stage 5 construction of bamboo chairs
DESCRIPTION
This PowerPoint contains information about actual construction of bamboo chair, with this it gives pictorial information about Cleaning, cutting, bending, measuring, treating and weaving etc...TRANSCRIPT
![Page 1: Stage 5 construction of bamboo chairs](https://reader033.vdocuments.us/reader033/viewer/2022061212/5493fc51ac7959042e8b4a87/html5/thumbnails/1.jpg)
Stage 5: ConstructionConstruction of the chair
This PowerPoint Presentation is developed and created by :
![Page 2: Stage 5 construction of bamboo chairs](https://reader033.vdocuments.us/reader033/viewer/2022061212/5493fc51ac7959042e8b4a87/html5/thumbnails/2.jpg)
Recap:
• Material lists should have been given to your instructor.
• Teamwork: Everyone in the team should have equal jobs to do.
• Push yourself, this is a learning process. If you know your good at something teach someone else how to do it well and push yourself to do and learn something you are less good at instead.
• View this process as an experiment – feel free to make mistakes and learn from them.
![Page 3: Stage 5 construction of bamboo chairs](https://reader033.vdocuments.us/reader033/viewer/2022061212/5493fc51ac7959042e8b4a87/html5/thumbnails/3.jpg)
Vigyan Ashram 2012 Construction
Cleaning, cutting, bending, measuring, treating and weaving ...
![Page 4: Stage 5 construction of bamboo chairs](https://reader033.vdocuments.us/reader033/viewer/2022061212/5493fc51ac7959042e8b4a87/html5/thumbnails/4.jpg)
Group 1
![Page 5: Stage 5 construction of bamboo chairs](https://reader033.vdocuments.us/reader033/viewer/2022061212/5493fc51ac7959042e8b4a87/html5/thumbnails/5.jpg)
Group 2
![Page 6: Stage 5 construction of bamboo chairs](https://reader033.vdocuments.us/reader033/viewer/2022061212/5493fc51ac7959042e8b4a87/html5/thumbnails/6.jpg)
Day 2
![Page 7: Stage 5 construction of bamboo chairs](https://reader033.vdocuments.us/reader033/viewer/2022061212/5493fc51ac7959042e8b4a87/html5/thumbnails/7.jpg)
Both Groups
![Page 8: Stage 5 construction of bamboo chairs](https://reader033.vdocuments.us/reader033/viewer/2022061212/5493fc51ac7959042e8b4a87/html5/thumbnails/8.jpg)
![Page 9: Stage 5 construction of bamboo chairs](https://reader033.vdocuments.us/reader033/viewer/2022061212/5493fc51ac7959042e8b4a87/html5/thumbnails/9.jpg)
Day 3
![Page 10: Stage 5 construction of bamboo chairs](https://reader033.vdocuments.us/reader033/viewer/2022061212/5493fc51ac7959042e8b4a87/html5/thumbnails/10.jpg)
![Page 11: Stage 5 construction of bamboo chairs](https://reader033.vdocuments.us/reader033/viewer/2022061212/5493fc51ac7959042e8b4a87/html5/thumbnails/11.jpg)
![Page 12: Stage 5 construction of bamboo chairs](https://reader033.vdocuments.us/reader033/viewer/2022061212/5493fc51ac7959042e8b4a87/html5/thumbnails/12.jpg)
Day 4
![Page 13: Stage 5 construction of bamboo chairs](https://reader033.vdocuments.us/reader033/viewer/2022061212/5493fc51ac7959042e8b4a87/html5/thumbnails/13.jpg)
4 days down... Tired?