springvale coal servicesdata.centennialcoal.com.au/domino/centennialcoal/cc205.nsf/0... · the air...

18
Springvale Coal Services Summary of Environmental Monitoring Data Prepared by: Springvale Coal Services For the period July 2015

Upload: others

Post on 15-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Springvale Coal Servicesdata.centennialcoal.com.au/domino/centennialcoal/cc205.nsf/0... · The air quality monitoring results for the reporting period are summarised below. 3.1 Depositional

Springvale Coal Services

Summary of Environmental Monitoring Data

Prepared by: Springvale Coal Services

For the period July 2015

Page 2: Springvale Coal Servicesdata.centennialcoal.com.au/domino/centennialcoal/cc205.nsf/0... · The air quality monitoring results for the reporting period are summarised below. 3.1 Depositional

Environmental Monitoring Results Summary –Springvale Coal Services

Page 1

TABLE OF CONTENTS

Abbreviations .......................................................................................................................................................................... 3

1. Introduction ......................................................................................................................................................................... 4

2. Weather................................................................................................................................................................................ 6

3. Air Quality Monitoring ........................................................................................................................................................ 6

3.1 Depositional Dust .............................................................................................................. 6

4. Surface Water Quality ........................................................................................................................................................ 6

5. Incidents .............................................................................................................................................................................. 7

6. Noise monitoring ................................................................................................................................................................ 8

7. Complaints ......................................................................................................................................................................... 8

Appendix 1 – Air Quality and Water Quality Monitoring Plan Appendix 2 – Noise Monitoring Results

Page 3: Springvale Coal Servicesdata.centennialcoal.com.au/domino/centennialcoal/cc205.nsf/0... · The air quality monitoring results for the reporting period are summarised below. 3.1 Depositional

Environmental Monitoring Results Summary –Springvale Coal Services

Page 2

TABLES

Table 1 – Licence Information ..................................................................................................................................................... 4

Table 2 – Supporting Information for Monitoring Points .......................................................................................................... 5

Table 3 – Weather Summary ........................................................................................................................................................ 6

Table 4 – Depositional Dust ......................................................................................................................................................... 6

Table 5 – LDP006 Sampling Results ........................................................................................................................................... 7

Table 6 – LDP007 Sampling Results ........................................................................................................................................... 7

Page 4: Springvale Coal Servicesdata.centennialcoal.com.au/domino/centennialcoal/cc205.nsf/0... · The air quality monitoring results for the reporting period are summarised below. 3.1 Depositional

Environmental Monitoring Results Summary –Springvale Coal Services

Page 3

ABBREVIATIONS

Abbreviation Description

CS Coal Services

DG Dust Gauge

EC Electrical Conductivity

EPL Environment Protection Licence

kL kilolitre

L litre

LDP Licensed Discharge Point

mg milligrams

ML Megalitre

TSS Total Suspended Solids

uS or µS microsiemens

Page 5: Springvale Coal Servicesdata.centennialcoal.com.au/domino/centennialcoal/cc205.nsf/0... · The air quality monitoring results for the reporting period are summarised below. 3.1 Depositional

Environmental Monitoring Results Summary –Springvale Coal Services

Page 4

1. INTRODUCTION

As per conditions M1 to M7 of Environment Protection Licence (EPL) 3607, this report summarises environmental monitoring

results for Springvale Coal Services for the period July 2015. Monitoring sites are shown on the Lambert’s Gully Mine Site

section of the Centennial website and in Appendix 1. Although EPL 3607 also covers Springvale Colliery, monitoring data from

this site will be reported separately from this Springvale Coal Services Monitoring Report.

A summary of the licence information is provided in the following tables. Table 1 shows the licence information and Table 2

summarises the parameters, units and dates of sampling for monitoring data for the reporting period. It should be noted that

there was a variation to EPL 3607 issued on 12 August 2014.

Table 1 – Licence Information

Environment Protection Licence number 3607

Licensee’s Name Springvale Coal Pty Ltd

Licensee’s Address Level 18, BT Tower, 1 Market Street

Sydney NSW 2000

EPL Location http://epa.nsw.gov.au/prpoeoapp/ViewPOEOLicence.aspx?DOCID=38340&SYSU

ID=1&LICID=3607

Page 6: Springvale Coal Servicesdata.centennialcoal.com.au/domino/centennialcoal/cc205.nsf/0... · The air quality monitoring results for the reporting period are summarised below. 3.1 Depositional

Environmental Monitoring Results Summary –Springvale Coal Services

Page 5

Table 2 – Supporting Information for Monitoring Points

Parameter Monitoring

Frequency Unit of Measure

July 2015

Sampling Date Published Date

Depositional Dust DG3 (Point 8 – 3) Monthly g/m2/month 22/07/2015 14/08/2015

Depositional Dust DG4 (Point 8 – 4) Monthly g/m2/month 22/07/2015 14/08/2015

Depositional Dust DG5 (Point 8 – 5) Monthly g/m2/month 22/07/2015 14/08/2015

LDP006 (Point 6) Conductivity Monthly during discharge µS/cm 2/07/2015 14/08/2015

LDP006 (Point 6) Filterable iron Monthly during discharge mg/L 2/07/2015 14/08/2015

LDP006 (Point 6) Filterable manganese Monthly during discharge mg/L 2/07/2015 14/08/2015

LDP006 (Point 6) Oil & Grease Monthly during discharge mg/L 2/07/2015 14/08/2015

LDP006 (Point 6) Total Suspended Solids

Monthly during discharge mg/L 2/07/2015 14/08/2015

LDP006 (Point 6) pH Monthly during discharge pH units 2/07/2015 14/08/2015

LDP007 (Point 7) Conductivity Monthly during discharge µS/cm NA NA

LDP007 (Point 7) Total Suspended Solids

Monthly during discharge mg/L NA NA

LDP007 (Point 7) pH Monthly during discharge pH units NA NA

Page 7: Springvale Coal Servicesdata.centennialcoal.com.au/domino/centennialcoal/cc205.nsf/0... · The air quality monitoring results for the reporting period are summarised below. 3.1 Depositional

Environmental Monitoring Results Summary –Springvale Coal Services

Page 6

2. WEATHER

A summary of rainfall data recorded at the on-site meteorological monitoring station during the July 2015 reporting period is

shown in Table 3 below.

Table 3 – Weather Summary

Month Temperature Rainfall (mm)

Minimum -7.7 0

Maximum 14.6 14.8

Total 49.2

3. AIR QUALITY MONITORING

The air quality monitoring results for the reporting period are summarised below.

3.1 Depositional Dust

Depositional dust (g/m2/month) results (insoluble solids) for the year to date are shown in Table 4.

Table 4 – Depositional Dust

Site Jan 15 Feb-15 Mar-15 Apr-15 July-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15

CS-D3 (Point 8-3) 0.6 3 2.1 0.9 1.3 9.0 6.4

CS-D4 (Point 8-4) 0.4 0.4 0.5 0.4 0.3 0.5 0.8

CS-D5 (Point 8-5) BD 0.5 0.7 0.4 0.4 0.4 0.6

CS-D# – Coal Services Dust Gauge

EPL 3607 does not include a licence limit for depositional dust, however a rolling average air quality criteria of 4 g/m2/mth is

commonly used for comparison purposes. Dust monitoring data indicates that dust deposition results for July 2015 range from

below 0.6 at CS_D5 to 6.4 g/m2/month at CS_D3.

4. SURFACE WATER QUALITY

Surface water pH, total suspended solids (TSS mg/L), electrical conductivity (EC µS/cm), oil and grease (mg/L), filterable iron,

filterable manganese are monitored at LDP006 as indicated on the Environmental Monitoring location figure, located in

Appendix 1 and on the Centennial website. LDP007 is also part of the EPL however this monitoring location is the discharge

from a sump and generally has no discharge.

Page 8: Springvale Coal Servicesdata.centennialcoal.com.au/domino/centennialcoal/cc205.nsf/0... · The air quality monitoring results for the reporting period are summarised below. 3.1 Depositional

Environmental Monitoring Results Summary –Springvale Coal Services

Page 7

Table 5 – LDP006 Sampling Results

Parameter Unit of

Measure Result Limit Exceedance

pH pH units 6.85 6.5-8.5 No

Total Suspended Solids mg/L <5 30 No

Electrical Conductivity uS/cm 2810 # #

Oil & Grease mg/L <5 10 No

Turbidity mg/L 2 50 No

Filterable iron mg/L 2.05 # #

Filterable Manganese mg/L 2.68 # #

# no concentration limit.

Table 6 – LDP007 Sampling Results

Parameter Unit of Measure Sampling

pH pH units NA

Total Suspended Solids mg/L NA

Electrical Conductivity uS/cm NA

5. INCIDENTS

There were no incidents recorded during the reporting period.

Page 9: Springvale Coal Servicesdata.centennialcoal.com.au/domino/centennialcoal/cc205.nsf/0... · The air quality monitoring results for the reporting period are summarised below. 3.1 Depositional

Environmental Monitoring Results Summary –Springvale Coal Services

Page 8

6. NOISE MONITORING

Noise monitoring for the operation is conducted at monitoring locations detailed in Appendix 2.

Activities from WCS complied with the relevant development consent noise limits during monitoring on 20

and 21 July 2015 at all monitoring locations except NM7 during the night period.

WCS noise levels at NM7 exceeded the LA1,1minute criteria by 3 dB during the night period on 21 July 2015.

Impact noises as a result of maintenance works being carried out on the WCS overland conveyors were generally

responsible for the site only noise levels.

7. COMPLAINTS

There were no community complaints during the reporting period.

Page 10: Springvale Coal Servicesdata.centennialcoal.com.au/domino/centennialcoal/cc205.nsf/0... · The air quality monitoring results for the reporting period are summarised below. 3.1 Depositional

Environmental Monitoring Results Summary –Springvale Coal Services

Page 9

APPENDIX 1

Air Quality & Water Quality Monitoring Site Plan

Page 11: Springvale Coal Servicesdata.centennialcoal.com.au/domino/centennialcoal/cc205.nsf/0... · The air quality monitoring results for the reporting period are summarised below. 3.1 Depositional

Environmental Monitoring Results Summary –Springvale Coal Services

Page 10

Page 12: Springvale Coal Servicesdata.centennialcoal.com.au/domino/centennialcoal/cc205.nsf/0... · The air quality monitoring results for the reporting period are summarised below. 3.1 Depositional

Environmental Monitoring Results Summary –Springvale Coal Services

Page 11

APPENDIX 2

Noise Monitoring Results

Page 13: Springvale Coal Servicesdata.centennialcoal.com.au/domino/centennialcoal/cc205.nsf/0... · The air quality monitoring results for the reporting period are summarised below. 3.1 Depositional
Page 14: Springvale Coal Servicesdata.centennialcoal.com.au/domino/centennialcoal/cc205.nsf/0... · The air quality monitoring results for the reporting period are summarised below. 3.1 Depositional
Page 15: Springvale Coal Servicesdata.centennialcoal.com.au/domino/centennialcoal/cc205.nsf/0... · The air quality monitoring results for the reporting period are summarised below. 3.1 Depositional

LAeq,15min GENERATED BY WCS AGAINST IMPACT ASSESSMENT CRITERIA -

JULY 2015

Location Start Date and

Time

Wind

Speed

m/s1

VTG

oC/100m1

Criterion

dB

Criterion

Applies?2

WCS LAeq,15min

dB3,4

Exceedance4,5

Day

NM1 21/07/2015 14:56 2.4 -2.0 40 Y IA Nil

NM2 21/07/2015 15:17 2.4 -2.0 41 Y IA Nil

NM3 21/07/2015 15:49 2.0 -2.0 36 Y IA Nil

NM4 21/07/2015 12:50 2.2 -1.8 35 Y <25 Nil

NM5 21/07/2015 16:31 1.0 -2.0 41 Y IA Nil

NM6 21/07/2015 16:53 1.0 -2.0 36 Y <25 Nil

NM7 21/07/2015 17:08 1.4 0.5 37 Y 31 Nil

NM8 21/07/2015 14:28 1.6 -2.0 35 Y IA Nil

NM9 21/07/2015 13:24 2.2 -2.0 35 Y IA Nil

NM10 21/07/2015 13:55 1.8 -2.0 35 Y IA Nil

Evening

NM1 20/07/2015 19:53 1.7 3.0 40 Y IA Nil

NM2 20/07/2015 20:13 0.5 3.0 35 Y IA Nil

NM3 20/07/2015 20:35 0.5 3.0 35 Y IA Nil

NM4 20/07/2015 18:55 1.6 -1.0 35 Y IA Nil

NM5 20/07/2015 21:18 0.6 3.0 38 Y IA Nil

NM6 20/07/2015 21:44 0.9 3.0 36 Y IA Nil

NM7 21/07/2015 19:20 2.0 3.0 37 Y 37 Nil

NM8 20/07/2015 19:29 1.7 3.0 35 Y IA Nil

NM9 21/07/2015 18:30 2.3 0.5 35 Y IA Nil

NM10 21/07/2015 18:03 2.1 0.5 35 Y IA Nil

Night

NM1 20/07/2015 23:43 0.4 0.5 35 Y IA Nil

NM2 21/07/2015 00:05 0.5 3.0 35 Y <30 Nil

Page 16: Springvale Coal Servicesdata.centennialcoal.com.au/domino/centennialcoal/cc205.nsf/0... · The air quality monitoring results for the reporting period are summarised below. 3.1 Depositional

Location Start Date and

Time

Wind

Speed

m/s1

VTG

oC/100m1

Criterion

dB

Criterion

Applies?2

WCS LAeq,15min

dB3,4

Exceedance4,5

NM3 21/07/2015 00:26 0.5 3.0 35 Y IA Nil

NM4 20/07/2015 22:50 0.7 3.0 36 Y <25 Nil

NM5 20/07/2015 22:24 0.7 3.0 36 Y IA Nil

NM6 20/07/2015 22:02 0.9 3.0 39 Y IA Nil

NM7 21/07/2015 00:10 0.5 3.0 41 Y 38 Nil

NM8 20/07/2015 23:18 0.5 3.0 35 Y IA Nil

NM9 21/07/2015 22:25 0.7 3.0 35 Y IA Nil

NM10 21/07/2015 22:00 0.4 3.0 35 Y IA Nil

Notes:

1. Criterion may or may not apply due to rounding of meteorological data values;

2. Noise emission limits do not apply during the following meteorological conditions: wind speeds greater than 3 metres

per second (at a height of 10 metres); or temperature inversion conditions greater than 3oC/100m;

3. Estimated or measured LAeq,15min attributed to WCS;

4. Bolded results in red indicate exceedance of criteria; and

5. NA in exceedance column means atmospheric conditions outside conditions specified in development consent and so

criterion is not applicable.

Page 17: Springvale Coal Servicesdata.centennialcoal.com.au/domino/centennialcoal/cc205.nsf/0... · The air quality monitoring results for the reporting period are summarised below. 3.1 Depositional

Table 4.3 compares measured LA1,1min levels from WCS with impact assessment criteria.

Table 4.3: LA1,1min GENERATED BY WCS AGAINST IMPACT ASSESSMENT

CRITERIA - JULY 2015

Location Start Date and

Time

Wind

Speed

m/s1

VTG

oC/100m1

Criterion

dB

Criterion

Applies?2

WCS LA1,1min

dB3,4

Exceedance4,5

Night

NM1 20/07/2015 23:43 0.4 0.5 47 Y IA Nil

NM2 21/07/2015 00:05 0.5 3.0 51 Y <30 Nil

NM3 21/07/2015 00:26 0.5 3.0 45 Y IA Nil

NM4 20/07/2015 22:50 0.7 3.0 45 Y <25 Nil

NM5 20/07/2015 22:24 0.7 3.0 57 Y IA Nil

NM6 20/07/2015 22:02 0.9 3.0 45 Y IA Nil

NM7 21/07/2015 00:10 0.5 3.0 45 Y 48 3

NM8 20/07/2015 23:18 0.5 3.0 45 Y IA Nil

NM9 21/07/2015 22:25 0.7 3.0 45 Y IA Nil

NM10 21/07/2015 22:00 0.4 3.0 45 Y IA Nil

Notes:

1. Criterion may or may not apply due to rounding of meteorological data values;

2. Noise emission limits do not apply during the following meteorological conditions: wind speeds greater than 3 metres

per second (at a height of 10 metres); or temperature inversion conditions greater than 3oC/100m;

3. Estimated or measured LA1,1min attributed to WCS;

4. Bolded results in red indicate exceedance of criteria; and

5. NA in exceedance column means atmospheric conditions outside conditions specified in development consent and so

criterion is not applicable.

Page 18: Springvale Coal Servicesdata.centennialcoal.com.au/domino/centennialcoal/cc205.nsf/0... · The air quality monitoring results for the reporting period are summarised below. 3.1 Depositional

Environmental Monitoring Results Summary –Springvale Coal Services

Centennial Springvale Coal Pty Ltd ABN 39 052 096 769

Centennial Coal Company Limited

Locked Bag 1002

Wallerawang NSW 2845

www.centennialcoal.com.au