SR-109 (PORTLAND BYPASS) FROM EXISTING SR-109
SOUTH OF PORTLAND TO SR-109 NORTH OF PORTLAND
SUMNER COUNTY
DESIGN PUBLIC MEETING
August 15, 2019
![Page 2: SR -109 (PORTLAND BYPASS) FROM EXISTING SR …...comments cards •Fill out a comment card tonight •Take a comment card with you and mail it in within 21 days •Mail in a letter](https://reader030.vdocuments.us/reader030/viewer/2022040412/5f03b23c7e708231d40a528a/html5/thumbnails/2.jpg)
Welcome & Thank You for Attending
Introduction
of TDOT Representatives and
Consultants
Project Presentation
Why, Where,
What, How, & When
Materials
Handouts, Plans, &
Displays
Breakout Session
for Q & A
Comments & Feedback
• Court Reporter Available
• Comments Cards
![Page 3: SR -109 (PORTLAND BYPASS) FROM EXISTING SR …...comments cards •Fill out a comment card tonight •Take a comment card with you and mail it in within 21 days •Mail in a letter](https://reader030.vdocuments.us/reader030/viewer/2022040412/5f03b23c7e708231d40a528a/html5/thumbnails/3.jpg)
Tonight’s Schedule
6:15 p.m. Formal Presentation
7:00 p.m. Question and Answer
Open House • Staff located at displays to answer questions
Gather Feedback • Complete comment cards and/or provide verbal
comments to court reporter
8:00 p.m. Adjourn
![Page 4: SR -109 (PORTLAND BYPASS) FROM EXISTING SR …...comments cards •Fill out a comment card tonight •Take a comment card with you and mail it in within 21 days •Mail in a letter](https://reader030.vdocuments.us/reader030/viewer/2022040412/5f03b23c7e708231d40a528a/html5/thumbnails/4.jpg)
Purpose of Meeting
• Discuss proposed SR-109 (Portland Bypass) - Including SR-52 Widening
• Provide preliminary plans for public review
• Receive input from the public
– Comment cards
– Court reporter
• Answer questions and address concerns
![Page 5: SR -109 (PORTLAND BYPASS) FROM EXISTING SR …...comments cards •Fill out a comment card tonight •Take a comment card with you and mail it in within 21 days •Mail in a letter](https://reader030.vdocuments.us/reader030/viewer/2022040412/5f03b23c7e708231d40a528a/html5/thumbnails/5.jpg)
Purpose and Need of Project
The primary purpose of the proposed project is to improve
local, regional, and statewide mobility by improving traffic flow
on the SR-109 corridor through Portland.
This project will finalize long-term improvements to the SR-109
corridor between Interstate 40 in Wilson Co. and Interstate 65
in Robertson Co.
System Linkage
Transportation Demand
Safety
Traffic and Capacity
Roadway Deficiencies
![Page 6: SR -109 (PORTLAND BYPASS) FROM EXISTING SR …...comments cards •Fill out a comment card tonight •Take a comment card with you and mail it in within 21 days •Mail in a letter](https://reader030.vdocuments.us/reader030/viewer/2022040412/5f03b23c7e708231d40a528a/html5/thumbnails/6.jpg)
Project Location Map
![Page 7: SR -109 (PORTLAND BYPASS) FROM EXISTING SR …...comments cards •Fill out a comment card tonight •Take a comment card with you and mail it in within 21 days •Mail in a letter](https://reader030.vdocuments.us/reader030/viewer/2022040412/5f03b23c7e708231d40a528a/html5/thumbnails/7.jpg)
Proposed Improvements
• Four lane bypass on new alignment with 48 ft. median
• “Flyover” Interchange at Existing SR-109 at the Beginning of
Project
• Modified Diamond Interchange at SR-52
• Widen SR-52 to five lanes from East of Lyon Dr.
to West Market St.
![Page 8: SR -109 (PORTLAND BYPASS) FROM EXISTING SR …...comments cards •Fill out a comment card tonight •Take a comment card with you and mail it in within 21 days •Mail in a letter](https://reader030.vdocuments.us/reader030/viewer/2022040412/5f03b23c7e708231d40a528a/html5/thumbnails/8.jpg)
Typical Section: Proposed SR-109
![Page 9: SR -109 (PORTLAND BYPASS) FROM EXISTING SR …...comments cards •Fill out a comment card tonight •Take a comment card with you and mail it in within 21 days •Mail in a letter](https://reader030.vdocuments.us/reader030/viewer/2022040412/5f03b23c7e708231d40a528a/html5/thumbnails/9.jpg)
Typical Section: Proposed SR-52
![Page 10: SR -109 (PORTLAND BYPASS) FROM EXISTING SR …...comments cards •Fill out a comment card tonight •Take a comment card with you and mail it in within 21 days •Mail in a letter](https://reader030.vdocuments.us/reader030/viewer/2022040412/5f03b23c7e708231d40a528a/html5/thumbnails/10.jpg)
Proposed Improvements - SR-109 Interchange
![Page 11: SR -109 (PORTLAND BYPASS) FROM EXISTING SR …...comments cards •Fill out a comment card tonight •Take a comment card with you and mail it in within 21 days •Mail in a letter](https://reader030.vdocuments.us/reader030/viewer/2022040412/5f03b23c7e708231d40a528a/html5/thumbnails/11.jpg)
Proposed Improvements - SR-52 Interchange
![Page 12: SR -109 (PORTLAND BYPASS) FROM EXISTING SR …...comments cards •Fill out a comment card tonight •Take a comment card with you and mail it in within 21 days •Mail in a letter](https://reader030.vdocuments.us/reader030/viewer/2022040412/5f03b23c7e708231d40a528a/html5/thumbnails/12.jpg)
Proposed Grade Separated Roadways
• Payne Road
• SR-52 (w/Interchange)
• College Street
![Page 13: SR -109 (PORTLAND BYPASS) FROM EXISTING SR …...comments cards •Fill out a comment card tonight •Take a comment card with you and mail it in within 21 days •Mail in a letter](https://reader030.vdocuments.us/reader030/viewer/2022040412/5f03b23c7e708231d40a528a/html5/thumbnails/13.jpg)
Payne Rd. Improvements
![Page 14: SR -109 (PORTLAND BYPASS) FROM EXISTING SR …...comments cards •Fill out a comment card tonight •Take a comment card with you and mail it in within 21 days •Mail in a letter](https://reader030.vdocuments.us/reader030/viewer/2022040412/5f03b23c7e708231d40a528a/html5/thumbnails/14.jpg)
College Street
![Page 15: SR -109 (PORTLAND BYPASS) FROM EXISTING SR …...comments cards •Fill out a comment card tonight •Take a comment card with you and mail it in within 21 days •Mail in a letter](https://reader030.vdocuments.us/reader030/viewer/2022040412/5f03b23c7e708231d40a528a/html5/thumbnails/15.jpg)
Proposed Intersections
• SR-76
• Jackson Road
• Collins Road (west approach only)
• TGT Road (west approach only)
• Kirby Road Extension/Existing SR-109
• Sharon Drive/ Woods Drive
• Vanatta Road
![Page 16: SR -109 (PORTLAND BYPASS) FROM EXISTING SR …...comments cards •Fill out a comment card tonight •Take a comment card with you and mail it in within 21 days •Mail in a letter](https://reader030.vdocuments.us/reader030/viewer/2022040412/5f03b23c7e708231d40a528a/html5/thumbnails/16.jpg)
SR-76 Improvements
![Page 17: SR -109 (PORTLAND BYPASS) FROM EXISTING SR …...comments cards •Fill out a comment card tonight •Take a comment card with you and mail it in within 21 days •Mail in a letter](https://reader030.vdocuments.us/reader030/viewer/2022040412/5f03b23c7e708231d40a528a/html5/thumbnails/17.jpg)
Jackson Road Improvements
![Page 18: SR -109 (PORTLAND BYPASS) FROM EXISTING SR …...comments cards •Fill out a comment card tonight •Take a comment card with you and mail it in within 21 days •Mail in a letter](https://reader030.vdocuments.us/reader030/viewer/2022040412/5f03b23c7e708231d40a528a/html5/thumbnails/18.jpg)
Collins Rd. Improvements
![Page 19: SR -109 (PORTLAND BYPASS) FROM EXISTING SR …...comments cards •Fill out a comment card tonight •Take a comment card with you and mail it in within 21 days •Mail in a letter](https://reader030.vdocuments.us/reader030/viewer/2022040412/5f03b23c7e708231d40a528a/html5/thumbnails/19.jpg)
TGT Rd. Improvements
![Page 20: SR -109 (PORTLAND BYPASS) FROM EXISTING SR …...comments cards •Fill out a comment card tonight •Take a comment card with you and mail it in within 21 days •Mail in a letter](https://reader030.vdocuments.us/reader030/viewer/2022040412/5f03b23c7e708231d40a528a/html5/thumbnails/20.jpg)
Kirby Rd. Extension/ Existing SR-109 Improvements
![Page 21: SR -109 (PORTLAND BYPASS) FROM EXISTING SR …...comments cards •Fill out a comment card tonight •Take a comment card with you and mail it in within 21 days •Mail in a letter](https://reader030.vdocuments.us/reader030/viewer/2022040412/5f03b23c7e708231d40a528a/html5/thumbnails/21.jpg)
Sharon Dr., Woods Dr. and Vanatta Rd. Improvements
![Page 22: SR -109 (PORTLAND BYPASS) FROM EXISTING SR …...comments cards •Fill out a comment card tonight •Take a comment card with you and mail it in within 21 days •Mail in a letter](https://reader030.vdocuments.us/reader030/viewer/2022040412/5f03b23c7e708231d40a528a/html5/thumbnails/22.jpg)
Project Status
Planning
Environmental
Design
Right-of-Way
Construction
Preliminary
Engineering
Phase
Right-of-way
Phase
Construction
Phase
Project Currently in
the Design Phase
![Page 23: SR -109 (PORTLAND BYPASS) FROM EXISTING SR …...comments cards •Fill out a comment card tonight •Take a comment card with you and mail it in within 21 days •Mail in a letter](https://reader030.vdocuments.us/reader030/viewer/2022040412/5f03b23c7e708231d40a528a/html5/thumbnails/23.jpg)
Next Steps
• Address Public Comments
• Finalize Design for Right-of-Way
• Right-of-Way Appraisal and Acquisition
– North Section: Begin Appraisal and Acquisition Process in 2nd Quarter of 2020
• Approximate Appraisal and Acquisition Completion Time – 24 to 30 months
– South Section: Subject to Future ROW Funding
• Let to Construction
– Once ROW Acquisition is Completed and Funds Budgeted for Construction
– North and South Segments to Be Let as Separate Projects
– Approximated Construction Completion Time – 2+ Years
![Page 24: SR -109 (PORTLAND BYPASS) FROM EXISTING SR …...comments cards •Fill out a comment card tonight •Take a comment card with you and mail it in within 21 days •Mail in a letter](https://reader030.vdocuments.us/reader030/viewer/2022040412/5f03b23c7e708231d40a528a/html5/thumbnails/24.jpg)
Comments
REMEMBER…
Your comments are very important to us!
How to comment:
– Submit written comments on the provided comments cards • Fill out a comment card tonight
• Take a comment card with you and mail it in within 21 days
• Mail in a letter with your comments within 21 days
– Provide verbal comments to the court reporter • Comments will be included in the official record
![Page 25: SR -109 (PORTLAND BYPASS) FROM EXISTING SR …...comments cards •Fill out a comment card tonight •Take a comment card with you and mail it in within 21 days •Mail in a letter](https://reader030.vdocuments.us/reader030/viewer/2022040412/5f03b23c7e708231d40a528a/html5/thumbnails/25.jpg)
Contact
For more information, please contact:
Shane Hester, P.E., Director
TDOT, Region 3 Project Development
(615) 350-4292
Sharon Schutz, P.E., C.E. Manager 2
TDOT, Region 3 Project Development
(615) 350-4208
![Page 26: SR -109 (PORTLAND BYPASS) FROM EXISTING SR …...comments cards •Fill out a comment card tonight •Take a comment card with you and mail it in within 21 days •Mail in a letter](https://reader030.vdocuments.us/reader030/viewer/2022040412/5f03b23c7e708231d40a528a/html5/thumbnails/26.jpg)
THANK YOU!
For Your Attendance And Participation In
The SR-109 Design Public Meeting