Agenda

Welcome Introductions Purpose of Workshop EEM Organizational Structure S&P Section IX Layout Review of Updates Reoccurring Themes Q&A

S&P Electrical Workshop 2016

2

Electrical & Energy Management (EEM) Organizational Structure Rick Raike - Chief of Electrical and Energy Management

S&P Electrical Workshop 2016

3

Operations DirectorOperations

Chief of Electrical and Energy

Management

Instrumentation Manager

Electric Shop

NS Electrical Manager

Electric Shop

SS Electrical Manager

Electric Shop

NS E & I Supervisor

NS E & I Supervisor

SS E & I Supervisor

Electrical Superintendent

CIP Projects

SS E & I Supervisor

NS E & I (6)

NS E & I(7)

SS E & I(7)

SCADA Admin Asst

1

SCADA Tech1

NS Materials & Ops Coordinator

SS Materials & Ops Coordinator

SS E & I(8)CIP Projects

Requiring FTE E & I’s (7)

July 2015

Electrical and Energy Management – Organizational Chart FY-16

S&P Section IX Layout Format change from table format to

specification format Consist of two sections – Pump stations and

Treatment Plants Pump Stations consist of 30 items and

Treatment Plants consist of 36 items Attachments A~E Grey highlights will indicate latest changes

S&P Electrical Workshop 2016

5

Pump Station

Item

#

Item Description Page#

1 Switchgear and MCC 3 2 Emergency Generators 7 3 Energy Efficient Motors 13 4 Sump Pumps 14 5 Level Sensing Systems 14 6 Variable Frequency Drives (VFDs) 15

7 Watt Hour Meter (for MCCs or individual motors)

17

8 PLCs 17 9 Exhaust Fans 17 10 Lighting 18 11 Concrete Housekeeping Pads 20 12 Conduit and Conduit Systems 20 13 Wire 22 14 Relays 23 15 Lockout/Tagout Safety 23 16 Switches/Receptacles/Plugs 23 17 Electric Heaters 24 18 Electrical Drawings 24 19 Safety Switches (fused or unfused) 24 20 Transformers 25 21 Metering Vaults/Pits 25 22 Pressure Sustaining/Regulating

Valves 25

23 Alarm Systems 26 24 Flow Meters 27 25 RTUs 27 26 Louvers/Dampers 27 27 Cathodic Protection 27 28 Junction Boxes and Misc.

Enclosures 28

29 Panel Boards/Control Panels 28 30 Miscellaneous Electrical 29

S&P Electrical Workshop 2016

6

Item

# Treatment Plant Page

#

1 Switchgear 30 2 MCCs 33 3 Emergency Generators 37 4 Energy Efficient Motors 43 5 Sump Pumps 43 6 Level Sensing Systems 43 7 Variable Frequency Drives (VFDs) 46

8 Metering Packages for Switchgear, MCCs or Individual Motors

47

9 PLCs_TP 47 10 Exhaust Fans 48 11 Lighting 48 12 Concrete Housekeeping Pads 50 13 Conduit and Conduit Systems 50 14 Wire 53 15 Relays 55 16 Lockout/Tagout Safety 55 17 Switches/Receptacles/Plugs 55 18 Heaters 56 19 Electrical Drawings 56 20 Safety Switches (fused or unfused) 56 21 Transformers 57 22 Metering Vaults/Pits 57

23 Pressure Sustaining/Regulating Valves

58

24 Flow Meters 59 25 RTUs 60 26 Louvers/Dampers 60 27 Transfer Switches 60 28 On-Line Vibration Monitors 61 29 Panel Meters 61 30 Analyzers/Monitors 62 31 Miscellaneous Instrumentation 64 32 Miscellaneous Electrical 65 33 Heating and Cooling 65 34 Junction/Pull Boxes and

Miscellaneous Enclosures 66

35 Panel Boards/Control Panels 66 36 Distributive Control System (DCS) 67

Table Format- S&P Electrical Workshop 2016

7

PUMP STATION

Electrical and Instrumentation

Requirements

Electrical Equipment/Item Manufacturer Specific Criteria Day Tanks Pryco

Tramont - UL Listed – double wall - Provide with Oberndorfer bronze gear type

pump. Pumps with rubber or nitrile impellers will not be accepted

- Provide with a low level alarm and light - Size for 2 hour minimum running time - Provide a fuel level indicator on the day

tank - Provide a 2 pump system. Each pump

shall be capable of pumping 100% fuel oil throughout the entire system.

- Provide “Not in Auto” lamp or other warning device

- Use momentary switch for tank fill/test

• Day Tanks – Manufacturers

Pryco Tramont

– Specific Criteria UL Listed – double wall Provide with Oberndorfer bronze gear type pump. All pumps

must be mounted on Day Tank. Pumps with rubber or nitrile impellers will not be accepted

Provide with a low level alarm and light Size for 2 hour minimum running time Provide a fuel level indicator on the day tank Provide a 2 pump system. Each pump shall be capable of

pumping 100% fuel oil throughout the entire system. Provide “Not in Auto” lamp or other warning device Use momentary switch for tank fill/test

Specification format- S&P Electrical Workshop 2016

8

Day Tanks 1. All pumps must be mounted on the Day

Tanks. In ground pumps not preferred, but may used in site specific applications.

See pg. IX-11

Day Tank - S&P Electrical Workshop 2016

9

E- Stops -Mfr: Pilla -Model: GS120 See pg. IX-40

S&P Electrical Workshop 2016

10

Review of Updates (Part 1)

S&P Electrical Workshop 2016

11

Review of Updates (Part 1)

Generator Section for Pump Stations and Treatment Plants.

1. Size air, fuel, and oil filters to provide a minimum 250 hours before servicing (a minimum of 100 hours was previously stated). See pg. IX-9 & 41

2. Removed - Mfr. American Battery Charger. See pg. IX-10 & 42

3. Added - SENS Battery Charger. See pg. IX-10 & 42

Generator Section - S&P Electrical Workshop 2016

12

4. Added - Size radiator to prevent overheating in the most severe conditions; changed from 110°F to 122°F. See pg. IX-41 5. Added - 4D starting batteries are not acceptable (Use 8D only). See pg. IX-11 & 42

Generator Section - S&P Electrical Workshop 2016

13

Variable Frequency Drives (VFD’s) 1. Change the name from Power Logix to Power Flex Series (Allen Bradley) See pg. IX-

16 & 49

S&P Electrical Workshop 2016

14

Rubber Matting 1. What is considered OSHA approved

matting? Electrical rated matting that meets the Type II ASTM D178 Standard. See pg.

IX-10, 35, & 39

S&P Electrical Workshop 2016

15

Conduits 1. Painted red in pump station per request of

the owner (Does not apply for PVC Coated Rigid). Refer to Section X Coatings manual page 148. See pg. IX-21

S&P Electrical Workshop 2016

16

MCC/Switchgear Fasteners 1. Provide extra fasteners when ordering gear

(spare parts). See pg. IX-33 and IX-36

S&P Electrical Workshop 2016

17

Analyzers/Monitors 1. Added E&H probe for Incinerator scrubber

water (process pH); Specific applications at Treatment Plants See pg. IX-67

S&P Electrical Workshop 2016

18

Level Sensing Systems Bubbler 1. Remove Bell & Gossett as Mfr. 2. Add model 3HBB-10-M300 AX (Dual Head

Air Compressor) or equal See pg. IX-15

3. Separate circuit for each compressor (Panel schedule)

S&P Electrical Workshop 2016

19

Voltage Test Points Mfr. Safeside See pg. IX-7 and IX-39

S&P Electrical Workshop 2016

20

DIN Rail 1. Add Panduit Panduct DIN Rail Wiring Duct See pg. IX-5

S&P Electrical Workshop 2016

21

Review of Updates (Part 2)

S&P Electrical Workshop 2016

22

Review of Updates (Part 2)

Pump Station section 16- provide one weatherproof (WP/Watertight) receptacle with lockable cover on the exterior wall of the pump station on a separate circuit; separately switched -> must not be hot at all times. See pg. IX-25

Provide high level float ball for alarms See pg. IX-15

Provide Intrinsically safe barriers See pg. IX-16

S&P Electrical Workshop 2016

23

Add Remote Switch Operator to open/close main circuit breaker outside of the arc flash boundary. See pg. IX-32

S&P Electrical Workshop 2016

24

S&P Electrical Workshop 2016

25

Add ARMS “Arms Reduction Maintenance Switch or Equal; When activated downstream incident energy levels will be reduced. See pg. IX-32

Add LSI or LSIG (>=1000A) Electronic Trip Units See pg. IX-33

S&P Electrical Workshop 2016

26

Add Short Circuit, Coordination, and Arc Flash requirements to specifications (Arc Flash calculations must be performed for both Utility bus and Generator bus); A label must be added to the generator breaker. See pg.

IX-31

S&P Electrical Workshop 2016

27

Push-buttons, selector switches, etc. must be NEMA rated only (Some Mfr. Have both NEMA/IEC ratings on components). See pg.

IX-34 & 37

S&P Electrical Workshop 2016

28

ETM Add Mfr. Crompton and ENB Elapsed Time Meters; Yokogawa UL certification in question. See pg. IX-65

S&P Electrical Workshop 2016

29

Surge Protection Devices Remove SPD Type IC4/IC6 Surge Protectors - Don’t use DC powered surge protection on

field devices (4~20mA). - Don’t use AC powered surge protection for

field devices. - All SPD should be installed at the incoming

power section of the gear.

S&P Electrical Workshop 2016

30

Splicing 1. No splicing allowed on HRSD projects

without approval from Engineer/Owner. 2. No splicing in man-holes 3. If granted approval, splicing must be perform

by certified splicer. 4. May require above ground installation.

S&P Electrical Workshop 2016

31

Variable Frequency Drives- New circuit diagram

S&P Electrical Workshop 2016

32

Tegam Windows • J. Matt Ferguson • DRISCOLL AUTOMATIC • 918/663-6625 – Main • 918/664-0930 – Fax • 918/636-3500 – Cell • P.O. Box 52583 • Tulsa, OK 74152

S&P Electrical Workshop 2016

33

Tegam Windows- AW1012 Can be eliminated if installed in condition spaced.

S&P Electrical Workshop 2016

34

Conduit schedule vs. Circuit Method Some consultants method of design does not

use conduit schedules so individual conduit tag numbers do not exist. The one line diagrams use circuit numbers. For power circuits (except for lighting and receptacles circuits) a conduit is dedicated to that circuit. For control and instrumentation circuits; They often have multiple circuits in a common conduit.

S&P Electrical Workshop 2016

35

Labeling Method (phenolic labels) – White lettering on Black background. See pg. IX-30,

33, & 36

S&P Electrical Workshop 2016

36

Actuators EIM actuators- verify use of proper voltage 120 vs. 480V -Use proper control boards based upon required voltage.

S&P Electrical Workshop 2016

37

Polaris Style Connectors not preferred ; T leads to motor (rarely used); Prefer lugs

S&P Electrical Workshop 2016

38

Pump Station ATS Push to test function; manually initiate 2 hour test to start generator and assume load. After two hours the system automatically returns to utility source if available. Note: This is not an exercise function.

Remove Mfrs. Cummins and SQD; Specify Eaton or ASCO. See pg. IX-11

S&P Electrical Workshop 2016

39

Locate HOA switch at drives for variable

speed applications Locate HOA switch at pump for constant

speed applications.

S&P Electrical Workshop 2016

40

Reoccurring Themes

S&P Electrical Workshop 2016

41

Load Bank Test Boxes 1. Fabrication –UL Shop Harper Sheet Metal Richmond VA 23224 (804) 233-6550

S&P Electrical Workshop 2016

42

Reoccurring Themes

o Load bank test boxes – Eaton and other Mfrs. have similar connection boxes; However HRSD standardized the use of Leviton Connectors, due to Operation’s wire spool trailers having Leviton mating connectors.

o Other products utilize Hubbell connectors. The Mfrs. would like for HRSD to use Hubbell connectors to prevent the modification of their UL listing.

S&P Electrical Workshop 2016

43

o Shop Drawing Submittal/Approval Process o HRSD Electrical Staff would desire access to a file

storage area, to review submittals in parallel with consultants, in an effort to streamline the overall process.

o Secure As-Builts/ Record Drawings before closeout of Project.

o Functionals and P&ID’s o Interposing Relays o DCU Power Supplies/Isolation transformer o Arc Flash Mitigation (> 40 cal/cm2)– Design, SC,

Coordination, AF analysis, and labeling.

S&P Electrical Workshop 2016

44

o Arc Flash – Breaker/Relay settings for contractors.

o Variable Frequency Drives (VFD’s) o Long term maintenance plan at substantial

completion. o Rice Rule o MOPO o Generator/paralleling gear (block load or soft

load)

S&P Electrical Workshop 2016

45

o 100 ms closed transition test and 225 ms breaker timing test

o NFPA 820 o Energy Conservation

S&P Electrical Workshop 2016

46

o Dominion Virginia Power Interconnection Agreement

S&P Electrical Workshop 2016

47

New Electrical Services 1. Site Plan 2. Load Letter 3. Power Riser 4. Sequence of Operation 5. Access Facility Charges – Right size

equipment

S&P Electrical Workshop 2016

48

S&P Electrical Workshop 2016

49

S&P Electrical Workshop 2016

50

Lighting Quick strike preferred for metal halide See pg.

IX-20 and IX-52

LED preferred

S&P Electrical Workshop 2016

51

Wire Stranded wire only (No solid wire allowed). Sometimes solid wire for smaller No. gauge

wire will be specified. See pg. IX-23 and IX-

57

S&P Electrical Workshop 2016

52

Some other beneficial practices:

Separate Electrical Meetings Checklist for QA/QC Involve HRSD with Electrical Inspections Verify loop checks

S&P Electrical Workshop 2016

53

Turnover file, cables, hardware, and software to HRSD.

HRSD needs ownership to any processor based controls and/or equipment.

No proprietary programs that would not grant HRSD access to modify and/or troubleshoot.

S&P Electrical Workshop 2016

54

o Scheduling of Training for Equipment or New systems.

o Generator load bank test must witnessed by HRSD EEM and Automotive Representative.

o Excavation around live energized lines. Hand dig or pot hole to locate potential utility conflicts.

S&P Electrical Workshop 2016

55