SR 260 Thousand Trails – I‐17
![Page 3: SR Trails –Iaztransportationboard.gov/...NW...Engineers-Report.pdfSR 89, including the intersection (WRE’s obligation for improvements). Note: Funding opportunities could be either](https://reader033.vdocuments.us/reader033/viewer/2022052800/5f10ad257e708231d44a46d7/html5/thumbnails/3.jpg)
3
SR 69 Prescott Lakes Parkway – Frontier Village MP 293.8 – 294.8
![Page 4: SR Trails –Iaztransportationboard.gov/...NW...Engineers-Report.pdfSR 89, including the intersection (WRE’s obligation for improvements). Note: Funding opportunities could be either](https://reader033.vdocuments.us/reader033/viewer/2022052800/5f10ad257e708231d44a46d7/html5/thumbnails/4.jpg)
4
US 93 MP 185 to MP 190.51
![Page 5: SR Trails –Iaztransportationboard.gov/...NW...Engineers-Report.pdfSR 89, including the intersection (WRE’s obligation for improvements). Note: Funding opportunities could be either](https://reader033.vdocuments.us/reader033/viewer/2022052800/5f10ad257e708231d44a46d7/html5/thumbnails/5.jpg)
5
US 93 Corridor
I‐11
Additional projects to widen old NB sections
I‐40/US 93 System Interchanges
Access control plan
![Page 6: SR Trails –Iaztransportationboard.gov/...NW...Engineers-Report.pdfSR 89, including the intersection (WRE’s obligation for improvements). Note: Funding opportunities could be either](https://reader033.vdocuments.us/reader033/viewer/2022052800/5f10ad257e708231d44a46d7/html5/thumbnails/6.jpg)
6
US 93 Carrow Stephens
60% DesignConstruction tentatively scheduled for FY ’23Cost: $31 Million
![Page 7: SR Trails –Iaztransportationboard.gov/...NW...Engineers-Report.pdfSR 89, including the intersection (WRE’s obligation for improvements). Note: Funding opportunities could be either](https://reader033.vdocuments.us/reader033/viewer/2022052800/5f10ad257e708231d44a46d7/html5/thumbnails/7.jpg)
7
US 93 Cane Springs
Design: FY ‘19Construction: FY ‘24Cost: $31 Million
![Page 8: SR Trails –Iaztransportationboard.gov/...NW...Engineers-Report.pdfSR 89, including the intersection (WRE’s obligation for improvements). Note: Funding opportunities could be either](https://reader033.vdocuments.us/reader033/viewer/2022052800/5f10ad257e708231d44a46d7/html5/thumbnails/8.jpg)
8
Wickenburg Ranch DevelopmentUpdate
![Page 9: SR Trails –Iaztransportationboard.gov/...NW...Engineers-Report.pdfSR 89, including the intersection (WRE’s obligation for improvements). Note: Funding opportunities could be either](https://reader033.vdocuments.us/reader033/viewer/2022052800/5f10ad257e708231d44a46d7/html5/thumbnails/9.jpg)
9
Gap Funding Breakdown
Cost:Design: $4 MillionR/W: $5 Million (DCR)Construction: $32.5 Million (DCR)Total cost: $41.5 MillionDeveloper obligation: $9.88 MillionADOT Obligation: $31.62 Million
![Page 10: SR Trails –Iaztransportationboard.gov/...NW...Engineers-Report.pdfSR 89, including the intersection (WRE’s obligation for improvements). Note: Funding opportunities could be either](https://reader033.vdocuments.us/reader033/viewer/2022052800/5f10ad257e708231d44a46d7/html5/thumbnails/10.jpg)
1010
Potential Joint Project with Wickenburg Ranch Development
Wickenburg Ranch Development would pay $4 million for the design of the Gap Project in FY’17 ADOT would contribute at least $4 million in FY ’19 for construction in conjunction with $5.88 million from WRE to improve US 93. The first priority would be MP 195.3 to SR 89, including the intersection (WRE’s obligation for improvements).Note: Funding opportunities could be either Major Project Funding or Minor Project Funding. Completed design would allow the Gap Project to be divided into smaller projects for construction.
![Page 11: SR Trails –Iaztransportationboard.gov/...NW...Engineers-Report.pdfSR 89, including the intersection (WRE’s obligation for improvements). Note: Funding opportunities could be either](https://reader033.vdocuments.us/reader033/viewer/2022052800/5f10ad257e708231d44a46d7/html5/thumbnails/11.jpg)
11
![Page 12: SR Trails –Iaztransportationboard.gov/...NW...Engineers-Report.pdfSR 89, including the intersection (WRE’s obligation for improvements). Note: Funding opportunities could be either](https://reader033.vdocuments.us/reader033/viewer/2022052800/5f10ad257e708231d44a46d7/html5/thumbnails/12.jpg)