städtebau 2 projekt (final)
TRANSCRIPT
NewRüttenscheid
“Not In Your Thinking,
But In Our Planning”
Städtebau 2 Projekt
Heng Jia Wang
Bronislava Hubová
Lukáš Lechman
Er Zhuan Zhuan
LOCATION OF THE PROJECT SITE
Deutschland
Nordrhein-Westfalen
Essen
Essen-RüttenscheidEssen - Grünstenscheid
Mes
se
Esse
n
Bre
dene
y
Hauptb
ahnh
of
Hauptb
ahnh
of
Düss
eld
orf
Düsseldorf
Esse
n Ost
Essen West
Straßenbahn
U-Bahn
S-Bahn
Highway
Bicycle way
ACCESSIBILITY TO RÜTTENSCHEIDER STRAẞE
No access to to
Rüttenscheider Straße due
to the different ro
ad level
DIFFERENT LEVELS BETWEEN PLANNING AREA AND RÜTTENSCHEDER STR.
Road Level of
Rüttenscheider
Straße
Ground Level of the Planning location
SolutionCreate a staircase at the location which only allows pedestrian to go through, but not a vehicle
LACK OF PUBLIC GREEN AREA
SolutionCreate an integrated housing properties with more private green space and public green space.
Gruga Park – The nearest
and CHARGED park
Lack of Community green area within the
planning area
SolutionTherefore our objective of the development project will high green area and relatively low density
HIGH GREEN AREA, LOW DENSITY
LACK OF PARKING SPACEM
esse
Ess
en
The Planning
area used to be
the parking area
for Messe Essen
when there is
giant exhibition
Solution- Parking area will prepared along the road site for the truck and lorry coming for exhibition.- Additional parking area will be prepared in the green circle area.- People are encourage to arrive at Messe Essen by public transport (U Bahan- Gruga/Messe) rather than by own transport.
THE FOOTBALL FIELD WITH WALL AGAINST THE NOISE
SolutionFootball field and wall will be removed:- No barrier between the new planning area and existing housing area.- Suit to the planning which more focus on Green housing development.- Overcome the problem of noise.
CONCEPT
More Green, low density Normal, Medium and High Class Housing More public space More out door activity facilities Connection to Rüttenschied Straße and
area nearby Environmental friendly, with walk way
and bicycle way
4 MAIN SECTIONS
Normal Cost Housing
High Class Housing
Medium Cost Housing
Sport and Recreation Area
NORMAL COST HOUSING
- 4 Block with a total of xx units- Bicycle way and walk way connecting
- Parking area are prepared along the road side
- Public green area
MEDIUM COST HOUSING- A total of 7 blocks and xx units- Parkings prepared at road side- Green area in between each blocks- Semi-private green area- Walk way and bicycle way connecting
HIGH CLASS HOUSING
- A total of 3 blocks, with xx units
- Private green area- Walk way and bicycle way
provided- Parking prepared at road side
SPORT AREAExtreme
Sport Area
Foot Ball Field
Recreation Area
Basket Ball Field
Tennis Court
Badminton Court