ssv test checklist gran-2g-1038

7
GR Band 900 Region BTS Name 1038 Test Time 3am Test Conclusion OK Site Name 1038 Cell Id 10381 Azimuth 0 M tilt 0 E tilt 0 Cell BCCH 1003 Item Test Yes No 1 2 3 4 Abis Interface Status OK? 5 All Neighbors created? 6 7 Power parameter correct? 8 Call Setup per cell OK? 9 UL / OL Check? 10 Conducted by Operator Staff Name Remarks Site i VSWR test OK? (<=1.5) Alarms/Health Check OK? (end-user affecting Each cell have expected BCCH and Freq Plan (TRX) ? (no swapped GXXX SW features installed? Handover between Sectors OK?

Upload: sandeep-kumar-mahey

Post on 23-Nov-2015

14 views

Category:

Documents


3 download

DESCRIPTION

SSV Test Checklist GRAN-2G-1038

TRANSCRIPT

GRANGRAN Site Acceptance ChecklistBand900RegionBahrainDate22-Jan-2014BTS Name1038Test Time3amTest ConclusionOKSite Name1038Cell Id103811038210383Azimuth0130240M tilt000E tilt090Cell BCCH100310081011ItemTestYesNoN/AComments1VSWR test OK? (