standard water details drawing indexstandard water details drawing index no. name date w-1. not used...

31
STANDARD WATER DETAILS DRAWING INDEX NO. NAME DATE W-1. Not Used W-2. Intersection Layout----------------------------------------------------------------- 8-12-2009 W-3. Trench Section---------------------------------------------------------------------- 12-23-2013 W-4. Not Used W-5A. Horizontal Concrete Blocking----------------------------------------------------- 3-20-2006 W-5B. Vertical Concrete Blocking-------------------------------------------------------- 1-08-2007 W-6A Alternate “A” Pipe Anchor--------------------------------------------------------- 7-01-2014 W-6B Alternate “B” Pipe Anchor--------------------------------------------------------- 3-20-2006 W-7. Water Valve Box---------------------------------------------------------------------3-20-2006 W-8. Water Valve Box---------------------------------------------------------------------12-23-2013 W-9. Water Valve Extension--------------------------------------------------------------12-23-2013 W-10. Valve Marker Post------------------------------------------------------------------- 7-01-2014 W-11. Tapping Tee-------------------------------------------------------------------------- 8-12-2009 W-12. Not Used W-13. 1” Water Meter Installation-------------------------------------------------------- 10-16-2013 W-14. 1 ½” Water Meter Installation----------------------------------------------------- 10-16-2013 W-14A. 2” Water Meter Installation-------------------------------------------------------- 10-16-2013 W-15. 3” – 4” Domestic Meter Installation--------------------------------------------- 9-03-2014 W-16. Water Meter Placement------------------------------------------------------------- 3-20-2006 W-17. 1” & 2” Steel Water Meter Box----------------------------------------------------12-23-2013 W-18A 1”, 1 ½” & 2” Plastic Water Meter Box------------------------------------------ 12-23-2013 W-19A Double Detector Check Valve Assembly-----------------------------------------7-01-2014 W-19B. Material List Double Detector Check--------------------------------------------- 7-01-2014 W-20. Not Used W-21. Not Used W-22. Not Used W-23 . Not Used W-24 Fire Hydrant Connection----------------------------------------------------------- 2-05-2014 W-25 Air and Vacuum Assembly-------------------------------------------------------- 7-01-2014 W-25A 2” Air & Vacuum Valve Assembly----------------------------------------------- 7-01-2014 W-26. 2” Blow-Off Assembly-------------------------------------------------------------- 7-01-2014 W-27A. Pressure Reducing Valve Vault – Plan------------------------------------------- 9-03-2014 W-27B. Pressure Reducing Valve Vault – Material List---------------------------------- 9-03-2014 W-27C. Pressure Reducing Valve Vault – Ladder and Support Detail------------------ 9-24-2013 W-27D. Pressure Reducing Valve Vault – Pipe Penetration Detail and Wall Anchor 9-24-2013 W-28. Residential Pressure Reducing Valve…………………………………….... 12-24-2013 W-29. Not Used W-30. Not Used W-31. Not Used W-32. Typical Water Main Flushing------------------------------------------------------ 8-12-2009

Upload: others

Post on 20-Apr-2020

27 views

Category:

Documents


0 download

TRANSCRIPT

STANDARD WATER DETAILS DRAWING INDEX NO. NAME DATE W-1. Not Used W-2. Intersection Layout----------------------------------------------------------------- 8-12-2009 W-3. Trench Section---------------------------------------------------------------------- 12-23-2013 W-4. Not Used W-5A. Horizontal Concrete Blocking----------------------------------------------------- 3-20-2006 W-5B. Vertical Concrete Blocking-------------------------------------------------------- 1-08-2007 W-6A Alternate “A” Pipe Anchor--------------------------------------------------------- 7-01-2014 W-6B Alternate “B” Pipe Anchor--------------------------------------------------------- 3-20-2006 W-7. Water Valve Box------------------------------------------------------------ ---------3-20-2006 W-8. Water Valve Box--------------------------------------------------------------------- 12-23-2013 W-9. Water Valve Extension-------------------------------------------------------------- 12-23-2013 W-10. Valve Marker Post------------------------------------------------------------------- 7-01-2014 W-11. Tapping Tee-------------------------------------------------------------------------- 8-12-2009 W-12. Not Used W-13. 1” Water Meter Installation-------------------------------------------------------- 10-16-2013 W-14. 1 ½” Water Meter Installation----------------------------------------------------- 10-16-2013 W-14A. 2” Water Meter Installation-------------------------------------------------------- 10-16-2013 W-15. 3” – 4” Domestic Meter Installation--------------------------------------------- 9-03-2014 W-16. Water Meter Placement------------------------------------------------------------- 3-20-2006 W-17. 1” & 2” Steel Water Meter Box---------------------------------------------------- 12-23-2013 W-18A 1”, 1 ½” & 2” Plastic Water Meter Box------------------------------------------ 12-23-2013 W-19A Double Detector Check Valve Assembly----------------------------------------- 7-01-2014 W-19B. Material List Double Detector Check--------------------------------------------- 7-01-2014 W-20. Not Used W-21. Not Used W-22. Not Used W-23 . Not Used W-24 Fire Hydrant Connection----------------------------------------------------------- 2-05-2014 W-25 Air and Vacuum Assembly-------------------------------------------------------- 7-01-2014 W-25A 2” Air & Vacuum Valve Assembly----------------------------------------------- 7-01-2014 W-26. 2” Blow-Off Assembly-------------------------------------------------------------- 7-01-2014 W-27A. Pressure Reducing Valve Vault – Plan------------------------------------------- 9-03-2014 W-27B. Pressure Reducing Valve Vault – Material List---------------------------------- 9-03-2014 W-27C. Pressure Reducing Valve Vault – Ladder and Support Detail------------------ 9-24-2013 W-27D. Pressure Reducing Valve Vault – Pipe Penetration Detail and Wall Anchor 9-24-2013 W-28. Residential Pressure Reducing Valve…………………………………….... 12-24-2013 W-29. Not Used W-30. Not Used W-31. Not Used W-32. Typical Water Main Flushing------------------------------------------------------ 8-12-2009

NOTES

W-2

STANDARD DETAILS

N

NOTES

W-3

STANDARD DETAILS

W-5A

STANDARD DETAILS

EDCBA

NOTES

THRUST BLOCKING TABLE

A A

A A

A

B

B B

B

C D E

CROSS TEE

CAP 90° BEND 45° BEND 22-1/2° BEND 11-1/4° BEND

W-5B

STANDARD DETAILS

NOTES

BLOCKING FOR VERTICAL BENDS

NOTES

PLANPROFILE

ELEVATION

SECTION

WATER

W-6A

STANDARD DETAILS

NOTES

PLAN

ELEVATION

W-6B

STANDARD DETAILS

W-7

STANDARD DETAILS

NOTES

VALVE BOX LID

VALVE BOX TOP VALVE BOX BOTTOM

W-8

STANDARD DETAILS

NOTES

NOTES

SECTION

DETAIL A-A

W-9

STANDARD DETAILS

NOTES

WATER

W-10

STANDARD DETAILS

NOTES

DUCTILE IRON TAPPING TEEMECHANICAL JOINT SLEEVE

STAINLESS STEEL TAPPING TEE

W-11

STANDARD DETAILS

NOTES

NO SCALE W-13

STANDARD DETAILS

APPROVEDREV DATE

6" MINIMUM

8" MAXIMUM

”.

PLAN

ELEVATION

W-14

STANDARD DETAILS

NOTES”.

W-14A

STANDARD DETAILS

NOTES”.

PLAN

ELEVATION

WATER

W-15

STANDARD DETAILS

PLAN VIEW

MATERIAL LIST, 3" & 4" METER

SIDE VIEW

INSTALLATION IN PLANTER STRIP 3' OR WIDER

INSTALLATION BEHIND SIDEWALK

INSTALLATION IN SIDEWALK

INSTALLATION WITH NO SIDEWALK

W-16

STANDARD DETAILS

NOTES

WM

W-17

STANDARD DETAILS

WM

1" STEEL METER BOX 2" STEEL METER BOX

W-18A

STANDARD DETAILS

LONG SIDE VIEW

SHORT SIDE VIEW

TOP VIEW

NOTES:

MSBC MSBCF

GENERAL NOTES

PLAN

WATER

W-19A

STANDARD DETAILS

ELEVATION

NOTES

WATER

W-19B

STANDARD DETAILS

W-24

NOTE:

STANDARD DETAILS

NOTESVALVE ASSEMBLY DETAIL

WATER

W-25

STANDARD DETAILS

VALVE ASSEMBLY DETAIL

W-25A

STANDARD DETAILS

PRV VAULT INSTALLATION DETAILNOTES

NOTES

PLAN VIEW

ELEVATION

WATER

NO SCALE W-26

STANDARD DETAILS

APPROVEDREV DATE

W-27A

NOTES

PLAN VIEW

ELEVATION

X X

STANDARD DETAILS

W-27B

NOTES

WATERSTANDARD DETAILS

W-27C

STANDARD DETAILS

NOTES

ADJUSTABLE PIPE SUPPORT

LADDER SECTION LADDER PLAN

W-27D

STANDARD DETAILSNOTES

PIPE PENETRATION DETAIL

WALL ANCHOR DETAIL

NOTES

W-28

STANDARD DETAILS

NOTES

TYPE A

TYPE BPLAN

W-32

STANDARD DETAILS