state transportation improvement program · division purchase order contract (dpoc) - in progress...
TRANSCRIPT
WILSON
WAYNE
JOHNSTON
EDGECOMBE
NASH
HALIFAX
701
117
70301
13
258
64
158
264301
64
30195
95
795
40
42
55
96
43
50
210
561
111
231
484
97
33
125
222
42
581
111
Wilson
RoanokeRapids
Tarboro
RockyMount
Smithfield
Clayton
Goldsboro
AV-5740
AV-5745
W-5107
B-4933
B-5657
B-5660
B-5654
B-4562
B-5659
B-5124B-5658
B-4839
B-5656
W-5500
R-5719U-5796
R-3822B
R-5722
U-5026
I-5842
I-5782
U-4753
I-5724
U-2714U-3609A
U-3334B
U-3621A
R-5718
R-3822A
U-5726
EB-5729
U-5725
U-3609B
U-3330EB-5761
EB-5711
I-5781
U-4407
I-5816
I-5817
I-5841
EB-5762
R-5720
I-5728
I-3318BB
R-3410B R-3618
U-5794
U-3464
I-5727
I-5742
R-3825B
I-5725
U-3611
I-5818
R-3410AW-5600
I-5726
I-5784
I-5783
I-5786
I-5723 U-5724
I-4739
EB-5707
U-5795
EB-5731
U-3331EB-5763
U-4762
I-5111BB
I-5761
DRAFT STIPFY 2015-2025STI ProjectsDIVISION 4
0 10 205Miles
BRIDGES FUNDED THROUGH STI
STATEWIDE AVIATION
REGIONAL AVIATION
DIVISION AVIATION
DIVISION FERRYREGIONAL RAILDIVISION RAILREGIONAL TRANSITDIVISION TRANSITSAFETYTRANSITION *TRANSITION *INTERSTATE MAINTENANCESTATEWIDE HIGHWAYREGIONAL HIGHWAYDIVISON HIGHWAYDIVISION BIKE/PEDESTRIANINTERSTATE ROUTEUS ROUTENC ROUTESECONDARY ROADUNDER CONSTRUCTIONMUNICIPAL BOUNDARIESMILITARY BASENCDOT DIVISION BOUNDARYCOUNTY BOUNDARYWATER FEATURES
* Note: Reflects 108 of the Major Transition ProjectsNote: FY 2015 projects represent major projects not
let as of November 2014
COUNTY
FUTURE YEARS
F
NHPB - National Highway Performance Program (Bridge)NHPIM - National Highway Performance Program (Interstate Maintenance)O - OthersRR - Rail-Highway SafetyS (M) - State MatchSRTS - Safe Routes to School
FLPI - Federal Lands Program (Indian Reservation Roads) STP - Surface Transportation ProgramHFB - Highway Fund Bridge Replacement Program STPDA - Surface Transportation Program - Direct AttributableHP - Federal-Aid High Priority STPEB - Surface Transportation Program, Enhancements (Bike)
STPON - Surface Transportation Program Bridge (On System Bridge)STPOFF -Surface Transportation Program (Off System Bridge) PE - Preliminary EngineeringT - State Highway Trust Funds
NHP - National Highway Performance Program TAP - Transportation Alternatives Program RG - Right of Way (GARVEE)
SW - StatewideTRN -Transition Project
S - StructureU - Utilities
I - ImplementationL - LandscapingM - MitigationO - OperationsP - Paving
WAKE
NUMBERLENGTH (MILES)
DIVISION 00
R-0000
IDROUTE/CITY
US or NC RoutesON NEW LOCATION. I - InterstateWITH A BYPASS OF HOMETOWN ROUTE/CITY
Project termini and a general
SW
M1500
A
NHP
4000
FUNDING CATEGORY (1)
used for each project phase.
FUNDING SOURCE (2)
U
B3000R
FY 2017
C
(3) WORK TYPE (ACTIVITY)
A - Acquisition
with proposed work type or activity beginning in the initial scheduled year. (Estimates are in thousand of
For other work types or activities see Work Type (Activity) box below.
dollars.)
of a project segment indicates (Cash-Flow Funding) COMMITMENTSFUTURE
SW CBSW
One or two letter
HIGHWAY PROGRAM
UNFUNDED
NC 3 TO SR 1003SR 1003 TO NC 96
ASW
UNFUNDED
20000CRC 5000C 5000 BC B
WIDEN TO A FOUR-LANE FACILITY
A
NC 00 R7.3 R25063,450I-40 TO NC 96 EAST OF HOMETOWN.
B
FY 2025 FY 2018
700
FY 2019
DEVELOPMENTAL PROGRAMSTATE TRANSPORTATION IMPROVEMENT PROGRAM
FY 2020FY 2015 FY 2016
M
TOTAL PROJECT
COST (THOU)
NHPNHP
FUN
DS
A
PRIOR YEARS COST
(THOU)
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
U 5000NHP
C10000
FY 2021
C
FY 2023 FY 2024
FY 2022
5000
9000
APD - Appalachian Development
NHPNHP
LOCATION / DESCRIPTION NHP
NHP
I-40 TO NC 3
Preliminary engineering, Right of Way, Mitigation, Utilities or Construction. break.
work description.
way, utility, mitigation and construction cost estimates
See Highway Funding Key
any project breaks.Category for the project andIdentifies the "STI" Funding
by funding category in current dollars. Cost may include one or more funding types. Multi-year funding
for an explanation of funding categories
Phases of implementation: ESTIMATED COST Preliminary engineering, right of
(1) FUNDING CATEGORY
PROJECT BREAKS
designation for project
LOCATION / DESCRIPTION
SR - Secondary Road
IDENTIFICATION NUMBER Assigned to each project at conception and remains with
BVarious - multiple routesNEW ROUTE or City
WORK TYPE (ACTIVITY) (3)
BOND (R) - Revenue Bond
HRRR - High Risk Rural Roads
L - LocalHSIP - Highway Safety Improvement Program
project until completion.
DIV - DivisionEX - Exempt
REG - RegionalHF - State Dollars (Non-STI)
F - Feasibility StudyCG - Construction (GARVEE)C - Construction
G - Grading and Structures
R - Right of Way
(2) FUNDING KEY FOR HIGHWAY FUNDING SOURCES
ER - Emergency Relief Funds
CMAQ - Congestion MitigationDP - Discretionary or Demonstration
FED - Federal Rail Funds
HIGHWAY PROGRAMDIVISION 4
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025URBAN PROJECTS
U-4762 6504US 64 ALTERNATE TO SR 1243 (LEGGETT ROAD). WIDEN TO MULTI-LANES.
1.25
DIV
T R 1023 T U 123 T 5358C
EDGECOMBE SR 1250(SPRINGFIELD ROAD)
FEASIBILITY STUDIES
SCHEDULED FOR FEASIBILITY STUDY
FS-1504A SR 1003 (ROLESVILLE ROAD) IN WAKE COUNTY TO US 17 IN WILLIAMSTON. UPGRADE TO INTERSTATE STANDARDS.
86.5EDGECOMBEFRANKLINMARTINNASHWAKE
US 64
FEDERAL BRIDGE PROJECTSB-4931 3472REPLACE BRIDGE NO. 22 OVER TOWN
CREEK.
HF
HFB 315R HFB 7M HFB 3150C
EDGECOMBE US 258
B-4933 7160 200REPLACE BRIDGE NO. 80 OVER TAR RIVER. REPLACE BRIDGE NO. 49 OVER TAR RIVER OVERFLOW.REG
T 860R T 3050C C 3050
EDGECOMBE NC 33
B-4932 6526 225REPLACE BRIDGE NO. 28 OVER TAR RIVER.
HF
HFB R 1000 HFB M 1 HFB C 5300
EDGECOMBE NC 42
B-5671 3135REPLACE BRIDGE NO. 87 OVER SWIFT CREEK.
HF
HFB 285R HFB 2850C
EDGECOMBE NC 97
B-5655 3135REPLACE BRIDGE NO. 11 OVER TOWN CREEK.
HF
HFB R 285 HFB 2850C
EDGECOMBE NC 111/NC 122
UNDER CONSTRUCTION - PART OF BD-5104 PROJECT
B-5316 720 720REPLACE BRIDGE NO. 59 OVER TRIBUTARY OF COKEY SWAMP.
DIV
EDGECOMBE SR 1006(BULLUCK SCHOOLROAD)
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5104 17209 15209DIVISION 4 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.
DIV
STPOFF 200R STPOFF 1800C
EDGECOMBEHALIFAXJOHNSTONNASHWAYNEWILSON
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4904 12135 12135ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 4 PROJECT MITIGATION.
EDGECOMBEHALIFAXJOHNSTONNASHWAYNEWILSON
VARIOUS
4-7 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 4
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025HAZARD ELIMINATION PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5204 2477 2477DIVISION 4 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
EDGECOMBEHALIFAXJOHNSTONNASHWAYNEWILSON
VARIOUS
CONGESTION MITIGATION PROJECTSC-5616 898PROJECTS TO IMPROVE CONGESTION AND
AIR QUALITY IN THE ROCKY MOUNT MPO.EX
CMAQ C 449 C 449 EDGECOMBENASH
VARIOUS
C-5619 744PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE UPPER COASTAL PLAIN RPO.
EX
CMAQ C 372 C 372 EDGECOMBEJOHNSTONNASH
VARIOUS
UNDER CONSTRUCTION
C-5112 6382 6382EXPANSION AND UPGRADE OF TRAFFIC SIGNAL SYSTEM IN ROCKY MOUNT.
EX
EDGECOMBENASH
ROCKY MOUNT
C-4970 286 286INTERSECTION IMPROVEMENTS AT VARIOUS LOCATIONS.
EX A RALEIGH STREET AND EAST GRAND AVENUE-FAIRFIELD ROAD - UNDER CONSTRUCTIONEXB ATLANTIC AVENUE AND THOMAS STREET - UNDER CONSTRUCTIONEXC GEORGE STREET AND TARBORO STREET - UNDER CONSTRUCTIONEXD BENVENUE ROAD AND TIFFANY BOULEVARD - COMPLETEEXE SUNSET AVENUE AND BUCK LEONARD BOULEVARD - COMPLETE
EDGECOMBENASH
ROCKY MOUNT
UNDER CONSTRUCTION
C-5113 240 240MAIN STREET SIGNAL SYNCHRONIZATION.EX
EDGECOMBE TARBORO
ENHANCEMENT (CALL PROJECTS)E-5501 224FREEDOM ROADS. INSTALL INTERACTIVE
WAYSIDE SIGNAGE FOR DESIGNATED SITES.
TRN
STPE 96C O 128C
ALAMANCEBEAUFORTBRUNSWICKBUNCOMBECAMDENCHOWANCRAVENDAREDURHAMEDGECOMBEGUILFORDHALIFAXLENOIRPASQUOTANKWASHINGTONWAYNE
VARIOUS
INTERSTATE PROJECTSI-5724 1100NASH COUNTY LINE TO SR 1226 (BELLAMY
LAKE ROAD). PAVEMENT REHABILITATION.2
SW
NHPIM C 1100 HALIFAX I-95
4-8 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 4
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025RURAL PROJECTS
R-3822 7126NC 125 TO SOUTH OF US 158. CONSTRUCT TWO-LANE FACILITY ON NEW LOCATION
1.5
DIV
T R 1225 A T R 150 B T U 147 A T 1500C B T 4104C A
A SOUTH OF PROPOSED BRIDGE OVER CHOCKOYOTTE CREEK TO NC 125, CONSTRUCT TWO-LANE FACILITY ON NEW LOCATION.DIVB PROPOSED BRIDGE OVER CHOCKOYOTTE CREEK TO SERVICE ROAD/ PREMIER BOULEVARD, CONSTRUCT TWO-LANE FACILITY ON NEW LOCATION.DIV
HALIFAX NEW ROUTE
URBAN PROJECTSU-5725 20526I-95 TO OLD FARM ROAD. WIDEN TO MULTI-
LANES.1.65
REG
T 7945R T 953U T 11628C
HALIFAX NC 125
FEASIBILITY STUDIES
PROGRAMMED FOR PLANNING AND ENVIRONMENTAL STUDY ONLY
I-5133 10034 10034CORRIDOR PLANNING AND FINANCE STUDY. SOUTH CAROLINA STATE LINE TO THE VIRGINIA STATE LINE.
CUMBERLANDHALIFAXHARNETTJOHNSTONNASHNORTHAMPTONROBESONWILSON
I-95
FEDERAL BRIDGE PROJECTSB-5662 1100REPLACE BRIDGE NO. 93 OVER
CONOCONNARA SWAMP.HF
HFB R 100 HFB 1000C
HALIFAX NC 561
B-4761 1910 240REPLACE BRIDGE NO. 29 OVER LITTLE FISHING CREEK.
HF
HFB 160R HFB 10U HFB C 1500
HALIFAX NC 561
DIVISION PURCHASE ORDER CONTRACT
B-5657 617REPLACE BRIDGE NO. 15 OVER BEAVERDAM SWAMP.
DIV
STPOFF 29R STPOFF 588C
HALIFAX SR 1001(JUSTICE BRANCHROAD)
B-4537 1110 9REPLACE BRIDGE NO. 127 OVER JACKET SWAMP.
HF
HFB R 100 HFB M 1 HFB C 1000
HALIFAX SR 1002(RINGWOOD ROAD)
B-4935 575REPLACE BRIDGE NO. 120 OVER BRANCH OF DEEP CREEK.
HF
HFB R 50 HFB C 525
HALIFAX SR 1003(MOONLIGHT ROAD)
B-5660 1436REPLACE BRIDGE NO. 65 OVER DEEP CREEK.
DIV
STPOFF 68R STPOFF C 1368
HALIFAX SR 1100(BELLS BRIDGEROAD)
DIVISION PURCHASE ORDER CONTRACT
B-5665 259REPLACE BRIDGE NO. 138 OVER LITTLE FISHING CREEK.
HF
HFB 25R HFB C 234
HALIFAX SR 1309(SPRUILLS BRIDGE ROAD)
4-9 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 4
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS
DIVISION PURCHASE ORDER CONTRACT
B-5672 1058REPLACE BRIDGE NO. 134 OVER BEAR SWAMP.
HF
HFB 100R HFB C 958
HALIFAX SR 1310(AIRLIE ROAD)
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5104 17209 15209DIVISION 4 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.
DIV
STPOFF 200R STPOFF 1800C
EDGECOMBEHALIFAXJOHNSTONNASHWAYNEWILSON
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4904 12135 12135ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 4 PROJECT MITIGATION.
EDGECOMBEHALIFAXJOHNSTONNASHWAYNEWILSON
VARIOUS
HAZARD ELIMINATION PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5204 2477 2477DIVISION 4 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
EDGECOMBEHALIFAXJOHNSTONNASHWAYNEWILSON
VARIOUS
ENHANCEMENT (CALL PROJECTS)E-5501 224FREEDOM ROADS. INSTALL INTERACTIVE
WAYSIDE SIGNAGE FOR DESIGNATED SITES.
TRN
STPE 96C O 128C
ALAMANCEBEAUFORTBRUNSWICKBUNCOMBECAMDENCHOWANCRAVENDAREDURHAMEDGECOMBEGUILFORDHALIFAXLENOIRPASQUOTANKWASHINGTONWAYNE
VARIOUS
INTERSTATE PROJECTS
PLANNING/DESIGN IN PROGRESS - COORDINATE WITH I-5111
I-4739 9361 2691ACCESS IMPROVEMENTS IN THE VICINITY OF EXISTING I-40/NC 42 INTERCHANGE.
2
SW
NHP R 920 NHP C 2875 2875C
JOHNSTON I-40
I-5817 7601.8 MILES EAST OF SR 1010 (CLEVELAND ROAD) TO 1 MILE EAST OF SR 1525 (CORNWALLIS ROAD). PAVEMENT REHABILITATION.
1SW
NHPIM C 760 JOHNSTON I-40
4-10 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 4
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025INTERSTATE PROJECTS
I-5816 2042WAKE COUNTY LINE TO 0.5 MILE EAST OF NC 42. PAVEMENT REHABILITATION.
2SW
NHPIM C 2042 JOHNSTON I-40
I-5783 25SR 1211 (MORGAN ROAD) TO SAMPSON COUNTY LINE. PAVEMENT REHABILITATION.
10.6SW
NHPIM C 25 JOHNSTON I-40
I-5782 8500.3 MILE EAST OF I-95 TO SR 1211 (MORGAN ROAD). PAVEMENT REHABILITATION.
1SW
NHPIM C 850 JOHNSTON I-40
I-5781 29001.1 MILES EAST OF NC 242 TO 0.3 MILES EAST OF I-95. PAVEMENT REHABILITATION.
1.6SW
NHPIM C 2900 JOHNSTON I-40
I-5723 22600.6 MILES EAST OF SR 1211 (MORGAN ROAD) IN JOHNSTON COUNTY TO 2 MILES EAST OF JOHNSTON COUNTY LINE IN SAMPSON COUNTY. PAVEMENT REHABILITATION.
12.6
SW
NHPIM C 2260 JOHNSTONSAMPSON
I-40
PLANNING / DESIGN IN PROGRESS - COORDINATE WITH R-2828 AND R-2829
I-5111 157009 2594I-440 / US 64 (EXIT 301) TO NC 42 (EXIT 312). ADDITIONAL LANES AND ITS DEPLOYMENT ON ALTERNATE ROUTES FOR TRAFFIC MANAGEMENT.
11 NHP R 5000 A NHP M 566 A NHP C 13250 A C 13250 A C 13250 A 13250C A NHP R 7500 BA R 7500 BA NHP M 849 BA NHP C 10750 BA C 10750 BA C 10750 BA 10750C BA NHP R 7500 BB R 7500 BB NHP C 7334 BB C 7333 BB C 7333 BB
A I-440 / US 64 (EXIT 301) TO US 70 BUSINESS (EXIT 306)SWBA US 70 BUSINESS (EXIT 306) TO JOHNSTON COUNTY LINESWBB WAKE COUNTY LINE TO NC 42REG
JOHNSTONWAKE
I-40
I-5786 1600.4 MILE NORTH OF US 70 BYPASS TO 0.2 MILE NORTH OF NC 222. PAVEMENT REHABILITATION.
11.4SW
NHPIM C 160 JOHNSTON I-95
I-5784 9000SR 1162 (BLACK CREEK ROAD) TO 0.4 MILE NORTH OF US 70 BYPASS. PAVEMENT REHABILITATION.
9.7SW
NHPIM C 9000 JOHNSTON I-95
I-5303 4650JOHNSTON COUNTY LINE (MILE POST 77) TO EAST OF I-40 (MILE POST 84). PAVEMENT REHABILITATION.
6.1SW
NHPIM 4650C JOHNSTON I-95
PLANNING/DESIGN IN PROGRESS
I-3318 30858 13358US 70 (EXIT 97) TO US 301 (EXIT 107). PAVEMENT AND BRIDGE REHABILITATION.
10.7 NHPIM 5000C BA NHPIM C 12500 BB
A US 70 (EXIT 97) TO NORTH OF SR 1001 (MILEPOST 100) - COMPLETEBA NORTH OF SR 1001 (MILEPOST 100) TO US 301 (EXIT 107)BB REPLACE BRIDGE NO. 114 AND BRIDGE NO. 116 AND APPROACHES OVER LITTLE RIVER - RIGHT OF WAY IN PROGRESSTRN
JOHNSTON I-95
RURAL PROJECTS
PLANNING/DESIGN IN PROGRESS - "A" COMPLETE
R-3825 30196 9896US 70 TO SR 1003 (BUFFALOE ROAD). WIDEN TO MULTI-LANES.
6 T R 3100 B T C 17200 B
A US 70 AT CLAYTON TO EAST OF SR 1902 (GLEN LAUREL ROAD) - COMPLETEB EAST OF SR 1902 (GLEN LAUREL ROAD) TO SR 1003 (BUFFALOE ROAD)DIV
JOHNSTON NC 42
R-3410 90958NC 50 TO US 70 BUSINESS. WIDEN TO MULTI-LANES.
8
REG
T 9134R A T 1096U A T 15236C A C 15236 A C 15237 AT 5562R B T 667U B T 9597C B C 9597 B C 9596 B
A US 70 BYPASS TO US 70 BUSINESS, WIDEN TO MULTI-LANESREGB NC 50 TO US 70 BYPASS, WIDEN TO MULTI-LANESREG
JOHNSTON NC 42
R-5718 7239US 70 TO SR 1934 (OLD BEULAH ROAD). WIDEN TO THREE LANES.
1.3
DIV
NHP R 560 NHP U 67 NHP 6612C
JOHNSTON SR 1003(BUFFALO ROAD)
4-11 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 4
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025RURAL PROJECTS
R-5722 1079SR 1501 (SWIFT CREEK ROAD) TO EAST OF SR 1908 (FIRE DEPARTMENT ROAD). INTERSECTION IMPROVEMENTS AT WILSON'S MILLS ELEMENTARY SCHOOL.
0.3
DIV
T R 192 T U 23 T C 864
JOHNSTON SR 1913(WILSON'S MILLS ROAD)
PLANNING / DESIGN IN PROGRESS - NORTH CAROLINA TURNPIKE AUTHORITY PROJECT - COORDINATE WITH I-5111
R-2829* 478907 6635EASTERN WAKE FREEWAY / TRIANGLE EXPRESSWAY SOUTHEAST EXTENSION (RALEIGH OUTER LOOP), I-40 TO US 64 / US 264 BYPASS. FREEWAY ON NEW LOCATION.
10.8
SW
BOND R R 18800T R 18800BOND R U 1550T U 1550BOND R 16273M BOND R 150865C T 264434C
JOHNSTONWAKE
NEW ROUTE(FUTURE NC 540)
PLANNING / DESIGN IN PROGRESS - NORTH CAROLINA TURNPIKE AUTHORITY DESIGN-BUILD PROJECT - COORDINATE WITH I-5111
R-2828* 550265 16952SOUTHERN WAKE FREEWAY / TRIANGLE EXPRESSWAY SOUTHEAST EXTENSION (RALEIGH OUTER LOOP), US 401 TO I-40. CONSTRUCT FREEWAY ON NEW LOCATION.
8.7
SW
BOND R 15300R T 22800R T 2000U BOND R 30363M BOND R 67917C67917C C 67916 T 86367C86367C C 86366
JOHNSTONWAKE
NEW ROUTE(FUTURE NC 540)
R-3618 30548SR 1553 (SHOTWELL ROAD) SOUTHWEST OF US 70 TO NC 42 EAST OF CLAYTON. CONSTRUCT TWO LANE ROAD ON MULTI-LANE RIGHT OF WAY.
5
DIV
T R 6665 R 6665T U 1600 T 15618C
JOHNSTON NEW ROUTE
URBAN PROJECTSU-3464 31956NC 96 TO SR 1007 (BRODGEN ROAD).
WIDEN TO MULTI-LANES.3.7
REG
NHP 8480R NHP 1018U NHP 14972C C 7486
JOHNSTON US 301NC 96
U-5726 13317SR 1623 (BOOKER DAIRY ROAD) TO SR 2302 (RICKS ROAD). CONSTRUCT ACCESS MANAGEMENT IMPROVEMENTS.
1.6
REG
NHP 2704R NHP 324U NHP 5144C C 5145
JOHNSTON US 301NC 39NC 96
U-3334 32441 22051US 70 BUSINESS WEST OF SMITHFIELD TO US 301 (BRIGHT LEAF BOULEVARD) IN SMITHFIELD. CONSTRUCT TWO LANE ROAD, PART ON NEW LOCATION.
3.7
DIV
T R 4090 B T C 6300 B
A US 70 BUSINESS TO SR 1003 (BUFFALO ROAD) - COMPLETEB SR 1003 (BUFFALO ROAD) TO US 301 (BRIGHTLEAF BOULEVARD)DIV
JOHNSTON SR 1923(BOOKER DAIRYROAD EXTENSION)
U-5795 3984US 70 TO US 301. WIDEN TO THREE LANES. 0.8
DIV
T R 605 T U 73 T 3306C
JOHNSTON SR 2302(RICKS ROAD)
FORMERLY U-9999B - IN PROGRESS
U-4850 13569 7569CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION (CAMPO) PLANNING (PL) SUPPLEMENT.
DIV
STPDA 1200PE PE 1200 PE 1200 PE 1200 L 300PE PE 300 PE 300 PE 300
FRANKLINGRANVILLEHARNETTJOHNSTONWAKE
VARIOUS
4-12 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 4
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025URBAN PROJECTS
U-4735 74634CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION (CAMPO) STPDA FUNDS - RESERVED FOR FUTURE PROGRAMMING.
DIV
STPDA C 7956 C 11113 11113C11113C11113C C 11113 C 11113FRANKLINGRANVILLEHARNETTJOHNSTONWAKE
VARIOUS
PLANNING, DESIGN, RIGHT OF WAY AND CONSTRUCTION BY OTHERS - IN PROGRESS.
U-5118 20820 13485OPERATIONAL IMPROVEMENTS FOR SAFETY AND CONGESTION MITIGATION.
DIV
STPDA 500R R 100 L 100R R 25 STPDA 4500C C 788 O 1125C C 197
FRANKLINGRANVILLEHARNETTJOHNSTONWAKE
VARIOUS
FEASIBILITY STUDIES
PROGRAMMED FOR PLANNING AND ENVIRONMENTAL STUDY ONLY
I-5133 10034 10034CORRIDOR PLANNING AND FINANCE STUDY. SOUTH CAROLINA STATE LINE TO THE VIRGINIA STATE LINE.
CUMBERLANDHALIFAXHARNETTJOHNSTONNASHNORTHAMPTONROBESONWILSON
I-95
FEDERAL BRIDGE PROJECTSB-4937 10200REPLACE BRIDGE NO. 118 AND BRIDGE NO.
119 OVER CSX RAILROAD.HF
HFB R 900 HFB 9300C
JOHNSTON I-95
B-5663 1210REPLACE BRIDGE NO. 46 OVER MILL CREEK.
HF
HFB 110R HFB 1100C
JOHNSTON SR 1124(REEDY PONDCHURCH ROAD)
B-4770 2545 100REPLACE BRIDGE NO. 32 OVER HANNAH CREEK.
HF
HFB R 220 HFB C 2225
JOHNSTON SR 1185(JOYNER BRIDGEROAD)
B-4771 2741 100REPLACE BRIDGE NO. 11 OVER MILL CREEK.
HF
HFB R 240 HFB M 1 HFB C 2400
JOHNSTON SR 1201(RICHARDSON BRIDGEROAD)
B-5654 634REPLACE BRIDGE NO. 141 OVER WHITE OAK CREEK.
DIV
STPOFF R 30 STPOFF 302C302C
JOHNSTON SR 1550(WINSTON ROAD)
B-5664 1980REPLACE BRIDGE NO. 145 OVER SWIFT CREEK.
HF
HFB 180R HFB 1800C
JOHNSTON SR 1555(BARBOUR MILLROAD)
DIVISION PURCHASE ORDER CONTRACT
B-5659 326REPLACE BRIDGE NO. 432 OVER CATTAIL CREEK.
DIV
STPOFF R 16 STPOFF 155C155C
JOHNSTON SR 1738(EATMON ROAD)
4-13 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 4
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS
DIVISION PURCHASE ORDER CONTRACT
B-5661 1020REPLACE BRIDGE NO. 243 OVER LITTLE RIVER.
HF
HFB 95R HFB C 925
JOHNSTON SR 2123(OLD DAM ROAD)
B-4562 1384 9REPLACE BRIDGE NO. 216 OVER LITTLE BUFFALO CREEK.
DIV
STPOFF 125R STPOFF C 625 C 625
JOHNSTON SR 2143(BEULAHTOWN ROAD)
DIVISION PURCHASE ORDER CONTRACT
B-5667 782REPLACE BRIDGE NO. 231 OVER LITTLE BUFFALO CREEK.
HF
HFB 70R HFB C 712
JOHNSTON SR 2159(BOTTLENECK ROAD)
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5104 17209 15209DIVISION 4 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.
DIV
STPOFF 200R STPOFF 1800C
EDGECOMBEHALIFAXJOHNSTONNASHWAYNEWILSON
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4904 12135 12135ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 4 PROJECT MITIGATION.
EDGECOMBEHALIFAXJOHNSTONNASHWAYNEWILSON
VARIOUS
HAZARD ELIMINATION PROJECTSW-5107 18649 1750SR 2305 (FIRETOWER ROAD) TO EAST OF SR
2310 (DAVIS MILL ROAD/STEVENS CHAPEL ROAD). SAFETY IMPROVEMENTS.SW
HSIP 5633C C 5633 C 5633 JOHNSTON US 70
W-5600 30914US 70 BUSINESS TO NEUSE RIVER BRIDGE. CONVERT TO FREEWAY WITH INTERCHANGES AT SR 1501 (SWIFT CREEK ROAD) AND SR 1919 (WILSON'S MILLS ROAD).DIV
HSIP R 4380 HSIP U 526 HSIP C 8669 8670C8669C
JOHNSTON US 70
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5204 2477 2477DIVISION 4 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
EDGECOMBEHALIFAXJOHNSTONNASHWAYNEWILSON
VARIOUS
CONGESTION MITIGATION PROJECTSC-5565 4422TRIANGLE J COUNCIL OF GOVERNMENTS
TRANSPORTATION DEMAND MANAGEMENT PROGRAM - PHASE II.
EX
CMAQ 482I A I 572 A I 620 A I 640 A L 430I A I 496 A I 579 A I 603 A
A DEVELOP FLEXIBLE WORK SCHEDULES IN CAMPO AREA.EXB DEVELOP FLEXIBLE WORK SCHEDULES IN DCHC AREA.
CHATHAMDURHAMFRANKLINGRANVILLEJOHNSTONORANGEWAKE
VARIOUS
4-14 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 4
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025CONGESTION MITIGATION PROJECTS
C-5604 11695PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE CAPITAL AREA MPO.
EX
CMAQ C 5857 C 5838 FRANKLINGRANVILLEJOHNSTONWAKE
VARIOUS
C-5619 744PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE UPPER COASTAL PLAIN RPO.
EX
CMAQ C 372 C 372 EDGECOMBEJOHNSTONNASH
VARIOUS
INTERSTATE PROJECTSI-5725 49401 MILE NORTH OF NC 58 TO SR 1700 (OAK
LEVEL ROAD). PAVEMENT REHABILITATION.4.6
SW
NHPIM C 4940 NASH I-95
I-5726 3915SR 1524 (RED OAK-BATTLEBORO ROAD) TO HALIFAX COUNTY LINE. PAVEMENT REHABILITATION.
7.9SW
NHPIM C 3915 NASH I-95
I-5761 19001.1 MILES NORTH OF SR 1603 (OLD CARRIAGE ROAD) TO 1.7 MILES NORTH OF SR 1700 (OAK LEVEL ROAD). PAVEMENT REHABILITATION.
1.7SW
NHPIM C 1900 NASH I-95
I-5841 2500SR 1745 (BEND OF THE RIVER ROAD) TO 1 MILE NORTH OF NC 58. PAVEMENT REHABILITATION.
2.6SW
NHPIM C 2500 NASH I-95
RURAL PROJECTSR-5720 30708SR 1003 (RED OAK ROAD) TO SR 1603 (OLD
CARRIAGE ROAD). WIDEN TO MULTI-LANES.2.5
DIV
T R 6126 6126R T U 735 735U T 5662C5662C C 5662
NASH SR 1770(EASTERN AVENUE)
COMPLETE - GARVEE BOND FUNDING $32.1 MILLION; PAYBACK FY 2008-2019
R-2823 68894 54810SR 1604 (HUNTER HILL ROAD) TO US 301 IN ROCKY MOUNT. WIDEN TO MULTI-LANES, PART ON NEW LOCATION.
4.5
TRN
STP RG 505 RG 505 RG 505 RG 505 STP CG 3016 CG 3016 CG 3016 CG 3016
NASH ROCKY MOUNTNORTHERN CONNECTOR
URBAN PROJECTS
PLANNING/DESIGN IN PROGRESS
U-5026 43000 200SR 1770 (SUNSET AVENUE). CONVERT GRADE SEPARATION TO AN INTERCHANGE.
DIV
NHP R 9000 R 9000 NHP 8266C8267C8267C
NASH I-95
PLANNING/DESIGN IN PROGRESS
U-3330 34614 1941NC 43/NC 48 (BENVENUE ROAD) TO SR 1836 (MAY DRIVE) IN ROCKY MOUNT. ADD AN ADDITIONAL LANE IN EACH DIRECTION.
2.3
REG
NHP 3563R R 3562 NHP 3625U NHP M 23 NHP C 7300 C 7300 C 7300
NASH US 301 BYPASS
PLANNING/DESIGN IN PROGRESS
U-3621 28324 20524SR 1613 (NORTH WINSTEAD AVENUE) TO NC 43/NC 48 (BENVENUE ROAD) IN ROCKY MOUNT. WIDEN TO MULTI-LANES.
2.4 T R 1800 A T C 2000 A C 2000 A C 2000 A
A SR 1613 (NORTH WINSTEAD AVENUE) TO SR 1616 (COUNTRY CLUB ROAD)DIVB SR 1616 (COUNTRY CLUB ROAD) TO NC 43/NC 48 (BENVENUE ROAD) - UNDER CONSTRUCTION
NASH SR 1604(HUNTER HILL ROAD)
UNDER CONSTRUCTION
U-3331 17851 17851US 64 BUSINESS TO SR 1541 (JEFFREYS ROAD) IN ROCKY MOUNT. WIDEN TO MULTI-LANES.
1.1
TRN
NASH SR 1616(COUNTRY CLUB ROAD)
4-15 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 4
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEASIBILITY STUDIES
PROGRAMMED FOR PLANNING AND ENVIRONMENTAL STUDY ONLY
I-5133 10034 10034CORRIDOR PLANNING AND FINANCE STUDY. SOUTH CAROLINA STATE LINE TO THE VIRGINIA STATE LINE.
CUMBERLANDHALIFAXHARNETTJOHNSTONNASHNORTHAMPTONROBESONWILSON
I-95
SCHEDULED FOR FEASIBILITY STUDY
FS-1504A SR 1003 (ROLESVILLE ROAD) IN WAKE COUNTY TO US 17 IN WILLIAMSTON. UPGRADE TO INTERSTATE STANDARDS.
86.5EDGECOMBEFRANKLINMARTINNASHWAKE
US 64
FEDERAL BRIDGE PROJECTSB-5670 5118REPLACE BRIDGE NO. 29 OVER TAR RIVER.
HF
HFB 465R HFB 3M HFB C 4650
NASH US 64 ALTERNATE
RIGHT OF WAY IN PROGRESS
B-5124 6804 704REPLACE BRIDGE NO. 151 OVER SWIFT CREEK, BRIDGE NO. 141 AND BRIDGE NO. 85 OVER SWIFT CREEK OVERFLOW.REG
STPON 6100C NASH US 301
B-5668 1430REPLACE BRIDGE NO. 103 OVER TRIBUTARY OF TURKEY CREEK.
HF
HFB 130R HFB 1300C
NASH SR 1105(OLD MIDDLESEX ROAD)
B-5669 1626REPLACE BRIDGE NO. 143 OVER STONEY CREEK.
HF
HFB 150R HFB 1M HFB 1475C
NASH SR 1302(VICK ROAD)
DIVISION PURCHASE ORDER CONTRACT
B-5658 660REPLACE BRIDGE NO. 126 OVER BIG PEACHTREE CREEK.
DIV
STPOFF 31R STPOFF C 315 C 314
NASH SR 1310(TAYLOR'S GIN ROAD)
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5104 17209 15209DIVISION 4 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.
DIV
STPOFF 200R STPOFF 1800C
EDGECOMBEHALIFAXJOHNSTONNASHWAYNEWILSON
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4904 12135 12135ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 4 PROJECT MITIGATION.
EDGECOMBEHALIFAXJOHNSTONNASHWAYNEWILSON
VARIOUS
4-16 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 4
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025HAZARD ELIMINATION PROJECTS
UNDER CONSTRUCTION
W-5108 1175 1175NORTH OF SR 1845 (PORTER ROAD) TO BURROWS STREET. SAFETY IMPROVEMENTS.
6.6TRN
NASH US 301
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5204 2477 2477DIVISION 4 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
EDGECOMBEHALIFAXJOHNSTONNASHWAYNEWILSON
VARIOUS
CONGESTION MITIGATION PROJECTSC-5616 898PROJECTS TO IMPROVE CONGESTION AND
AIR QUALITY IN THE ROCKY MOUNT MPO.EX
CMAQ C 449 C 449 EDGECOMBENASH
VARIOUS
C-5619 744PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE UPPER COASTAL PLAIN RPO.
EX
CMAQ C 372 C 372 EDGECOMBEJOHNSTONNASH
VARIOUS
UNDER CONSTRUCTION
C-5545 172 172WASHINGTON STREET, NC 58 (FIRST STREET) TO CHURCH STREET AND ALSTON STREET, CIRCLE DRIVE NORTH TO CIRCLE DRIVE SOUTH. CONSTRUCT SIDEWALKS.
EXNASH NASHVILLE
C-5549 533NASHVILLE ROAD, RALEIGH ROAD, WINSTEAD AVENUE AND RALEIGH STREET. CONSTRUCT SIDEWALKS.
EX
CMAQ 43PE L 11PE CMAQ 383C L 96C
NASH ROCKY MOUNT
C-5548 469 47BENVENUE STREET, TARBORO STREET, FALLS ROAD, FRANKLIN STREET, LEGETT ROAD, AND CHURCH STREET. CONSTRUCT SIDEWALKS.
EX
CMAQ 338C L 84C
NASH ROCKY MOUNT
UNDER CONSTRUCTION
C-5547 287 287NASHVILLE ROAD AND GRACE STREET. CONSTRUCT SIDEWALKS.EX
NASH ROCKY MOUNT
C-5546 146 16BENVENUE ROAD (NC43/48) AT JEFFERYS ROAD. INTERSECTION IMPROVEMENTS.
EX
CMAQ 104C L 26C
NASH ROCKY MOUNT
UNDER CONSTRUCTION
C-5112 6382 6382EXPANSION AND UPGRADE OF TRAFFIC SIGNAL SYSTEM IN ROCKY MOUNT.
EX
EDGECOMBENASH
ROCKY MOUNT
C-4970 286 286INTERSECTION IMPROVEMENTS AT VARIOUS LOCATIONS.
EX A RALEIGH STREET AND EAST GRAND AVENUE-FAIRFIELD ROAD - UNDER CONSTRUCTIONEXB ATLANTIC AVENUE AND THOMAS STREET - UNDER CONSTRUCTIONEXC GEORGE STREET AND TARBORO STREET - UNDER CONSTRUCTIONEXD BENVENUE ROAD AND TIFFANY BOULEVARD - COMPLETEEXE SUNSET AVENUE AND BUCK LEONARD BOULEVARD - COMPLETE
EDGECOMBENASH
ROCKY MOUNT
4-17 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 4
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025RURAL PROJECTS
UNDER CONSTRUCTION - SECTION BA - GARVEE BOND FUNDING $68.8 MILLION; PAYBACK FY 2008 - FY 2019; PLANNING/DESIGN IN PROGRESS
R-2554* 364068 332763WEST OF NC 581 IN WAYNE COUNTY TO EAST OF SR 1323 (PROMISE LAND ROAD) IN LENOIR COUNTY. FOUR LANE DIVIDED FREEWAY ON NEW LOCATION.
20.5 NHP CG 7545 BA CG 7545 BA CG 7545 BA CG 7545 BA NHP 1125C D
A WEST OF NC 581 TO EAST OF SR 1300 (SALEM CHURCH ROAD) - UNDER CONSTRUCTIONTRNBA EAST OF SR 1300 (SALEM CHURCH ROAD) TO EAST OF SR 1556 (WAYNE MEMORIAL DRIVE) - COMPLETEBB EAST OF SR 1556 (WAYNE MEMORIAL DRIVE) TO WEST OF SR 1714 (CREEK ROAD) - UNDER CONSTRUCTIONTRNC WEST OF SR 1714 (CREEK ROAD) TO EAST OF SR 1323 (PROMISE LAND ROAD) - UNDER CONSTRUCTIONTRND IMPLEMENTATION OF INTELLIGENT TRANSPORTATION SYSTEMS (ITS)TRN
LENOIRWAYNE
US 70(GOLDSBOROBYPASS)
R-5719 11640SR 1135 (COUNTRY CLUB ROAD). CONSTRUCT INTERCHANGE WITH US 117.
DIV
NHP R 1380 NHP 10260C
WAYNE US 117
URBAN PROJECTSU-5724 1395REALIGNMENT OF SR 1709 (CENTRAL
HEIGHTS ROAD) AT BERKELEY BOULEVARD.
REG
NHP R 270 NHP 1125C
WAYNE US 13(BERKELEY BOULEVARD
PLANNING/DESIGN IN PROGRESS
U-3609 15687 4037SR 1560 (ROYAL AVENUE) TO NORTH OF SR 1705 (HOOD SWAMP ROAD) IN GOLDSBORO. WIDEN TO MULTI-LANES.
3 STP 4000R B STP C 7650 B
A SR 1560 (ROYAL AVENUE) TO SR 1003 (NEW HOPE ROAD) - UNDER CONSTRUCTIONTRNB SR 1003 (NEW HOPE ROAD) TO NORTH OF SR 1705 (HOOD SWAMP ROAD)REG
WAYNE US 13(BERKELEY BOULEVARD)
U-4407 20091SR 1579 (BERKELEY BOULEVARD) EAST TO US 70 BYPASS. WIDEN TO MULTI-LANES.
1.8
REG
T R 2772 T U 333 T 16986C
WAYNE US 70 BUSINESS(EAST ASH STREET)
U-5796 8676SR 1120 (O'BERRY ROAD). CONSTRUCT INTERCHANGE.
DIV
NHP R 1380 NHP C 7296
WAYNE US 117
U-2714 20947US 70 BYPASS TO SR 1306 (FEDELON TRAIL). WIDEN ROADWAY AND MAKE SAFETY IMPROVEMENTS.
1.12
REG
NHP R 890 NHP U 107 NHP C 9975 9975C
WAYNE US 117
U-3611 49190SR 1556 (WAYNE MEMORIAL DRIVE) TO SR 1713 (MILLER'S CHAPEL ROAD). WIDEN TO MULTI-LANES.
5.1
DIV
T R 4517T U 1084T 43589C
WAYNE SR 1003(NEW HOPE ROAD)
PLANNING/DESIGN IN PROGRESS
U-4753 13700SR 1003 (NEW HOPE ROAD) TO PROPOSED US 70 BYPASS IN GOLDSBORO. WIDEN TO MULTI-LANES.
0.9
DIV
T 4400R T 3100C C 3100 C 3100
WAYNE SR 1556(WAYNE MEMORIALDRIVE)
FEASIBILITY STUDIES
SCHEDULED FOR FEASIBILITY STUDY
FS-1504B SR 1705 (HOOD SWAMP ROAD) TO SR 1572 (SAULSTON ROAD). WIDEN TO MULTI-LANES.
1.8WAYNE US 13
FEASIBILITY STUDY IN PROGRESS
FS-1204A PROPOSED US 70 GOLDSBORO BYPASS TO THE JOHNSTON COUNTY LINE. UPGRADE EXISTING FACILITY TO A FREEWAY.
WAYNE US 70
FEASIBILITY STUDY IN PROGRESS
FS-1004A INTERSECTION WITH SR 1560 (ROYAL AVENUE) AND US 13 (BERKELEY BOULEVARD). REALIGN INTERSECTION.
WAYNE SR 1709(CENTRAL HEIGHT ROAD)
4-18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 4
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS
B-4838 6090 150REPLACE BRIDGE NO. 20 OVER CSX RAILROAD.
HF
HFB R 540 HFB 5400C
WAYNE US 70 BUSINESS
B-4839 1255 100REPLACE BRIDGE NO. 96 OVER THOROUGHFARE SWAMP.
DIV
STPOFF R 105 STPOFF C 350 350C350C
WAYNE SR 1006(CORBETT HILLROAD)
B-4941 551REPLACE BRIDGE NO. 93 OVER TOWN CREEK.
HF
HFB R 50 HFB M 1 HFB C 500
WAYNE SR 1009(JORDAN STOREROAD)
B-4840 850REPLACE BRIDGE NO. 264 OVER THUNDER SWAMP.
HF
HFB R 75 HFB C 775
WAYNE SR 1117(THUNDER SWAMPROAD)
DIVISION PURCHASE ORDER CONTRACT
B-5656 436REPLACE BRIDGE NO. 133 OVER YELLOW SWAMP.
DIV
STPOFF 21R STPOFF 415C
WAYNE SR 1127(HERRING ROAD)
B-4842 1431REPLACE BRIDGE NO. 45 OVER GREAT SWAMP.
HF
HFB R 130 HFB M 1 HFB C 1300
WAYNE SR 1353(HOOKS ROAD)
B-4844 2357 360REPLACE BRIDGE NO. 117 OVER NORTHEAST CAPE FEAR RIVER.
DIV
STPOFF R 180 STPOFF M 17 STPOFF 600C600C600C
WAYNE SR 1502(ARTHUR DAVIS ROAD)SR 1958(BENNETTS BRIDGEROAD)
B-4940 1625REPLACE BRIDGE NO. 25 OVER EXUM MILL BRANCH.
HF
HFB R 150 HFB C 1475
WAYNE SR 1575(BARTLETT ROAD)
B-4942 850REPLACE BRIDGE NO. 121 OVER WEST BEAR CREEK.
HF
HFB R 75 HFB C 775
WAYNE SR 1702(MARK EDWARDS ROAD)
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5104 17209 15209DIVISION 4 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.
DIV
STPOFF 200R STPOFF 1800C
EDGECOMBEHALIFAXJOHNSTONNASHWAYNEWILSON
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4904 12135 12135ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 4 PROJECT MITIGATION.
EDGECOMBEHALIFAXJOHNSTONNASHWAYNEWILSON
VARIOUS
4-19 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 4
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025HAZARD ELIMINATION PROJECTS
W-5500 3183 250SR 1622 (WOODSIDE DRIVE) TO SR 1752 (SAULSTON-PATETOWN ROAD). SAFETY IMPROVEMENTS INCLUDING WIDENING, SHOULDERS, SUPERELEVATION REVISIONS, OVERLAYING PAVEMENT MARKINGS AND SIGNING.
TRN
HSIP 1428R HSIP C 1505
WAYNE SR 1556(WAYNE MEMORIALDRIVE)
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5204 2477 2477DIVISION 4 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
EDGECOMBEHALIFAXJOHNSTONNASHWAYNEWILSON
VARIOUS
ENHANCEMENT (CALL PROJECTS)E-5501 224FREEDOM ROADS. INSTALL INTERACTIVE
WAYSIDE SIGNAGE FOR DESIGNATED SITES.
TRN
STPE 96C O 128C
ALAMANCEBEAUFORTBRUNSWICKBUNCOMBECAMDENCHOWANCRAVENDAREDURHAMEDGECOMBEGUILFORDHALIFAXLENOIRPASQUOTANKWASHINGTONWAYNE
VARIOUS
INTERSTATE PROJECTSI-5727 45250.2 MILES NORTH OF SR 1116 (GOVERNOR
HUNT ROAD) TO 2 MILES NORTH OF SR 1154 (ST. ROSE CHURCH ROAD). PAVEMENT REHABILITATION.
5SW
NHPIM C 4525 WILSON I-95
I-5728 5600.2 MILES NORTH OF US 301 TO 2.2 MILES NORTH OF US 301. PAVEMENT REHABILITATION.
2SW
NHPIM C 560 WILSON I-95
I-5742 29000.5 MILES NORTH OF I-795 TO 0.7 MILES NORTH OF SR 1309 (BLOOMERY ROAD). PAVEMENT REHABILITATION.
3.9SW
NHPIM C 2900 WILSON I-95
I-5842 7500.7 MILE NORTH OF SR 1309 (BLOOMERY ROAD) TO NASH COUNTY LINE. PAVEMENT REHABILITATION.
0.9SW
NHPIM C 750 WILSON I-95
I-5818 43260.2 MILE NORTH OF US 301 TO I-95. PAVEMENT REHABILITATION.
5.4SW
NHPIM C 4326 WILSON I-795
URBAN PROJECTSU-5794 14008NC 58 TO US 264 ALTERNATE. WIDEN AND
UPGRADE FACILITY.3.7
DIV
T R 100 T 13908C
WILSON SR 1309(BLOOMERY ROAD)SR 1382(PACKHOUSE ROAD)
4-20 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 4
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEASIBILITY STUDIES
PROGRAMMED FOR PLANNING AND ENVIRONMENTAL STUDY ONLY
I-5133 10034 10034CORRIDOR PLANNING AND FINANCE STUDY. SOUTH CAROLINA STATE LINE TO THE VIRGINIA STATE LINE.
CUMBERLANDHALIFAXHARNETTJOHNSTONNASHNORTHAMPTONROBESONWILSON
I-95
FEDERAL BRIDGE PROJECTSB-5666 2360REPLACE BRIDGE NO. 47 OVER SEABOARD
COAST LINE RAILROAD.HF
HFB 210R HFB 2150C
WILSON US 117
B-5313 1085 100REPLACE BRIDGE NO. 109 OVER TOWN CREEK.
HF
HFB R 135 HFB C 850
WILSON SR 1002(TOWN CREEK ROAD)
RIGHT OF WAY IN PROGRESS
B-4681 863 188REPLACE BRIDGE NO. 119 OVER LITTLE CONTENTNEA CREEK.
HF
HFB 675C WILSON SR 1531(EAGLE'S CROSS ROAD)
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5104 17209 15209DIVISION 4 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.
DIV
STPOFF 200R STPOFF 1800C
EDGECOMBEHALIFAXJOHNSTONNASHWAYNEWILSON
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4904 12135 12135ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 4 PROJECT MITIGATION.
EDGECOMBEHALIFAXJOHNSTONNASHWAYNEWILSON
VARIOUS
HAZARD ELIMINATION PROJECTS
RIGHT OF WAY IN PROGRESS
W-5331 440 120SOUTH OF SR 1626 (FAIRFIELD DAIRY ROAD) NORTHWARD ONE MILE. CONSTRUCT LEFT TURN LANE AT SR 1626, OVERLAY WITH FRICTION COURSE, RE-STRIPE WITH THERMOPLASTIC MARKINGS AND INSTALL CENTERLINE PAVEMENT MARKINGS.
TRN
HSIP 320C WILSON NC 58
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5204 2477 2477DIVISION 4 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
EDGECOMBEHALIFAXJOHNSTONNASHWAYNEWILSON
VARIOUS
4-21 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
COUNTY ID
FUTURE YEARS
F
RR - Rail-Highway SafetyRTAP - Rural Transit Assistance ProgramS - State I - ImpementationS (M) - State Match O - OperationsSMAP - Operating Assistance and State Maintenance Oc - OPS Funded CapitalSRTS - Safe Routes to School PE - Preliminary EngineeringSTAT - State PL - Planning / DesignSTHSR - Stimulus High Speed Rail R - Right-of-WaySTPDA - Surface Transportation Program - Direct AttributableSTPE - Surface Transportation Program, EnhancementsSTPEB - Surface Transportation Program, Enhancements (Bike)T - State Highway Trust FundsT2001 - State Rail FundsTAP - Transportation Alternatives ProgramTIGER DISC - TIGER Discretionary Grants
HP - Federal-Aid High PriorityJARC - Job Assistance and Reverse Commute (3037)
(1) FUNDING CATEGORY
DURHAM AREA
SR - Secondary Road
TRANSIT PARTNERROUTE / CITY /
NUMBER
TA-4738
LOCATION / DESCRIPTION
PASSENGER AMENITIES - BUS STOP TRANSIT AUTHORITY
DIV
SHELTERS, BENCHES, SHOP EQUIPMENTSPARE PARTS, ENGINES, SERVICE VEHICLES, ETC.
CP
BUS STOP SHELTER AND BENCHES LOCATED AT HOLLOWAY STREET
ESTIMATED COST Preliminary engineering, right of
C10000
dollars.)
of a project segment indicates (Cash-Flow Funding)Mitigation, Utilities or Construction.
way, utility, mitigation and construction cost estimates
(2) FUNDING SOURCES KEY
O - OtherL - Local
initial scheduled year. (Estimates are in thousand of
For other work types or activities see Work Type (Activity) box below.
work description. CPProject termini and a general
conception and remains with
9000
PROJECT BREAKS
CP
Various - multiple routes
A
5000
FY 2022
C
CP 3000CP
BCP 5000 B
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FY 2023 FY 2024FY 2021
STATE TRANSPORTATION IMPROVEMENT PROGRAM
FY 2020
TOTAL PROJECT
COST (THOU)
FUZFUZ
FUN
DS
A
PRIOR YEARS COST
(THOU)
ACP 700
FY 2015 FY 2016
4000CP
FY 2025
5000
BB
CP CP 5000B
UNFUNDED
NON HIGHWAY PROGRAM
ADIV
FY 2017 FY 2018
BSHOP EQUIPMENT, SPARE PARTS, ENGINES, SERVICE VEHICLES, ETC.
WORK TYPE (ACTIVITY) (3)Phases of implementation:
DIV C
20000
COMMITMENTSFUTURE
by funding category in current dollars. Cost may include one or more funding types. Multi-year funding
Preliminary engineering, Right of Way, UNFUNDED
BUS STOP SHELTER AND BENCHES LOCATED AT GREGSON AVENUE
with proposed work type or activity beginning in the
break.
One or two letter
CP
A
for an explanation of funding categories
FUNDING CATEGORY (1)
DIV
DIVISION 00
DEVELOPMENTAL PROGRAM
DURHAM
FY 2019
TRANSIT PARTNERROUTE / CITY /
NEW ROUTE or CityTRANSIT PARTNER
IDENTIFICATION NUMBER Assigned to each project at
US or NC RoutesI - Interstate
project until completion.
C - City
FEPD - Elderly and Persons with Disablity (5310)
FMOD - Fixed Guideway Modifications
designation for project
any project breaks.Category for the project and
LOCATION / DESCRIPTION
used for each project phase.
FUNDING SOURCE (2)
Identifies the "STI" Funding
See Highway Funding Key
FSPR - State Planning and Research
FNF - New Freedom ProgramFNS - New Starts - Capital (5309)
FMPL - Metropolitan Planning (5303)
FED - Federal Rail Funds
FLAP - Federal Lands Access Program
FUZ - Urbanized Area Formula Program (5307)
CMAQ - Congestion Mitigation
FF - Federal Ferry
FNU - Non Urbanized Area Formula Program (5311)
(3) WORK TYPE (ACTIVITY)
C - ConstructionAD - Administrative
CP - Capital
A - AcquisitionHF - State Dollars (Non-STI)REG - RegionalSW - Statewide
DIV - Division
DP - Discretionary or DemonstrationFBUS - Capital Program - Bus Earmark (5309)
NON HIGHWAY PROGRAMDIVISION 4
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025BICYCLE AND PEDESTRIAN PROJECTS
EB-5729 4250US 64 TO NC 97 (RALEIGH ROAD), CONSTRUCT STREETSCAPE IMPROVEMENTS.
1.6
DIV
TAP 160PE L 40PE L R 50 TAP C 3200L C 800
EDGECOMBE NC 97(ATLANTIC AVE)
EB-5731 550SR 1243 (LEGGETT ROAD) TO HOLLY STREET PARK, CONSTRUCT NEW GREENWAY.
1
DIV
TAP 40PE L 10PE L R 50 TAP C 360L C 90
EDGECOMBE COWLICK TRAIL
PUBLIC TRANSPORTATION PROJECTSTQ-8002 40CAPITAL - MOBILITY MANAGEMENT
HF
FEPD 28CP L 6CP S 6CP
EDGECOMBENASH
CITY OF ROCKY MOUNT
TQ-6806 100OPERATING
HF
FEPD 50O L 50O
EDGECOMBENASH
CITY OF ROCKY MOUNT
TI-6104 28273 6108INTERCITY BUS FROM RALEIGH TO NORFOLK, VA VIA ELIZABETH CITY ALONG US 64, US 301, US 264, AND US 17 WITH STOPS AT RALEIGH, ROCKY MOUNT, WILSON, GREENVILLE, WASHINGTON, WILLIAMSTON, EDENTON, AND ELIZABETH CITY
HF
FNU 3669O O 2312 O 2312 O 2312 O 2312 O 2312 2312O2312O2312O BEAUFORTBERTIECHOWANEDGECOMBEFRANKLINMARTINNASHPASQUOTANKPERQUIMANSPITTWAKEWILSON
GREYHOUND LINES
TA-5150 2580REPLACEMENT (5) 30 FOOT LOW FLOOR BUSES
HF
FUZ 2060CP S 520CP
EDGECOMBENASH
TAR RIVER TRANSIT
TA-6502 729 72CAPITAL
HF
FNU 657CP EDGECOMBENASH
TAR RIVER TRANSIT
TA-5151 150EXPANSION (2) 25 FOOT LIGHT TRANSIT VEHICLES
HF
FBUS 150CP EDGECOMBENASH
TAR RIVER TRANSIT
TA-5152 100EXPANSION (1) 25 FOOT LIGHT TRANSIT VEHICLE
HF
FBUS 80CP L 20CP
EDGECOMBENASH
TAR RIVER TRANSIT
TG-4785A 1200 276OPERATING ASSISTANCE - ADA PARATRANSIT SERVICE
HF
FUZ 184Oc Oc 92 Oc 93 Oc 93 Oc 93 Oc 93 92Oc92Oc92Oc EDGECOMBENASH
TAR RIVER TRANSIT
TG-4785B 4593 1047PREVENTIVE MAINTENANCE
HF
FUZ 754Oc Oc 349 Oc 349 Oc 349 Oc 349 Oc 349 349Oc349Oc349Oc EDGECOMBENASH
TAR RIVER TRANSIT
TK-5180 2824 792ADMINISTRATION
HF
FNU 472O O 195 O 195 O 195 O 195 O 195 195O195O195O EDGECOMBENASH
TAR RIVER TRANSIT
4-25 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 4
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS
TO-6108 2677 756OPERATING ASSISTANCE
HF
FNU 392O O 196 O 193 O 190 O 190 O 190 190O190O190O EDGECOMBENASH
TAR RIVER TRANSIT
TO-5127 11048 3198OPERATING ASSISTANCE
HF
FUZ 1030O O 515 O 515 O 515 O 515 O 515 515O515O515O SMAP 540O O 270 O 270 O 270 O 270 O 270 270O270O270O
EDGECOMBENASH
TAR RIVER TRANSIT
TS-5117 109 29SAFETY & SECURITY - MIN. 1% SET ASIDE
HF
FUZ 16CP CP 8 CP 8 CP 8 CP 8 CP 8 8CP8CP8CP EDGECOMBENASH
TAR RIVER TRANSIT
PASSENGER RAIL PROJECTS
IN PROGRESS
P-5005 30521 30521CONGESTION MITIGATION CROSSOVERS.
A CAROLINIAN CORRIDOR - CSXT MP A 101.0 (ENFIELD CROSSING)TRNB CAROLINIAN CORRIDOR - CSXT MP A 115.9 (ARMSTRONG CROSSING)TRNC CAROLINIAN CORRIDOR - CSXT MP A 86.4 (SOUTH WELDON CROSSING)TRND BOYLAN CROSSOVER IN RALEIGH - UNDER CONSTRUCTIONTRN
EDGECOMBEHALIFAXNASHWAKE
CSXT RR
PUBLIC TRANSPORTATION PROJECTSTA-6180 1194 519CAPITAL
HF
FNU 675CP BERTIEHALIFAXHERTFORDNORTHAMPTON
CHOANOKE PUBLICTRANSPORTATIONAUTHORITY
TK-6119 6504 1576ADMINISTRATION
HF
FNU 984O O 493 O 493 O 493 O 493 O 493 493O493O493O FNU
BERTIEHALIFAXHERTFORDNORTHAMPTON
CHOANOKE PUBLICTRANSPORTATIONAUTHORITY
PASSENGER RAIL PROJECTS
IN PROGRESS
P-5005 30521 30521CONGESTION MITIGATION CROSSOVERS.
A CAROLINIAN CORRIDOR - CSXT MP A 101.0 (ENFIELD CROSSING)TRNB CAROLINIAN CORRIDOR - CSXT MP A 115.9 (ARMSTRONG CROSSING)TRNC CAROLINIAN CORRIDOR - CSXT MP A 86.4 (SOUTH WELDON CROSSING)TRND BOYLAN CROSSOVER IN RALEIGH - UNDER CONSTRUCTIONTRN
EDGECOMBEHALIFAXNASHWAKE
CSXT RR
AVIATION PROJECTSAV-5745 335LAND ACQUISITION & CLEARING PROJECT.
DIV
T C 302 O C 33
JOHNSTON JOHNSTON COUNTYAIRPORT (JNX)
BICYCLE AND PEDESTRIAN PROJECTS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY OTHERS - IN PROGRESS.
EL-5100 13670 13670PEDESTRIAN, BICYCLE, AND TRANSIT PROJECTS IN THE CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION (CAMPO).
DIV
FRANKLINGRANVILLEHARNETTJOHNSTONWAKE
VARIOUS
4-26 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 4
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025BICYCLE AND PEDESTRIAN PROJECTS
PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY LOCAL GOVERNMENT AGENCIES; TAP FUNDING INCLUDES UNPROGRAMMED BALANCE - PROGRAMMING SUBJECT TO MPO APPROVAL
U-5530 33250 2548CAPITAL AREA MPO: BICYCLE, PEDESTRIAN, TRANSIT, AND TRANSPORTATION ALTERNATIVES PROGRAM (TAP) - ELIGIBLE PROJECTS.
DIV
STPDA 418PE PE 418 PE 418 PE 418 TAP 88PE PE 88 PE 88 PE 88 L 126PE PE 126 PE 126 PE 126 STPDA 836R R 836 R 836 R 836 TAP 179R R 179 R 179 R 179 L 254R R 254 R 254 R 254 STPDA 2924C C 2924 C 2924 C 2924 TAP 626C C 626 C 626 C 626 L 887C C 887 C 887 C 887 TAP C 535 C 535 C 535 C 535 C 535 535C535C535C C 535 C 535
FRANKLINGRANVILLEHARNETTJOHNSTONWAKE
VARIOUS
PUBLIC TRANSPORTATION PROJECTSTQ-6797 96OPERATING
HF
FEPD 96O JOHNSTON JOHNSTON COUNTY INDUSTRIES
TQ-6791 180OPERATING
HF
FEPD 90O L 90O
JOHNSTON JOHNSTON COUNTYINDUSTRIES
TA-6534 211CAPITAL
HF
JARC 169CP L 21CP S 21CP
JOHNSTON JOHNSTON COUNTY COUNCILON AGING, INC.
TA-6152 820 184CAPITAL
HF
FNU 636CP JOHNSTON JOHNSTON COUNTY COUNCILON AGING, INC.
TK-6138 4116 1176ADMINISTRATION
HF
FNU 588O O 294 O 294 O 294 O 294 O 294 294O294O294O FNU
JOHNSTON JOHNSTON COUNTY COUNCILON AGING, INC.
TM-6128 398OPERATING ASSISTANCE
HF
JARC 398O JOHNSTON JOHNSTON COUNTY COUNCILON AGING, INC.
BICYCLE AND PEDESTRIAN PROJECTSEB-5711 150SR 1836 (MAY DRIVE) TO US 301 BUSINESS,
NORTH BOUND (CHURCH STREET). INSTALL PEDESTRIAN SIGNALS.
1.7
DIV
TAP PE 20 L PE 5 TAP C 100 L C 25
NASH US 64 BUSINESS(SUNSET AVENUE)
EB-5761 2250US 64 TO NC 97 (RALEIGH BOULEVARD) OVERPASS. CONSTRUCT STREETSCAPE IMPROVEMENTS.
DIV
TAP 160PE L 40PE L 50R TAP 1600C L 400C
NASH US 301 BUSINESS(CHURCH STREET)
EB-5763 3175US 301 BUSINESS, SOUTH BOUND (FRANKLIN STREET) TO FALLS ROAD. CONVERT ABANDONED RAILROAD TO MULTI-USE PATH.
DIV
TAP 80PE L 20PE L R 75 TAP C 2400L C 600
NASH ROCKY MOUNT
PUBLIC TRANSPORTATION PROJECTSTQ-6806 100OPERATING
HF
FEPD 50O L 50O
EDGECOMBENASH
CITY OF ROCKY MOUNT
4-27 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 4
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS
TQ-8002 40CAPITAL - MOBILITY MANAGEMENT
HF
FEPD 28CP L 6CP S 6CP
EDGECOMBENASH
CITY OF ROCKY MOUNT
TI-6104 28273 6108INTERCITY BUS FROM RALEIGH TO NORFOLK, VA VIA ELIZABETH CITY ALONG US 64, US 301, US 264, AND US 17 WITH STOPS AT RALEIGH, ROCKY MOUNT, WILSON, GREENVILLE, WASHINGTON, WILLIAMSTON, EDENTON, AND ELIZABETH CITY
HF
FNU 3669O O 2312 O 2312 O 2312 O 2312 O 2312 2312O2312O2312O BEAUFORTBERTIECHOWANEDGECOMBEFRANKLINMARTINNASHPASQUOTANKPERQUIMANSPITTWAKEWILSON
GREYHOUND LINES
TA-5150 2580REPLACEMENT (5) 30 FOOT LOW FLOOR BUSES
HF
FUZ 2060CP S 520CP
EDGECOMBENASH
TAR RIVER TRANSIT
TA-5151 150EXPANSION (2) 25 FOOT LIGHT TRANSIT VEHICLES
HF
FBUS 150CP EDGECOMBENASH
TAR RIVER TRANSIT
TA-5152 100EXPANSION (1) 25 FOOT LIGHT TRANSIT VEHICLE
HF
FBUS 80CP L 20CP
EDGECOMBENASH
TAR RIVER TRANSIT
TA-6502 729 72CAPITAL
HF
FNU 657CP EDGECOMBENASH
TAR RIVER TRANSIT
TA-5153 400EXPANSION BUS
HF
FUZ 320CP L 80CP
NASH TAR RIVER TRANSIT
TG-4785A 1200 276OPERATING ASSISTANCE - ADA PARATRANSIT SERVICE
HF
FUZ 184Oc Oc 92 Oc 93 Oc 93 Oc 93 Oc 93 92Oc92Oc92Oc EDGECOMBENASH
TAR RIVER TRANSIT
TG-4785B 4593 1047PREVENTIVE MAINTENANCE
HF
FUZ 754Oc Oc 349 Oc 349 Oc 349 Oc 349 Oc 349 349Oc349Oc349Oc EDGECOMBENASH
TAR RIVER TRANSIT
TK-5180 2824 792ADMINISTRATION
HF
FNU 472O O 195 O 195 O 195 O 195 O 195 195O195O195O EDGECOMBENASH
TAR RIVER TRANSIT
TO-6108 2677 756OPERATING ASSISTANCE
HF
FNU 392O O 196 O 193 O 190 O 190 O 190 190O190O190O EDGECOMBENASH
TAR RIVER TRANSIT
TO-5127 11048 3198OPERATING ASSISTANCE
HF
FUZ 1030O O 515 O 515 O 515 O 515 O 515 515O515O515O SMAP 540O O 270 O 270 O 270 O 270 O 270 270O270O270O
EDGECOMBENASH
TAR RIVER TRANSIT
TS-5117 109 29SAFETY & SECURITY - MIN. 1% SET ASIDE
HF
FUZ 16CP CP 8 CP 8 CP 8 CP 8 CP 8 8CP8CP8CP EDGECOMBENASH
TAR RIVER TRANSIT
4-28 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 4
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PASSENGER RAIL PROJECTS
IN PROGRESS
P-5005 30521 30521CONGESTION MITIGATION CROSSOVERS.
A CAROLINIAN CORRIDOR - CSXT MP A 101.0 (ENFIELD CROSSING)TRNB CAROLINIAN CORRIDOR - CSXT MP A 115.9 (ARMSTRONG CROSSING)TRNC CAROLINIAN CORRIDOR - CSXT MP A 86.4 (SOUTH WELDON CROSSING)TRND BOYLAN CROSSOVER IN RALEIGH - UNDER CONSTRUCTIONTRN
EDGECOMBEHALIFAXNASHWAKE
CSXT RR
AVIATION PROJECTSAV-5740 336LAND ACQUISITION. 0
DIV
T R 302 O R 34
WAYNE WAYNE EXECUTIVEJETPORT (GWW)
BICYCLE AND PEDESTRIAN PROJECTSEB-5762 476US 117 BUSINESS (WILLIAM STREET) TO SR
1565 (SPENCE AVENUE). CONSTRUCT SIDEWALK ON NORTH SIDE.
DIV
TAP 46PE L 11PE TAP C 335 L C 84
WAYNE SR 1560(ROYALL AVENUE)
EB-5508 600SR 1003 (NEW HOPE ROAD) MULTI-USE TRAIL. CONSTRUCT MULTI-USE TRAIL.TRN
STPEB 600C WAYNE GOLDSBORO
EB-5707 125US 70 BYPASS TO SR 1560 (ROYALL AVENUE). CONSTRUCT 10 FOOT WIDE ASPHALT GREENWAY.
0.38
DIV
SRTS PE 15 SRTS C 110
WAYNE STONEY CREEKGREENWAY
PUBLIC TRANSPORTATION PROJECTSTM-6138 360OPERATING ASSISTANCE
HF
JARC 180O L 180O
WAYNE GOLDSBORO-WAYNETRANSPORTATIONAUTHORITY
TO-6107 604 184OPERATING ASSISTANCE
HF
FNU 84O O 42 O 42 O 42 O 42 O 42 42O42O42O WAYNE GOLDSBORO-WAYNETRANSPORTATIONAUTHORITY
TO-4719 9474 2834OPERATING ASSISTANCE
HF
FUZ 848O O 424 O 424 O 424 O 424 O 424 424O424O424O SMAP 480O O 240 O 240 O 240 O 240 O 240 240O240O240O
WAYNE GOLDSBORO-WAYNETRANSPORTATIONAUTHORITY
added per FY 2011 allocations
TP-5116 372 62PLANNING ASSISTANCE
HF
FMPL 62CP CP 31 CP 31 CP 31 CP 31 CP 31 31CP31CP31CP WAYNE GOLDSBORO-WAYNETRANSPORTATIONAUTHORITY
TS-5129 87 37SAFETY & SECURITY - MIN. 1% SET ASIDE
HF
FUZ 10CP CP 5 CP 5 CP 5 CP 5 CP 5 5CP5CP5CP WAYNE GOLDSBORO-WAYNETRANSPORTATIONAUTHORITY
TD-5268 133252013 GOLDSBORO MAIN STREET REVITALIZATION & TRANSPORTATION INVESTMENT PROJECTHF
L 3325CP TIGER 10000CP
WAYNE GOLDSBORO-WAYNE TRANSP
4-29 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 4
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS
TA-5141 12525' BUS REPLACEMENT
HF
FUZ 100CP L 25CP
WAYNE GOLDSBORO-WAYNETRANSPORTATIONAUTHORITY
TA-5149 34830' BUS REPLACEMENT
HF
FUZ 278CP L 70CP
WAYNE GOLDSBORO-WAYNETRANSPORTATIONAUTHORITY
TA-6505 833 258CAPITAL
HF
FNU 575CP WAYNE GOLDSBORO-WAYNETRANSPORTATIONAUTHORITY
TG-6146 545 105ROUTINE CAPITAL - BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, SERVICE VEHICLES, ETC
HF
FNU 88CP CP 44 CP 44 CP 44 CP 44 CP 44 44CP44CP44CP WAYNE GOLDSBORO-WAYNETRANSPORTATIONAUTHORITY
TG-4752A 655 355ROUTINE CAPITAL - BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, SERVICE VEHICLES, ETC
HF
FUZ 60CP CP 30 CP 30 CP 30 CP 30 CP 30 30CP30CP30CP WAYNE GOLDSBORO-WAYNETRANSPORTATIONAUTHORITY
TG-4752B 2085 685PREVENTIVE MAINTENANCE
HF
FUZ 280Oc Oc 140 Oc 140 Oc 140 Oc 140 Oc 140 140Oc140Oc140Oc WAYNE GOLDSBORO-WAYNE TRANSPTRANSPORTATIONAUTHORITY
TG-4752C 1344 514OPERATING ASSISTANCE - ADA PARATRANSIT SERVICE
HF
FUZ 166Oc Oc 83 Oc 83 Oc 83 Oc 83 Oc 83 83Oc83Oc83Oc WAYNE GOLDSBORO-WAYNETRANSPORTATIONAUTHORITY
TK-5179 4324 1212ADMINISTRATION
HF
FNU 664O O 306 O 306 O 306 O 306 O 306 306O306O306O WAYNE GOLDSBORO-WAYNETRANSPORTATIONAUTHORITY
BICYCLE AND PEDESTRIAN PROJECTSEB-5507 255 30SR 1184 (TARBORO STREET), FAIRVIEW
AVENUE TO VINSON-BYNUM SCHOOL. ADD SIDEWALK.TRN
STPEB C 225 WILSON WILSON
PUBLIC TRANSPORTATION PROJECTSTA-6260 119 83CAPITALHF
FNU 36CP WILSON CITY OF WILSON
TK-5178 4567 1315ADMINISTRATION
HF
FNU 644O O 326 O 326 O 326 O 326 O 326 326O326O326O FNU
WILSON CITY OF WILSON
TO-4779 15711 4559OPERATING ASSISTANCE
HF
FNU 1808O O 908 O 908 O 908 O 908 O 908 908O908O908O SMAP 416O O 208 O 208 O 208 O 208 O 208 208O208O208O
WILSON CITY OF WILSON
4-30 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 4
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS
TI-6104 28273 6108INTERCITY BUS FROM RALEIGH TO NORFOLK, VA VIA ELIZABETH CITY ALONG US 64, US 301, US 264, AND US 17 WITH STOPS AT RALEIGH, ROCKY MOUNT, WILSON, GREENVILLE, WASHINGTON, WILLIAMSTON, EDENTON, AND ELIZABETH CITY
HF
FNU 3669O O 2312 O 2312 O 2312 O 2312 O 2312 2312O2312O2312O BEAUFORTBERTIECHOWANEDGECOMBEFRANKLINMARTINNASHPASQUOTANKPERQUIMANSPITTWAKEWILSON
GREYHOUND LINES
TA-6226 238 38CAPITALHF
FNU 200CP WILSON WILSON COUNTY
TK-6173 1269 397ADMINISTRATION
HF
FNU 184O O 86 O 86 O 86 O 86 O 86 86O86O86O FNU
WILSON WILSON COUNTY
4-31 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project