SRI SRI GNAN MANDIR SCHOOL,BANALI
UPDATE OF THE PROJECT
![Page 2: SRI SRI GNAN MANDIR SCHOOL,BANALI UPDATE OF THE PROJECT](https://reader037.vdocuments.us/reader037/viewer/2022110319/56649c6d5503460f9491ef10/html5/thumbnails/2.jpg)
Our current place of school
1) We have given admission for 110 students.2) In June we are expecting total 200 admissions.
![Page 3: SRI SRI GNAN MANDIR SCHOOL,BANALI UPDATE OF THE PROJECT](https://reader037.vdocuments.us/reader037/viewer/2022110319/56649c6d5503460f9491ef10/html5/thumbnails/3.jpg)
Our current classroom
![Page 4: SRI SRI GNAN MANDIR SCHOOL,BANALI UPDATE OF THE PROJECT](https://reader037.vdocuments.us/reader037/viewer/2022110319/56649c6d5503460f9491ef10/html5/thumbnails/4.jpg)
School Construction update
We have completed roofing job.
![Page 5: SRI SRI GNAN MANDIR SCHOOL,BANALI UPDATE OF THE PROJECT](https://reader037.vdocuments.us/reader037/viewer/2022110319/56649c6d5503460f9491ef10/html5/thumbnails/5.jpg)
We made possible to dance 305 plants in the school ground
Without your support this was not possible
![Page 6: SRI SRI GNAN MANDIR SCHOOL,BANALI UPDATE OF THE PROJECT](https://reader037.vdocuments.us/reader037/viewer/2022110319/56649c6d5503460f9491ef10/html5/thumbnails/6.jpg)
Well construction
We got first water on 7th feet. Water level in the well is increasing everyday.
![Page 7: SRI SRI GNAN MANDIR SCHOOL,BANALI UPDATE OF THE PROJECT](https://reader037.vdocuments.us/reader037/viewer/2022110319/56649c6d5503460f9491ef10/html5/thumbnails/7.jpg)
Following work is pending1) Plaster of all rooms started
2) To colour the building.3) Tiling of the rooms
4) To construct water storage tank5) To create latrine facility.6) Furniture in all rooms