st stop!op! - lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x...

72
STOP! STOP! 16770-CB Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll free number: 1-888-827-9056 or email: [email protected] Our staff is ready to provide assistance April through October M-F 8:00 AM to 4:30 PM EST Saturday 8:30 AM to 4:30 PM EST November through March M - F 8:00 AM to 5:00 PM EST

Upload: others

Post on 08-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

STOP!STOP!

16770-CB

Call Us First!DO NOT RETURN TO STORE.

For immediate help with assembly or product informationcall our toll free number:

1-888-827-9056 or email:

[email protected]

Our staff is ready to provide assistanceApril through October M-F 8:00 AM to 4:30 PM EST

Saturday 8:30 AM to 4:30 PM ESTNovember through March M - F 8:00 AM to 5:00 PM EST

Page 2: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

(This page intentionally left blank.)

Page 3: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

KEEP THIS MANUAL FOR FUTURE REFERENCE

ASSEMBLY MANUAL

BUILDING SIZE

GABLE 10' x 8' (305 x 244)

ACTUAL FLOOR SIZE10' x 8' (305 x 244 cm)BASE MODEL 10' x 7' 8-5/8" (305 x 235,3 cm)10' x 12' (305 x 365,8 cm)ADD ONE 10' x 4' 10' x 11' 8-5/8" (305 x 357,2 cm)10' x 16' (305 x 487,7 cm)ADD TWO 10' x 4' 10' x 15' 8-5/8" (305 x 479 cm)

07/01/202016770-CB

BEFORE YOU BEGIN

IMPORTANT! READ INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING ASSEMBLY.

- CUSTOMER SERVICE - Call: 1-888-827-9056 email: [email protected]

• BUILDING RESTRICTIONS AND APPROVALS Be sure to check with local building department and homeowners association for specific restrictions and/ or requirements before building

. • ENGINEERED DRAWINGSContact our Customer Service Team if engineered drawings are needed to pull local permits.

• SURFACE PREPARATION To ensure proper assembly you must build your shed on a level surface. Recommended methods and materials to level your shed are

listed on page 6.

• CHECK ALL PARTSInventory all parts listed on pages 4 - 5. Contact our Customer Service Team if any parts are missing or damaged.

• ADDITIONAL MATERIALSYou will need additional materials to complete your shed. See page 6 for required and optional materials and quantities.

Page 4: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

2

TOOLS

Safety! Always use approved safety glasses during assembly.

OptionalRequired

HELPFUL REMINDER SYMBOLSLook for these symbols for helpful reminders throughout this manual.

ORIENT LUMBER AND TRIM FOR BEST APPEARANCE

= Assistance Required; two or more people.

= Ensure squareness.

= Important required step or operation.

= Helpful assembly hint.

= Mark part with pencil.

= Beginning of steps for assembly or installation.

= You have fi nished the assembly or installation.

= Level

� Gloves

Framing lumber is graded for structural strength and not appearance. Exterior trim is graded for one good side.

Always install the material leaving the best edge and best surface visible. Please remember that these blemishes in no waynegatively affect the strength or integrity of our product. (See Fig. A, B, C.)

A

� Safety Glasses

� Tape Measure

� Paint Tools

� Ladder

� Caulk Gun

� Hammer

� Level

FINISH

BEGIN

� Pencil

� Phillips Screwdriver

� Drill / Driver� 3/8" Drill Bit� #2 Philips Drive Bit

� Tool Belt/ Nail Pouch

� Chalk Line

� Nail Gun

• gun nails

� Tin Snips (for drip edge)

� Square or

� Utility Knife� Shingle Blades

B C

Page 5: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

PARTS IDENTIFICATION AND SIZESD

OO

RTR

USS

TRIM

WA

LLTreated lumber is stamped:

6 x 24" (15 x 61 cm)x6 x4 x4

PARTS LISTINVENTORY YOUR PARTS before you begin.We suggest sorting parts by the category they are listed in.

ZJx1 5/8 x 3 x 72" (1,6 x 7,6 x 183 cm)

WOOD SIZE CONVERSION CHARTNominal Board Size Actual Size

1 x 4 .................3/4" x 3-1/2" (1,9 x 8,9 cm)

2 x 4 ..............1-1/2" x 3-1/2" (3,8 x 8,9 cm)

2 x 3 ..............1-1/2" x 2-1/2" (3,8 x 6,3 cm)

1 x 3 .................3/4" x 2-1/2" (3,8 x 6,3 cm)

10x8' 10x12' 10x16'

x1 2 x 3 x 22-1/8" (5 x 7,6 x 56 cm) LT

x4 2 x 3 x 72" (5 x 7,6 x 183 cm) OY

x4 7/16 x 2-1/2 x 24-3/4" (1,1 x 6,3 x 62,9 cm)

7/16 x 2-1/2 x 48" (1,1 x 6,3 x 122 cm)

x6 x4 x4 2 x 3 x 69" (5 x 7,6 x 175,3 cm)OV

x4 2 x 3 x 77" (5 x 7,6 x 196 cm) PB

x2 2 x 3 x 92-5/8 " (5 x 7,6 x 235,3 cm) PM

x2 2 x 3 x 94-1/2" (5 x 7,6 x 240 cm) PR

2 x 4 x 65-7/8" (5 x 10 x 167 cm)x6 x4 x4 CV

5/8 x 4 x 14" (1,6 x 10 x 35,6 cm)x8 WNA

2 x 3 x 58" (5 x 7,6 x 147,3 cm)x4 CDD

1 x 3 x 94-3/4"(2,5 x 7,6 x 240,1 cm)x2 x2 x2 HS

2 x 3 x 46-1/4" (5 x 7,6 x 117,5 cm) x2 NH

2 x 3 x 48" (5 x 7,6 x 122 cm) x2 x2 NK

Part identification is stamped on some parts.

• Check these locations for part stamp.

RS RS

x4 1 x 3 x 7-1/2" (2,5 x 7,6 x 19 cm)GBB

x4 3/4 x 5-1/8 x 8-3/8" (1,9 x 13 x 21,3 cm) LEFT PAINTED GREENRIGHT PAINTED RED

x2 x4

x4 x4

3

1 x 3 x 5" (2,5 x 7,6 x 12,7 cm) USED AS A GAUGE BLOCK FOR 3/4" (19 mm) MEASUREMENTx1 GAA

3/4" (19 mm)

XMAx1 11/16 x 2-1/2 x 60-5/8" (1,7 x 6,3 x 154 cm)x1 x1

OOx2 69" Door Stiffener (175,3 cm)

Page 6: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

WALL PANEL & DOORS PARTS LIST

ROOF PANELS

FASTENER/HARDWARE BAG (Shown Actual Size)

SOFFIT PANELS

x22

x45

x28

x118

x96

3" (7,6 cm)

2" (5,0 cm)

2" (5,0 cm)

3/4" (19 mm)

1-1/4" (3,2 cm)

x2 3/8 x 5 x 93-1/4" (0,9 x 12,7 x 236,9 cm)

x2 x2 x4 3/8 x 48 x 72" (1 x 122 x 183 cm)

x1 x1

x1x1

x1RIGHT DOOR

x1LEFT DOOR

x1 RIGHT x1 LEFT

NOTE:If you are using a nail gun, nails may be used where screws are shown for quicker assembly.Length of nail must match screw length.

4

DOOR HARDWARE (Not Actual Size)

3/4" (19 mm) 3/4" (19 mm) 3/4" (19 mm)

64" Metal Threshold

Bagged seperately / special coating

x1

x4

x1 x1

x7 x11

Roof panels are 7/16" (11 mm) thick.

x2x2 19" x 96"(48 x 244 cm)

48" x 96"(122 x 244 cm)

Page 7: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

10 x

8'

10 x

12'

10 x

16'

5

ROOF PANELS

NOTES

Roof panels are 7/16" (11 mm) thick.

Roof panels are 7/16" (11 mm) thick.

Roof panels are 7/16" (11 mm) thick.

x2

x2

x4

x2

x2

x2

x2

x2

x2

x4

19" x 96"(48 x 244 cm)

19" x 48"(48 x 122 cm)

19" x 48"(48 x 122 cm)

19" x 96"(48 x 244 cm)

19" x 96"(48 x 244 cm)

48" x 96"(122 x 244 cm)

48" x 96"(122 x 244 cm)

48" x 96"(122 x 244 cm)

48" x 48"(122 x 122 cm)

48" x 48"(122 x 122 cm)

2" (5,0 cm)x1 1 lb. of 2" (5,0 cm)

2" (5,0 cm)

2" (5,0 cm)

x2

x2

1 lb. of 2" (5,0 cm)

1 lb. of 2" (5,0 cm)

Page 8: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

6

10x8' 10x12' 10x16' ALL SIZES

COMPLETING YOUR SHEDYou will need these additional materials

TO VALIDATE YOUR WARRANTY YOU MUST USE THE FOLLOWING:

ADDITIONAL MATERIALS

REFER TO THE BACK OF THIS MANUAL AND THE MANUFACTURER’S INSTRUCTIONS FOR INSTALLATION OF SHINGLES, DRIP EDGE AND FELT.

3-TAB SHINGLES (Bundles)....................

PAINT FOR SIDING (Gallons).................. Use 10 0% acrylic latex exter ior paint.

1" GALVANIZED ROOFING NAILS (lbs). For shingles.

PAINT FOR TRIM .............................1 QuartUse 10 0% acrylic latex exterior paint.

CAULK ............................................ 2 TubesUse acrylic latex exter ior caulk that is paintable.

FOUNDATION OR FLOOR MATERIALS

• Your shed kit does not include a wood �oor frame or �oor panel materials.

• See page 8 for the additional oor panel sizes and quantities required.

• This shed does not include any leveling materials.

• See the FLOOR LEVELING section on page 10 for recommended methods and suggested materials to properly level your oor, as this will vary depending on your speci c site.

NOTES

4 6 8

1-½ 2 2-½

2 3 4

(2) coats r ecommended.

10x8' 10x12' 10x16'

DRIP EDGE (Feet)....................................

#15 ROOFING FELT (Sq ft. to cover).....

1" GALVANIZED ROOFING NAILS(lbs).

40 50 60

96 144 192

For r ng felt.

Shown actual size

NAIL BOXES (Not included)3" (7,6 cm)

2" (5,0 cm)

x2 BOXES

x4 BOXES

Page 9: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

A

BC

4"(10 cm)

3-1/2"(8,9 cm)

D

D

7

CONCRETE FOUNDATION If you choose to install your kit on a concrete slab refer to the diagram below.Attach the sill plates on the foundaton as shown, and continue on to page 21.

A B C DActual Floor SizeBuilding Size

• A treated 2 x 4" (5 x 10 cm) sill plate is required when installing your shed on concrete.

Purchase full length treated lumber, or butt shorter pieces end-to-end and seal seams with caulk. • Use a high quality exterior grade caulk beneath all sill plates. • Fasten 2 x 4" (5 x 10 cm) sill plates to slab using approved concrete anchors (fasteners not included). • Check local code for concrete foundation requirements.

120" (305 cm)

120" (305 cm)

120" (305 cm)

85-5/8" (217 cm)

133-5/8" (339 cm)

181-5/8" (461 cm)

10'x 7'-8-5/8" (305 x 235 cm)

10'x 11'-8-5/8" (305 x 357 cm)

10'x 15'-8-5/8" (305 x 479 cm)

10'x 8' (305 x 244 cm)

10'x 12' (305 x 366 cm)

10'x 16' (305 x 488 cm)

92-5/8" (235 cm) 151-1/2" (385 cm)

140-5/8" (357 cm) 185" (470 cm)

188-5/8" (479 cm) 224" (568 cm)

Treated Sill Plate

Caulk betweensill plate andconcrete.

10' x 8' Building Requires:

10' x 12' Building Requires:

10' x 16' Building Requires:

2 x 4 x10' (5 x 10 x 305 cm)x2

2 x 4 x10' (5 x 10 x 305 cm)x2

2 x 4 x10' (5 x 10 x 305 cm)x2

2 x 4 x 8' (5 x 10 x 244 cm)x2

2 x 4 x 8' (5 x 10 x 244 cm)x2 2 x 4 x 4' (5 x 10 x 122 cm)x2

2 x 4 x 8' (5 x 10 x 244 cm)x2 2 x 4 x 8' (5 x 10 x 244 cm)x2

MUST be treated lumber.

Caulkx1 or 2

Allow new concrete slabs to cure for at least seven (7) days.

Page 10: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

FLOOR FRAME (Not Included) You may need treated 2 x 4" boards cut to size and nails to complete your floor.Floor panel sizes and quantities are shown below. MUST be treated lumber.

x4 2 x 4 x 72" (5 x 10 x 183 cm)

x2 2 x 4 x 72" (5 x 10 x 183 cm)

x4 2 x 4 x 72" (5 x 10 x 183 cm)

x4 2 x 4 x 48" (5 x 10 x 122 cm)

x2 2 x 4 x 48" (5 x 10 x 122 cm)

x4 2 x 4 x 48" (5 x 10 x 122 cm)

x6 2 x 4 x 45" (5 x 10 x 114,3 cm)

x6 2 x 4 x 89-1/2" (5 x 10 x 227 cm)

x6 2 x 4 x 93" (5 x 10 x 236,2 cm)

x6 2 x 4 x 89-1/2" (5 x 10 x 227 cm)

x6 2 x 4 x 89-1/2" (5 x 10 x 227 cm)

10 x

8'

10 x

8'

10 x

12'

10 x

12'

10 x

16'

10 x

16'

8

2" (5,0 cm)x1

x1

1 lb. of 2" (5,0 cm) Hot Dipped Galvanized Box-Type Nails.

1 lb. of 3" (7,8 cm) Hot Dipped Galvanized Deck-Type Nails.

FLOOR PANELS (Not Included)You may need floor panels and nails to complete your floor. Floor panel sizes and quantities

are shown below. Use a minimum of 5/8" (1,6 cm) Oriented Strand Board (OSB)

5/8 x 23-7/8 x 92-5/8" (1,6 x 60,6 x 235,3 cm)

5/8 x 23-7/8 x48" (1,6 x 60,6 x 122 cm)

5/8 x 23-7/8 x 92-5/8" (1,6 x 60,6 x 235,3 cm)

5/8 x 23-7/8 x 48" (1,6 x 60,6 x 122 cm)

5/8 x 23-7/8 x 96" (1,6 x 60,6 x 244 cm)

5/8 x 48 x 92-5/8" (1,6 x 122 x 235,3 cm)

5/8 x 48 x 92-5/8" (1,6 x 122 x 235,3 cm)

5/8 x 48 x 92-5/8" (1,6 x 122 x 235,3 cm)

5/8 x 48 x 48" (1,6 x 122 x 122 cm)

5/8 x 48 x 96" (1,6 x 122 x 244 cm)

x1

x1

x1

x1

x1

x2

x2

x2

x2

x2

Page 11: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

DOOR

9

OPTIONAL WOOD FRAME FLOOR LEVELING OPTIONS There are multiple ways to level your floor frame. Our recommended leveling method is shown below.

Leveling materials are not included in this kit.

PREFERRED METHOD - 4x4 TREATED RUNNERS (Typical for 10' x 12' Kit)

• 3" Screw angled into 4x4.• (2) at each point frame and 4x4 touch.

• Level under 4x4 runners only.• Locate leveling material 12" from ends of runners and no more than 48" apart.• Asphalt shingles should be used between 4x4 runners and blocks or treated lumber. Never use shingles in direct contact with ground.• For best results and aiding in water drainage use gravel under each concrete block.

LEVELING METHODS

MATERIAL REQUIRED

x2 (10' x 8') 4" x 4" x 10' (10 x 10 x 305 cm) Treated Lumber

x4 (10' x 12') 4" x 4" x 10' (10 x 10 x 305 cm) Treated Lumber

x5 (10' x 16') 4" x 4" x 10' (10 x 10 x 305 cm) Treated Lumber

Fasteners for Frame to 4"x 4". (3" Screws shown as one option.) Minimum (12 for each runner) 3" screws / exterior grade.

Use only wood treated for ground contact and fasteners approved for use with treated wood.

Always support frame seams.

Leveling higher than 16" not recommended.

LEVELING MATERIALSGravel

2x4 Treated LumberSolid Masonry Blocks in 1", 2", 4" or 8" thickness

Asphalt Shingles

4" Block

8" Block

GravelGravel

Do not exceed 16".

4x4 Runner

Shingle

ShingleMaximum between leveling material locations.

48"12"

2x4 Treated Lumber

2" Block

Level

12"

Runners are generally 12" (30,5 cm) from ends of floor frame and under seams.

4x4 Runners (not included).

Seam

12" (30,5 cm)

36" (91,4 cm)

40-5/16" (102,4 cm)Centered

40-5/16" (102,4 cm)Centered 12"

(30,5 cm)

Measurements to centers of 4x4's.

Page 12: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

10

Use two 3" nails at each mark.

PARTS REQUIRED:

x6

x2

x2x28

48"(122 cm)

72"(183 cm)

89-1/2"(227 cm)

92-5/8"(235 cm)

Orient parts as shown on flat surface. Measure and mark from end of boards.

10' x 8' FLOOR FRAME (Not Included)

3" (7,6 cm)

2 x 4 x 72" (5 x 10 x 183 cm) Treated Wood

2 x 4 x 89-1/2" (5 x 10 x 227 cm) Treated Wood

2 x 4 x 48" (5 x 10 x 122 cm) Treated Wood

Center on marks.

Center on marks.

120"(305 cm)

48"(122 cm)

48"(122 cm)

24"(61 cm)

72"(183 cm)

96"(244 cm)

Offset Seam

Offset Seam

Flushat ends.

BEGIN

2

1

DOOR

You have finished your 10' x 8' floor frame. If building 10' x 8' kit go to page 13. If building 10' x 12' kit go to page 11. If building 10' x 16' kit go to page 12.

FINISH3

HINT: For easier nailing stand on frame.

Toenailing

DOOR

Page 13: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

DOOR

11

3

2

1

3" (7,6 cm)

Use two 3" nails at each mark. Go to page 14.

Orient parts as shown on flat surface to build back section 2. Measure and mark each dimension from end of boards.

Follow steps 1-3 on page 10 to build front 10' x 8' floor section 1.

PARTS REQUIRED:

Flushat ends.

Center on marks.

45"(114,3 cm)48 "

(122 cm)

48 "(122 cm)

1-1/2"(3,8 cm)

120"(305 cm)

48"(122 cm)

48"(122 cm)

24"(61 cm)

72"(183 cm)

96"(244 cm)

72"(183 cm)

x2x28

x2

x6

10 x 12' FLOOR FRAME (Not Included)

BEGIN You will build two floor sections.

Offset Seam

2 x 4 x 45" (5 x 10 x 114,3 cm)

2 x 4 x 48" (5 x 10 x 122 cm)

2 x 4 x 72" (5 x 10 x 183 cm)

Offset Seam

Toenailing

HINT: For easier nailing stand on frame.

Section 2Section 1

Page 14: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

DOOR

12

3

2

1

3" (7,6 cm)

Use two 3" nails at each mark. Go to page 15.

Orient parts as shown on flat surface to build back section 2. Measure and mark each dimension from end of boards.

Follow steps 1-3 on page 10 to build front 10' x 8' floor section 1.

PARTS REQUIRED:x2

x28

x2

x6

10 x 16' FLOOR FRAME (Not Included)

BEGIN You will build two floor sections.

2 x 4 x 93 " (5 x 10 x 236,2 cm)

2 x 4 x 48" (5 x 10 x 122 cm)

2 x 4 x 72" (5 x 10 x 183 cm)

Offset Seam

HINT: For easier nailing stand on frame.

Section 2Section 1

Flushat ends.

Center on marks.

93"(236,2 cm)

96 "(244 cm)

48 "(122 cm)

1-1/2"(3,8 cm)

120"(305 cm)

48"(122 cm)

48"(122 cm)

24"(61 cm)

72"(183 cm)

96"(244 cm)

72"(183 cm)

Offset Seam

Toenailing

Page 15: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

DOOR

13

LEVEL AND SQUARE FLOOR FRAMEBefore attaching fl oor decking, it is important to level and square the fl oor frame.

A level and square fl oor frame is required to correctly construct your shed.

• 3" Screw angled into 4x4.• (2) at each point frame and 4x4 touch.

DOOR

FINISH5

BEGIN

2

3

4

1

Use level and check the frame is level before applying fl oor panels.

Check for frame squareness by measuring diagonally across corners. If the measurements are the same, the frame is square. The diagonal measurement will be approximately 151-1/2" (385 cm).

When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner. At the opposite end of the frame, secure the frame to 4x4 runners with one fastener at ends of each runner making sure the frame remains square (Fig. A).

Once the fl oor frame is level and square fasten the frame at each point the frame contacts the 4x4 runners. Use minimum of 12 screws for each runner. Go to page 16.

See page 9 for the preferred fl oor leveling method.

First, secure at ends with

one fastener.

Second, secure at ends with one fastener.

151-1/2"(385 cm)

151-1/2"(385 cm)

Fig. A

12"(30,5 cm)

12"(30,5 cm)

Page 16: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

DOOR

DOOR

DOOR

14

• 3" Screw angled into 4x4.• (2) at each point frame and 4x4 touch.

Put both fl oor sections together and attach as shown using 3" nails.4

You have fi nished your fl oor frame. Proceed to level and square frame.

10 x 12' FLOOR FRAME (Not Included)

(4) Nails per side, stagger pattern.

FINISH5

FINISH5

LEVEL AND SQUARE FLOOR FRAMEBefore attaching fl oor decking, it is important to level and square the fl oor frame.

A level and square fl oor frame is required to correctly construct your shed.

BEGIN

2

3

4

1

Use level and check the frame is level before applying fl oor panels.Check for frame squareness by measuring diagonally across corners. If the measurements are the same, the frame is square. The diagonal measurement will be approximately 185" (470 cm).

When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner. At the opposite end of the frame, secure the frame to 4x4 runners with one fastener at ends of each runner making sure the frame remains square (Fig. A).

Once the fl oor frame is level and square fasten the frame at each point the frame contacts the 4x4 runners. Go to page 16.

See page 8 for the preferred fl oor leveling method.

Fig. A

3" (7,6 cm)x20

140-5/8"(357,2 cm)

120"(305 cm)

Section 2Section 1

185"(470 cm)

Runners are generally 12" (30,5 cm) from ends of fl oor frame and under seams.

4x4 Runners(not included).

Seam

12"(30,5 cm)

36"(91,4 cm)

40-5/16"(102,4 cm)Centered

40-5/16"(102,4 cm)Centered 12"

(30,5 cm)

Measurements tocenters of 4x4's.

185"(470 cm)

Page 17: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

DOOR

DOOR

DOOR

15

Put both fl oor sections together and attach as shown using 3" nails.4

You have fi nished your fl oor frame. Proceed to level and square frame.

10 x 16' FLOOR FRAME (Not Included)

(4) Nails per side, stagger pattern.

FINISH5

FINISH5

LEVEL AND SQUARE FLOOR FRAMEBefore attaching fl oor decking, it is important to level and square the fl oor frame.

A level and square fl oor frame is required to correctly construct your shed.

BEGIN

2

3

4

1

Use level and check the frame is level before applying fl oor panels.Check for frame squareness by measuring diagonally across corners. If the measurements are the same, the frame is square. The diagonal measurement will be approximately 224" (568 cm).

When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner. At the opposite end of the frame, secure the frame to 4x4 runners with one fastener at ends of each runner making sure the frame remains square (Fig. A).

Once the fl oor frame is level and square fasten the frame at each point the frame contacts the 4x4 runners. Continue on page 16.

See page 8 for the preferred fl oor leveling method.

Fig. A

3" (7,6 cm)x20

188-5/8"(479 cm)

120"(305 cm)

Section 2Section 1

12"(30,5 cm)

12"(30,5 cm)

40-5/16"(102,4 cm)Centered

42"(106,7 cm)Centered

40-5/16"(102,4 cm)Centered

42"(106,7 cm)Centered

224"(568 cm)

224"(568 cm)

Runners are generally 12" (30,5 cm) from ends of fl oor frame and under seams. 4x4 Runners

(not included).

Measurements tocenters of 4x4's.

Seam

Page 18: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

Fig. CDOOR

151-1/2" (385 cm)151-1/2"

(385 cm)

16

PARTS REQUIRED:

92-5/8" (235 cm)

10' x 8' FLOOR PANELS (Not Included)

x552" (5 cm)

(2) Nails

Flush

Fig. A

Flush at top corner edge.

Fig. B

(2) Nails

DOOR

Attach the 48 x 92-5/8" panel with the rough side up (painted-grid lines side) with the 48" edge and corner flush to the floor frame (Fig A). Secure panel with two 2" nails in the corners.

Move to the opposite end. Using the long edge of the panel as a lever move thepanel side-to-side until the top corner is flush to the floor frame (Fig. B).Secure panel with two 2" nails in the corners.

2

BEGIN1

3

4 Continue attaching the panel using 2" nails 6" apart on edges and 12" apart inside panel. Use a chalk line or use pre-painted grid lines to nail into joists under panel.

Ensure your floor frame is square by installing one panel and squaring frame.

Check the floor frame is square by measuring diagonally across the frame corners. If the measurements are the same your floor frame is square. The measurement will be approximately 151-1/2" (385 cm) (Fig. C).

48" x 92-5/8"(122 x 235,3 cm)x1

Flush6" (15 cm) edges of panel.

12" (30,5 cm) inside panel.Grid lines UP

3/4" (19 mm)

Approximately

120" (305 cm)

48" (122 cm)

Flush

FLOOR PANELS NOT INCLUDED.SEE PAGE 8 FOR PANEL SIZESAND QUANTITIES.

Page 19: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

17

DOOR

Use a chalk line or grid lines on panels for 2" nails 6" apart on edges and 12" apart inside panel. .

Continue installing panels with rough side up (painted grid lines).5

If building the 10' x 8' kit, you have fi nished Installing your fl oor panels, and can continue at p. 22. If building the 10' x 12' kit continue at page 18. If building the 10' x 16' kit, continue at p. 20.

PARTS REQUIRED: x95

10' x 8' FLOOR PANELS (Not Included)

6

FINISH7

2" (5 cm)

92-5/8"(235 cm)

120"(305 cm)

23-7/8"(61 cm)

48"(122 cm)

Flush

12" (30,5 cm)

6" (15 cm)

Flush

48" x 92-5/8"(122 x 235,3 cm)

x1 x1

Grid lines UP.

5/8 x 23-7/8 x 92-5/8"(1,6 x 61 x 235 cm)

FLOOR PANELS NOT INCLUDED. SEE PAGE 8 FOR PANEL SIZESAND QUANTITIES.

Page 20: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

18

PARTS REQUIRED:10' x 12' FLOOR PANELS (Not Included)

x552" (5 cm)

DOOR

Attach the 48 x 48" panel with the rough side up (painted-grid lines side) on Section 2 with the 48" edge and corner flush to the floor frame and Section 1.

Secure using 2" nails 6" apart on edges and 12" apart inside panel. Use a chalk line or use pre-painted grid lines to nail into joists under panel.

2

BEGIN1

x1

6" (15 cm) edges of panel.

120" (305 cm)

48" (122 cm)

12" (30,5 cm)inside panel.

Grid lines UP.

48" (122 cm)

Flush

92-5/8" (235 cm)

3/4" (19 mm) Approximately

48" x 48"(122 x 122 cm)

Section 2Section 1

FLOOR PANELS NOT INCLUDED. SEE PAGE 8 FOR PANEL SIZESAND QUANTITIES.

Page 21: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

19

10' x 12' FLOOR PANELS (Not Included)

Use a chalk line or grid lines on panels for 2" nails 6" apart on edges and 12" apart inside panel. .

Continue installing panels with rough side up (painted grid lines) as shown.3

You have fi nished Installing your fl oor panels. Continue on page 22.

PARTS REQUIRED: x95

4

FINISH5

2" (5 cm)

DOOR

6" (15 cm) edges of panel.

120"(305 cm)

48"(122 cm)

12" (30,5 cm)inside panel.

Grid lines UP.

48"(122 cm)

23-7/8"(61 cm) Flush

92-5/8"(235 cm)

48" x 48"(122 x 122 cm)

x1 x1 5/8 x 23-7/8 x 48"(1,6 x 61 x 122 cm)

Section 2Section 1

FLOOR PANELS NOT INCLUDED. SEE PAGE 8 FOR PANEL SIZESAND QUANTITIES.

Page 22: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

20

PARTS REQUIRED:10' x 16' FLOOR PANELS (Not Included)

x552" (5 cm)

DOOR

Position the 48 x 96" panel with the rough side up (painted-grid lines side) with the 96" edge and corner flush to the floor frame and Section 1.

Secure the panel using 2" nails 6" apart on edges and 12" apart inside panel. Use a chalk line or use pre-painted grid lines to nail into joists under panel.

2

BEGIN1

48" x 96"(122 x 244 cm)x1

6" (15 cm) edges of panel

120" (305 cm)

96" (244 cm)

12" (30,5 cm)inside panel.

Grid lines UP.

48" (122 cm)

Flush

92-5/8" (235 cm)

3/4" (19 mm) Approximately

Section 2Section 1

FLOOR PANELS NOT INCLUDED. SEE PAGE 8 FOR PANEL SIZESAND QUANTITIES.

Page 23: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

DOOR

21

10' x 16' FLOOR PANELS (Not Included)

Use a chalk line or grid lines on panels for 2" nails 6" apart on edges and 12" apart inside panel. .

Continue installing panels with rough side up (painted grid lines).3

You have fi nished Installing your fl oor panels. Continue on page 22.

PARTS REQUIRED: x95

4

FINISH5

2" (5 cm)

5/8 x 48 x 96"(1,6 x 122 x 244 cm)

x1 x1 5/8 x 23-7/8 x 96"(1,6 x 61 x 244 cm)

6" (15 cm) edges of panel.

120"(305 cm)

96"(244 cm)

12" (30,5 cm)inside panel.

Grid lines UP.

48"(122 cm)

23-7/8"(61 cm) Flush

92-5/8"(235 cm)

Section 2Section 1

FLOOR PANELS NOT INCLUDED. SEE PAGE 8 FOR PANEL SIZESAND QUANTITIES.

Page 24: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

22

I M P O R TA N T !

Check the floor frame is level after installing floor panels. Re-level if needed.

• The floor should used as a stable work surface for wall construction.

• Organize your assembly procedure during the build process to avoid over-handling of the walls.

HINT:

IMPORTANT!

DOOR

SIDEWALL

SIDEWALL FRONTWALL

BACKWALL

DOOR

Page 25: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

125"(317,5 cm)

NH astemporarysupports

OO astemporary

support

23

RAFTER ASSEMBLY JIG

PARTS REQUIRED: x8

FINISH4

Build a Jig to ensure all Rafters are assembled the same.

Mark a straight line on the Floor from corner to corner (Fig. A) or on sill plates to fi t measurements (Fig. B).

Screw blocks in place to measurement shown.

Make sure blocks are square and at 125" (317,5 cm)

You have fi nished building a Rafter Jig.

2

3

BEGIN

1-1/4" (3,2 cm)

Chalk Line

Square

Fig. B

Fig. A

125'(317.5 cm)

Flush

GBB GBB

OO

NHNH

GBB GBBFlush

DOOR

18-1/2°

(2) 1-1/4" (3,2 cm)Screws per block

1 x 3 x 7-1/2" (2,5 x 7,6 x 19 cm)x4 GBB

125'(317.5 cm)

Rafter jig on wood fl oor Rafter jig on concrete slaband sill plates

22-3/4'(57,8 cm)

Page 26: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

125"(317,5 cm)

1/4" (6 mm)Gap

Gusset

24

RAFTERS

2" (5 cm)

FINISH5

Nail gusset onto rafter using 2" nails, staggered, as shown.

Repeat steps 1-3 to build two more assemblies for 10' x 8' Kit, four more assemblies for 10' x 12' Kit, or six more assemblies for 10' x 16' Kit.

Flip over rafter assembly and nail gusset to back side.

Unscrew jig and save blocks. Set aside rafters and proceed to building your back wall.

Contact at peak.

4

3

2

BEGIN

PARTS REQUIRED:

2 x 4 x 65-7/8" (5 x 10 x 167 cm)

6 x 24" (15 x 61 cm)

x6/x10/x14x6/x10/x14

x72

CV

Place two rafter halves CV on fl oor jig. You will assemble (4) rafters.

DOOR

NH astemporarysupports

OO astemporary

support

Rafter jig on wood fl oorRafter jig on concrete slab and sill plates

Page 27: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

25

Use NH as a guide to locate PB. (Do not nail.)

1-1/2"(3,8 cm)

77"(176 cm)

46-1/4"(117,5 cm)

46-1/4"(117,5 cm)

48-3/4"(124 cm)

48-3/4"(124 cm)

1-1/2"(3,8 cm)

1-1/2"(3,8 cm)

1-1/2"(3,8 cm)

94-1/2"(240 cm)

Orient parts on edge on floor as shown.

Nail using two 3" nails at each connection.2

1BEGIN

3" (7,6 cm)

PB PB

NHPR

PARTS REQUIRED:

BACK WALL FRAME

3" (7,6 cm) Nails

DOOR

HINT:

2 x 3 x 46-1/4" (5 x 7,6 x 117,5 cm)

2 x 3 x 77" (5 x 7,6 x 196 cm)

2 x 3 x 94-1/2" (5 x 7,6 x 240 cm)

x1x6

x2

x1

PB

NH

PR

Page 28: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

DOOR

26

Orient parts on edge on fl oor as shown.

Use two 3" screws at middle connection.

3

4

FINISH5 You have fi nished building your back wall frame.

PARTS REQUIRED: 3" (7,6 cm)

BACK WALL FRAME

2 x 3 x 46-1/4" (5 x 7,6 x 117,5 cm) x1

x2NH

46-1/4"(117,5 cm)

1-1/2(3,8 cm)

48-3/4"(124 cm)

48-3/4"(124 cm)

NH

(2) 3" (7,6 cm)Screws

Page 29: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

1"(2,5 cm) 3/4"

(1,9 cm)

1" (2,5 cm)

3/4"(1,9 cm)

6"(15,2 cm)

3/4"(1,9 cm)

3/4"(1,9 cm)

6"(15,2 cm)

Gauge Block

Gauge Block12"

(30,5 cm)

27

Place LEFT panel on back frame as shown with primed side facing up.BEGIN

Use a 3/4" gauge block at edges of panel.

3

2

1

Nail using 2" nails 6" apart on edges and 12" apart inside panel. .Do not nail in groove.

BACK WALL PANELS

2" (5 cm)PARTS REQUIRED:

3/4" GAUGE BLOCK

DOOR

x32

Maintain 1" measurement as shown.Fig. A

Fig. B

Primed side UP

For squareness maintain 3/4" measurement along panel edges.

x1 3/8 x 48 x 84"(1 x 122 x 213,4 cm)

Page 30: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

1" (2,5 cm)

3/4"(1,9 cm)

12"(30,5 cm)

6"(15,2 cm)

97-1/2"(247,7 cm)

Flush

For squareness, maintain 3/4"and 97-1/2" measurements.

For squareness, maintain 3/4"and 97-1/2" measurements.

28

Place RIGHT panel on back frame as shown with primed side facing up.

5

6

4

Use a 3/4" gauge block at edges of panel.

Nail using 2" nails 6" apart on edges and 12" apart inside panel. .Do not nailin groove.

BACK WALL PANELS

2" (5 cm)PARTS REQUIRED: x32

3/4" GAUGE BLOCK

DOOR

You have fi nished attaching your back wall panelsFINISH7

To draw panels tight at seams angle nail.

Gauge Block

x1 3/8 x 48 x 84"(1 x 122 x 213,4 cm)

Page 31: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

Right panel has square edge.

Left panel has lip edge.

29

1-1/4" (3 cm)

4

You will assemble TWO RIGHT and TWO LEFT wing walls.

Place OY on floor. Place a wing wall panel primed side down onto OY (Fig. A) and flush to panel edges as shown.

3

2

1

Secure flush to edges using eight 1-1/4 screws 10" apart.

You have finished building two sets of wing wall assemblies. Set ONE LEFT and ONE RIGHT aside. Continue building your back wall.

BEGIN

DOOR

Flush

2-1/2"(6,35 cm)

2-1/2"(6,35 cm)

x2

x2

Use 2x3'sfor support.

10" (25,4 cm) Approximately

OY

Primed Side Down.

Fig A.

Locate OY flush to these edges.

WING WALL PANELSPARTS REQUIRED: x32

2 x 3 x 72" (5 x 7,6 x 183 cm) x4 OY

x2

x2 LEFT

RIGHT

Page 32: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

Use a 2x3"for support.

Flush

6"(15,cm)

6"(15 cm)

Flush

30

Nail left and right wing wall assemblies onto back wall frame using 2" nails 6" apart.

Place wing wall assemblies onto frame with bottom of panels fl ush.

6

5

You have fi nished attaching your wing walls.FINISH7

Do not nailin groove.

DOOR

LEFT

RIGHT

HINT:To draw panels tight at seams angle nail.

BACK WALL PANELS

2" (5 cm)

x1

x24

x1

PARTS REQUIRED:

LEFT

RIGHT

Pre-assembled

Pre-assembled

Primed side UP

Primed side UP

Page 33: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

x1 RIGHTx1 LEFT

31

DOOR

HINT:To draw panels tight at seams angle nail.

x6

BACK WALL GABLE PANELS

2" (5 cm) x6PARTS REQUIRED:

3/4" GAUGE BLOCK

GAA

2

4

3

Use a 3/4" gauge block at edge of panel. Nail using 2" nails along edge as shown.

Nail using 2" nails along edge as shown.

Place left gable panel onto frame primed side up and fl ush to left panel.NOTE: Panel grooves will not align.

Place right gable panel onto frame primed side up and fl ush to left panel.NOTE: Panel grooves will not align.

You have fi nished building your back wall.FINISH5

1BEGIN

Primed side UP

Primed side UP

Flush

Flush

Gauge Block

Use a 2x3"for support.

Use a 2x3"for support.

Do not nailin groove.

3/4"(1,9 cm)

Page 34: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

PB

PB

LT

LT

PR

47-1/4"(120 cm)

47-1/4"(120 cm)

70-1/4"(178 cm)

70-1/4"(178 cm)

2-1/2"(6,4 cm)

2-1/2"(6,4 cm)

22-1/8(56 cm)

PB

PR

2-1/2"(6,4 cm)

2-1/2"(6,4 cm)

70-1/4"(178 cm)

94-1/2"(240 cm)

32

Nail two PB to PR with two 3" nails at each end.

Lay out two PB, one PR and one LT on edge on fl oor.

2

Ensure LT is centered with PR and nail in place with two 3" nails.3

You have fi nished building your Front Wall Frame.FINISH4

BEGIN

1

FRONT WALL FRAME

3" (7,6 cm)PARTS REQUIRED:

x22 x 3 x 22-1/8" (5 x 7,6 x 56 cm)

2 x 3 x 94-1/2" (5 x 7,6 x 240 cm) x1

x1x6

LT

2 x 3 x 77" (5 x 7,6 x 196 cm) PB

PR

DOOR

HINT:

Page 35: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

3/4" (1.9 cm)

1" (2,5 cm) 3/4"

(1,9 cm)

6"(15,2 cm)

6"(15,2 cm)

For squareness, maintain 3/4" measurements along panel edges.

3/4"(1,9 cm)

3/4"(1,9 cm)

97-1/2"(247,7 cm)

33

2" (5 cm)

3/4" GAUGE BLOCK

FRONT WALL PANELS

2

3

1BEGIN

Place LEFT panel on front frame as shown with primed side up.

Use a 3/4" gauge block on edges of panel.

Nail panel to frame with 2" nails 6" apart. Do not nail in groove.

PARTS REQUIRED:

x1

x22

DOOR

Primed Side UP

3/4" GAUGE BLOCK

3/4" GAUGE BLOCK

Page 36: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

1" (2,5 cm)

3/4" (1,9 cm)

3/4" (1,9 cm)

PanelsFlush

6"(15,2 cm)

97-1/2"(247,7 cm)

For squareness, maintain 3/4" and 97-1/2" measurements.

34

2" (5 cm)

3/4" GAUGE BLOCK

FRONT WALL PANELS

5

6

4 Place RIGHT panel on front frame primed side up.

Use a 3/4" gauge block on edges of panel.

Nail panel to frame with 2" nails 6" apart. Do not nail in groove.

To draw panels tight at seams angle nail.

DOOR

PARTS REQUIRED: x22

x1

Gauge Block

Primed Side UP

Page 37: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

Flush

Flush

35

2" (5 cm)

FRONT WALL PANELSPARTS REQUIRED:

LEFT

RIGHT

x1

x24

x1

Pre-assembled

Pre-assembled

Primed Side UP

7

8

You have fi nished attaching your wing walls.FINISH9

Place wing wall panels onto frame with bottom of panels fl ush.

Nail left and right wing wall assembliesusing 2" nails 6" apart. Do not nail

in groove.

To draw panels tight at seams angle nail.

DOOR

6"(15,2 cm)

6"(15,2 cm)

Use a 2x3"for support.

Page 38: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

PM

OV x3

22-1/4"(57 cm)

22-1/4"(57 cm)

46-1/4"(117,5 cm)

1-1/2"(3,8 cm)

1-1/2"(3,8 cm)

49-1/2"(125,7 cm)

24-3/4"(63 cm)

24-3/4"(63 cm)

36

SIDE WALL FRAMES

1BEGIN

3

2 If building 10' x 8' kit orient parts on edge on floor. Measure and mark from end of boards.

If building 10' x 12' kit goto page 40. If building 10' x 16' kit go to page 44.

IMPORTANT! You will build two walls the same.

Use two 3" nails at each mark.

3" (7,6 cm) PARTS REQUIRED:

x62 x 3 x 69" (5 x 7,6 x 175 cm)

x47/16 x 2-1/2 x 24-3/4" (1,1 x 6,4 x 62,9 cm)

OV

x22 x 3 x 92-5/8" (5 x 7,6 x 235,3 cm)

PM

x14

DOOR

Center on marks.

HINT:

3" (7,6 cm) Nails

Page 39: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

PARTS REQUIRED:

x2

x22

3/8 x 5 x 93-1/4" (0,9 x 12,7 x 236,9 cm)

4

5

Place panel onto 2 x 3 with primed side against 2 x 3 (Fig A)

Keep panel flush along entire edge of 2 x 3 top plate (Fig A).

Attach soffit panel flush to 2 x 3 (Fig A) and with 3/8" offset at ends (Fig. B, C) using eleven 1-1/4" screws.

DOOR

1-1/4" (3,2 cm)

37

Fig. A

Fig. C

Fig. B

PRIMED SIDE

Flush

3/8" (10 mm)

3/8" (10 mm)

93-1/4" (236,9 cm)

9-1/2" (24 cm)

10' x 8' SIDE WALL FRAME- SOFFIT

Page 40: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

38

2" (5 cm)PARTS REQUIRED:

3/8 x 48 x 72"(1 x 122 x 183 cm)

48" (122 cm)

3/4" (19 mm)

3/4" (19 mm)

x2

x58

3/4" GAUGE BLOCK

10' x 8' SIDE WALL PANELS

BEGIN HERE

6" (15 cm)

12" (30 cm)

For squareness maintain 3/4" and flush under soffit panel.

DOOR

3/4" Gauge Block Fig. A

Fig. B

3/4" (19 mm)

3/4" (19 mm)

2 Nails

2 Nails

Place the 48 x 72" panel onto wall frame with primed side up as shown. Note the lip and square edges.

Use the gauge block to mark the 3/4" measurement on the wall stud. Locate the panel flush under the soffit panel. Secure panel with two 2" nails in the corners (Fig. A).

8

7

6

Nail the panel using 2" nails 6" apart on edges and 12" apart inside panel.

Ensure your wall frame is square by installing one panel and squaring frame.

Move to the opposite end. Using the long edge of the panel as a lever move the panel side-to-side until you have a 3/4" measurement on the wall stud. Secure corner with two 2" nails.

LIPEDGE SQUARE

EDGE

Flush

Flush

Do not nail in groove.

There will be an overhang at top.

Primed Side UP

Page 41: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

DOOR

39

2" (5 cm)PARTS REQUIRED: x58

3/8" x 48" x 72"(1 x 122 x 183 cm)

x2

10' x 8' SIDE WALL PANELS

Place 48" panel on frame as shown with primed side facing up.NOTE THE SQUARE AND LIP EDGES.

Nail using 2" nails 6" apart on edges and 12" apart inside panel.

9

Carefully fl ip your sidewall over.Repeat STEPS 1-9 to assemble your second side wall.

Do not nailin groove.

You have fi nished building both of your side walls. Go to page 46.FINISH10

Flush

6" (15 cm)

48"(122 cm)

12" (30 cm)

LIPEDGE

SQUAREEDGE

To draw panels tight at seams angle nail.

DOOR

Page 42: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

PM

OV x5

NK

22-1/4" (57 cm)

22-1/4" (57 cm)

24" (61 cm)

24" (61 cm)

24" (61 cm)

24" (61 cm)

46-1/4" (117,5 cm)

1-1/2" (3,8 cm)

1-1/2" (3,8 cm)

48-3/4" (123,8 cm)

24-3/4" (63 cm)

48-3/4" (123,8 cm)

24-3/4" (63 cm)

48"(122 cm)

70-1/4" (178,4 cm)

94-1/4" (239,4 cm)

140-1/2"(356,9 cm) 118-1/4"

(300,5 cm)

DOOR

40

10' x 12' SIDE WALL FRAMES

1BEGIN

3

2 If building 10' x 12' kit orient parts on edge on floor. Measure and mark from end of boards.

If building 10' x 16' kit go to page 44.

IMPORTANT! You will build two walls the same.

Use two 3" nails at each mark.

3" (7,6 cm) PARTS REQUIRED:

x6 x22 x 3 x 69" (5 x 7,6 x 175 cm) 2 x 3 x 48" (5 x 7,6 x 122 cm)

x4 x27/16 x 2-1/2 x 24-3/4" (1,1 x 6,4 x 62,9 cm) 7/16 x 2-1/2 x 48 (1,1 x 6,4 x 122 cm)

OV NK

x22 x 3 x 92-5/8" (5 x 7,6 x 235,3 cm)

PM

x28

Centeron marks

3" (7,6 cm) Nails

HINT:

Page 43: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

PARTS REQUIRED:

x2

x2

x32

3/8 x 5 x 93-1/4" (0,9 x 12,7 x 236,9 cm)

3/8 x 5 x 48" (0,9 x 12,7 x 122 cm)

4

5

Place panels onto 2 x 3 with primed side against 2 x 3 as shown (Fig A)

Keep panel flush along entire edge of 2 x 3 top plate (Fig A).

Attach soffit panels flush to 2 x 3 (Fig A) and with 3/8" offset at ends (Fig. B, C) using fourteen 1-1/4" screws.

1-1/4" (3,2 cm)

DOOR

41

Fig. A

Fig. C

Fig. B

PRIMED SIDE

Flush

3/8" (10 mm)

3/8" (10 mm)

93-1/4" (236,9 cm)

48" (122 cm)

9-1/2" (24 cm)

10' x 12' SIDE WALL FRAME- SOFFIT

Page 44: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

42

2" (5 cm)PARTS REQUIRED:

3/8 x 48 x 72"(1 x 122 x 183 cm)

48" (122 cm)

3/4" (19 mm)

3/4" (19 mm)

x2

x58

3/4" GAUGE BLOCK

10' x 12' SIDE WALL PANELS

BEGIN HERE

6" (15 cm)

12" (30 cm)

For squareness maintain 3/4" and flush under soffit panel.

DOOR

3/4" Gauge Block Fig. A

Fig. B

3/4" (19 mm)

3/4" (19 mm)

2 Nails

2 Nails

Place the 48 x 72" panel onto wall frame with primed side up as shown. Note the lip and square edges.

Use the gauge block to mark the 3/4" measurement on the wall stud. Locate the panel flush under the soffit panel. Secure panel with two 2" nails in the corners (Fig. A).

8

7

6

Nail the panel using 2" nails 6" apart on edges and 12" apart inside panel.

Ensure your wall frame is square by installing one panel and squaring frame.

Move to the opposite end. Using the long edge of the panel as a lever move the panel side-to-side until you have a 3/4" measurement on the wall stud. Secure corner with two 2" nails.

LIPEDGE SQUARE

EDGE

Flush

Flush

Do not nail in groove.

There will be an overhang at top.

Primed Side UP

Page 45: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

DOOR

43

2" (5 cm)PARTS REQUIRED: x148

3/8" x 48" x 72"(1 x 122 x 183 cm)

x4

10' x 12' SIDE WALL PANELS

Place 48" panels on frame as shown with primed side facing up.NOTE THE SQUARE AND LIP EDGES.

Nail using 2" nails 6" apart on edges and 12" apart inside panel.

9

Carefully fl ip your sidewall over.Repeat STEPS 1-9 to assemble your second side wall.

Do not nailin groove.

You have fi nished building both of your side walls. Go to page 46.FINISH10

Flush

6" (15 cm)

48"(122 cm)

12" (30 cm)

LIPEDGE

SQUAREEDGE

To draw panels tight at seams angle nail.

DOOR

Page 46: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

PM

OV x7

NK NK

22-1/4" (57 cm)

24" (61 cm)

24" (61 cm)

22-1/4" (57 cm)

24" (61 cm)

24" (61 cm)

24" (61 cm)

24" (61 cm)

1-1/2" (3,8 cm)

1-1/2" (3,8 cm)

48-3/4" (123,8 cm)

24-3/4" (63 cm)

48"(122 cm)

48-3/4" (123,8 cm)

48" (122 cm) 145-1/2"

(369,6 cm)

24-3/4" (63 cm)

188-1/2"(478,8 cm) 166-1/4"

(422,3 cm) 142-1/4" (361,3 cm) 118-1/4"

(300,5 cm) 94-1/4" (239,4 cm) 70-1/4"

(178,4 cm) 46-1/4" (117,5 cm)

48"(122 cm)

DOOR

44

10' x 16' SIDE WALL FRAMES

1BEGIN

2

Measure and mark from end of boards.

IMPORTANT! You will build two walls the same.

Use two 3" nails at each mark.

3" (7,6 cm) PARTS REQUIRED:

x6 x22 x 3 x 69" (5 x 7,6 x 175 cm) 2 x 3 x 48" (5 x 7,6 x 122 cm)

x4 x47/16 x 2-1/2 x 24-3/4" (1,1 x 6,4 x 62,9 cm) 7/16 x 2-1/2 x 48" (1,1 x 6,4 x 122 cm)

OV NK

x22 x 3 x 92-5/8" (5 x 7,6 x 235,3 cm)

PM

x84

Centeron marks

3" (7,6 cm) Nails

HINT:

Page 47: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

PARTS REQUIRED:

x2

x4

x32

3/8 x 5 x 93-1/4" (0,9 x 12,7 x 236,9 cm)

3/8 x 5 x 48" (0,9 x 12,7 x 122 cm)

3

4

Place panels onto 2 x 3 with primed side against 2 x 3 as shown (Fig A)

Keep panel flush along entire edge of 2 x 3 top plate (Fig A).

Attach soffit panels flush to 2 x 3 (Fig A) and with 3/8" offset at ends (Fig. B, C) using nineteen 1-1/4" screws.

1-1/4" (3,2 cm)

DOOR

45

10' x 16' SIDE WALL FRAME- SOFFIT

Fig. A

Fig. C

Fig. B

Flush

3/8" (10 mm)

3/8" (10 mm)

93-1/4" (236,9 cm)

48" (122 cm)

48" (122 cm)

9-1/2" (24 cm)

PRIMED SIDE

Page 48: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

46

2" (5 cm)PARTS REQUIRED:

3/8 x 48 x 72"(1 x 122 x 183 cm)

x2

x58

3/4" GAUGE BLOCK

10' x 16' SIDE WALL PANELS

48" (122 cm)

3/4" (19 mm)

3/4" (19 mm)

BEGIN HERE

6" (15 cm)

12" (30 cm)

For squareness maintain 3/4" and flush under soffit panel.

DOOR

Use the gauge block to mark the 3/4" measurement on the wall stud. Locate the panel flush under the soffit panel. Secure panel with two 2" nails in the corners (Fig. A).

6

5Ensure your wall frame is square by installing one panel and squaring frame.

Move to the opposite end. Using the long edge of the panel as a lever move the panel side-to-side until you have a 3/4" measurement on the wall stud. Secure corner with two 2" nails.

3/4" Gauge Block Fig. A

Fig. B

3/4" (19 mm)

3/4" (19 mm)

2 Nails

2 Nails

7 Nail the panel using 2" nails 6" apart on edges and 12" apart inside panel.

Place the 48 x 72" panel onto wall frame with primed side up as shown. Note the lip and square edges.

LIPEDGE SQUARE

EDGE

Flush

Flush

Do not nail in groove.

There will be an overhang at top.

Primed Side UP

Page 49: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

DOOR

47

2" (5 cm)PARTS REQUIRED: x238

3/8" x 48" x 72"(1 x 122 x 183 cm)

x6

10' x 16 ' SIDE WALL PANELS

DOOR

Place 48" panels on frame as shown with primed side facing up.NOTE THE SQUARE AND LIP EDGES.

Nail using 2" nails 6" apart on edges and 12" apart inside panel.

8

Do not nailin groove.

Carefully fl ip your sidewall over.Repeat STEPS 1-9 to assemble your second side wall.

You have fi nished building both of your side walls. Go to page 46.FINISH10

Flush

6" (15 cm)

48"(122 cm)

48"(122 cm)

48"(122 cm)

12" (30 cm)

LIPEDGE

SQUAREEDGE

To draw panels tight at seams angle nail.

Page 50: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

48

2" (5 cm)

PARTS REQUIRED (TEMPORARY):

69" Door Stiffener (175,3 cm)x1

x8

x24

BACK WALL INSTALLATION

3" (7,6 cm)OO

DOOR

2" (5 cm)

Do not nailin groove.

Use OO as a temporary brace. Secure with two 3" screws.

Center back wall assembly on the 120" (305 cm) fl oor dimension.

2

BEGIN

1

First, nail lower edge of panel to fl oor frame using 2" nails 6" apart.Angle nail to hit fl oor frame (Fig. A).

3

Screw back wall uprights to fl oor using two 3" screws (Fig. B). 4

5 You have fi nished standing your back wall.FINISH

120" (305 cm)3" (7,6 cm)Screws

Nail 2" nails fi rst.

Angle to nail into fl oor frame.

2" (5 cm) Nail

Fig. A

3" (7,6 cm)Screw

3" (7,6 cm)Screw

3" (7,6 cm)Screw

3" (7,6 cm)Screw

Fig. B

Page 51: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

49

Center sidewall on floor front to back.

Nail the lower sidewall corner to the backwall trim with one 2" nail (Fig. A). At the top of the sidewall the soffit panel will overlap the backwall panel 3/8" (Fig. B).

3 Nail down the bottom plate using two 3" nails between the wall studs.

Screw through the backwall trim into the top and bottom plates using 3" screws (Fig. E). Repeat process to secure the left sidewall.

1

2

BEGIN

2" (5 cm)

3" (7,6 cm) 3" (7,6 cm)

SIDE WALLS INSTALLATION

Be sure the measurement between the panel edge and the trim is the same along the entire length. Then secure with one 2" nail in the upper corner (Fig. C).

Nail along the panel edge into the trim using 2" nails spaced 6" apart.

Nail along bottom of panel using 2" nails 6" apart. Angle nail to hit floor frame (Fig. D).

Stand right sidewall on floor. It is important to secure the sidewall in the following order:

Additional fasteners needed for 10' x 12' kit or 10' x 16' kit. Same instructions apply.

DOOR

DOOR

x4/8/12 x2

x30/39/48

6"(15 cm)

6"(15 cm)

CENTER

2" (5 cm) Nail

Fig. ATrim

Fig. D

Fig. E3" (7,6 cm)

Screw

2x3"

3" (7,6 cm) Nail

Panel Same Measurement

Fig. C

Trim

2" (5 cm) Nail

DOOR

3" (7,6 cm) Screw

3/8" (0,9 cm) OVERLAP Fig. B

TrimPanel

Soffit Panel

Page 52: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

2 Be sure the measurement between the panel edge and the trim is the same along the entire length. Then secure with one 2" nail in the upper corner (Fig. D).

Nail along the panel edge into the trim using 2" nails spaced 6" apart.

Secure the frontwall frame using two 3" screws (Fig. E). Screw through the frontwall trim into the top and bottom plates using one 3" screw (Fig. F).

Repeat process to secure the right side of the frontwall.

3

Center frontwall on floor side-to-side. The sidewall soffit will overlap the frontwall 3/8" (Fig. A). Nail the frontwall flush to the floor using 2" nails 6" apart. Angle nails to hit floor frame (Fig. B).

Nail the lower sidewall corner to the frontwall trim with one 2" nail (Fig. C).

1

BEGINStand frontwall on floor. It is important to secure the frontwall in the following order.

6"(15 cm) 2" (5 cm)

Nail

6"(15 cm)

Same Measurement

SidePanel

Fig. D

Trim

2" (5 cm) Nail

50

2" (5 cm)

3" (7,6 cm)

FRONT WALL INSTALLATIONx8

x36

DOOR

Fig. E

3" (7,6 cm) Screw

3" (7,6 cm) Screw

3" (7,6 cm) Screw

Fig. F 3" (7,6 cm) Screw

2 x 3"

CENTER

6"(15 cm)

6"(15 cm)2" (5 cm)

Nail

Fig. C

Trim

2" (5 cm) Nail

Fig. B

Fig. A

TrimPanel

Soffit Panel 3/8" (0,9 cm) OVERLAP

Page 53: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

51

1-1/4" (3 cm)

Flush to top of panel.

GABLE TRIMPARTS REQUIRED:

2 x 3 x 58" (5 x 7,6 x 147,3 cm)x4 CDD

Flush

CDD

CDD

x24

DOOR

FINISH4

Position one CDD fl ush to front panel edge and center on right edge of groove (Fig. A). Attach trim with eight 1-1/4" screws from inside. Install two screws at seam (Fig. B).

Position second CDD fl ush to panel edge and fl ush to CDD already attached (Fig. A).Attach trim with eight 1-1/4" screws from inside. Install two screws at seam (Fig. B).

Repeat steps 1-2 to attach the back trim.

You have attached your upper trim. Continue to attaching your endcaps.

2

3

BEGIN

Fig. AFig. B

8" (20,3 cm)

Approximately

Page 54: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

52

FINISH3

Clamp or hold trim XMA onto gable panel seam and up against gable trim. Ensure XMA is level.

From the inside, attach XMA with 3/4" screws as pattern shows.

You have attached your back wall gable trim.

2

BEGIN

BACK WALL GABLE TRIMPARTS REQUIRED:

x1 XMA11/16 x 2-1/2 x 60-5/8" (1,7 x 6,3 x 154 cm)

3/4" (1,9 cm) x11

DOOR

FlushFlush

GABLE TRIM

LEVEL

XMA

XMA

INSIDE

(11) 3/4" (1,9 cm) Screws

1-1/4"(3,2 cm)

2-1/2"(6,3 cm)

SEAM

Page 55: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

53

TRIM / ENDCAPS

Glue

GlueFlushFlush

Flush

Flush

Right - RED x2

Left - GREEN x2

FINISH4

Glue 7-1/2" boards onto endcaps, and fasten with 1-1/4" screws, as shown.

Locate endcaps fl ush with upper trim and corner trim and attach each endcap from inside of shed using four 1-1/4" screws as shown (Fig. A).

You have attached your endcaps.

Repeat steps to build two more endcaps.2

3

BEGIN

PARTS REQUIRED:1-1/4" (3,2 cm)

x14

GBB

GBB

DOOR

x4 1 x 3 x 7-1/2" (2,5 x 7,6 x 19 cm)GBB

x4 3/4 x 5-1/8 x 8-3/8" (1,9 x 13 x 21,3 cm) LEFT PAINTED GREENRIGHT PAINTED RED

(4) 1-1/4" (3,2 cm) Screws

Flush

Flush

Fig. A

Page 56: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

22-1/4"(56,5 cm)

22-1/4"(56,5 cm)

24"(61 cm)

24"(61 cm)

54

RAFTERS

3" (7,6 cm)

FINISH4

Locate rafters directly over studs and fl ush to overhang in wall frame (Fig. A).Check that you have the measurements shown. Screw through soffi t panel into rafters using one 2" screw (Fig. A).

Repeat steps to attach three rafters.

Attach with two 3" screws at each end (Fig. B). Re-tighten 2" screws if neccessary.

You have attached your rafters.

Flush

3

2

BEGIN

PARTS REQUIRED:

pre-assembled

x3

x12

x6

Screw into top plate.

Align over studs.

Maintain the measurements between rafters.

2" (5 cm)

2" (5 cm)Screw

Fig.A

1" (2,5 cm)

Fig. B

DOOR

NOTE: Measurements from inside of panels

Page 57: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

55

ROOF PANELS

Move to the opposite end. Using the long edge of the panel as a lever move the panel side-to-side until the top corner is flush to the peak (Fig. C) and there is 1/8" measurement to the gable trim (Fig. D). You may need to move your backwall to get the 1/8" measurement. Secure panel with two 2" nails in the corners.

2

You must square the roof by attaching one panel fist. You will use the panels’ long edge as a lever to bring your roof into square. Commonly known as “racking”.

Roof panels may cause serious injury until securely fastened.

Attach the 48 x 96" panel with the rough side up (painted-grid lines side) with a 1/8" measurement on the rafter (Fig A) and the panel flush at the peak (Fig. B). Secure panel with two 2" nails in the corners.

1BEGIN

Two Nails

48"(122 cm)

1/8" (3 mm)

Fig. A

Flush at peak.

Fig. B

1/8"(3 mm)

Gable Trim

Fig. D

Flush at peak.

Fig. C

DOOR

2" (5 cm)PARTS REQUIRED: x 4

7/16 x 48 x 96"(1,1 x 122 x 244 cm)

x2

Page 58: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

56

ROOF PANELS

Keep spacing between the center of the rafters at the lower edge of the panel and secure with one 2" nail into each rafter (Fig. E). Move to the top of the panel and keep spacing between the center of the rafters. Secure with one 2" nail into each rafter (Fig. E). Nail the roof panel using 2" nails 6" apart on edges and 12" apart inside panel (Fig. F).

3

Attach the lower roof panels flush to the upper panels and with a 1/8" measurement at the gable trim (Fig.G).

Nail the roof panel using 2" nails 6" apart on edges and 12" apart inside panel.

Repeat process to attach roof panels on the opposite side.

4

12"(30,5 cm) 6" (15 cm)

Fig. F

19"(48 cm)

96"(244 cm)

1/8"(3 mm)

Gable Trim

FlushFig. G

PARTS REQUIRED:2" (5 cm)

x90

22-1/4" (56,5 cm)

22-1/4" (56,5 cm)

24" (61 cm)

24" (61 cm)

Fig. E

NOTE: Measurements from inside of panels

2" Nail

7/16 x 19 x 96"(1,1 x 48 x 244 cm)

x2

DOOR

DOOR

Page 59: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

57

HS

HS

Flush

TRIM

PARTS REQUIRED: x20

Flush

2" (5 cm)

BEGIN

FINISH3

Attach fascia trim fl ush under roof panel (Fig. A) and endcaps at ends of rafters (Fig. B) using 2" (5 cm) nails as shown.

Repeat steps to attach fascia trim on both sides.

You have attached your fascia trim.

2

1 x 3 x 94-3/4" (2,5 x 7,6 x 240,6 cm)x2 HS

Fig. B

DOOR

Fig. A

Page 60: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

58

Orient parts as shown on flat surface. 3/8" offset is to top. Look for red (right) and green (left) on hinge board.

PARTS REQUIRED:

x1x1Left Door Right Door

BEGIN1

DOORS

1-1/4" (3 cm)

2" (5 cm)

2 Attach temporary support OO with 3" screws in middle and at ends. Tighten securely.

Attach temporary support ZJ at bottom with 1-1/4" screws in middle and 2" screws at ends. Tighten securely.

DOOR

HINT:Look for 3/8" SPACER

attached to doors.

ZJ

OO

Make sure spacer is attached.

Tighten screws securely.

OFFSET

(4) 3" (7,6 cm) Screws

Screws in middle 1-1/4" (3 cm)

Screw at ends 2" (5 cm)

Bottom edges flush.

3/8"(1 cm)3/8"

(1 cm)

3/8"(1 cm)

3/8"(1 cm)

OFFSETGREEN RED

3" (7,6 cm)

OOx1 x2

x2

x4

ZJx15/8 x 3 x 72" (1,6 x 7,6 x 183 cm)

69" Door Stiffener (175,3 cm)

Page 61: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

59

DOOR

3

PARTS REQUIRED:x1

x73" (7,6 cm)

DOORS

OO

Flushagainst wall panels.

Fig. AOO

OO

Center doors on right edge of groove as shown (Fig. B).4

Check ledger board is still fl ush under panels.

Remove temporary supports and check doors open properly.6

FINISH7 You have fi nished installing your doors.

Screw hinge boards into wall supports and fl oor using four 3" screws as shown. Make sure screws go into framing and fl oor (Fig. C, D).

5

3" (7,6 cm)Screws into the wall support and fl oor frame.

Fig. B

Center 3/8" measurement onright edge of groove.

Fig. C

3/8"(1 cm)

Fig. D

Angle 3" (7,6 cm)Screw

Attach temporary support OO as a ledger board fl ush under wall panels for doors to rest on, using three 3" screws (Fig. A).

69" Door Stiffener (175,3 cm)

Page 62: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

DOOR

60

DOOR

CENTER CENTER

CENTER

CENTER

Center

Install 3/4" screws from inside. x6

2" Nails x8

Fig. B

14" (35,5 cm)Approximately

Nail into framing.

Two Screws

DoorTrim

HingeBoard

Fig. A

DoorPanel

ZJ

Center metal threshold between doors and secure using eleven 3/4" special coating screws into fl oor as shown (Fig, C).

4

You have fi nished securing your door and trim. FINISH5

BEGIN1 Secure hinge boards from inside using 3/4" screws as shown (Fig. A).

3 Center trim ZJ over doors and secure using eight 2" fi nish nails into framing as shown.

2 Reinforce the door trim using 3/4" screws through door panel into trim (Fig. A).Locate screws as shown in Fig. B. Use two screws at seams.

(11) Specialcoating screws

Fig. C

PARTS REQUIRED:2" (5 cm) x8

3/4" (1,9 cm) x52

64" Metal Thresholdx1

5/8 x 3 x 72" (1,6 x 7,6 x 183 cm)x1 ZJ

Page 63: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

61

You have fi nished installing your door weatherstrips.

BEGIN

With left door closed, center a weatherstrip OO vertically on the left door in the door opening (Fig. A). OO will offset the left door 1" OUT past the door trim 1" (Fig. B).

1

PARTS REQUIRED:x2

x142" (5 cm)

DOOR WEATHERSTRIP

OO

FINISH5

On right door center OO vertically in door opening (Fig. A). OO will offset the right door 1" IN from the door trim (Fig. C).

3

Secure OO using seven 3" screws through outside trim into OO (Fig. C).4

DOOR

OO

Screws2"

(5 cm) x14

1"(2,5 cm)

OFFSET

1"(2,5 cm)

OFFSET

Secure OO using seven 3" screws through outside trim into OO (Fig. B)2

Fig. A Fig. B

Center OO in door opening.

11" (28 cm)Approximately

69" Door Stiffener (175,3 cm)

Page 64: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

62

35-1/2"(90 cm)

BEGIN

PARTS REQUIRED:

You have fi nished mounting your door hardware.FINISH4

Install hasp on right door and latch on left door. Bottom edge of hasp is35-1/2" (90 cm) up from bottom edge of door trim. Measure and mark locations and install with 3/4" screws as shown (Fig B).

DOOR HARDWARE

3

With door closed mark hole location for bolt to extend into.HINT: Extend bolt to leave a mark in wood. Tap bolt with hammer. Drill 3/8" hole deep enough for bolt to slide into.

2

Mount barrel bolt fl ush at top of OO on left door using 3/4" screws as shown (Fig A).1

x1

x4 x73/4" (1,9 cm)

HINT: With door closed extend bolt and tap with hammer to leave a mark in wood for drilling.

DOOR

x1

3/4" (1,9 cm)

Drill 3/8" holein-line with bolt.

OO

Fig. A

Fig. B

Flush on OO.

3/4" (1,9 cm) Screw x7

3/8" (9 mm) Drill Bit

Page 65: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

63

ZZ

DOOR TRIM

DOOR

ZZ

FINISH3

PARTS REQUIRED:

5/8 x 3 x 14" (1,6 x 7,6 x 35,5 cm)x8

x163/4" (19 mm)

BEGINPosition parts on lower pane of Door Panel, as shown.

21

Attach each using two 3/4" (19 mm) screws as shown.

You have fi nished attaching your door trim.

WNA

5/8 x 4 x 14" (1,6 x 10 x 35,6 cm)x8 WNA 3/4" (1,9 cm)

x18PARTS REQUIRED:

DOOR TRIM

Page 66: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

64

• Use acrylic latex caulk that is paintable. Caulk at all horizontal and vertical seams, between the trim and walls, and all around the door trim.

• Use a high quality exterior acrylic latex paint. When painting your building, there are a few key areas that can be easily overlooked that must be painted: • Bottom edge of all siding and trim • Inside of doors and all 4 edges

Note: Prime all un-primed exterior wood before painting. (Follow directions provided by manufacturer.)

Snip bottom side of drip edge andbend over to other side of roof.

(Follow directions provided by manufacturer.)

PAINT & CAULK- NOT INCLUDED -

ROOF FELT- NOT INCLUDED -

DRIP EDGE- NOT INCLUDED -

• Install over roof felt or over roof felt on gable side and under roof felt on eave side (Fig. A). • Do not use nails on side of drip edge that hangs over side of building. • Only nail top of drip edge as shown.

• Install felt flush to all roof edges overlapping 3". Use minimal amount of roofing nails to hold in place.

OK to overlap at ridge.3" OVERLAP

Flush

Flush

Edge flush to trim.

Roof Felt

Drip EdgeDrip Edge

Fig. A

Page 67: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

65

• Follow directions provided by manufacturer and these instructions.

SHINGLES - NOT INCLUDED -

Install first starter row upside down and color up with a 1" overhang at back and bottom of roof panel. Use (4) nails per shingle. Starter row must be straight and level all the way across with lower edge of roof deck. NOTE: If you have installed drip edge install shingles flush to drip edge.

BEGIN

1

TABS UP

Shingle overlaps roof decking.

1" (2,5 cm) overhang past roof deck.

1" (2,5 cm) overhang or flush with drip edge.

(4) Nails

BACK OF SHED

FRONT OF SHED

NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS.

Familiarize yourself with a 3-Tab Shingle.

SHINGLE NAIL PATTERN

1"(2,5 cm)

NAILS

Sealing Strip 1"(2,5 cm)

1/2"(1,3 cm)

Full Rain Slot

Half A Rain Slot

NotchNotch

Page 68: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

66

Beginning at front of shed, install first row of shingles with notch at 1" past roof edge or flush with drip edge.22

FRONT OF SHED

BACK OF SHED

Notch- or -

Drip Edge

Notch

Roof Deck

1"(2,5 cm)

Flush with starter row.

Flush with starter row.

Continue installing rows of shingles by staggering at front.

4

SHINGLES continued...

Install second row of shingles flush at top of first row's rain slots. Ensure 1" overhang or flush to drip edge at front, stagger each row.

3

1"(2,5 cm)

1"(2,5 cm)

BACK OF SHED

FRONT OF SHED

FRONT OF SHED

Flush with rain slots. Flush with rain slots.

Notch

Notch

Page 69: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

67

You have fi nished shingling your roof. Proceed to capping the ridge.FINISH

Continue installing rows of shingles to the peak. At the peak make sure there is a maximum of 5" or less to the rain slot, as shown below. If shingles overlap at ridge cut to peak with a utility knife.

Repeat steps 1 - 7 to shingle the opposite side of your roof. Trim shingles at ridge.

Once both sides are shingled you need to trim ends. Strike a chalk line 1" from edge.

Using your shingle hooked blade carefully cut shingles along chalk line.

5

7

6

9

8

SHINGLEScontinued...

• If more than 5" to rain slot you must install another row of shingles.

5"(12,7 cm) MAX.

Top of rain slot.

Cut Off.CUT

Page 70: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

68

SHINGLES - RIDGE CAP

• You will finish off the top of the roof with a ridge cap made from shingles.

Note: • You will need about 20 - 22 cut pieces.

Cut shingles into THREE pieces. Hint: Use cut-off pieces first.

Score shingle, then snap-off angled cut.

Install first ridge cap flush to shingles at front, as shown.

Install second ridge cap 5" back, as shown.

2

3

BEGIN

1

2" (5 cm)

2" (5 cm)

2" (5 cm)

2" (5 cm)

2" (5 cm)

2" (5 cm

Top of slot.Weather Seal

Flush

(1) Nail per side through weather seal.

(1) Nail per side through weather seal.

5" 12,7 cm

FRONT OF SHED

FRONT OF SHED

Flush

20 to 22Pieces

Page 71: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

69

SHINGLES - RIDGE CAPcontinued...

Continue installing ridge cap to back of roof.

Make sure there is 4" between the shingle-color and edge of shingles.

When you have 4" minimum of shingle color cut one piece to cap your roof.

Install fl ush to shingles.

4

5

6

7

(2) Nails per side.

You have fi nished your ridge cap.FINISH8

Flush to shingles

Trim cap off fl ush to shingles

Cap

Page 72: ST STOP!OP! - Lowe'spdf.lowes.com/installationguides/095317184581_install.pdfx6 x4 x4 6 x 24" (15 x 61 cm) PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts

70

LIMITED CONDITIONAL WARRANTY*Backyard Storage Solutions, LLC warrants the following:1. Every product is warranted from defects in workmanship and manufacturing for 1 year.2. All accessories, hardware and metal components are warranted for 2 years.3. All Oriented Strand Board (OSB) is warranted for 2 years4. Siding and Trim is warranted for 10 years.5. Solar Shed windows are warranted for 1 year.6. Cedar lumber is warranted for 15 years.7. Preserved Pine is warranted for 10 years.8. Redwood is warranted for 10 years.

Backyard Storage Solutions, LLC will repair, replace or pay for the affected part. In no event shall Backyard Storage Solutions, LLC pay the cost of labor or installation or any other costs related thereto. All warranties are from date of purchase. If a cash refund is paid on an affected part, it will be prorated from the date of purchase.

CONDITIONSThe warranty is effective only when:1. The unit has been erected in accordance with the assembly instructions. 2. The unit has been properly shingled and painted or stained and reasonably and regularly maintained thereafter.3. The failure occurs when the unit is owned by the original purchaser.4. Backyard Storage Solutions, LLC has received the warranty registration card within thirty (30) days of purchase and notification of the failure in writing within the warranty period specified above.5. Backyard Storage Solutions, LLC has had reasonable opportunity during the sixty (60) days following receipt of notification to inspect and verify the failure prior to commencement of any repair work.

REQUIREMENTSStorage BuildingsTo validate your warranty, it is necessary to properly maintain your Backyard Storage Solutions, LLC unit; shingle the roof and paint or solid-colored stain the siding using quality, 100% acrylic latex exterior product with a minimum of two (2) coats within thirty (30) days of assembly; caulk above all doors and all horizontal and vertical trim boards; paint and seal all exposed edges, sides and faces of siding/trim and OSB siding to include all exterior walls and all sides and all edges of doors.

Gazebos & PergolasTo validate your warranty, it is necessary to properly maintain your Backyard Storage Solutions, LLC unit. This includes treating all of the exposed cedar and pine surfaces on your gazebo or pergola structure with an exterior grade wood preservative, an exterior oil-based semi-transparent stain, an acrylic latex exterior paint or an acrylic latex solid color exterior stain within 30 days of assembly and as needed thereafter to maintain your warranty.

Keep vegetation trimmed away from building and make sure siding panels and trim do not come in contact with masonry or cement. The minimum ground clearance for siding must be one half inch (½ inch) from concrete slab or two and one half inches (2 ½”) from the ground when building is erected or constructed on a treated wood floor kit. Water from sprinklers must be kept off unit. In no event will Backyard Storage Solutions, LLC be responsible for any indirect, incidental, consequential or special damages nor for failure(s) that are caused by events, acts or omissions beyond our control including, but not limited to, misuse or improper assembly, improper maintenance (which eventually leads to rot or decay) and acts of God. Backyard Storage Solutions, LLC will not be held responsible for any labor costs incurred to construct your unit.This warranty gives you certain specific rights that vary from state to state.

CLAIM PROCEDURETo make a claim under this warranty, you can either call 1-888-827-9056 or email: [email protected]. Please have ready the information below when you call or include the information in your email:1. The model and size of the product.2. A list of the part(s) for which the claim is made.3. Proof of purchase of the Backyard Storage Solutions, LLC item, as shown on the original invoice or receipt.4. Run code: found on exterior product label or assembly instructions enclosed in the product package.

All other inquiries can be mailed to: Backyard Storage Solutions, LLC Attn: Customer Service 1000 Ternes Monroe, MI 48162

*WARRANTY TERMS MAY VARY OUTSIDE THE U.S.A.IMPORTANT: This is your warranty certificate. 10Y MV LDR: 3/20/2019