state transportation improvement program · division purchase order contract (dpoc) - in progress...

27
4 Division 4 Edgecombe Halifax Johnston Nash Wayne Wilson STATE TRANSPORTATION IMPROVEMENT PROGRAM

Upload: trinhmien

Post on 26-Dec-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

4

Division 4EdgecombeHalifaxJohnstonNashWayneWilson

STATE TRANSPORTATION IMPROVEMENT PROGRAM

WILSON

WAYNE

JOHNSTON

EDGECOMBE

NASH

HALIFAX

701

117

70301

13

258

64

158

264301

64

30195

95

795

40

42

55

96

43

50

210

561

111

231

484

97

33

125

222

42

581

111

Wilson

RoanokeRapids

Tarboro

RockyMount

Smithfield

Clayton

Goldsboro

AV-5740

AV-5745

W-5107

B-4933

B-5657

B-5660

B-5654

B-4562

B-5659

B-5124B-5658

B-4839

B-5656

W-5500

R-5719U-5796

R-3822B

R-5722

U-5026

I-5842

I-5782

U-4753

I-5724

U-2714U-3609A

U-3334B

U-3621A

R-5718

R-3822A

U-5726

EB-5729

U-5725

U-3609B

U-3330EB-5761

EB-5711

I-5781

U-4407

I-5816

I-5817

I-5841

EB-5762

R-5720

I-5728

I-3318BB

R-3410B R-3618

U-5794

U-3464

I-5727

I-5742

R-3825B

I-5725

U-3611

I-5818

R-3410AW-5600

I-5726

I-5784

I-5783

I-5786

I-5723 U-5724

I-4739

EB-5707

U-5795

EB-5731

U-3331EB-5763

U-4762

I-5111BB

I-5761

DRAFT STIPFY 2015-2025STI ProjectsDIVISION 4

0 10 205Miles

BRIDGES FUNDED THROUGH STI

STATEWIDE AVIATION

REGIONAL AVIATION

DIVISION AVIATION

DIVISION FERRYREGIONAL RAILDIVISION RAILREGIONAL TRANSITDIVISION TRANSITSAFETYTRANSITION *TRANSITION *INTERSTATE MAINTENANCESTATEWIDE HIGHWAYREGIONAL HIGHWAYDIVISON HIGHWAYDIVISION BIKE/PEDESTRIANINTERSTATE ROUTEUS ROUTENC ROUTESECONDARY ROADUNDER CONSTRUCTIONMUNICIPAL BOUNDARIESMILITARY BASENCDOT DIVISION BOUNDARYCOUNTY BOUNDARYWATER FEATURES

* Note: Reflects 108 of the Major Transition ProjectsNote: FY 2015 projects represent major projects not

let as of November 2014

COUNTY

FUTURE YEARS

F

NHPB - National Highway Performance Program (Bridge)NHPIM - National Highway Performance Program (Interstate Maintenance)O - OthersRR - Rail-Highway SafetyS (M) - State MatchSRTS - Safe Routes to School

FLPI - Federal Lands Program (Indian Reservation Roads) STP - Surface Transportation ProgramHFB - Highway Fund Bridge Replacement Program STPDA - Surface Transportation Program - Direct AttributableHP - Federal-Aid High Priority STPEB - Surface Transportation Program, Enhancements (Bike)

STPON - Surface Transportation Program Bridge (On System Bridge)STPOFF -Surface Transportation Program (Off System Bridge) PE - Preliminary EngineeringT - State Highway Trust Funds

NHP - National Highway Performance Program TAP - Transportation Alternatives Program RG - Right of Way (GARVEE)

SW - StatewideTRN -Transition Project

S - StructureU - Utilities

I - ImplementationL - LandscapingM - MitigationO - OperationsP - Paving

WAKE

NUMBERLENGTH (MILES)

DIVISION 00

R-0000

IDROUTE/CITY

US or NC RoutesON NEW LOCATION. I - InterstateWITH A BYPASS OF HOMETOWN ROUTE/CITY

Project termini and a general

SW

M1500

A

NHP

4000

FUNDING CATEGORY (1)

used for each project phase.

FUNDING SOURCE (2)

U

B3000R

FY 2017

C

(3) WORK TYPE (ACTIVITY)

A - Acquisition

with proposed work type or activity beginning in the initial scheduled year. (Estimates are in thousand of

For other work types or activities see Work Type (Activity) box below.

dollars.)

of a project segment indicates (Cash-Flow Funding) COMMITMENTSFUTURE

SW CBSW

One or two letter

HIGHWAY PROGRAM

UNFUNDED

NC 3 TO SR 1003SR 1003 TO NC 96

ASW

UNFUNDED

20000CRC 5000C 5000 BC B

WIDEN TO A FOUR-LANE FACILITY

A

NC 00 R7.3 R25063,450I-40 TO NC 96 EAST OF HOMETOWN.

B

FY 2025 FY 2018

700

FY 2019

DEVELOPMENTAL PROGRAMSTATE TRANSPORTATION IMPROVEMENT PROGRAM

FY 2020FY 2015 FY 2016

M

TOTAL PROJECT

COST (THOU)

NHPNHP

FUN

DS

A

PRIOR YEARS COST

(THOU)

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

U 5000NHP

C10000

FY 2021

C

FY 2023 FY 2024

FY 2022

5000

9000

APD - Appalachian Development

NHPNHP

LOCATION / DESCRIPTION NHP

NHP

I-40 TO NC 3

Preliminary engineering, Right of Way, Mitigation, Utilities or Construction. break.

work description.

way, utility, mitigation and construction cost estimates

See Highway Funding Key

any project breaks.Category for the project andIdentifies the "STI" Funding

by funding category in current dollars. Cost may include one or more funding types. Multi-year funding

for an explanation of funding categories

Phases of implementation: ESTIMATED COST Preliminary engineering, right of

(1) FUNDING CATEGORY

PROJECT BREAKS

designation for project

LOCATION / DESCRIPTION

SR - Secondary Road

IDENTIFICATION NUMBER Assigned to each project at conception and remains with

BVarious - multiple routesNEW ROUTE or City

WORK TYPE (ACTIVITY) (3)

BOND (R) - Revenue Bond

HRRR - High Risk Rural Roads

L - LocalHSIP - Highway Safety Improvement Program

project until completion.

DIV - DivisionEX - Exempt

REG - RegionalHF - State Dollars (Non-STI)

F - Feasibility StudyCG - Construction (GARVEE)C - Construction

G - Grading and Structures

R - Right of Way

(2) FUNDING KEY FOR HIGHWAY FUNDING SOURCES

ER - Emergency Relief Funds

CMAQ - Congestion MitigationDP - Discretionary or Demonstration

FED - Federal Rail Funds

HIGHWAY PROGRAMDIVISION 4

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025URBAN PROJECTS

U-4762 6504US 64 ALTERNATE TO SR 1243 (LEGGETT ROAD). WIDEN TO MULTI-LANES.

1.25

DIV

T R 1023 T U 123 T 5358C

EDGECOMBE SR 1250(SPRINGFIELD ROAD)

FEASIBILITY STUDIES

SCHEDULED FOR FEASIBILITY STUDY

FS-1504A SR 1003 (ROLESVILLE ROAD) IN WAKE COUNTY TO US 17 IN WILLIAMSTON. UPGRADE TO INTERSTATE STANDARDS.

86.5EDGECOMBEFRANKLINMARTINNASHWAKE

US 64

FEDERAL BRIDGE PROJECTSB-4931 3472REPLACE BRIDGE NO. 22 OVER TOWN

CREEK.

HF

HFB 315R HFB 7M HFB 3150C

EDGECOMBE US 258

B-4933 7160 200REPLACE BRIDGE NO. 80 OVER TAR RIVER. REPLACE BRIDGE NO. 49 OVER TAR RIVER OVERFLOW.REG

T 860R T 3050C C 3050

EDGECOMBE NC 33

B-4932 6526 225REPLACE BRIDGE NO. 28 OVER TAR RIVER.

HF

HFB R 1000 HFB M 1 HFB C 5300

EDGECOMBE NC 42

B-5671 3135REPLACE BRIDGE NO. 87 OVER SWIFT CREEK.

HF

HFB 285R HFB 2850C

EDGECOMBE NC 97

B-5655 3135REPLACE BRIDGE NO. 11 OVER TOWN CREEK.

HF

HFB R 285 HFB 2850C

EDGECOMBE NC 111/NC 122

UNDER CONSTRUCTION - PART OF BD-5104 PROJECT

B-5316 720 720REPLACE BRIDGE NO. 59 OVER TRIBUTARY OF COKEY SWAMP.

DIV

EDGECOMBE SR 1006(BULLUCK SCHOOLROAD)

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5104 17209 15209DIVISION 4 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

EDGECOMBEHALIFAXJOHNSTONNASHWAYNEWILSON

VARIOUS

MITIGATION PROJECTS

IN PROGRESS

EE-4904 12135 12135ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 4 PROJECT MITIGATION.

EDGECOMBEHALIFAXJOHNSTONNASHWAYNEWILSON

VARIOUS

4-7 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 4

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025HAZARD ELIMINATION PROJECTS

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5204 2477 2477DIVISION 4 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

EDGECOMBEHALIFAXJOHNSTONNASHWAYNEWILSON

VARIOUS

CONGESTION MITIGATION PROJECTSC-5616 898PROJECTS TO IMPROVE CONGESTION AND

AIR QUALITY IN THE ROCKY MOUNT MPO.EX

CMAQ C 449 C 449 EDGECOMBENASH

VARIOUS

C-5619 744PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE UPPER COASTAL PLAIN RPO.

EX

CMAQ C 372 C 372 EDGECOMBEJOHNSTONNASH

VARIOUS

UNDER CONSTRUCTION

C-5112 6382 6382EXPANSION AND UPGRADE OF TRAFFIC SIGNAL SYSTEM IN ROCKY MOUNT.

EX

EDGECOMBENASH

ROCKY MOUNT

C-4970 286 286INTERSECTION IMPROVEMENTS AT VARIOUS LOCATIONS.

EX A RALEIGH STREET AND EAST GRAND AVENUE-FAIRFIELD ROAD - UNDER CONSTRUCTIONEXB ATLANTIC AVENUE AND THOMAS STREET - UNDER CONSTRUCTIONEXC GEORGE STREET AND TARBORO STREET - UNDER CONSTRUCTIONEXD BENVENUE ROAD AND TIFFANY BOULEVARD - COMPLETEEXE SUNSET AVENUE AND BUCK LEONARD BOULEVARD - COMPLETE

EDGECOMBENASH

ROCKY MOUNT

UNDER CONSTRUCTION

C-5113 240 240MAIN STREET SIGNAL SYNCHRONIZATION.EX

EDGECOMBE TARBORO

ENHANCEMENT (CALL PROJECTS)E-5501 224FREEDOM ROADS. INSTALL INTERACTIVE

WAYSIDE SIGNAGE FOR DESIGNATED SITES.

TRN

STPE 96C O 128C

ALAMANCEBEAUFORTBRUNSWICKBUNCOMBECAMDENCHOWANCRAVENDAREDURHAMEDGECOMBEGUILFORDHALIFAXLENOIRPASQUOTANKWASHINGTONWAYNE

VARIOUS

INTERSTATE PROJECTSI-5724 1100NASH COUNTY LINE TO SR 1226 (BELLAMY

LAKE ROAD). PAVEMENT REHABILITATION.2

SW

NHPIM C 1100 HALIFAX I-95

4-8 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 4

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025RURAL PROJECTS

R-3822 7126NC 125 TO SOUTH OF US 158. CONSTRUCT TWO-LANE FACILITY ON NEW LOCATION

1.5

DIV

T R 1225 A T R 150 B T U 147 A T 1500C B T 4104C A

A SOUTH OF PROPOSED BRIDGE OVER CHOCKOYOTTE CREEK TO NC 125, CONSTRUCT TWO-LANE FACILITY ON NEW LOCATION.DIVB PROPOSED BRIDGE OVER CHOCKOYOTTE CREEK TO SERVICE ROAD/ PREMIER BOULEVARD, CONSTRUCT TWO-LANE FACILITY ON NEW LOCATION.DIV

HALIFAX NEW ROUTE

URBAN PROJECTSU-5725 20526I-95 TO OLD FARM ROAD. WIDEN TO MULTI-

LANES.1.65

REG

T 7945R T 953U T 11628C

HALIFAX NC 125

FEASIBILITY STUDIES

PROGRAMMED FOR PLANNING AND ENVIRONMENTAL STUDY ONLY

I-5133 10034 10034CORRIDOR PLANNING AND FINANCE STUDY. SOUTH CAROLINA STATE LINE TO THE VIRGINIA STATE LINE.

CUMBERLANDHALIFAXHARNETTJOHNSTONNASHNORTHAMPTONROBESONWILSON

I-95

FEDERAL BRIDGE PROJECTSB-5662 1100REPLACE BRIDGE NO. 93 OVER

CONOCONNARA SWAMP.HF

HFB R 100 HFB 1000C

HALIFAX NC 561

B-4761 1910 240REPLACE BRIDGE NO. 29 OVER LITTLE FISHING CREEK.

HF

HFB 160R HFB 10U HFB C 1500

HALIFAX NC 561

DIVISION PURCHASE ORDER CONTRACT

B-5657 617REPLACE BRIDGE NO. 15 OVER BEAVERDAM SWAMP.

DIV

STPOFF 29R STPOFF 588C

HALIFAX SR 1001(JUSTICE BRANCHROAD)

B-4537 1110 9REPLACE BRIDGE NO. 127 OVER JACKET SWAMP.

HF

HFB R 100 HFB M 1 HFB C 1000

HALIFAX SR 1002(RINGWOOD ROAD)

B-4935 575REPLACE BRIDGE NO. 120 OVER BRANCH OF DEEP CREEK.

HF

HFB R 50 HFB C 525

HALIFAX SR 1003(MOONLIGHT ROAD)

B-5660 1436REPLACE BRIDGE NO. 65 OVER DEEP CREEK.

DIV

STPOFF 68R STPOFF C 1368

HALIFAX SR 1100(BELLS BRIDGEROAD)

DIVISION PURCHASE ORDER CONTRACT

B-5665 259REPLACE BRIDGE NO. 138 OVER LITTLE FISHING CREEK.

HF

HFB 25R HFB C 234

HALIFAX SR 1309(SPRUILLS BRIDGE ROAD)

4-9 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 4

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS

DIVISION PURCHASE ORDER CONTRACT

B-5672 1058REPLACE BRIDGE NO. 134 OVER BEAR SWAMP.

HF

HFB 100R HFB C 958

HALIFAX SR 1310(AIRLIE ROAD)

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5104 17209 15209DIVISION 4 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

EDGECOMBEHALIFAXJOHNSTONNASHWAYNEWILSON

VARIOUS

MITIGATION PROJECTS

IN PROGRESS

EE-4904 12135 12135ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 4 PROJECT MITIGATION.

EDGECOMBEHALIFAXJOHNSTONNASHWAYNEWILSON

VARIOUS

HAZARD ELIMINATION PROJECTS

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5204 2477 2477DIVISION 4 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

EDGECOMBEHALIFAXJOHNSTONNASHWAYNEWILSON

VARIOUS

ENHANCEMENT (CALL PROJECTS)E-5501 224FREEDOM ROADS. INSTALL INTERACTIVE

WAYSIDE SIGNAGE FOR DESIGNATED SITES.

TRN

STPE 96C O 128C

ALAMANCEBEAUFORTBRUNSWICKBUNCOMBECAMDENCHOWANCRAVENDAREDURHAMEDGECOMBEGUILFORDHALIFAXLENOIRPASQUOTANKWASHINGTONWAYNE

VARIOUS

INTERSTATE PROJECTS

PLANNING/DESIGN IN PROGRESS - COORDINATE WITH I-5111

I-4739 9361 2691ACCESS IMPROVEMENTS IN THE VICINITY OF EXISTING I-40/NC 42 INTERCHANGE.

2

SW

NHP R 920 NHP C 2875 2875C

JOHNSTON I-40

I-5817 7601.8 MILES EAST OF SR 1010 (CLEVELAND ROAD) TO 1 MILE EAST OF SR 1525 (CORNWALLIS ROAD). PAVEMENT REHABILITATION.

1SW

NHPIM C 760 JOHNSTON I-40

4-10 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 4

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025INTERSTATE PROJECTS

I-5816 2042WAKE COUNTY LINE TO 0.5 MILE EAST OF NC 42. PAVEMENT REHABILITATION.

2SW

NHPIM C 2042 JOHNSTON I-40

I-5783 25SR 1211 (MORGAN ROAD) TO SAMPSON COUNTY LINE. PAVEMENT REHABILITATION.

10.6SW

NHPIM C 25 JOHNSTON I-40

I-5782 8500.3 MILE EAST OF I-95 TO SR 1211 (MORGAN ROAD). PAVEMENT REHABILITATION.

1SW

NHPIM C 850 JOHNSTON I-40

I-5781 29001.1 MILES EAST OF NC 242 TO 0.3 MILES EAST OF I-95. PAVEMENT REHABILITATION.

1.6SW

NHPIM C 2900 JOHNSTON I-40

I-5723 22600.6 MILES EAST OF SR 1211 (MORGAN ROAD) IN JOHNSTON COUNTY TO 2 MILES EAST OF JOHNSTON COUNTY LINE IN SAMPSON COUNTY. PAVEMENT REHABILITATION.

12.6

SW

NHPIM C 2260 JOHNSTONSAMPSON

I-40

PLANNING / DESIGN IN PROGRESS - COORDINATE WITH R-2828 AND R-2829

I-5111 157009 2594I-440 / US 64 (EXIT 301) TO NC 42 (EXIT 312). ADDITIONAL LANES AND ITS DEPLOYMENT ON ALTERNATE ROUTES FOR TRAFFIC MANAGEMENT.

11 NHP R 5000 A NHP M 566 A NHP C 13250 A C 13250 A C 13250 A 13250C A NHP R 7500 BA R 7500 BA NHP M 849 BA NHP C 10750 BA C 10750 BA C 10750 BA 10750C BA NHP R 7500 BB R 7500 BB NHP C 7334 BB C 7333 BB C 7333 BB

A I-440 / US 64 (EXIT 301) TO US 70 BUSINESS (EXIT 306)SWBA US 70 BUSINESS (EXIT 306) TO JOHNSTON COUNTY LINESWBB WAKE COUNTY LINE TO NC 42REG

JOHNSTONWAKE

I-40

I-5786 1600.4 MILE NORTH OF US 70 BYPASS TO 0.2 MILE NORTH OF NC 222. PAVEMENT REHABILITATION.

11.4SW

NHPIM C 160 JOHNSTON I-95

I-5784 9000SR 1162 (BLACK CREEK ROAD) TO 0.4 MILE NORTH OF US 70 BYPASS. PAVEMENT REHABILITATION.

9.7SW

NHPIM C 9000 JOHNSTON I-95

I-5303 4650JOHNSTON COUNTY LINE (MILE POST 77) TO EAST OF I-40 (MILE POST 84). PAVEMENT REHABILITATION.

6.1SW

NHPIM 4650C JOHNSTON I-95

PLANNING/DESIGN IN PROGRESS

I-3318 30858 13358US 70 (EXIT 97) TO US 301 (EXIT 107). PAVEMENT AND BRIDGE REHABILITATION.

10.7 NHPIM 5000C BA NHPIM C 12500 BB

A US 70 (EXIT 97) TO NORTH OF SR 1001 (MILEPOST 100) - COMPLETEBA NORTH OF SR 1001 (MILEPOST 100) TO US 301 (EXIT 107)BB REPLACE BRIDGE NO. 114 AND BRIDGE NO. 116 AND APPROACHES OVER LITTLE RIVER - RIGHT OF WAY IN PROGRESSTRN

JOHNSTON I-95

RURAL PROJECTS

PLANNING/DESIGN IN PROGRESS - "A" COMPLETE

R-3825 30196 9896US 70 TO SR 1003 (BUFFALOE ROAD). WIDEN TO MULTI-LANES.

6 T R 3100 B T C 17200 B

A US 70 AT CLAYTON TO EAST OF SR 1902 (GLEN LAUREL ROAD) - COMPLETEB EAST OF SR 1902 (GLEN LAUREL ROAD) TO SR 1003 (BUFFALOE ROAD)DIV

JOHNSTON NC 42

R-3410 90958NC 50 TO US 70 BUSINESS. WIDEN TO MULTI-LANES.

8

REG

T 9134R A T 1096U A T 15236C A C 15236 A C 15237 AT 5562R B T 667U B T 9597C B C 9597 B C 9596 B

A US 70 BYPASS TO US 70 BUSINESS, WIDEN TO MULTI-LANESREGB NC 50 TO US 70 BYPASS, WIDEN TO MULTI-LANESREG

JOHNSTON NC 42

R-5718 7239US 70 TO SR 1934 (OLD BEULAH ROAD). WIDEN TO THREE LANES.

1.3

DIV

NHP R 560 NHP U 67 NHP 6612C

JOHNSTON SR 1003(BUFFALO ROAD)

4-11 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 4

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025RURAL PROJECTS

R-5722 1079SR 1501 (SWIFT CREEK ROAD) TO EAST OF SR 1908 (FIRE DEPARTMENT ROAD). INTERSECTION IMPROVEMENTS AT WILSON'S MILLS ELEMENTARY SCHOOL.

0.3

DIV

T R 192 T U 23 T C 864

JOHNSTON SR 1913(WILSON'S MILLS ROAD)

PLANNING / DESIGN IN PROGRESS - NORTH CAROLINA TURNPIKE AUTHORITY PROJECT - COORDINATE WITH I-5111

R-2829* 478907 6635EASTERN WAKE FREEWAY / TRIANGLE EXPRESSWAY SOUTHEAST EXTENSION (RALEIGH OUTER LOOP), I-40 TO US 64 / US 264 BYPASS. FREEWAY ON NEW LOCATION.

10.8

SW

BOND R R 18800T R 18800BOND R U 1550T U 1550BOND R 16273M BOND R 150865C T 264434C

JOHNSTONWAKE

NEW ROUTE(FUTURE NC 540)

PLANNING / DESIGN IN PROGRESS - NORTH CAROLINA TURNPIKE AUTHORITY DESIGN-BUILD PROJECT - COORDINATE WITH I-5111

R-2828* 550265 16952SOUTHERN WAKE FREEWAY / TRIANGLE EXPRESSWAY SOUTHEAST EXTENSION (RALEIGH OUTER LOOP), US 401 TO I-40. CONSTRUCT FREEWAY ON NEW LOCATION.

8.7

SW

BOND R 15300R T 22800R T 2000U BOND R 30363M BOND R 67917C67917C C 67916 T 86367C86367C C 86366

JOHNSTONWAKE

NEW ROUTE(FUTURE NC 540)

R-3618 30548SR 1553 (SHOTWELL ROAD) SOUTHWEST OF US 70 TO NC 42 EAST OF CLAYTON. CONSTRUCT TWO LANE ROAD ON MULTI-LANE RIGHT OF WAY.

5

DIV

T R 6665 R 6665T U 1600 T 15618C

JOHNSTON NEW ROUTE

URBAN PROJECTSU-3464 31956NC 96 TO SR 1007 (BRODGEN ROAD).

WIDEN TO MULTI-LANES.3.7

REG

NHP 8480R NHP 1018U NHP 14972C C 7486

JOHNSTON US 301NC 96

U-5726 13317SR 1623 (BOOKER DAIRY ROAD) TO SR 2302 (RICKS ROAD). CONSTRUCT ACCESS MANAGEMENT IMPROVEMENTS.

1.6

REG

NHP 2704R NHP 324U NHP 5144C C 5145

JOHNSTON US 301NC 39NC 96

U-3334 32441 22051US 70 BUSINESS WEST OF SMITHFIELD TO US 301 (BRIGHT LEAF BOULEVARD) IN SMITHFIELD. CONSTRUCT TWO LANE ROAD, PART ON NEW LOCATION.

3.7

DIV

T R 4090 B T C 6300 B

A US 70 BUSINESS TO SR 1003 (BUFFALO ROAD) - COMPLETEB SR 1003 (BUFFALO ROAD) TO US 301 (BRIGHTLEAF BOULEVARD)DIV

JOHNSTON SR 1923(BOOKER DAIRYROAD EXTENSION)

U-5795 3984US 70 TO US 301. WIDEN TO THREE LANES. 0.8

DIV

T R 605 T U 73 T 3306C

JOHNSTON SR 2302(RICKS ROAD)

FORMERLY U-9999B - IN PROGRESS

U-4850 13569 7569CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION (CAMPO) PLANNING (PL) SUPPLEMENT.

DIV

STPDA 1200PE PE 1200 PE 1200 PE 1200 L 300PE PE 300 PE 300 PE 300

FRANKLINGRANVILLEHARNETTJOHNSTONWAKE

VARIOUS

4-12 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 4

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025URBAN PROJECTS

U-4735 74634CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION (CAMPO) STPDA FUNDS - RESERVED FOR FUTURE PROGRAMMING.

DIV

STPDA C 7956 C 11113 11113C11113C11113C C 11113 C 11113FRANKLINGRANVILLEHARNETTJOHNSTONWAKE

VARIOUS

PLANNING, DESIGN, RIGHT OF WAY AND CONSTRUCTION BY OTHERS - IN PROGRESS.

U-5118 20820 13485OPERATIONAL IMPROVEMENTS FOR SAFETY AND CONGESTION MITIGATION.

DIV

STPDA 500R R 100 L 100R R 25 STPDA 4500C C 788 O 1125C C 197

FRANKLINGRANVILLEHARNETTJOHNSTONWAKE

VARIOUS

FEASIBILITY STUDIES

PROGRAMMED FOR PLANNING AND ENVIRONMENTAL STUDY ONLY

I-5133 10034 10034CORRIDOR PLANNING AND FINANCE STUDY. SOUTH CAROLINA STATE LINE TO THE VIRGINIA STATE LINE.

CUMBERLANDHALIFAXHARNETTJOHNSTONNASHNORTHAMPTONROBESONWILSON

I-95

FEDERAL BRIDGE PROJECTSB-4937 10200REPLACE BRIDGE NO. 118 AND BRIDGE NO.

119 OVER CSX RAILROAD.HF

HFB R 900 HFB 9300C

JOHNSTON I-95

B-5663 1210REPLACE BRIDGE NO. 46 OVER MILL CREEK.

HF

HFB 110R HFB 1100C

JOHNSTON SR 1124(REEDY PONDCHURCH ROAD)

B-4770 2545 100REPLACE BRIDGE NO. 32 OVER HANNAH CREEK.

HF

HFB R 220 HFB C 2225

JOHNSTON SR 1185(JOYNER BRIDGEROAD)

B-4771 2741 100REPLACE BRIDGE NO. 11 OVER MILL CREEK.

HF

HFB R 240 HFB M 1 HFB C 2400

JOHNSTON SR 1201(RICHARDSON BRIDGEROAD)

B-5654 634REPLACE BRIDGE NO. 141 OVER WHITE OAK CREEK.

DIV

STPOFF R 30 STPOFF 302C302C

JOHNSTON SR 1550(WINSTON ROAD)

B-5664 1980REPLACE BRIDGE NO. 145 OVER SWIFT CREEK.

HF

HFB 180R HFB 1800C

JOHNSTON SR 1555(BARBOUR MILLROAD)

DIVISION PURCHASE ORDER CONTRACT

B-5659 326REPLACE BRIDGE NO. 432 OVER CATTAIL CREEK.

DIV

STPOFF R 16 STPOFF 155C155C

JOHNSTON SR 1738(EATMON ROAD)

4-13 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 4

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS

DIVISION PURCHASE ORDER CONTRACT

B-5661 1020REPLACE BRIDGE NO. 243 OVER LITTLE RIVER.

HF

HFB 95R HFB C 925

JOHNSTON SR 2123(OLD DAM ROAD)

B-4562 1384 9REPLACE BRIDGE NO. 216 OVER LITTLE BUFFALO CREEK.

DIV

STPOFF 125R STPOFF C 625 C 625

JOHNSTON SR 2143(BEULAHTOWN ROAD)

DIVISION PURCHASE ORDER CONTRACT

B-5667 782REPLACE BRIDGE NO. 231 OVER LITTLE BUFFALO CREEK.

HF

HFB 70R HFB C 712

JOHNSTON SR 2159(BOTTLENECK ROAD)

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5104 17209 15209DIVISION 4 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

EDGECOMBEHALIFAXJOHNSTONNASHWAYNEWILSON

VARIOUS

MITIGATION PROJECTS

IN PROGRESS

EE-4904 12135 12135ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 4 PROJECT MITIGATION.

EDGECOMBEHALIFAXJOHNSTONNASHWAYNEWILSON

VARIOUS

HAZARD ELIMINATION PROJECTSW-5107 18649 1750SR 2305 (FIRETOWER ROAD) TO EAST OF SR

2310 (DAVIS MILL ROAD/STEVENS CHAPEL ROAD). SAFETY IMPROVEMENTS.SW

HSIP 5633C C 5633 C 5633 JOHNSTON US 70

W-5600 30914US 70 BUSINESS TO NEUSE RIVER BRIDGE. CONVERT TO FREEWAY WITH INTERCHANGES AT SR 1501 (SWIFT CREEK ROAD) AND SR 1919 (WILSON'S MILLS ROAD).DIV

HSIP R 4380 HSIP U 526 HSIP C 8669 8670C8669C

JOHNSTON US 70

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5204 2477 2477DIVISION 4 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

EDGECOMBEHALIFAXJOHNSTONNASHWAYNEWILSON

VARIOUS

CONGESTION MITIGATION PROJECTSC-5565 4422TRIANGLE J COUNCIL OF GOVERNMENTS

TRANSPORTATION DEMAND MANAGEMENT PROGRAM - PHASE II.

EX

CMAQ 482I A I 572 A I 620 A I 640 A L 430I A I 496 A I 579 A I 603 A

A DEVELOP FLEXIBLE WORK SCHEDULES IN CAMPO AREA.EXB DEVELOP FLEXIBLE WORK SCHEDULES IN DCHC AREA.

CHATHAMDURHAMFRANKLINGRANVILLEJOHNSTONORANGEWAKE

VARIOUS

4-14 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 4

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025CONGESTION MITIGATION PROJECTS

C-5604 11695PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE CAPITAL AREA MPO.

EX

CMAQ C 5857 C 5838 FRANKLINGRANVILLEJOHNSTONWAKE

VARIOUS

C-5619 744PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE UPPER COASTAL PLAIN RPO.

EX

CMAQ C 372 C 372 EDGECOMBEJOHNSTONNASH

VARIOUS

INTERSTATE PROJECTSI-5725 49401 MILE NORTH OF NC 58 TO SR 1700 (OAK

LEVEL ROAD). PAVEMENT REHABILITATION.4.6

SW

NHPIM C 4940 NASH I-95

I-5726 3915SR 1524 (RED OAK-BATTLEBORO ROAD) TO HALIFAX COUNTY LINE. PAVEMENT REHABILITATION.

7.9SW

NHPIM C 3915 NASH I-95

I-5761 19001.1 MILES NORTH OF SR 1603 (OLD CARRIAGE ROAD) TO 1.7 MILES NORTH OF SR 1700 (OAK LEVEL ROAD). PAVEMENT REHABILITATION.

1.7SW

NHPIM C 1900 NASH I-95

I-5841 2500SR 1745 (BEND OF THE RIVER ROAD) TO 1 MILE NORTH OF NC 58. PAVEMENT REHABILITATION.

2.6SW

NHPIM C 2500 NASH I-95

RURAL PROJECTSR-5720 30708SR 1003 (RED OAK ROAD) TO SR 1603 (OLD

CARRIAGE ROAD). WIDEN TO MULTI-LANES.2.5

DIV

T R 6126 6126R T U 735 735U T 5662C5662C C 5662

NASH SR 1770(EASTERN AVENUE)

COMPLETE - GARVEE BOND FUNDING $32.1 MILLION; PAYBACK FY 2008-2019

R-2823 68894 54810SR 1604 (HUNTER HILL ROAD) TO US 301 IN ROCKY MOUNT. WIDEN TO MULTI-LANES, PART ON NEW LOCATION.

4.5

TRN

STP RG 505 RG 505 RG 505 RG 505 STP CG 3016 CG 3016 CG 3016 CG 3016

NASH ROCKY MOUNTNORTHERN CONNECTOR

URBAN PROJECTS

PLANNING/DESIGN IN PROGRESS

U-5026 43000 200SR 1770 (SUNSET AVENUE). CONVERT GRADE SEPARATION TO AN INTERCHANGE.

DIV

NHP R 9000 R 9000 NHP 8266C8267C8267C

NASH I-95

PLANNING/DESIGN IN PROGRESS

U-3330 34614 1941NC 43/NC 48 (BENVENUE ROAD) TO SR 1836 (MAY DRIVE) IN ROCKY MOUNT. ADD AN ADDITIONAL LANE IN EACH DIRECTION.

2.3

REG

NHP 3563R R 3562 NHP 3625U NHP M 23 NHP C 7300 C 7300 C 7300

NASH US 301 BYPASS

PLANNING/DESIGN IN PROGRESS

U-3621 28324 20524SR 1613 (NORTH WINSTEAD AVENUE) TO NC 43/NC 48 (BENVENUE ROAD) IN ROCKY MOUNT. WIDEN TO MULTI-LANES.

2.4 T R 1800 A T C 2000 A C 2000 A C 2000 A

A SR 1613 (NORTH WINSTEAD AVENUE) TO SR 1616 (COUNTRY CLUB ROAD)DIVB SR 1616 (COUNTRY CLUB ROAD) TO NC 43/NC 48 (BENVENUE ROAD) - UNDER CONSTRUCTION

NASH SR 1604(HUNTER HILL ROAD)

UNDER CONSTRUCTION

U-3331 17851 17851US 64 BUSINESS TO SR 1541 (JEFFREYS ROAD) IN ROCKY MOUNT. WIDEN TO MULTI-LANES.

1.1

TRN

NASH SR 1616(COUNTRY CLUB ROAD)

4-15 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 4

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEASIBILITY STUDIES

PROGRAMMED FOR PLANNING AND ENVIRONMENTAL STUDY ONLY

I-5133 10034 10034CORRIDOR PLANNING AND FINANCE STUDY. SOUTH CAROLINA STATE LINE TO THE VIRGINIA STATE LINE.

CUMBERLANDHALIFAXHARNETTJOHNSTONNASHNORTHAMPTONROBESONWILSON

I-95

SCHEDULED FOR FEASIBILITY STUDY

FS-1504A SR 1003 (ROLESVILLE ROAD) IN WAKE COUNTY TO US 17 IN WILLIAMSTON. UPGRADE TO INTERSTATE STANDARDS.

86.5EDGECOMBEFRANKLINMARTINNASHWAKE

US 64

FEDERAL BRIDGE PROJECTSB-5670 5118REPLACE BRIDGE NO. 29 OVER TAR RIVER.

HF

HFB 465R HFB 3M HFB C 4650

NASH US 64 ALTERNATE

RIGHT OF WAY IN PROGRESS

B-5124 6804 704REPLACE BRIDGE NO. 151 OVER SWIFT CREEK, BRIDGE NO. 141 AND BRIDGE NO. 85 OVER SWIFT CREEK OVERFLOW.REG

STPON 6100C NASH US 301

B-5668 1430REPLACE BRIDGE NO. 103 OVER TRIBUTARY OF TURKEY CREEK.

HF

HFB 130R HFB 1300C

NASH SR 1105(OLD MIDDLESEX ROAD)

B-5669 1626REPLACE BRIDGE NO. 143 OVER STONEY CREEK.

HF

HFB 150R HFB 1M HFB 1475C

NASH SR 1302(VICK ROAD)

DIVISION PURCHASE ORDER CONTRACT

B-5658 660REPLACE BRIDGE NO. 126 OVER BIG PEACHTREE CREEK.

DIV

STPOFF 31R STPOFF C 315 C 314

NASH SR 1310(TAYLOR'S GIN ROAD)

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5104 17209 15209DIVISION 4 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

EDGECOMBEHALIFAXJOHNSTONNASHWAYNEWILSON

VARIOUS

MITIGATION PROJECTS

IN PROGRESS

EE-4904 12135 12135ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 4 PROJECT MITIGATION.

EDGECOMBEHALIFAXJOHNSTONNASHWAYNEWILSON

VARIOUS

4-16 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 4

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025HAZARD ELIMINATION PROJECTS

UNDER CONSTRUCTION

W-5108 1175 1175NORTH OF SR 1845 (PORTER ROAD) TO BURROWS STREET. SAFETY IMPROVEMENTS.

6.6TRN

NASH US 301

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5204 2477 2477DIVISION 4 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

EDGECOMBEHALIFAXJOHNSTONNASHWAYNEWILSON

VARIOUS

CONGESTION MITIGATION PROJECTSC-5616 898PROJECTS TO IMPROVE CONGESTION AND

AIR QUALITY IN THE ROCKY MOUNT MPO.EX

CMAQ C 449 C 449 EDGECOMBENASH

VARIOUS

C-5619 744PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE UPPER COASTAL PLAIN RPO.

EX

CMAQ C 372 C 372 EDGECOMBEJOHNSTONNASH

VARIOUS

UNDER CONSTRUCTION

C-5545 172 172WASHINGTON STREET, NC 58 (FIRST STREET) TO CHURCH STREET AND ALSTON STREET, CIRCLE DRIVE NORTH TO CIRCLE DRIVE SOUTH. CONSTRUCT SIDEWALKS.

EXNASH NASHVILLE

C-5549 533NASHVILLE ROAD, RALEIGH ROAD, WINSTEAD AVENUE AND RALEIGH STREET. CONSTRUCT SIDEWALKS.

EX

CMAQ 43PE L 11PE CMAQ 383C L 96C

NASH ROCKY MOUNT

C-5548 469 47BENVENUE STREET, TARBORO STREET, FALLS ROAD, FRANKLIN STREET, LEGETT ROAD, AND CHURCH STREET. CONSTRUCT SIDEWALKS.

EX

CMAQ 338C L 84C

NASH ROCKY MOUNT

UNDER CONSTRUCTION

C-5547 287 287NASHVILLE ROAD AND GRACE STREET. CONSTRUCT SIDEWALKS.EX

NASH ROCKY MOUNT

C-5546 146 16BENVENUE ROAD (NC43/48) AT JEFFERYS ROAD. INTERSECTION IMPROVEMENTS.

EX

CMAQ 104C L 26C

NASH ROCKY MOUNT

UNDER CONSTRUCTION

C-5112 6382 6382EXPANSION AND UPGRADE OF TRAFFIC SIGNAL SYSTEM IN ROCKY MOUNT.

EX

EDGECOMBENASH

ROCKY MOUNT

C-4970 286 286INTERSECTION IMPROVEMENTS AT VARIOUS LOCATIONS.

EX A RALEIGH STREET AND EAST GRAND AVENUE-FAIRFIELD ROAD - UNDER CONSTRUCTIONEXB ATLANTIC AVENUE AND THOMAS STREET - UNDER CONSTRUCTIONEXC GEORGE STREET AND TARBORO STREET - UNDER CONSTRUCTIONEXD BENVENUE ROAD AND TIFFANY BOULEVARD - COMPLETEEXE SUNSET AVENUE AND BUCK LEONARD BOULEVARD - COMPLETE

EDGECOMBENASH

ROCKY MOUNT

4-17 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 4

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025RURAL PROJECTS

UNDER CONSTRUCTION - SECTION BA - GARVEE BOND FUNDING $68.8 MILLION; PAYBACK FY 2008 - FY 2019; PLANNING/DESIGN IN PROGRESS

R-2554* 364068 332763WEST OF NC 581 IN WAYNE COUNTY TO EAST OF SR 1323 (PROMISE LAND ROAD) IN LENOIR COUNTY. FOUR LANE DIVIDED FREEWAY ON NEW LOCATION.

20.5 NHP CG 7545 BA CG 7545 BA CG 7545 BA CG 7545 BA NHP 1125C D

A WEST OF NC 581 TO EAST OF SR 1300 (SALEM CHURCH ROAD) - UNDER CONSTRUCTIONTRNBA EAST OF SR 1300 (SALEM CHURCH ROAD) TO EAST OF SR 1556 (WAYNE MEMORIAL DRIVE) - COMPLETEBB EAST OF SR 1556 (WAYNE MEMORIAL DRIVE) TO WEST OF SR 1714 (CREEK ROAD) - UNDER CONSTRUCTIONTRNC WEST OF SR 1714 (CREEK ROAD) TO EAST OF SR 1323 (PROMISE LAND ROAD) - UNDER CONSTRUCTIONTRND IMPLEMENTATION OF INTELLIGENT TRANSPORTATION SYSTEMS (ITS)TRN

LENOIRWAYNE

US 70(GOLDSBOROBYPASS)

R-5719 11640SR 1135 (COUNTRY CLUB ROAD). CONSTRUCT INTERCHANGE WITH US 117.

DIV

NHP R 1380 NHP 10260C

WAYNE US 117

URBAN PROJECTSU-5724 1395REALIGNMENT OF SR 1709 (CENTRAL

HEIGHTS ROAD) AT BERKELEY BOULEVARD.

REG

NHP R 270 NHP 1125C

WAYNE US 13(BERKELEY BOULEVARD

PLANNING/DESIGN IN PROGRESS

U-3609 15687 4037SR 1560 (ROYAL AVENUE) TO NORTH OF SR 1705 (HOOD SWAMP ROAD) IN GOLDSBORO. WIDEN TO MULTI-LANES.

3 STP 4000R B STP C 7650 B

A SR 1560 (ROYAL AVENUE) TO SR 1003 (NEW HOPE ROAD) - UNDER CONSTRUCTIONTRNB SR 1003 (NEW HOPE ROAD) TO NORTH OF SR 1705 (HOOD SWAMP ROAD)REG

WAYNE US 13(BERKELEY BOULEVARD)

U-4407 20091SR 1579 (BERKELEY BOULEVARD) EAST TO US 70 BYPASS. WIDEN TO MULTI-LANES.

1.8

REG

T R 2772 T U 333 T 16986C

WAYNE US 70 BUSINESS(EAST ASH STREET)

U-5796 8676SR 1120 (O'BERRY ROAD). CONSTRUCT INTERCHANGE.

DIV

NHP R 1380 NHP C 7296

WAYNE US 117

U-2714 20947US 70 BYPASS TO SR 1306 (FEDELON TRAIL). WIDEN ROADWAY AND MAKE SAFETY IMPROVEMENTS.

1.12

REG

NHP R 890 NHP U 107 NHP C 9975 9975C

WAYNE US 117

U-3611 49190SR 1556 (WAYNE MEMORIAL DRIVE) TO SR 1713 (MILLER'S CHAPEL ROAD). WIDEN TO MULTI-LANES.

5.1

DIV

T R 4517T U 1084T 43589C

WAYNE SR 1003(NEW HOPE ROAD)

PLANNING/DESIGN IN PROGRESS

U-4753 13700SR 1003 (NEW HOPE ROAD) TO PROPOSED US 70 BYPASS IN GOLDSBORO. WIDEN TO MULTI-LANES.

0.9

DIV

T 4400R T 3100C C 3100 C 3100

WAYNE SR 1556(WAYNE MEMORIALDRIVE)

FEASIBILITY STUDIES

SCHEDULED FOR FEASIBILITY STUDY

FS-1504B SR 1705 (HOOD SWAMP ROAD) TO SR 1572 (SAULSTON ROAD). WIDEN TO MULTI-LANES.

1.8WAYNE US 13

FEASIBILITY STUDY IN PROGRESS

FS-1204A PROPOSED US 70 GOLDSBORO BYPASS TO THE JOHNSTON COUNTY LINE. UPGRADE EXISTING FACILITY TO A FREEWAY.

WAYNE US 70

FEASIBILITY STUDY IN PROGRESS

FS-1004A INTERSECTION WITH SR 1560 (ROYAL AVENUE) AND US 13 (BERKELEY BOULEVARD). REALIGN INTERSECTION.

WAYNE SR 1709(CENTRAL HEIGHT ROAD)

4-18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 4

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS

B-4838 6090 150REPLACE BRIDGE NO. 20 OVER CSX RAILROAD.

HF

HFB R 540 HFB 5400C

WAYNE US 70 BUSINESS

B-4839 1255 100REPLACE BRIDGE NO. 96 OVER THOROUGHFARE SWAMP.

DIV

STPOFF R 105 STPOFF C 350 350C350C

WAYNE SR 1006(CORBETT HILLROAD)

B-4941 551REPLACE BRIDGE NO. 93 OVER TOWN CREEK.

HF

HFB R 50 HFB M 1 HFB C 500

WAYNE SR 1009(JORDAN STOREROAD)

B-4840 850REPLACE BRIDGE NO. 264 OVER THUNDER SWAMP.

HF

HFB R 75 HFB C 775

WAYNE SR 1117(THUNDER SWAMPROAD)

DIVISION PURCHASE ORDER CONTRACT

B-5656 436REPLACE BRIDGE NO. 133 OVER YELLOW SWAMP.

DIV

STPOFF 21R STPOFF 415C

WAYNE SR 1127(HERRING ROAD)

B-4842 1431REPLACE BRIDGE NO. 45 OVER GREAT SWAMP.

HF

HFB R 130 HFB M 1 HFB C 1300

WAYNE SR 1353(HOOKS ROAD)

B-4844 2357 360REPLACE BRIDGE NO. 117 OVER NORTHEAST CAPE FEAR RIVER.

DIV

STPOFF R 180 STPOFF M 17 STPOFF 600C600C600C

WAYNE SR 1502(ARTHUR DAVIS ROAD)SR 1958(BENNETTS BRIDGEROAD)

B-4940 1625REPLACE BRIDGE NO. 25 OVER EXUM MILL BRANCH.

HF

HFB R 150 HFB C 1475

WAYNE SR 1575(BARTLETT ROAD)

B-4942 850REPLACE BRIDGE NO. 121 OVER WEST BEAR CREEK.

HF

HFB R 75 HFB C 775

WAYNE SR 1702(MARK EDWARDS ROAD)

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5104 17209 15209DIVISION 4 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

EDGECOMBEHALIFAXJOHNSTONNASHWAYNEWILSON

VARIOUS

MITIGATION PROJECTS

IN PROGRESS

EE-4904 12135 12135ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 4 PROJECT MITIGATION.

EDGECOMBEHALIFAXJOHNSTONNASHWAYNEWILSON

VARIOUS

4-19 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 4

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025HAZARD ELIMINATION PROJECTS

W-5500 3183 250SR 1622 (WOODSIDE DRIVE) TO SR 1752 (SAULSTON-PATETOWN ROAD). SAFETY IMPROVEMENTS INCLUDING WIDENING, SHOULDERS, SUPERELEVATION REVISIONS, OVERLAYING PAVEMENT MARKINGS AND SIGNING.

TRN

HSIP 1428R HSIP C 1505

WAYNE SR 1556(WAYNE MEMORIALDRIVE)

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5204 2477 2477DIVISION 4 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

EDGECOMBEHALIFAXJOHNSTONNASHWAYNEWILSON

VARIOUS

ENHANCEMENT (CALL PROJECTS)E-5501 224FREEDOM ROADS. INSTALL INTERACTIVE

WAYSIDE SIGNAGE FOR DESIGNATED SITES.

TRN

STPE 96C O 128C

ALAMANCEBEAUFORTBRUNSWICKBUNCOMBECAMDENCHOWANCRAVENDAREDURHAMEDGECOMBEGUILFORDHALIFAXLENOIRPASQUOTANKWASHINGTONWAYNE

VARIOUS

INTERSTATE PROJECTSI-5727 45250.2 MILES NORTH OF SR 1116 (GOVERNOR

HUNT ROAD) TO 2 MILES NORTH OF SR 1154 (ST. ROSE CHURCH ROAD). PAVEMENT REHABILITATION.

5SW

NHPIM C 4525 WILSON I-95

I-5728 5600.2 MILES NORTH OF US 301 TO 2.2 MILES NORTH OF US 301. PAVEMENT REHABILITATION.

2SW

NHPIM C 560 WILSON I-95

I-5742 29000.5 MILES NORTH OF I-795 TO 0.7 MILES NORTH OF SR 1309 (BLOOMERY ROAD). PAVEMENT REHABILITATION.

3.9SW

NHPIM C 2900 WILSON I-95

I-5842 7500.7 MILE NORTH OF SR 1309 (BLOOMERY ROAD) TO NASH COUNTY LINE. PAVEMENT REHABILITATION.

0.9SW

NHPIM C 750 WILSON I-95

I-5818 43260.2 MILE NORTH OF US 301 TO I-95. PAVEMENT REHABILITATION.

5.4SW

NHPIM C 4326 WILSON I-795

URBAN PROJECTSU-5794 14008NC 58 TO US 264 ALTERNATE. WIDEN AND

UPGRADE FACILITY.3.7

DIV

T R 100 T 13908C

WILSON SR 1309(BLOOMERY ROAD)SR 1382(PACKHOUSE ROAD)

4-20 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 4

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEASIBILITY STUDIES

PROGRAMMED FOR PLANNING AND ENVIRONMENTAL STUDY ONLY

I-5133 10034 10034CORRIDOR PLANNING AND FINANCE STUDY. SOUTH CAROLINA STATE LINE TO THE VIRGINIA STATE LINE.

CUMBERLANDHALIFAXHARNETTJOHNSTONNASHNORTHAMPTONROBESONWILSON

I-95

FEDERAL BRIDGE PROJECTSB-5666 2360REPLACE BRIDGE NO. 47 OVER SEABOARD

COAST LINE RAILROAD.HF

HFB 210R HFB 2150C

WILSON US 117

B-5313 1085 100REPLACE BRIDGE NO. 109 OVER TOWN CREEK.

HF

HFB R 135 HFB C 850

WILSON SR 1002(TOWN CREEK ROAD)

RIGHT OF WAY IN PROGRESS

B-4681 863 188REPLACE BRIDGE NO. 119 OVER LITTLE CONTENTNEA CREEK.

HF

HFB 675C WILSON SR 1531(EAGLE'S CROSS ROAD)

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5104 17209 15209DIVISION 4 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

EDGECOMBEHALIFAXJOHNSTONNASHWAYNEWILSON

VARIOUS

MITIGATION PROJECTS

IN PROGRESS

EE-4904 12135 12135ECOSYSTEM ENHANCEMENT PROGRAM FOR DIVISION 4 PROJECT MITIGATION.

EDGECOMBEHALIFAXJOHNSTONNASHWAYNEWILSON

VARIOUS

HAZARD ELIMINATION PROJECTS

RIGHT OF WAY IN PROGRESS

W-5331 440 120SOUTH OF SR 1626 (FAIRFIELD DAIRY ROAD) NORTHWARD ONE MILE. CONSTRUCT LEFT TURN LANE AT SR 1626, OVERLAY WITH FRICTION COURSE, RE-STRIPE WITH THERMOPLASTIC MARKINGS AND INSTALL CENTERLINE PAVEMENT MARKINGS.

TRN

HSIP 320C WILSON NC 58

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5204 2477 2477DIVISION 4 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

EDGECOMBEHALIFAXJOHNSTONNASHWAYNEWILSON

VARIOUS

4-21 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

COUNTY ID

FUTURE YEARS

F

RR - Rail-Highway SafetyRTAP - Rural Transit Assistance ProgramS - State I - ImpementationS (M) - State Match O - OperationsSMAP - Operating Assistance and State Maintenance Oc - OPS Funded CapitalSRTS - Safe Routes to School PE - Preliminary EngineeringSTAT - State PL - Planning / DesignSTHSR - Stimulus High Speed Rail R - Right-of-WaySTPDA - Surface Transportation Program - Direct AttributableSTPE - Surface Transportation Program, EnhancementsSTPEB - Surface Transportation Program, Enhancements (Bike)T - State Highway Trust FundsT2001 - State Rail FundsTAP - Transportation Alternatives ProgramTIGER DISC - TIGER Discretionary Grants

HP - Federal-Aid High PriorityJARC - Job Assistance and Reverse Commute (3037)

(1) FUNDING CATEGORY

DURHAM AREA

SR - Secondary Road

TRANSIT PARTNERROUTE / CITY /

NUMBER

TA-4738

LOCATION / DESCRIPTION

PASSENGER AMENITIES - BUS STOP TRANSIT AUTHORITY

DIV

SHELTERS, BENCHES, SHOP EQUIPMENTSPARE PARTS, ENGINES, SERVICE VEHICLES, ETC.

CP

BUS STOP SHELTER AND BENCHES LOCATED AT HOLLOWAY STREET

ESTIMATED COST Preliminary engineering, right of

C10000

dollars.)

of a project segment indicates (Cash-Flow Funding)Mitigation, Utilities or Construction.

way, utility, mitigation and construction cost estimates

(2) FUNDING SOURCES KEY

O - OtherL - Local

initial scheduled year. (Estimates are in thousand of

For other work types or activities see Work Type (Activity) box below.

work description. CPProject termini and a general

conception and remains with

9000

PROJECT BREAKS

CP

Various - multiple routes

A

5000

FY 2022

C

CP 3000CP

BCP 5000 B

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FY 2023 FY 2024FY 2021

STATE TRANSPORTATION IMPROVEMENT PROGRAM

FY 2020

TOTAL PROJECT

COST (THOU)

FUZFUZ

FUN

DS

A

PRIOR YEARS COST

(THOU)

ACP 700

FY 2015 FY 2016

4000CP

FY 2025

5000

BB

CP CP 5000B

UNFUNDED

NON HIGHWAY PROGRAM

ADIV

FY 2017 FY 2018

BSHOP EQUIPMENT, SPARE PARTS, ENGINES, SERVICE VEHICLES, ETC.

WORK TYPE (ACTIVITY) (3)Phases of implementation:

DIV C

20000

COMMITMENTSFUTURE

by funding category in current dollars. Cost may include one or more funding types. Multi-year funding

Preliminary engineering, Right of Way, UNFUNDED

BUS STOP SHELTER AND BENCHES LOCATED AT GREGSON AVENUE

with proposed work type or activity beginning in the

break.

One or two letter

CP

A

for an explanation of funding categories

FUNDING CATEGORY (1)

DIV

DIVISION 00

DEVELOPMENTAL PROGRAM

DURHAM

FY 2019

TRANSIT PARTNERROUTE / CITY /

NEW ROUTE or CityTRANSIT PARTNER

IDENTIFICATION NUMBER Assigned to each project at

US or NC RoutesI - Interstate

project until completion.

C - City

FEPD - Elderly and Persons with Disablity (5310)

FMOD - Fixed Guideway Modifications

designation for project

any project breaks.Category for the project and

LOCATION / DESCRIPTION

used for each project phase.

FUNDING SOURCE (2)

Identifies the "STI" Funding

See Highway Funding Key

FSPR - State Planning and Research

FNF - New Freedom ProgramFNS - New Starts - Capital (5309)

FMPL - Metropolitan Planning (5303)

FED - Federal Rail Funds

FLAP - Federal Lands Access Program

FUZ - Urbanized Area Formula Program (5307)

CMAQ - Congestion Mitigation

FF - Federal Ferry

FNU - Non Urbanized Area Formula Program (5311)

(3) WORK TYPE (ACTIVITY)

C - ConstructionAD - Administrative

CP - Capital

A - AcquisitionHF - State Dollars (Non-STI)REG - RegionalSW - Statewide

DIV - Division

DP - Discretionary or DemonstrationFBUS - Capital Program - Bus Earmark (5309)

 

NON HIGHWAY PROGRAMDIVISION 4

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025BICYCLE AND PEDESTRIAN PROJECTS

EB-5729 4250US 64 TO NC 97 (RALEIGH ROAD), CONSTRUCT STREETSCAPE IMPROVEMENTS.

1.6

DIV

TAP 160PE L 40PE L R 50 TAP C 3200L C 800

EDGECOMBE NC 97(ATLANTIC AVE)

EB-5731 550SR 1243 (LEGGETT ROAD) TO HOLLY STREET PARK, CONSTRUCT NEW GREENWAY.

1

DIV

TAP 40PE L 10PE L R 50 TAP C 360L C 90

EDGECOMBE COWLICK TRAIL

PUBLIC TRANSPORTATION PROJECTSTQ-8002 40CAPITAL - MOBILITY MANAGEMENT

HF

FEPD 28CP L 6CP S 6CP

EDGECOMBENASH

CITY OF ROCKY MOUNT

TQ-6806 100OPERATING

HF

FEPD 50O L 50O

EDGECOMBENASH

CITY OF ROCKY MOUNT

TI-6104 28273 6108INTERCITY BUS FROM RALEIGH TO NORFOLK, VA VIA ELIZABETH CITY ALONG US 64, US 301, US 264, AND US 17 WITH STOPS AT RALEIGH, ROCKY MOUNT, WILSON, GREENVILLE, WASHINGTON, WILLIAMSTON, EDENTON, AND ELIZABETH CITY

HF

FNU 3669O O 2312 O 2312 O 2312 O 2312 O 2312 2312O2312O2312O BEAUFORTBERTIECHOWANEDGECOMBEFRANKLINMARTINNASHPASQUOTANKPERQUIMANSPITTWAKEWILSON

GREYHOUND LINES

TA-5150 2580REPLACEMENT (5) 30 FOOT LOW FLOOR BUSES

HF

FUZ 2060CP S 520CP

EDGECOMBENASH

TAR RIVER TRANSIT

TA-6502 729 72CAPITAL

HF

FNU 657CP EDGECOMBENASH

TAR RIVER TRANSIT

TA-5151 150EXPANSION (2) 25 FOOT LIGHT TRANSIT VEHICLES

HF

FBUS 150CP EDGECOMBENASH

TAR RIVER TRANSIT

TA-5152 100EXPANSION (1) 25 FOOT LIGHT TRANSIT VEHICLE

HF

FBUS 80CP L 20CP

EDGECOMBENASH

TAR RIVER TRANSIT

TG-4785A 1200 276OPERATING ASSISTANCE - ADA PARATRANSIT SERVICE

HF

FUZ 184Oc Oc 92 Oc 93 Oc 93 Oc 93 Oc 93 92Oc92Oc92Oc EDGECOMBENASH

TAR RIVER TRANSIT

TG-4785B 4593 1047PREVENTIVE MAINTENANCE

HF

FUZ 754Oc Oc 349 Oc 349 Oc 349 Oc 349 Oc 349 349Oc349Oc349Oc EDGECOMBENASH

TAR RIVER TRANSIT

TK-5180 2824 792ADMINISTRATION

HF

FNU 472O O 195 O 195 O 195 O 195 O 195 195O195O195O EDGECOMBENASH

TAR RIVER TRANSIT

4-25 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

NON HIGHWAY PROGRAMDIVISION 4

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS

TO-6108 2677 756OPERATING ASSISTANCE

HF

FNU 392O O 196 O 193 O 190 O 190 O 190 190O190O190O EDGECOMBENASH

TAR RIVER TRANSIT

TO-5127 11048 3198OPERATING ASSISTANCE

HF

FUZ 1030O O 515 O 515 O 515 O 515 O 515 515O515O515O SMAP 540O O 270 O 270 O 270 O 270 O 270 270O270O270O

EDGECOMBENASH

TAR RIVER TRANSIT

TS-5117 109 29SAFETY & SECURITY - MIN. 1% SET ASIDE

HF

FUZ 16CP CP 8 CP 8 CP 8 CP 8 CP 8 8CP8CP8CP EDGECOMBENASH

TAR RIVER TRANSIT

PASSENGER RAIL PROJECTS

IN PROGRESS

P-5005 30521 30521CONGESTION MITIGATION CROSSOVERS.

A CAROLINIAN CORRIDOR - CSXT MP A 101.0 (ENFIELD CROSSING)TRNB CAROLINIAN CORRIDOR - CSXT MP A 115.9 (ARMSTRONG CROSSING)TRNC CAROLINIAN CORRIDOR - CSXT MP A 86.4 (SOUTH WELDON CROSSING)TRND BOYLAN CROSSOVER IN RALEIGH - UNDER CONSTRUCTIONTRN

EDGECOMBEHALIFAXNASHWAKE

CSXT RR

PUBLIC TRANSPORTATION PROJECTSTA-6180 1194 519CAPITAL

HF

FNU 675CP BERTIEHALIFAXHERTFORDNORTHAMPTON

CHOANOKE PUBLICTRANSPORTATIONAUTHORITY

TK-6119 6504 1576ADMINISTRATION

HF

FNU 984O O 493 O 493 O 493 O 493 O 493 493O493O493O FNU

BERTIEHALIFAXHERTFORDNORTHAMPTON

CHOANOKE PUBLICTRANSPORTATIONAUTHORITY

PASSENGER RAIL PROJECTS

IN PROGRESS

P-5005 30521 30521CONGESTION MITIGATION CROSSOVERS.

A CAROLINIAN CORRIDOR - CSXT MP A 101.0 (ENFIELD CROSSING)TRNB CAROLINIAN CORRIDOR - CSXT MP A 115.9 (ARMSTRONG CROSSING)TRNC CAROLINIAN CORRIDOR - CSXT MP A 86.4 (SOUTH WELDON CROSSING)TRND BOYLAN CROSSOVER IN RALEIGH - UNDER CONSTRUCTIONTRN

EDGECOMBEHALIFAXNASHWAKE

CSXT RR

AVIATION PROJECTSAV-5745 335LAND ACQUISITION & CLEARING PROJECT.

DIV

T C 302 O C 33

JOHNSTON JOHNSTON COUNTYAIRPORT (JNX)

BICYCLE AND PEDESTRIAN PROJECTS

PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY OTHERS - IN PROGRESS.

EL-5100 13670 13670PEDESTRIAN, BICYCLE, AND TRANSIT PROJECTS IN THE CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION (CAMPO).

DIV

FRANKLINGRANVILLEHARNETTJOHNSTONWAKE

VARIOUS

4-26 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

NON HIGHWAY PROGRAMDIVISION 4

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025BICYCLE AND PEDESTRIAN PROJECTS

PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY LOCAL GOVERNMENT AGENCIES; TAP FUNDING INCLUDES UNPROGRAMMED BALANCE - PROGRAMMING SUBJECT TO MPO APPROVAL

U-5530 33250 2548CAPITAL AREA MPO: BICYCLE, PEDESTRIAN, TRANSIT, AND TRANSPORTATION ALTERNATIVES PROGRAM (TAP) - ELIGIBLE PROJECTS.

DIV

STPDA 418PE PE 418 PE 418 PE 418 TAP 88PE PE 88 PE 88 PE 88 L 126PE PE 126 PE 126 PE 126 STPDA 836R R 836 R 836 R 836 TAP 179R R 179 R 179 R 179 L 254R R 254 R 254 R 254 STPDA 2924C C 2924 C 2924 C 2924 TAP 626C C 626 C 626 C 626 L 887C C 887 C 887 C 887 TAP C 535 C 535 C 535 C 535 C 535 535C535C535C C 535 C 535

FRANKLINGRANVILLEHARNETTJOHNSTONWAKE

VARIOUS

PUBLIC TRANSPORTATION PROJECTSTQ-6797 96OPERATING

HF

FEPD 96O JOHNSTON JOHNSTON COUNTY INDUSTRIES

TQ-6791 180OPERATING

HF

FEPD 90O L 90O

JOHNSTON JOHNSTON COUNTYINDUSTRIES

TA-6534 211CAPITAL

HF

JARC 169CP L 21CP S 21CP

JOHNSTON JOHNSTON COUNTY COUNCILON AGING, INC.

TA-6152 820 184CAPITAL

HF

FNU 636CP JOHNSTON JOHNSTON COUNTY COUNCILON AGING, INC.

TK-6138 4116 1176ADMINISTRATION

HF

FNU 588O O 294 O 294 O 294 O 294 O 294 294O294O294O FNU

JOHNSTON JOHNSTON COUNTY COUNCILON AGING, INC.

TM-6128 398OPERATING ASSISTANCE

HF

JARC 398O JOHNSTON JOHNSTON COUNTY COUNCILON AGING, INC.

BICYCLE AND PEDESTRIAN PROJECTSEB-5711 150SR 1836 (MAY DRIVE) TO US 301 BUSINESS,

NORTH BOUND (CHURCH STREET). INSTALL PEDESTRIAN SIGNALS.

1.7

DIV

TAP PE 20 L PE 5 TAP C 100 L C 25

NASH US 64 BUSINESS(SUNSET AVENUE)

EB-5761 2250US 64 TO NC 97 (RALEIGH BOULEVARD) OVERPASS. CONSTRUCT STREETSCAPE IMPROVEMENTS.

DIV

TAP 160PE L 40PE L 50R TAP 1600C L 400C

NASH US 301 BUSINESS(CHURCH STREET)

EB-5763 3175US 301 BUSINESS, SOUTH BOUND (FRANKLIN STREET) TO FALLS ROAD. CONVERT ABANDONED RAILROAD TO MULTI-USE PATH.

DIV

TAP 80PE L 20PE L R 75 TAP C 2400L C 600

NASH ROCKY MOUNT

PUBLIC TRANSPORTATION PROJECTSTQ-6806 100OPERATING

HF

FEPD 50O L 50O

EDGECOMBENASH

CITY OF ROCKY MOUNT

4-27 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

NON HIGHWAY PROGRAMDIVISION 4

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS

TQ-8002 40CAPITAL - MOBILITY MANAGEMENT

HF

FEPD 28CP L 6CP S 6CP

EDGECOMBENASH

CITY OF ROCKY MOUNT

TI-6104 28273 6108INTERCITY BUS FROM RALEIGH TO NORFOLK, VA VIA ELIZABETH CITY ALONG US 64, US 301, US 264, AND US 17 WITH STOPS AT RALEIGH, ROCKY MOUNT, WILSON, GREENVILLE, WASHINGTON, WILLIAMSTON, EDENTON, AND ELIZABETH CITY

HF

FNU 3669O O 2312 O 2312 O 2312 O 2312 O 2312 2312O2312O2312O BEAUFORTBERTIECHOWANEDGECOMBEFRANKLINMARTINNASHPASQUOTANKPERQUIMANSPITTWAKEWILSON

GREYHOUND LINES

TA-5150 2580REPLACEMENT (5) 30 FOOT LOW FLOOR BUSES

HF

FUZ 2060CP S 520CP

EDGECOMBENASH

TAR RIVER TRANSIT

TA-5151 150EXPANSION (2) 25 FOOT LIGHT TRANSIT VEHICLES

HF

FBUS 150CP EDGECOMBENASH

TAR RIVER TRANSIT

TA-5152 100EXPANSION (1) 25 FOOT LIGHT TRANSIT VEHICLE

HF

FBUS 80CP L 20CP

EDGECOMBENASH

TAR RIVER TRANSIT

TA-6502 729 72CAPITAL

HF

FNU 657CP EDGECOMBENASH

TAR RIVER TRANSIT

TA-5153 400EXPANSION BUS

HF

FUZ 320CP L 80CP

NASH TAR RIVER TRANSIT

TG-4785A 1200 276OPERATING ASSISTANCE - ADA PARATRANSIT SERVICE

HF

FUZ 184Oc Oc 92 Oc 93 Oc 93 Oc 93 Oc 93 92Oc92Oc92Oc EDGECOMBENASH

TAR RIVER TRANSIT

TG-4785B 4593 1047PREVENTIVE MAINTENANCE

HF

FUZ 754Oc Oc 349 Oc 349 Oc 349 Oc 349 Oc 349 349Oc349Oc349Oc EDGECOMBENASH

TAR RIVER TRANSIT

TK-5180 2824 792ADMINISTRATION

HF

FNU 472O O 195 O 195 O 195 O 195 O 195 195O195O195O EDGECOMBENASH

TAR RIVER TRANSIT

TO-6108 2677 756OPERATING ASSISTANCE

HF

FNU 392O O 196 O 193 O 190 O 190 O 190 190O190O190O EDGECOMBENASH

TAR RIVER TRANSIT

TO-5127 11048 3198OPERATING ASSISTANCE

HF

FUZ 1030O O 515 O 515 O 515 O 515 O 515 515O515O515O SMAP 540O O 270 O 270 O 270 O 270 O 270 270O270O270O

EDGECOMBENASH

TAR RIVER TRANSIT

TS-5117 109 29SAFETY & SECURITY - MIN. 1% SET ASIDE

HF

FUZ 16CP CP 8 CP 8 CP 8 CP 8 CP 8 8CP8CP8CP EDGECOMBENASH

TAR RIVER TRANSIT

4-28 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

NON HIGHWAY PROGRAMDIVISION 4

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PASSENGER RAIL PROJECTS

IN PROGRESS

P-5005 30521 30521CONGESTION MITIGATION CROSSOVERS.

A CAROLINIAN CORRIDOR - CSXT MP A 101.0 (ENFIELD CROSSING)TRNB CAROLINIAN CORRIDOR - CSXT MP A 115.9 (ARMSTRONG CROSSING)TRNC CAROLINIAN CORRIDOR - CSXT MP A 86.4 (SOUTH WELDON CROSSING)TRND BOYLAN CROSSOVER IN RALEIGH - UNDER CONSTRUCTIONTRN

EDGECOMBEHALIFAXNASHWAKE

CSXT RR

AVIATION PROJECTSAV-5740 336LAND ACQUISITION. 0

DIV

T R 302 O R 34

WAYNE WAYNE EXECUTIVEJETPORT (GWW)

BICYCLE AND PEDESTRIAN PROJECTSEB-5762 476US 117 BUSINESS (WILLIAM STREET) TO SR

1565 (SPENCE AVENUE). CONSTRUCT SIDEWALK ON NORTH SIDE.

DIV

TAP 46PE L 11PE TAP C 335 L C 84

WAYNE SR 1560(ROYALL AVENUE)

EB-5508 600SR 1003 (NEW HOPE ROAD) MULTI-USE TRAIL. CONSTRUCT MULTI-USE TRAIL.TRN

STPEB 600C WAYNE GOLDSBORO

EB-5707 125US 70 BYPASS TO SR 1560 (ROYALL AVENUE). CONSTRUCT 10 FOOT WIDE ASPHALT GREENWAY.

0.38

DIV

SRTS PE 15 SRTS C 110

WAYNE STONEY CREEKGREENWAY

PUBLIC TRANSPORTATION PROJECTSTM-6138 360OPERATING ASSISTANCE

HF

JARC 180O L 180O

WAYNE GOLDSBORO-WAYNETRANSPORTATIONAUTHORITY

TO-6107 604 184OPERATING ASSISTANCE

HF

FNU 84O O 42 O 42 O 42 O 42 O 42 42O42O42O WAYNE GOLDSBORO-WAYNETRANSPORTATIONAUTHORITY

TO-4719 9474 2834OPERATING ASSISTANCE

HF

FUZ 848O O 424 O 424 O 424 O 424 O 424 424O424O424O SMAP 480O O 240 O 240 O 240 O 240 O 240 240O240O240O

WAYNE GOLDSBORO-WAYNETRANSPORTATIONAUTHORITY

added per FY 2011 allocations

TP-5116 372 62PLANNING ASSISTANCE

HF

FMPL 62CP CP 31 CP 31 CP 31 CP 31 CP 31 31CP31CP31CP WAYNE GOLDSBORO-WAYNETRANSPORTATIONAUTHORITY

TS-5129 87 37SAFETY & SECURITY - MIN. 1% SET ASIDE

HF

FUZ 10CP CP 5 CP 5 CP 5 CP 5 CP 5 5CP5CP5CP WAYNE GOLDSBORO-WAYNETRANSPORTATIONAUTHORITY

TD-5268 133252013 GOLDSBORO MAIN STREET REVITALIZATION & TRANSPORTATION INVESTMENT PROJECTHF

L 3325CP TIGER 10000CP

WAYNE GOLDSBORO-WAYNE TRANSP

4-29 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

NON HIGHWAY PROGRAMDIVISION 4

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS

TA-5141 12525' BUS REPLACEMENT

HF

FUZ 100CP L 25CP

WAYNE GOLDSBORO-WAYNETRANSPORTATIONAUTHORITY

TA-5149 34830' BUS REPLACEMENT

HF

FUZ 278CP L 70CP

WAYNE GOLDSBORO-WAYNETRANSPORTATIONAUTHORITY

TA-6505 833 258CAPITAL

HF

FNU 575CP WAYNE GOLDSBORO-WAYNETRANSPORTATIONAUTHORITY

TG-6146 545 105ROUTINE CAPITAL - BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, SERVICE VEHICLES, ETC

HF

FNU 88CP CP 44 CP 44 CP 44 CP 44 CP 44 44CP44CP44CP WAYNE GOLDSBORO-WAYNETRANSPORTATIONAUTHORITY

TG-4752A 655 355ROUTINE CAPITAL - BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, SERVICE VEHICLES, ETC

HF

FUZ 60CP CP 30 CP 30 CP 30 CP 30 CP 30 30CP30CP30CP WAYNE GOLDSBORO-WAYNETRANSPORTATIONAUTHORITY

TG-4752B 2085 685PREVENTIVE MAINTENANCE

HF

FUZ 280Oc Oc 140 Oc 140 Oc 140 Oc 140 Oc 140 140Oc140Oc140Oc WAYNE GOLDSBORO-WAYNE TRANSPTRANSPORTATIONAUTHORITY

TG-4752C 1344 514OPERATING ASSISTANCE - ADA PARATRANSIT SERVICE

HF

FUZ 166Oc Oc 83 Oc 83 Oc 83 Oc 83 Oc 83 83Oc83Oc83Oc WAYNE GOLDSBORO-WAYNETRANSPORTATIONAUTHORITY

TK-5179 4324 1212ADMINISTRATION

HF

FNU 664O O 306 O 306 O 306 O 306 O 306 306O306O306O WAYNE GOLDSBORO-WAYNETRANSPORTATIONAUTHORITY

BICYCLE AND PEDESTRIAN PROJECTSEB-5507 255 30SR 1184 (TARBORO STREET), FAIRVIEW

AVENUE TO VINSON-BYNUM SCHOOL. ADD SIDEWALK.TRN

STPEB C 225 WILSON WILSON

PUBLIC TRANSPORTATION PROJECTSTA-6260 119 83CAPITALHF

FNU 36CP WILSON CITY OF WILSON

TK-5178 4567 1315ADMINISTRATION

HF

FNU 644O O 326 O 326 O 326 O 326 O 326 326O326O326O FNU

WILSON CITY OF WILSON

TO-4779 15711 4559OPERATING ASSISTANCE

HF

FNU 1808O O 908 O 908 O 908 O 908 O 908 908O908O908O SMAP 416O O 208 O 208 O 208 O 208 O 208 208O208O208O

WILSON CITY OF WILSON

4-30 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

NON HIGHWAY PROGRAMDIVISION 4

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS

TI-6104 28273 6108INTERCITY BUS FROM RALEIGH TO NORFOLK, VA VIA ELIZABETH CITY ALONG US 64, US 301, US 264, AND US 17 WITH STOPS AT RALEIGH, ROCKY MOUNT, WILSON, GREENVILLE, WASHINGTON, WILLIAMSTON, EDENTON, AND ELIZABETH CITY

HF

FNU 3669O O 2312 O 2312 O 2312 O 2312 O 2312 2312O2312O2312O BEAUFORTBERTIECHOWANEDGECOMBEFRANKLINMARTINNASHPASQUOTANKPERQUIMANSPITTWAKEWILSON

GREYHOUND LINES

TA-6226 238 38CAPITALHF

FNU 200CP WILSON WILSON COUNTY

TK-6173 1269 397ADMINISTRATION

HF

FNU 184O O 86 O 86 O 86 O 86 O 86 86O86O86O FNU

WILSON WILSON COUNTY

4-31 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project