DESCR CIAL ENVIRONMENTS TO REDUCE AUTO TRIPS TO/AROUND CAMPUS, SUPPORT REMOTE PARKING FUNDING CAT(S) 5LOTS, PROVIDE MOBILITY OPTIONS FOR PEDESTRIANS/DISABLED (NEW TRANSIT SERVICE)

REMARKS REVISE CSJ FROM 0902-90-939 TO 0902-90-107 PROJECT PREVIOUS CSJ 0902-90-939P7 HISTORY

TOTAL PROJECT COST INFORMATIONPREL ENG $ 0

ROW PURCH $ 0 COST OFCONSTR $ 437,500 APPROVED

CONST ENG $ 0 PHASESCONTING $ 0 $ 437,500INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 437,500

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 350,000 $ 0 $ 0 $ 87,500 $ 0 $ 437,500TOTAL $ 350,000 $ 0 $ 0 $ 87,500 $ 0 $ 437,500

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-971 2019 CS E,ENG DALLAS $ 3,602,950LIMITS FROM ON PRAIRIE CREEK RD FROM N OF MILITARY PKWY PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO NORTH OF FORNEY ROADPROJECT CONSTRUCT GRADE SEPARATION OVER UPRR MPO PROJ NUM 14000

DESCR FUNDING CAT(S) 3LC,10REMARKS LOCAL CONTRIBUTION TO BE PAID BY THE CITY OF DALLAS PROJECT 2017-2018 CMAQ/STBG PROJECT SELECTION/LOCAL BOND PROGRAM

P7 AND DALLAS COUNTY; CATEGORY 10 IS EARMARK FUNDING HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 3,602,950ROW PURCH $ 4,200,000 COST OF

CONSTR $ 13,313,653 APPROVEDCONST ENG $ 137,559 PHASES

CONTING $ 31,788 $ 3,602,950INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 21,285,950

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 1,600,000 $ 1,600,00010 $ 1,602,360 $ 0 $ 0 $ 400,590 $ 0 $ 2,002,950TOTAL $ 1,602,360 $ 0 $ 0 $ 400,590 $ 1,600,000 $ 3,602,950

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG 0902-90-074 2019 VA E,ENV VARIOUS $ 5,000,000LIMITS FROM DFW CORE EXPRESS HIGH SPEED RAIL PROJECT SPONSOR NCTCOG

REVISION DATE 07/2018LIMITS TO FROM DALLAS TO FORT WORTHPROJECT COMPLETION OF THE DFW CORE EXPRESS SERVICE HIGH-SPEED RAIL PROJECT ENVIRONMENTAL MPO PROJ NUM 11674

DESCR PROCESS; INCLUDES COG STAFF TIME AND CONSULTANT ASSISTANCE FUNDING CAT(S) 7,OtherREMARKS PROJECT 1,000,000 OF TRANSPORTATION DEVELOPMENT CREDITS (CAT 3 -

P7 HISTORY TDC [MPO]) UTILIZED IN LIEU OF A LOCAL MATCH ARE NOT CALCULATED IN FUNDING TOTAL; PRIOR CSJ 0902-90-944

TOTAL PROJECT COST INFORMATIONPREL ENG $ 5,000,000

ROW PURCH $ 0 COST OFCONSTR $ 0 APPROVED

CONST ENG $ 0 PHASESCONTING $ 0 $ 5,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 5,000,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 5,000,000 $ 0 $ 0 $ 0 $ 0 $ 5,000,000Other $ 0 $ 0 $ 0 $ 0 $ 0 $ 0TOTAL $ 5,000,000 $ 0 $ 0 $ 0 $ 0 $ 5,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 347: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 347 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG COLLIN 0000-18-079 2019 DNT C,E,ENV PROSPER $ 91,468,983LIMITS FROM AT US 380 PROJECT SPONSOR NTTA

REVISION DATE 07/2018LIMITS TOPROJECT CONSTRUCT OVERPASS AT US 380 AND RAMPS TO NB AND SB FRONTAGE ROADS MPO PROJ NUM 84146

DESCR FUNDING CAT(S) 3LCREMARKS LOCAL CONTRIBUTION TO BE PAID BY NTTA PROJECT E PHASE IN FY2018 IS $5,567,069 FOR ENG; E PHASE IN FY201

P7 HISTORY 9 IS $350,000 FOR ENV TOTAL PROJECT COST INFORMATION

PREL ENG $ 5,917,069ROW PURCH $ 0 COST OF

CONSTR $ 91,118,983 APPROVEDCONST ENG $ 3,189,164 PHASES

CONTING $ 1,366,785 $ 91,468,983INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 101,592,001

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 91,468,983 $ 91,468,983TOTAL $ 0 $ 0 $ 0 $ 0 $ 91,468,983 $ 91,468,983

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0000-18-078 2019 PGBT-WE C GRAND PRAIRIE $ 31,377,079LIMITS FROM SH 183 PROJECT SPONSOR NTTA

REVISION DATE 07/2018LIMITS TO IH 20PROJECT WIDEN PGBT WE TOLLWAY FROM 6 TO 8 LANES BETWEEN SH 183 AND IH 30 AND 4 TO 8 LANE MPO PROJ NUM 84145

DESCR S BETWEEN IH 20 AND IH 30 FUNDING CAT(S) 3LCREMARKS LOCAL CONTRIBUTION TO BE PAID BY NTTA PROJECT C IN FY 2019 IS FOR CONSTRUCTION; C IN FY 2020 IS FOR CON

P7 HISTORY STRUCTION ENGINEERING TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,517,243ROW PURCH $ 0 COST OF

CONSTR $ 31,377,079 APPROVEDCONST ENG $ 15,688,539 PHASES

CONTING $ 470,656 $ 31,377,079INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 50,053,517

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 31,377,079 $ 31,377,079TOTAL $ 0 $ 0 $ 0 $ 0 $ 31,377,079 $ 31,377,079

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0000-18-077 2019 PGBT C VARIOUS $ 22,307,423LIMITS FROM IH 35E PROJECT SPONSOR NTTA

REVISION DATE 07/2018LIMITS TO BELT LINE ROAD (IRVING)PROJECT WIDEN EXISTING TOLLWAY FROM 6 TO 8 LANES MPO PROJ NUM 84141

DESCR FUNDING CAT(S) 3LCREMARKS LOCAL CONTRIBUTION BY NTTA PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,432,614ROW PURCH $ 0 COST OF

CONSTR $ 22,307,423 APPROVEDCONST ENG $ 780,760 PHASES

CONTING $ 334,611 $ 22,307,423INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 25,855,408

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 22,307,423 $ 22,307,423TOTAL $ 0 $ 0 $ 0 $ 0 $ 22,307,423 $ 22,307,423

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 348: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 348 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG KAUFMAN 0522-01-023 2019 SH 243 E,ENG KAUFMAN $ 50,000LIMITS FROM AT FM 2515 AND FM 2727 PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TOPROJECT INTERSECTION IMPROVEMENT MPO PROJ NUM 83277

DESCR FUNDING CAT(S) SBPEREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 50,000ROW PURCH $ 0 COST OF

CONSTR $ 766,471 APPROVEDCONST ENG $ 35,948 PHASES

CONTING $ 22,918 $ 50,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 875,337

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 50,000 $ 0 $ 0 $ 0 $ 50,000TOTAL $ 0 $ 50,000 $ 0 $ 0 $ 0 $ 50,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0014-02-050 2019 IH 35W E,ENG FORT WORTH $ 35,180,486LIMITS FROM IH 20 PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO SH 174PROJECT RECONSTRUCT AND WIDEN 6 TO 10 LANES FROM IH 20 TO FM 1187 AND RECONSTRUCT AND WI MPO PROJ NUM 55208

DESCR DEN 6 TO 8 LANES FROM FM 1187 TO SH 174 FUNDING CAT(S) SBPEREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 35,180,486ROW PURCH $ 48,200,000 COST OF

CONSTR $ 679,342,456 APPROVEDCONST ENG $ 33,219,846 PHASES

CONTING $ 7,676,569 $ 35,180,486INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 803,619,357

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 35,180,486 $ 0 $ 0 $ 0 $ 35,180,486TOTAL $ 0 $ 35,180,486 $ 0 $ 0 $ 0 $ 35,180,486

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0092-02-125 2019 IH 45 E,ENG HUTCHINS $ 75,000LIMITS FROM AT DOWDY FERRY RD PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TOPROJECT INTERSECTION IMPROVEMENTS MPO PROJ NUM 55206

DESCR FUNDING CAT(S) SBPEREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 75,000ROW PURCH $ 0 COST OF

CONSTR $ 1,909,164 APPROVEDCONST ENG $ 89,540 PHASES

CONTING $ 57,084 $ 75,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,130,788

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 75,000 $ 0 $ 0 $ 0 $ 75,000TOTAL $ 0 $ 75,000 $ 0 $ 0 $ 0 $ 75,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 349: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 349 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG COLLIN 0816-04-101 2019 FM 455 C ANNA $ 2,300,000LIMITS FROM US 75 PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO CR 286PROJECT RECONSTRUCT AND WIDEN 2 LANE RURAL TO 4 LANE DIVIDED MPO PROJ NUM 35004

DESCR FUNDING CAT(S) 4REMARKS CAT 4-PROP 1 PROJECT 10-YEAR PLAN PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 113,409ROW PURCH $ 0 COST OF

CONSTR $ 2,300,000 APPROVEDCONST ENG $ 114,798 PHASES

CONTING $ 46,058 $ 2,300,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,574,265

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 0 $ 2,300,000 $ 0 $ 0 $ 0 $ 2,300,000TOTAL $ 0 $ 2,300,000 $ 0 $ 0 $ 0 $ 2,300,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 2266-02-148 2019 SH 360 E,ENG,R,ACQ ARLINGTON $ 3,465,000LIMITS FROM NORTH OF E RANDOL MILL RD PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO SOUTH OF E RANDOL MILL RDPROJECT RECONSTRUCT 6 TO 8 MAIN LANES AND RAILROAD THROUGH GIRDER BRIDGE AND 4/8 LANE TO MPO PROJ NUM 13008

DESCR 4/8 LANE CONTINUOUS FRONTAGE ROADS FUNDING CAT(S) S102,SBPEREMARKS PROJECT 10 YEAR PLAN PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,465,000ROW PURCH $ 1,000,000 COST OF

CONSTR $ 50,000,000 APPROVEDCONST ENG $ 2,006,708 PHASES

CONTING $ 84,002 $ 3,465,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 55,555,710

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 2,465,000 $ 0 $ 0 $ 0 $ 2,465,000S102 $ 800,000 $ 200,000 $ 0 $ 0 $ 0 $ 1,000,000TOTAL $ 800,000 $ 2,665,000 $ 0 $ 0 $ 0 $ 3,465,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0364-01-147 2019 SH 121 C,E,ENG GRAPEVINE $ 398,500,000LIMITS FROM SH 114 PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO DALLAS COUNTY LINEPROJECT CONSTRUCT IH 635 AND FM 2499 DEFERRED CONNECTIONS MPO PROJ NUM 13007

DESCR FUNDING CAT(S) 12,SBPEREMARKS PROJECT PART OF REGIONAL 10-YEAR PLAN

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 28,500,000ROW PURCH $ 0 COST OF

CONSTR $ 370,000,000 APPROVEDCONST ENG $ 16,475,970 PHASES

CONTING $ 10,503,870 $ 398,500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 425,479,840

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL12 $ 296,000,000 $ 74,000,000 $ 0 $ 0 $ 0 $ 370,000,000SBPE $ 0 $ 28,500,000 $ 0 $ 0 $ 0 $ 28,500,000TOTAL $ 296,000,000 $ 102,500,000 $ 0 $ 0 $ 0 $ 398,500,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 350: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 350 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 1068-04-170 2019 IH 30 E,ENG GRAND PRAIRIE $ 530,000LIMITS FROM DALLAS COUNTY LINE PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO SH 161PROJECT RECONSTRUCT AND WIDEN FROM 6 TO 8 GENERAL PURPOSE LANES WITH 2 REVERSIBLE EXPRES MPO PROJ NUM 13000

DESCR S LANE AND CONSTRUCT 0 TO 4 LANE CONTINUOUS FRONTAGE ROADS; MODIFICATIONS TO SH FUNDING CAT(S) SBPE161 CONNECTIONS

REMARKS PROJECT PART OF REGIONAL 10 YEAR PLANP7 HISTORY

TOTAL PROJECT COST INFORMATIONPREL ENG $ 530,000

ROW PURCH $ 8,910,000 COST OFCONSTR $ 9,000,000 APPROVED

CONST ENG $ 429,556 PHASESCONTING $ 17,981 $ 530,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 18,887,537

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 530,000 $ 0 $ 0 $ 0 $ 530,000TOTAL $ 0 $ 530,000 $ 0 $ 0 $ 0 $ 530,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG 0902-00-157 2019 VA C VARIOUS $ 1,120,000LIMITS FROM REGION-WIDE AIR QUALITY (AQ) INITIATIVES TO REDUCE EMISSIONS PROJECT SPONSOR NCTCOG

REVISION DATE 07/2018LIMITS TO SUPPORTS NCTCOG STAFF, CONSULTANTS & PURCHASE OF MARKETING/OUTREACH MATERIALS TO EDUCATE PUBLIC/STAKEHOLDERS

PROJECT ADMINISTER/IMPLEMENT AQ INITIATIVES INCLUDING CONTROL STRATEGY DEVELOPMENT & ENF MPO PROJ NUM 11979.3DESCR ORCEMENT, TECHNOLOGY/FUEL EVALUATION, DATA & FEASIBILITY ANALYSES, POLICY/BEST P FUNDING CAT(S) 7,Other

RACTICE DEVELOPMENT/DISSEMINATION, STAKEHOLDER COLLABORATION, & AIR CHECK TEXASADMINISTRATION

REMARKS PROJECT 224,000 OF TRANSPORTATION DEVELOPMENT CREDITS (CAT 3 - TDP7 HISTORY C [MPO]) UTILIZED IN LIEU OF A LOCAL MATCH ARE NOT CALCUL

ATED IN FUNDING TOTAL TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 1,120,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 1,120,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,120,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 1,120,000 $ 0 $ 0 $ 0 $ 0 $ 1,120,000Other $ 0 $ 0 $ 0 $ 0 $ 0 $ 0TOTAL $ 1,120,000 $ 0 $ 0 $ 0 $ 0 $ 1,120,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0902-90-087 2019 VARIOUS C,E,ENV FORT WORTH $ 134,000LIMITS FROM SIGNAL COMMUNICATION PROJECT SPONSOR FORT WORTH

REVISION DATE 07/2018LIMITS TO AT 140 LOCATIONS CITYWIDEPROJECT INSTALL NEW COMMUNICATION EQUIPMENT AT 140 LOCATIONS MPO PROJ NUM 25027

DESCR FUNDING CAT(S) 5REMARKS PROJECT $12,000 OF ENG. COSTS OBLIGATED IN FY 2018; $1,000 FOR EN

P7 HISTORY V. IN FY 2019 TOTAL PROJECT COST INFORMATION

PREL ENG $ 13,000ROW PURCH $ 0 COST OF

CONSTR $ 133,000 APPROVEDCONST ENG $ 6,588 PHASES

CONTING $ 1,552 $ 134,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 154,140

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 107,200 $ 0 $ 0 $ 26,800 $ 0 $ 134,000TOTAL $ 107,200 $ 0 $ 0 $ 26,800 $ 0 $ 134,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 351: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 351 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG 0902-90-050 2019 VA E,ENG,R,ACQ,UTLVARIOUS $ 290,000LIMITS FROM TRINITY BLVD/ELM ST PROJECT SPONSOR FORT WORTH

REVISION DATE 07/2018LIMITS TO TRINITY RAILWAY EXPRESS (TRE) CENTREPORT RAIL STATION AND TO THE MIKE LEWIS TRAIL IN GRAND PRAIRIE

PROJECT SHARED-USE PATH (TRAIL) FROM THE INTERSECTION OF TRINITY BLVD/ELM ST TO CENTREPO MPO PROJ NUM 25022DESCR RT RAIL STATION; PRELIMINARY ENGINEERING FOR CONNECTION TO MIKE LEWIS TRAIL FUNDING CAT(S) 5

REMARKS PROJECT $1,000,000 OF FUNDS FOR ENV PHASE IN FY2018P7 HISTORY

TOTAL PROJECT COST INFORMATIONPREL ENG $ 1,190,000

ROW PURCH $ 100,000 COST OFCONSTR $ 2,210,000 APPROVED

CONST ENG $ 240,694 PHASESCONTING $ 0 $ 290,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 3,740,694

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 232,000 $ 0 $ 0 $ 58,000 $ 0 $ 290,000TOTAL $ 232,000 $ 0 $ 0 $ 58,000 $ 0 $ 290,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-051 2019 CS C GRAND PRAIRIE $ 29,700,000LIMITS FROM WILDLIFE PARKWAY FROM SH 161 PROJECT SPONSOR DALLAS CO

REVISION DATE 07/2018LIMITS TO BELT LINE RDPROJECT CONSTRUCT 0/2 LANE RURAL TO 2/4 LANE DIVIDED INCLUDING BRIDGE OVER TRINITY RIVER MPO PROJ NUM 20213

DESCR FUNDING CAT(S) 3LC,3RTR121REMARKS LOCAL CONTRIBUTION BY GRAND PRAIRIE/DALLAS COUNTY; PROJECT PROJECT FUNDED WITH PGBT EE LOAN REPAYMENT (TO BE REPAID

P7 RTR 121-DA1 HISTORY INTO RTR 121-DA1 ACCOUNT) TOTAL PROJECT COST INFORMATION

PREL ENG $ 3,671,000ROW PURCH $ 1,750,000 COST OF

CONSTR $ 29,700,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 29,700,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 35,121,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3RTR121 $ 0 $ 0 $ 18,000,000 $ 0 $ 0 $ 18,000,0003LC $ 0 $ 0 $ 0 $ 0 $ 11,700,000 $ 11,700,000TOTAL $ 0 $ 0 $ 18,000,000 $ 0 $ 11,700,000 $ 29,700,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-015 2019 CS C VARIOUS $ 5,944,000LIMITS FROM WINTERGREEN ROAD FROM DUNCANVILLE ROAD EAST OF STEWART BRANCH CREEK PROJECT SPONSOR DALLAS CO

REVISION DATE 07/2018LIMITS TO AND DUNCANVILLE ROAD FROM WINTERGREEN TO SOUTH OF STEWART BRANCH CREEKPROJECT REALIGN OFFSET INTERSECTION TO ACCOMMODATE 4 LANE APPROACHES MPO PROJ NUM 11747

DESCR FUNDING CAT(S) 3LC,3RTR121REMARKS RTR 121-DA1; LOCAL FUNDING TO BE PAID BY DALLAS COU PROJECT MPO MILESTONE PROJECT - CANNOT BE DELAYED PAST FY 2019

P7 NTY $3,896,000, DALLAS WATER UTILITIES $150,000, DE HISTORYSOTO $358,667, CEDAR HILL $353,667, AND DUNCANVILLE$310,666

TOTAL PROJECT COST INFORMATIONPREL ENG $ 1,630,000

ROW PURCH $ 625,000 COST OFCONSTR $ 5,944,000 APPROVED

CONST ENG $ 0 PHASESCONTING $ 0 $ 5,944,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 8,199,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3RTR121 $ 0 $ 0 $ 2,170,000 $ 542,500 $ 0 $ 2,712,5003LC $ 0 $ 0 $ 0 $ 0 $ 3,231,500 $ 3,231,500TOTAL $ 0 $ 0 $ 2,170,000 $ 542,500 $ 3,231,500 $ 5,944,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 352: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 352 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DENTON 0353-02-053 2019 SH 114 C ROANOKE $ 11,052,921LIMITS FROM AT UP RAILROAD UNDERPASS PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO IN ROANOKE DOT NO 795 342VPROJECT REPLACE RAILROAD UNDERPASS AND IMPROVE BS 114K DRAINAGE MPO PROJ NUM 51060

DESCR FUNDING CAT(S) 2M,5,6REMARKS CMAQ FUNDS FOR INTERSECTION, SIGNAL, AND BIKE/PED I PROJECT PART OF REGIONAL 10 YEAR PLAN

P7 MPROVEMENTS ONLY; CAT 2M FUNDS ARE PROP 1 FUNDS HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 400,000ROW PURCH $ 2,000,000 COST OF

CONSTR $ 11,052,921 APPROVEDCONST ENG $ 392,689 PHASES

CONTING $ 157,440 $ 11,052,921INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 14,003,050

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 6,000,000 $ 1,500,000 $ 0 $ 0 $ 0 $ 7,500,0005 $ 442,337 $ 110,584 $ 0 $ 0 $ 0 $ 552,9216 $ 2,400,000 $ 600,000 $ 0 $ 0 $ 0 $ 3,000,000TOTAL $ 8,842,337 $ 2,210,584 $ 0 $ 0 $ 0 $ 11,052,921

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG ELLIS 0048-03-055 2019 US 77 C WAXAHACHIE $ 13,137,250LIMITS FROM SOUTH OF FM 66 PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO NORTH OF MCMILLAN STREETPROJECT RECONSTRUCT AND CONVERT 2 LANE UNDIVIDED TO 4 LANE DIVIDED ONE-WAY COUPLET MPO PROJ NUM 51220

DESCR FUNDING CAT(S) 1,6REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 700,000ROW PURCH $ 6,700,000 COST OF

CONSTR $ 13,137,250 APPROVEDCONST ENG $ 579,351 PHASES

CONTING $ 232,441 $ 13,137,250INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 21,349,042

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL1 $ 0 $ 3,137,250 $ 0 $ 0 $ 0 $ 3,137,2506 $ 8,000,000 $ 2,000,000 $ 0 $ 0 $ 0 $ 10,000,000TOTAL $ 8,000,000 $ 5,137,250 $ 0 $ 0 $ 0 $ 13,137,250

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0047-07-228 2019 US 75 C DALLAS $ 7,100,000LIMITS FROM AT NORTHAVEN ROAD PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TOPROJECT CONSTRUCT BIKE/PEDESTRIAN BRIDGE OVER US 75 (ON SYSTEM SECTION) MPO PROJ NUM 55108.1

DESCR FUNDING CAT(S) 5REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,200,000ROW PURCH $ 750,000 COST OF

CONSTR $ 7,100,000 APPROVEDCONST ENG $ 332,113 PHASES

CONTING $ 76,746 $ 7,100,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 9,458,859

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 5,680,000 $ 1,420,000 $ 0 $ 0 $ 0 $ 7,100,000TOTAL $ 5,680,000 $ 1,420,000 $ 0 $ 0 $ 0 $ 7,100,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 353: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 353 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0092-01-052 2019 US 175/SH 310C DALLAS $ 41,688,000LIMITS FROM ON SM WRIGHT PHASE 2A; SOUTH OF BUDD ST PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO IH 45PROJECT RECONSTRUCT FREEWAY TO 6 LANE DIVIDED ARTERIAL MPO PROJ NUM 20062

DESCR FUNDING CAT(S) 2MREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 3,000,000ROW PURCH $ 5,900,000 COST OF

CONSTR $ 41,688,000 APPROVEDCONST ENG $ 2,058,212 PHASES

CONTING $ 21,002 $ 41,688,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 52,667,214

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 33,350,400 $ 8,337,600 $ 0 $ 0 $ 0 $ 41,688,000TOTAL $ 33,350,400 $ 8,337,600 $ 0 $ 0 $ 0 $ 41,688,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DENTON 0081-03-048 2019 US 377 C ROANOKE $ 14,836,119LIMITS FROM HENRIETTA CREEK ROAD PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO SH 114 (SECTION 5)PROJECT RECONSTRUCT AND WIDEN 2/4 TO 4 LANE DIVIDED URBAN MPO PROJ NUM 20120

DESCR FUNDING CAT(S) 1,2M,5REMARKS CMAQ FUNDS FOR INTERSECTION, SIGNALS, AND BICYCLE/P PROJECT

P7 EDESTRIAN IMPROVEMENTS ONLY HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,500,000ROW PURCH $ 500,000 COST OF

CONSTR $ 14,836,119 APPROVEDCONST ENG $ 707,253 PHASES

CONTING $ 283,757 $ 14,836,119INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 18,827,129

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL1 $ 691,075 $ 172,769 $ 0 $ 0 $ 0 $ 863,8442M $ 9,640,000 $ 2,410,000 $ 0 $ 0 $ 0 $ 12,050,0005 $ 1,537,820 $ 384,455 $ 0 $ 0 $ 0 $ 1,922,275TOTAL $ 11,868,895 $ 2,967,224 $ 0 $ 0 $ 0 $ 14,836,119

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG 0902-00-188 2019 VA C VARIOUS $ 1,175,000LIMITS FROM 511 TRAVELER INFORMATION SYSTEM (ITS) PROJECT SPONSOR NCTCOG

REVISION DATE 07/2018LIMITS TOPROJECT DEVELOP AND IMPLEMENT TRAVELER INFORMATION SYSTEM IN REGION MPO PROJ NUM 11893.5

DESCR FUNDING CAT(S) 7REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 1,175,000 APPROVEDCONST ENG $ 41,125 PHASES

CONTING $ 17,625 $ 1,175,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,233,750

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 940,000 $ 235,000 $ 0 $ 0 $ 0 $ 1,175,000TOTAL $ 940,000 $ 235,000 $ 0 $ 0 $ 0 $ 1,175,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 354: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 354 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0013-10-082 2019 CS C SAGINAW $ 11,000,000LIMITS FROM ON BAILEY-BOSWELL AT BUS 287P PROJECT SPONSOR SAGINAW

REVISION DATE 07/2018LIMITS TOPROJECT INTERSECTION IMPROVEMENT - CONSTRUCT 0 TO 2 LANE OVERPASS/BRIDGE OVER UPRR, BNSF MPO PROJ NUM 83244

DESCR RR, & BUS 287P FUNDING CAT(S) 3LCREMARKS LOCAL CONTRIBUTION BY SAGINAW PROJECT LOCAL BOND FUNDED PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 550,000ROW PURCH $ 0 COST OF

CONSTR $ 11,000,000 APPROVEDCONST ENG $ 840,990 PHASES

CONTING $ 0 $ 11,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 12,390,990

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 11,000,000 $ 11,000,000TOTAL $ 0 $ 0 $ 0 $ 0 $ 11,000,000 $ 11,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0000-02-011 2019 CS E,ENG NORTH RICHLAND HILLS$ 500,000LIMITS FROM HOLIDAY LN FROM IH 820 PROJECT SPONSOR NORTH RICHLAND HILLS

REVISION DATE 07/2018LIMITS TO DICK LEWIS DRPROJECT RECONSTRUCT 4 TO 4 LANE ROADWAY MPO PROJ NUM 81423

DESCR FUNDING CAT(S) 3LCREMARKS LOCAL CONTRIBUTION PAID BY NORTH RICHLAND HILLS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 500,000ROW PURCH $ 0 COST OF

CONSTR $ 1,200,000 APPROVEDCONST ENG $ 42,000 PHASES

CONTING $ 18,000 $ 500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,760,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 500,000 $ 500,000TOTAL $ 0 $ 0 $ 0 $ 0 $ 500,000 $ 500,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 2374-01-171 2019 IH 635 C,E,ENG DALLAS $ 72,956,931LIMITS FROM AT SKILLMAN/AUDELIA INTERCHANGE PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TOPROJECT INTERCHANGE IMPROVEMENTS MPO PROJ NUM 54111

DESCR FUNDING CAT(S) 2M,3LC,12REMARKS LOCAL CONTRIBUTION BY CITY OF DALLAS PROJECT 10-YEAR PLAN PROJECT; CATEGORY 12 FUNDS ARE STATE COMMITM

P7 HISTORY ENT TO TDC/MPO REVOLVER SWAP TOTAL PROJECT COST INFORMATION

PREL ENG $ 12,629,105ROW PURCH $ 8,750,000 COST OF

CONSTR $ 60,327,826 APPROVEDCONST ENG $ 3,394,567 PHASES

CONTING $ 2,164,127 $ 72,956,931INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 87,265,625

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 52,000,000 $ 13,000,000 $ 0 $ 0 $ 0 $ 65,000,0003LC $ 0 $ 0 $ 0 $ 0 $ 3,579,931 $ 3,579,93112 $ 3,501,600 $ 875,400 $ 0 $ 0 $ 0 $ 4,377,000TOTAL $ 55,501,600 $ 13,875,400 $ 0 $ 0 $ 3,579,931 $ 72,956,931

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 355: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 355 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DENTON 1315-01-027 2019 FM 1385 C PROSPER $ 1,360,000LIMITS FROM NORTH OF FISHTRAP ROAD PROJECT SPONSOR PROSPER

REVISION DATE 07/2018LIMITS TO SOUTH OF FISHTRAP ROADPROJECT REALIGN AND IMPROVE THE INTERSECTION OF FM 1385 AND FISHTRAP ROAD MPO PROJ NUM 20295.2

DESCR FUNDING CAT(S) 3LC,3RTR121REMARKS RTR 121-DE1; LOCAL CONTRIBUTION BY PROSPER PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 110,000ROW PURCH $ 150,000 COST OF

CONSTR $ 1,360,000 APPROVEDCONST ENG $ 47,600 PHASES

CONTING $ 20,400 $ 1,360,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,688,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3RTR121 $ 0 $ 0 $ 1,000,000 $ 250,000 $ 0 $ 1,250,0003LC $ 0 $ 0 $ 0 $ 0 $ 110,000 $ 110,000TOTAL $ 0 $ 0 $ 1,000,000 $ 250,000 $ 110,000 $ 1,360,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG 0902-90-920 2019 VA C VARIOUS $ 400,000LIMITS FROM REGIONAL ITS QUALITY IMPLEMENTATION TO ENSURE EFFECTIVE USE OF ITS DEVICES PROJECT SPONSOR NCTCOG

REVISION DATE 07/2018, INCLUDING FOR DATA COLLECTION ON LIMITEDLIMITS TO ACCESS FACILITIES IN DALLAS AND FORT WORTH DISTRICTS; NCTCOG STAFF & CNSLT

S WILLPROJECT ANALYZE DATA FROM TXDOT DEVICES ALONG MJR CORR FOR USE IN NETWORK PLAN & TRAFF M MPO PROJ NUM 11630.5

DESCR ODELING; ASSIST W/ DETECTION & CERTIFICATION TO ALLOW FOR EARLIER DETECT & DEPLO FUNDING CAT(S) 7Y TO CLEAR INCIDENT; FILL IN GAPS IN ITS NETWORK, ENSURE ACCURATE INFO FOR TRAVELING PUBLIC

REMARKS PROJECTP7 HISTORY

TOTAL PROJECT COST INFORMATIONPREL ENG $ 0

ROW PURCH $ 0 COST OFCONSTR $ 400,000 APPROVED

CONST ENG $ 0 PHASESCONTING $ 0 $ 400,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 400,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 320,000 $ 80,000 $ 0 $ 0 $ 0 $ 400,000TOTAL $ 320,000 $ 80,000 $ 0 $ 0 $ 0 $ 400,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0902-90-056 2019 VA C VARIOUS $ 50,000LIMITS FROM ALL LIMITED ACCESS FREEWAYS IN TARRANT COUNTY PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TOPROJECT ENSURE EFFECTIVE USE OF ITS DEVICES, INCLUDING FOR DATA COLLECTION MPO PROJ NUM 11630.3

DESCR FUNDING CAT(S) 7REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 50,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 50,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 50,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 40,000 $ 10,000 $ 0 $ 0 $ 0 $ 50,000TOTAL $ 40,000 $ 10,000 $ 0 $ 0 $ 0 $ 50,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 356: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 356 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG HOOD 0080-11-001 2019 US 377 C CRESSON $ 52,000,000LIMITS FROM JOHNSON/HOOD COUNTY LINE PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO SOUTH OF SH 171PROJECT CONSTRUCT 0 TO 4 LANE DIVIDED ROADWAY WITH INTERCHANGE AT US 377 AND BU 377; GRA MPO PROJ NUM 54114

DESCR DE SEPARATION AT FWWR AND SH 171 FUNDING CAT(S) 2M,3LCREMARKS LOCAL CONTRIBUTION PAID BY HOOD COUNTY PROJECT 10-YEAR PLAN PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,678,434ROW PURCH $ 5,299,500 COST OF

CONSTR $ 52,000,000 APPROVEDCONST ENG $ 2,718,910 PHASES

CONTING $ 693,599 $ 52,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 62,390,443

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 32,800,000 $ 8,200,000 $ 0 $ 0 $ 0 $ 41,000,0003LC $ 0 $ 0 $ 0 $ 0 $ 11,000,000 $ 11,000,000TOTAL $ 32,800,000 $ 8,200,000 $ 0 $ 0 $ 11,000,000 $ 52,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-00-966 2019 VA C VARIOUS $ 150,000LIMITS FROM ALL LIMITED ACCESS FREEWAYS IN DALLAS COUNTY PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TOPROJECT ENSURE EFFECTIVE USE OF ITS DEVICES, INCLUDING FOR DATA COLLECTION MPO PROJ NUM 11630.4

DESCR FUNDING CAT(S) 7REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 150,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 150,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 150,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 120,000 $ 30,000 $ 0 $ 0 $ 0 $ 150,000TOTAL $ 120,000 $ 30,000 $ 0 $ 0 $ 0 $ 150,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-165 2019 CS C VARIOUS $ 2,734,420LIMITS FROM PLEASANT RUN ROAD TRAIL FROM LANCASTER-HUTCHINS ROAD PROJECT SPONSOR DALLAS CO

REVISION DATE 07/2018LIMITS TO MILLERS FERRY ROADPROJECT CONSTRUCT 3.1 MILE LONG SHARED USE PATH ON THE SOUTH SIDE OF PLEASANT RUN ROAD MPO PROJ NUM 11981.1

DESCR FUNDING CAT(S) 9TAPREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 221,710ROW PURCH $ 0 COST OF

CONSTR $ 2,512,710 APPROVEDCONST ENG $ 221,710 PHASES

CONTING $ 30,603 $ 2,734,420INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,986,733

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 2,187,536 $ 0 $ 0 $ 546,884 $ 0 $ 2,734,420TOTAL $ 2,187,536 $ 0 $ 0 $ 546,884 $ 0 $ 2,734,420

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 357: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 357 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG 0172-09-036 2019 US 287 C VARIOUS $ 2,700,000LIMITS FROM IH 20 PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO SH 360PROJECT INSTALLATION OF NEW ITS FIBER AND EQUIPMENT MPO PROJ NUM 25019

DESCR FUNDING CAT(S) 5REMARKS PROJECT RELATED TO CSJ 0172-10-014

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 110,247ROW PURCH $ 0 COST OF

CONSTR $ 2,700,000 APPROVEDCONST ENG $ 110,368 PHASES

CONTING $ 25,504 $ 2,700,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,946,119

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 2,160,000 $ 540,000 $ 0 $ 0 $ 0 $ 2,700,000TOTAL $ 2,160,000 $ 540,000 $ 0 $ 0 $ 0 $ 2,700,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PARIS NCTCOG HUNT 1290-07-001 2019 SH 276 R,UTL QUINLAN $ 600,000LIMITS FROM WEST OF FM 36 PROJECT SPONSOR TXDOT-PARIS

REVISION DATE 07/2018LIMITS TO SH 34PROJECT CONSTRUCT 0 TO 4 LANE FACILITY ON NEW LOCATION (QUINLAN BYPASS) WITH A CONTINUOU MPO PROJ NUM 55152

DESCR S LEFT TURN LANE FUNDING CAT(S) S102REMARKS PROJECT $600,000 OF S102 FUNDS IN FY19 FOR UTILITIES AND $2,910,0

P7 HISTORY 00 OF ROW IN FY17; PART OF REGIONAL 10 YEAR PLAN TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,087,592ROW PURCH $ 3,510,000 COST OF

CONSTR $ 9,000,000 APPROVEDCONST ENG $ 472,332 PHASES

CONTING $ 120,493 $ 600,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 15,190,417

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALS102 $ 480,000 $ 60,000 $ 0 $ 60,000 $ 0 $ 600,000TOTAL $ 480,000 $ 60,000 $ 0 $ 60,000 $ 0 $ 600,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PARIS NCTCOG 0901-22-114 2019 VA E,ENG VARIOUS $ 1,000,000LIMITS FROM UPDATE HUNT COUNTY TRANSPORTATION PLAN AND MULTIMODAL TRANSPORTATION PLANPROJECT SPONSOR NCTCOG

REVISION DATE 07/2018IN COLLIN COUNTYLIMITS TOPROJECT UPDATE HUNT COUNTY TRANSPORTATION PLAN TO IDENTIFY IMPROVEMENTS TO IH 30, SH 66, MPO PROJ NUM 20268.3

DESCR AND US 380 AND START A MULTIMODAL TRANSPORTATION PLAN IN COLLIN COUNTY INCLUDIN FUNDING CAT(S) 7,OtherG ADDING NORTH/SOUTH CAPACITY AND EAST/WEST CONNECTIONS ACROSS THE LAKES

REMARKS PROJECT 200,000 OF TRANSPORTATION DEVELOPMENT CREDITS (CAT 3 - TDP7 HISTORY C [MPO]) UTILIZED IN LIEU OF A LOCAL MATCH AND ARE NOT CA

LCULATED IN FUNDING TOTAL TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,000,000ROW PURCH $ 0 COST OF

CONSTR $ 0 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 1,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,000,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 1,000,000 $ 0 $ 0 $ 0 $ 0 $ 1,000,000Other $ 0 $ 0 $ 0 $ 0 $ 0 $ 0TOTAL $ 1,000,000 $ 0 $ 0 $ 0 $ 0 $ 1,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 358: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 358 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG 0902-00-186 2019 VA C VARIOUS $ 650,000LIMITS FROM M&O - LAND USE/TRANSPORTATION AND BIKE/PEDESTRIAN INITIATIVES; INCLUDES BI PROJECT SPONSOR NCTCOG

REVISION DATE 07/2018CYCLE/PEDESTRIAN PLANNING, TRANSITLIMITS TO ORIENTED DEVELOPMENT, DEVELOPMENT OF A REGIONAL PEDESTRIAN SAFETY PROGRAM,

AND IMPLEMENTATION OF SUSTAINABLE DEVELOPMENTPROJECT INITIATIVES; INCLUDES NCTCOG STAFF TIME AND POSSIBLE CONSULTANT ASSISTANCE TO DE MPO PROJ NUM 11647

DESCR VELOP AND IMPLEMENT FUNDING PROGRAMS, COLLECT AND ANALYZE DATA, COORDINATE RE. S FUNDING CAT(S) 7,OtherCHOOL SITING, SAFE ROUTES TO SCHOOL, SAFETY AND EDUCATION

REMARKS PROJECT 130,000 OF TRANSPORTATION DEVELOPMENT CREDITS (CAT 3 - TDP7 HISTORY C [MPO]) UTILIZED IN LIEU OF A LOCAL MATCH AND ARE NOT CA

LCULATED IN FUNDING TOTAL TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 650,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 650,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 650,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 650,000 $ 0 $ 0 $ 0 $ 0 $ 650,000Other $ 0 $ 0 $ 0 $ 0 $ 0 $ 0TOTAL $ 650,000 $ 0 $ 0 $ 0 $ 0 $ 650,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG 0902-00-178 2019 VA C VARIOUS $ 312,500LIMITS FROM M&O - PROGRAM OVERSIGHT COORDINATION, INCLUDING DEPARTMENT STREAMLINING INPROJECT SPONSOR NCTCOG

REVISION DATE 07/2018ITIATIVES, PROCUREMENT (EDUCATION,LIMITS TO OUTREACH W/ POTENTIAL BIDDERS INCL WEB UPDATES), CONTRACT MGMT, ENHANCEMEN

T OF RESOURCES & COMPLIANCE W/ DBE PRGM (INCLPROJECT OUTREACH TO VENDORS, AND DEVELOPMENT OF PARTNERSHIP W/ REGIONAL & STATE CERT AGE MPO PROJ NUM 11633.2

DESCR NCIES), & LEGAL (COORDINATION OF RTC POLICIES, EVALUATION, DEVLOPMENT, REGULATIO FUNDING CAT(S) 7,OtherN OF LEGAL INSTRUMENTS TO IMPLEMENT MPO PROJECTS)

REMARKS PROJECT 62,500 OF TRANSPORTATION DEVELOPMENT CREDITS (CAT 3 - TDCP7 HISTORY [MPO]) CREDITS UTILIZED IN LIEU OF A LOCAL MATCH AND ARE

NOT CALCULATED IN FUNDING TOTAL TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 312,500 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 312,500INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 312,500

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 312,500 $ 0 $ 0 $ 0 $ 0 $ 312,500Other $ 0 $ 0 $ 0 $ 0 $ 0 $ 0TOTAL $ 312,500 $ 0 $ 0 $ 0 $ 0 $ 312,500

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG 0918-00-265 2019 MH C CELINA $ 22,500,000LIMITS FROM ON DALLAS NORTH TOLLWAY FROM FM 428 PROJECT SPONSOR DENTON CO

REVISION DATE 07/2018LIMITS TO DENTON/COLLIN COUNTY LINE (CR 9)PROJECT CONSTRUCT 0 TO 2 LANE NON-TOLLED FRONTAGE ROAD (6 LANES ULTIMATE) (DNT 4B EXTENS MPO PROJ NUM 20299

DESCR ION) FUNDING CAT(S) 3LC,3RTR121REMARKS RTR 121-DE1; LOCAL CONTRIBUTION PAID BY DENTON COUN PROJECT PROJECT LOCATED IN COLLIN CO, BUT USING DENTON CO RTR FUN

P7 TY (COMMITTED TO NTTA) HISTORY DS TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,850,000ROW PURCH $ 337,500 COST OF

CONSTR $ 22,500,000 APPROVEDCONST ENG $ 787,500 PHASES

CONTING $ 337,500 $ 22,500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 26,812,500

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3RTR121 $ 0 $ 0 $ 4,800,000 $ 1,200,000 $ 0 $ 6,000,0003LC $ 0 $ 0 $ 0 $ 0 $ 16,500,000 $ 16,500,000TOTAL $ 0 $ 0 $ 4,800,000 $ 1,200,000 $ 16,500,000 $ 22,500,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 359: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 359 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0353-05-120 2019 SL 12 E,ENG DALLAS $ 800,000LIMITS FROM AT SKILLMAN PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TOPROJECT RECONSTRUCT GRADE SEPARATION AS A SINGLE POINT URBAN INTERCHANGE MPO PROJ NUM 55112

DESCR FUNDING CAT(S) SBPEREMARKS PROJECT 10-YEAR PLAN PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 800,000ROW PURCH $ 0 COST OF

CONSTR $ 18,316,185 APPROVEDCONST ENG $ 934,494 PHASES

CONTING $ 595,765 $ 800,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 20,646,444

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 800,000 $ 0 $ 0 $ 0 $ 800,000TOTAL $ 0 $ 800,000 $ 0 $ 0 $ 0 $ 800,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-168 2019 CS C DALLAS $ 42,530,000LIMITS FROM RIVERFRONT BLVD FROM CADIZ STREET PROJECT SPONSOR DALLAS CO

REVISION DATE 07/2018LIMITS TO UNION PACIFIC RAILROADPROJECT RECONSTRUCT 6/8 LANE TO 6 LANE WITH BIKE/PEDESTRIAN IMPROVEMENTS AND INTERSECTIO MPO PROJ NUM 11726.4

DESCR N IMPROVEMENTS FUNDING CAT(S) 3LC,3RTR121,3RTR161REMARKS LOCAL CONTRIBUTION BY DALLAS COUNTY AND THE CITY OF PROJECT

P7 DALLAS; RTR 161-DA1; RTR 121-DA1 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 3,570,000ROW PURCH $ 600,000 COST OF

CONSTR $ 42,530,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 42,530,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 46,700,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3RTR121 $ 0 $ 0 $ 19,706,780 $ 4,926,695 $ 0 $ 24,633,4753RTR161 $ 0 $ 0 $ 5,000,000 $ 1,250,000 $ 0 $ 6,250,0003LC $ 0 $ 0 $ 0 $ 0 $ 11,646,525 $ 11,646,525TOTAL $ 0 $ 0 $ 24,706,780 $ 6,176,695 $ 11,646,525 $ 42,530,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DENTON 0918-46-282 2019 VA C CARROLLTON $ 3,011,470LIMITS FROM DUDLEY BRANCH TRAIL FROM NORTH CARROLLTON/FRANKFORD DART STATION PROJECT SPONSOR CARROLLTON

REVISION DATE 07/2018LIMITS TO OLD DENTON RDPROJECT CONSTRUCT APPROX 2.1 MILES BIKE/PEDESTRIAN TRAIL MPO PROJ NUM 40017

DESCR FUNDING CAT(S) 5REMARKS PROJECT PROJECT FUNDING IS 75% FEDERAL AND 25% LOCAL; 2017 TA SET

P7 HISTORY -ASIDE CALL FOR PROJECTS; C PHASE IN FY19 FOR CONSTRUCTION; C PHASE IN FY20 FOR CONSTRUCTION ENGINEERING

TOTAL PROJECT COST INFORMATIONPREL ENG $ 727,670

ROW PURCH $ 0 COST OFCONSTR $ 3,011,470 APPROVED

CONST ENG $ 260,871 PHASESCONTING $ 38,777 $ 3,011,470INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 4,038,788

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 2,258,600 $ 0 $ 0 $ 752,870 $ 0 $ 3,011,470TOTAL $ 2,258,600 $ 0 $ 0 $ 752,870 $ 0 $ 3,011,470

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 360: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 360 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-144 2019 VA C,E,ENG MESQUITE $ 500,000LIMITS FROM SKYLINE TRAIL ALONG TOWN EAST BOULEVARD FROM MILITARY PARKWAY PROJECT SPONSOR MESQUITE

REVISION DATE 07/2018LIMITS TO SKYLINE BOULEVARDPROJECT CONSTRUCT BIKE/PEDESTRIAN TRAIL MPO PROJ NUM 40022

DESCR FUNDING CAT(S) 5REMARKS THIS ENTRY INCLUDES CE FUNDING AS WELL AS CONSTRUCT PROJECT

P7 ION FUNDING HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 50,000ROW PURCH $ 0 COST OF

CONSTR $ 400,000 APPROVEDCONST ENG $ 50,000 PHASES

CONTING $ 6,191 $ 500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 506,191

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 400,000 $ 0 $ 0 $ 100,000 $ 0 $ 500,000TOTAL $ 400,000 $ 0 $ 0 $ 100,000 $ 0 $ 500,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-00-258 2019 VA C VARIOUS $ 2,737,999LIMITS FROM M&O - REGIONAL COMMUNICATION SYSTEM/INTERAGENCY COMMUNICATION NETWORK & SOPROJECT SPONSOR NCTCOG

REVISION DATE 07/2018FTWARE (EASTERN SUBREGION) PHASE IIILIMITS TOPROJECT FREEWAY INCIDENT MANAGEMENT PROGRAM MPO PROJ NUM 11186.3

DESCR FUNDING CAT(S) 5,OtherREMARKS PROJECT 547,600 OF TRANSPORTATION DEVELOPMENT CREDITS (CAT 3 - TD

P7 HISTORY C [MPO]) CREDITS UTILIZED IN LIEU OF A LOCAL MATCH AND ARE NOT CALCULATED IN FUNDING TOTAL

TOTAL PROJECT COST INFORMATIONPREL ENG $ 0

ROW PURCH $ 0 COST OFCONSTR $ 2,737,999 APPROVED

CONST ENG $ 0 PHASESCONTING $ 0 $ 2,737,999INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,737,999

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 2,737,999 $ 0 $ 0 $ 0 $ 0 $ 2,737,999Other $ 0 $ 0 $ 0 $ 0 $ 0 $ 0TOTAL $ 2,737,999 $ 0 $ 0 $ 0 $ 0 $ 2,737,999

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG DENTON 0081-13-054 2019 IH 35W C,R,ACQ VARIOUS $ 41,381,700LIMITS FROM TARRANT COUNTY LINE PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO EAGLE PARKWAYPROJECT RECONSTRUCT 2 TO 2 GENERAL PURPOSE LANES IN EACH DIRECTION (INTERIM) AND ADD MAN MPO PROJ NUM 55077

DESCR AGED LANE TRANSITIONS (SEGMENT 3C) FUNDING CAT(S) 3LC,S102REMARKS LOCAL CONTRIBUTION PAID BY THE NORTH TARRANT EXPRES PROJECT LETS WITH CSJ 0081-12-047

P7 S MOBILITY PARTNERS HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 51,071ROW PURCH $ 1,440,000 COST OF

CONSTR $ 39,941,700 APPROVEDCONST ENG $ 44,814 PHASES

CONTING $ 1,876 $ 41,381,700INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 41,479,461

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 39,941,700 $ 39,941,700S102 $ 1,152,000 $ 288,000 $ 0 $ 0 $ 0 $ 1,440,000TOTAL $ 1,152,000 $ 288,000 $ 0 $ 0 $ 39,941,700 $ 41,381,700

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 361: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 361 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-072 2019 CS C DALLAS $ 2,285,087LIMITS FROM 8 INTERSECTIONS AT KCS RR IN DALLAS AT E DALLAS/KCS RR CROSSINGS - PEAVY R PROJECT SPONSOR DALLAS

REVISION DATE 07/2018D, GUS THOMASSON RD,LIMITS TO BARNES BRIDGE RD, CENTERVILLE RD, LAKELAND DR, HIGHLAND DR, SANTA ANNA AVE

, & ST FRANCIS AVE AT KCS RRPROJECT UPGRADE GATES AND INSTALL MEDIANS AT ALL LOCATIONS; INSTALL SIGNAGE AT PEAVY, GU MPO PROJ NUM 11258.9

DESCR S THOMASSON, LAKELAND, HIGHLAND, & ST FRANCIS; RESURFACE AT LAKELAND & ST FRANCI FUNDING CAT(S) 7S

REMARKS PROJECT MPO MILESTONE PROJECT - CANNOT BE DELAYED BEYOND FY 2019P7 HISTORY

TOTAL PROJECT COST INFORMATIONPREL ENG $ 149,654

ROW PURCH $ 0 COST OFCONSTR $ 2,285,087 APPROVED

CONST ENG $ 129,286 PHASESCONTING $ 29,786 $ 2,285,087INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,593,813

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 1,828,070 $ 0 $ 0 $ 457,017 $ 0 $ 2,285,087TOTAL $ 1,828,070 $ 0 $ 0 $ 457,017 $ 0 $ 2,285,087

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-45-812 2019 CS R,ACQ,UTL IRVING $ 5,840,000LIMITS FROM ON CONFLANS RD FROM SH 161 PROJECT SPONSOR IRVING

REVISION DATE 07/2018LIMITS TO VALLEY VIEW LANEPROJECT CONSTRUCT 0 TO 4 LANE DIVIDED FACILITY WITH NEW SIDEWALKS AND SHARED USE PATH MPO PROJ NUM 11237.2

DESCR FUNDING CAT(S) 3LC,7REMARKS LOCAL CONTRIBUTION PAID FOR BY IRVING; ROW CSJ 0918 PROJECT 2017 PE AUDIT PROJECT

P7 -47-198 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,737,721ROW PURCH $ 5,840,000 COST OF

CONSTR $ 22,504,000 APPROVEDCONST ENG $ 800,000 PHASES

CONTING $ 70,481 $ 5,840,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 30,952,202

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 2,440,000 $ 2,440,0007 $ 2,720,000 $ 0 $ 0 $ 680,000 $ 0 $ 3,400,000TOTAL $ 2,720,000 $ 0 $ 0 $ 680,000 $ 2,440,000 $ 5,840,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DENTON 0000-18-054 2019 FM 2499 C FLOWER MOUND $ 300,000LIMITS FROM AT LAKESIDE PROJECT SPONSOR FLOWER MOUND

REVISION DATE 07/2018LIMITS TOPROJECT INTERSECTION IMPROVEMENT MPO PROJ NUM 83287

DESCR FUNDING CAT(S) 3LCREMARKS LOCAL CONTRIBUTION PAID BY FLOWER MOUND PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 31,500ROW PURCH $ 0 COST OF

CONSTR $ 300,000 APPROVEDCONST ENG $ 10,500 PHASES

CONTING $ 4,500 $ 300,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 346,500

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 300,000 $ 300,000TOTAL $ 0 $ 0 $ 0 $ 0 $ 300,000 $ 300,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 362: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 362 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG KAUFMAN 0751-02-027 2019 FM 148 E,ENG,R,ACQ CRANDALL $ 4,800,000LIMITS FROM SOUTH OF FM 3039 PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO US 175PROJECT CONSTRUCT 0 TO 2 LANE RURAL UNDIVIDED ROADWAY MPO PROJ NUM 83284

DESCR FUNDING CAT(S) 3LC,S102,SBPEREMARKS LOCAL CONTRIBUTION PAID BY KAUFMAN CO PROJECT 2013 KAUFMAN COUNTY BOND PROGRAM

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,700,000ROW PURCH $ 3,100,000 COST OF

CONSTR $ 34,921,239 APPROVEDCONST ENG $ 1,711,141 PHASES

CONTING $ 436,516 $ 4,800,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 41,868,896

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 600,000 $ 600,000SBPE $ 0 $ 1,100,000 $ 0 $ 0 $ 0 $ 1,100,000S102 $ 2,480,000 $ 310,000 $ 0 $ 310,000 $ 0 $ 3,100,000TOTAL $ 2,480,000 $ 1,410,000 $ 0 $ 310,000 $ 600,000 $ 4,800,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DENTON 0000-18-021 2019 CS C FLOWER MOUND $ 240,000LIMITS FROM ON SILVERON BLVD AT FM 2499 PROJECT SPONSOR FLOWER MOUND

REVISION DATE 07/2018LIMITS TOPROJECT SIGNAL INSTALLATION MPO PROJ NUM 82389

DESCR FUNDING CAT(S) 3LCREMARKS LOCAL CONTRIBUTION PAID BY FLOWER MOUND PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 240,000 APPROVEDCONST ENG $ 8,400 PHASES

CONTING $ 3,600 $ 240,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 252,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 240,000 $ 240,000TOTAL $ 0 $ 0 $ 0 $ 0 $ 240,000 $ 240,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG PARKER 0000-02-016 2019 MH C WEATHERFORD $ 30,000,000LIMITS FROM EASTERN LOOP FROM FM 51 PROJECT SPONSOR PARKER CO

REVISION DATE 07/2018LIMITS TO FM 730PROJECT CONSTRUCT 0 TO 2 LANE URBAN DIVIDED (4 LANE ULTIMATE) MPO PROJ NUM 83253

DESCR FUNDING CAT(S) 3LCREMARKS LOCAL CONTRIBUTION PAID FOR BY PARKER CO PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 3,000,000ROW PURCH $ 3,600,000 COST OF

CONSTR $ 30,000,000 APPROVEDCONST ENG $ 1,050,000 PHASES

CONTING $ 450,000 $ 30,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 38,100,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 30,000,000 $ 30,000,000TOTAL $ 0 $ 0 $ 0 $ 0 $ 30,000,000 $ 30,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 363: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 363 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0902-48-891 2019 VA C VARIOUS $ 5,918,610LIMITS FROM NORTH TARRANT EXPRESS (NTE) HOV 2/3+ SUBSIDY PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TOPROJECT HOV 2/3+ SUBSIDY FOR NORTH TARRANT EXPRESS (NTE) MPO PROJ NUM 20294

DESCR FUNDING CAT(S) 3RTR121REMARKS RTR 121-TC1 PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 5,918,610 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 5,918,610INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 5,918,610

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3RTR121 $ 0 $ 0 $ 5,918,610 $ 0 $ 0 $ 5,918,610TOTAL $ 0 $ 0 $ 5,918,610 $ 0 $ 0 $ 5,918,610

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DENTON 0918-46-230 2019 CS C FLOWER MOUND $ 7,750,000LIMITS FROM ON GERAULT/MORRISS FROM FM 2499 PROJECT SPONSOR FLOWER MOUND

REVISION DATE 07/2018LIMITS TO FM 407PROJECT WIDEN AND RECONSTRUCT 4 TO 6 LANE DIVIDED URBAN ARTERIAL FROM FM 2499 TO FM 3040 MPO PROJ NUM 20141.1

DESCR AND RECONSTRUCT 4 TO 4 LANE DIVIDED URBAN FROM FM 3040 TO FM 407 WITH TRAFFIC S FUNDING CAT(S) 3RTR121IGNAL AND DRAINAGE IMPROVEMENTS WEST OF FM 2499/GERAULT ROAD INTERSECTION

REMARKS RTR 121-DE1 PROJECT $18,630,206 PREVIOUSLY OBLIGATED FOR CONSTRUCTION IN FY20P7 HISTORY 10

TOTAL PROJECT COST INFORMATIONPREL ENG $ 2,879,708

ROW PURCH $ 1,468,780 COST OFCONSTR $ 26,380,206 APPROVED

CONST ENG $ 923,307 PHASESCONTING $ 395,203 $ 7,750,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 32,047,204

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3RTR121 $ 0 $ 0 $ 6,200,000 $ 1,550,000 $ 0 $ 7,750,000TOTAL $ 0 $ 0 $ 6,200,000 $ 1,550,000 $ 0 $ 7,750,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DENTON 0000-18-020 2019 WAKETON RDC FLOWER MOUND $ 4,700,000LIMITS FROM FM 2499 PROJECT SPONSOR FLOWER MOUND

REVISION DATE 07/2018LIMITS TO CHINN CHAPEL RDPROJECT REALIGNMENT OF ROADWAY (2 TO 2 LANES) MPO PROJ NUM 82386

DESCR FUNDING CAT(S) 3LCREMARKS LOCAL CONTRIBUTION PAID BY FLOWER MOUND PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 250,000ROW PURCH $ 691,000 COST OF

CONSTR $ 4,700,000 APPROVEDCONST ENG $ 164,500 PHASES

CONTING $ 70,500 $ 4,700,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 5,876,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 4,700,000 $ 4,700,000TOTAL $ 0 $ 0 $ 0 $ 0 $ 4,700,000 $ 4,700,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 364: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 364 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-077 2019 VA C RICHARDSON $ 3,403,000LIMITS FROM ON DUCK CREEK TRAIL, FROM PLANO RD PROJECT SPONSOR RICHARDSON

REVISION DATE 07/2018LIMITS TO CAMPBELL/US 75 IN RICHARDSONPROJECT BIKE AND PEDESTRIAN TRAIL MPO PROJ NUM 11116

DESCR FUNDING CAT(S) 3LC,5REMARKS LOCAL CONTRIBUTION SPLIT 50%/50 % BETWEEN RICHARDSO PROJECT MPO MILESTONE POLICY PROJECT - CANNOT BE DELAYED BEYOND F

P7 N AND DALLAS COUNTY HISTORY Y 2019 TOTAL PROJECT COST INFORMATION

PREL ENG $ 403,770ROW PURCH $ 0 COST OF

CONSTR $ 3,403,000 APPROVEDCONST ENG $ 140,153 PHASES

CONTING $ 32,387 $ 3,403,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 3,979,310

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 790,966 $ 790,9665 $ 2,089,627 $ 0 $ 0 $ 522,407 $ 0 $ 2,612,034TOTAL $ 2,089,627 $ 0 $ 0 $ 522,407 $ 790,966 $ 3,403,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DENTON 0000-18-030 2019 CS C FLOWER MOUND $ 7,000,000LIMITS FROM DENTON CREEK BLVD AT GRAHAM BRANCH PROJECT SPONSOR FLOWER MOUND

REVISION DATE 07/2018LIMITS TOPROJECT BUILD NEW LOCATION 0 TO 4 LANE BRIDGE MPO PROJ NUM 83129.1

DESCR FUNDING CAT(S) 3LCREMARKS LOCAL CONTRIBUTION PAID BY FLOWER MOUND PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 735,000ROW PURCH $ 882,000 COST OF

CONSTR $ 7,000,000 APPROVEDCONST ENG $ 245,000 PHASES

CONTING $ 105,000 $ 7,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 8,967,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 7,000,000 $ 7,000,000TOTAL $ 0 $ 0 $ 0 $ 0 $ 7,000,000 $ 7,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-074 2019 CS C,R,ACQ RICHARDSON $ 1,100,000LIMITS FROM ON CAMPBELL RD FROM COLLINS PROJECT SPONSOR RICHARDSON

REVISION DATE 07/2018LIMITS TO US 75PROJECT EXTEND SB RIGHT TURN LANE ON FRONTAGE ROAD AT CAMPBELL; ADD SB LEFT TURN LANE ON MPO PROJ NUM 11794.2

DESCR FRONTAGE ROAD AT CAMPBELL; ADD AUXILIARY LANE ON CAMPBELL FROM US 75 TO COLLINS FUNDING CAT(S) 7REMARKS PROJECT MPO MILESTONE POLICY PROJECT - CANNOT BE DELAYED BEYOND F

P7 HISTORY Y 2019 TOTAL PROJECT COST INFORMATION

PREL ENG $ 150,000ROW PURCH $ 150,000 COST OF

CONSTR $ 950,000 APPROVEDCONST ENG $ 50,771 PHASES

CONTING $ 32,368 $ 1,100,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,333,139

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 880,000 $ 0 $ 0 $ 220,000 $ 0 $ 1,100,000TOTAL $ 880,000 $ 0 $ 0 $ 220,000 $ 0 $ 1,100,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 365: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 365 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG JOHNSON 1181-02-033 2019 FM 917 E,ENG,R,ACQ,UTLJOSHUA $ 4,747,000LIMITS FROM EDDY AVENUE PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO SH 174PROJECT CONSTRUCT RR GRADE SEPARATION AND REALIGN FM 917 MPO PROJ NUM 11955

DESCR FUNDING CAT(S) S102,SBPEREMARKS PROJECT PART OF REGIONAL 10 YEAR PLAN

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,500,000ROW PURCH $ 3,247,000 COST OF

CONSTR $ 15,059,771 APPROVEDCONST ENG $ 478,500 PHASES

CONTING $ 478,500 $ 4,747,000INDIRECT $ 96,750BOND FIN $ 362,250

PT CHG ORD $ 0TOTAL CST $ 21,222,771

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 1,500,000 $ 0 $ 0 $ 0 $ 1,500,000S102 $ 0 $ 3,247,000 $ 0 $ 0 $ 0 $ 3,247,000TOTAL $ 0 $ 4,747,000 $ 0 $ 0 $ 0 $ 4,747,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0902-48-579 2019 CS E,ENG,R,ACQ,UTLVARIOUS $ 1,412,102LIMITS FROM US 81/US 287 AT FM 3479/HARMON ROAD/NORTH TARRANT PARKWAY PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TOPROJECT CONSTRUCT NORTH TARRANT PARKWAY OVER US 287 WITH TURNAROUND ON EASTSIDE; CONSTRU MPO PROJ NUM 11572

DESCR CT HARMON RD OVER US 287; RECONSTRUCT EXISTING SB ENTRANCE RAMP TO US 287 W/AUXI FUNDING CAT(S) 3LC,7LIARY LANE

REMARKS LOCAL CONTRIBUTION PAID BY CITY OF FORT WORTH PROJECTP7 HISTORY

TOTAL PROJECT COST INFORMATIONPREL ENG $ 751,602

ROW PURCH $ 660,500 COST OFCONSTR $ 6,141,600 APPROVED

CONST ENG $ 314,615 PHASESCONTING $ 200,575 $ 1,412,102INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 8,068,892

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 185,852 $ 185,8527 $ 981,000 $ 245,250 $ 0 $ 0 $ 0 $ 1,226,250TOTAL $ 981,000 $ 245,250 $ 0 $ 0 $ 185,852 $ 1,412,102

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG KAUFMAN 0495-01-066 2019 SP 557 E,ENG TERRELL $ 391,474LIMITS FROM FM 148 PROJECT SPONSOR TERRELL

REVISION DATE 07/2018LIMITS TO IH 20PROJECT NEW LOCATION TWO LANE FRONTAGE ROAD EASTBOUND ONLY MPO PROJ NUM 83224

DESCR FUNDING CAT(S) 3LCREMARKS LOCAL CONTRIBUTION PAID BY TERRELL PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 391,474ROW PURCH $ 100,000 COST OF

CONSTR $ 3,204,000 APPROVEDCONST ENG $ 254,617 PHASES

CONTING $ 64,953 $ 391,474INDIRECT $ 250,980BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 4,266,024

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 391,474 $ 391,474TOTAL $ 0 $ 0 $ 0 $ 0 $ 391,474 $ 391,474

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 366: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 366 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG PARKER 1601-02-028 2019 FM 1884 R,ACQ WEATHERFORD $ 1,643,513LIMITS FROM SH 171 PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO SOUTH OF B.B. FIELDER ROADPROJECT WIDEN FROM 2 LANE TO 4 LANE WITH RAISED MEDIAN MPO PROJ NUM 54004

DESCR FUNDING CAT(S) S102REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 570,578ROW PURCH $ 1,643,513 COST OF

CONSTR $ 7,775,860 APPROVEDCONST ENG $ 1,249,963 PHASES

CONTING $ 501,497 $ 1,643,513INDIRECT $ 361,888BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 12,103,299

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALS102 $ 1,314,810 $ 328,703 $ 0 $ 0 $ 0 $ 1,643,513TOTAL $ 1,314,810 $ 328,703 $ 0 $ 0 $ 0 $ 1,643,513

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DENTON 0918-46-267 2019 VA C DENTON $ 330,600LIMITS FROM CITY OF DENTON SCHOOL CONNECTION SIDEWALKS PROJECT SPONSOR DENTON

REVISION DATE 07/2018LIMITS TOPROJECT NEW SIDEWALK SEGMENTS NEAR SCHOOL SITES AT PECAN CREEK AND WOODROW WILSON ELEMENMPO PROJ NUM 11614.5

DESCR TARY SCHOOL IN THE CITY OF DENTON FUNDING CAT(S) 5REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 64,520ROW PURCH $ 76,000 COST OF

CONSTR $ 330,600 APPROVEDCONST ENG $ 24,321 PHASES

CONTING $ 6,204 $ 330,600INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 501,645

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 264,480 $ 0 $ 0 $ 66,120 $ 0 $ 330,600TOTAL $ 264,480 $ 0 $ 0 $ 66,120 $ 0 $ 330,600

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0718-02-045 2019 FM 156 C,R,ACQ FORT WORTH $ 53,509,245LIMITS FROM US 81/287 PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO WATAUGA ROAD (MCELROY)PROJECT RECONSTRUCT AND WIDEN 2 LANE TO 4 LANE DIVIDED MPO PROJ NUM 11244.1

DESCR FUNDING CAT(S) 2M,7,S102REMARKS MPO MILESTONE POLICY PROJECT, CANNOT BE DELAYED BEY PROJECT PART OF REGIONAL 10-YEAR PLAN

P7 OND FY 2019 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 4,300,000ROW PURCH $ 400,000 COST OF

CONSTR $ 53,109,245 APPROVEDCONST ENG $ 2,640,686 PHASES

CONTING $ 1,059,469 $ 53,509,245INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 61,509,400

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 32,000,000 $ 8,000,000 $ 0 $ 0 $ 0 $ 40,000,0007 $ 10,598,245 $ 2,511,000 $ 0 $ 0 $ 0 $ 13,109,245S102 $ 320,000 $ 80,000 $ 0 $ 0 $ 0 $ 400,000TOTAL $ 42,918,245 $ 10,591,000 $ 0 $ 0 $ 0 $ 53,509,245

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 367: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 367 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG JOHNSON 0080-12-001 2019 US 377 C CRESSON $ 15,500,000LIMITS FROM NORTH OF SH 171 PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO JOHNSON/HOOD COUNTY LINEPROJECT CONSTRUCT 0 TO 4 LANE DIVIDED ROADWAY WITH AN INTERCHANGE AT US 377 AND BU 377 MPO PROJ NUM 54125

DESCR FUNDING CAT(S) 2M,12_425REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 830,780ROW PURCH $ 850,000 COST OF

CONSTR $ 15,500,000 APPROVEDCONST ENG $ 745,053 PHASES

CONTING $ 190,064 $ 15,500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 18,115,897

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 3,800,000 $ 950,000 $ 0 $ 0 $ 0 $ 4,750,00012_425 $ 8,600,000 $ 2,150,000 $ 0 $ 0 $ 0 $ 10,750,000TOTAL $ 12,400,000 $ 3,100,000 $ 0 $ 0 $ 0 $ 15,500,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG JOHNSON 3372-01-010 2019 FM 3391 R,ACQ,UTL BURLESON $ 1,750,000LIMITS FROM IH 35W PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO EAST OF CR 602PROJECT WIDEN FROM 2 LANES TO 6 LANES FROM IH 35W TO HURST AVENUE AND 2 LANES TO 4 LANES MPO PROJ NUM 52501

DESCR FROM HURST AVENUE TO CR 602 FUNDING CAT(S) 10,S102REMARKS EARMARK PROJECT ENG FUNDS OBLIGATED IN 2007

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,994,500ROW PURCH $ 1,750,000 COST OF

CONSTR $ 31,000,000 APPROVEDCONST ENG $ 148,720 PHASES

CONTING $ 193,336 $ 1,750,000INDIRECT $ 187,090BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 35,273,646

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL10 $ 600,000 $ 150,000 $ 0 $ 0 $ 0 $ 750,000S102 $ 0 $ 1,000,000 $ 0 $ 0 $ 0 $ 1,000,000TOTAL $ 600,000 $ 1,150,000 $ 0 $ 0 $ 0 $ 1,750,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-028 2019 VA C DALLAS $ 3,121,000LIMITS FROM LAKE HIGHLANDS BIKE TRAIL PROJECT; BOUNDED BY WHITE ROCK CREEK TRAIL AND M PROJECT SPONSOR DALLAS

REVISION DATE 07/2018ERRIMAN PARKWAY NORTH OF SKILLMAN STLIMITS TO EXISTING LAKE HIGHLANDS TRAIL SOUTH TO THE NORTH AND THE DART RAIL LINE TO

THE EASTPROJECT CONNECTIVITY PROJECT EXTENDING THE EXISTING LAKE HIGHLANDS BIKE TRAIL TO WHITE R MPO PROJ NUM 20241

DESCR OCK CREEK TRAIL AND MERRIMAN PARKWAY NORTH OF SKILLMAN ST ADDING PEDESTRIAN BRID FUNDING CAT(S) 3RTR121GES

REMARKS RTR 121-ESD PROJECT PLANNING CSJ 0918-47-918 AND CSJ 0918-SD-014P7 HISTORY

TOTAL PROJECT COST INFORMATIONPREL ENG $ 346,778

ROW PURCH $ 0 COST OFCONSTR $ 3,121,000 APPROVED

CONST ENG $ 0 PHASESCONTING $ 0 $ 3,121,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 3,467,778

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3RTR121 $ 0 $ 0 $ 2,496,800 $ 624,200 $ 0 $ 3,121,000TOTAL $ 0 $ 0 $ 2,496,800 $ 624,200 $ 0 $ 3,121,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 368: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 368 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-027 2019 VA C,E,ENG DALLAS $ 2,482,813LIMITS FROM COLLECTIVE MIXED USE DEVELOPMENT PROJECT SPONSOR DALLAS

REVISION DATE 07/2018LIMITS TOPROJECT BICYCLE LANES, SIDEWALKS, PEDESTRIAN AND INTERSECTION IMPROVEMENTS BOUNDED BY FO MPO PROJ NUM 20240

DESCR RT WORTH AVE, BAHAMA DR, IH 30, AND PLYMOUTH ROAD; AND CONNECTION TO COOMBS CREE FUNDING CAT(S) 3RTR121K TRAIL ALONG PLYMOUTH RD.

REMARKS RTR 121-ESD PROJECTP7 HISTORY

TOTAL PROJECT COST INFORMATIONPREL ENG $ 208,282

ROW PURCH $ 0 COST OFCONSTR $ 2,274,531 APPROVED

CONST ENG $ 0 PHASESCONTING $ 0 $ 2,482,813INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,482,813

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3RTR121 $ 0 $ 0 $ 1,986,250 $ 496,563 $ 0 $ 2,482,813TOTAL $ 0 $ 0 $ 1,986,250 $ 496,563 $ 0 $ 2,482,813

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DENTON 2250-02-013 2019 SL 288 E,ENG DENTON $ 1,532,590LIMITS FROM IH 35 AT SL 288 PROJECT SPONSOR DENTON CO

REVISION DATE 07/2018LIMITS TO US 380 WEST OF DENTONPROJECT CONSTRUCT 2 LANE RURAL ROADWAY ON NEW LOCATION WITH INTERCHANGE AT IH 35; NW QUA MPO PROJ NUM 20175

DESCR DRANT & INTERCHANGE FUNDING CAT(S) 3LCREMARKS LOCAL CONTRIBUTION PAID BY DENTON COUNTY PROJECT RELATED TO TIP 53075/ CSJ 2250-02-014

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,532,590ROW PURCH $ 1,000,000 COST OF

CONSTR $ 15,435,720 APPROVEDCONST ENG $ 705,412 PHASES

CONTING $ 1,278,078 $ 1,532,590INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 19,951,800

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 1,532,590 $ 1,532,590TOTAL $ 0 $ 0 $ 0 $ 0 $ 1,532,590 $ 1,532,590

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DENTON 0918-46-237 2019 CS C,R,ACQ LEWISVILLE $ 6,282,235LIMITS FROM ON CORPORATE DRIVE PROJECT SPONSOR LEWISVILLE

REVISION DATE 07/2018LIMITS TO AT ELM FORK TRINITY RIVER BRIDGEPROJECT CONSTRUCT FOUR LANE DIVIDED ROADWAY SEGMENT 3 MPO PROJ NUM 20152

DESCR FUNDING CAT(S) 3RTR121REMARKS PLANNING CSJ 0918-46-972; RTR 121-DE1 PROJECT LOCAL MATCH TO REGIONAL RTR FUNDS WILL BE FULFILLED THROU

P7 HISTORY GH RELATED PROJECT TIP 20110/CSJ 0918-46-241 TOTAL PROJECT COST INFORMATION

PREL ENG $ 662,589ROW PURCH $ 1,607,884 COST OF

CONSTR $ 4,674,351 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 6,282,235INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 6,944,824

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3RTR121 $ 0 $ 0 $ 4,202,093 $ 2,080,142 $ 0 $ 6,282,235TOTAL $ 0 $ 0 $ 4,202,093 $ 2,080,142 $ 0 $ 6,282,235

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 369: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 369 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DENTON 0918-46-236 2019 CS C LEWISVILLE $ 6,211,499LIMITS FROM ON CORPORATE DRIVE FROM ELM FORK TRINITY RIVER BRIDGE PROJECT SPONSOR LEWISVILLE

REVISION DATE 07/2018LIMITS TO DGNO RRPROJECT CONSTRUCT FOUR LANE DIVIDED ROADWAY; SEGMENT 2 MPO PROJ NUM 20131

DESCR FUNDING CAT(S) 3RTR121REMARKS RTR 121-DE1 PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 512,679ROW PURCH $ 0 COST OF

CONSTR $ 6,211,499 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 6,211,499INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 6,724,178

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3RTR121 $ 0 $ 0 $ 4,969,199 $ 1,242,300 $ 0 $ 6,211,499TOTAL $ 0 $ 0 $ 4,969,199 $ 1,242,300 $ 0 $ 6,211,499

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DENTON 0081-03-049 2019 US 377 E,ENG ROANOKE $ 4,645,000LIMITS FROM SH 114 PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO SOUTH OF FM 1171PROJECT RECONSTRUCT AND WIDEN 2/4 LANE ROADWAY TO 4 LANE DIVIDED URBAN MPO PROJ NUM 20123

DESCR FUNDING CAT(S) 3LC,SBPEREMARKS LOCAL CONTRIBUTION BY DENTON COUNTY PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 4,645,000ROW PURCH $ 0 COST OF

CONSTR $ 73,606,221 APPROVEDCONST ENG $ 3,165,067 PHASES

CONTING $ 132,491 $ 4,645,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 81,548,779

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 2,645,000 $ 2,645,000SBPE $ 0 $ 2,000,000 $ 0 $ 0 $ 0 $ 2,000,000TOTAL $ 0 $ 2,000,000 $ 0 $ 0 $ 2,645,000 $ 4,645,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DENTON 0081-03-047 2019 US 377 R,ACQ ARGYLE $ 34,549,157LIMITS FROM SOUTH OF FM 1171 PROJECT SPONSOR DENTON CO

REVISION DATE 07/2018LIMITS TO CRAWFORD ROADPROJECT RECONSTRUCT AND WIDEN ROADWAY FROM 2 LANE RURAL TO 4 LANE DIVIDED URBAN MPO PROJ NUM 20115

DESCR FUNDING CAT(S) S102REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 4,495,379ROW PURCH $ 34,549,157 COST OF

CONSTR $ 90,739,299 APPROVEDCONST ENG $ 3,914,052 PHASES

CONTING $ 163,844 $ 34,549,157INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 133,861,731

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALS102 $ 27,639,326 $ 3,454,916 $ 0 $ 3,454,915 $ 0 $ 34,549,157TOTAL $ 27,639,326 $ 3,454,916 $ 0 $ 3,454,915 $ 0 $ 34,549,157

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 370: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 370 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG COLLIN 2679-02-008 2019 FM 2514 C PARKER $ 16,802,000LIMITS FROM FM 2551 PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO WEST OF FM 1378PROJECT WIDEN 2 LANE RURAL TO 4 LANE (ULTIMATE 6 LANE) URBAN ROADWAY INCLUDING NEW PEDES MPO PROJ NUM 20083

DESCR TRIAN IMPROVEMENTS AND LEFT/RIGHT TURN LANES FUNDING CAT(S) 2M,3RTR121,5REMARKS RTR MATCH BY TXDOT FUNDS; RTR 121-CC1; CMAQ FUNDS F PROJECT 10-YEAR PLAN PROJECT

P7 OR INTERSECTION AND PEDESTRIAN IMPROVEMENTS ONLY HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 950,000ROW PURCH $ 7,500,000 COST OF

CONSTR $ 16,802,000 APPROVEDCONST ENG $ 858,009 PHASES

CONTING $ 344,241 $ 16,802,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 26,454,250

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 10,880,000 $ 2,720,000 $ 0 $ 0 $ 0 $ 13,600,0003RTR121 $ 0 $ 0 $ 2,000,000 $ 0 $ 0 $ 2,000,0005 $ 961,600 $ 240,400 $ 0 $ 0 $ 0 $ 1,202,000TOTAL $ 11,841,600 $ 2,960,400 $ 2,000,000 $ 0 $ 0 $ 16,802,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG COLLIN 0918-24-154 2019 CS C PLANO $ 1,813,024LIMITS FROM INDEPENDENCE PARKWAY; ON LEGACY DRIVE PROJECT SPONSOR PLANO

REVISION DATE 07/2018LIMITS TO K AVENUEPROJECT ADD RIGHT TURN LANES AND DUAL LEFT TURN LANES MPO PROJ NUM 20060

DESCR FUNDING CAT(S) 3LC,3RTR121REMARKS LOCAL CONTRIBUTION PAID FOR BY PLANO; RTR 121-CC1 PROJECT PLANNING CSJ 0918-24-981

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 146,232ROW PURCH $ 56,244 COST OF

CONSTR $ 1,813,024 APPROVEDCONST ENG $ 63,456 PHASES

CONTING $ 27,195 $ 1,813,024INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,106,151

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3RTR121 $ 0 $ 0 $ 1,001,399 $ 250,350 $ 0 $ 1,251,7493LC $ 0 $ 0 $ 0 $ 0 $ 561,275 $ 561,275TOTAL $ 0 $ 0 $ 1,001,399 $ 250,350 $ 561,275 $ 1,813,024

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0902-48-864 2019 VA E,ENG NORTH RICHLAND HILLS$ 254,550LIMITS FROM SNIDER ST EXTENSION PROJECT; ON MAIN ST, SNIDER ST, AND NORTHEAST PKWY BOU PROJECT SPONSOR NORTH RICHLAND HILLS

REVISION DATE 07/2018NDED BYLIMITS TO MAIN ST TO THE SOUTH, NORTHEAST PKWY ON THE NORTH, DAVIS BLVD ON THE EAST

& SMITHFIELD RD ON THE WESTPROJECT PEDESTRIAN AMENITIES; LANDSCAPING; TRAFFIC SIGNALIZATION; STREET CONSTRUCTION IN MPO PROJ NUM 11383

DESCR CLUDES EXTENDING SNIDER STREET NORTH TO CONNECT TO NORTHEAST PARKWAY (2 LANES), FUNDING CAT(S) 3RTR161AND NORTHEAST PARKWAY WEST TO CONNECT TO SNIDER STREET (2 LANES)

REMARKS RTR 161-TC1 PROJECTP7 HISTORY

TOTAL PROJECT COST INFORMATIONPREL ENG $ 254,550

ROW PURCH $ 0 COST OFCONSTR $ 2,545,500 APPROVED

CONST ENG $ 89,092 PHASESCONTING $ 38,182 $ 254,550INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,927,324

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3RTR161 $ 0 $ 0 $ 203,640 $ 50,910 $ 0 $ 254,550TOTAL $ 0 $ 0 $ 203,640 $ 50,910 $ 0 $ 254,550

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 371: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 371 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 2374-04-060 2019 IH 20 C DUNCANVILLE $ 6,000,000LIMITS FROM NORTH MAIN STREET PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO CAMP WISDOM ROADPROJECT CONSTRUCT 0 TO 4 LANE FRONTAGE ROADS MPO PROJ NUM 11265

DESCR FUNDING CAT(S) 7REMARKS PROJECT MPO MILESTONE POLICY PROJECT - CANNOT BE DELAYED BEYOND F

P7 HISTORY Y 2019 TOTAL PROJECT COST INFORMATION

PREL ENG $ 160,659ROW PURCH $ 1,560,594 COST OF

CONSTR $ 6,000,000 APPROVEDCONST ENG $ 265,354 PHASES

CONTING $ 67,692 $ 6,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 8,054,299

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 4,800,000 $ 1,200,000 $ 0 $ 0 $ 0 $ 6,000,000TOTAL $ 4,800,000 $ 1,200,000 $ 0 $ 0 $ 0 $ 6,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 372: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 372 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 2374-02-053 2020 IH 635 C GARLAND $ 95,000,000LIMITS FROM WEST OF THE KCS RR (WEST OF SH 78) PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO IH 30PROJECT WIDEN 8 TO 10 GENERAL PURPOSE LANES AND RECONSTRUCT 4/6 LANE DISCONTINUOUS TO 4/ MPO PROJ NUM 55075.1

DESCR 8 LANE CONTINUOUS FRONTAGE ROADS FUNDING CAT(S) 5,7REMARKS LBJ EAST CORRIDOR; CHANGE TIP CODE FROM 55075 TO 55 PROJECT 10-YEAR PLAN PROJECT; ADDITIONAL $15,000,000 IN ENG FUNDI

P7 075.1; S102 FUNDS INCLUDED IN CON. PHASE DUE TO THE HISTORY NG IN FY 1994DESIGN-BUILD PROCESS; MANAGED LN IN TIP 55075.2/CSJ 2374-02-152; PORTION OF FUNDS FOR PROJ. IN FY’19;THIS ENTRY MOVED TO FY’20 DUE TO FIN. CONSTRAINT

TOTAL PROJECT COST INFORMATIONPREL ENG $ 57,177,195

ROW PURCH $ 55,137,064 COST OFCONSTR $ 264,097,298 APPROVED

CONST ENG $ 15,133,687 PHASESCONTING $ 633,503 $ 95,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 392,178,747

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 20,000,000 $ 5,000,000 $ 0 $ 0 $ 0 $ 25,000,0007 $ 56,000,000 $ 14,000,000 $ 0 $ 0 $ 0 $ 70,000,000TOTAL $ 76,000,000 $ 19,000,000 $ 0 $ 0 $ 0 $ 95,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-971 2020 CS R,ACQ,UTL DALLAS $ 4,200,000LIMITS FROM ON PRAIRIE CREEK RD FROM N OF MILITARY PKWY PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO NORTH OF FORNEY ROADPROJECT CONSTRUCT GRADE SEPARATION OVER UPRR MPO PROJ NUM 14000

DESCR FUNDING CAT(S) 3LCREMARKS LOCAL CONTRIBUTION TO BE PAID BY CITY OF DALLAS AND PROJECT 2017-2018 CMAQ/STBG PROJECT SELECTION/LOCAL BOND PROGRAM

P7 DALLAS COUNTY HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 3,602,950ROW PURCH $ 4,200,000 COST OF

CONSTR $ 13,313,653 APPROVEDCONST ENG $ 137,559 PHASES

CONTING $ 31,788 $ 4,200,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 21,285,950

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 4,200,000 $ 4,200,000TOTAL $ 0 $ 0 $ 0 $ 0 $ 4,200,000 $ 4,200,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-970 2020 CS R,ACQ DALLAS $ 3,846,250LIMITS FROM ON MOCKINGBIRD LANE FROM US 75 PROJECT SPONSOR DALLAS

REVISION DATE 07/2018LIMITS TO GREENVILLE AVENUEPROJECT PEDESTRIAN AND BICYCLE ENHANCEMENTS INCLUDING TRAFFIC SIGNALS, SIDEWALKS, CROSSW MPO PROJ NUM 14018

DESCR ALKS, AND LIGHTING FUNDING CAT(S) 3LC,5,S102REMARKS LOCAL CONTRIBUTION TO BE PAID BY THE CITY OF DALLAS PROJECT PRIOR CSJ 0000-18-094

P7 ; CHANGE CSJ FROM 0000-18-094 TO 0918-47-970 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 208,443ROW PURCH $ 3,846,250 COST OF

CONSTR $ 1,638,455 APPROVEDCONST ENG $ 57,346 PHASES

CONTING $ 24,577 $ 3,846,250INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 5,775,071

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 458,791 $ 458,7915 $ 1,809,967 $ 0 $ 0 $ 452,492 $ 0 $ 2,262,459S102 $ 900,000 $ 225,000 $ 0 $ 0 $ 0 $ 1,125,000TOTAL $ 2,709,967 $ 225,000 $ 0 $ 452,492 $ 458,791 $ 3,846,250

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 373: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 373 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-920 2020 CS C,R,UTL IRVING $ 17,874,100LIMITS FROM ON SH 356/IRVING BLVD FROM O’CONNOR ROAD PROJECT SPONSOR IRVING

REVISION DATE 07/2018LIMITS TO STRICKLAND PLAZAPROJECT RECONSTRUCT FROM 3 TO 2 LANES WITH A BICYCLE LANE, SIDEWALK IMPROVEMENTS, AND ON MPO PROJ NUM 14029

DESCR -STREET PARKING FROM O’CONNOR TO BRITAIN FUNDING CAT(S) 3LC,3RTR161REMARKS LOCAL CONTRIBUTION PAID BY THE CITY OF IRVING; CITY PROJECT R IN FY2020 IS UTIL ($5,118,640); REMAINDER OF R IN TOTAL

P7 IS MATCHING THE RTR FUNDS FOR CONSTRUCTION BY FUND HISTORY PROJECT COST IS ROW IN FY2019; 2017-2018 CMAQ/STBG PROJEING THE PRE-CONSTRUCTION PHASES; RTR 161-DA1; CHANG CT SELECTION/SUSTAINABLE DEVELOPMENT PHASE 4; PRIOR CSJ 0E CSJ FROM 0000-18-088 TO 0918-47-920 000-18-088

TOTAL PROJECT COST INFORMATIONPREL ENG $ 1,787,410

ROW PURCH $ 5,518,640 COST OFCONSTR $ 12,755,460 APPROVED

CONST ENG $ 446,441 PHASESCONTING $ 191,332 $ 17,874,100INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 20,699,283

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3RTR161 $ 0 $ 0 $ 12,000,000 $ 755,460 $ 0 $ 12,755,4603LC $ 0 $ 0 $ 0 $ 0 $ 5,118,640 $ 5,118,640TOTAL $ 0 $ 0 $ 12,000,000 $ 755,460 $ 5,118,640 $ 17,874,100

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-916 2020 CS R,UTL VARIOUS $ 200,000LIMITS FROM ON WYCLIFF AVENUE FROM WEST OF LAKESIDE DRIVE PROJECT SPONSOR HIGHLAND PARK

REVISION DATE 07/2018LIMITS TO WEST OF GLENWOOD AVENUEPROJECT RECONSTRUCTION OF A TWO-LANE ROADWAY THAT WILL INCLUDE A NEW BRIDGE STRUCTURE TO MPO PROJ NUM 14034

DESCR RAISE ROADWAY OUT OF THE 100-YEAR FLOODPLAIN AS WELL AS DRAINAGE IMPROVEMENTS A FUNDING CAT(S) 3LCT TRIBUTARY 1 IN ORDER TO REDUCE/ELIMINATE FLOOD FREQUENCY

REMARKS LOCAL CONTRIBUTION TO BE PAID BY THE TOWN OF HIGHLA PROJECT 2017-2018 CMAQ/STBG PROJECT SELECTION/SAFETY, INNOVATIVEP7 ND PARK AND THE CITY OF DALLAS; CHANGE CSJ FROM 000 HISTORY CONSTRUCTION, AND EMERGENCY PROJECTS; PRIOR CSJ 0000-18-0

0-18-092 TO 0918-47-916 92 TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,250,000ROW PURCH $ 200,000 COST OF

CONSTR $ 8,000,000 APPROVEDCONST ENG $ 280,000 PHASES

CONTING $ 120,000 $ 200,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 9,850,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 200,000 $ 200,000TOTAL $ 0 $ 0 $ 0 $ 0 $ 200,000 $ 200,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-912 2020 CS C CEDAR HILL $ 315,000LIMITS FROM ON WINTERGREEN ROAD PROJECT SPONSOR CEDAR HILL

REVISION DATE 07/2018LIMITS TO AT NEW CLARK ROADPROJECT NEW SIGNAL IMPROVEMENTS, INCLUDING RETIMING MPO PROJ NUM 14027

DESCR FUNDING CAT(S) 5REMARKS CHANGE CSJ FROM 0000-18-086 TO 0918-47-912 PROJECT 2017-2018 CMAQ/STBG PROJECT SELECTION/LOCAL BOND PROGRAM;

P7 HISTORY PRIOR CSJ 0000-18-086 TOTAL PROJECT COST INFORMATION

PREL ENG $ 35,000ROW PURCH $ 0 COST OF

CONSTR $ 315,000 APPROVEDCONST ENG $ 11,025 PHASES

CONTING $ 4,725 $ 315,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 365,750

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 252,000 $ 0 $ 0 $ 63,000 $ 0 $ 315,000TOTAL $ 252,000 $ 0 $ 0 $ 63,000 $ 0 $ 315,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 374: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 374 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-239 2020 CS R,ACQ,UTL LANCASTER $ 822,882LIMITS FROM JEFFERSON ST FROM WINTERGREEN RD TO PLEASANT RUN RD AND PLEASANT RUN RD FRPROJECT SPONSOR DALLAS CO

REVISION DATE 07/2018OM JEFFERSON STLIMITS TO LANCASTER-HUTCHINS RDPROJECT WIDEN AND RECONSTRUCT 2 LANE UNDIVIDED RURAL TO 4 LANE DIVIDED URBAN MPO PROJ NUM 14003

DESCR FUNDING CAT(S) 7REMARKS CHANGE CSJ FROM 0918-45-917 TO 0918-47-239 PROJECT 2017-2018 CMAQ/STBG PROJECT SELECTION/STRATEGIC PARTNERSH

P7 HISTORY IPS TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,316,563ROW PURCH $ 822,882 COST OF

CONSTR $ 8,385,555 APPROVEDCONST ENG $ 549,994 PHASES

CONTING $ 220,663 $ 822,882INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 11,295,657

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 658,306 $ 0 $ 0 $ 164,576 $ 0 $ 822,882TOTAL $ 658,306 $ 0 $ 0 $ 164,576 $ 0 $ 822,882

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-208 2020 CS R,ACQ,UTL VARIOUS $ 1,400,000LIMITS FROM ON WINTERGREEN RD FROM JEFFERSON STREET PROJECT SPONSOR DALLAS CO

REVISION DATE 07/2018LIMITS TO WEST OF CARPENTER ROADPROJECT RECONSTRUCT AND WIDEN 2 LANE UNDIVIDED RURAL TO 4 LANE DIVIDED URBAN MPO PROJ NUM 14002

DESCR FUNDING CAT(S) 7REMARKS PROJECT PLANNING CSJ 0918-45-997; 2017-2018 CMAQ/STBG PROJECT SEL

P7 HISTORY ECTION/STRATEGIC PARTNERSHIPS TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,239,442ROW PURCH $ 1,400,000 COST OF

CONSTR $ 13,860,558 APPROVEDCONST ENG $ 989,101 PHASES

CONTING $ 396,837 $ 1,400,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 18,885,938

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 1,120,000 $ 0 $ 0 $ 280,000 $ 0 $ 1,400,000TOTAL $ 1,120,000 $ 0 $ 0 $ 280,000 $ 0 $ 1,400,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0095-02-096 2020 US 80 R,ACQ,UTL SUNNYVALE $ 42,000,000LIMITS FROM BELT LINE RD PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO LAWSON RDPROJECT RECONSTRUCT AND WIDEN 4 TO 6 MAINLANES AND 2/4 TO 4/6 LANE CONTINUOUS FRONTAGE R MPO PROJ NUM 53110

DESCR OADS FUNDING CAT(S) S102REMARKS PROJECT 10-YEAR PLAN PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 10,000,000ROW PURCH $ 42,000,000 COST OF

CONSTR $ 100,000,000 APPROVEDCONST ENG $ 7,072,474 PHASES

CONTING $ 296,057 $ 42,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 159,368,531

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALS102 $ 33,600,000 $ 4,200,000 $ 0 $ 4,200,000 $ 0 $ 42,000,000TOTAL $ 33,600,000 $ 4,200,000 $ 0 $ 4,200,000 $ 0 $ 42,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 375: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 375 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0094-03-060 2020 SS 482 C IRVING $ 128,049,000LIMITS FROM AT SH 114 & SH 183 PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TOPROJECT RECONSTRUCT INTERCHANGE (PH 2) MPO PROJ NUM 53003

DESCR FUNDING CAT(S) 12REMARKS PROJECT 10-YEAR PLAN PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 8,923,507ROW PURCH $ 8,195,057 COST OF

CONSTR $ 128,049,000 APPROVEDCONST ENG $ 5,103,974 PHASES

CONTING $ 3,253,919 $ 128,049,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 153,525,457

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL12 $ 102,439,200 $ 25,609,800 $ 0 $ 0 $ 0 $ 128,049,000TOTAL $ 102,439,200 $ 25,609,800 $ 0 $ 0 $ 0 $ 128,049,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0009-11-181 2020 IH 30 R,ACQ DALLAS $ 50,000,000LIMITS FROM IH 35E PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO IH 45PROJECT RECONSTRUCT AND WIDEN 6 TO 12 MAINLANES AND RECONSTRUCT AND WIDEN 0/2 LANE DISCO MPO PROJ NUM 13030

DESCR NTINUOUS TO 2/8 LANE DISCONTINUOUS FRONTAGE ROADS FUNDING CAT(S) S102REMARKS PROJECT 10-YEAR PLAN PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 10,000,000ROW PURCH $ 50,000,000 COST OF

CONSTR $ 143,739,595 APPROVEDCONST ENG $ 6,200,226 PHASES

CONTING $ 259,544 $ 50,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 210,199,365

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALS102 $ 45,000,000 $ 5,000,000 $ 0 $ 0 $ 0 $ 50,000,000TOTAL $ 45,000,000 $ 5,000,000 $ 0 $ 0 $ 0 $ 50,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0009-11-129 2020 IH 30 R,ACQ VARIOUS $ 100,000,000LIMITS FROM IH 45 PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO BASS PRO DRIVEPROJECT RECONST 4/6/8 LN DISCONT TO 4/6 LN CONT FRTG RDS; IH 45 TO US 80: RECONST & WIDE MPO PROJ NUM 13043

DESCR N 8 TO 10 MAINLANES W/1 REV HOV TO 2 REV MGD LNS; US 80 TO IH 635: RECONST 6 TO FUNDING CAT(S) S1026 MAINLANES W/1 REV HOV LN TO 1 REV MANAGED LN; IH 635 TO BASS PRO: OPERATIONALIMPROVEMENTS

REMARKS PROJECT 10-YEAR PLAN PROJECTP7 HISTORY

TOTAL PROJECT COST INFORMATIONPREL ENG $ 50,000,000

ROW PURCH $ 100,000,000 COST OFCONSTR $ 1,286,138,854 APPROVED

CONST ENG $ 55,477,768 PHASESCONTING $ 2,322,325 $ 100,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,493,938,947

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALS102 $ 90,000,000 $ 10,000,000 $ 0 $ 0 $ 0 $ 100,000,000TOTAL $ 90,000,000 $ 10,000,000 $ 0 $ 0 $ 0 $ 100,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 376: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 376 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0000-18-078 2020 PGBT-WE C GRAND PRAIRIE $ 15,688,539LIMITS FROM SH 183 PROJECT SPONSOR NTTA

REVISION DATE 07/2018LIMITS TO IH 20PROJECT WIDEN PGBT WE TOLLWAY FROM 6 TO 8 LANES BETWEEN SH 183 AND IH 30 AND 4 TO 8 LANE MPO PROJ NUM 84145

DESCR S BETWEEN IH 20 AND IH 30 FUNDING CAT(S) 3LCREMARKS LOCAL CONTRIBUTION TO BE PAID BY NTTA PROJECT C IN FY 2019 IS FOR CONSTRUCTION; C IN FY 2020 IS FOR CON

P7 HISTORY STRUCTION ENGINEERING TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,517,243ROW PURCH $ 0 COST OF

CONSTR $ 31,377,079 APPROVEDCONST ENG $ 15,688,539 PHASES

CONTING $ 470,656 $ 15,688,539INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 50,053,517

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 15,688,539 $ 15,688,539TOTAL $ 0 $ 0 $ 0 $ 0 $ 15,688,539 $ 15,688,539

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DENTON 0135-10-057 2020 US 377/US 380R,UTL DENTON $ 2,000,000LIMITS FROM SL 288 PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO US 377/US 380 INTERSECTIONPROJECT ADD RAISED MEDIAN WITH LEFT TURN LANES, ADD RIGHT TURN LANES AND RESTRIPE FOR SH MPO PROJ NUM 55104

DESCR ARED USE FUNDING CAT(S) S102REMARKS LOCAL CONTRIBUTION BY CITY OF DENTON; CMAQ FOR SHAR PROJECT R PHASE IN FY 2019 IS FOR $3,000,000 FOR ROW; R PHASE IN

P7 ED-USE PATH HISTORY FY 2020 IS FOR $2,000,000 FOR UTILITIES; PART OF REGIONAL10 YEAR PLAN

TOTAL PROJECT COST INFORMATIONPREL ENG $ 904,000

ROW PURCH $ 5,000,000 COST OFCONSTR $ 18,599,014 APPROVED

CONST ENG $ 879,830 PHASESCONTING $ 352,996 $ 2,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 25,735,840

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALS102 $ 1,600,000 $ 200,000 $ 0 $ 200,000 $ 0 $ 2,000,000TOTAL $ 1,600,000 $ 200,000 $ 0 $ 200,000 $ 0 $ 2,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DENTON 0918-46-952 2020 CS R,UTL SHADY SHORES $ 2,800,000LIMITS FROM ON SOUTH SHADY SHORES ROAD FROM WEST SHADY SHORES ROAD PROJECT SPONSOR DENTON CO

REVISION DATE 07/2018LIMITS TO SWISHER ROADPROJECT RECONSTRUCT ROAD FROM 2 TO 2 LANES TO ELEVATE OUT OF FLOOD PLAIN WITH DRAINAGE I MPO PROJ NUM 14033

DESCR MPROVEMENTS FUNDING CAT(S) 3LCREMARKS LOCAL CONTRIBUTION PAID BY DENTON COUNTY, LAKE DALL PROJECT 2017-2018 CMAQ/STBG PROJECT SELECTION - SAFETY, INNOVATIV

P7 AS, AND SHADY SHORES; CHANGE CSJ FROM 0000-18-091 T HISTORY E CONSTRUCTION, AND EMERGENCY PROJECTS; PRIOR CSJ 0000-18O 0918-46-952 -091

TOTAL PROJECT COST INFORMATIONPREL ENG $ 1,400,000

ROW PURCH $ 2,800,000 COST OFCONSTR $ 14,000,000 APPROVED

CONST ENG $ 637,000 PHASESCONTING $ 273,000 $ 2,800,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 19,110,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 2,800,000 $ 2,800,000TOTAL $ 0 $ 0 $ 0 $ 0 $ 2,800,000 $ 2,800,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 377: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 377 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 1068-01-214 2020 IH 30 R,ACQ FORT WORTH $ 500,000LIMITS FROM SS 580 (E OF LINKCREST DR) PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO IH 820PROJECT RECONSTRUCT 4 TO 6 MAIN LANES; RECONSTRUCT 4 LANE DISCONTINUOUS FRONTAGE TO 4/6 MPO PROJ NUM 13003

DESCR LANE CONTINUOUS FRONTAGE ROADS; RECONSTRUCT SS 580 INTERCHANGE FUNDING CAT(S) S102REMARKS PROJECT 10 YEAR PLAN PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 4,700,000ROW PURCH $ 500,000 COST OF

CONSTR $ 72,000,000 APPROVEDCONST ENG $ 4,196,254 PHASES

CONTING $ 175,657 $ 500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 81,571,911

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALS102 $ 0 $ 500,000 $ 0 $ 0 $ 0 $ 500,000TOTAL $ 0 $ 500,000 $ 0 $ 0 $ 0 $ 500,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0902-48-712 2020 CS E,ENG VARIOUS $ 2,500,000LIMITS FROM EAST-WEST CONNECTOR FROM SH 360 PROJECT SPONSOR DFW AIRPORT

REVISION DATE 07/2018LIMITS TO RENTAL CAR DRIVEPROJECT CONSTRUCTION OF EAST-WEST CONNECTOR 0 TO 4 LANES DIVIDED URBAN MPO PROJ NUM 11734

DESCR FUNDING CAT(S) 7REMARKS CHANGE CSJ FROM 0902-90-034 TO 0902-48-712; RELATED PROJECT $2,075,000 OF ENG. COST IN EARLIER FISCAL YEARS

P7 TO TIP 11734/CSJ 0902-90-034 (CONSTRUCTION CSJ) HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 4,575,000ROW PURCH $ 0 COST OF

CONSTR $ 0 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 2,500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 4,575,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 2,000,000 $ 0 $ 0 $ 500,000 $ 0 $ 2,500,000TOTAL $ 2,000,000 $ 0 $ 0 $ 500,000 $ 0 $ 2,500,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0000-02-019 2020 CS C VARIOUS $ 4,563,980LIMITS FROM GLADE ROAD; NORTHBOUND SH 360 FRONTAGE ROAD PROJECT SPONSOR DFW AIRPORT

REVISION DATE 07/2018LIMITS TO WEST AIRFIELD DRIVEPROJECT RECONSTRUCT FROM 2 TO 2 LANES (ADD CENTER TURN LANE AND SHOULDERS) MPO PROJ NUM 14039

DESCR FUNDING CAT(S) 7,OtherREMARKS PROJECT 912,796 OF TRANSPORTATION DEVELOPMENT CREDITS (CAT 3 - TD

P7 HISTORY C [MPO]) UTILIZED IN LIEU OF A LOCAL MATCH AND ARE NOT CALCULATED IN FUNDING TOTAL; 2017-2018 CMAQ/STBG FEDERAL/LOCAL EXCHANGE PROJECT SELECTION PROGRAM

TOTAL PROJECT COST INFORMATIONPREL ENG $ 524,857

ROW PURCH $ 625,000 COST OFCONSTR $ 4,563,980 APPROVED

CONST ENG $ 159,739 PHASESCONTING $ 68,460 $ 4,563,980INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 5,942,036

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 4,563,980 $ 0 $ 0 $ 0 $ 0 $ 4,563,980Other $ 0 $ 0 $ 0 $ 0 $ 0 $ 0TOTAL $ 4,563,980 $ 0 $ 0 $ 0 $ 0 $ 4,563,980

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 378: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 378 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0902-90-939 2020 VA E,ENG FORT WORTH $ 52,000LIMITS FROM BUS 287/NORTH MAIN STREET AT NORTH AIRPORT ENTRANCE PROJECT SPONSOR FORT WORTH

REVISION DATE 07/2018LIMITS TOPROJECT ADD RIGHT TURN LANE FOR SOUTHBOUND TRAFFIC INTO AIRPORT’S NORTHERN ENTRANCE (MAI MPO PROJ NUM 14037

DESCR N ENTRANCE FOR JET FUEL TRUCKS) FUNDING CAT(S) 5REMARKS REVISE CSJ FROM 0000-02-018 TO 0902-90-939 PROJECT PART OF 2017-2018 CMAQ/STBG SAFETY, INNOVATIVE CONSTRUCTI

P7 HISTORY ON, AND EMERGENCY PROJECT SELECTION TOTAL PROJECT COST INFORMATION

PREL ENG $ 52,000ROW PURCH $ 10,000 COST OF

CONSTR $ 178,000 APPROVEDCONST ENG $ 6,230 PHASES

CONTING $ 2,670 $ 52,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 248,900

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 41,600 $ 0 $ 0 $ 10,400 $ 0 $ 52,000TOTAL $ 41,600 $ 0 $ 0 $ 10,400 $ 0 $ 52,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0902-90-984 2020 VA E,ENG FORT WORTH $ 52,000LIMITS FROM BUS 287/NORTH MAIN STREET AT NORTH HANGAR ENTRANCE PROJECT SPONSOR FORT WORTH

REVISION DATE 07/2018LIMITS TOPROJECT ADD RIGHT TURN LANES FOR SOUTHBOUND TRAFFIC MPO PROJ NUM 14036

DESCR FUNDING CAT(S) 5REMARKS REVISE CSJ FROM 0000-02-017 TO 0902-90-984 PROJECT PART OF 2017-2018 CMAQ/STBG SAFETY, INNOVATIVE CONSTRUCTI

P7 HISTORY ON, AND EMERGENCY PROJECT SELECTION TOTAL PROJECT COST INFORMATION

PREL ENG $ 52,000ROW PURCH $ 35,000 COST OF

CONSTR $ 194,000 APPROVEDCONST ENG $ 6,790 PHASES

CONTING $ 2,910 $ 52,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 290,700

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 41,600 $ 0 $ 0 $ 10,400 $ 0 $ 52,000TOTAL $ 41,600 $ 0 $ 0 $ 10,400 $ 0 $ 52,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG WISE 2418-01-013 2020 FM 1810 R,ACQ DECATUR $ 5,000,000LIMITS FROM EAST OF PUBLIC ROAD 1122 PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO INTERSECTION OF US 81/287 AT FM 1810PROJECT REALIGNMENT OF FM 1810 AND GRADE SEPARATION AND RETAINING WALLS AT REALIGNED INT MPO PROJ NUM 13004

DESCR ERSECTION AT US 81/287 & BU 81D FUNDING CAT(S) S102REMARKS PROJECT R PHASE IN FY2020 IS $5 MILLION FOR ROW; R PHASE IN FY202

P7 HISTORY 3 IS $1.5 MILLION FOR UTILITIES TOTAL PROJECT COST INFORMATION

PREL ENG $ 4,600,000ROW PURCH $ 6,500,000 COST OF

CONSTR $ 30,000,000 APPROVEDCONST ENG $ 603,262 PHASES

CONTING $ 6,155 $ 5,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 41,709,417

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALS102 $ 0 $ 5,000,000 $ 0 $ 0 $ 0 $ 5,000,000TOTAL $ 0 $ 5,000,000 $ 0 $ 0 $ 0 $ 5,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 379: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 379 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PARIS NCTCOG HUNT 2659-01-010 2020 FM 1570 E,ENG GREENVILLE $ 1,648,500LIMITS FROM IH 30 PROJECT SPONSOR TXDOT-PARIS

REVISION DATE 07/2018LIMITS TO SH 66PROJECT CONSTRUCT 2 LANE TO 4 LANE DIVIDED WITH SHOULDERS (HMAC PAVEMENT AND RR CROSSING MPO PROJ NUM 13052

DESCR ) NORTH PROJECT FUNDING CAT(S) 3LCREMARKS LOCAL CONTRIBUTION BY HUNT COUNTY; CHANGE CSJ FROM PROJECT PART OF REGIONAL 10 YEAR PLAN; E IN FY20 IS FOR FINAL DES

P7 2659-01-900 TO 2659-01-010 HISTORY IGN; E IN FY18 FOR ENVIRONMENTAL AND INITIAL DESIGN TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,450,000ROW PURCH $ 900,000 COST OF

CONSTR $ 18,833,840 APPROVEDCONST ENG $ 944,356 PHASES

CONTING $ 378,885 $ 1,648,500INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 23,507,081

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 1,648,500 $ 1,648,500TOTAL $ 0 $ 0 $ 0 $ 0 $ 1,648,500 $ 1,648,500

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PARIS NCTCOG HUNT 1290-07-001 2020 SH 276 C QUINLAN $ 9,000,000LIMITS FROM WEST OF FM 36 PROJECT SPONSOR TXDOT-PARIS

REVISION DATE 07/2018LIMITS TO SH 34PROJECT CONSTRUCT 0 TO 4 LANE FACILITY ON NEW LOCATION (QUINLAN BYPASS) WITH A CONTINUOU MPO PROJ NUM 55152

DESCR S LEFT TURN LANE FUNDING CAT(S) 2MREMARKS CAT 2M - PROP 1 PROJECT PART OF REGIONAL 10 YEAR PLAN

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,087,592ROW PURCH $ 3,510,000 COST OF

CONSTR $ 9,000,000 APPROVEDCONST ENG $ 472,332 PHASES

CONTING $ 120,493 $ 9,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 15,190,417

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 7,200,000 $ 1,800,000 $ 0 $ 0 $ 0 $ 9,000,000TOTAL $ 7,200,000 $ 1,800,000 $ 0 $ 0 $ 0 $ 9,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PARIS NCTCOG HUNT 0692-01-900 2020 FM 1570 E,ENG GREENVILLE $ 1,256,500LIMITS FROM IH 30 PROJECT SPONSOR TXDOT-PARIS

REVISION DATE 07/2018LIMITS TO SH 34PROJECT WIDEN 2 LANE TO 4 LANE DIVIDED ROADWAY (SOUTH PROJECT) MPO PROJ NUM 13051

DESCR FUNDING CAT(S) 3LCREMARKS LOCAL CONTRIBUTION BY HUNT COUNTY PROJECT E PHASE IN FY19 IS INITIAL DESIGN AND ENVIRONMENTAL; E PH

P7 HISTORY ASE IN FY20 IS FINAL DESIGN TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,890,000ROW PURCH $ 890,000 COST OF

CONSTR $ 18,979,785 APPROVEDCONST ENG $ 941,397 PHASES

CONTING $ 377,698 $ 1,256,500INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 23,078,880

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 1,256,500 $ 1,256,500TOTAL $ 0 $ 0 $ 0 $ 0 $ 1,256,500 $ 1,256,500

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 380: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 380 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PARIS NCTCOG HUNT 0009-13-167 2020 IH 30 E,ENG,R,ACQ GREENVILLE $ 1,350,000LIMITS FROM AT FM 1570 PROJECT SPONSOR TXDOT-PARIS

REVISION DATE 07/2018LIMITS TOPROJECT CONSTRUCT INTERCHANGE MPO PROJ NUM 13050

DESCR FUNDING CAT(S) S102,SBPEREMARKS PROJECT PART OF REGIONAL 10 YEAR PLAN; E PHASE IN FY19 IS ENVIRON

P7 HISTORY MENTAL; E PHASE IN FY20 AND FY21 ARE INITIAL DESIGN AND FINAL DESIGN

TOTAL PROJECT COST INFORMATIONPREL ENG $ 2,079,249

ROW PURCH $ 350,000 COST OFCONSTR $ 30,000,000 APPROVED

CONST ENG $ 1,791,511 PHASESCONTING $ 1,142,136 $ 1,350,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 35,362,896

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 1,000,000 $ 0 $ 0 $ 0 $ 1,000,000S102 $ 280,000 $ 70,000 $ 0 $ 0 $ 0 $ 350,000TOTAL $ 280,000 $ 1,070,000 $ 0 $ 0 $ 0 $ 1,350,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG HOOD 0080-04-081 2020 US 377 R,ACQ GRANBURY $ 9,000,000LIMITS FROM EAST OF OLD ACTON HIGHWAY PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO END OF BRAZOS RIVER BRIDGEPROJECT WIDEN 4 LANE CONTINUOUS TWO-WAY LEFT TURN LANE TO 6 LANE DIVIDED WITH INTERCHANG MPO PROJ NUM 54019

DESCR E AT BU 377H FUNDING CAT(S) S102REMARKS PROJECT R PHASE IN FY2020 IS $9 MILLION FOR ROW; R PHASE IN FY202

P7 HISTORY 1 IS ADDITIONAL $1,750,954 FOR ROW; RELATED TO TIP 54018/CSJ 0080-03-049 AND TIP 54071/CSJ 0080-04-094

TOTAL PROJECT COST INFORMATIONPREL ENG $ 8,790,618

ROW PURCH $ 10,750,954 COST OFCONSTR $ 41,591,921 APPROVED

CONST ENG $ 2,062,959 PHASESCONTING $ 827,679 $ 9,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 64,024,131

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALS102 $ 7,200,000 $ 1,800,000 $ 0 $ 0 $ 0 $ 9,000,000TOTAL $ 7,200,000 $ 1,800,000 $ 0 $ 0 $ 0 $ 9,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG PARKER 0314-07-061 2020 IH 20 R,ACQ,UTL WEATHERFORD $ 1,150,000LIMITS FROM FM 2552 PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO BANKHEAD HIGHWAYPROJECT CONSTRUCT 0 TO 4/6 WESTBOUND AND EASTBOUND FRONTAGE ROADS MPO PROJ NUM 13054

DESCR FUNDING CAT(S) S102REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,500,000ROW PURCH $ 1,150,000 COST OF

CONSTR $ 21,000,000 APPROVEDCONST ENG $ 1,146,191 PHASES

CONTING $ 292,396 $ 1,150,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 25,088,587

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALS102 $ 920,000 $ 230,000 $ 0 $ 0 $ 0 $ 1,150,000TOTAL $ 920,000 $ 230,000 $ 0 $ 0 $ 0 $ 1,150,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 381: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 381 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG PARKER 0000-02-023 2020 FM 5 C WEATHERFORD $ 591,000LIMITS FROM AT EAST BANKHEAD DRIVE PROJECT SPONSOR PARKER CO

REVISION DATE 07/2018LIMITS TOPROJECT REALIGN THE INTERSECTION, PAVEMENT RESURFACING, DRAINAGE IMPROVEMENTS MPO PROJ NUM 14043

DESCR FUNDING CAT(S) 3LC,7REMARKS LOCAL CONTRIBUTION BY PARKER COUNTY PROJECT 2017-2018 CMAQ/STBG PROJECT SELECTION/LOCAL BOND PROGRAM

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 105,900ROW PURCH $ 0 COST OF

CONSTR $ 591,000 APPROVEDCONST ENG $ 20,685 PHASES

CONTING $ 8,865 $ 591,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 726,450

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 31,000 $ 31,0007 $ 448,000 $ 112,000 $ 0 $ 0 $ 0 $ 560,000TOTAL $ 448,000 $ 112,000 $ 0 $ 0 $ 31,000 $ 591,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG PARKER 0000-01-138 2020 US 180 R,ACQ WEATHERFORD $ 2,150,000LIMITS FROM FM 2552 PROJECT SPONSOR WEATHERFORD

REVISION DATE 07/2018LIMITS TO ALAMO ST.PROJECT RECONSTRUCT 2/4 LANE ROADWAY TO 4 LANE ROADWAY INCLUDING A ROUNDABOUT AT THE INT MPO PROJ NUM 14026

DESCR ERSECTION OF US 180, NEW BICYCLE LANES, NEW SIDEWALKS, AND INTERSECTION IMPROVEM FUNDING CAT(S) 3LCENTS AT FM 51

REMARKS LOCAL CONTRIBUTION PAID BY CITY OF WEATHERFORD PROJECTP7 HISTORY

TOTAL PROJECT COST INFORMATIONPREL ENG $ 1,980,000

ROW PURCH $ 2,150,000 COST OFCONSTR $ 12,460,000 APPROVED

CONST ENG $ 872,200 PHASESCONTING $ 373,800 $ 2,150,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 17,836,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 2,150,000 $ 2,150,000TOTAL $ 0 $ 0 $ 0 $ 0 $ 2,150,000 $ 2,150,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DENTON 0918-46-954 2020 CS C LEWISVILLE $ 3,000,000LIMITS FROM ON COLLEGE STREET; FROM MILL STREET PROJECT SPONSOR LEWISVILLE

REVISION DATE 07/2018LIMITS TO RAILROAD STREETPROJECT RECONSTRUCT FROM 2 TO 2 LANES, ADD BICYCLE LANES, WIDEN/EXPAND SIDEWALKS, AND AD MPO PROJ NUM 14030

DESCR D ON-STREET PARKING FUNDING CAT(S) 5,7,OtherREMARKS LOCAL CONTRIBUTION PAID BY CITY OF LEWISVILLE; CHAN PROJECT 2017-2018 CMAQ/STBG PROJECT SELECTION/SUSTAINABLE DEVELOP

P7 GE CSJ FROM 0000-18-089 TO 0918-46-954 HISTORY MENT PHASE 4; 600,000 OF TRANSPORTATION DEVELOPMENT CREDITS (CAT 3 - POLICY BUNDLE TDC [MPO]) UTILIZED IN LIEU OFA LOCAL MATCH AND ARE NOT CALCULATED IN FUNDING TOTAL; PRIOR CSJ 0000-18-089

TOTAL PROJECT COST INFORMATIONPREL ENG $ 600,000

ROW PURCH $ 0 COST OFCONSTR $ 3,000,000 APPROVED

CONST ENG $ 105,000 PHASESCONTING $ 45,000 $ 3,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 3,750,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 605,000 $ 0 $ 0 $ 0 $ 0 $ 605,0007 $ 2,395,000 $ 0 $ 0 $ 0 $ 0 $ 2,395,000Other $ 0 $ 0 $ 0 $ 0 $ 0 $ 0TOTAL $ 3,000,000 $ 0 $ 0 $ 0 $ 0 $ 3,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 382: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 382 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DENTON 0918-46-282 2020 VA C CARROLLTON $ 260,871LIMITS FROM DUDLEY BRANCH TRAIL FROM NORTH CARROLLTON/FRANKFORD DART STATION PROJECT SPONSOR CARROLLTON

REVISION DATE 07/2018LIMITS TO OLD DENTON RDPROJECT CONSTRUCT APPROX 2.1 MILES BIKE/PEDESTRIAN TRAIL MPO PROJ NUM 40017

DESCR FUNDING CAT(S) 5REMARKS THIS ENTRY IS FOR CE PHASE ONLY PROJECT PROJECT FUNDING IS 75% FEDERAL AND 25% LOCAL; C PHASE IN

P7 HISTORY FY19 FOR CONSTRUCTION; C PHASE IN FY20 IS CONSTRUCTION ENGINEERING; 2017 TA SET-ASIDE CALL FOR PROJECTS

TOTAL PROJECT COST INFORMATIONPREL ENG $ 727,670

ROW PURCH $ 0 COST OFCONSTR $ 3,011,470 APPROVED

CONST ENG $ 260,871 PHASESCONTING $ 38,777 $ 260,871INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 4,038,788

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 195,653 $ 0 $ 0 $ 65,218 $ 0 $ 260,871TOTAL $ 195,653 $ 0 $ 0 $ 65,218 $ 0 $ 260,871

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG COLLIN 0451-03-013 2020 SH 205 R,UTL VARIOUS $ 2,000,000LIMITS FROM NORTH OF JOHN KING PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO SH 78PROJECT WIDEN 2 LANE RURAL HIGHWAY TO 4 LANE DIVIDED (6 LANE ULTIMATE) MPO PROJ NUM 55073

DESCR FUNDING CAT(S) S102REMARKS PROJECT R PHASE IN FY2019 IS $3 MILLION FOR ROW; R PHASE IN FY202

P7 HISTORY 0 IS $2 MILLION FOR UTILITIES; 10-YEAR PLAN PROJECT TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,722,000ROW PURCH $ 5,000,000 COST OF

CONSTR $ 28,654,950 APPROVEDCONST ENG $ 1,610,827 PHASES

CONTING $ 646,279 $ 2,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 37,634,056

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALS102 $ 1,600,000 $ 200,000 $ 0 $ 200,000 $ 0 $ 2,000,000TOTAL $ 1,600,000 $ 200,000 $ 0 $ 200,000 $ 0 $ 2,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG COLLIN 0047-09-034 2020 SH 5 E,ENG,R,ACQ MCKINNEY $ 4,000,000LIMITS FROM FRISCO ROAD (N OF FM 1378) PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO SPUR 399PROJECT RECONSTRUCT 2 LANE UNDIVIDED ROADWAY TO 4 LANE DIVIDED URBAN ROADWAY (ULTIMATE 6 MPO PROJ NUM 13010

DESCR LANES) FUNDING CAT(S) S102,SBPEREMARKS PROJECT 10-YEAR PLAN PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,500,000ROW PURCH $ 2,500,000 COST OF

CONSTR $ 10,000,000 APPROVEDCONST ENG $ 599,450 PHASES

CONTING $ 240,505 $ 4,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 14,839,955

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 1,500,000 $ 0 $ 0 $ 0 $ 1,500,000S102 $ 2,000,000 $ 250,000 $ 0 $ 250,000 $ 0 $ 2,500,000TOTAL $ 2,000,000 $ 1,750,000 $ 0 $ 250,000 $ 0 $ 4,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 383: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 383 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG COLLIN 0047-06-163 2020 US 75 E,ENG ALLEN $ 500,000LIMITS FROM BETHANY DRIVE PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO SH 121PROJECT REMOVE HOV LANES AND ADD PEAK HOUR TRAVEL LANES MPO PROJ NUM 30007

DESCR FUNDING CAT(S) SBPEREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 500,000ROW PURCH $ 0 COST OF

CONSTR $ 10,000,000 APPROVEDCONST ENG $ 249,700 PHASES

CONTING $ 10,453 $ 500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 10,760,153

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 500,000 $ 0 $ 0 $ 0 $ 500,000TOTAL $ 0 $ 500,000 $ 0 $ 0 $ 0 $ 500,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG COLLIN 0047-05-054 2020 SH 5 E,ENG,R,ACQ MCKINNEY $ 18,300,000LIMITS FROM SPUR 399 PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO SH 121PROJECT RECONSTRUCT AND WIDEN 2/4 LANE UNDIVIDED ROADWAY TO 4/6 LANE DIVIDED URBAN ROADW MPO PROJ NUM 13026

DESCR AY FUNDING CAT(S) S102,SBPEREMARKS PROJECT 10-YEAR PLAN PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 4,300,000ROW PURCH $ 14,000,000 COST OF

CONSTR $ 75,900,000 APPROVEDCONST ENG $ 4,476,027 PHASES

CONTING $ 1,795,825 $ 18,300,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 100,471,852

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 4,300,000 $ 0 $ 0 $ 0 $ 4,300,000S102 $ 11,200,000 $ 1,400,000 $ 0 $ 1,400,000 $ 0 $ 14,000,000TOTAL $ 11,200,000 $ 5,700,000 $ 0 $ 1,400,000 $ 0 $ 18,300,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG ELLIS 0172-12-902 2020 VA C ENNIS $ 17,000,000LIMITS FROM ON BUS 287/ENNIS AVE AT UP RAILROAD PROJECT SPONSOR ENNIS

REVISION DATE 07/2018LIMITS TOPROJECT CONSTRUCT GRADE SEPARATION AT THE INTERSECTION OF BUS 287/ENNIS AVE AND THE UPRR MPO PROJ NUM 14028

DESCR LINE FUNDING CAT(S) 3LC,7,11REMARKS LOCAL CONTRIBUTION BY UNION PACIFIC; CHANGE CSJ FRO PROJECT 2017-2018 CMAQ/STBG PROJECT SELECTION/SUSTAINABLE DEVELOP

P7 M 0000-18-087 TO 0172-12-902 HISTORY MENT: PHASE 4; PRIOR CSJ 0000-18-087 TOTAL PROJECT COST INFORMATION

PREL ENG $ 4,000,000ROW PURCH $ 0 COST OF

CONSTR $ 17,000,000 APPROVEDCONST ENG $ 595,000 PHASES

CONTING $ 255,000 $ 17,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 21,850,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 10,000,000 $ 2,500,000 $ 0 $ 0 $ 0 $ 12,500,00011 $ 2,000,000 $ 500,000 $ 0 $ 0 $ 0 $ 2,500,0003LC $ 0 $ 0 $ 0 $ 0 $ 2,000,000 $ 2,000,000TOTAL $ 12,000,000 $ 3,000,000 $ 0 $ 0 $ 2,000,000 $ 17,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 384: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 384 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PARIS NCTCOG HUNT 0901-22-121 2020 VARIOUS C QUINLAN $ 336,107LIMITS FROM ON S CHURCH ST FROM E MAIN ST PROJECT SPONSOR TXDOT-PARIS

REVISION DATE 07/2018LIMITS TO D.C. CANNON ELEMENTARY SCHOOL ON SS 264 & MEYERSPROJECT S. CHURCH STREET SIDEWALK IMPROVEMENTS, INCLUDING 5-FOOT SIDEWALK AND ADA RAMP C MPO PROJ NUM 40050

DESCR ONSTRUCTION FUNDING CAT(S) 9TAPREMARKS COST OF APPROVED PHASES INCLUDES CE COST PROJECT CITY OF QUINLAN PROVIDING $31,000 FOR IN-KIND CONTRIBUTIO

P7 HISTORY N; 2017 STATE SELECTED TA SET-ASIDE PROJECT; FUNDING SHOWN AS 9TAP IN ESTIP PER TXDOT TPP SINCE 9TA IS NOT A FUNDING CATEGORY OPTION IN THE ESTIP

TOTAL PROJECT COST INFORMATIONPREL ENG $ 41,352

ROW PURCH $ 0 COST OFCONSTR $ 332,656 APPROVED

CONST ENG $ 3,451 PHASESCONTING $ 3,739 $ 336,107INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 381,198

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 268,885 $ 0 $ 0 $ 67,222 $ 0 $ 336,107TOTAL $ 268,885 $ 0 $ 0 $ 67,222 $ 0 $ 336,107

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0902-90-089 2020 CS C CROWLEY $ 10,142,051LIMITS FROM MAIN STREET (FM 1187 BUS) FROM CROWLEY ROAD (FM 731) PROJECT SPONSOR CROWLEY

REVISION DATE 07/2018LIMITS TO BEVERLY STREETPROJECT RECONSTRUCT FROM 3 TO 2 LANES, ADD BICYCLE LANES, NEW SIDEWALKS, ADD ON-STREET P MPO PROJ NUM 14016

DESCR ARKING, AND CONSTRUCT TWO ROUNDABOUTS FUNDING CAT(S) 3LC,5,7REMARKS LOCAL CONTRIBUTION PAID BY CITY OF CROWLEY; CMAQ FU PROJECT 2017-2018 CMAQ/STBG SD PHASE 4 PROJECT SELECTION PROGRAM

P7 NDS FOR BIKE LANES, SIDEWALKS, AND ROUNDABOUTS ONLY HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 719,336ROW PURCH $ 308,525 COST OF

CONSTR $ 10,142,051 APPROVEDCONST ENG $ 404,321 PHASES

CONTING $ 103,143 $ 10,142,051INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 11,677,376

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 4,517,051 $ 4,517,0515 $ 1,447,099 $ 0 $ 0 $ 361,775 $ 0 $ 1,808,8747 $ 3,052,901 $ 0 $ 0 $ 763,225 $ 0 $ 3,816,126TOTAL $ 4,500,000 $ 0 $ 0 $ 1,125,000 $ 4,517,051 $ 10,142,051

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0902-90-959 2020 VA T VARIOUS $ 500,000LIMITS FROM NEW TRANSIT SERVICES WITHIN THE CITIES OF FOREST HILL, CROWLEY, & EVERMAN PROJECT SPONSOR FWTA

REVISION DATE 07/2018LIMITS TO AND CONNECTING AREAS TO MAKE A SEAMLESS TRANSIT ROUTEPROJECT PILOT PROGRAM TO IMPLEMENT AND OPERATE NEW FIXED AND FLEXIBLE STOP ROUTE TRANSIT MPO PROJ NUM 11262.3

DESCR SERVICE FOR CITIZENS OF FOREST HILL, EVERMAN AND CROWLEY, INCLUDING THE PROVISI FUNDING CAT(S) 5,OtherON OF BUSES AND BUS STOPS

REMARKS RELATED TO TIP 11262.3/CSJ 0902-90-940 PROJECT 100,000 OF TRANSPORTATION DEVELOPMENT CREDITS (CAT 3 - POP7 HISTORY LICY BUNDLE TDC [MPO]) CREDITS UTILIZED IN LIEU OF A LOCA

L MATCH AND ARE NOT CALCULATED IN FUNDING TOTAL; PART OFHEMPHILL/LAMAR FUNDING PARTNERSHIP

TOTAL PROJECT COST INFORMATIONPREL ENG $ 0

ROW PURCH $ 0 COST OFCONSTR $ 500,000 APPROVED

CONST ENG $ 0 PHASESCONTING $ 0 $ 500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 500,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 500,000 $ 0 $ 0 $ 0 $ 0 $ 500,000Other $ 0 $ 0 $ 0 $ 0 $ 0 $ 0TOTAL $ 500,000 $ 0 $ 0 $ 0 $ 0 $ 500,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 385: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 385 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG COLLIN 0918-24-242 2020 CS C MCKINNEY $ 577,665LIMITS FROM ON STACY ROAD FROM FM 2478 PROJECT SPONSOR MCKINNEY

REVISION DATE 07/2018LIMITS TO EAST OF FM 2478PROJECT CONSTRUCT INTERSECTION IMPROVEMENT MPO PROJ NUM 19009

DESCR FUNDING CAT(S) 5,OtherREMARKS CHANGE CSJ FROM 0918-24-903 TO 0918-24-242; COSTS O PROJECT 97,574 OF TRANSPORTATION DEVELOPMENT CREDITS (CAT 3- TDC

P7 F APPROVED PHASE INCLUDES CE COST HISTORY [MPO]) UTILIZED IN LIEU OF A LOCAL MATCH AND ARE NOT CALCULATED IN FUNDING TOTAL; FUNDING MOVED FROM TIP 19002/CSJ0135-03-047; PART OF COLLIN COUNTY LIRAP/LIP FUNDING PARTNERSHIP

TOTAL PROJECT COST INFORMATIONPREL ENG $ 105,000

ROW PURCH $ 0 COST OFCONSTR $ 487,872 APPROVED

CONST ENG $ 89,793 PHASESCONTING $ 5,808 $ 577,665INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 688,473

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 559,706 $ 0 $ 0 $ 17,959 $ 0 $ 577,665Other $ 0 $ 0 $ 0 $ 0 $ 0 $ 0TOTAL $ 559,706 $ 0 $ 0 $ 17,959 $ 0 $ 577,665

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-236 2020 VA C VARIOUS $ 3,750,000LIMITS FROM REGIONAL TRAIL CONNECTIONS TO THE FUTURE CYPRESS WATERS COTTON BELT RAIL SPROJECT SPONSOR DALLAS CO

REVISION DATE 07/2018TATION; MOCKINGBIRD LN TO SANDERS LOOPLIMITS TO EXISTING TRAIL NORTH OF OLYMPUS BLVD TO SOUTH OF THE FUTURE CYPRESS WATERS

RAIL STATIONPROJECT CONSTRUCT SHARED USE PATH AND RELATED PEDESTRIAN AND BICYCLE IMPROVEMENTS (PEDES MPO PROJ NUM 14013

DESCR TRIAN CROSSWALKS, SIGNAGE, LIGHTING, AND SIGNALS) IN PROXIMITY OF THE FUTURE CYP FUNDING CAT(S) 5RESS WATERS COTTON BELT RAIL STATION

REMARKS CHANGE CSJ FROM 0918-47-911 TO 0918-47-236 PROJECT 2017-2018 CMAQ/STBG PROJECT SELECTION/TRANSIT PROGRAMP7 HISTORY

TOTAL PROJECT COST INFORMATIONPREL ENG $ 1,100,000

ROW PURCH $ 0 COST OFCONSTR $ 3,750,000 APPROVED

CONST ENG $ 217,317 PHASESCONTING $ 50,219 $ 3,750,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 5,117,536

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 3,000,000 $ 0 $ 0 $ 750,000 $ 0 $ 3,750,000TOTAL $ 3,000,000 $ 0 $ 0 $ 750,000 $ 0 $ 3,750,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-206 2020 VA C DALLAS $ 6,471,866LIMITS FROM LAKE HIGHLANDS TRAIL NORTHERN EXTENSION & LAKE HIGHLANDS TRAIL PHASE 2A, 2 PROJECT SPONSOR DALLAS

REVISION DATE 07/2018B; FROM EXISTING WHITE ROCK CREEK TRAIL TOLIMITS TO EXISTING LAKE HIGHLANDS TRAIL AT WHITE ROCK TRAIL ROADWAY TO THE LAKE HIGH

LANDS DART STATION NEAR WALNUT HILLPROJECT CONSTRUCT NEW SHARED-USE PATH FOR BICYCLISTS AND PEDESTRIANS; BIKEWAY AND PEDEST MPO PROJ NUM 40049

DESCR RIAN IMPROVEMENTS INCLUDING SIDEWALKS, BICYCLE/PEDESTRIAN SIGNALS, CROSSWALKS, S FUNDING CAT(S) 3LC,5,9TAPIGNAGE, AND BICYCLE/PEDESTRIAN TRAFFIC COUNT EQUIPMENT

REMARKS LOCAL CONTRIBUTION PAID BY CITY OF DALLAS; COST OF PROJECT 2017 TA SET-ASIDE CALL FOR PROJECTS; TOTAL PROJECT FUNDINP7 APPROVED PHASES INCLUDES CE COST HISTORY G IS SPLIT IS 76% FEDERAL/24% LOCAL; FUNDING SHOWN AS 9TA

P IN ESTIP PER TXDOT TPP SINCE 9TA IS NOT A FUNDING CATEGORY OPTION IN THE ESTIP; PLANNING CSJ 0918-45-925

TOTAL PROJECT COST INFORMATIONPREL ENG $ 963,784

ROW PURCH $ 0 COST OFCONSTR $ 6,133,882 APPROVED

CONST ENG $ 337,984 PHASESCONTING $ 91,367 $ 6,471,866INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 7,527,017

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 340,032 $ 340,0325 $ 1,238,753 $ 0 $ 0 $ 309,688 $ 0 $ 1,548,4419TAP $ 3,666,714 $ 0 $ 0 $ 916,679 $ 0 $ 4,583,393TOTAL $ 4,905,467 $ 0 $ 0 $ 1,226,367 $ 340,032 $ 6,471,866

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 386: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 386 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-204 2020 VA C DALLAS $ 755,050LIMITS FROM RIDGEWOOD TRAIL LIGHTING; ELLSWORTH AVE PROJECT SPONSOR DALLAS

REVISION DATE 07/2018LIMITS TO SKILLMAN STPROJECT INSTALL SAFETY LIGHTING ALONG EXISTING RIDGEWOOD TRAIL MPO PROJ NUM 40047

DESCR FUNDING CAT(S) 9TAPREMARKS PROJECT 2017 TA SET-ASIDE CALL FOR PROJECTS; FUNDING SHOWN AS 9TA

P7 HISTORY P IN ESTIP PER TXDOT TPP SINCE 9TA IS NOT A FUNDING CATEGORY OPTION IN THE ESTIP; PLANNING CSJ 0918-45-921

TOTAL PROJECT COST INFORMATIONPREL ENG $ 104,050

ROW PURCH $ 0 COST OFCONSTR $ 716,000 APPROVED

CONST ENG $ 39,050 PHASESCONTING $ 10,637 $ 755,050INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 869,737

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 604,040 $ 0 $ 0 $ 151,010 $ 0 $ 755,050TOTAL $ 604,040 $ 0 $ 0 $ 151,010 $ 0 $ 755,050

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-203 2020 VA E,ENG VARIOUS $ 290,884LIMITS FROM FM 1382 SIDE PATH FROM INTERSECTION OF FM 1382 AND CAMP WISDOM ROAD PROJECT SPONSOR DALLAS CO

REVISION DATE 07/2018LIMITS TO MANSFIELD RDPROJECT CONSTRUCT NEW SHARED-USE PATH FOR BICYCLISTS AND PEDESTRIANS INCLUDING CROSSWALK MPO PROJ NUM 40045

DESCR S AND SIGNAGE FUNDING CAT(S) 9TAPREMARKS CHANGE CSJ FROM 0918-45-911 TO 0918-47-203 PROJECT 2017 TA SET-ASIDE CALL FOR PROJECTS; FUNDING SHOWN AS 9TA

P7 HISTORY P IN ESTIP PER TXDOT TPP SINCE 9TA IS NOT A FUNDING CATEGORY OPTION IN THE ESTIP

TOTAL PROJECT COST INFORMATIONPREL ENG $ 290,884

ROW PURCH $ 0 COST OFCONSTR $ 1,652,751 APPROVED

CONST ENG $ 92,554 PHASESCONTING $ 26,219 $ 290,884INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,062,408

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 232,707 $ 0 $ 0 $ 58,177 $ 0 $ 290,884TOTAL $ 232,707 $ 0 $ 0 $ 58,177 $ 0 $ 290,884

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-202 2020 VA C CEDAR HILL $ 1,436,115LIMITS FROM SOUTH CLARK RD TRAIL VELOWEB; FROM EXISTING RED OAK CREEK TRAIL PROJECT SPONSOR CEDAR HILL

REVISION DATE 07/2018LIMITS TO E BELT LINE RDPROJECT CONSTRUCT SHARED-USE PATH, BICYCLE/PEDESTRIAN SIGNALS, CROSSWALKS, SIGNAGE, AND MPO PROJ NUM 40041

DESCR SAFETY IMPROVEMENTS FUNDING CAT(S) 3LC,9TAPREMARKS LOCAL CONTRIBUTION PAID BY CITY OF CEDAR HILL; COST PROJECT 2017 TA SET-ASIDE CALL FOR PROJECTS; TOTAL PROJECT FUNDIN

P7 OF APPROVED PHASES INCLUDES CE COST HISTORY G IS SPLIT IS 70[%] FEDERAL/30[%] LOCAL; FUNDING SHOWN AS9TAP IN ESTIP PER TXDOT TPP SINCE 9TA IS NOT A FUNDING CATEGORY OPTION IN THE ESTIP

TOTAL PROJECT COST INFORMATIONPREL ENG $ 68,386

ROW PURCH $ 0 COST OFCONSTR $ 1,367,729 APPROVED

CONST ENG $ 68,386 PHASESCONTING $ 16,299 $ 1,436,115INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,520,800

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 188,062 $ 188,0629TAP $ 998,442 $ 0 $ 0 $ 249,611 $ 0 $ 1,248,053TOTAL $ 998,442 $ 0 $ 0 $ 249,611 $ 188,062 $ 1,436,115

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 387: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 387 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-904 2020 VA T IRVING $ 11,000,000LIMITS FROM CARPENTER RANCH STATION ON THE ORANGE LINE IN IRVING PROJECT SPONSOR DART

REVISION DATE 07/2018LIMITS TOPROJECT CONSTRUCT NEW CARPENTER RANCH RAIL STATION ON ORANGE LINE IN IRVING MPO PROJ NUM 14008

DESCR FUNDING CAT(S) 5REMARKS PROJECT 2017-2018 CMAQ/STBG PROJECT SELECTION/TRANSIT PROGRAM

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 11,000,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 11,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 11,000,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 8,800,000 $ 0 $ 0 $ 2,200,000 $ 0 $ 11,000,000TOTAL $ 8,800,000 $ 0 $ 0 $ 2,200,000 $ 0 $ 11,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG 0008-08-902 2020 SH 180 C GRAND PRAIRIE $ 500,000LIMITS FROM EAST OF HENSLEY PROJECT SPONSOR GRAND PRAIRIE

REVISION DATE 07/2018LIMITS TO GREAT SOUTHWEST PKWYPROJECT INSTALLATION OF 4 NEW CCTV CAMERAS AND 5 NEW DMS ALONG SH 180 TO FACILITATE TRAF MPO PROJ NUM 11630.6

DESCR FIC MANAGEMENT BY VIEWING TRAFFIC CONDITIONS VIA CCTV AND ADJUSTING SIGNAL TIMIN FUNDING CAT(S) 5G AND PROVIDING FEEDBACK TO MOTORING PUBLIC VIA DMS

REMARKS PROJECTP7 HISTORY

TOTAL PROJECT COST INFORMATIONPREL ENG $ 50,000

ROW PURCH $ 0 COST OFCONSTR $ 500,000 APPROVED

CONST ENG $ 26,790 PHASESCONTING $ 6,191 $ 500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 582,981

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 400,000 $ 100,000 $ 0 $ 0 $ 0 $ 500,000TOTAL $ 400,000 $ 100,000 $ 0 $ 0 $ 0 $ 500,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0902-90-081 2020 CS C RICHLAND HILLS $ 1,694,110LIMITS FROM RICHLAND HILLS TRE CONNECTION; GLENVIEW DRIVE ON THE NORTH PROJECT SPONSOR RICHLAND HILLS

REVISION DATE 07/2018LIMITS TO TRE TRAIN STATION ON THE SOUTHPROJECT CONSTRUCT BICYCLE AND PEDESTRIAN IMPROVEMENTS INCLUDING SHARED-USE PATH, BIKEWAY MPO PROJ NUM 40060

DESCR S, SIDEWALKS, CROSSWALKS, AND SIGNAGE FUNDING CAT(S) 5,9TAPREMARKS THIS ENTRY INCLUDES CE FUNDING PROJECT 2017 TA SET-ASIDE CALL FOR PROJECTS; FUNDING SHOWN AS 9TA

P7 HISTORY P IN ESTIP PER TXDOT TPP SINCE 9TA IS NOT A FUNDING CATEGORY OPTION IN THE ESTIP

TOTAL PROJECT COST INFORMATIONPREL ENG $ 402,291

ROW PURCH $ 0 COST OFCONSTR $ 1,598,819 APPROVED

CONST ENG $ 95,291 PHASESCONTING $ 25,956 $ 1,694,110INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,122,357

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 1,194,007 $ 0 $ 0 $ 298,502 $ 0 $ 1,492,5099TAP $ 161,281 $ 0 $ 0 $ 40,320 $ 0 $ 201,601TOTAL $ 1,355,288 $ 0 $ 0 $ 338,822 $ 0 $ 1,694,110

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 388: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 388 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0902-90-080 2020 CS C NORTH RICHLAND HILLS$ 211,937LIMITS FROM SMITHFIELD MIDDLE SCHOOL BOUNDED BY DAVIS BLVD TO THE WEST, AMUNDSON DR TOPROJECT SPONSOR NORTH RICHLAND HILLS

REVISION DATE 07/2018THE NORTHWEST AND TO THE NORTHLIMITS TO CRANE RD TO THE EAST, AND MID CITIES BLVD TO THE SOUTHPROJECT SAFE ROUTES TO SCHOOL PEDESTRIAN IMPROVEMENTS IN PROXIMITY TO SMITHFIELD MIDDLE MPO PROJ NUM 40056

DESCR SCHOOL INCLUDING NEW CROSSWALKS, SIGNAGE, AND SIDEWALK SPOT IMPROVEMENTS TO COMP FUNDING CAT(S) 5LETE EXISTING NETWORK GAPS

REMARKS THIS ENTRY INCLUDES CE FUNDING PROJECT 2017 TA SET-ASIDE CALL FOR PROJECTSP7 HISTORY

TOTAL PROJECT COST INFORMATIONPREL ENG $ 51,984

ROW PURCH $ 0 COST OFCONSTR $ 199,940 APPROVED

CONST ENG $ 11,997 PHASESCONTING $ 3,268 $ 211,937INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 267,189

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 169,550 $ 0 $ 0 $ 42,387 $ 0 $ 211,937TOTAL $ 169,550 $ 0 $ 0 $ 42,387 $ 0 $ 211,937

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0902-90-079 2020 CS C NORTH RICHLAND HILLS$ 623,044LIMITS FROM NRH ACTIVE TRANSPORTATION PROJECTS FOR TRAIL/ON-ROAD BOUNDED BY NORTH TARRPROJECT SPONSOR NORTH RICHLAND HILLS

REVISION DATE 07/2018ANT PARKWAY TO THE NORTHLIMITS TO PRECINCT LINE ROAD TO THE EAST, GLENVIEW DRIVE TO THE SOUTH, SUNCREST DRIV

E TO THE WESTPROJECT CONSTRUCT BIKE/PED SAFETY IMPROVEMENTS INCL INSTALLING FLASHING BEACONS, BIKE/PE MPO PROJ NUM 40055

DESCR D SIGNALS, CROSSWALKS, SIGNAGE, SIDEWALKS, BIKEWAYS, REFUGE ISLANDS AT INTERSECT FUNDING CAT(S) 5,9TAPIONS, AND SHARED USE PATH FROM EXISTING COTTON BELT TRAIL TO EXISTING JOHN BARFIELD TRAIL

REMARKS THIS ENTRY INCLUDES CE FUNDING PROJECT 2017 TA SET-ASIDE CALL FOR PROJECTS; FUNDING SHOWN AS 9TAP7 HISTORY P IN ESTIP PER TXDOT TPP SINCE 9TA IS NOT A FUNDING CATEG

ORY OPTION IN THE ESTIP TOTAL PROJECT COST INFORMATION

PREL ENG $ 148,574ROW PURCH $ 0 COST OF

CONSTR $ 587,970 APPROVEDCONST ENG $ 35,074 PHASES

CONTING $ 9,554 $ 623,044INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 781,172

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 308,647 $ 0 $ 0 $ 77,162 $ 0 $ 385,8099TAP $ 189,788 $ 0 $ 0 $ 47,447 $ 0 $ 237,235TOTAL $ 498,435 $ 0 $ 0 $ 124,609 $ 0 $ 623,044

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG PARKER 0902-38-128 2020 CS C ALEDO $ 871,372LIMITS FROM ALONG OLD ANNETTA RD AND FM 1187 FROM OLD TUNNEL RD TO VANDAGRIFF ELEM SCHPROJECT SPONSOR ALEDO

REVISION DATE 07/2018OOLLIMITS TOPROJECT SAFE ROUTES TO SCHOOL; CONSTRUCT PEDESTRIAN IMPROVEMENTS INCLUDING SIDEWALKS, CR MPO PROJ NUM 40057

DESCR OSSWALKS, PEDESTRIAN SIGNALS, AND SIGNAGE FUNDING CAT(S) 5REMARKS COST OF APPROVED PHASES INCLUDES CE COST PROJECT 2017 TA SET-ASIDE CALL FOR PROJECTS

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 170,978ROW PURCH $ 0 COST OF

CONSTR $ 823,992 APPROVEDCONST ENG $ 47,380 PHASES

CONTING $ 12,695 $ 871,372INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,055,045

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 697,098 $ 0 $ 0 $ 174,274 $ 0 $ 871,372TOTAL $ 697,098 $ 0 $ 0 $ 174,274 $ 0 $ 871,372

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 389: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 389 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0902-90-084 2020 VA C FORT WORTH $ 1,328,156LIMITS FROM CC MOSS ELEM, BOUNDED BY MARTIN LUTHER KING JR FWY TO THE SW, PATE DR TO T PROJECT SPONSOR FORT WORTH

REVISION DATE 07/2018HE E, E BERRY ST TO THE NLIMITS TO ML PHILLIPS ELEM BOUNDED BY CAMP BOWIE BLVD TO THE SE; WINTHROP AVE TO THE

E, CALMONT AVE TO THE N, LACKLAND RD TO THE WPROJECT CONSTRUCT AND RECONSTRUCT SIDEWALKS, CROSSWALKS, SIGNAGE, BICYCLE/PEDESTRIAN SIG MPO PROJ NUM 40062

DESCR NALS, AND BIKEWAYS (SAFE ROUTES TO SCHOOLS FOR 2 SCHOOLS IN THE SOUTH DISTRICT) FUNDING CAT(S) 3LC,5,9TAPREMARKS LOCAL CONTRIBUTION PAID BY CITY OF FORT WORTH; THIS PROJECT 2017 TA SET-ASIDE CALL FOR PROJECTS; FUNDING SHOWN AS 9TA

P7 ENTRY INCLUDES CE FUNDING HISTORY P IN ESTIP PER TXDOT TPP SINCE 9TA IS NOT A FUNDING CATEGORY OPTION IN THE ESTIP

TOTAL PROJECT COST INFORMATIONPREL ENG $ 48,986

ROW PURCH $ 0 COST OFCONSTR $ 1,279,170 APPROVED

CONST ENG $ 48,986 PHASESCONTING $ 16,556 $ 1,328,156INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,393,698

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 299,466 $ 299,4665 $ 431,070 $ 0 $ 0 $ 107,768 $ 0 $ 538,8389TAP $ 391,882 $ 0 $ 0 $ 97,970 $ 0 $ 489,852TOTAL $ 822,952 $ 0 $ 0 $ 205,738 $ 299,466 $ 1,328,156

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0902-90-083 2020 VA C FORT WORTH $ 1,563,387LIMITS FROM D MCRAE ELEM BOUNDED BY AVE J TO THE N, S AYERS AVE TO THE E, LITTLEJOHN A PROJECT SPONSOR FORT WORTH

REVISION DATE 07/2018VE TO THE S, THRALL ST TO THE W; DAGGETT ELEMLIMITS TO BOUNDED BY WILLING/FAIRMOUNT AVE TO THE W, W RICHMOND AVE TO THE N, HEMPHI

LL ST TO THE E, CANTEY ST TO THE SPROJECT CONSTRUCT AND RECONSTRUCT SIDEWALKS, CROSSWALKS, SIGNAGE, BICYCLE/PEDESTRIAN SIG MPO PROJ NUM 40063

DESCR NALS, AND BIKEWAYS (SAFE ROUTES TO SCHOOLS FOR 2 SCHOOLS IN THE SOUTH DISTRICT) FUNDING CAT(S) 3LC,5,9TAPREMARKS LOCAL CONTRIBUTION PAID BY CITY OF FORT WORTH; THIS PROJECT 2017 TA SET-ASIDE CALL FOR PROJECTS; FUNDING SHOWN AS 9TA

P7 ENTRY INCLUDES CE FUNDING HISTORY P IN ESTIP PER TXDOT TPP SINCE 9TA IS NOT A FUNDING CATEGORY OPTION IN THE ESTIP

TOTAL PROJECT COST INFORMATIONPREL ENG $ 144,819

ROW PURCH $ 0 COST OFCONSTR $ 1,517,494 APPROVED

CONST ENG $ 45,893 PHASESCONTING $ 17,345 $ 1,563,387INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,725,551

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 692,569 $ 692,5695 $ 406,255 $ 0 $ 0 $ 101,564 $ 0 $ 507,8199TAP $ 290,399 $ 0 $ 0 $ 72,600 $ 0 $ 362,999TOTAL $ 696,654 $ 0 $ 0 $ 174,164 $ 692,569 $ 1,563,387

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0902-90-082 2020 VA C FORT WORTH $ 2,064,699LIMITS FROM WJ TURNER ELEM, DIAMOND HILL ELEM, AND BONNIE BRAE ELEM SCHOOL CAMPUSES BOPROJECT SPONSOR FORT WORTH

REVISION DATE 07/2018UNDED BY W LORRAINE ST TO THE NLIMITS TO N BEACH ST TO THE E; BRENNAN AVE TO THE S, TITUS ST TO THE WPROJECT CONSTRUCT AND RECONSTRUCT SIDEWALKS, CROSSWALKS, SIGNAGE, BICYCLE/PEDESTRIAN SIG MPO PROJ NUM 40061

DESCR NALS, AND BIKEWAYS (SAFE ROUTES TO SCHOOLS FOR 3 SCHOOLS IN THE NORTH DISTRICT) FUNDING CAT(S) 3LC,5,9TAPREMARKS LOCAL CONTRIBUTION PAID BY CITY OF FORT WORTH; THIS PROJECT 2017 TA SET-ASIDE CALL FOR PROJECTS; FUNDING SHOWN AS 9TA

P7 ENTRY INCLUDES CE FUNDING HISTORY P IN ESTIP PER TXDOT TPP SINCE 9TA IS NOT A FUNDING CATEGORY OPTION IN THE ESTIP

TOTAL PROJECT COST INFORMATIONPREL ENG $ 124,355

ROW PURCH $ 0 COST OFCONSTR $ 1,978,170 APPROVED

CONST ENG $ 86,529 PHASESCONTING $ 27,103 $ 2,064,699INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,216,157

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 277,612 $ 277,6125 $ 764,577 $ 0 $ 0 $ 191,144 $ 0 $ 955,7219TAP $ 665,094 $ 0 $ 0 $ 166,272 $ 0 $ 831,366TOTAL $ 1,429,671 $ 0 $ 0 $ 357,416 $ 277,612 $ 2,064,699

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 390: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 390 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DENTON 0816-02-072 2020 FM 455 R,UTL VARIOUS $ 2,000,000LIMITS FROM WEST OF FM 2450 PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO EAST OF MARION RDPROJECT RECONSTRUCT AND WIDEN TWO LANE RURAL TO FOUR LANE URBAN DIVIDED MPO PROJ NUM 83255

DESCR FUNDING CAT(S) S102REMARKS PROJECT R PHASE IN FY 2019 IS FOR $16,100,000 FOR ROW; R PHASE IN

P7 HISTORY FY 2020 IS FOR $2,000,000 FOR UTILITIES; PART OF REGIONAL 10 YEAR PLAN

TOTAL PROJECT COST INFORMATIONPREL ENG $ 3,000,000

ROW PURCH $ 18,100,000 COST OFCONSTR $ 42,817,890 APPROVED

CONST ENG $ 2,035,687 PHASESCONTING $ 816,737 $ 2,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 66,770,314

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALS102 $ 1,600,000 $ 200,000 $ 0 $ 200,000 $ 0 $ 2,000,000TOTAL $ 1,600,000 $ 200,000 $ 0 $ 200,000 $ 0 $ 2,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG COLLIN 2056-01-042 2020 FM 2551 C MURPHY $ 44,570,571LIMITS FROM FM 2514 PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO FM 2170PROJECT RECONSTRUCT AND WIDEN 2 LANE RURAL TO 6 LANE URBAN DIVIDED MPO PROJ NUM 83209

DESCR FUNDING CAT(S) 2MREMARKS PROJECT 10-YEAR PLAN PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,200,000ROW PURCH $ 17,050,000 COST OF

CONSTR $ 44,570,571 APPROVEDCONST ENG $ 2,139,055 PHASES

CONTING $ 858,209 $ 44,570,571INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 65,817,835

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 35,656,457 $ 8,914,114 $ 0 $ 0 $ 0 $ 44,570,571TOTAL $ 35,656,457 $ 8,914,114 $ 0 $ 0 $ 0 $ 44,570,571

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG COLLIN 2679-03-015 2020 FM 2514 R,UTL WYLIE $ 2,000,000LIMITS FROM EAST OF LAVON PARKWAY PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO NORTH OF DRAIN DRIVEPROJECT WIDEN FACILITY FROM 2 LANE TO 4 LANE URBAN DIVIDED (ULTIMATE 6 LANE DIVIDED) MPO PROJ NUM 55038

DESCR FUNDING CAT(S) S102REMARKS PROJECT R PHASE IN FY2017 IS $7.051 MILLION FOR ROW; R PHASE IN F

P7 HISTORY Y2020 IS $2 MILLION FOR UTILITIES; 10-YEAR PLAN PROJECT TOTAL PROJECT COST INFORMATION

PREL ENG $ 452,260ROW PURCH $ 9,051,000 COST OF

CONSTR $ 11,167,795 APPROVEDCONST ENG $ 428,495 PHASES

CONTING $ 171,916 $ 2,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 21,271,466

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALS102 $ 1,600,000 $ 200,000 $ 0 $ 200,000 $ 0 $ 2,000,000TOTAL $ 1,600,000 $ 200,000 $ 0 $ 200,000 $ 0 $ 2,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 391: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 391 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG KAUFMAN 0197-03-054 2020 US 175 C CRANDALL $ 12,925,618LIMITS FROM FM 148 PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO CR 4106 IN CRANDALLPROJECT CONSTRUCT NEW 2-LANE FRONTAGE ROADS; CONVERT EXISTING FRONTAGE ROAD FROM 2-LANE MPO PROJ NUM 51460

DESCR 2-WAY TO 2-LANE 1-WAY FRONTAGE ROAD & RAMP MODIFICATIONS FUNDING CAT(S) 2MREMARKS PROJECT PART OF REGIONAL 10 YEAR PLAN

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,733,000ROW PURCH $ 3,500,000 COST OF

CONSTR $ 12,925,618 APPROVEDCONST ENG $ 608,995 PHASES

CONTING $ 155,356 $ 12,925,618INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 19,922,969

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 10,340,494 $ 2,585,124 $ 0 $ 0 $ 0 $ 12,925,618TOTAL $ 10,340,494 $ 2,585,124 $ 0 $ 0 $ 0 $ 12,925,618

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DENTON 0135-10-050 2020 US 380 R,ACQ,UTL VARIOUS $ 7,000,000LIMITS FROM US 377 PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO WEST OF CR 26 (COLLIN COUNTY LINE)PROJECT WIDEN 4 TO 6 LANES DIVIDED URBAN WITH NEW GRADE SEPARATIONS AT FM 423, FM 720, N MPO PROJ NUM 20096

DESCR AVO RD, TEEL PKWY, AND LEGACY DR, WITH SIDEWALK IMPROVEMENTS FUNDING CAT(S) S102REMARKS CMAQ FOR INTERSECTION IMPROVEMENTS, GRADE SEPARATIOPROJECT PART OF REGIONAL 10 YEAR PLAN

P7 NS, AND PEDESTRIAN IMPROVEMENTS ONLY HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 6,400,000ROW PURCH $ 7,000,000 COST OF

CONSTR $ 129,728,061 APPROVEDCONST ENG $ 6,188,901 PHASES

CONTING $ 2,483,047 $ 7,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 151,800,009

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALS102 $ 5,600,000 $ 700,000 $ 0 $ 700,000 $ 0 $ 7,000,000TOTAL $ 5,600,000 $ 700,000 $ 0 $ 700,000 $ 0 $ 7,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG 0918-00-913 2020 VA T VARIOUS $ 36,500,000LIMITS FROM COTTON BELT RAIL LINE FROM DFW AIRPORT STATION PROJECT SPONSOR DART

REVISION DATE 07/2018LIMITS TO SHILOH STATION IN PLANOPROJECT ENGINEERING, ENVIRONMENTAL, AND CONSTRUCTION OF COTTON BELT REGIONAL RAIL PROJEC MPO PROJ NUM 14006

DESCR T (COTTON BELT PROJECT #4) FUNDING CAT(S) 5REMARKS RELATED TO TIP 14005, 14013, 83245, AND 14004 PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 36,500,000 APPROVEDCONST ENG $ 1,697,500 PHASES

CONTING $ 727,500 $ 36,500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 38,925,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 29,200,000 $ 0 $ 0 $ 7,300,000 $ 0 $ 36,500,000TOTAL $ 29,200,000 $ 0 $ 0 $ 7,300,000 $ 0 $ 36,500,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 392: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 392 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG COLLIN 0918-24-954 2020 SH 121 FRTG RDC PLANO $ 402,000LIMITS FROM CUSTER PROJECT SPONSOR PLANO

REVISION DATE 07/2018LIMITS TO SPRING CREEK PKWYPROJECT SIGNAL CONTROLLER AND SOFTWARE UPGRADES MPO PROJ NUM 19007

DESCR FUNDING CAT(S) 5,OtherREMARKS PROJECT PART OF COLLIN COUNTY LIRAP/LIP FUNDING PARTNERSHIP; 80,4

P7 HISTORY 00 OF TRANSPORTATION DEVELOPMENT CREDITS (CAT 3 - TDC [MPO]) UTILIZED IN LIEU OF A LOCAL MATCH AND ARE NOT CALCULATED IN FUNDING TOTAL

TOTAL PROJECT COST INFORMATIONPREL ENG $ 21,583

ROW PURCH $ 0 COST OFCONSTR $ 402,000 APPROVED

CONST ENG $ 21,539 PHASESCONTING $ 4,977 $ 402,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 450,099

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 402,000 $ 0 $ 0 $ 0 $ 0 $ 402,000Other $ 0 $ 0 $ 0 $ 0 $ 0 $ 0TOTAL $ 402,000 $ 0 $ 0 $ 0 $ 0 $ 402,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG COLLIN 0918-24-938 2020 VA C PLANO $ 1,867,000LIMITS FROM PLANO CITYWIDE TRAFFIC CAMERA, TRAFFIC SIGNAL, AND SIGNAL COMMUNICATION UP PROJECT SPONSOR PLANO

REVISION DATE 07/2018GRADESLIMITS TOPROJECT PLANO CITYWIDE TRAFFIC CAMERA, TRAFFIC SIGNAL, AND SIGNAL COMMUNICATION UPGRADES MPO PROJ NUM 19005

DESCR FUNDING CAT(S) 5,OtherREMARKS PROJECT PART OF COLLIN COUNTY LIRAP/LIP FUNDING PARTNERSHIP; 373,

P7 HISTORY 400 OF TRANSPORTATION DEVELOPMENT CREDITS (CAT 3 - TDC [MPO]) UTILIZED IN LIEU OF A LOCAL MATCH AND ARE NOT CALCULATED IN FUNDING TOTAL

TOTAL PROJECT COST INFORMATIONPREL ENG $ 100,237

ROW PURCH $ 0 COST OFCONSTR $ 1,867,000 APPROVED

CONST ENG $ 100,032 PHASESCONTING $ 23,116 $ 1,867,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,090,385

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 1,867,000 $ 0 $ 0 $ 0 $ 0 $ 1,867,000Other $ 0 $ 0 $ 0 $ 0 $ 0 $ 0TOTAL $ 1,867,000 $ 0 $ 0 $ 0 $ 0 $ 1,867,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DENTON 1310-01-043 2020 FM 407 E,ENG,R,ACQ JUSTIN $ 600,000LIMITS FROM GULF AVE PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO SAGE DRIVEPROJECT REALIGN EXISTING 2 TO 2 LANE ROADWAY MPO PROJ NUM 55205

DESCR FUNDING CAT(S) S102,SBPEREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 100,000ROW PURCH $ 500,000 COST OF

CONSTR $ 2,181,909 APPROVEDCONST ENG $ 107,923 PHASES

CONTING $ 1,095 $ 600,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,890,927

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 100,000 $ 0 $ 0 $ 0 $ 100,000S102 $ 400,000 $ 50,000 $ 0 $ 50,000 $ 0 $ 500,000TOTAL $ 400,000 $ 150,000 $ 0 $ 50,000 $ 0 $ 600,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 393: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 393 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 2266-02-148 2020 SH 360 C ARLINGTON $ 50,000,000LIMITS FROM NORTH OF E RANDOL MILL RD PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO SOUTH OF E RANDOL MILL RDPROJECT RECONSTRUCT 6 TO 8 MAIN LANES AND RAILROAD THROUGH GIRDER BRIDGE AND 4/8 LANE TO MPO PROJ NUM 13008

DESCR 4/8 LANE CONTINUOUS FRONTAGE ROADS FUNDING CAT(S) 2MREMARKS PROJECT 10 YEAR PLAN PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,465,000ROW PURCH $ 1,000,000 COST OF

CONSTR $ 50,000,000 APPROVEDCONST ENG $ 2,006,708 PHASES

CONTING $ 84,002 $ 50,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 55,555,710

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 40,000,000 $ 10,000,000 $ 0 $ 0 $ 0 $ 50,000,000TOTAL $ 40,000,000 $ 10,000,000 $ 0 $ 0 $ 0 $ 50,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 1068-02-147 2020 IH 30 R,ACQ ARLINGTON $ 3,460,000LIMITS FROM SIX FLAGS DRIVE PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO DALLAS COUNTY LINEPROJECT RECONSTRUCT AND WIDEN 6 TO 8 GENERAL PURPOSE LANES, 2 CONCURRENT EXPRESS LANES A MPO PROJ NUM 13001

DESCR ND CONSTRUCT 0 TO 4 CONTINUOUS FRONTAGE ROAD LANES FUNDING CAT(S) S102REMARKS PROJECT 10 YEAR PLAN PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 3,950,000ROW PURCH $ 3,460,000 COST OF

CONSTR $ 65,740,000 APPROVEDCONST ENG $ 3,592,290 PHASES

CONTING $ 150,375 $ 3,460,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 76,892,665

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALS102 $ 2,768,000 $ 692,000 $ 0 $ 0 $ 0 $ 3,460,000TOTAL $ 2,768,000 $ 692,000 $ 0 $ 0 $ 0 $ 3,460,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 1068-04-170 2020 IH 30 R,ACQ GRAND PRAIRIE $ 8,910,000LIMITS FROM DALLAS COUNTY LINE PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO SH 161PROJECT RECONSTRUCT AND WIDEN FROM 6 TO 8 GENERAL PURPOSE LANES WITH 2 REVERSIBLE EXPRES MPO PROJ NUM 13000

DESCR S LANE AND CONSTRUCT 0 TO 4 LANE CONTINUOUS FRONTAGE ROADS; MODIFICATIONS TO SH FUNDING CAT(S) S102161 CONNECTIONS

REMARKS PROJECT PART OF REGIONAL 10 YEAR PLANP7 HISTORY

TOTAL PROJECT COST INFORMATIONPREL ENG $ 530,000

ROW PURCH $ 8,910,000 COST OFCONSTR $ 9,000,000 APPROVED

CONST ENG $ 429,556 PHASESCONTING $ 17,981 $ 8,910,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 18,887,537

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALS102 $ 7,128,000 $ 1,782,000 $ 0 $ 0 $ 0 $ 8,910,000TOTAL $ 7,128,000 $ 1,782,000 $ 0 $ 0 $ 0 $ 8,910,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 394: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 394 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0902-90-943 2020 TRE E,ENG FORT WORTH $ 2,200,000LIMITS FROM DALWORTH JUNCTION EAST OF IH 35W PROJECT SPONSOR FWTA

REVISION DATE 07/2018LIMITS TO EAST OF SYLVANIA AVENUE SOUTH OF EXISTING TRACKPROJECT CONSTRUCT A SECOND TRACK AND REHABILITATE EXISTING TRACK AND BRIDGES; INCLUDES 4 MPO PROJ NUM 84144

DESCR BRIDGES FUNDING CAT(S) 3LCREMARKS LOCAL CONTRIBUTION PAID BY FWTA PROJECT ENV COSTS OF $820K FUNDED IN FY 2018

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 3,020,000ROW PURCH $ 0 COST OF

CONSTR $ 28,000,000 APPROVEDCONST ENG $ 2,300,000 PHASES

CONTING $ 307,357 $ 2,200,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 33,627,357

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 2,200,000 $ 2,200,000TOTAL $ 0 $ 0 $ 0 $ 0 $ 2,200,000 $ 2,200,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DENTON 0918-46-283 2020 CS C LEWISVILLE $ 1,892,442LIMITS FROM GARDEN RIDGE TRAIL; ON NORTH GARDEN RIDGE BOULEVARD FROM IH 35E PROJECT SPONSOR LEWISVILLE

REVISION DATE 07/2018LIMITS TO NORTH VALLEY PARKWAY AND W. MAIN STREETPROJECT CONSTRUCT BIKE/PEDESTRIAN TRAIL, SIDEWALK, AND ON-STREET BIKE LANES MPO PROJ NUM 40021

DESCR FUNDING CAT(S) 5REMARKS PROJECT PROJECT FUNDING IS 75% FEDERAL AND 25% LOCAL

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 132,031ROW PURCH $ 0 COST OF

CONSTR $ 1,760,411 APPROVEDCONST ENG $ 132,031 PHASES

CONTING $ 23,175 $ 1,892,442INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,047,648

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 1,419,332 $ 0 $ 0 $ 473,110 $ 0 $ 1,892,442TOTAL $ 1,419,332 $ 0 $ 0 $ 473,110 $ 0 $ 1,892,442

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0047-07-232 2020 US 75 C RICHARDSON $ 15,000,000LIMITS FROM IH 635 PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO COLLIN COUNTY LINEPROJECT REMOVE HOV LANES AND ADD PEAK HOUR TRAVEL LANES MPO PROJ NUM 30005

DESCR FUNDING CAT(S) 7REMARKS PROJECT PLANNING CSJ 0047-07-990; PART OF THE EASTERN SUBREGION S

P7 HISTORY UPPLEMENTAL PROJECT COMMITMENTS FOR THE TXDOT CONGESTIONRELIEF PROGRAM APPROVED BY THE RTC JANUARY 20, 2016

TOTAL PROJECT COST INFORMATIONPREL ENG $ 1,000,000

ROW PURCH $ 0 COST OFCONSTR $ 15,000,000 APPROVED

CONST ENG $ 240,097 PHASESCONTING $ 10,051 $ 15,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 16,250,148

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 12,000,000 $ 3,000,000 $ 0 $ 0 $ 0 $ 15,000,000TOTAL $ 12,000,000 $ 3,000,000 $ 0 $ 0 $ 0 $ 15,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 395: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 395 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG COLLIN 0047-06-158 2020 US 75 C VARIOUS $ 15,000,000LIMITS FROM DALLAS COUNTY LINE PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO BETHANY DRIVEPROJECT REMOVE HOV LANES AND ADD PEAK HOUR TRAVEL LANES MPO PROJ NUM 30006

DESCR FUNDING CAT(S) 7REMARKS PROJECT PART OF THE EASTERN SUBREGION SUPPLEMENTAL PROJECT COMMIT

P7 HISTORY MENTS FOR THE TXDOT CONGESTION RELIEF PROGRAM APPROVED BYTHE RTC JANUARY 20, 2016

TOTAL PROJECT COST INFORMATIONPREL ENG $ 1,500,000

ROW PURCH $ 0 COST OFCONSTR $ 15,000,000 APPROVED

CONST ENG $ 355,790 PHASESCONTING $ 3,631 $ 15,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 16,859,421

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 12,000,000 $ 3,000,000 $ 0 $ 0 $ 0 $ 15,000,000TOTAL $ 12,000,000 $ 3,000,000 $ 0 $ 0 $ 0 $ 15,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG COLLIN 0091-05-059 2020 SH 289 C PLANO $ 4,567,480LIMITS FROM ON PRESTON ROAD/SH 289 PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO AT PGBTPROJECT WIDEN BRIDGE TO PROVIDE 2 LEFT TURN LANES FOR PGBT ENTRANCE RAMPS; ADD SB RIGHT MPO PROJ NUM 20055

DESCR TURN LANE AT PGBT FUNDING CAT(S) 3LC,5REMARKS LOCAL CONTRIBUTION PAID BY PLANO PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 480,000ROW PURCH $ 120,000 COST OF

CONSTR $ 4,567,480 APPROVEDCONST ENG $ 300,570 PHASES

CONTING $ 181,851 $ 4,567,480INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 5,649,901

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 1,500,000 $ 1,500,0005 $ 2,453,984 $ 613,496 $ 0 $ 0 $ 0 $ 3,067,480TOTAL $ 2,453,984 $ 613,496 $ 0 $ 0 $ 1,500,000 $ 4,567,480

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DENTON 2250-02-014 2020 SL 288 R,ACQ DENTON $ 1,000,000LIMITS FROM US 380 WEST OF DENTON PROJECT SPONSOR DENTON CO

REVISION DATE 07/2018LIMITS TO IH 35W SOUTH OF DENTONPROJECT CONSTRUCT TWO LANE RURAL ROADWAY ON NEW LOCATION PH 1 OF ULTIMATE FREEWAY - EXTE MPO PROJ NUM 53075

DESCR NSION OF LOOP 288 FUNDING CAT(S) S102REMARKS PROJECT RELATED TO TIP 20175/CSJ 2250-02-013

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,147,496ROW PURCH $ 1,000,000 COST OF

CONSTR $ 3,000,000 APPROVEDCONST ENG $ 2,007,330 PHASES

CONTING $ 3,636,913 $ 1,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 11,791,739

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALS102 $ 800,000 $ 100,000 $ 0 $ 100,000 $ 0 $ 1,000,000TOTAL $ 800,000 $ 100,000 $ 0 $ 100,000 $ 0 $ 1,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 396: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 396 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0000-18-071 2020 CS C ROWLETT $ 3,000,000LIMITS FROM ON HICKOX RD FROM TOLER RD PROJECT SPONSOR ROWLETT

REVISION DATE 07/2018LIMITS TO MERRITT RDPROJECT WIDEN FROM 2 LANES TO 4 LANES (PHASE 2) MPO PROJ NUM 83030

DESCR FUNDING CAT(S) 3LCREMARKS LOCAL CONTRIBUTION PAID BY ROWLETT PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 300,000ROW PURCH $ 360,000 COST OF

CONSTR $ 3,000,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 3,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 3,660,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 3,000,000 $ 3,000,000TOTAL $ 0 $ 0 $ 0 $ 0 $ 3,000,000 $ 3,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0902-90-055 2020 VA C VARIOUS $ 50,000LIMITS FROM ALL LIMITED ACCESS FREEWAYS IN TARRANT COUNTY PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TOPROJECT ENSURE EFFECTIVE USE OF ITS DEVICES, INCLUDING FOR DATA COLLECTION MPO PROJ NUM 11630.3

DESCR FUNDING CAT(S) 7REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 50,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 50,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 50,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 40,000 $ 10,000 $ 0 $ 0 $ 0 $ 50,000TOTAL $ 40,000 $ 10,000 $ 0 $ 0 $ 0 $ 50,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DENTON 0918-46-290 2020 CS C DENTON $ 2,650,000LIMITS FROM HICKORY CREEK RD FROM FM 2181 PROJECT SPONSOR DENTON

REVISION DATE 07/2018LIMITS TO PROPOSED FM 2499PROJECT CONSTRUCT AND WIDEN FROM 2 LANE UNDIVIDED TO 4 LANE UNDIVIDED URBAN ROADWAY MPO PROJ NUM 20297

DESCR FUNDING CAT(S) 3RTR121REMARKS RTR 121-DE1 PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 300,000ROW PURCH $ 50,000 COST OF

CONSTR $ 2,650,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 2,650,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 3,000,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3RTR121 $ 0 $ 0 $ 2,120,000 $ 530,000 $ 0 $ 2,650,000TOTAL $ 0 $ 0 $ 2,120,000 $ 530,000 $ 0 $ 2,650,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 397: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 397 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DENTON 0918-46-281 2020 CS C DENTON $ 1,700,000LIMITS FROM NORTH TEXAS BOULEVARD PROJECT SPONSOR DENTON

REVISION DATE 07/2018LIMITS TO AND IH 35EPROJECT DESIGN AND CONSTRUCT ROUNDABOUT MPO PROJ NUM 20247

DESCR FUNDING CAT(S) 3RTR121REMARKS RTR 121-DE1 PROJECT ROW DONATION IS MATCH TO RTR FUNDS

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 300,000ROW PURCH $ 500,000 COST OF

CONSTR $ 1,700,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 1,700,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,500,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3RTR121 $ 0 $ 0 $ 1,700,000 $ 0 $ 0 $ 1,700,000TOTAL $ 0 $ 0 $ 1,700,000 $ 0 $ 0 $ 1,700,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0196-03-263 2020 IH 35E E,ENG DALLAS $ 1,600,000LIMITS FROM MANANA DRIVE PROJECT SPONSOR DALLAS CO

REVISION DATE 07/2018LIMITS TO ROYAL LANEPROJECT CONSTRUCT NEW 0 TO 2 LANE FRONTAGE ROADS NORTHBOUND FROM MANANA DR TO ROYAL LANE MPO PROJ NUM 83259

DESCR AND SOUTHBOUND FROM WALNUT HILL LANE TO MANANA DR AND PEDESTRIAN IMPROVEMENTS A FUNDING CAT(S) 3LCLONG WALNUT HILL LANE

REMARKS LOCAL CONTRIBUTION PAID BY DALLAS COUNTY PROJECTP7 HISTORY

TOTAL PROJECT COST INFORMATIONPREL ENG $ 1,600,000

ROW PURCH $ 0 COST OFCONSTR $ 19,107,681 APPROVED

CONST ENG $ 936,276 PHASESCONTING $ 238,846 $ 1,600,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 21,882,803

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 1,600,000 $ 1,600,000TOTAL $ 0 $ 0 $ 0 $ 0 $ 1,600,000 $ 1,600,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0000-02-011 2020 CS C NORTH RICHLAND HILLS$ 1,200,000LIMITS FROM HOLIDAY LN FROM IH 820 PROJECT SPONSOR NORTH RICHLAND HILLS

REVISION DATE 07/2018LIMITS TO DICK LEWIS DRPROJECT RECONSTRUCT 4 TO 4 LANE ROADWAY MPO PROJ NUM 81423

DESCR FUNDING CAT(S) 3LCREMARKS LOCAL CONTRIBUTION PAID BY NORTH RICHLAND HILLS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 500,000ROW PURCH $ 0 COST OF

CONSTR $ 1,200,000 APPROVEDCONST ENG $ 42,000 PHASES

CONTING $ 18,000 $ 1,200,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,760,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 1,200,000 $ 1,200,000TOTAL $ 0 $ 0 $ 0 $ 0 $ 1,200,000 $ 1,200,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 398: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 398 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG COLLIN 2679-03-016 2020 FM 2514 R,UTL WYLIE $ 2,000,000LIMITS FROM NORTH OF DRAIN DRIVE PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO BROWN STREETPROJECT WIDEN FACILITY FROM 2 LANE TO 4 LANE URBAN DIVIDED (ULTIMATE 6 LANE DIVIDED) MPO PROJ NUM 55037

DESCR FUNDING CAT(S) S102REMARKS PROJECT R PHASE IN FY2017 IS $15.8 MILLION FOR ROW; R PHASE IN FY

P7 HISTORY 2020 IS $2 MILLION FOR UTILITIES; 10-YEAR PLAN PROJECT TOTAL PROJECT COST INFORMATION

PREL ENG $ 820,000ROW PURCH $ 17,800,000 COST OF

CONSTR $ 20,179,763 APPROVEDCONST ENG $ 906,026 PHASES

CONTING $ 363,507 $ 2,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 40,069,296

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALS102 $ 1,600,000 $ 200,000 $ 0 $ 200,000 $ 0 $ 2,000,000TOTAL $ 1,600,000 $ 200,000 $ 0 $ 200,000 $ 0 $ 2,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0000-18-017 2020 CS C ADDISON $ 1,237,350LIMITS FROM KELLER SPRINGS RD AT ADDISON RD PROJECT SPONSOR ADDISON

REVISION DATE 07/2018LIMITS TOPROJECT WIDEN INTERSECTION APPROACHES MPO PROJ NUM 82048

DESCR FUNDING CAT(S) 3LCREMARKS LOCAL CONTRIBUTION PAID BY ADDISON PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 1,237,350 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 1,237,350INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,237,350

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 1,237,350 $ 1,237,350TOTAL $ 0 $ 0 $ 0 $ 0 $ 1,237,350 $ 1,237,350

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG COLLIN 0918-24-196 2020 CS C VARIOUS $ 18,534,000LIMITS FROM FRONTIER PARKWAY (CR 5) FROM SH 289 (PRESTON ROAD) PROJECT SPONSOR COLLIN CO

REVISION DATE 07/2018LIMITS TO DNTPROJECT CONSTRUCT NEW 2 TO 4 LANE DIVIDED URBAN ARTERIAL WITH GRADE SEPARATION OVER BNRR MPO PROJ NUM 20280

DESCR , 2-WAY SERVICE ROAD NORTH OF GRADE SEPARATION, AND QUIET ZONES FUNDING CAT(S) 3LC,3RTR121REMARKS RTR 121-CC1; LOCAL CONTRIBUTION BY CELINA, PROSPER, PROJECT

P7 AND COLLIN COUNTY HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,000,000ROW PURCH $ 3,126,000 COST OF

CONSTR $ 18,534,000 APPROVEDCONST ENG $ 648,690 PHASES

CONTING $ 278,010 $ 18,534,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 24,586,700

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3RTR121 $ 0 $ 0 $ 8,350,000 $ 2,087,500 $ 0 $ 10,437,5003LC $ 0 $ 0 $ 0 $ 0 $ 8,096,500 $ 8,096,500TOTAL $ 0 $ 0 $ 8,350,000 $ 2,087,500 $ 8,096,500 $ 18,534,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 399: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 399 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG KAUFMAN 0495-01-066 2020 SP 557 C,R,UTL TERRELL $ 3,304,000LIMITS FROM FM 148 PROJECT SPONSOR TERRELL

REVISION DATE 07/2018LIMITS TO IH 20PROJECT NEW LOCATION TWO LANE FRONTAGE ROAD EASTBOUND ONLY MPO PROJ NUM 83224

DESCR FUNDING CAT(S) 3LCREMARKS LOCAL CONTRIBUTION PAID BY TERRELL; ROW WILL BE DON PROJECT R IN FY 2020 IS FOR UTILITIES

P7 ATED HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 391,474ROW PURCH $ 100,000 COST OF

CONSTR $ 3,204,000 APPROVEDCONST ENG $ 254,617 PHASES

CONTING $ 64,953 $ 3,304,000INDIRECT $ 250,980BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 4,266,024

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 3,304,000 $ 3,304,000TOTAL $ 0 $ 0 $ 0 $ 0 $ 3,304,000 $ 3,304,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 3559-02-007 2020 SH 170 E,ENG VARIOUS $ 13,875,000LIMITS FROM IH 35W PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO DENTON C/LPROJECT CONSTRUCT 0 TO 4 LANE FREEWAY BETWEEN EXISTING FRONTAGE ROADS MPO PROJ NUM 54088

DESCR FUNDING CAT(S) SBPEREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 13,875,000ROW PURCH $ 0 COST OF

CONSTR $ 415,716,425 APPROVEDCONST ENG $ 17,875,806 PHASES

CONTING $ 748,289 $ 13,875,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 448,215,520

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 13,875,000 $ 0 $ 0 $ 0 $ 13,875,000TOTAL $ 0 $ 13,875,000 $ 0 $ 0 $ 0 $ 13,875,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-064 2020 VA C GARLAND $ 3,300,000LIMITS FROM MGR BIKEWAY FROM JUPITER & APOLLO PROJECT SPONSOR GARLAND

REVISION DATE 07/2018LIMITS TO CAMPBELL RDPROJECT TRAIL CONNECTOR ACROSS IH 30 & DUCK CREEK, GUTHRIE TRAIL CONNECTOR, DUCK CREEK G MPO PROJ NUM 20261

DESCR REENBELT/GLENBROOK DR CONNECTOR, SPRING CREEK CONNECTOR, ON-STREET BIKE ROUTE, & FUNDING CAT(S) 3RTR121BRAND RD TO FIREWHEEL TOWN CENTER CONNECTOR, BIKE ROUTE & LINK TO VELOWEB

REMARKS RTR 121-DA1 PROJECTP7 HISTORY

TOTAL PROJECT COST INFORMATIONPREL ENG $ 255,000

ROW PURCH $ 0 COST OFCONSTR $ 3,300,000 APPROVED

CONST ENG $ 0 PHASESCONTING $ 0 $ 3,300,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 3,555,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3RTR121 $ 0 $ 0 $ 2,640,000 $ 660,000 $ 0 $ 3,300,000TOTAL $ 0 $ 0 $ 2,640,000 $ 660,000 $ 0 $ 3,300,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 400: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 400 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DENTON 0918-46-238 2020 C LEWISVILLE $ 8,284,939LIMITS FROM HOLFORD’S PRAIRIE RD PROJECT SPONSOR LEWISVILLE

REVISION DATE 07/2018LIMITS TO ELM FORK TRINITY RIVER BRIDGEPROJECT CONSTRUCT FOUR LANE DIVIDED ROADWAY; SEGMENT 4 MPO PROJ NUM 20108

DESCR FUNDING CAT(S) 3RTR121REMARKS CHANGE CSJ FROM 0918-46-973 TO 0918-46-238; RTR 121 PROJECT

P7 -DE1 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 641,389ROW PURCH $ 1,281,220 COST OF

CONSTR $ 8,284,939 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 8,284,939INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 10,207,548

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3RTR121 $ 0 $ 0 $ 6,627,951 $ 1,656,988 $ 0 $ 8,284,939TOTAL $ 0 $ 0 $ 6,627,951 $ 1,656,988 $ 0 $ 8,284,939

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 2374-03-074 2020 IH 20 C DALLAS $ 2,718,645LIMITS FROM AT BONNIE VIEW RD PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TOPROJECT IMPROVE APPROACH, WIDEN BRIDGE TO ADD TURN LANES, AND REPLACE TRAFFIC SIGNAL SYS MPO PROJ NUM 20066

DESCR TEM FUNDING CAT(S) 7REMARKS PROJECT PLANNING CSJ 2374-04-925

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 270,000ROW PURCH $ 0 COST OF

CONSTR $ 2,718,645 APPROVEDCONST ENG $ 241,791 PHASES

CONTING $ 146,289 $ 2,718,645INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 3,376,725

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 2,174,916 $ 543,729 $ 0 $ 0 $ 0 $ 2,718,645TOTAL $ 2,174,916 $ 543,729 $ 0 $ 0 $ 0 $ 2,718,645

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0902-48-864 2020 VA C NORTH RICHLAND HILLS$ 2,545,500LIMITS FROM SNIDER ST EXTENSION PROJECT; ON MAIN ST, SNIDER ST, AND NORTHEAST PKWY BOU PROJECT SPONSOR NORTH RICHLAND HILLS

REVISION DATE 07/2018NDED BYLIMITS TO MAIN ST TO THE SOUTH, NORTHEAST PKWY ON THE NORTH, DAVIS BLVD ON THE EAST

& SMITHFIELD RD ON THE WESTPROJECT PEDESTRIAN AMENITIES; LANDSCAPING; TRAFFIC SIGNALIZATION; STREET CONSTRUCTION IN MPO PROJ NUM 11383

DESCR CLUDES EXTENDING SNIDER STREET NORTH TO CONNECT TO NORTHEAST PARKWAY (2 LANES), FUNDING CAT(S) 3RTR161AND NORTHEAST PARKWAY WEST TO CONNECT TO SNIDER STREET (2 LANES)

REMARKS RTR 161-TC1 PROJECTP7 HISTORY

TOTAL PROJECT COST INFORMATIONPREL ENG $ 254,550

ROW PURCH $ 0 COST OFCONSTR $ 2,545,500 APPROVED

CONST ENG $ 89,092 PHASESCONTING $ 38,182 $ 2,545,500INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,927,324

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3RTR161 $ 0 $ 0 $ 2,036,400 $ 509,100 $ 0 $ 2,545,500TOTAL $ 0 $ 0 $ 2,036,400 $ 509,100 $ 0 $ 2,545,500

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 401: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 401 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 1068-04-170 2021 IH 30 C GRAND PRAIRIE $ 9,000,000LIMITS FROM DALLAS COUNTY LINE PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO SH 161PROJECT RECONSTRUCT AND WIDEN FROM 6 TO 8 GENERAL PURPOSE LANES WITH 2 REVERSIBLE EXPRES MPO PROJ NUM 13000

DESCR S LANE AND CONSTRUCT 0 TO 4 LANE CONTINUOUS FRONTAGE ROADS; MODIFICATIONS TO SH FUNDING CAT(S) 4161 CONNECTIONS

REMARKS PROJECT PART OF REGIONAL 10 YEAR PLANP7 HISTORY

TOTAL PROJECT COST INFORMATIONPREL ENG $ 530,000

ROW PURCH $ 8,910,000 COST OFCONSTR $ 9,000,000 APPROVED

CONST ENG $ 429,556 PHASESCONTING $ 17,981 $ 9,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 18,887,537

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 7,200,000 $ 1,800,000 $ 0 $ 0 $ 0 $ 9,000,000TOTAL $ 7,200,000 $ 1,800,000 $ 0 $ 0 $ 0 $ 9,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-916 2021 CS C VARIOUS $ 8,000,000LIMITS FROM ON WYCLIFF AVENUE FROM WEST OF LAKESIDE DRIVE PROJECT SPONSOR HIGHLAND PARK

REVISION DATE 07/2018LIMITS TO WEST OF GLENWOOD AVENUEPROJECT RECONSTRUCTION OF A TWO-LANE ROADWAY THAT WILL INCLUDE A NEW BRIDGE STRUCTURE TO MPO PROJ NUM 14034

DESCR RAISE ROADWAY OUT OF THE 100-YEAR FLOODPLAIN AS WELL AS DRAINAGE IMPROVEMENTS A FUNDING CAT(S) 3LC,7T TRIBUTARY 1 IN ORDER TO REDUCE/ELIMINATE FLOOD FREQUENCY

REMARKS LOCAL CONTRIBUTION TO BE PAID BY THE TOWN OF HIGHLA PROJECT 2017-2018 CMAQ/STBG PROJECT SELECTION/SAFETY, INNOVATIVEP7 ND PARK AND THE CITY OF DALLAS; CHANGE CSJ FROM 000 HISTORY CONSTRUCTION, AND EMERGENCY PROJECTS; PRIOR CSJ 0000-18-0

0-18-092 TO 0918-47-916 92 TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,250,000ROW PURCH $ 200,000 COST OF

CONSTR $ 8,000,000 APPROVEDCONST ENG $ 280,000 PHASES

CONTING $ 120,000 $ 8,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 9,850,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 1,000,000 $ 1,000,0007 $ 5,600,000 $ 0 $ 0 $ 1,400,000 $ 0 $ 7,000,000TOTAL $ 5,600,000 $ 0 $ 0 $ 1,400,000 $ 1,000,000 $ 8,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-45-999 2021 CS R,ACQ,UTL GLENN HEIGHTS $ 3,600,000LIMITS FROM ON EAST BEAR CREEK ROAD FROM HAMPTON ROAD PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO IH 35EPROJECT RECONSTRUCT AND WIDEN FROM 2 LANES RURAL UNDIVIDED TO 4 LANES URBAN DIVIDED (ULT MPO PROJ NUM 14032

DESCR IMATE 6) WITH BICYCLE/PEDESTRIAN ACCOMMODATIONS AND INTERSECTION IMPROVEMENTS FUNDING CAT(S) 3LC,7,S102REMARKS LOCAL CONTRIBUTION BY CITY OF GLENN HEIGHTS AND FRA PROJECT 2017-2018 CMAQ/STBG PROJECT SELECTION/STRATEGIC PARTNERSH

P7 NCHISE UTILITY COMPANIES HISTORY IPS (ROUND 2) TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,000,000ROW PURCH $ 3,600,000 COST OF

CONSTR $ 20,000,000 APPROVEDCONST ENG $ 160,891 PHASES

CONTING $ 64,551 $ 3,600,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 25,825,442

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 1,100,000 $ 1,100,0007 $ 1,000,000 $ 0 $ 0 $ 250,000 $ 0 $ 1,250,000S102 $ 1,125,000 $ 125,000 $ 0 $ 0 $ 0 $ 1,250,000TOTAL $ 2,125,000 $ 125,000 $ 0 $ 250,000 $ 1,100,000 $ 3,600,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 402: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 402 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0009-11-241 2021 IH 30 C VARIOUS $ 127,574,879LIMITS FROM BASS PRO DRIVE PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO DALROCK RDPROJECT CONSTRUCT 0 TO 6 LANE FRONTAGE ROADS, BAYSIDE BRIDGE, AND RAMP MODIFICATIONS; RE MPO PROJ NUM 55169

DESCR CONSTRUCT DALROCK INTERCHANGE FUNDING CAT(S) 4REMARKS PROJECT 10-YEAR PLAN PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 8,000,000ROW PURCH $ 3,000,000 COST OF

CONSTR $ 127,574,879 APPROVEDCONST ENG $ 6,338,649 PHASES

CONTING $ 4,041,058 $ 127,574,879INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 148,954,586

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 102,059,903 $ 25,514,976 $ 0 $ 0 $ 0 $ 127,574,879TOTAL $ 102,059,903 $ 25,514,976 $ 0 $ 0 $ 0 $ 127,574,879

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DENTON 0135-10-057 2021 US 377/US 380C DENTON $ 18,599,014LIMITS FROM SL 288 PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO US 377/US 380 INTERSECTIONPROJECT ADD RAISED MEDIAN WITH LEFT TURN LANES, ADD RIGHT TURN LANES AND RESTRIPE FOR SH MPO PROJ NUM 55104

DESCR ARED USE FUNDING CAT(S) 2M,3LC,5REMARKS LOCAL CONTRIBUTION BY CITY OF DENTON; CMAQ FOR SHAR PROJECT R PHASE IN FY 2019 IS FOR $3,000,000 FOR ROW; R PHASE IN

P7 ED-USE PATH ONLY HISTORY FY 2020 IS FOR $2,000,000 FOR UTILITIES; PART OF REGIONAL10 YEAR PLAN

TOTAL PROJECT COST INFORMATIONPREL ENG $ 904,000

ROW PURCH $ 5,000,000 COST OFCONSTR $ 18,599,014 APPROVED

CONST ENG $ 879,830 PHASESCONTING $ 352,996 $ 18,599,014INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 25,735,840

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 14,271,211 $ 3,567,803 $ 0 $ 0 $ 0 $ 17,839,0143LC $ 0 $ 0 $ 0 $ 0 $ 95,000 $ 95,0005 $ 532,000 $ 133,000 $ 0 $ 0 $ 0 $ 665,000TOTAL $ 14,803,211 $ 3,700,803 $ 0 $ 0 $ 95,000 $ 18,599,014

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DENTON 2250-02-013 2021 SL 288 R,ACQ DENTON $ 1,000,000LIMITS FROM IH 35 AT SL 288 PROJECT SPONSOR DENTON CO

REVISION DATE 07/2018LIMITS TO US 380 WEST OF DENTONPROJECT CONSTRUCT 2 LANE RURAL ROADWAY ON NEW LOCATION WITH INTERCHANGE AT IH 35; NW QUA MPO PROJ NUM 20175

DESCR DRANT & INTERCHANGE FUNDING CAT(S) S102REMARKS PROJECT RELATED TO TIP 53075/ CSJ 2250-02-014

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,532,590ROW PURCH $ 1,000,000 COST OF

CONSTR $ 15,435,720 APPROVEDCONST ENG $ 705,412 PHASES

CONTING $ 1,278,078 $ 1,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 19,951,800

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALS102 $ 800,000 $ 100,000 $ 0 $ 100,000 $ 0 $ 1,000,000TOTAL $ 800,000 $ 100,000 $ 0 $ 100,000 $ 0 $ 1,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 403: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 403 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DENTON 0918-46-952 2021 CS C SHADY SHORES $ 14,000,000LIMITS FROM ON SOUTH SHADY SHORES ROAD FROM WEST SHADY SHORES ROAD PROJECT SPONSOR DENTON CO

REVISION DATE 07/2018LIMITS TO SWISHER ROADPROJECT RECONSTRUCT ROAD FROM 2 TO 2 LANES TO ELEVATE OUT OF FLOOD PLAIN WITH DRAINAGE I MPO PROJ NUM 14033

DESCR MPROVEMENTS FUNDING CAT(S) 3LC,7REMARKS LOCAL CONTRIBUTION PAID BY DENTON COUNTY, LAKE DALL PROJECT 2017-2018 CMAQ/STBG PROJECT SELECTION - SAFETY, INNOVATIV

P7 AS, AND SHADY SHORES; CHANGE CSJ FROM 0000-18-091 T HISTORY E CONSTRUCTION, AND EMERGENCY PROJECTS; PRIOR CSJ 0000-18O 0918-46-952 -091

TOTAL PROJECT COST INFORMATIONPREL ENG $ 1,400,000

ROW PURCH $ 2,800,000 COST OFCONSTR $ 14,000,000 APPROVED

CONST ENG $ 637,000 PHASESCONTING $ 273,000 $ 14,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 19,110,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 1,500,000 $ 1,500,0007 $ 10,000,000 $ 0 $ 0 $ 2,500,000 $ 0 $ 12,500,000TOTAL $ 10,000,000 $ 0 $ 0 $ 2,500,000 $ 1,500,000 $ 14,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 1330-01-068 2021 FM 1187 E,ENG VARIOUS $ 7,000,000LIMITS FROM CHISHOLM TRAIL PARKWAY PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO BF 1187CPROJECT WIDEN 2 TO 4 LANE URBAN DIVIDED MPO PROJ NUM 55184

DESCR FUNDING CAT(S) SBPEREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 7,000,000ROW PURCH $ 0 COST OF

CONSTR $ 36,975,066 APPROVEDCONST ENG $ 1,833,963 PHASES

CONTING $ 735,804 $ 7,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 46,544,833

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 7,000,000 $ 0 $ 0 $ 0 $ 7,000,000TOTAL $ 0 $ 7,000,000 $ 0 $ 0 $ 0 $ 7,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0094-05-067 2021 SH 183 E,ENG RIVER OAKS $ 3,000,000LIMITS FROM SAM CALLOWAY ROAD PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO IH 30PROJECT RECONSTRUCT 4 TO 4/6 MAIN LANES MPO PROJ NUM 55183

DESCR FUNDING CAT(S) SBPEREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 3,000,000ROW PURCH $ 0 COST OF

CONSTR $ 59,254,913 APPROVEDCONST ENG $ 2,903,491 PHASES

CONTING $ 29,627 $ 3,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 65,188,031

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 3,000,000 $ 0 $ 0 $ 0 $ 3,000,000TOTAL $ 0 $ 3,000,000 $ 0 $ 0 $ 0 $ 3,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 404: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 404 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0014-02-050 2021 IH 35W R,ACQ FORT WORTH $ 48,200,000LIMITS FROM IH 20 PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO SH 174PROJECT RECONSTRUCT AND WIDEN 6 TO 10 LANES FROM IH 20 TO FM 1187 AND RECONSTRUCT AND WI MPO PROJ NUM 55208

DESCR DEN 6 TO 8 LANES FROM FM 1187 TO SH 174 FUNDING CAT(S) S102REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 35,180,486ROW PURCH $ 48,200,000 COST OF

CONSTR $ 679,342,456 APPROVEDCONST ENG $ 33,219,846 PHASES

CONTING $ 7,676,569 $ 48,200,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 803,619,357

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALS102 $ 38,560,000 $ 9,640,000 $ 0 $ 0 $ 0 $ 48,200,000TOTAL $ 38,560,000 $ 9,640,000 $ 0 $ 0 $ 0 $ 48,200,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0902-90-939 2021 VA C,R,UTL FORT WORTH $ 188,000LIMITS FROM BUS 287/NORTH MAIN STREET AT NORTH AIRPORT ENTRANCE PROJECT SPONSOR FORT WORTH

REVISION DATE 07/2018LIMITS TOPROJECT ADD RIGHT TURN LANE FOR SOUTHBOUND TRAFFIC INTO AIRPORT’S NORTHERN ENTRANCE (MAI MPO PROJ NUM 14037

DESCR N ENTRANCE FOR JET FUEL TRUCKS) FUNDING CAT(S) 5REMARKS REVISE CSJ FROM 0000-02-018 TO 0902-90-939 PROJECT PART OF 2017-2018 CMAQ/STBG SAFETY, INNOVATIVE CONSTRUCTI

P7 HISTORY ON, AND EMERGENCY PROJECT SELECTION TOTAL PROJECT COST INFORMATION

PREL ENG $ 52,000ROW PURCH $ 10,000 COST OF

CONSTR $ 178,000 APPROVEDCONST ENG $ 6,230 PHASES

CONTING $ 2,670 $ 188,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 248,900

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 150,400 $ 0 $ 0 $ 37,600 $ 0 $ 188,000TOTAL $ 150,400 $ 0 $ 0 $ 37,600 $ 0 $ 188,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0902-90-984 2021 VA C,R,UTL FORT WORTH $ 229,000LIMITS FROM BUS 287/NORTH MAIN STREET AT NORTH HANGAR ENTRANCE PROJECT SPONSOR FORT WORTH

REVISION DATE 07/2018LIMITS TOPROJECT ADD RIGHT TURN LANES FOR SOUTHBOUND TRAFFIC MPO PROJ NUM 14036

DESCR FUNDING CAT(S) 5REMARKS REVISE CSJ FROM 0000-02-017 TO 0902-90-984 PROJECT PART OF 2017-2018 CMAQ/STBG SAFETY, INNOVATIVE CONSTRUCTI

P7 HISTORY ON, AND EMERGENCY PROJECT SELECTION TOTAL PROJECT COST INFORMATION

PREL ENG $ 52,000ROW PURCH $ 35,000 COST OF

CONSTR $ 194,000 APPROVEDCONST ENG $ 6,790 PHASES

CONTING $ 2,910 $ 229,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 290,700

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 183,200 $ 0 $ 0 $ 45,800 $ 0 $ 229,000TOTAL $ 183,200 $ 0 $ 0 $ 45,800 $ 0 $ 229,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 405: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 405 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PARIS NCTCOG HUNT 0009-13-900 2021 IH 30 E,ENG VARIOUS $ 1,000,000LIMITS FROM WEST OF FM 1903 PROJECT SPONSOR TXDOT-PARIS

REVISION DATE 07/2018LIMITS TO EAST OF FM 1903PROJECT RECONSTRUCT OVERPASS AND APPROACHES MPO PROJ NUM 55223

DESCR FUNDING CAT(S) SBPEREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,000,000ROW PURCH $ 2,616,300 COST OF

CONSTR $ 25,000,000 APPROVEDCONST ENG $ 1,588,990 PHASES

CONTING $ 1,013,024 $ 1,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 31,218,314

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 1,000,000 $ 0 $ 0 $ 0 $ 1,000,000TOTAL $ 0 $ 1,000,000 $ 0 $ 0 $ 0 $ 1,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PARIS NCTCOG HUNT 0009-13-167 2021 IH 30 E,ENG GREENVILLE $ 884,249LIMITS FROM AT FM 1570 PROJECT SPONSOR TXDOT-PARIS

REVISION DATE 07/2018LIMITS TOPROJECT CONSTRUCT INTERCHANGE MPO PROJ NUM 13050

DESCR FUNDING CAT(S) SBPEREMARKS PROJECT PART OF REGIONAL 10 YEAR PLAN; E PHASE IN FY19 IS ENVIRON

P7 HISTORY MENTAL; E PHASE IN FY20 AND FY21 ARE INITIAL DESIGN AND FINAL DESIGN

TOTAL PROJECT COST INFORMATIONPREL ENG $ 2,079,249

ROW PURCH $ 350,000 COST OFCONSTR $ 30,000,000 APPROVED

CONST ENG $ 1,791,511 PHASESCONTING $ 1,142,136 $ 884,249INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 35,362,896

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 884,249 $ 0 $ 0 $ 0 $ 884,249TOTAL $ 0 $ 884,249 $ 0 $ 0 $ 0 $ 884,249

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG 0918-00-968 2021 VA T VARIOUS $ 23,750,000LIMITS FROM COTTON BELT RAIL LINE FROM DFW AIRPORT STATION PROJECT SPONSOR DART

REVISION DATE 07/2018LIMITS TO SHILOH STATION IN PLANOPROJECT ENGINEERING, ENVIRONMENTAL, AND CONSTRUCTION OF COTTON BELT REGIONAL RAIL PROJEC MPO PROJ NUM 14004

DESCR T (COTTON BELT PROJECT #3) FUNDING CAT(S) 7REMARKS RELATED TO TIP 14005, 14013, 83245, AND 14006 PROJECT PART OF DART/RTC TRIP FUNDING PARTNERSHIP; PHASE 2

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 23,750,000 APPROVEDCONST ENG $ 831,250 PHASES

CONTING $ 356,250 $ 23,750,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 24,937,500

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 19,000,000 $ 0 $ 0 $ 4,750,000 $ 0 $ 23,750,000TOTAL $ 19,000,000 $ 0 $ 0 $ 4,750,000 $ 0 $ 23,750,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 406: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 406 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG 0918-00-914 2021 VA T VARIOUS $ 20,500,000LIMITS FROM COTTON BELT RAIL LINE FROM DFW AIRPORT STATION PROJECT SPONSOR DART

REVISION DATE 07/2018LIMITS TO SHILOH STATION IN PLANOPROJECT ENGINEERING, ENVIRONMENTAL, AND CONSTRUCTION OF COTTON BELT REGIONAL RAIL PROJEC MPO PROJ NUM 14006

DESCR T (COTTON BELT PROJECT #4) FUNDING CAT(S) 5,7REMARKS RELATED TO TIP 14005, 14013, 83245, AND 14004 PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 20,500,000 APPROVEDCONST ENG $ 437,500 PHASES

CONTING $ 187,500 $ 20,500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 21,125,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 10,000,000 $ 0 $ 0 $ 2,500,000 $ 0 $ 12,500,0005 $ 6,400,000 $ 0 $ 0 $ 1,600,000 $ 0 $ 8,000,000TOTAL $ 16,400,000 $ 0 $ 0 $ 4,100,000 $ 0 $ 20,500,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG PARKER 0008-09-037 2021 FM 1187 C ALEDO $ 6,440,000LIMITS FROM MAVERICK ST PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO FM 5PROJECT RECONSTRUCT AND WIDEN FROM 2/3 LANES TO 5 LANE URBAN; INTERSECTION IMPROVEMENTS MPO PROJ NUM 14041

DESCR INCLUDING A ROUNDABOUT FUNDING CAT(S) 5,7REMARKS CMAQ FOR INTERSECTION IMPROVEMENTS AND ROUNDABOUTPROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 519,060ROW PURCH $ 403,010 COST OF

CONSTR $ 6,440,000 APPROVEDCONST ENG $ 354,549 PHASES

CONTING $ 142,248 $ 6,440,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 7,858,867

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 1,032,000 $ 258,000 $ 0 $ 0 $ 0 $ 1,290,0007 $ 4,120,000 $ 1,030,000 $ 0 $ 0 $ 0 $ 5,150,000TOTAL $ 5,152,000 $ 1,288,000 $ 0 $ 0 $ 0 $ 6,440,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DENTON 1311-01-055 2021 FM 1171 E,ENG VARIOUS $ 1,600,000LIMITS FROM IH 35W PROJECT SPONSOR DENTON CO

REVISION DATE 07/2018LIMITS TO WEST OF FM 156PROJECT CONSTRUCT NEW 0 TO 6 LANE DIVIDED ARTERIAL MPO PROJ NUM 55218

DESCR FUNDING CAT(S) 3LCREMARKS LOCAL CONTRIBUTION PAID BY DENTON COUNTY PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,600,000ROW PURCH $ 990,000 COST OF

CONSTR $ 53,322,975 APPROVEDCONST ENG $ 2,612,826 PHASES

CONTING $ 666,537 $ 1,600,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 59,192,338

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 1,600,000 $ 1,600,000TOTAL $ 0 $ 0 $ 0 $ 0 $ 1,600,000 $ 1,600,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 407: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 407 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DENTON 0816-02-072 2021 FM 455 C VARIOUS $ 42,817,890LIMITS FROM WEST OF FM 2450 PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO EAST OF MARION RDPROJECT RECONSTRUCT AND WIDEN TWO LANE RURAL TO FOUR LANE URBAN DIVIDED MPO PROJ NUM 83255

DESCR FUNDING CAT(S) 2MREMARKS PROJECT PART OF REGIONAL 10 YEAR PLAN

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 3,000,000ROW PURCH $ 18,100,000 COST OF

CONSTR $ 42,817,890 APPROVEDCONST ENG $ 2,035,687 PHASES

CONTING $ 816,737 $ 42,817,890INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 66,770,314

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 34,254,312 $ 8,563,578 $ 0 $ 0 $ 0 $ 42,817,890TOTAL $ 34,254,312 $ 8,563,578 $ 0 $ 0 $ 0 $ 42,817,890

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG JOHNSON 1181-02-033 2021 FM 917 C JOSHUA $ 15,059,771LIMITS FROM EDDY AVENUE PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO SH 174PROJECT CONSTRUCT RR GRADE SEPARATION AND REALIGN FM 917 MPO PROJ NUM 11955

DESCR FUNDING CAT(S) 2MREMARKS PROJECT PART OF REGIONAL 10 YEAR PLAN

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,500,000ROW PURCH $ 3,247,000 COST OF

CONSTR $ 15,059,771 APPROVEDCONST ENG $ 478,500 PHASES

CONTING $ 478,500 $ 15,059,771INDIRECT $ 96,750BOND FIN $ 362,250

PT CHG ORD $ 0TOTAL CST $ 21,222,771

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 12,047,817 $ 3,011,954 $ 0 $ 0 $ 0 $ 15,059,771TOTAL $ 12,047,817 $ 3,011,954 $ 0 $ 0 $ 0 $ 15,059,771

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG COLLIN 2679-03-016 2021 FM 2514 C WYLIE $ 20,179,763LIMITS FROM NORTH OF DRAIN DRIVE PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO BROWN STREETPROJECT WIDEN FACILITY FROM 2 LANE TO 4 LANE URBAN DIVIDED (ULTIMATE 6 LANE DIVIDED) MPO PROJ NUM 55037

DESCR FUNDING CAT(S) 2MREMARKS PROJECT 10-YEAR PLAN PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 820,000ROW PURCH $ 17,800,000 COST OF

CONSTR $ 20,179,763 APPROVEDCONST ENG $ 906,026 PHASES

CONTING $ 363,507 $ 20,179,763INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 40,069,296

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 16,143,810 $ 4,035,953 $ 0 $ 0 $ 0 $ 20,179,763TOTAL $ 16,143,810 $ 4,035,953 $ 0 $ 0 $ 0 $ 20,179,763

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 408: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 408 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG COLLIN 2679-03-015 2021 FM 2514 C WYLIE $ 11,167,795LIMITS FROM EAST OF LAVON PARKWAY PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO NORTH OF DRAIN DRIVEPROJECT WIDEN FACILITY FROM 2 LANE TO 4 LANE URBAN DIVIDED (ULTIMATE 6 LANE DIVIDED) MPO PROJ NUM 55038

DESCR FUNDING CAT(S) 2MREMARKS PROJECT 10-YEAR PLAN PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 452,260ROW PURCH $ 9,051,000 COST OF

CONSTR $ 11,167,795 APPROVEDCONST ENG $ 428,495 PHASES

CONTING $ 171,916 $ 11,167,795INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 21,271,466

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 8,934,236 $ 2,233,559 $ 0 $ 0 $ 0 $ 11,167,795TOTAL $ 8,934,236 $ 2,233,559 $ 0 $ 0 $ 0 $ 11,167,795

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG COLLIN 2351-02-014 2021 FM 2478 C MCKINNEY $ 3,985,550LIMITS FROM FM 1461 PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO NORTH OF FM 1461PROJECT WIDEN TWO LANE RURAL HIGHWAY TO FOUR LANE DIVIDED (SIX LANE ULTIMATE); REALIGN I MPO PROJ NUM 54005.1

DESCR NTERSECTION OF FM 1461 FUNDING CAT(S) 2MREMARKS PROJECT RELATED TO PROJECT TIP 54005/CSJ 2351-01-017; 10-YEAR PLA

P7 HISTORY N PROJECT TOTAL PROJECT COST INFORMATION

PREL ENG $ 200,000ROW PURCH $ 744,052 COST OF

CONSTR $ 3,985,550 APPROVEDCONST ENG $ 174,000 PHASES

CONTING $ 69,810 $ 3,985,550INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 5,173,412

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 3,188,440 $ 797,110 $ 0 $ 0 $ 0 $ 3,985,550TOTAL $ 3,188,440 $ 797,110 $ 0 $ 0 $ 0 $ 3,985,550

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG COLLIN 2351-01-017 2021 FM 2478 C MCKINNEY $ 34,793,244LIMITS FROM US 380 PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO FM 1461PROJECT WIDEN TWO LANE RURAL HIGHWAY TO FOUR LANE DIVIDED; REALIGN INTERSECTION AT FM 14 MPO PROJ NUM 54005

DESCR 61; SIX LANE ULTIMATE FUNDING CAT(S) 2MREMARKS PROJECT RELATED TO TIP 54005.1/CSJ 2351-02-014; 10-YEAR PLAN PROJ

P7 HISTORY ECT TOTAL PROJECT COST INFORMATION

PREL ENG $ 4,750,000ROW PURCH $ 13,000,000 COST OF

CONSTR $ 34,793,244 APPROVEDCONST ENG $ 1,659,370 PHASES

CONTING $ 665,755 $ 34,793,244INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 54,868,369

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 27,834,595 $ 6,958,649 $ 0 $ 0 $ 0 $ 34,793,244TOTAL $ 27,834,595 $ 6,958,649 $ 0 $ 0 $ 0 $ 34,793,244

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 409: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 409 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG COLLIN 0549-03-024 2021 SH 121 C ANNA $ 50,329,445LIMITS FROM COLLIN COUNTY OUTER LOOP PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO NORTH OF FM 455PROJECT RECONSTRUCT AND WIDEN FROM 2 LANE TO 4 LANE RURAL DIVIDED; CONSTRUCT 0 TO 4 LANE MPO PROJ NUM 13015

DESCR DISCONTINUOUS ACCESS ROAD AND FM 455 INTERCHANGE FUNDING CAT(S) 4REMARKS PROJECT 10-YEAR PLAN PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,500,000ROW PURCH $ 24,000,000 COST OF

CONSTR $ 50,329,445 APPROVEDCONST ENG $ 2,439,430 PHASES

CONTING $ 978,723 $ 50,329,445INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 80,247,598

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 40,263,556 $ 10,065,889 $ 0 $ 0 $ 0 $ 50,329,445TOTAL $ 40,263,556 $ 10,065,889 $ 0 $ 0 $ 0 $ 50,329,445

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG COLLIN 0451-03-013 2021 SH 205 C VARIOUS $ 28,654,950LIMITS FROM NORTH OF JOHN KING PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO SH 78PROJECT WIDEN 2 LANE RURAL HIGHWAY TO 4 LANE DIVIDED (6 LANE ULTIMATE) MPO PROJ NUM 55073

DESCR FUNDING CAT(S) 2MREMARKS PROJECT 10-YEAR PLAN PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,722,000ROW PURCH $ 5,000,000 COST OF

CONSTR $ 28,654,950 APPROVEDCONST ENG $ 1,610,827 PHASES

CONTING $ 646,279 $ 28,654,950INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 37,634,056

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 22,923,960 $ 5,730,990 $ 0 $ 0 $ 0 $ 28,654,950TOTAL $ 22,923,960 $ 5,730,990 $ 0 $ 0 $ 0 $ 28,654,950

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG COLLIN 0047-06-161 2021 US 75 E,ENG,R,ACQ ALLEN $ 6,500,000LIMITS FROM BETHANY DRIVE PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO SH 121PROJECT RECONSTRUCT RIDGEVIEW INTERCHANGE MPO PROJ NUM 13044

DESCR FUNDING CAT(S) S102,SBPEREMARKS PROJECT 10-YEAR PLAN PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,500,000ROW PURCH $ 5,000,000 COST OF

CONSTR $ 30,000,000 APPROVEDCONST ENG $ 1,288,366 PHASES

CONTING $ 821,368 $ 6,500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 38,609,734

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 1,500,000 $ 0 $ 0 $ 0 $ 1,500,000S102 $ 4,000,000 $ 500,000 $ 0 $ 500,000 $ 0 $ 5,000,000TOTAL $ 4,000,000 $ 2,000,000 $ 0 $ 500,000 $ 0 $ 6,500,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 410: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 410 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG ELLIS 1051-01-051 2021 FM 664 R,UTL VARIOUS $ 2,000,000LIMITS FROM IH 35E PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO IH 45PROJECT WIDEN 2/4 LANE RURAL ROADWAY TO 6 LANE URBAN MPO PROJ NUM 13035

DESCR FUNDING CAT(S) S102REMARKS PROJECT PART OF REGIONAL 10 YEAR PLAN; R PHASE IN FY 2019 IS FOR

P7 HISTORY $30,000,000 FOR ROW; R PHASE IN FY 2021 IS FOR $2,000,000FOR UTILITIES

TOTAL PROJECT COST INFORMATIONPREL ENG $ 10,000,000

ROW PURCH $ 32,000,000 COST OFCONSTR $ 182,391,982 APPROVED

CONST ENG $ 9,046,642 PHASESCONTING $ 3,629,600 $ 2,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 237,068,224

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALS102 $ 1,600,000 $ 200,000 $ 0 $ 200,000 $ 0 $ 2,000,000TOTAL $ 1,600,000 $ 200,000 $ 0 $ 200,000 $ 0 $ 2,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG ELLIS 0442-03-042 2021 IH 35E E,ENG,R,ACQ RED OAK $ 7,500,000LIMITS FROM AT FM 664 PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TOPROJECT RECONSTRUCT INTERCHANGE MPO PROJ NUM 13034

DESCR FUNDING CAT(S) S102,SBPEREMARKS PROJECT PART OF REGIONAL 10 YEAR PLAN

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,500,000ROW PURCH $ 6,000,000 COST OF

CONSTR $ 29,246,463 APPROVEDCONST ENG $ 1,340,283 PHASES

CONTING $ 854,466 $ 7,500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 38,941,212

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 1,500,000 $ 0 $ 0 $ 0 $ 1,500,000S102 $ 5,400,000 $ 600,000 $ 0 $ 0 $ 0 $ 6,000,000TOTAL $ 5,400,000 $ 2,100,000 $ 0 $ 0 $ 0 $ 7,500,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG ELLIS 0048-04-094 2021 IH 35E C WAXAHACHIE $ 42,000,000LIMITS FROM AT FM 387 (BUTCHER ROAD) PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TOPROJECT CONSTRUCT GRADE SEPARATION AND RECONSTRUCT 4/6 LANE FRONTAGE ROADS MPO PROJ NUM 13042

DESCR FUNDING CAT(S) 4REMARKS PROJECT PART OF REGIONAL 10 YEAR PLAN

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,500,000ROW PURCH $ 17,000,000 COST OF

CONSTR $ 42,000,000 APPROVEDCONST ENG $ 2,367,755 PHASES

CONTING $ 1,509,507 $ 42,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 65,377,262

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 33,600,000 $ 8,400,000 $ 0 $ 0 $ 0 $ 42,000,000TOTAL $ 33,600,000 $ 8,400,000 $ 0 $ 0 $ 0 $ 42,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 411: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 411 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG KAUFMAN 2588-01-017 2021 FM 548 R,ACQ,UTL FORNEY $ 17,000,000LIMITS FROM N OF US 80 AT WALMART PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO SH 205PROJECT WIDEN AND RECONSTRUCT 2 LANE RURAL TO 4 LANE URBAN DIVIDED (6 LANE ULTIMATE) MPO PROJ NUM 55111

DESCR FUNDING CAT(S) S102REMARKS PROJECT PART OF REGIONAL 10 YEAR PLAN

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 3,300,000ROW PURCH $ 17,000,000 COST OF

CONSTR $ 84,650,269 APPROVEDCONST ENG $ 3,318,257 PHASES

CONTING $ 1,331,317 $ 17,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 109,599,843

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALS102 $ 13,600,000 $ 1,700,000 $ 0 $ 1,700,000 $ 0 $ 17,000,000TOTAL $ 13,600,000 $ 1,700,000 $ 0 $ 1,700,000 $ 0 $ 17,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG KAUFMAN 0095-03-080 2021 US 80 E,ENG,R,ACQ,UTLDALLAS $ 19,000,000LIMITS FROM LAWSON ROAD (DALLAS/KAUFMAN C/L) PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO FM 460PROJECT RECONSTRUCT AND WIDEN 4 TO 6 MAINLANES AND RECONSTRUCT 4 LANE DISCONTINUOUS FRON MPO PROJ NUM 53086

DESCR TAGE RDS TO 4 LANE CONTINUOUS FRONTAGE RDS FUNDING CAT(S) S102,SBPEREMARKS PROJECT PART OF REGIONAL 10 YEAR PLAN

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 7,000,000ROW PURCH $ 12,000,000 COST OF

CONSTR $ 133,000,000 APPROVEDCONST ENG $ 5,563,981 PHASES

CONTING $ 232,911 $ 19,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 157,796,892

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 7,000,000 $ 0 $ 0 $ 0 $ 7,000,000S102 $ 9,600,000 $ 1,200,000 $ 0 $ 1,200,000 $ 0 $ 12,000,000TOTAL $ 9,600,000 $ 8,200,000 $ 0 $ 1,200,000 $ 0 $ 19,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG ROCKWALL 2588-02-008 2021 FM 548 R,UTL VARIOUS $ 2,000,000LIMITS FROM S OF SH 205 (KAUFMAN COUNTY LINE) PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO SH 205PROJECT WIDEN AND RECONSTRUCT 2 LANE RURAL TO 4 LANE DIVIDED URBAN ROADWAY (ULTIMATE 6) MPO PROJ NUM 13017

DESCR FUNDING CAT(S) S102REMARKS PROJECT R PHASE IN FY2019 IS $3 MILLION FOR ROW; R PHASE IN FY202

P7 HISTORY 1 IS $2 MILLION FOR UTILITIES; 10 YEAR PLAN PROJECT TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,500,000ROW PURCH $ 5,000,000 COST OF

CONSTR $ 6,200,000 APPROVEDCONST ENG $ 304,688 PHASES

CONTING $ 122,244 $ 2,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 13,126,932

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALS102 $ 1,600,000 $ 200,000 $ 0 $ 200,000 $ 0 $ 2,000,000TOTAL $ 1,600,000 $ 200,000 $ 0 $ 200,000 $ 0 $ 2,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 412: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 412 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG ROCKWALL 0451-04-021 2021 SH 205 C ROCKWALL $ 5,000,000LIMITS FROM JCT SH 205/ JOHN KING (N. GOLIAD ST) PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO NORTH OF JOHN KING (COLLIN COUNTY LINE)PROJECT WIDEN 2 LANE RURAL HIGHWAY TO 4 LANE DIVIDED (6 LANE ULTIMATE) MPO PROJ NUM 55074

DESCR FUNDING CAT(S) 2MREMARKS PROJECT 10 YEAR PLAN PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,200,000ROW PURCH $ 1,000,000 COST OF

CONSTR $ 5,000,000 APPROVEDCONST ENG $ 158,826 PHASES

CONTING $ 63,723 $ 5,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 7,422,549

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 4,000,000 $ 0 $ 0 $ 1,000,000 $ 0 $ 5,000,000TOTAL $ 4,000,000 $ 0 $ 0 $ 1,000,000 $ 0 $ 5,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG ROCKWALL 0009-12-221 2021 IH 30 E,ENG,R,ACQ ROWLETT $ 2,500,000LIMITS FROM DALROCK RD (ROCKWALL C/L) PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO EAST OF DALROCK RDPROJECT TRANSITION FOR DALROCK INTERCHANGE MPO PROJ NUM 55222

DESCR FUNDING CAT(S) S102,SBPEREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,000,000ROW PURCH $ 1,500,000 COST OF

CONSTR $ 8,005,057 APPROVEDCONST ENG $ 375,437 PHASES

CONTING $ 239,351 $ 2,500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 11,119,845

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 1,000,000 $ 0 $ 0 $ 0 $ 1,000,000S102 $ 1,350,000 $ 150,000 $ 0 $ 0 $ 0 $ 1,500,000TOTAL $ 1,350,000 $ 1,150,000 $ 0 $ 0 $ 0 $ 2,500,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-205 2021 VA C DALLAS $ 6,267,928LIMITS FROM TRINITY STRAND TRAIL PHASE 2; EXISTING TRINITY STRAND TRAIL AT THE INTERSE PROJECT SPONSOR DALLAS

REVISION DATE 07/2018CTION OF MARKET CNTR BLVD & TURTLE CREEK BLVDLIMITS TO INWOOD/LOVE FIELD DART STATIONPROJECT CONSTRUCT BICYCLE AND PEDESTRIAN IMPROVEMENTS INCLUDING SHARED-USE PATH, ON STRE MPO PROJ NUM 40048

DESCR ET BIKEWAY, BICYCLE/PEDESTRIAN SIGNALS, CROSSWALKS, SIGNAGE, AND BICYCLE/PEDESTR FUNDING CAT(S) 3LC,9TAPIAN TRAFFIC COUNT EQUIPMENT

REMARKS LOCAL CONTRIBUTION PAID BY CITY OF DALLAS; COST OF PROJECT 2017 TA SET-ASIDE CALL FOR PROJECTS; TOTAL PROJECT FUNDINP7 APPROVED PHASES INCLUDES CE COST HISTORY G IS SPLIT 71% FEDERAL/29% LOCAL; FUNDING SHOWN AS 9TAP I

N ESTIP PER TXDOT TPP SINCE 9TA IS NOT A FUNDING CATEGORYOPTION IN THE ESTIP; PLANNING CSJ 0918-45-924

TOTAL PROJECT COST INFORMATIONPREL ENG $ 806,568

ROW PURCH $ 0 COST OFCONSTR $ 5,946,360 APPROVED

CONST ENG $ 321,568 PHASESCONTING $ 80,478 $ 6,267,928INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 7,154,974

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 824,496 $ 824,4969TAP $ 4,354,746 $ 0 $ 0 $ 1,088,686 $ 0 $ 5,443,432TOTAL $ 4,354,746 $ 0 $ 0 $ 1,088,686 $ 824,496 $ 6,267,928

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 413: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 413 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-207 2021 VA C ROWLETT $ 367,335LIMITS FROM MILLER RD AND CHIESA RD SIDEWALK; SAFE ROUTES TO SCHOOL PROJECT SPONSOR ROWLETT

REVISION DATE 07/2018LIMITS TOPROJECT SAFE ROUTES TO SCHOOL PEDESTRIAN IMPROVEMENTS IN PROXIMITY TO HEFURTH ELEMENTARY MPO PROJ NUM 40044

DESCR SCHOOL INCLUDING NEW SIDEWALKS, BICYCLE/PEDESTRIAN SIGNALS, CROSSWALKS, AND SIG FUNDING CAT(S) 9TAPNAGE

REMARKS COST OF APPROVED PHASES INCLUDES CE COST PROJECT 2017 TA SET-ASIDE CALL FOR PROJECTS; FUNDING SHOWN AS 9TAP7 HISTORY P IN ESTIP PER TXDOT TPP SINCE 9TA IS NOT A FUNDING CATEG

ORY OPTION IN THE ESTIP TOTAL PROJECT COST INFORMATION

PREL ENG $ 69,350ROW PURCH $ 0 COST OF

CONSTR $ 347,486 APPROVEDCONST ENG $ 19,849 PHASES

CONTING $ 5,407 $ 367,335INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 442,092

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 293,868 $ 0 $ 0 $ 73,467 $ 0 $ 367,335TOTAL $ 293,868 $ 0 $ 0 $ 73,467 $ 0 $ 367,335

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-210 2021 VA C DALLAS $ 745,353LIMITS FROM UNION BIKEWAY CONNECTOR; HOUSTON ST PROJECT SPONSOR DALLAS

REVISION DATE 07/2018LIMITS TO N HARWOOD ST AT WOODALL RODGERS FWYPROJECT CONSTRUCT ON-STREET BIKEWAY FACILITIES MPO PROJ NUM 40043

DESCR FUNDING CAT(S) 9TAPREMARKS COST OF APPROVED PHASES INCLUDES CE COST; CHANGE CSPROJECT 2017 TA SET-ASIDE CALL FOR PROJECTS; FUNDING SHOWN AS 9TA

P7 J FROM 0918-45-903 TO 0918-47-210 HISTORY P IN ESTIP PER TXDOT TPP SINCE 9TA IS NOT A FUNDING CATEGORY OPTION IN THE ESTIP

TOTAL PROJECT COST INFORMATIONPREL ENG $ 250,169

ROW PURCH $ 0 COST OFCONSTR $ 728,019 APPROVED

CONST ENG $ 17,334 PHASESCONTING $ 9,821 $ 745,353INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,005,343

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 596,283 $ 0 $ 0 $ 149,070 $ 0 $ 745,353TOTAL $ 596,283 $ 0 $ 0 $ 149,070 $ 0 $ 745,353

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0902-90-085 2021 VA C ARLINGTON $ 930,116LIMITS FROM JULIA BURGEN LINEAR PARK TRAIL SYSTEM; FROM THE EXISTING PATH EAST OF MARY PROJECT SPONSOR ARLINGTON

REVISION DATE 07/2018STREETLIMITS TO S. PECAN STREETPROJECT CONSTRUCT NEW SHARED-USE PATH FOR BICYCLISTS AND PEDESTRIANS OVER TRADING HORSE MPO PROJ NUM 40065

DESCR TRIBUTARY FUNDING CAT(S) 3LC,9TAPREMARKS LOCAL CONTRIBUTION PAID BY CITY OF ARLINGTON; THIS PROJECT 2017 TA SET-ASIDE CALL FOR PROJECTS; TOTAL PROJECT FUNDIN

P7 ENTRY INCLUDES CE FUNDING HISTORY G SPLIT 50% FEDERAL/50% LOCAL; FUNDING SHOWN AS 9TAP IN ESTIP PER TXDOT TPP SINCE 9TA IS NOT A FUNDING CATEGORY OPTION IN THE ESTIP

TOTAL PROJECT COST INFORMATIONPREL ENG $ 155,020

ROW PURCH $ 0 COST OFCONSTR $ 880,791 APPROVED

CONST ENG $ 49,325 PHASESCONTING $ 13,133 $ 930,116INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,098,269

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 406,926 $ 406,9269TAP $ 418,552 $ 0 $ 0 $ 104,638 $ 0 $ 523,190TOTAL $ 418,552 $ 0 $ 0 $ 104,638 $ 406,926 $ 930,116

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 414: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 414 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-239 2021 CS C LANCASTER $ 8,385,555LIMITS FROM JEFFERSON ST FROM WINTERGREEN RD TO PLEASANT RUN RD AND PLEASANT RUN RD FRPROJECT SPONSOR DALLAS CO

REVISION DATE 07/2018OM JEFFERSON STLIMITS TO LANCASTER-HUTCHINS RDPROJECT WIDEN AND RECONSTRUCT 2 LANE UNDIVIDED RURAL TO 4 LANE DIVIDED URBAN MPO PROJ NUM 14003

DESCR FUNDING CAT(S) 7REMARKS CHANGE CSJ FROM 0918-45-917 TO 0918-47-239 PROJECT 2017-2018 CMAQ/STBG PROJECT SELECTION/STRATEGIC PARTNERSH

P7 HISTORY IPS TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,316,563ROW PURCH $ 822,882 COST OF

CONSTR $ 8,385,555 APPROVEDCONST ENG $ 549,994 PHASES

CONTING $ 220,663 $ 8,385,555INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 11,295,657

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 6,708,444 $ 0 $ 0 $ 1,677,111 $ 0 $ 8,385,555TOTAL $ 6,708,444 $ 0 $ 0 $ 1,677,111 $ 0 $ 8,385,555

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-208 2021 CS C VARIOUS $ 13,860,558LIMITS FROM ON WINTERGREEN RD FROM JEFFERSON STREET PROJECT SPONSOR DALLAS CO

REVISION DATE 07/2018LIMITS TO WEST OF CARPENTER ROADPROJECT RECONSTRUCT AND WIDEN 2 LANE UNDIVIDED RURAL TO 4 LANE DIVIDED URBAN MPO PROJ NUM 14002

DESCR FUNDING CAT(S) 3LC,7REMARKS LOCAL CONTRIBUTION PAID BY CITY OF HUTCHINS, CITY O PROJECT PLANNING CSJ 0918-45-997; 2017-2018 CMAQ/STBG PROJECT SEL

P7 F LANCASTER, AND DALLAS COUNTY HISTORY ECTION/STRATEGIC PARTNERSHIPS TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,239,442ROW PURCH $ 1,400,000 COST OF

CONSTR $ 13,860,558 APPROVEDCONST ENG $ 989,101 PHASES

CONTING $ 396,837 $ 13,860,558INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 18,885,938

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 5,525,000 $ 5,525,0007 $ 6,668,446 $ 0 $ 0 $ 1,667,112 $ 0 $ 8,335,558TOTAL $ 6,668,446 $ 0 $ 0 $ 1,667,112 $ 5,525,000 $ 13,860,558

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0902-90-943 2021 TRE C FORT WORTH $ 30,300,000LIMITS FROM DALWORTH JUNCTION EAST OF IH 35W PROJECT SPONSOR FWTA

REVISION DATE 07/2018LIMITS TO EAST OF SYLVANIA AVENUE SOUTH OF EXISTING TRACKPROJECT CONSTRUCT A SECOND TRACK AND REHABILITATE EXISTING TRACK AND BRIDGES; INCLUDES 4 MPO PROJ NUM 84144

DESCR BRIDGES FUNDING CAT(S) 3LCREMARKS LOCAL CONTRIBUTION PAID BY FWTA PROJECT THIS ENTRY INCLUDES CE FUNDING

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 3,020,000ROW PURCH $ 0 COST OF

CONSTR $ 28,000,000 APPROVEDCONST ENG $ 2,300,000 PHASES

CONTING $ 307,357 $ 30,300,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 33,627,357

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 30,300,000 $ 30,300,000TOTAL $ 0 $ 0 $ 0 $ 0 $ 30,300,000 $ 30,300,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 415: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 415 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DENTON 0135-10-050 2021 US 380 C VARIOUS $ 129,728,061LIMITS FROM US 377 PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO WEST OF CR 26 (COLLIN COUNTY LINE)PROJECT WIDEN 4 TO 6 LANES DIVIDED URBAN WITH NEW GRADE SEPARATIONS AT FM 423, FM 720, N MPO PROJ NUM 20096

DESCR AVO RD, TEEL PKWY, AND LEGACY DR, WITH SIDEWALK IMPROVEMENTS FUNDING CAT(S) 2M,5,7REMARKS CMAQ FOR INTERSECTION IMPROVEMENTS, GRADE SEPARATIOPROJECT PART OF REGIONAL 10 YEAR PLAN

P7 NS, AND PEDESTRIAN IMPROVEMENTS ONLY HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 6,400,000ROW PURCH $ 7,000,000 COST OF

CONSTR $ 129,728,061 APPROVEDCONST ENG $ 6,188,901 PHASES

CONTING $ 2,483,047 $ 129,728,061INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 151,800,009

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 41,000,753 $ 10,250,188 $ 0 $ 0 $ 0 $ 51,250,9415 $ 44,960,000 $ 11,240,000 $ 0 $ 0 $ 0 $ 56,200,0007 $ 17,821,696 $ 4,455,424 $ 0 $ 0 $ 0 $ 22,277,120TOTAL $ 103,782,449 $ 25,945,612 $ 0 $ 0 $ 0 $ 129,728,061

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG JOHNSON 0902-50-104 2021 CS C BURLESON $ 3,608,080LIMITS FROM ON ALSBURY FROM HULEN ST PROJECT SPONSOR BURLESON

REVISION DATE 07/2018LIMITS TO CR 1020 (APPROXIMATELY 0.2 MILES)PROJECT CONSTRUCTION OF A 4 LANE EXTENSION OF ALSBURY BOULEVARD MPO PROJ NUM 53079

DESCR FUNDING CAT(S) 3LC,10REMARKS LOCAL CONTRIBUTION PAID BY BURLESON PROJECT CONGRESSIONAL EARMARK (2008 OMNIBUS APPROP ACT)

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 494,800ROW PURCH $ 0 COST OF

CONSTR $ 3,608,080 APPROVEDCONST ENG $ 51,591 PHASES

CONTING $ 48,151 $ 3,608,080INDIRECT $ 43,267BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 4,245,889

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 3,515,000 $ 3,515,00010 $ 93,080 $ 0 $ 0 $ 0 $ 0 $ 93,080TOTAL $ 93,080 $ 0 $ 0 $ 0 $ 3,515,000 $ 3,608,080

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0902-90-916 2021 VA C VARIOUS $ 50,000LIMITS FROM ALL LIMITED ACCESS FREEWAYS IN TARRANT COUNTY PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TOPROJECT ENSURE EFFECTIVE USE OF ITS DEVICES, INCLUDING FOR DATA COLLECTION MPO PROJ NUM 11630.3

DESCR FUNDING CAT(S) 7REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 50,000 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 50,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 50,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 40,000 $ 10,000 $ 0 $ 0 $ 0 $ 50,000TOTAL $ 40,000 $ 10,000 $ 0 $ 0 $ 0 $ 50,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 416: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 416 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG 0902-90-050 2021 VA C VARIOUS $ 2,210,000LIMITS FROM TRINITY BLVD/ELM ST PROJECT SPONSOR FORT WORTH

REVISION DATE 07/2018LIMITS TO TRINITY RAILWAY EXPRESS (TRE) CENTREPORT RAIL STATION AND TO THE MIKE LEWIS TRAIL IN GRAND PRAIRIE

PROJECT SHARED-USE PATH (TRAIL) FROM THE INTERSECTION OF TRINITY BLVD/ELM ST TO CENTREPO MPO PROJ NUM 25022DESCR RT RAIL STATION; PRELIMINARY ENGINEERING FOR CONNECTION TO MIKE LEWIS TRAIL FUNDING CAT(S) 5

REMARKS PROJECT $1,000,000 OF FUNDS FOR ENV PHASE IN FY2018P7 HISTORY

TOTAL PROJECT COST INFORMATIONPREL ENG $ 1,190,000

ROW PURCH $ 100,000 COST OFCONSTR $ 2,210,000 APPROVED

CONST ENG $ 240,694 PHASESCONTING $ 0 $ 2,210,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 3,740,694

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 1,768,000 $ 0 $ 0 $ 442,000 $ 0 $ 2,210,000TOTAL $ 1,768,000 $ 0 $ 0 $ 442,000 $ 0 $ 2,210,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0000-18-026 2021 CS C MESQUITE $ 10,500,000LIMITS FROM ON LAWSON RD FROM MILAM RD PROJECT SPONSOR DALLAS CO

REVISION DATE 07/2018LIMITS TO CLAY-MATHIS RDPROJECT WIDEN FROM 2 LANES TO 4 LANES MPO PROJ NUM 83052

DESCR FUNDING CAT(S) 3LCREMARKS LOCAL CONTRIBUTION PAID BY MESQUITE/DALLAS CO (SPLI PROJECT

P7 T 50/50) HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,050,000ROW PURCH $ 1,260,000 COST OF

CONSTR $ 10,500,000 APPROVEDCONST ENG $ 367,500 PHASES

CONTING $ 157,500 $ 10,500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 13,335,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 10,500,000 $ 10,500,000TOTAL $ 0 $ 0 $ 0 $ 0 $ 10,500,000 $ 10,500,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0902-90-034 2021 CS C VARIOUS $ 22,500,000LIMITS FROM EAST-WEST CONNECTOR FROM SH 360 PROJECT SPONSOR DFW AIRPORT

REVISION DATE 07/2018LIMITS TO RENTAL CAR DRIVEPROJECT CONSTRUCTION OF EAST-WEST CONNECTOR 0 TO 4 LANES DIVIDED URBAN MPO PROJ NUM 11734

DESCR FUNDING CAT(S) 7REMARKS RELATED TO TIP 11734/CSJ 0902-48-712 (ENGINEERING C PROJECT $4,575,000 IN ENG. COSTS ARE ALSO SHOWN IN TIP 11734/CSJ

P7 SJ) HISTORY 0902-48-712 TOTAL PROJECT COST INFORMATION

PREL ENG $ 4,575,000ROW PURCH $ 0 COST OF

CONSTR $ 22,500,000 APPROVEDCONST ENG $ 787,500 PHASES

CONTING $ 337,500 $ 22,500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 28,200,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 18,000,000 $ 0 $ 0 $ 4,500,000 $ 0 $ 22,500,000TOTAL $ 18,000,000 $ 0 $ 0 $ 4,500,000 $ 0 $ 22,500,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 417: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 417 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG HOOD 0080-03-049 2021 US 377 R,ACQ GRANBURY $ 3,500,000LIMITS FROM END OF BRAZOS RIVER BRIDGE PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO SOUTH OF BRAZOS RIVER BRIDGEPROJECT WIDEN 4 LANE TO 6 LANE DIVIDED WITH INTERCHANGE AT SH 144 AND FM 51 MPO PROJ NUM 54018

DESCR FUNDING CAT(S) S102REMARKS PROJECT RELATED TO TIP 54019/CSJ 0080-04-081 AND TIP 54071/CSJ 00

P7 HISTORY 80-04-094 TOTAL PROJECT COST INFORMATION

PREL ENG $ 5,000,000ROW PURCH $ 3,500,000 COST OF

CONSTR $ 15,389,011 APPROVEDCONST ENG $ 763,294 PHASES

CONTING $ 306,241 $ 3,500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 24,958,546

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALS102 $ 0 $ 3,500,000 $ 0 $ 0 $ 0 $ 3,500,000TOTAL $ 0 $ 3,500,000 $ 0 $ 0 $ 0 $ 3,500,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG HOOD 0080-04-081 2021 US 377 R,ACQ GRANBURY $ 1,750,954LIMITS FROM EAST OF OLD ACTON HIGHWAY PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO END OF BRAZOS RIVER BRIDGEPROJECT WIDEN 4 LANE CONTINUOUS TWO-WAY LEFT TURN LANE TO 6 LANE DIVIDED WITH INTERCHANG MPO PROJ NUM 54019

DESCR E AT BU 377H FUNDING CAT(S) 10REMARKS CAT 10: EARMARK PROJECT R PHASE IN FY2020 IS $9 MILLION FOR ROW; R PHASE IN FY202

P7 HISTORY 1 IS ADDITIONAL $1,750,954 FOR ROW; RELATED TO TIP 54018/CSJ 0080-03-049 AND TIP 54071/CSJ 0080-04-094

TOTAL PROJECT COST INFORMATIONPREL ENG $ 8,790,618

ROW PURCH $ 10,750,954 COST OFCONSTR $ 41,591,921 APPROVED

CONST ENG $ 2,062,959 PHASESCONTING $ 827,679 $ 1,750,954INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 64,024,131

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL10 $ 1,400,763 $ 350,191 $ 0 $ 0 $ 0 $ 1,750,954TOTAL $ 1,400,763 $ 350,191 $ 0 $ 0 $ 0 $ 1,750,954

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG PARKER 1601-02-028 2021 FM 1884 C WEATHERFORD $ 7,775,860LIMITS FROM SH 171 PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO SOUTH OF B.B. FIELDER ROADPROJECT WIDEN FROM 2 LANE TO 4 LANE WITH RAISED MEDIAN MPO PROJ NUM 54004

DESCR FUNDING CAT(S) 1,11REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 570,578ROW PURCH $ 1,643,513 COST OF

CONSTR $ 7,775,860 APPROVEDCONST ENG $ 1,249,963 PHASES

CONTING $ 501,497 $ 7,775,860INDIRECT $ 361,888BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 12,103,299

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL1 $ 4,540,688 $ 1,135,172 $ 0 $ 0 $ 0 $ 5,675,86011 $ 1,680,000 $ 420,000 $ 0 $ 0 $ 0 $ 2,100,000TOTAL $ 6,220,688 $ 1,555,172 $ 0 $ 0 $ 0 $ 7,775,860

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 418: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 418 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0902-48-860 2021 VA R,ACQ HURST $ 30,000LIMITS FROM HURST BELLAIRE SD PROJECT; BOUNDED BY PIPELINE ON THE NORTH; BROWN TRAIL O PROJECT SPONSOR HURST

REVISION DATE 07/2018N THE WESTLIMITS TO PECAN ST ON THE SOUTH; BELLAIRE ON THE EASTPROJECT PEDESTRIAN AMENITIES; LANDSCAPING; INTERSECTION IMPROVEMENTS; SIGNALIZATION; STR MPO PROJ NUM 11385

DESCR EET CONSTRUCTION REALIGNING 4 LANE BROWN TRAIL AVE FUNDING CAT(S) 7REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 45,419ROW PURCH $ 30,000 COST OF

CONSTR $ 845,857 APPROVEDCONST ENG $ 42,314 PHASES

CONTING $ 9,778 $ 30,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 973,368

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 24,000 $ 0 $ 0 $ 6,000 $ 0 $ 30,000TOTAL $ 24,000 $ 0 $ 0 $ 6,000 $ 0 $ 30,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 419: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 419 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2022

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-971 2022 CS C DALLAS $ 13,313,653LIMITS FROM ON PRAIRIE CREEK RD FROM N OF MILITARY PKWY PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO NORTH OF FORNEY ROADPROJECT CONSTRUCT GRADE SEPARATION OVER UPRR MPO PROJ NUM 14000

DESCR FUNDING CAT(S) 3LC,5REMARKS LOCAL CONTRIBUTION TO BE PAID BY UNION PACIFIC RAIL PROJECT 2017-2018 CMAQ/STBG PROJECT SELECTION/LOCAL BOND PROGRAM

P7 ROAD, CITY OF DALLAS, AND DALLAS COUNTY HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 3,602,950ROW PURCH $ 4,200,000 COST OF

CONSTR $ 13,313,653 APPROVEDCONST ENG $ 137,559 PHASES

CONTING $ 31,788 $ 13,313,653INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 21,285,950

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 6,847,837 $ 6,847,8375 $ 5,172,653 $ 0 $ 0 $ 1,293,163 $ 0 $ 6,465,816TOTAL $ 5,172,653 $ 0 $ 0 $ 1,293,163 $ 6,847,837 $ 13,313,653

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-970 2022 CS C DALLAS $ 1,638,455LIMITS FROM ON MOCKINGBIRD LANE FROM US 75 PROJECT SPONSOR DALLAS

REVISION DATE 07/2018LIMITS TO GREENVILLE AVENUEPROJECT PEDESTRIAN AND BICYCLE ENHANCEMENTS INCLUDING TRAFFIC SIGNALS, SIDEWALKS, CROSSW MPO PROJ NUM 14018

DESCR ALKS, AND LIGHTING FUNDING CAT(S) 5,11REMARKS CHANGE CSJ FROM 0000-18-094 TO 0918-47-970 PROJECT PRIOR CSJ 0000-18-094

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 208,443ROW PURCH $ 3,846,250 COST OF

CONSTR $ 1,638,455 APPROVEDCONST ENG $ 57,346 PHASES

CONTING $ 24,577 $ 1,638,455INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 5,775,071

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 588,113 $ 0 $ 0 $ 147,028 $ 0 $ 735,14111 $ 722,651 $ 180,663 $ 0 $ 0 $ 0 $ 903,314TOTAL $ 1,310,764 $ 180,663 $ 0 $ 147,028 $ 0 $ 1,638,455

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-203 2022 VA C VARIOUS $ 1,745,305LIMITS FROM FM 1382 SIDE PATH FROM INTERSECTION OF FM 1382 AND CAMP WISDOM ROAD PROJECT SPONSOR DALLAS CO

REVISION DATE 07/2018LIMITS TO MANSFIELD RDPROJECT CONSTRUCT NEW SHARED-USE PATH FOR BICYCLISTS AND PEDESTRIANS INCLUDING CROSSWALK MPO PROJ NUM 40045

DESCR S AND SIGNAGE FUNDING CAT(S) 9TAPREMARKS CHANGE CSJ FROM 0918-45-911 TO 0918-47-203; COST OF PROJECT 2017 TA SET-ASIDE CALL FOR PROJECTS; FUNDING SHOWN AS 9TA

P7 APPROVED PHASES INCLUDES C AND CE HISTORY P IN ESTIP PER TXDOT TPP SINCE 9TA IS NOT A FUNDING CATEGORY OPTION IN THE ESTIP

TOTAL PROJECT COST INFORMATIONPREL ENG $ 290,884

ROW PURCH $ 0 COST OFCONSTR $ 1,652,751 APPROVED

CONST ENG $ 92,554 PHASESCONTING $ 26,219 $ 1,745,305INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,062,408

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 1,396,244 $ 0 $ 0 $ 349,061 $ 0 $ 1,745,305TOTAL $ 1,396,244 $ 0 $ 0 $ 349,061 $ 0 $ 1,745,305

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 420: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 420 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2022

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-45-999 2022 CS C GLENN HEIGHTS $ 20,000,000LIMITS FROM ON EAST BEAR CREEK ROAD FROM HAMPTON ROAD PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO IH 35EPROJECT RECONSTRUCT AND WIDEN FROM 2 LANES RURAL UNDIVIDED TO 4 LANES URBAN DIVIDED (ULT MPO PROJ NUM 14032

DESCR IMATE 6) WITH BICYCLE/PEDESTRIAN ACCOMMODATIONS AND INTERSECTION IMPROVEMENTS FUNDING CAT(S) 3LC,5,7REMARKS LOCAL CONTRIBUTION BY CITY OF GLENN HEIGHTS AND DAL PROJECT 2017-2018 CMAQ/STBG PROJECT SELECTION/STRATEGIC PARTNERSH

P7 LAS COUNTY; CMAQ FUNDING FOR BICYCLE/PEDESTRIAN AND HISTORY IPS (ROUND 2)INTERSECTION IMPROVEMENTS ONLY

TOTAL PROJECT COST INFORMATIONPREL ENG $ 2,000,000

ROW PURCH $ 3,600,000 COST OFCONSTR $ 20,000,000 APPROVED

CONST ENG $ 160,891 PHASESCONTING $ 64,551 $ 20,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 25,825,442

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 2,925,000 $ 2,925,0005 $ 6,320,000 $ 1,290,000 $ 0 $ 290,000 $ 0 $ 7,900,0007 $ 7,340,000 $ 0 $ 0 $ 1,835,000 $ 0 $ 9,175,000TOTAL $ 13,660,000 $ 1,290,000 $ 0 $ 2,125,000 $ 2,925,000 $ 20,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0009-02-067 2022 SH 78 C DALLAS $ 5,500,000LIMITS FROM AT GASTON AVE PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TOPROJECT RECONFIGURE INTERSECTION WITH SIDEWALK IMPROVEMENTS MPO PROJ NUM 13032

DESCR FUNDING CAT(S) 2M,5REMARKS PROJECT 10-YEAR PLAN PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 500,000ROW PURCH $ 3,000,000 COST OF

CONSTR $ 5,500,000 APPROVEDCONST ENG $ 232,467 PHASES

CONTING $ 148,204 $ 5,500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 9,380,671

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 800,000 $ 200,000 $ 0 $ 0 $ 0 $ 1,000,0005 $ 3,600,000 $ 900,000 $ 0 $ 0 $ 0 $ 4,500,000TOTAL $ 4,400,000 $ 1,100,000 $ 0 $ 0 $ 0 $ 5,500,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DENTON 1311-01-055 2022 FM 1171 R,ACQ,UTL VARIOUS $ 990,000LIMITS FROM IH 35W PROJECT SPONSOR DENTON CO

REVISION DATE 07/2018LIMITS TO WEST OF FM 156PROJECT CONSTRUCT NEW 0 TO 6 LANE DIVIDED ARTERIAL MPO PROJ NUM 55218

DESCR FUNDING CAT(S) 3LCREMARKS LOCAL CONTRIBUTION PAID BY DENTON COUNTY PROJECT R PHASE INCLUDES UTIL

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,600,000ROW PURCH $ 990,000 COST OF

CONSTR $ 53,322,975 APPROVEDCONST ENG $ 2,612,826 PHASES

CONTING $ 666,537 $ 990,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 59,192,338

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 990,000 $ 990,000TOTAL $ 0 $ 0 $ 0 $ 0 $ 990,000 $ 990,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 421: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 421 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2022

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 1068-01-213 2022 IH 30 R,ACQ FORT WORTH $ 35,000,000LIMITS FROM IH 820 PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO CAMP BOWIE BLVDPROJECT RECONSTRUCT FROM 6 TO 8 MAIN LANES; RECONSTRUCT 2/8 LANE TO 2/8 LANE DISCONTINUO MPO PROJ NUM 13002

DESCR US FRONTAGE ROADS AND CONVERT 2 WAY FRONTAGE ROAD SECTIONS TO 1 WAY EB AND WB (1 FUNDING CAT(S) S102LANE TO 2 LANE DISCONTINUOUS)

REMARKS PROJECT 10 YEAR PLAN PROJECTP7 HISTORY

TOTAL PROJECT COST INFORMATIONPREL ENG $ 34,200,000

ROW PURCH $ 35,000,000 COST OFCONSTR $ 150,000,000 APPROVED

CONST ENG $ 27,483,297 PHASESCONTING $ 1,150,463 $ 35,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 247,833,760

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALS102 $ 28,000,000 $ 7,000,000 $ 0 $ 0 $ 0 $ 35,000,000TOTAL $ 28,000,000 $ 7,000,000 $ 0 $ 0 $ 0 $ 35,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0353-03-100 2022 SH 114 C VARIOUS $ 33,000,000LIMITS FROM FM 1938 PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO DOVE RDPROJECT CONSTRUCT 0 TO 2 LANE EB FRONTAGE ROAD FROM FM 1938 TO SOLANA/KIRKWOOD AND CONST MPO PROJ NUM 13006

DESCR RUCT 0 TO 2 LANE WB AND 0 TO 2 LANE EB FRONTAGE ROADS FROM SOLANA/KIRKWOOD TO DO FUNDING CAT(S) 2MVE

REMARKS PROJECT 10 YEAR PLAN PROJECTP7 HISTORY

TOTAL PROJECT COST INFORMATIONPREL ENG $ 2,000,000

ROW PURCH $ 0 COST OFCONSTR $ 33,000,000 APPROVED

CONST ENG $ 1,869,381 PHASESCONTING $ 431,984 $ 33,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 37,301,365

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 26,400,000 $ 6,600,000 $ 0 $ 0 $ 0 $ 33,000,000TOTAL $ 26,400,000 $ 6,600,000 $ 0 $ 0 $ 0 $ 33,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0008-13-125 2022 IH 820 E,ENG FORT WORTH $ 25,872,726LIMITS FROM IH 20 PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO MEADOWBROOKPROJECT RECONSTRUCT FREEWAY FROM 4/8 TO 8/14 LANE FACILITY MPO PROJ NUM 55041

DESCR FUNDING CAT(S) SBPEREMARKS PROJECT 10 YEAR PLAN PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 25,872,726ROW PURCH $ 53,000,000 COST OF

CONSTR $ 381,171,200 APPROVEDCONST ENG $ 32,244,525 PHASES

CONTING $ 1,349,771 $ 25,872,726INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 493,638,222

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 25,872,726 $ 0 $ 0 $ 0 $ 25,872,726TOTAL $ 0 $ 25,872,726 $ 0 $ 0 $ 0 $ 25,872,726

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 422: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 422 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2022

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PARIS NCTCOG HUNT 0009-13-170 2022 IH 30 R,ACQ VARIOUS $ 2,034,900LIMITS FROM SOUTH OF CR 2509 PROJECT SPONSOR TXDOT-PARIS

REVISION DATE 07/2018LIMITS TO NORTH OF CR 2509PROJECT CONSTRUCT NEW INTERCHANGE MPO PROJ NUM 55226

DESCR FUNDING CAT(S) S102REMARKS PROJECT R IN FY22 IS ROW; R IN APPENDIX D IS FOR UTILITIES; PART

P7 HISTORY OF REGIONAL 10 YEAR PLAN TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,000,000ROW PURCH $ 2,616,300 COST OF

CONSTR $ 30,000,000 APPROVEDCONST ENG $ 1,656,353 PHASES

CONTING $ 1,055,969 $ 2,034,900INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 36,328,622

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALS102 $ 1,680,000 $ 354,900 $ 0 $ 0 $ 0 $ 2,034,900TOTAL $ 1,680,000 $ 354,900 $ 0 $ 0 $ 0 $ 2,034,900

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PARIS NCTCOG HUNT 0009-13-169 2022 IH 30 E,ENG VARIOUS $ 1,000,000LIMITS FROM SOUTH OF FM 1565 PROJECT SPONSOR TXDOT-PARIS

REVISION DATE 07/2018LIMITS TO NORTH OF FM 1565PROJECT CONSTRUCT OVERPASS MPO PROJ NUM 55225

DESCR FUNDING CAT(S) SBPEREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,000,000ROW PURCH $ 2,616,300 COST OF

CONSTR $ 25,000,000 APPROVEDCONST ENG $ 1,380,294 PHASES

CONTING $ 879,974 $ 1,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 30,876,568

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 1,000,000 $ 0 $ 0 $ 0 $ 1,000,000TOTAL $ 0 $ 1,000,000 $ 0 $ 0 $ 0 $ 1,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG 0918-00-926 2022 VA T VARIOUS $ 55,500,000LIMITS FROM COTTON BELT RAIL LINE FROM DFW AIRPORT STATION PROJECT SPONSOR DART

REVISION DATE 07/2018LIMITS TO SHILOH STATION IN PLANOPROJECT ENGINEERING, ENVIRONMENTAL, AND CONSTRUCTION OF COTTON BELT REGIONAL RAIL PROJEC MPO PROJ NUM 14006

DESCR T (COTTON BELT PROJECT #4) FUNDING CAT(S) 5,7REMARKS RELATED TO TIP 14005, 14013, 83245, AND 14004 PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 55,500,000 APPROVEDCONST ENG $ 1,312,500 PHASES

CONTING $ 562,500 $ 55,500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 57,375,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 39,600,000 $ 0 $ 0 $ 9,900,000 $ 0 $ 49,500,0005 $ 4,800,000 $ 0 $ 0 $ 1,200,000 $ 0 $ 6,000,000TOTAL $ 44,400,000 $ 0 $ 0 $ 11,100,000 $ 0 $ 55,500,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 423: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 423 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2022

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG PARKER 0314-07-061 2022 IH 20 C WEATHERFORD $ 21,000,000LIMITS FROM FM 2552 PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO BANKHEAD HIGHWAYPROJECT CONSTRUCT 0 TO 4/6 WESTBOUND AND EASTBOUND FRONTAGE ROADS MPO PROJ NUM 13054

DESCR FUNDING CAT(S) 4REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,500,000ROW PURCH $ 1,150,000 COST OF

CONSTR $ 21,000,000 APPROVEDCONST ENG $ 1,146,191 PHASES

CONTING $ 292,396 $ 21,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 25,088,587

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 18,900,000 $ 2,100,000 $ 0 $ 0 $ 0 $ 21,000,000TOTAL $ 18,900,000 $ 2,100,000 $ 0 $ 0 $ 0 $ 21,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG PARKER 0000-01-138 2022 US 180 C WEATHERFORD $ 12,460,000LIMITS FROM FM 2552 PROJECT SPONSOR WEATHERFORD

REVISION DATE 07/2018LIMITS TO ALAMO ST.PROJECT RECONSTRUCT 2/4 LANE ROADWAY TO 4 LANE ROADWAY INCLUDING A ROUNDABOUT AT THE INT MPO PROJ NUM 14026

DESCR ERSECTION OF US 180, NEW BICYCLE LANES, NEW SIDEWALKS, AND INTERSECTION IMPROVEM FUNDING CAT(S) 5,7ENTS AT FM 51

REMARKS CMAQ FOR SIDEWALKS, BIKELANES, AND INTERSECTION IMP PROJECTP7 ROVEMENTS ONLY HISTORY

TOTAL PROJECT COST INFORMATIONPREL ENG $ 1,980,000

ROW PURCH $ 2,150,000 COST OFCONSTR $ 12,460,000 APPROVED

CONST ENG $ 872,200 PHASESCONTING $ 373,800 $ 12,460,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 17,836,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL5 $ 680,800 $ 170,200 $ 0 $ 0 $ 0 $ 851,0007 $ 9,287,200 $ 654,400 $ 0 $ 1,667,400 $ 0 $ 11,609,000TOTAL $ 9,968,000 $ 824,600 $ 0 $ 1,667,400 $ 0 $ 12,460,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG JOHNSON 0747-05-035 2022 FM 157 E,ENG MANSFIELD $ 3,000,000LIMITS FROM BU 287 P PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TO US 67PROJECT REALIGN AND WIDEN ROADWAY AND WIDEN 2 TO 4 LANES RURAL DIVIDED MPO PROJ NUM 54053

DESCR FUNDING CAT(S) SBPEREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 3,000,000ROW PURCH $ 5,000,000 COST OF

CONSTR $ 78,000,000 APPROVEDCONST ENG $ 1,306,677 PHASES

CONTING $ 1,887,423 $ 3,000,000INDIRECT $ 1,826,445BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 91,020,545

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 2,400,000 $ 600,000 $ 0 $ 0 $ 0 $ 3,000,000TOTAL $ 2,400,000 $ 600,000 $ 0 $ 0 $ 0 $ 3,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 424: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 424 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2022

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG COLLIN 0047-06-163 2022 US 75 C ALLEN $ 10,000,000LIMITS FROM BETHANY DRIVE PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO SH 121PROJECT REMOVE HOV LANES AND ADD PEAK HOUR TRAVEL LANES MPO PROJ NUM 30007

DESCR FUNDING CAT(S) 7REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 500,000ROW PURCH $ 0 COST OF

CONSTR $ 10,000,000 APPROVEDCONST ENG $ 249,700 PHASES

CONTING $ 10,453 $ 10,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 10,760,153

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 8,000,000 $ 2,000,000 $ 0 $ 0 $ 0 $ 10,000,000TOTAL $ 8,000,000 $ 2,000,000 $ 0 $ 0 $ 0 $ 10,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG ELLIS 1394-02-027 2022 FM 1387 E,ENG,R,ACQ MIDLOTHIAN $ 24,000,000LIMITS FROM MIDLOTHIAN PARKWAY PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO FM 664PROJECT RECONSTRUCT AND WIDEN FROM 2 LANE UNDIVIDED RURAL TO 4 LANE URBAN DIVIDED (ULTIM MPO PROJ NUM 13020

DESCR ATE 6 LANE) FUNDING CAT(S) S102,SBPEREMARKS PROJECT PART OF REGIONAL 10 YEAR PLAN

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 4,000,000ROW PURCH $ 20,000,000 COST OF

CONSTR $ 25,000,000 APPROVEDCONST ENG $ 4,168,263 PHASES

CONTING $ 1,672,347 $ 24,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 54,840,610

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALSBPE $ 0 $ 4,000,000 $ 0 $ 0 $ 0 $ 4,000,000S102 $ 16,000,000 $ 2,000,000 $ 0 $ 2,000,000 $ 0 $ 20,000,000TOTAL $ 16,000,000 $ 6,000,000 $ 0 $ 2,000,000 $ 0 $ 24,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG ELLIS 0442-03-042 2022 IH 35E C RED OAK $ 29,246,463LIMITS FROM AT FM 664 PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TOPROJECT RECONSTRUCT INTERCHANGE MPO PROJ NUM 13034

DESCR FUNDING CAT(S) 4REMARKS PROJECT PART OF REGIONAL 10 YEAR PLAN

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,500,000ROW PURCH $ 6,000,000 COST OF

CONSTR $ 29,246,463 APPROVEDCONST ENG $ 1,340,283 PHASES

CONTING $ 854,466 $ 29,246,463INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 38,941,212

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 23,397,171 $ 5,849,292 $ 0 $ 0 $ 0 $ 29,246,463TOTAL $ 23,397,171 $ 5,849,292 $ 0 $ 0 $ 0 $ 29,246,463

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 425: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 425 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2022

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG ELLIS 0092-03-053 2022 IH 45 C FERRIS $ 40,419,966LIMITS FROM AT FM 664 PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TOPROJECT CONSTRUCT INTERCHANGE MPO PROJ NUM 13029

DESCR FUNDING CAT(S) 4REMARKS PROJECT PART OF REGIONAL 10 YEAR PLAN

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,000,000ROW PURCH $ 5,100,000 COST OF

CONSTR $ 40,419,966 APPROVEDCONST ENG $ 1,822,785 PHASES

CONTING $ 1,162,074 $ 40,419,966INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 50,504,825

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 32,335,973 $ 8,083,993 $ 0 $ 0 $ 0 $ 40,419,966TOTAL $ 32,335,973 $ 8,083,993 $ 0 $ 0 $ 0 $ 40,419,966

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG KAUFMAN 0095-03-080 2022 US 80 C DALLAS $ 133,000,000LIMITS FROM LAWSON ROAD (DALLAS/KAUFMAN C/L) PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TO FM 460PROJECT RECONSTRUCT AND WIDEN 4 TO 6 MAINLANES AND RECONSTRUCT 4 LANE DISCONTINUOUS FRON MPO PROJ NUM 53086

DESCR TAGE RDS TO 4 LANE CONTINUOUS FRONTAGE RDS FUNDING CAT(S) 4REMARKS PROJECT PART OF REGIONAL 10 YEAR PLAN

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 7,000,000ROW PURCH $ 12,000,000 COST OF

CONSTR $ 133,000,000 APPROVEDCONST ENG $ 5,563,981 PHASES

CONTING $ 232,911 $ 133,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 157,796,892

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 106,400,000 $ 26,600,000 $ 0 $ 0 $ 0 $ 133,000,000TOTAL $ 106,400,000 $ 26,600,000 $ 0 $ 0 $ 0 $ 133,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PARIS NCTCOG HUNT 2658-01-013 2022 FM 2642 C ROYSE CITY $ 17,035,840LIMITS FROM FM 35 PROJECT SPONSOR TXDOT-PARIS

REVISION DATE 07/2018LIMITS TO SH 66PROJECT WIDEN 2 LANE TO 4 LANE DIVIDED URBAN WITH SIDEWALKS MPO PROJ NUM 13039

DESCR FUNDING CAT(S) 2M,7REMARKS PROJECT 10-YEAR PLAN PROJECT; 2017-2018 CMAQ/STBG PROJECT SELECTI

P7 HISTORY ON/LOCAL BOND PROGRAM TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,705,000ROW PURCH $ 3,747,900 COST OF

CONSTR $ 17,035,840 APPROVEDCONST ENG $ 884,484 PHASES

CONTING $ 354,864 $ 17,035,840INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 23,728,088

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2M $ 4,440,000 $ 1,110,000 $ 0 $ 0 $ 0 $ 5,550,0007 $ 9,188,672 $ 2,297,168 $ 0 $ 0 $ 0 $ 11,485,840TOTAL $ 13,628,672 $ 3,407,168 $ 0 $ 0 $ 0 $ 17,035,840

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 426: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 426 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2022

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0353-05-120 2022 SL 12 C DALLAS $ 18,316,185LIMITS FROM AT SKILLMAN PROJECT SPONSOR TXDOT-DALLAS

REVISION DATE 07/2018LIMITS TOPROJECT RECONSTRUCT GRADE SEPARATION AS A SINGLE POINT URBAN INTERCHANGE MPO PROJ NUM 55112

DESCR FUNDING CAT(S) 1,4REMARKS PROJECT 10-YEAR PLAN PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 800,000ROW PURCH $ 0 COST OF

CONSTR $ 18,316,185 APPROVEDCONST ENG $ 934,494 PHASES

CONTING $ 595,765 $ 18,316,185INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 20,646,444

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL1 $ 892,948 $ 223,237 $ 0 $ 0 $ 0 $ 1,116,1854 $ 13,760,000 $ 3,440,000 $ 0 $ 0 $ 0 $ 17,200,000TOTAL $ 14,652,948 $ 3,663,237 $ 0 $ 0 $ 0 $ 18,316,185

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0902-48-579 2022 CS C VARIOUS $ 6,141,600LIMITS FROM US 81/US 287 AT FM 3479/HARMON ROAD/NORTH TARRANT PARKWAY PROJECT SPONSOR TXDOT-FORT WORTH

REVISION DATE 07/2018LIMITS TOPROJECT CONSTRUCT NORTH TARRANT PARKWAY OVER US 287 WITH TURNAROUND ON EASTSIDE; CONSTRU MPO PROJ NUM 11572

DESCR CT HARMON RD OVER US 287; RECONSTRUCT EXISTING SB ENTRANCE RAMP TO US 287 W/AUXI FUNDING CAT(S) 3LC,7LIARY LANE

REMARKS LOCAL CONTRIBUTION PAID BY CITY OF FORT WORTH PROJECTP7 HISTORY

TOTAL PROJECT COST INFORMATIONPREL ENG $ 751,602

ROW PURCH $ 660,500 COST OFCONSTR $ 6,141,600 APPROVED

CONST ENG $ 314,615 PHASESCONTING $ 200,575 $ 6,141,600INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 8,068,892

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 1,467,850 $ 1,467,8507 $ 3,739,000 $ 934,750 $ 0 $ 0 $ 0 $ 4,673,750TOTAL $ 3,739,000 $ 934,750 $ 0 $ 0 $ 1,467,850 $ 6,141,600

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0918-47-237 2022 CS C DALLAS $ 4,250,000LIMITS FROM WHEATLAND RD FROM DALLAS/LANCASTER CITY LIMIT PROJECT SPONSOR DALLAS

REVISION DATE 07/2018LIMITS TO UNIVERSITY HILLS ALONG THE DALLAS/LANCASTER CITY LIMITSPROJECT CONSTRUCT 0 TO 4 LANE DIVIDED ROADWAY AND BICYCLE/PEDESTRIAN FACILITIES MPO PROJ NUM 25025

DESCR FUNDING CAT(S) 7REMARKS CHANGE CSJ FROM 0918-47-992 TO 0918-47-237 PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 249,797ROW PURCH $ 0 COST OF

CONSTR $ 4,250,000 APPROVEDCONST ENG $ 246,797 PHASES

CONTING $ 62,958 $ 4,250,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 4,809,552

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 3,400,000 $ 0 $ 0 $ 850,000 $ 0 $ 4,250,000TOTAL $ 3,400,000 $ 0 $ 0 $ 850,000 $ 0 $ 4,250,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 427: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 427 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2022

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

FORT WORTH NCTCOG TARRANT 0902-48-860 2022 VA C HURST $ 845,857LIMITS FROM HURST BELLAIRE SD PROJECT; BOUNDED BY PIPELINE ON THE NORTH; BROWN TRAIL O PROJECT SPONSOR HURST

REVISION DATE 07/2018N THE WESTLIMITS TO PECAN ST ON THE SOUTH; BELLAIRE ON THE EASTPROJECT PEDESTRIAN AMENITIES; LANDSCAPING; INTERSECTION IMPROVEMENTS; SIGNALIZATION; STR MPO PROJ NUM 11385

DESCR EET CONSTRUCTION REALIGNING 4 LANE BROWN TRAIL AVE FUNDING CAT(S) 7REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 45,419ROW PURCH $ 30,000 COST OF

CONSTR $ 845,857 APPROVEDCONST ENG $ 42,314 PHASES

CONTING $ 9,778 $ 845,857INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 973,368

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL7 $ 676,686 $ 0 $ 0 $ 169,171 $ 0 $ 845,857TOTAL $ 676,686 $ 0 $ 0 $ 169,171 $ 0 $ 845,857

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DALLAS 0000-18-033 2022 CS C ROWLETT $ 3,950,000LIMITS FROM CHAHA RD FROM ROWLETT RD PROJECT SPONSOR ROWLETT

REVISION DATE 07/2018LIMITS TO KIRBY RDPROJECT WIDEN FROM 2 LANES TO 3 LANES MPO PROJ NUM 83144

DESCR FUNDING CAT(S) 3LCREMARKS LOCAL CONTRIBUTION PAID BY ROWLETT PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 395,000ROW PURCH $ 474,000 COST OF

CONSTR $ 3,950,000 APPROVEDCONST ENG $ 138,250 PHASES

CONTING $ 59,250 $ 3,950,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 5,016,500

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 3,950,000 $ 3,950,000TOTAL $ 0 $ 0 $ 0 $ 0 $ 3,950,000 $ 3,950,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DENTON 0000-18-022 2022 CS C FLOWER MOUND $ 215,000LIMITS FROM COLLEGE PKWY AT TIMBER CREEK PROJECT SPONSOR FLOWER MOUND

REVISION DATE 07/2018LIMITS TOPROJECT SIGNAL INSTALLATION MPO PROJ NUM 82399

DESCR FUNDING CAT(S) 3LCREMARKS LOCAL CONTRIBUTION PAID BY FLOWER MOUND PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 215,000 APPROVEDCONST ENG $ 7,525 PHASES

CONTING $ 3,225 $ 215,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 225,750

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 215,000 $ 215,000TOTAL $ 0 $ 0 $ 0 $ 0 $ 215,000 $ 215,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 428: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 428 OF 696

10:03:31 AM NCTCOG MPO - HIGHWAY PROJECTS

FY 2022

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

DALLAS NCTCOG DENTON 0000-18-019 2022 CS C FLOWER MOUND $ 9,000,000LIMITS FROM ON KIRKPATRICK LN (PHASE III) FROM FM 1171 PROJECT SPONSOR FLOWER MOUND

REVISION DATE 07/2018LIMITS TO BELLAIRE BLVDPROJECT CONSTRUCT 0 TO 4 LANE ROADWAY MPO PROJ NUM 82384

DESCR FUNDING CAT(S) 3LCREMARKS LOCAL CONTRIBUTION PAID BY CITY OF FLOWER MOUND PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 945,000ROW PURCH $ 1,134,000 COST OF

CONSTR $ 9,000,000 APPROVEDCONST ENG $ 315,000 PHASES

CONTING $ 135,000 $ 9,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 11,529,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 0 $ 9,000,000 $ 9,000,000TOTAL $ 0 $ 0 $ 0 $ 0 $ 9,000,000 $ 9,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 429: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

2019-2022Statewide TransportationImprovement ProgramPermian Basin MPOHighway Projects

Page 430: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 430 OF 696

10:03:31 AM PERMIAN BASIN MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

ODESSA PERMIAN BASIN ECTOR 2224-01-102 2019 SL 338 C,E,R ODESSA $ 18,400,000LIMITS FROM AT N US 385 PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO .PROJECT CONSTRUCT NEW INTERCHANGE MPO PROJ NUM RC-21* (CI-119)

DESCR FUNDING CAT(S) 4REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 481,126ROW PURCH $ 330,000 COST OF

CONSTR $ 9,818,907 APPROVEDCONST ENG $ 460,506 PHASES

CONTING $ 293,585 $ 18,400,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 11,384,124

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 7,360,000 $ 1,840,000 $ 0 $ 0 $ 0 $ 9,200,000TOTAL $ 7,360,000 $ 1,840,000 $ 0 $ 0 $ 0 $ 9,200,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

ODESSA PERMIAN BASIN MIDLAND 0906-32-057 2019 CS C,E MIDLAND $ 627,038LIMITS FROM ON N LORAINE AND N MAIN ST FROM PROJECT SPONSOR City of Midalnd

REVISION DATE 07/2018LIMITS TO W LOUISIANA ST TO E WALL STPROJECT CONSTRUCT BICYCLE LANES, CURB EXTENSIONS, AND MEDIAN AND IMPROVE ADA COMPLIANCE MPO PROJ NUM

DESCR FUNDING CAT(S) 9TAPREMARKS PROJECT NAME: Project Name-Midland-Downtown Bike/Pe PROJECT 2017 TASA state-selected; Commission approved 10/26/17 MO

P7 d Infrastructrue. HISTORY 115076 TOTAL PROJECT COST INFORMATION

PREL ENG $ 24,536ROW PURCH $ 0 COST OF

CONSTR $ 594,323 APPROVEDCONST ENG $ 8,179 PHASES

CONTING $ 6,534 $ 627,038INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 633,572

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 501,630 $ 0 $ 0 $ 125,408 $ 0 $ 627,038TOTAL $ 501,630 $ 0 $ 0 $ 125,408 $ 0 $ 627,038

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

ODESSA PERMIAN BASIN MIDLAND 1188-02-087 2019 SL 250 C,E MIDLAND $ 21,500,000LIMITS FROM At CR 1150/CR 60 PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TOPROJECT CONSTRUCT NEW INTERCHANGE MPO PROJ NUM RC-19* (CI-908)

DESCR FUNDING CAT(S) 2U,3LC,12REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,157,937ROW PURCH $ 0 COST OF

CONSTR $ 23,631,365 APPROVEDCONST ENG $ 1,122,490 PHASES

CONTING $ 652,226 $ 21,500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 26,564,018

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL3LC $ 0 $ 0 $ 0 $ 2,000,000 $ 0 $ 2,000,00012 $ 11,040,000 $ 2,760,000 $ 0 $ 0 $ 0 $ 13,800,0002U $ 4,560,000 $ 1,140,000 $ 0 $ 0 $ 0 $ 5,700,000TOTAL $ 15,600,000 $ 3,900,000 $ 0 $ 2,000,000 $ 0 $ 21,500,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 431: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 431 OF 696

10:03:31 AM PERMIAN BASIN MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

ODESSA PERMIAN BASIN ECTOR 0228-06-081 2019 US 385 C,E,R ODESSA $ 8,500,000LIMITS FROM AT N LP 338 PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TOPROJECT CONSTRUCT NEW INTERCHANGE MPO PROJ NUM RC-21* (CI-119)

DESCR FUNDING CAT(S) 12REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 438,803ROW PURCH $ 0 COST OF

CONSTR $ 8,955,158 APPROVEDCONST ENG $ 419,997 PHASES

CONTING $ 267,759 $ 8,500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 402,086TOTAL CST $ 10,081,717

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL12 $ 6,800,000 $ 1,700,000 $ 0 $ 0 $ 0 $ 8,500,000TOTAL $ 6,800,000 $ 1,700,000 $ 0 $ 0 $ 0 $ 8,500,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 432: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 432 OF 696

10:03:31 AM PERMIAN BASIN MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

ODESSA PERMIAN BASIN ECTOR 2224-01-099 2020 SL 338 C,E,R ODESSA $ 19,200,000LIMITS FROM AT EAST YUKON RD PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TOPROJECT CONSTRUCT NEW INTERCHANGE MPO PROJ NUM RC-10* int (CI-118)

DESCR FUNDING CAT(S) 2UREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,058,272ROW PURCH $ 1,460,000 COST OF

CONSTR $ 21,597,389 APPROVEDCONST ENG $ 1,012,918 PHASES

CONTING $ 645,762 $ 19,200,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 25,774,341

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2U $ 15,360,000 $ 3,840,000 $ 0 $ 0 $ 0 $ 19,200,000TOTAL $ 15,360,000 $ 3,840,000 $ 0 $ 0 $ 0 $ 19,200,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

ODESSA PERMIAN BASIN MIDLAND 0005-14-084 2020 IH 20 C,E,R MIDLAND $ 19,840,000LIMITS FROM AT CR 1250 PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TOPROJECT CONSTRUCT NEW INTERCHANGE MPO PROJ NUM RC-50b* int3 (CI-539)

DESCR FUNDING CAT(S) 4REMARKS PROJECT Moved to TIP FY 2020 from 2019

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,072,312ROW PURCH $ 100,000 COST OF

CONSTR $ 21,883,915 APPROVEDCONST ENG $ 1,026,356 PHASES

CONTING $ 654,329 $ 19,840,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 24,736,912

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 17,856,000 $ 1,984,000 $ 0 $ 0 $ 0 $ 19,840,000TOTAL $ 17,856,000 $ 1,984,000 $ 0 $ 0 $ 0 $ 19,840,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 433: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 433 OF 696

10:03:31 AM PERMIAN BASIN MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

ODESSA PERMIAN BASIN MIDLAND 0463-02-075 2021 SH 191 C,E,R MIDLAND $ 12,630,001LIMITS FROM AVALON DR PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO LOOP 250PROJECT RAMP RECONFIGURATION MPO PROJ NUM RC-86a

DESCR FUNDING CAT(S) 2U,3LCREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 634,772ROW PURCH $ 500,000 COST OF

CONSTR $ 12,954,522 APPROVEDCONST ENG $ 387,340 PHASES

CONTING $ 75,522 $ 12,630,001INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 581,658TOTAL CST $ 14,552,156

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2U $ 9,304,000 $ 2,326,000 $ 0 $ 0 $ 0 $ 11,630,0003LC $ 0 $ 0 $ 0 $ 0 $ 1,000,000 $ 1,000,000TOTAL $ 9,304,000 $ 2,326,000 $ 0 $ 0 $ 1,000,000 $ 12,630,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

ODESSA PERMIAN BASIN MIDLAND 1718-07-043 2021 FM 1788 C,E,R MIDLAND $ 6,000,000LIMITS FROM SH 191 PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO IH 20PROJECT UPGRADE TO NON-FREEWAY MPO PROJ NUM RC-52*

DESCR FUNDING CAT(S) 2UREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 328,512ROW PURCH $ 500,000 COST OF

CONSTR $ 6,704,333 APPROVEDCONST ENG $ 327,842 PHASES

CONTING $ 75,759 $ 6,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 7,936,446

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2U $ 4,800,000 $ 1,200,000 $ 0 $ 0 $ 0 $ 6,000,000TOTAL $ 4,800,000 $ 1,200,000 $ 0 $ 0 $ 0 $ 6,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

ODESSA PERMIAN BASIN MIDLAND 1188-02-100 2021 Loop 250 C,E,R MIDLAND $ 12,630,000LIMITS FROM SH 191 (BS 158-B) PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO Wadley Ave.PROJECT RAMP RECONFIGURATION MPO PROJ NUM RC-86a

DESCR FUNDING CAT(S) 2U,3LCREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 634,772ROW PURCH $ 500,000 COST OF

CONSTR $ 12,954,522 APPROVEDCONST ENG $ 607,567 PHASES

CONTING $ 387,340 $ 12,630,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 581,658TOTAL CST $ 15,084,201

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2U $ 9,304,000 $ 2,326,000 $ 0 $ 0 $ 0 $ 11,630,0003LC $ 0 $ 0 $ 0 $ 0 $ 1,000,000 $ 1,000,000TOTAL $ 9,304,000 $ 2,326,000 $ 0 $ 0 $ 1,000,000 $ 12,630,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 434: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 434 OF 696

10:03:31 AM PERMIAN BASIN MPO - HIGHWAY PROJECTS

FY 2022

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

ODESSA PERMIAN BASIN MIDLAND 0005-14-087 2022 IH 20 C,E MIDLAND $ 51,600,000LIMITS FROM FM 1788 PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO Loop 250 WestPROJECT IMPROVE MOBILITY MPO PROJ NUM RC-95

DESCR FUNDING CAT(S) 2U,12REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,976,490ROW PURCH $ 0 COST OF

CONSTR $ 60,744,700 APPROVEDCONST ENG $ 2,970,416 PHASES

CONTING $ 686,415 $ 51,600,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 67,378,021

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2U $ 2,400,000 $ 600,000 $ 0 $ 0 $ 0 $ 3,000,00012 $ 38,880,000 $ 9,720,000 $ 0 $ 0 $ 0 $ 48,600,000TOTAL $ 41,280,000 $ 10,320,000 $ 0 $ 0 $ 0 $ 51,600,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

ODESSA PERMIAN BASIN MIDLAND 0005-14-086 2022 IH 20 C,E MIDLAND $ 44,700,000LIMITS FROM Ector County Line PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO FM 1788PROJECT IMPROVE MOBILITY MPO PROJ NUM RC-36ab (Cl-901)

DESCR FUNDING CAT(S) 2U,12REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 2,578,471ROW PURCH $ 0 COST OF

CONSTR $ 52,621,862 APPROVEDCONST ENG $ 2,573,209 PHASES

CONTING $ 594,627 $ 44,700,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 58,368,169

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2U $ 1,600,000 $ 400,000 $ 0 $ 0 $ 0 $ 2,000,00012 $ 34,160,000 $ 8,540,000 $ 0 $ 0 $ 0 $ 42,700,000TOTAL $ 35,760,000 $ 8,940,000 $ 0 $ 0 $ 0 $ 44,700,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

ODESSA PERMIAN BASIN ECTOR 0005-13-060 2022 IH 20 C,E ODESSA $ 8,600,000LIMITS FROM JBS Parkway PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO Midland County LinePROJECT IMPROVE MOBILITY MPO PROJ NUM RC-36a (Cl-901)

DESCR FUNDING CAT(S) 2U,12REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 496,082ROW PURCH $ 0 COST OF

CONSTR $ 10,124,117 APPROVEDCONST ENG $ 495,069 PHASES

CONTING $ 114,403 $ 8,600,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 11,229,671

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2U $ 800,000 $ 200,000 $ 0 $ 0 $ 0 $ 1,000,00012 $ 6,080,000 $ 1,520,000 $ 0 $ 0 $ 0 $ 7,600,000TOTAL $ 6,880,000 $ 1,720,000 $ 0 $ 0 $ 0 $ 8,600,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 435: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

2019-2022Statewide TransportationImprovement ProgramSan Angelo MPOHighway Projects

Page 436: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 436 OF 696

10:03:31 AM SAN ANGELO MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANGELO SAN ANGELO TOM GREEN 0159-07-007 2020 SL 378 C SAN ANGELO $ 14,470,000LIMITS FROM FM 1223 PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO US 87PROJECT Widen, Add Center Turn Lane, and ACP Overlay MPO PROJ NUM HR100-20-01

DESCR FUNDING CAT(S) 1,2UREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 769,297ROW PURCH $ 0 COST OF

CONSTR $ 14,470,000 APPROVEDCONST ENG $ 778,717 PHASES

CONTING $ 312,429 $ 14,470,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 16,330,443

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2U $ 4,152,000 $ 1,038,000 $ 0 $ 0 $ 0 $ 5,190,0001 $ 7,424,000 $ 1,856,000 $ 0 $ 0 $ 0 $ 9,280,000TOTAL $ 11,576,000 $ 2,894,000 $ 0 $ 0 $ 0 $ 14,470,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

SAN ANGELO SAN ANGELO TOM GREEN 0907-24-048 2020 CS C,E SAN ANGELO $ 2,613,780LIMITS FROM On Chadbourne St from W Beauregard Ave PROJECT SPONSOR City of San Angelo

REVISION DATE 07/2018LIMITS TO Concho RiverPROJECT Reconstruct sidewalks and construct new Concho River Trail access structure MPO PROJ NUM HR100-20-00

DESCR FUNDING CAT(S) 3LC,9TAPREMARKS Project Name: San Angelo - Sidewalks and SUP Connec PROJECT 2017 TASA State Selected; Commission approved 10/26/17 MO

P7 tion HISTORY 115076 TOTAL PROJECT COST INFORMATION

PREL ENG $ 102,278ROW PURCH $ 0 COST OF

CONSTR $ 2,477,409 APPROVEDCONST ENG $ 34,093 PHASES

CONTING $ 0 $ 2,613,780INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,613,780

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 1,960,335 $ 0 $ 0 $ 490,084 $ 0 $ 2,450,4193LC $ 0 $ 0 $ 0 $ 0 $ 163,361 $ 163,361TOTAL $ 1,960,335 $ 0 $ 0 $ 490,084 $ 163,361 $ 2,613,780

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 437: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

2019-2022Statewide TransportationImprovement ProgramSetrpc MPOHighway Projects

Page 438: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 438 OF 696

10:03:31 AM SETRPC MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

BEAUMONT SETRPC JEFFERSON 0065-07-062 2019 US 69 C OTHER $ 14,250,000LIMITS FROM Tram road, South PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO LNVA CanalPROJECT Widen freeway from 4 to 6 lanes MPO PROJ NUM 17002-F40N

DESCR FUNDING CAT(S) 2UREMARKS PROJECT Administrative Amendment - Move project from FY 2018 to F

P7 HISTORY Y 2019 TOTAL PROJECT COST INFORMATION

PREL ENG $ 698,250ROW PURCH $ 0 COST OF

CONSTR $ 14,250,000 APPROVEDCONST ENG $ 612,750 PHASES

CONTING $ 25,650 $ 14,250,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 671,175TOTAL CST $ 16,257,825

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2U $ 11,400,000 $ 2,850,000 $ 0 $ 0 $ 0 $ 14,250,000TOTAL $ 11,400,000 $ 2,850,000 $ 0 $ 0 $ 0 $ 14,250,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 439: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 439 OF 696

10:03:31 AM SETRPC MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

BEAUMONT SETRPC ORANGE 0028-14-091 2020 IH 10 C OTHER $ 40,070,000LIMITS FROM 0.54 miles east of FM 3247 PROJECT SPONSOR TXDOT

REVISION DATE 07/2018LIMITS TO Sabine river bridgePROJECT Widen existing mainlanes from 4 to 6 lanes MPO PROJ NUM 17003-F40N

DESCR FUNDING CAT(S) 12,2UREMARKS P3; Approved as CAT 2-U corridor project in 2012 UT PROJECT Administrative amendment - Move project from FY 2019 to F

P7 P HISTORY Y 2020 TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,963,430ROW PURCH $ 0 COST OF

CONSTR $ 40,070,000 APPROVEDCONST ENG $ 1,723,010 PHASES

CONTING $ 72,126 $ 40,070,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 1,887,297TOTAL CST $ 45,715,863

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL12 $ 14,720,000 $ 3,680,000 $ 0 $ 0 $ 0 $ 18,400,0002U $ 17,336,000 $ 4,334,000 $ 0 $ 0 $ 0 $ 21,670,000TOTAL $ 32,056,000 $ 8,014,000 $ 0 $ 0 $ 0 $ 40,070,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 440: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

2019-2022Statewide TransportationImprovement ProgramSherman-Denison MPOHighway Projects

Page 441: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 441 OF 696

10:03:31 AM SHERMAN-DENISON MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PARIS SHERMAN-DENISON GRAYSON 0901-19-194 2019 VA C,E WHITEWRIGHT $ 1,332,679LIMITS FROM ON W HIGHLAND, W PINE AND S SEARS PROJECT SPONSOR CITY OF WHITEWRIGHT

REVISION DATE 07/2018LIMITS TO ON FM 151 FROM S SEARS TO BENEDICTPROJECT 6-FOOT AND 10-FOOT SIDEWALK AND ADA RAMP CONSTRUCTION MPO PROJ NUM SDTAP2019-02

DESCR FUNDING CAT(S) 9TAPREMARKS PROJECT NAME: WHITEWRIGHT - SIDEWALKS, IN-KIND CONT PROJECT 2017 TASA STATE-SELECTED; COMMISSION APPROVED 10/26/17 MO

P7 RIBUTION: $121,000 HISTORY 115076 TOTAL PROJECT COST INFORMATION

PREL ENG $ 68,583ROW PURCH $ 0 COST OF

CONSTR $ 1,399,643 APPROVEDCONST ENG $ 68,443 PHASES

CONTING $ 15,816 $ 1,332,679INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 58,225TOTAL CST $ 1,610,710

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 1,066,143 $ 0 $ 0 $ 266,536 $ 0 $ 1,332,679TOTAL $ 1,066,143 $ 0 $ 0 $ 266,536 $ 0 $ 1,332,679

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PARIS SHERMAN-DENISON GRAYSON 0901-19-193 2019 VA C,E DENISON $ 1,149,892LIMITS FROM DAY ST (ON ABANDONED U.P. RAILWAY) PROJECT SPONSOR CITY OF DENISON

REVISION DATE 07/2018LIMITS TO LOY LAKE ROADPROJECT 12-FOOT WIDE SHARED USE PATH ON AN ABANDONED UNION PACIFIC RAILWAY MPO PROJ NUM SDTAP2019-01

DESCR FUNDING CAT(S) 9TAPREMARKS PROJECT NAME: DENISON - KATY TRAIL (SUP) PROJECT 2017 TASA STATE-SELECTED; COMMISSION APPROVED 10/26/17 MO

P7 HISTORY 115076 TOTAL PROJECT COST INFORMATION

PREL ENG $ 44,996ROW PURCH $ 0 COST OF

CONSTR $ 1,089,898 APPROVEDCONST ENG $ 14,999 PHASES

CONTING $ 11,983 $ 1,149,892INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,161,876

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 919,914 $ 0 $ 0 $ 229,978 $ 0 $ 1,149,892TOTAL $ 919,914 $ 0 $ 0 $ 229,978 $ 0 $ 1,149,892

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PARIS SHERMAN-DENISON GRAYSON 2455-01-034 2019 FM 1417 C,E,R SHERMAN $ 9,003,858LIMITS FROM TAYLOR STREET PROJECT SPONSOR SDMPO

REVISION DATE 07/2018LIMITS TO SH 56PROJECT WIDEN FROM 2-LANE TO 4-LANE; RECONST INTERCHANGE AT SH 56; REPLACE BRIDGE A MPO PROJ NUM SD2018-2B

DESCR T SAND CREEK FUNDING CAT(S) 1REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 467,404ROW PURCH $ 0 COST OF

CONSTR $ 9,538,850 APPROVEDCONST ENG $ 473,127 PHASES

CONTING $ 189,823 $ 9,003,858INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 356,753TOTAL CST $ 11,025,957

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL1 $ 7,203,086 $ 1,800,772 $ 0 $ 0 $ 0 $ 9,003,858TOTAL $ 7,203,086 $ 1,800,772 $ 0 $ 0 $ 0 $ 9,003,858

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 442: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 442 OF 696

10:03:31 AM SHERMAN-DENISON MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PARIS SHERMAN-DENISON GRAYSON 2455-01-031 2019 FM 1417 C,E,R SHERMAN $ 17,636,102LIMITS FROM US 82 PROJECT SPONSOR SDMPO

REVISION DATE 07/2018LIMITS TO TAYLOR STREETPROJECT WIDEN FROM 2-LN TO 4-LN MPO PROJ NUM SD2018-2A

DESCR FUNDING CAT(S) 2U,11,3LC,1REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 823,665ROW PURCH $ 0 COST OF

CONSTR $ 16,809,494 APPROVEDCONST ENG $ 833,751 PHASES

CONTING $ 334,509 $ 17,636,102INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 628,675TOTAL CST $ 19,430,094

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2U $ 752,000 $ 188,000 $ 0 $ 0 $ 0 $ 940,00011 $ 400,000 $ 100,000 $ 0 $ 0 $ 0 $ 500,0003LC $ 0 $ 0 $ 0 $ 0 $ 2,000,000 $ 2,000,0001 $ 11,356,882 $ 2,839,220 $ 0 $ 0 $ 0 $ 14,196,102TOTAL $ 12,508,882 $ 3,127,220 $ 0 $ 0 $ 2,000,000 $ 17,636,102

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PARIS SHERMAN-DENISON GRAYSON 0729-01-039 2019 FM 121 C,E,R VAN ALSTYNE $ 11,553,024LIMITS FROM 1200 FT WEST OF FM 3356 PROJECT SPONSOR SDMPO

REVISION DATE 07/2018LIMITS TO JIM JONES ROADPROJECT WIDEN NON-FREEWAY MPO PROJ NUM SDHWY086

DESCR FUNDING CAT(S) 1,11REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 585,793ROW PURCH $ 2,958,800 COST OF

CONSTR $ 11,954,951 APPROVEDCONST ENG $ 592,965 PHASES

CONTING $ 237,904 $ 11,553,024INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 447,115TOTAL CST $ 16,777,528

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL1 $ 7,642,420 $ 1,910,604 $ 0 $ 0 $ 0 $ 9,553,02411 $ 1,600,000 $ 400,000 $ 0 $ 0 $ 0 $ 2,000,000TOTAL $ 9,242,420 $ 2,310,604 $ 0 $ 0 $ 0 $ 11,553,024

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 443: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 443 OF 696

10:03:31 AM SHERMAN-DENISON MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PARIS SHERMAN-DENISON GRAYSON 0047-18-083 2020 US 75 C,E,R SHERMAN $ 21,700,000LIMITS FROM AT US 82 PROJECT SPONSOR SDMPO

REVISION DATE 07/2018LIMITS TOPROJECT WIDEN FRONTAGE ROADS AND RECONFIGURE RAMPS MPO PROJ NUM US75-US82

DESCR FUNDING CAT(S) 4REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,131,276ROW PURCH $ 0 COST OF

CONSTR $ 23,087,261 APPROVEDCONST ENG $ 1,082,793 PHASES

CONTING $ 690,309 $ 21,700,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 1,036,618TOTAL CST $ 27,028,257

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 17,360,000 $ 4,340,000 $ 0 $ 0 $ 0 $ 21,700,000TOTAL $ 17,360,000 $ 4,340,000 $ 0 $ 0 $ 0 $ 21,700,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PARIS SHERMAN-DENISON GRAYSON 0047-03-087 2020 US 75 C,E,R SHERMAN $ 68,612,922LIMITS FROM 0.651 MI S OF CENTER STREET PROJECT SPONSOR SDMPO

REVISION DATE 07/2018LIMITS TO FM 1417PROJECT RECONSTRUCT AND WIDENING FROM 4-LN TO 6-LN MPO PROJ NUM US75-GAP1

DESCR FUNDING CAT(S) 4,12,2U,6,3LCREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 3,576,965ROW PURCH $ 0 COST OF

CONSTR $ 72,999,282 APPROVEDCONST ENG $ 3,138,969 PHASES

CONTING $ 131,399 $ 68,612,922INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 3,438,266TOTAL CST $ 83,284,881

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 11,000,000 $ 2,750,000 $ 0 $ 0 $ 0 $ 13,750,00012 $ 24,034,800 $ 6,008,700 $ 0 $ 0 $ 0 $ 30,043,5002U $ 10,004,850 $ 2,501,212 $ 0 $ 0 $ 0 $ 12,506,0626 $ 5,250,688 $ 1,312,672 $ 0 $ 0 $ 0 $ 6,563,3603LC $ 0 $ 0 $ 0 $ 0 $ 5,750,000 $ 5,750,000TOTAL $ 50,290,338 $ 12,572,584 $ 0 $ 0 $ 5,750,000 $ 68,612,922

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PARIS SHERMAN-DENISON GRAYSON 0047-02-150 2020 US 75 C,E,R SHERMAN $ 71,410,438LIMITS FROM SH 91 PROJECT SPONSOR SDMPO

REVISION DATE 07/2018LIMITS TO 0.651 MI S OF CENTER STREETPROJECT RECONSTRUCT AND WIDENING FROM 4-LN TO 6-LN MPO PROJ NUM US75-GAP2

DESCR FUNDING CAT(S) 4,12,2U,6,3LCREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 3,722,806ROW PURCH $ 0 COST OF

CONSTR $ 75,975,641 APPROVEDCONST ENG $ 3,266,953 PHASES

CONTING $ 136,756 $ 71,410,438INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 3,578,453TOTAL CST $ 86,680,609

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 13,146,400 $ 3,286,600 $ 0 $ 0 $ 0 $ 16,433,00012 $ 19,245,200 $ 4,811,300 $ 0 $ 0 $ 0 $ 24,056,5002U $ 11,643,150 $ 2,910,788 $ 0 $ 0 $ 0 $ 14,553,9386 $ 7,493,600 $ 1,873,400 $ 0 $ 0 $ 0 $ 9,367,0003LC $ 0 $ 0 $ 0 $ 0 $ 7,000,000 $ 7,000,000TOTAL $ 51,528,350 $ 12,882,088 $ 0 $ 0 $ 7,000,000 $ 71,410,438

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 444: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 444 OF 696

10:03:31 AM SHERMAN-DENISON MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

PARIS SHERMAN-DENISON GRAYSON 0901-19-187 2020 VA C,E,R GUNTER $ 8,000,000LIMITS FROM FM 121 PROJECT SPONSOR SDMPO

REVISION DATE 07/2018LIMITS TO GRAYSON COUNTY LINEPROJECT CONSTRUCT NEW 2-LANE HIGHWAY MPO PROJ NUM SD2019-2

DESCR FUNDING CAT(S) 2U,11REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 426,656ROW PURCH $ 0 COST OF

CONSTR $ 8,707,270 APPROVEDCONST ENG $ 426,656 PHASES

CONTING $ 108,841 $ 8,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 475,417TOTAL CST $ 10,144,840

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2U $ 3,200,000 $ 800,000 $ 0 $ 0 $ 0 $ 4,000,00011 $ 3,200,000 $ 800,000 $ 0 $ 0 $ 0 $ 4,000,000TOTAL $ 6,400,000 $ 1,600,000 $ 0 $ 0 $ 0 $ 8,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 445: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

2019-2022Statewide TransportationImprovement ProgramTexarkana MPOHighway Projects

Page 446: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 446 OF 696

10:03:31 AM TEXARKANA MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

ATLANTA TEXARKANA BOWIE 0000-00-000 2020 Gibson LN C TEXARKANA $ 5,749,680LIMITS FROM UNIVERSITY Avenue PROJECT SPONSOR CITY OF TEXARKANA , TX

REVISION DATE 07/2018LIMITS TO PLEASANT GROVE ROADPROJECT CONSTRUCT NEW 4 LANE CONCRETE CURB AND GUTTER CITY STREET MPO PROJ NUM 700

DESCR FUNDING CAT(S) OtherREMARKS Funding consists of CIP PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 0ROW PURCH $ 0 COST OF

CONSTR $ 5,749,680 APPROVEDCONST ENG $ 0 PHASES

CONTING $ 0 $ 5,749,680INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 5,749,680

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTALOther $ 0 $ 0 $ 0 $ 5,749,680 $ 0 $ 5,749,680TOTAL $ 0 $ 0 $ 0 $ 5,749,680 $ 0 $ 5,749,680

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

ATLANTA TEXARKANA BOWIE 1231-01-066 2020 FM 989 C TEXARKANA $ 4,353,635LIMITS FROM IH 30 NORTH FRONTAGE ROAD PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO 0.3 MI N OF GIBSON LANEPROJECT WIDEN EXISTING 2-LANE HIGHWAY TO 4-LANE DIVIDED URBAN SECTION MPO PROJ NUM 46A

DESCR FUNDING CAT(S) 2UREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 213,328ROW PURCH $ 0 COST OF

CONSTR $ 4,353,635 APPROVEDCONST ENG $ 215,940 PHASES

CONTING $ 86,637 $ 4,353,635INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 4,869,540

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2U $ 3,482,908 $ 870,727 $ 0 $ 0 $ 0 $ 4,353,635TOTAL $ 3,482,908 $ 870,727 $ 0 $ 0 $ 0 $ 4,353,635

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

ATLANTA TEXARKANA BOWIE 0610-07-113 2020 IH 30 C TEXARKANA $ 66,392,932LIMITS FROM 0.6 MI W OF FM 989 PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO ARKANSAS STATE LINEPROJECT WIDEN EXISTING INTERSTATE FROM 4 LANES TO 6 LANES MPO PROJ NUM 21

DESCR FUNDING CAT(S) 1,4REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 3,253,254ROW PURCH $ 0 COST OF

CONSTR $ 66,392,932 APPROVEDCONST ENG $ 2,854,896 PHASES

CONTING $ 119,507 $ 66,392,932INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 72,620,589

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 48,800,000 $ 12,200,000 $ 0 $ 0 $ 0 $ 61,000,0001 $ 4,314,346 $ 1,078,586 $ 0 $ 0 $ 0 $ 5,392,932TOTAL $ 53,114,346 $ 13,278,586 $ 0 $ 0 $ 0 $ 66,392,932

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 447: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 447 OF 696

10:03:31 AM TEXARKANA MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

ATLANTA TEXARKANA BOWIE 0610-07-097 2020 IH 30 C TEXARKANA $ 20,570,924LIMITS FROM FM 3419 PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO FM 989PROJECT CONSTRUCT ONE-WAY FRONTAGE ROADS, ENTRANCE & EXIT RAMPS & TURNAROUNDS MPO PROJ NUM 55

DESCR FUNDING CAT(S) 2U,4REMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,007,975ROW PURCH $ 61,600 COST OF

CONSTR $ 20,570,925 APPROVEDCONST ENG $ 1,005,918 PHASES

CONTING $ 232,451 $ 20,570,924INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 22,878,869

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL4 $ 12,942,000 $ 1,438,000 $ 0 $ 0 $ 0 $ 14,380,0002U $ 5,571,832 $ 619,092 $ 0 $ 0 $ 0 $ 6,190,924TOTAL $ 18,513,832 $ 2,057,092 $ 0 $ 0 $ 0 $ 20,570,924

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 448: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

2019-2022Statewide TransportationImprovement ProgramTyler MPOHighway Projects

Page 449: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 449 OF 696

10:03:31 AM TYLER MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

TYLER TYLER SMITH 0910-16-144 2019 CS C,E TYLER $ 1,175,658LIMITS FROM VARIOUS CITY STREETS PROJECT SPONSOR TYLER

REVISION DATE 07/2018LIMITS TO IN THE CITY OF TYLERPROJECT STRIPE VARIOUS CITY STREETS FOR BICYCLE LANES MPO PROJ NUM

DESCR FUNDING CAT(S) 9TAPREMARKS TYLER BIKE STRIPE PROJECT TxDOT - 2017 TASA SELECTION 10/26/17 MO# 115076

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 46,004ROW PURCH $ 0 COST OF

CONSTR $ 1,114,319 APPROVEDCONST ENG $ 15,335 PHASES

CONTING $ 0 $ 1,175,658INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,175,658

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 940,526 $ 0 $ 0 $ 235,132 $ 0 $ 1,175,658TOTAL $ 940,526 $ 0 $ 0 $ 235,132 $ 0 $ 1,175,658

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 450: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 450 OF 696

10:03:31 AM TYLER MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

TYLER TYLER SMITH 0495-04-069 2020 IH 20 C,E LINDALE $ 13,240,000LIMITS FROM 1 MI E OF TOLL 49 (HARVEY RD), E PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO US 69 IN LINDALEPROJECT RAMP REVERSAL & ONE-WAY FRONTAGE ROADS MPO PROJ NUM ST-7

DESCR FUNDING CAT(S) 1,2UREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 799,980ROW PURCH $ 166,000 COST OF

CONSTR $ 16,326,130 APPROVEDCONST ENG $ 798,347 PHASES

CONTING $ 184,485 $ 13,240,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 679,167TOTAL CST $ 18,274,942

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2U $ 6,792,000 $ 1,698,000 $ 0 $ 0 $ 0 $ 8,490,0001 $ 3,800,000 $ 950,000 $ 0 $ 0 $ 0 $ 4,750,000TOTAL $ 10,592,000 $ 2,648,000 $ 0 $ 0 $ 0 $ 13,240,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 451: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 451 OF 696

10:03:31 AM TYLER MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

TYLER TYLER SMITH 0606-01-007 2021 PR 16 C OTHER $ 905,036LIMITS FROM PARK MAINT RD IN TYLER ST PARK, SW PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO CEDAR POINT CAMPING AREA EXITPROJECT CONSTRUCT ENTRANCE & PARKING THAT IS FURTHER BACK FROM FM 14 FOR NEW HEADQUARTER MPO PROJ NUM

DESCR S BUILDING FUNDING CAT(S) 10REMARKS PROJECT PREVIOUSLY LISTED UNDER CSJ 0910-16-120

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 49,708ROW PURCH $ 0 COST OF

CONSTR $ 1,014,455 APPROVEDCONST ENG $ 49,606 PHASES

CONTING $ 11,463 $ 905,036INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,125,232

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL10 $ 0 $ 905,036 $ 0 $ 0 $ 0 $ 905,036TOTAL $ 0 $ 905,036 $ 0 $ 0 $ 0 $ 905,036

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

TYLER TYLER SMITH 0522-04-032 2021 FM 16 C,E OTHER $ 24,740,000LIMITS FROM 4 MI W OF FM 849 (CR481-E), E PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO US 69 IN LINDALEPROJECT WIDEN 2 LNS TO 4 LNS W/FLUSH MEDIAN,US69 TO TOLL 49 EXTNSN MPO PROJ NUM ST-8

DESCR FUNDING CAT(S) 1,2UREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,349,776ROW PURCH $ 0 COST OF

CONSTR $ 27,546,460 APPROVEDCONST ENG $ 1,366,304 PHASES

CONTING $ 548,174 $ 24,740,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 1,030,237TOTAL CST $ 30,810,714

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2U $ 19,784,000 $ 4,946,000 $ 0 $ 0 $ 0 $ 24,730,0001 $ 8,000 $ 2,000 $ 0 $ 0 $ 0 $ 10,000TOTAL $ 19,792,000 $ 4,948,000 $ 0 $ 0 $ 0 $ 24,740,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

TYLER TYLER SMITH 0191-03-083 2021 FM 2493 C,E BULLARD $ 32,650,000LIMITS FROM FM 346 IN FLINT PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO 0.3 MI SOUTH OF FM 344 (CHEROKEE C/L)PROJECT WIDEN FROM 2 LANES TO 4 LANES WITH FLUSH MEDIAN MPO PROJ NUM ST-9

DESCR FUNDING CAT(S) 1,2UREMARKS PROJECT GROUPED FOR PE ONLY FOR THE MAY 2015 STIP REVISION GROUP

P7 HISTORY ED FOR PE ONLY IN 2017-2020 STIP TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,810,387ROW PURCH $ 0 COST OF

CONSTR $ 36,946,687 APPROVEDCONST ENG $ 1,832,555 PHASES

CONTING $ 735,239 $ 32,650,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 41,324,868

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2U $ 26,112,000 $ 6,528,000 $ 0 $ 0 $ 0 $ 32,640,0001 $ 8,000 $ 2,000 $ 0 $ 0 $ 0 $ 10,000TOTAL $ 26,120,000 $ 6,530,000 $ 0 $ 0 $ 0 $ 32,650,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 452: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 452 OF 696

10:03:31 AM TYLER MPO - HIGHWAY PROJECTS

FY 2022

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

TYLER TYLER SMITH 0492-04-034 2022 FM 756 C,E OTHER $ 19,010,000LIMITS FROM JEFF DAVIS DR (CR 1167), S PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO FM 346PROJECT WIDEN 2 LN ROAD TO 4 LANE DIVIDED ROADWAY W/FLUSH MEDIAN MPO PROJ NUM LT-1

DESCR FUNDING CAT(S) 1,2UREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,363,647ROW PURCH $ 0 COST OF

CONSTR $ 27,829,548 APPROVEDCONST ENG $ 1,380,345 PHASES

CONTING $ 553,808 $ 19,010,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 1,040,825TOTAL CST $ 31,127,348

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2U $ 15,200,000 $ 3,800,000 $ 0 $ 0 $ 0 $ 19,000,0001 $ 8,000 $ 2,000 $ 0 $ 0 $ 0 $ 10,000TOTAL $ 15,208,000 $ 3,802,000 $ 0 $ 0 $ 0 $ 19,010,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 453: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

2019-2022Statewide TransportationImprovement ProgramVictoria MPOHighway Projects

Page 454: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 454 OF 696

10:03:31 AM VICTORIA MPO - HIGHWAY PROJECTS

FY 2020

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

YOAKUM VICTORIA VICTORIA 0088-05-098 2020 US 59 C,E VICTORIA $ 4,500,000LIMITS FROM US 87 PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO SH 185PROJECT CONTRUCT FRONTAGE ROAD MPO PROJ NUM 5

DESCR FUNDING CAT(S) 2UREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 234,596ROW PURCH $ 0 COST OF

CONSTR $ 4,787,681 APPROVEDCONST ENG $ 234,118 PHASES

CONTING $ 54,101 $ 4,500,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 5,310,496

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2U $ 3,600,000 $ 900,000 $ 0 $ 0 $ 0 $ 4,500,000TOTAL $ 3,600,000 $ 900,000 $ 0 $ 0 $ 0 $ 4,500,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 455: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 455 OF 696

10:03:31 AM VICTORIA MPO - HIGHWAY PROJECTS

FY 2021

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

YOAKUM VICTORIA VICTORIA 2350-01-060 2021 SL 463 C,E OTHER $ 4,000,000LIMITS FROM BU 59 PROJECT SPONSOR

REVISION DATE 07/2018LIMITS TO LONE TREE ROADPROJECT ADD 2 LANES MPO PROJ NUM 10

DESCR FUNDING CAT(S) 2UREMARKS PROJECT

P7 HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 219,008ROW PURCH $ 0 COST OF

CONSTR $ 4,469,556 APPROVEDCONST ENG $ 221,690 PHASES

CONTING $ 88,944 $ 4,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 167,161TOTAL CST $ 4,999,198

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2U $ 3,200,000 $ 800,000 $ 0 $ 0 $ 0 $ 4,000,000TOTAL $ 3,200,000 $ 800,000 $ 0 $ 0 $ 0 $ 4,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 456: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

2019-2022Statewide TransportationImprovement ProgramWaco MPOHighway Projects

Page 457: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 457 OF 696

10:03:31 AM WACO MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

WACO WACO MC LENNAN 2060-01-037 2019 FM 2113 E HEWITT $ 975,000LIMITS FROM FM 2063 (Sun Valley Blvd) PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO FM 1695 (Hewitt Dr)PROJECT Widen and add curb and gutter MPO PROJ NUM S-011

DESCR FUNDING CAT(S) 2UREMARKS Project under development, no current funding commi PROJECT

P7 tment HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 975,000ROW PURCH $ 0 COST OF

CONSTR $ 20,000,000 APPROVEDCONST ENG $ 975,000 PHASES

CONTING $ 10,000 $ 975,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 900,000TOTAL CST $ 21,960,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2U $ 0 $ 975,000 $ 0 $ 0 $ 0 $ 975,000TOTAL $ 0 $ 975,000 $ 0 $ 0 $ 0 $ 975,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

WACO WACO MC LENNAN 0258-09-142 2019 SH 6 E WACO $ 1,000,000LIMITS FROM US 84 PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO IH-35PROJECT Extend frontage roads and realign on and off ramps MPO PROJ NUM S-034A

DESCR FUNDING CAT(S) 2UREMARKS Project under development, no current funding commi PROJECT

P7 tment HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 1,000,000ROW PURCH $ 3,000,000 COST OF

CONSTR $ 20,000,000 APPROVEDCONST ENG $ 950,000 PHASES

CONTING $ 600,000 $ 1,000,000INDIRECT $ 250,000BOND FIN $ 0

PT CHG ORD $ 700,000TOTAL CST $ 25,800,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2U $ 0 $ 1,000,000 $ 0 $ 0 $ 0 $ 1,000,000TOTAL $ 0 $ 1,000,000 $ 0 $ 0 $ 0 $ 1,000,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

WACO WACO MC LENNAN 0258-08-035 2019 SH 6 E WACO $ 400,000LIMITS FROM SP 412 (McLauglin Rd) PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO FM 185 (Lady Bird Rd)PROJECT Widen to 4 lanes divided MPO PROJ NUM S-031A

DESCR FUNDING CAT(S) 2UREMARKS Project under development, no current funding commi PROJECT

P7 tment HISTORY TOTAL PROJECT COST INFORMATION

PREL ENG $ 400,000ROW PURCH $ 0 COST OF

CONSTR $ 8,200,000 APPROVEDCONST ENG $ 405,000 PHASES

CONTING $ 165,000 $ 400,000INDIRECT $ 85,000BOND FIN $ 0

PT CHG ORD $ 178,000TOTAL CST $ 9,255,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2U $ 0 $ 400,000 $ 0 $ 0 $ 0 $ 400,000TOTAL $ 0 $ 400,000 $ 0 $ 0 $ 0 $ 400,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 458: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 458 OF 696

10:03:31 AM WACO MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

WACO WACO MC LENNAN 0909-22-182 2019 CS C,E WACO $ 3,105,000LIMITS FROM N University Parks Drive PROJECT SPONSOR City of Waco

REVISION DATE 07/2018LIMITS TO Forrest Street / Garrison StreetPROJECT Construct continuous sidewalks, bike lane and streetscape improvements MPO PROJ NUM BP-001

DESCR FUNDING CAT(S) 9TAPREMARKS Project Name: Waco - Historic Elm Ave Bike/Ped Infr PROJECT TxDOT 2017 TASA Selection: Funding award through Transpor

P7 astructure HISTORY tation Commission minute order 115076 - October 26, 2017 TOTAL PROJECT COST INFORMATION

PREL ENG $ 121,500ROW PURCH $ 0 COST OF

CONSTR $ 2,943,000 APPROVEDCONST ENG $ 40,500 PHASES

CONTING $ 100,000 $ 3,105,000INDIRECT $ 100,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 3,305,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 2,484,000 $ 0 $ 0 $ 621,000 $ 0 $ 3,105,000TOTAL $ 2,484,000 $ 0 $ 0 $ 621,000 $ 0 $ 3,105,000

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

WACO WACO MC LENNAN 0909-22-181 2019 CS C,E WACO $ 593,170LIMITS FROM S 11th/S 12th - Garden Dr; Gurley - S 10th PROJECT SPONSOR City of Waco

REVISION DATE 07/2018LIMITS TO S 11th/S 12th - Columbus Ave; Gurley - S 27thPROJECT Construct continuous sidewalks along both roadways and bike lanes along South 11 MPO PROJ NUM BP-002 and BP-003

DESCR th St / South 12th St FUNDING CAT(S) 9TAPREMARKS Project Name: Waco - 11th / 12th St and Gurley Ln B PROJECT TxDOT 2017 TASA Selection: Funding award through Transpor

P7 ike/Ped Infrastructure HISTORY tation Commission minute order 115076 - October 26, 2017 TOTAL PROJECT COST INFORMATION

PREL ENG $ 23,211ROW PURCH $ 0 COST OF

CONSTR $ 562,222 APPROVEDCONST ENG $ 7,737 PHASES

CONTING $ 50,000 $ 593,170INDIRECT $ 50,000BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 693,170

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 474,536 $ 0 $ 0 $ 118,634 $ 0 $ 593,170TOTAL $ 474,536 $ 0 $ 0 $ 118,634 $ 0 $ 593,170

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

WACO WACO MC LENNAN 0015-01-243 2019 IH-35 C WACO $ 300,000,000LIMITS FROM South 12th Street PROJECT SPONSOR TxDOT

REVISION DATE 07/2018LIMITS TO North Loop 340PROJECT Reconstruct, widen mainlanes from 6 to 8, reconstruct and realign ramps and fron MPO PROJ NUM S-022B

DESCR tage roads FUNDING CAT(S) 2U,Other,6,12REMARKS Project represents phase one of CSJ 0015-01-171 PROJECT Frontage roads under construction between Univ Parks Dr (

P7 HISTORY FM 434) and US Business 77 TOTAL PROJECT COST INFORMATION

PREL ENG $ 15,843,500ROW PURCH $ 0 COST OF

CONSTR $ 300,000,000 APPROVEDCONST ENG $ 13,903,500 PHASES

CONTING $ 15,812,000 $ 300,000,000INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 345,559,000

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL2U $ 64,000,000 $ 16,000,000 $ 0 $ 0 $ 0 $ 80,000,0004 $ 72,000,000 $ 18,000,000 $ 0 $ 0 $ 0 $ 90,000,0006 $ 12,000,000 $ 3,000,000 $ 0 $ 0 $ 0 $ 15,000,00012 $ 92,000,000 $ 23,000,000 $ 0 $ 0 $ 0 $ 115,000,000TOTAL $ 240,000,000 $ 60,000,000 $ 0 $ 0 $ 0 $ 300,000,000

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER

Page 459: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

2019-2022Statewide TransportationImprovement ProgramWichita Falls MPOHighway Projects

Page 460: Statewide Transportation Improvement Programftp.dot.state.tx.us/pub/txdot-info/tpp/stip/2019-2022/highway.pdf · project reconstruct existing 2-lane highway to include center turn

TUESDAY, JULY 10, 2018 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 460 OF 696

10:03:31 AM WICHITA FALLS MPO - HIGHWAY PROJECTS

FY 2019

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

WICHITA FALLS WICHITA FALLS WICHITA 0903-03-116 2019 VA C,E WICHITA FALLS $ 2,589,495LIMITS FROM LOOP 11 ALONG WICHITA RIVER PROJECT SPONSOR CITY OF WICHITA FALLS

REVISION DATE 07/2018LIMITS TO LUCY PARKPROJECT CONSTRUCT NEW SHARED USE PATH AND ASSOCIATED WORK MPO PROJ NUM

DESCR FUNDING CAT(S) 9TAPREMARKS PROJECT NAME: WICHITA FALLS - LOOP 11 TO LUCY PARK PROJECT 2017 TASA state-selected; Commission approved 10/26/17 MO

P7 SUP HISTORY 115076 TOTAL PROJECT COST INFORMATION

PREL ENG $ 101,328ROW PURCH $ 0 COST OF

CONSTR $ 2,454,391 APPROVEDCONST ENG $ 33,776 PHASES

CONTING $ 26,111 $ 2,589,495INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,615,606

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 2,071,596 $ 0 $ 0 $ 517,899 $ 0 $ 2,589,495TOTAL $ 2,071,596 $ 0 $ 0 $ 517,899 $ 0 $ 2,589,495

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

WICHITA FALLS WICHITA FALLS WICHITA 0903-03-115 2019 VA C,E WICHITA FALLS $ 2,443,105LIMITS FROM ALONG BNSF RR CORRIDOR FROM BARNETT RD PROJECT SPONSOR CITY OF WICHITA FALLS

REVISION DATE 07/2018LIMITS TO SEYMOUR HWYPROJECT CONSTRUCT NEW CONCRETE SHARED USE PATH AND ASSOCIATED WORK. MPO PROJ NUM

DESCR FUNDING CAT(S) 9TAPREMARKS PROJECT NAME: WICHITA FALLS - BARNETT ROAD TO SEYMO PROJECT 2017 TASA state-selected; Commission approved 10/26/17 MO

P7 UR HWY SUP HISTORY 115076 TOTAL PROJECT COST INFORMATION

PREL ENG $ 95,600ROW PURCH $ 0 COST OF

CONSTR $ 2,315,640 APPROVEDCONST ENG $ 31,867 PHASES

CONTING $ 24,722 $ 2,443,105INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 2,467,829

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 1,954,484 $ 0 $ 0 $ 488,621 $ 0 $ 2,443,105TOTAL $ 1,954,484 $ 0 $ 0 $ 488,621 $ 0 $ 2,443,105

PENDING REVIEW

2019-2022 STIP 07/2018 Revision: Pending Approval

DISTRICT MPO COUNTY CSJ TIP FY HWY PHASE CITY YOE COST

WICHITA FALLS WICHITA FALLS WICHITA 0903-03-117 2019 VA C,E WICHITA FALLS $ 1,758,062LIMITS FROM ALONG NORTH SHORE OF LAKE WICHITA FROM 3600’ WEST OF LAKE WICHITA PARK PROJECT SPONSOR CITY OF WICHITA FALLS

REVISION DATE 07/2018LIMITS TO LAKE WICHITA PARKPROJECT CONSTRUCT NEW CONCRETE SHARED USE PATH AND ASSOCIATED WORK MPO PROJ NUM

DESCR FUNDING CAT(S) 9TAPREMARKS PROJECT NAME: WICHITA FALLS - L WICHITA, W OF L WIC PROJECT 2017 TASA state-selected; Commission approved 10/26/17 MO

P7 HITA PARK SUP HISTORY 115076 TOTAL PROJECT COST INFORMATION

PREL ENG $ 68,794ROW PURCH $ 0 COST OF

CONSTR $ 1,666,338 APPROVEDCONST ENG $ 22,931 PHASES

CONTING $ 24,722 $ 1,758,062INDIRECT $ 0BOND FIN $ 0

PT CHG ORD $ 0TOTAL CST $ 1,782,785

AUTHORIZED FUNDING BY CATEGORY/SHARECATEGORY FEDERAL STATE REGIONAL LOCAL LC TOTAL9TAP $ 1,406,450 $ 0 $ 0 $ 351,612 $ 0 $ 1,758,062TOTAL $ 1,406,450 $ 0 $ 0 $ 351,612 $ 0 $ 1,758,062

PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER