stan tug 2608 - products.damen.com€¦ · tugs stan tug 2608 technical specifications references...

15
EXECUTIVE SUMMARY - TUGS STAN TUG 2608 APRIL 2017

Upload: others

Post on 07-Sep-2020

17 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: STAN TUG 2608 - products.damen.com€¦ · TUGS STAN TUG 2608 TECHNICAL SPECIFICATIONS REFERENCES CONTACT PARTICULARS. TANK CONFIGURATION TUGS STAN TUG 2608 TECHNICAL SPECIFICATIONS

EXECUTIVE SUMMARY - TUGS

STAN TUG 2608APRIL 2017

Page 2: STAN TUG 2608 - products.damen.com€¦ · TUGS STAN TUG 2608 TECHNICAL SPECIFICATIONS REFERENCES CONTACT PARTICULARS. TANK CONFIGURATION TUGS STAN TUG 2608 TECHNICAL SPECIFICATIONS

TUGS STAN TUG 2608

Page 3: STAN TUG 2608 - products.damen.com€¦ · TUGS STAN TUG 2608 TECHNICAL SPECIFICATIONS REFERENCES CONTACT PARTICULARS. TANK CONFIGURATION TUGS STAN TUG 2608 TECHNICAL SPECIFICATIONS

CHARACTERISTICS

Main dimensions:

Length over all 26.16 m

Breadth over all 8.54 m

Depth at side 4.05 m

Draught aft 3.80 m

Full displacement ± 390 ton

Power 2 x 1230 kW

Bollard pull 45.0 ton

Speed 12.2 knots

Class I HULL • MACH Tug Unrestricted Navigation

TUGS STAN TUG 2608

TECHNICAL SPECIFICATIONS CONTACT PARTICULARSREFERENCES

Page 4: STAN TUG 2608 - products.damen.com€¦ · TUGS STAN TUG 2608 TECHNICAL SPECIFICATIONS REFERENCES CONTACT PARTICULARS. TANK CONFIGURATION TUGS STAN TUG 2608 TECHNICAL SPECIFICATIONS

TANK CONFIGURATION

TUGS STAN TUG 2608

TECHNICAL SPECIFICATIONS CONTACT PARTICULARSREFERENCES

Capacities:

Fuel oil 75.3 m³

Fresh water 12.2 m³

Sewage 1.8 m³

Bilge water 2.3 m³

Dirty oil 1.9 m³

Lubrication oil 1.9 m³

Ø Foam 5.9 m³

Ø Dispersant 7.7 m³

Page 5: STAN TUG 2608 - products.damen.com€¦ · TUGS STAN TUG 2608 TECHNICAL SPECIFICATIONS REFERENCES CONTACT PARTICULARS. TANK CONFIGURATION TUGS STAN TUG 2608 TECHNICAL SPECIFICATIONS

PROPULSION SYSTEM

TUGS STAN TUG 2608

TECHNICAL SPECIFICATIONS CONTACT PARTICULARSREFERENCES

Heavy duty Manganese-Bronze propellers

Stainless steel shafts

Reintjes reduction/ reverse gearboxes

Oil lubricated forward and aft bearing

Van der Giessen “Optima” nozzles with stainless

steel inner plate

Streamlined double plate rudders

Main engines: Caterpillar 3512C TA HD

(IMO Tier II compliant)

Page 6: STAN TUG 2608 - products.damen.com€¦ · TUGS STAN TUG 2608 TECHNICAL SPECIFICATIONS REFERENCES CONTACT PARTICULARS. TANK CONFIGURATION TUGS STAN TUG 2608 TECHNICAL SPECIFICATIONS

Proven/ reliable propulsion installation

Proven/ reliable bilge/ ballast module

Closed cooling water system

Forced engine room ventilation

25 dB(A) exhaust dampers of main engines

Two generator sets

Internal fire fighting system (CO2)

Optional equipment:

Sewage treatment plant

Dispersant system

External fire fighting set (dedicated motor + pump)

Capacity: 300 m³ / 600 m³ / 1200 m³

EQUIPMENT

TITLE SUBTITLE (optional - sample is given in the notes below)TUGS STAN TUG 2608

TECHNICAL SPECIFICATIONS CONTACT PARTICULARSREFERENCES

ENGINE ROOM LAYOUT

Page 7: STAN TUG 2608 - products.damen.com€¦ · TUGS STAN TUG 2608 TECHNICAL SPECIFICATIONS REFERENCES CONTACT PARTICULARS. TANK CONFIGURATION TUGS STAN TUG 2608 TECHNICAL SPECIFICATIONS

Towing bitt/ fairlead

Electric anchor winch with warping head

Heavy duty rubber W-block fendering

FORE DECK

TITLE SUBTITLE (optional - sample is given in the notes below)TUGS STAN TUG 2608

TECHNICAL SPECIFICATIONS CONTACT PARTICULARSREFERENCES

MAIN DECK LAYOUT

Page 8: STAN TUG 2608 - products.damen.com€¦ · TUGS STAN TUG 2608 TECHNICAL SPECIFICATIONS REFERENCES CONTACT PARTICULARS. TANK CONFIGURATION TUGS STAN TUG 2608 TECHNICAL SPECIFICATIONS

Spacious aft deck, safe working area

Flush engine room hatches

Closed stern

Optional equipment:

Hydraulic aft winch

Hydraulic crane

Electric capstan

Towing hook

AFT DECK

TITLE SUBTITLE (optional - sample is given in the notes below)TUGS STAN TUG 2608

TECHNICAL SPECIFICATIONS CONTACT PARTICULARSREFERENCES

MAIN DECK LAYOUT

Page 9: STAN TUG 2608 - products.damen.com€¦ · TUGS STAN TUG 2608 TECHNICAL SPECIFICATIONS REFERENCES CONTACT PARTICULARS. TANK CONFIGURATION TUGS STAN TUG 2608 TECHNICAL SPECIFICATIONS
Page 10: STAN TUG 2608 - products.damen.com€¦ · TUGS STAN TUG 2608 TECHNICAL SPECIFICATIONS REFERENCES CONTACT PARTICULARS. TANK CONFIGURATION TUGS STAN TUG 2608 TECHNICAL SPECIFICATIONS

ERGONOMICS

Modern durable linings made of

first class materials

Completely lined and insulated

Air conditioning, lighting and

crew comfort

Floating floor and acoustical

ceiling in wheelhouse, noise

level < 70 dBA

Optional outfitting:

Aft control station

Extended navigation package

Modern and efficient standard

layout

Helmsman’s position on front at

center line

Ergonomic designed control

panels

Excellent all round view from

helmsman’s position

Chart table on starboard side

Standard fitted with radar, VHF,

and echo sounder

TITLE SUBTITLE (optional - sample is given in the notes below)TUGS STAN TUG 2608

TECHNICAL SPECIFICATIONS CONTACT PARTICULARSREFERENCES

WHEELHOUSE LAYOUT

COMFORT

Page 11: STAN TUG 2608 - products.damen.com€¦ · TUGS STAN TUG 2608 TECHNICAL SPECIFICATIONS REFERENCES CONTACT PARTICULARS. TANK CONFIGURATION TUGS STAN TUG 2608 TECHNICAL SPECIFICATIONS

OUTFITTING OPTIONAL

Additional heating

accommodation

Washing machine and tumble

dryer

Freezer

8 persons accommodation

Modern accommodation with

durable linings made of first

class materials

Completely lined and insulated

Mess

Galley with refrigerator, cooker

and oven

Store

Two sanitary spaces with hot

and cold water tap

Air conditioned

TITLE SUBTITLE (optional - sample is given in the notes below)TUGS STAN TUG 2608

TECHNICAL SPECIFICATIONS CONTACT PARTICULARSREFERENCES

ACCOMMODATION LAYOUT

Page 12: STAN TUG 2608 - products.damen.com€¦ · TUGS STAN TUG 2608 TECHNICAL SPECIFICATIONS REFERENCES CONTACT PARTICULARS. TANK CONFIGURATION TUGS STAN TUG 2608 TECHNICAL SPECIFICATIONS

BUILDING YARD

TUGS STAN TUG 2608

TECHNICAL SPECIFICATIONS CONTACT PARTICULARSREFERENCES

Hull construction and complete outfitting:

Damen Shipyards Song Cam, Vietnam

Complete outfitting:

Damen Shipyards Gorinchem

Page 13: STAN TUG 2608 - products.damen.com€¦ · TUGS STAN TUG 2608 TECHNICAL SPECIFICATIONS REFERENCES CONTACT PARTICULARS. TANK CONFIGURATION TUGS STAN TUG 2608 TECHNICAL SPECIFICATIONS

TECHNICAL SPECIFICATIONS CONTACT PARTICULARSREFERENCES

TUGS STAN TUG 2608

Page 14: STAN TUG 2608 - products.damen.com€¦ · TUGS STAN TUG 2608 TECHNICAL SPECIFICATIONS REFERENCES CONTACT PARTICULARS. TANK CONFIGURATION TUGS STAN TUG 2608 TECHNICAL SPECIFICATIONS

TECHNICAL SPECIFICATIONS CONTACT PARTICULARSREFERENCES

TUGS STAN TUG 2608

DAMEN SHIPYARDS GORINCHEM

P.O. Box 1

4200 AA GORINCHEM

The Netherlands

Phone +31 (0) 183 63 99 11

Fax +31 (0) 183 63 21 89

E-mail [email protected]

Website www.damen.com

STANDARD OF EXCELLENCE

Page 15: STAN TUG 2608 - products.damen.com€¦ · TUGS STAN TUG 2608 TECHNICAL SPECIFICATIONS REFERENCES CONTACT PARTICULARS. TANK CONFIGURATION TUGS STAN TUG 2608 TECHNICAL SPECIFICATIONS