städtebau 2 projekt (final)

27

Upload: jiawang-heng

Post on 04-Aug-2015

56 views

Category:

Education


2 download

TRANSCRIPT

NewRüttenscheid

“Not In Your Thinking,

But In Our Planning”

Städtebau 2 Projekt

Heng Jia Wang

Bronislava Hubová

Lukáš Lechman

Er Zhuan Zhuan

LOCATION OF THE PROJECT SITE

Deutschland

Nordrhein-Westfalen

Essen

Essen-RüttenscheidEssen - Grünstenscheid

PUBLIC TRANSPORTATION

AND ACCESSIBILITY

Mes

se

Esse

n

Bre

dene

y

Hauptb

ahnh

of

Hauptb

ahnh

of

Düss

eld

orf

Düsseldorf

Esse

n Ost

Essen West

Straßenbahn

U-Bahn

S-Bahn

Highway

Bicycle way

U-BAHNRÜTTENSCHEIDER STR.

BYCYCLE WAY

BICYCLE WAY

EXISTING LAND USE

School Church

Hospital

dm

Grupa P

ark

Messe E

ssen

Mixed

Comercial areaSport

REWE

Netto

PROBLEMS

ACCESSIBILITY TO RÜTTENSCHEIDER STRAẞE

No access to to

Rüttenscheider Straße due

to the different ro

ad level

DIFFERENT LEVELS BETWEEN PLANNING AREA AND RÜTTENSCHEDER STR.

Road Level of

Rüttenscheider

Straße

Ground Level of the Planning location

SolutionCreate a staircase at the location which only allows pedestrian to go through, but not a vehicle

LACK OF PUBLIC GREEN AREA

SolutionCreate an integrated housing properties with more private green space and public green space.

Gruga Park – The nearest

and CHARGED park

Lack of Community green area within the

planning area

SolutionTherefore our objective of the development project will high green area and relatively low density

HIGH GREEN AREA, LOW DENSITY

LACK OF PARKING SPACEM

esse

Ess

en

The Planning

area used to be

the parking area

for Messe Essen

when there is

giant exhibition

Solution- Parking area will prepared along the road site for the truck and lorry coming for exhibition.- Additional parking area will be prepared in the green circle area.- People are encourage to arrive at Messe Essen by public transport (U Bahan- Gruga/Messe) rather than by own transport.

THE FOOTBALL FIELD WITH WALL AGAINST THE NOISE

SolutionFootball field and wall will be removed:- No barrier between the new planning area and existing housing area.- Suit to the planning which more focus on Green housing development.- Overcome the problem of noise.

CONCEPT

More Green, low density Normal, Medium and High Class Housing More public space More out door activity facilities Connection to Rüttenschied Straße and

area nearby Environmental friendly, with walk way

and bicycle way

OVER VIEW

4 MAIN SECTIONS

Normal Cost Housing

High Class Housing

Medium Cost Housing

Sport and Recreation Area

NORMAL COST HOUSING

- 4 Block with a total of xx units- Bicycle way and walk way connecting

- Parking area are prepared along the road side

- Public green area

MEDIUM COST HOUSING- A total of 7 blocks and xx units- Parkings prepared at road side- Green area in between each blocks- Semi-private green area- Walk way and bicycle way connecting

HIGH CLASS HOUSING

- A total of 3 blocks, with xx units

- Private green area- Walk way and bicycle way

provided- Parking prepared at road side

SPORT AREAExtreme

Sport Area

Foot Ball Field

Recreation Area

Basket Ball Field

Tennis Court

Badminton Court

PARKING

STAIRCASE

- Connecting to Rüttenschiedstraße

- Connecting to Witterkindstraße