Page 1: St. Anthony Falls Bridge Replacement Project Project Letting Sept. 19, 2007 3:00 PM

St. Anthony Falls Bridge Replacement Project

Project Letting

Sept. 19, 20073:00 PM

Page 2: St. Anthony Falls Bridge Replacement Project Project Letting Sept. 19, 2007 3:00 PM

Presentation Outline

• Early Milestones

• Technical Evaluation Process

• Best Value Selection Process

Page 3: St. Anthony Falls Bridge Replacement Project Project Letting Sept. 19, 2007 3:00 PM

Early Milestones• August 1 – Bridge Collapses• August 4 – Issue Request for Qualifications• August 8 – Short Listed teams• August 23 – Request For Proposals released• September 14 – Technical Proposals received• September 18 – Financial Proposals received• September 19 – Project letting• Between September 19 and October 15

– Contract finalized• October 15 – Construction expected to begin

Page 4: St. Anthony Falls Bridge Replacement Project Project Letting Sept. 19, 2007 3:00 PM

Procurement process

• Today’s letting is a step in process

• Contract must be executed before process is final

• Anticipate final contract in place by end of September 2007

Page 5: St. Anthony Falls Bridge Replacement Project Project Letting Sept. 19, 2007 3:00 PM

Technical Evaluation Process

• Technical Review Committee– Six Members responsible for developing

average Technical Proposal Score for each team

• Minn. Statute, Section 161.3420, Subd 2

• Technical Advisors– Advise TRC with technical aspects of

proposals– Coordinates Process

Page 6: St. Anthony Falls Bridge Replacement Project Project Letting Sept. 19, 2007 3:00 PM

Technical Evaluation Process• Process Oversight Committee

– Observation and Verification of Process

• Technical Subcommittees– Assist in identifying strengths and weaknesses

of each team• Aesthetic/Visual Quality• Roadway/Geometrics• Communication• Quality and Structural • Legal Financial

Page 7: St. Anthony Falls Bridge Replacement Project Project Letting Sept. 19, 2007 3:00 PM

Evaluation Criteria

• Quality (50%)– Experience and authority of key individuals– Extent of quality control/quality assurance– Safety

– Measures to evaluate performance in construction

• Aesthetics/Visual Quality (20%)

• Enhancements (15%)– Geometric and structural enhancements

• Public Outreach/Involvement (15%)

Page 8: St. Anthony Falls Bridge Replacement Project Project Letting Sept. 19, 2007 3:00 PM

Best Value Selection Process

• Design Build A+B, Best Value formula – Three Components

• “A” = Contract Bid Price• Plus “B” = Number of Days to Complete Project, which is

multiplied by $200,000 per day– $200,000 per day based on 50% of road user costs

• Divided by Technical Proposal Average Score (TPA)• Result = Adjusted Bid

(A) + (B x $200,000) divided by TPA = Adjusted bid • Contract awarded to lowest adjusted bid

Page 9: St. Anthony Falls Bridge Replacement Project Project Letting Sept. 19, 2007 3:00 PM

Technical proposal scoring

• Scores fall within these categories and ranges Excellent – 100 - 91 percent Very good – 90 - 76 percent Good – 75 – 61 percent Fair – 60 - 50 percent

Page 10: St. Anthony Falls Bridge Replacement Project Project Letting Sept. 19, 2007 3:00 PM

Data classificationTechnical proposal

items

Data Classification before contract award

Data classification

after contract award

Evaluation

Criteria

Confidential or protected – nonpublic

Public

Scoring

Methodology

Confidential or protected – nonpublic

Public

Evaluations Confidential or protected – nonpublic

Public

Proposals Private or nonpublic Public

Minnesota Statutes Section 13.72, Subdivision 11

Page 11: St. Anthony Falls Bridge Replacement Project Project Letting Sept. 19, 2007 3:00 PM

Thank You:

Ames/LundaC.S. McCrossanFlatiron-Manson

Walsh Construction/American Bridge

http://www.dot.state.mn.us/i35wbridge/