Splitting User Stories

Why and How?Ashwin Chandrasekaran

Page 2: Splitting User Stories - Why and How?

We talk about three topics in this presentation

What are User Stories?

Why split them?

How to split them?

Page 3: Splitting User Stories - Why and How?

What are User Stories?

Page 4: Splitting User Stories - Why and How?

User Story

User Story is an unit requirement written in business language that can

be developed, tested and delivers tangible value to end user

Page 5: Splitting User Stories - Why and How?

User Story Example

As a Ground Handling Agent, I want the flights in watchlist to move to departed section, so that I know they

are departed In addition, an user story contains:

- Story Description- Acceptance Criteria- Estimation- Priority

Page 6: Splitting User Stories - Why and How?

Why split them?

Page 7: Splitting User Stories - Why and How?

What is the ideal size of an User Story?

2 hours

4 days

8 days

20 days

40 days

Page 8: Splitting User Stories - Why and How?

1/2 -10 daysOptimal time to finish an User Story (including testing and integration)

Page 9: Splitting User Stories - Why and How?

3 Reasons to Split User Stories

Page 10: Splitting User Stories - Why and How?

Reason #1 : Difficult to Prioritize

Story 1 : 30 Days

Story 2 : 20 Days

Story 1 : 5 Days

Story 2 : 8 Days

Story 3 : 9 Days

Story 4 : 4 Days

Story 5 : 3 Days

Which is easy to prioritize?

But prioritization cannot be avoided

Not enough room here...

Easier for PO to play around...

Page 11: Splitting User Stories - Why and How?

Reason #2 : Plan is Rigid

Typical Sprint Velocity is around 40-50 Ideal Days

Story 1

30 Effort Days

Story 2

20 Effort Days

Story 1

8 ED

Story 2

7 ED

Story 3

5 ED

Story 4

6 ED

Story 5

9 ED

Story 6

5 ED

Story 7

5 ED

Page 12: Splitting User Stories - Why and How?

Reason #3 : Estimation Inaccuracy increase with Size

I can have the foundation done in 2 months.

I can complete the living room in 2 months, bedrooms in 3 months, kitchen in 1 month and toilets in 1 month

Last month is for painting and furniture

I can build the house in 1 year

Page 13: Splitting User Stories - Why and How?

How to Split User Stories?

Page 14: Splitting User Stories - Why and How?

Strategy #1 : Along Data Boundaries

User must be able to view information coming into the

system from Interface A, B, C

User must be able to view information coming into the

system from Interfaces D, E, F

User must be able to view information coming into the system from all the Interfaces.

Page 15: Splitting User Stories - Why and How?

Strategy #2 : Separate Exception / Error Handling

User can enter flight details and save them

Validation must be performed on flight data entered by user and

errors displayed

User can enter flight details and save them. Validation on flight data must be performed and

errors displayed

Page 16: Splitting User Stories - Why and How?

Strategy #3 : Based on Operations Performed

User can view all details about the flight

In the flight view screen, user can edit/save CDM fields that

are enabled

User can view all details about the flight and edit/save CDM fields that are enabled

Page 17: Splitting User Stories - Why and How?

Strategy #4 : Separate CRUD Operations

User can view existing parking stand information and create

new ones

User can update and delete existing parking stand

information

User can create, view, update and delete information related to Parking Stands

Page 18: Splitting User Stories - Why and How?

Strategy #5 : Separate Functional and Non-functional

User must be able to update TOBT value and results

displayed

User must be able to view TOBT update results within 10

seconds

User must be able to update TOBT and the result must be displayed within 10 seconds

Page 19: Splitting User Stories - Why and How?

Strategy #6 : Smaller Stories of Different Priorities

User must be able to generate a report that shows Air Traffic

over past 6 months

User must be able to print the Air Traffic Report

User can generate a report that shows the Air Traffic over past 6 months and also be able to print

itPriority 1 Priority 2

Page 20: Splitting User Stories - Why and How?

To Summarize...

Page 21: Splitting User Stories - Why and How?

Splitting User Stories

User Story describes a unit requirement in business language

Typical size of a User Story is 0.5 - 10 Effort Days

Splitting User Stories help in : Easier Prioritization, Planning and Better Estimation

Some ways to Split Stories are : Along Data Boundaries, Separating Exception Handling, Operations performed, CRUD operations, Separating Functional/Non-Functional, Smaller Stories of different Priorities