lff1
.vJ54 hO I "J..;/
Sbtl EC
CORPS OF ENGINEERS, U.S. ARMY
SPILLWAY FOR FOLSOM DAM
AMERICAN RIVER, CALl FORN lA
HYDRAULIC MODEL INVESTIGATION
TECHNICAL MEMORANDUM NO. 2-369
CONDUCTED FOR
SACRAMENTO DISTRICT, CORPS OF ENGINEERS
ARMY-MRC VICKSBURG, MISS.
BY
WATERWAYS EXPERIMENT STATION
VICKSBURG, MISSISSIPPI
AUGUST 1953
PDOPERTY OFU. S. All'! OFFICE CHIEF OF ENGLN!ElEBS LIBRARY
Report Documentation Page Form ApprovedOMB No. 0704-0188
Public reporting burden for the collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering andmaintaining the data needed, and completing and reviewing the collection of information Send comments regarding this burden estimate or any other aspect of this collection of information,including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, ArlingtonVA 22202-4302 Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to a penalty for failing to comply with a collection of information if itdoes not display a currently valid OMB control number
1. REPORT DATE AUG 1953 2. REPORT TYPE
3. DATES COVERED 00-00-1953 to 00-00-1953
4. TITLE AND SUBTITLE Spillway for Folsom Dam, American River, California: Hydraulic Model Investigation
5a. CONTRACT NUMBER
5b. GRANT NUMBER
5c. PROGRAM ELEMENT NUMBER
6. AUTHOR(S) 5d. PROJECT NUMBER
5e. TASK NUMBER
5f. WORK UNIT NUMBER
7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) U.S. Army Corps of Engineers,Waterway Experiment Station,3903 HallsFerry Road,Vicksburg,MS,39180
8. PERFORMING ORGANIZATIONREPORT NUMBER
9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM(S)
11. SPONSOR/MONITOR’S REPORT NUMBER(S)
12. DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release; distribution unlimited
13. SUPPLEMENTARY NOTES
14. ABSTRACT
15. SUBJECT TERMS
16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT Same as
Report (SAR)
18. NUMBEROF PAGES
149
19a. NAME OFRESPONSIBLE PERSON
a REPORT unclassified
b ABSTRACT unclassified
c THIS PAGE unclassified
Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18
i
PREFACE
Model investigations of the spillway for Folsom Dam were authorized
by teletype, dated 21 September 1950, from the Division Engineer, South
Pacific Division, to the Director, Waterways Experiment Station. The
studies were conducted in the Hydraulics Division of the Waterways Exper
iment Station during the period December 1950-September 1951, by Messrs.
J. W. Bolin, Jr., J. N. Strange, W. H. Sadler, and J. N. Palermo, under
the general supervision of Messrs. F. R. Brown and T. J. Buntin.
Messrs. J. H. Douma, Office, Chief of Engineers; W. C. Cassidy and
B. F. Jakobsen of the South Pacific Division; and H. A. Johnson, A.
Hoggard, and J. M. Groves, of the Sacramento District, visited the Water
ways Experiment Station at frequent intervals during the course of the
studies to discuss test results and correlate these results with design
work concurrently being accomplished in the District Office. Messrs. 0. L.
Rice, L. G. Puls, and J. N. Bradley, of the Bureau of Reclamation, also
visited the Experiment Station for conferences with Corps of Engineers
personnel on the work in progress. Many of the revisions investigated
represent the ideas and suggestions of the Bureau of Reclamation personnel.
CONTENTS
PREFACE •
SUMivT.ARY • . . . . . PART I: INTRODUCTION . . . . .
History of Authorization and Design of the Dam Pertinent Design Features • The Problem • • • • • • •
. . . . . . ' . . . . . . . . . .
. . . . . . . . . . . . . Design Criteria •• . . . . . . . . .
PART II: THE MODELS . . . . . . . . . . . . . . . . . Description • • • • • • • • • • • • • • • • • Model Appurtenances and Their Application • • . . . . . . . . Scale Relationships • • • • • • • • • . . . . . . .
iii
i
v
1
l 2 4 4
6
6 8 9
PART III: NARRATIVE OF TESTS -- MODEL A (FLIP -BUCKET TYPE) • • 10
Spillway Crest • • • • • • • • • • Flip-bucket T,ype Energy Dissipater Conduits • • • • • • • • • • •
. . . . . . . .
10 ll 18
PART IV: NARRATIVE OF TESTS --MODEL B (STILLING-BASIN TYPE) • 19
Spillway Crest • • • • • • • • • • • • • • 19 Stilling-basin Type Energy Dissipater • • • • • • • • • 19 Intermediate Training Wall of High Bucket • • 29
PART V: CONCLUSIONS
TABLES l-5
PHGTCGRAPHS l-68
PlATES l-76
. . . . . . . . . . . . . . . . . . . . . 31
v
SUMMARY
The spillway for Folsom Dam, flow over which will be controlled by
eight gates, was studied concurrently on two almost identical 1:80-scale
models. Two models were necessary because of the urgent need for a de
cision as to the type energy dissipator to use at the toe of the spillway.
A flip-bucket type energy dissipator was investigated on one model while
/a conventional type stilling basin was tested on the other.
Although tests revealed that the flip-bucket type energy dissipator
was ade~uate as far as the safety of the dam was concerned, the stilling
basin type was adopted for construction downstream from the five gate
bays adjacent to the right abutment because it will afford greater safety
to the powerhouse and reduce possible maintenance costs after completion
of the dam. The extra cost of the stilling basin was considered warranted
in view of the increased energy dissipation secured. The stilling basin
selected for construction has been designated type 22 in this report.
The flip-bucket type energy dissipator also will be constructed downstream
from the three gates adjacent to the left abutment. However, flow will
be confined to the five spillway bays discharging into the stilling basin
except for extreme emergencies.
SPILLWAY FOR FOLSOM DAM, AMERICAN RIVER, CALIFORNIA
Hydraulic Model Investigation
PART I: INTRODUCTION
History of Authorization and Design of the Dam
1. Folsom Dam, a multiple-purpose structure being constructed on
the American River below the confluence of the North and South Forks
about 2-1/2 miles northeast of Folsom, California (fig. 1), was authorized
initially for construction by the
Corps of Engineers. However, a
subse~uent act of Congress reau-
thorized the project making con-
struction of the dam and reservoir o
the responsibility of the Corps of
Engineers, and construction of a
120,000-kw power plant as well as
maintenance and operation of all
project facilities, including the
dam and reservoir after completion,
0
SCALE
z 1'\
< )'
0
)'
Fig. l. Vicinity map
~ -·-~
the responsibility of the Bureau of Reclamation. This reauthorization
resulted in the need for close and careful coordination of the Corps of
Engineers' and Bureau of Reclamation's technical designs and construe-
tion programs. The Bureau of Reclamation advocated a considerable num-
ber of changes in the design of the structures as prepared by the
Sacramento District. One of the major changes was a re~uest for a
2
conventional apron-type stilling basin at the toe of the spillway for en
ergy dissipation instead of the flip-bucket type energy dissipater pro
posed by the Sacramento District. This change was advocated by the Bureau
of Reclamation from the standpoint of its responsibility for the mainte
nance and safety of the structure after completion and because of possible
detrimental effects of the flip-bucket in the vicinity of the powerhouse.
Pertinent Design Features
2. The adopted plan for the main dam provides for a straight
concrete-gravity type main river section with earthen wing dams at both
abutments. The maximum height of the concrete section will be about 340
ft and the over-all length of the dam will be about 1400 ft. The reser
voir created by the dam will have a storage capacity of 1,120,000 acre
ft at maximum pool elevation of 475.4*.
3. The spillway will be of the ogee type with a maximum drop of
303 ft from crest (elevation 418) to stilling basin (elevation 115) and
will be located in the central portion of the concrete river section
(plates land 2). The spillway is designed to pass an outflow of
567,000 cfs under a head of 57.4 ft; the shape of the spillway crest
is in accordance with a design head of 50 ft, which is about 87 per cent
of the maximum flood-control head. Flow over the spillway will be con
trolled by eight 42-ft-wide by 50-ft-high radial gates, supported by
crest piers 8 ft in thickness. Thus, the gross width of the spillway
will be 392 ft and the net width will be 336 ft. Two types of energy
* All elevations are referred to feet above mean sea level.
3
dissipaters at the toe of the spillway were proposed for model investi
gation. As a result of the model study, a conventional apron-type
stilling basin was selected for construction in the prototype downstream
from the five spillway crest gates located adjacent to the right spillway
abutment, and a 50-ft-radius flip bucket with invert at elevation 276.98
was selected for construction downstream from the three spillway gates
adjacent to the left spillway abutment. Discharges as large as 300,000
cfs (pool elev 466) will be passed through the five spillway crest bays
upstream from the hydraulic-jump type dissipater; the spillway design
outflow of 567,000 cfs (pool elev 475.4) will be passed through all
eight spillway bays. The three bays upstream from the flip-bucket type
energw dissipater will be operated only in case of necessity. The
stilling basin when completed will consist of a horizontal apron 146.8
ft in length at elevation 115, which will be joined to the crest sec
tion at elevation 140 by a 1-on-8 sloping ramp. Over-all length of ramp
and basin will be 346.8 ft. A 15-ft-high end sill will be located on the
end of the basin. The flip-bucket type energy dissipater downstream
from the left three spillway bays will have a lip height and angle of
3.02 ft and 20 degrees, respectively.
4. Two sets of training walls are necessary to confine flow in
the flip bucket and horizontal apron-type energy dissipaters; The walls
(type A) adjacent to the flip bucket will be 10 ft in height and will
terminate at the end of the bucket lip. The walls of the stilling-basin
type energy dissipater will be of different heights; the right training
wall having a top elevation of 210 and the left wall a top elevation
of 183.
4
5. Normal flow regulation for irrigation and flood control will
be accomplished by eight 5-ft-wide by 9-ft-high curved sluices through
the spillway section. These sluices will be located in two tiers of four
each at elevations 210 and 280, respectively. Maximum capacity of the
sluices is estimated to be 31,600 cfs with the pool at elevation 475.4.
6. Three 14-ft-3-in.-diameter penstocks will be located to the
right of the spillway. When all units have been installed the total
power output will be 120,000 kilowatts. The Bureau of Reclamation plans
the removal of an existing private power plant downstream together with
river gravel lying between the Folsom Dam site and the downstream dam.
A substantial amount of rock also will be removed from the same stretch
of river for the purpose of obtaining additional power head on the
Folsom power plant. Such gravel and rock excavation will lower the
present tailwater elevation in the vicinity of the Folsom powerhouse by
about 70 ft.
The Problem
7. Model analyses of the Folsom Dam spillway were considered
necessary to provide information on which to base the selection of the
type energy dissipater that should be constructed. Other information
concerning flow over the spillway crest, height and length of training
walls, and flow conditions in the vicinity of the powerhouse and exit
area, also was to be secured for design purposes.
Design Criteria
8. The principal design criterion was that all structures should
be safe against failure for the spillway design flood of 567,000 cfs.
Also, if the conventional type stilling basin were selected, good
hydraulic jump action should exist over the apron for flows up to
200,000 cfs and the right training wall should be capable of pro
tecting the power plant from flooding for all flows up to 250,000 cfs.
If the flip-bucket type energy dissipater were selected, discharges
up to 250,000 cfs should be projected far enough downstream so as not
to interfere with power operation. Neither objectionable spray nor
turbulence that might hinder operation should occur in the vicinity
of the powerhouse.
5
6
PART II: THE MODELS
Description
9. Two models of the same scale ratio (1:80) were constructed and
operated concurrently, one model for tests of the flip-bucket energy dissi
pater and the other for tests of a conventional type stilling basin. The
two almost identical models were necessary because of the short time avail
able for conducting tests on the two types of energy dissipaters proposed.
10. One model, designated as Model A in this report, was constructed
in a brick and concrete flume for tests of the flip-bucket type energy
dissipater. The entire spillway and conduits were reproduced, together
with about 290 ft of nonoverflow section on the right and 140 ft of non
overflow section on the left, 450 ft of approach channel, the power
penstocks and powerhouse, and about 1950 ft of the exit channel (fig. 2
and plate 3).
11. The other model, designated Model B throughout this report and
used for tests of the stilling-basin energy dissipator, was reproduced in
a slightly smaller concrete and brick flume. Model B included the entire
spillway and conduits, together with about 200 ft of nonoverflow section
on the right side and 30 ft of nonoverflow section on the left side,
400 ft of approach channel, the stilling basin, the high flip bucket,
the power penstocks and powerhouse, and about 950 ft of the exit channel
(fig. 3 and plate 4). After tests indicated the use of the stilling
basin type energy dissipater, Model A was destroyed and Model B was moved
into the larger flume for tests of additional refinements to the stilling
basin design.
Fig. 2. Details o f Model A
Fig. 3 • Details of Model B
8
12. Similar type construction was used for both models. The ap
proach channels and the nonoverflow sections of the dam were molded in
concrete to masonite templets. The spillway crest sections were formed
of aluminum sheets fastened to accurately shaped sheet metal templets
and were surmounted with crest piers constructed of plastic. Conduits
through the spillway section were fabricated of sheet metal while the
powerhouse and stilling basin were of wood; the flip bucket was formed
in sheet metal. The exit area was capped with a thin layer of cement
mortar for velocity measurements. A few erosion tests were conducted
wherein the exit area was molded in sand or gravel.
Model Appurtenances and Their Application
13. Water used in the operation of the models was supplied by
centrifugal and axial-flow pumps connected in such a manner as to
allow for flexibility of operation. The water was drawn from a large
sump, and measured by means of venturi meters. The flow from the
supply line discharged into the headbay of each model where it was
stilled by baffles prior to its passage into the models. After passing
through the models, the water was returned to the sump by gravity flow
through return lines. Tailwater elevations in the lower end of the
models were adjusted by means of a tailgate operated by a worm gear
hoist. Steel rails set to grade alongside the models provided datum
planes for use of measuring devices. Water-surface elevations were
measured by means of point gages mounted on an aluminum channel supported
by the above-mentioned steel rails, and by means of piezometers. Veloc
ities were measured with a pitot tube. Pressures over the spillway
9
were measured in manometers connected by tubes to piezometer openings
in the models. Soundings over the sand or gravel bed downstream from
the bucket and stilling basin were taken with a portable sounding rod.
Discharges through the powerhouse were controlled by means of a Van
Leer weir.
Scale Relationships
14. The requirements for geometric and dynamic similarity between
model and prototype were satisfied by constructing all elements of the
models to an undistorted linear scale ratio, and testing all hydraulic
quantities in their proper relationships as derived from the Froude law.
General scale relationships were as follows:
Dimension Ratio Scale Relationship
Length Lr = L 1:80
Velocity vr = Lr l/2 1:8.94
Time Tr = L l/2 1:8.94 r
Discharge Qr = L 5/2 1:57,240 r
10
PART III: NARRATIVE OF TESTS -- MODEL A (FLIP-BUCKET TYPE)
Spillway Crest
15. The maximum drop from the spillway crest at elevation 418 to
the invert of the 50-ft-radius bucket below the five bays nearest the
right abutment (elevation 176.98) was 241.02 ft, whereas the drop to the
bucket invert below the three bays adjacent to the left abutment was
141.02 ft. The alignment of the downstream portion of the spillway fol
lowed the equation Y = 0.01798X1 •85 whereas the upstream portion of the
spillway was shaped to a compound curve with radii of 25 and 10 ft. Di-
mensions of the radial gates and crest piers have been described previously
in paragraph 3. Complete details of the spillway crest are shown on
plate 5.
16. Satisfactory flow conditions obtained over the spillway weir
of model A throughout the range in discharge for free and controlled
overflow. The semicircular shape of the upstream portion of the crest
piers permitted smooth passage of flow through the gated sections.
17. Measurements of head-discharge relations revealed that slightly
more than the computed flow was passed through the model (plate 6). At
the spillway flood pool (elevation 475.4) and with eight bays open full,
computations indicated a maximum discharge of 567,000 cfs, whereas an
equivalent discharge of 588,000 cfs was passed over the model crest. A
discharge of 358,000 cfs was passed through five gate bays with a pool
elevation of 475.4 as compared to a·computed discharge of 353,000 cfs.
The coefficients of discharge for the above discharge conditions and an
assumed pier contraction coefficient of 0.015 are 4.09 and 4.20,
11
res~ectively. These coefficients are slightly higher than those found in
other ex~eriments; this is attributed to the conservative pier contrac
tion coefficient assurr.ed.
18. Measurements of water-surface profiles for conditions of full
and partial gate o~enings are shown on plates 7-11. These profiles indi
cate the abutment walls to be of adequate height to confine flood flows
and to clear the gate trunnions. No pressure data were recorded over the
crest of Model A but data vrere recorded on Model B and are presented later.
Flip-bucket Type Energy Dissipater
19. Six bucket designs (plate 12) were investigated in an effort
to develop a design that would satisfy the conditions outlined in para
graph 8. All alterations were confined to the bucket below the five gate
bays (gates 1-5) adjacent to the right abutment. Tests were conducted
for the discharges and gate operation outlined in table 1 and for the
tailwater conditions shmvn on plate 13. Tests involved (a) obs~rvation
of bucl\:et action, (b) determination of >-rater-surface profiles, (c) inves
tigation of erosion tendencies in exit area, (d) measurement of veloci
ties and their distribution in the area downstream from the bucket, and
(e) measurement of surge waves and their frequency in the vicinity of the
powerhouse. Complete data were procured only on the original design since
the five alterations afforded little or no improvement in bucket ~erform
ance and consequently did not warrant detailed investigation.
Type 1 (original design) bucket
20. Description. The bucket originally proposed for the Folsom Dam
spillway had a radius of 50ft and was placed at two elevations. The
12
242-ft section of the bucket adjoining the'right training wall was at eleva
tion 176.98 {plate 12) and the 150-ft section adjoining the left training
wall was at elevation 276.98 (plate 1). Elevations of the left and right
training i-mlls were 212 and 290, respectively.
21. Flow conditions. It was observed that the sheet of water passing
over and downstream from the bucket lip had a very flat trajectory (photo
graphs 1-6). This condition was unexpected as a 20-degree lip slope in
tests of other structures had given entirely different results. The flat
trajectory was attributed to the close proximity of the rock bed immediately
downstream from the bucket ivhich caused a reduced pressure area immediately
dovrnstream from the bucket thus tending to depress the overflowing sheet
of 1-mter. Removal of a portion of the bedrock in the immediate vicinity
of the bucket (photograph 7) permitted the aeration of the underside of
the nappe resulting in a steeper trajectory of flow and improved down
stream conditions (photographs 8-10). The area immediately downstream
from the basin vTas practically unwatered by the overflowing nappe and re
mained so up to a discharge slightly in excess of 300,000 cfs when the tail
i-mter became sufficiently deep to form a roller under the nappe. High ve
locities existed in the exit area downstream of the point of impingement
of the nappe. Eddies >Tere formed on the left and right banks of the chan
nel, the size and location of vThich vTere dependent upon the discharge.
22. Water-surface profiles. Average water-surface profiles measured
through the flip bucket and exit channel immediately downstream are shown
on plates 7-11. These profiles indicate that the nappe impinged about
400 ft dovmstream from the bucket for a discharge of 250,000 cfs. The
powerhouse was located about 400 ft dmmstream from the bucket.
23 . Surface- current directions . Surface- current directions in
the exit area for various combinations of discharges over the spill-
"'ray and through the powerhouse are shown on plates 14- 18. The eddy
conditions described above are shown on the referenced plates.
24. Erosion tests . An erosion test \Tas conducted with a dis -
charge of lo8, 000 cfs over the spillway and 7 , 000 cfs through the
PO\Terhouse . For this test the exit area was molded in pea gravel to
the configuration shown on plate 19. The scour developed in the pea
gravel bed {fig . 4) was considerable, being about 35 -40 ft lrhere the
nappe impinged on the river bed . ¥aximum scour occurred along the
right training wall with a considerable portion of the scoured mate-
rial being deposited in the tailrace area. Flow conditions in the
Fig . 4 . Bed downstream from flip bucket after 1- hour scour , Model A. Discharge , 115 , 000 cfs ; pool elev, 466 . 0
13
14
exit area were improved after erosion of the bed (photographs 11 and 12).
The tailwater could not be lowered below elevation 187 because of the
deposit of pea gravel in the exit area. A second scour test was conducted
for the same discharge conditions but with the bed molded of larger gravel
(gravel that was retained on a 1-1/2-in. screen) to more nearly simulate
prototype conditions (photograph 13). This test showed approximately 50
ft of scour along the right training wall and a lesser amount downstream
from the bucket (photograph 14). A smaller amount of material also was
deposited in the tailrace. Attention should be given the relative loca
tion of scouring attack rather than the depth of scour, since it has not
yet been found possible to reproduce quantitatively in a model the re
sistance to erosion of a rrototype bed material. The scour data also are
useful in providing a measure of the effectiveness of the type energy
dissipater under study.
25. Bottom velocities. Velocities recorded 2 ft above the bed of
the exit area for various discharges are shown on plates 20-25. Velocity
measurements were very difficult to obtain in view of the turbulent con
dition of flow in the exit area. The data indicate that velocities as high
as 103 ft per sec existed in the area where the nappe from the bucket fell
into the exit channel. Velocities in the tailrace area were in the range
of 20-25 ft per sec. Measurements over the exit area for a total discharge
of 115,000 cfs after erosion of the bed had occurred (plate 26) revealed
some decrease in velocities. However, they were still high and could
prove troublesome in the prototype.
26. Surge observations. Surge observations or variations in water
level were recorded in the vicinity of the powerhouse (plate 19) for the
15
various test discharges. These data (table 2) indicate that the amount
of surge increased as the discharge was increased. For the critical dis-
charge of 250,000 cfs, the variation in water surface was from 4 to 9 ft
at the three test locations. Surge frequency ranged from only about 13
to 17 cycles per minute; a surge frequency of 30-50 cycles per minute
was considered critical for power generation.
Alternate bucket designs (types 2-6)
27. Description. The alternate bucket designs were developed with
a view toward breaking up the sheet of water as it passed over the
bucket lip or throwing it farther downstream away from the powerhouse. In
one design (type 6) the bucket was lowered with a view to dissipating en-
ergy by submerging the nappe passing over the bucket lip. Photographic
data only were procured on these alternate bucket designs. Details of
the designs are shown on plate 12 and are described below:
a. Type 2 bucket had a radius of 50 ft, an invert elevation of 173.3 and a 30-degree terminal angle ending at station 12+52.07.
b. Type 3 bucket had an invert elevation of 165.24 at station 12+32.38 and was joined to the spillway with a 50-ft radius; downstream from station 12+32.38 the bucket was horizontal to station 13+00.
c. Type 4 bucket had a radius of 50 ft, an invert elevation of 165.24, and a 5-degree terminal angle ending at station 13+00.
d. Type 5 bucket was similar to type 4 except that 16-ftwide by 9-ft-high dentates were located on the 5-degree terminal angle with a clear distance between dentates of 16 ft.
e. Type 6 bucket had a radius of 50 ft, an invert elevation of 126.98, and a 20-degree terminal angle.
28. Test results. The 30-degree terminal angle of the type 2
16
bucket caused the nappe to be deflected higher and farther downstream
before it impinged on the bed of the exit orea (photographs 15-20).
Hm1ever 1 the trajectory of the nappe was such that flow overtopped the
Fig . 5. View of type 5 bucket with dentates installed
right training wall in the
vicinity of the powerhouse ,
which could endanger the
structure . Flow over the
bucket of type 3 design
(photographs 21-23) caused
the tailwater to be swept
downstream and resulted in
high velocities over the
exit area . The addition of
the 5-degree slope (type 4)
altered flm.r condi tioris only slightly. The use of the dentates of the
type 5 bucket design (fig . 5) resulted in about the Game conditions in
the exit area as were ob-
served with the bucket of
orieinal design (photo-
graphs 24-26) . Since none
of the types 2-5 alters-
tions improved flow condi-
tions over the bucket and
in the exit area , the type
6 bucket (fig. 6) was de-
veloped . It was thought Fig . 6. View of type 6 flip bucket
17
that the low elevation of this bucket would provide a type of hydraulic
jump action that w~uld not erode the exit area too much. The resulting
flo'' conditions (photographs 27-29) revealed that a form of hydraulic
jump type action existed . Hmfever , flmr was very turbulent in the vicin-
ity of the pmrerhouse . Fig . 7 ill ustrates the scour that resulted after
successive discharges of 115 , 000, 200, 000, and 300,000 cfs for a period of
15 min (model) .
Discussion of results
29 . It "as decided from the results of all tests that the ori ginal
design bucket at elevation 176.98 "ras as economical to construct and
performed as '-rell a s any of those investigated . It also was the
Fif3 . 7. View of the bed dmmstream of the type 6 flip bucket , Model A. Scour after successive discharges of 115, 000, 200,000 and
300, 000 cfs for 15 m.inutes of model operation
18
consensus of representatives of all the interested agencies that, while
the bucket of original design was adequate as far as the safety of
the dam was concerned, it was not desirable that the nappe strike the
bed of the exit area in the vicinity of the powerhouse. It was
agreed that the resulting high velocities downstream could fill the
tailrace with debris thus reducing the head available for power
generation.
Conduits
30. Although conduits were installed through the spillway sec
tion of the model, no data were procured, as the design was changed
after initiation of the model study. The size also was reduced from
5.67 ft by 9.68 ft to 5.0 ft by 9.0 ft and the alignment was altered.
Plate 1 shows the location and alignment of the conduits as redesigned.
The redesigned conduits were neither installed nor tested in the m~del.
19
PART IV: NARRATIVE OF TESTS -- MODEL B (STILLING-BASIN TYPE)
Spillway Crest
31. The spillway crest reproduced in Model B was identical to the
crest used in Model A and described in paragraph 15. Details of the crest
are shown on plate 5.
32. Measurements of head-discharge relations were practically the
same as those recorded previously for the crest of Model A (plate 6).
Pressure data recorded over the crest of Model B are shown on plates 27-31
and in table 3. These data indicate only slight negative pressures with
the gates at partial opening. Pressures were all above atmospheric for
uncontrolled flow over the crest. No comparable pressure data were ob
tained on Model A.
Stilling-basin Type Energy Dissipater
33. Table 4 shows the 25 types of stilling-basin designs tested on
Model B together with references to plates and photographs that present
data pertaining to each design. Many of the designs were similar except
for revisions of the height of end sill and baffle piers or alterations
in the slope and elevation of the apron. As was the case during tests of
the flip-bucket type energy dissipater, the high bucket downstream from
gates 6, 7, and 8 adjacent to the left spillway abutment was not altered.
Tests were conducted for the discharges and gate operation outlined in
table 1 and for the tailwater conditions shown on plate 13. For the most
part tests involved observations of flow conditions, measurements of
water-surface elevations, determination of erosion tendencies, and
20
measurement of velocities and determination of their distribution. Only
observation tests were conducted on certain of the designs where minor
changes or alterations had been made .
Type 1 (original des i gn) stilling basin
34 . Description . The initial design of the stilling-basin type
energy dissipater proposed for Folsom Dam consisted of an apron with
an over-all length of 276 .1 , starting at elevation 119 . 35 , extending
on a 1-on-6 slope to elevation 115 and then horizontally for a dis-
tance of 250 ft (table 4 and fig . 8) . An end sill 5 ft in height was
placed on the end of the apron to deflect all high velocity bottom cur-
Fig . 8 . View of type 1 stilling basin, Model B
rents away from the exit area
immediately downstream. The
elevation selected for the
horizontal basin was about
that required to provide the
theoretical depth for forma-
tion of a hydraulic jump for
a discharge of 115,000 cfs .
35 . Flow conditions .
Observation of flow conditions
throughout the range in dis-
charge (photographs 30- 33) revealed that hydraulic jump action existed
for all flows . However , the tailwater elevation appeared to be slightly
lrnr and flow within the basin proper was quite turbulent . For dis-
charges in excess of 115,000 cfs, the jump appeared to extend beyond
the confines of the basin into the exit area . Variations of the
21
tailwater elevation revealed that best jump action obtained with the tail
water increased about 5 to 10ft (plate 32). The tailwater also could be
lowered about 15 ft before spray action occurred with a discharge of
200,000 cfs; the margin of safety against spray increased as the discharge
increased. Surface currents through the stilling basin and in the exit
channel downstream are shown on plates 33-37.
36. Water-surface profiles. Water-surface profiles along the
center line of the stilling basin for spillway discharges of 108,000,
193,000, 243,000, 300,000, and 567,000 cfs are shown on plates 27-31.
These data indicate that a hydraulic jump formed on the apron at all
discharges and that the training walls were of sufficient height to
contain all flows up to about 300,000 cfs. The data also indicate that
the jump extended into the exit area for discharges in excess of about
115,000 cfs.
37. Velocities. Bottom velocities in the stilling basin and down
stream therefrom for the test discharges are shown on plates 38-43. Bot
tom velocities over the end sill varied from a maximum of 13.4 ft per
sec at a discharge of 50,000 cfs to a maximum of 68.1 ft per sec at a
discharge of 300,000 cfs. Maximum velocities in the exit area for the
same discharges were 10 and 26 ft per sec, respectively. Velocities for
a discharge of 567,000 cfs were about the same as those observed with a
discharge of 300,000 cfs. Although velocities over the end sill and in
the exit area were still higher than desired, they were considerably
lower than had been observed with the flip-bucket type energy dissipater
at corresponding discharges. The effect of tailwater elevation on veloc
ities at the end sill is shown on plate 44. These data reveal that the
22
tail,-Tater conditions existing with a basin elevation of 115 resul ted in
optimum conditions .
Type 2 stilling basin
38 . Description . The type 2 basin was evolved to place the top
of the sloping ramp or upstream end of the stilling basin at a higher
elevation . This revision would increase the thickness of the concrete
at the toe of the spillway, which was considered desirable for reasons
of stability. The possible loss of basin efficiency was compensated
for by addition of 8-ft- hich dentates to the ramp and an increase in
the height of end sill to 15 ft . The type 2 basin consisted of a 1- on-
9 -95 sloping ramp, beeinning at station 12+39 . 7 at elevation 140 and
ending at station 14+88 . 5 at elevation 115 . The 8-ft- high dentates
were placed on the sloping ramp at station 13+50.9 . Use of the long
slope in the upstream portion of the basin reduced the length of the
horizontal apron to 82 . 4 ft . Details of the type 2 basin are shown in
Fig . 9 . Details of the type 2 stilling basin
table 4 and fig . 9 .
39 . Test results . Flm-1
conditions within the stilling
basin appeared to be improved
by the revisions to the basin
elements (photographs 34- 37) .
A good hydraulic jump existed
for a discharge of 108, 000 cfs
over the spillway . Plate 45
shows water- surface profiles
through the stilling basin and plate 46 shm1s bottom velocities for a
23
spillway discharge of 193,000 cfs. The data indicate that the exit chan
nel velocities were increased from a maximum of 13.4 ft per sec for the
type 1 basin to 19.0 ft per sec with the type 2 basin. The variations
in water level in the vicinity of the powerhouse, caused by turbulent
conditions created by stilling-basin action, are shown in table 2.
Similar data recorded with the flip-bucket type energy dissipater have
been discussed in paragraph 26. Yor a discharge of 250,000 cfs the
variation in water surface was from 7 to 8 ft and was slightly more
than observed with the flip-bucket type energy dissipater (4 to 9 ft).
Surge frequency was about 14 to 16 cycles per minute.
Types 3-5 stilling basins
40. Description. The types 3-5 basins differed from the type 1
basin only in the length of the horizontal apron and height of end sill.
The end sill height was maintained at 15 ft and the length of the apron
was shortened 25, 50, and 75 ft, respectively, for the types 3, 4 and 5
basins (table 4).
41. Test results. Observation of flow conditions in the three
basins revealed that, as the basin was shortened, basin action became
more turbulent and impact of flow on the end sill increased. Flow con
ditions for a discharge of 108,000 cfs were fair, however, with the basin
shortened as much as 75 ft. For discharges in excess of 108,000 cfs
basin conditions were poor (photographs 38-40).
Type 6 stilling basin
42. The type 6 stilling basin was identical to type 2 E:.....-:cept that
the height of the end sill was reduced from 15 to 10 ft in an effort to
improve flow conditions over the end sill. The reduction in sill height
24
had little or no effect on basin performance .
Types 7-9 stilling basins
43 . Description . Types 7-9 basins were investigated to study
the possibility of raising the elevation of the upstream portion of
the sloping apron higher tl an was done in the type 2 design . The
sloping apron of the types 7, 8, and 9 designs intersected the spill-
way at elevations 200.26, 153. 46, and 143.97, respectively (table 4) .
44 . Test results . Flow conditions ~Tithin the ty:pe 7 basin were
unsatisfactory (photographs 41- 43) . The slope of the apron began at
too high an elevation and iras too steep, and the stilling basin was
dependent upon the end sill to form the hydraulic jump. Flow condi-
tiona uith the types 8 and 9 basins (photographs 44-46) were similar
and about the same as those observed with t he type 1 original basin.
Ho;rever , the hydraul ic jump still extended into the exit channel for
discharges in excess of 200,000 cfs .
Pig . 10. Details of the type 10 stilling basin, Model B
Type 10 stilling basin
45 . Description. The type
10 stilling basin was the first
design which considered training
wall height . The basin proper
was similar to type 1 . The left
intermediate training '-rall was
lowered from elevation 210 to
elevation 165 (top of firm rock)
at the downstream end (table 4
and fig . 10) . This alteration
not only would effect economies in construction but it was thought that
it might improve basin conditions at high discharges by permitting the
tailwater to flow into the basin from the side over the low wall.
25
46. Test results. Flow conditions were similar to those observed
with the type l design. The low intermediate wall was still of such
height as to exclude practically all tailwater up to a discharge of
about 200,000 cfs. For the maximum discharge of 567,000 cfs the
drowning of the jump by tailwater flowing over the low wall was a def
inite improvement. However, basin action for the type 10 basin was con
sidered unsatisfactory for discharges in excess of 108,000 cfs (photo
graphs 47-50). The elevation of the left training wall, as tested, was
considered satisfactory.
Type 11 stilling basin
47. The type ll basin was similar to type 7 except the horizontal
portion of the basin at, elevation 115 and training walls were extended
85.9 ft downstream (table 4). Although the longer basin and training
walls produced better flow conditions (photographs 51-53) over the end
sill than were observed with type 7 basin, the increased cost of con
struction was not worth the improved performance secured. The toe of
the hydraulic jump also occurred too far downstream from the junction
of the apron and the crest section.
Type 12 stilling basin
48. Description. The type 12 basin was developed after a series
of intermediate observation tests wherein flow conditions were observed
with various slopes and tailwater elevations. The design giving most
promise consisted of a l-on-8 sloping apron beginning at elevation 147.5
26
at station 12+28.5 and ending at elevation 115 at station 14+88.5
(table 4). Over-all length of the original spillway structure was
maintained.
49. Test results. Observation of flow conditions revealed good
basin action at a low discharge (108,000 cfs) and fair action for the
higher discharges (photographs 54-56). The hydraulic jump formed
just downstream from the beginning of the stilling basin. Thus it
appeared that a 1-on-8 sloping apron was about the steepest that
could be used without an increase in the length of the basin.
Types 13-19 stilling basins
50. Description. The types 13-19 stilling basins (table 4)
represent designs developed to effect refinements in the type 12
basin with its 1-on-8 sloping apron. Such refinements involved
variations in (a) length and elevation of the horizontal apron, (b)
point of intersection of apron with spillway, and (c) use of dentates
or baffle piers. During the course of this series of tests a decision
was made in a conference between representatives of the Corps of
Engineers and the Bureau of Reclamation to incorporate the stilling
basin type energy dissipater in final plans for construction. This
was done to afford greater safety to the powerhouse and reduce pos
sible maintenance costs. Following this decision, the stilling basin
was moved into the larger flume, formerly occupied by Model A, and
testing was continued.
51. Test results. Data obtained with the types 13-19 stilling
basins consisted of observations of flow conditions and comparative
erosion tests. The scour tests were conducted with the exit area
27
molded flat in sand to elevation 115 (plates 47-58). The scour data in
dicated the possibility of increasing the elevation of the horizontal
portion of the basin from 115 to 125, and the elimination of dentates from
the sloping portion of the apron. ~•o of the basins, types 18 and 19,
showed considerable improvement in flow conditions and bottom velocities
were measured in the stilling basin and exit area (plates 59 and 60).
The velocity data indicate a reduction in end sill velocities from 90ft
per sec to 30 ft per sec as a result of baffle piers. However, with
velocities of the magnitude recorded baffle piers would, in all proba
bility, be damaged by cavitation. Therefore, their use was not con
sidered desirable.
Types 20-21 stilling basins
52. The type 20 basin involved the use of a flat sloping apron
throughout its length. The type 21 design involved use of an almost
horizontal basin adjacent to the training walls with a depressed center
section. Details of both basins are presented in table 4. Neither basin
resulted in improved performancej consequently no data thereon are
presented.
Types 22-25 stilling basins
53. Description. The type 22 stilling basin was developed after
a conference at the Waterways Experiment Station between representatives
of the Sacramento District, the South Pacific Division, the Office, Chief
of Engineers, the Bureau of Reclamation, and the Experiment Station,
during which all model data were reviewed. The type 22 basin (table 4
and plate 1) is a compilation of all the best features of the previously
tested designs. At the above-mentioned conference it also was decided
28
that bottom velocities over the exit area immediately downstream from
the end sill should not exceed 30 ft per sec. The types 23, 24 , and
25 basins (table 4) ,.,ere the same as type 22 except that one row of
baffle piers 8 , 10, and 12 ft high, respectively, was used to reduce
bottom velocities .
54 . Flow conditions . Photographs 57-61 show flow conditions in
t he type 22 basin for discharges of 108,000, 193, 000, 300, 000, and
567,000 cfs . These photographs indicate excellent hydraulic jump
action for a discharge of 108,000 cfs , good action for 193, 000 cfs ,
and fair action at discharges of 300,000 and 567,000 cfs . The use of
10-ft-high baffle piers (type 24 basin, fig . 11) improved flow condi-
tions slightly at the higher discharges (photographs 62-64) . The 8-
and 12-ft-high baffle piers of types 23 and 25 basins resulted in about
the same type of flo"' action.
55 . Bottom velocities and water-surface profiles . Plates 61-74
show bottom velocities and
water-surface profiles with
the types 22-25 basins .
Data are presented both
with the bed of the exit
area molded to natural con-
figuration and with a simu-
lated scour hole, approxi-
mately 4oo ft in length and
with a maximum depth of 32 Fig . 11. Details of type 24 stilling basin.
Row of 10-ft baffles at sta 14+94.2 ft , reproduced downstream
29
from the end sill. The data presented indicate that velocities imme
diately downstream from the end sill of the type 22 basin reached a
maximum of 57.4 ft per sec for a discharge of 300,000 cfs, which is in
excess of the 30-ft-per-sec limit mentioned in paragraph 53; for a dis
charge of 115,000 and 200,000 cfs maximum velocities were 16 and 35.2 ft
per sec, respectively. 1{ith a scour hole simulated downstream from the
end sill, maximum bottom velocities were only 12.4 ft per sec and were
upstream in direction. Maximum bottom velocities over the exit area
molded to natural configuration were generally decreased by the use of
either 8-, 10-, or 12-ft baffle piers and were within the 30-ft-per-sec
limit established. However, flow conditions indicated that the baffle
piers would be subjected to high impact forces, especially at high flows,
and damage through cavitation action appeared possible. Excavation of
the exit area downstream from the end sill or erosion of this area by
flow would result in bottom velocities within the range desired without
the use of baffle piers. Water-surface profiles for each of the four
basins for the two exit area conditions also are shown on plates 61-74.
Intermediate Training Wall of High Bucket
56. Although it was planned to retain the flip-bucket type energy
dissipater downstream from gates 6, 7, and 8, it was desired to reduce
the height of the intermediate wall adjacent to the high bucket, thus
reducing the lateral pressure exerted by flow over the curved bucket.
General details of the three type walls investigated are shown on plates
75 and 76 and photographs 65-67.
57. Pressure measurements were made at the locations shown on
30
plates 75 and 76 and are shown in table 5 for various head conditions.
The use of types B and C vralls resulted in a decrease in lateral pres
sure but diverted some of the flow laterally into the stilling basin
(photograph 68) below gates 1-5. This extra flow into the stilling
basin had no effect on basin performance.
31
PART V: CONCLUSIONS
58. Conclusions based upon the model findings are:
a. The conventional apron-type stilling basin should be constructed in the prototype instead of the flip-bucket type. While the safety of the dam would not be endangered through use of the more economical flip-bucket type energy dissipater, construction of the stilling-basin type dissipater was considered desirable in view of the increased safety to the powerhouse and the reduced maintenance costs with less eroded material entering the tailrace area.
b. The type 22 stilling basin was the most feasible from the standpoint of economy, stability of the dam, and performance.
c. The type 22 stilling basin resulted in good hydraulic jump action for discharges up to 200,000 cfs; jump action was only fair for discharges from 200,000 to 567,000 cfs. Maximum bottom velocities immediately downstream from the end sill slightly exceeded the limit of 30 ft per sec. However, after a small amount of erosion has occurred the velocities will be within the limits desired.
d. The type 24 stilling basin produced lower velocities in the exit area but is not recommended in view of possible damage to the baffle piers through cavitation action.
e. If the prototype discharge ever exceeds 300,000 cfs and it becomes necessary to release flow through gates 6, 7, and 8, some erosion downstream from the flip bucket and damage to the left training wall adjacent to the stilling basin may occur.
f. Pressure and flow conditions over the spillway crest were satisfactory.
~· Surge conditions in the powerhouse area for a spillway discharge of 250,000 cfs, with the stilling-basin type energy dissipater, ranged from 7 to 8 ft, but the frequency was such that no difficulty should be incurred in power operations.
TABLES
Table 1
TEST CONDITIONS FOR DEVELOPMENT OF DESIGN OF ENERGY DISSIPATOR
Outflow in 1,000 Cfs Pool Test Spillway Gates Elevation
No. Total Penstocks l 2 2_ 4 .2.. 6 7 8 (Computed)
1 57 7 10 10 10 10 10 0 0 0 466
2 115 7 22 22 22 22 20 0 0 0 445
3 200 7 39 39 39 39 37 0 0 0 466
4 250 7 49 49 49 49 47 0 0 0 466
5 300 0 60 6o 6o 6o 6o 0 0 0 466+
6 567 0 71 71 71 71 71 71 71 70 475
Note: No flow through conduits.
Table 2
SURGE ACTION IN VICINITY OF POWERHOUSE, MODElS A AND B
Total Gate Normal Maximum Minimum Range of Maximum Minimum Range of Discharge Opening Tailwater Sta- Surge, Elev Surge, Elev Surge, Ft Surge, Elev Surge, Elev Surge, Ft
Cfs Ft Elevation tion Model A Model A Model A Model B Model B Model B
57,000 6.0 176.5 1 180.0 177.0 3.0 176.0 174.0 2.0 2 181.0 179.0 2.0 176.5 174.5 2.0 3 179.0 177.0 2.0 176.0 175.0 1.0
115,000 14.G 179.2 1 184.0 182.0 2.0 180.0 179.0 1.0 2 184.0 182.0 2.0 181.0 179-0 2.0 3 186.0 183.0 3.0 181.0 178.0 3.0
200,00(' 28.0 196.0 1 198.0 193-0 5.0 201.0 195-0 6.0 2 199-0 195-0 4.0 202.0 196.0 6.o 3 200.0 195.0 5.0 201.0 196.0 5-0
250,000 33-75 205.4 1 207.0 203.0 4.0 210.0 202.0 8.0 2 210.0 2o4.o 6.0 210.0 203.0 7-0 3 212.0 203.0 9-0 212.0 2o4.o 8.0
300,000 Full 212.6 1 214.0 209.0 5.0 217.0 208.0 9-0 2 217.0 210.0 7-0 216.0 209.0 7-0 3 217.0 210.0 7-0 217.0 209.0 8.0
567,000 Full 242.0 1 248.0 234.0 14.0 246.0 234.0 12.0 2 251.0 236.0 15.0 245.0 236.0 9.0 3 257.0 236.0 21.0 248.0 236.0 12.0
Note: Locations of stations where surge action was obtained shown on plate 19.
Table 3
PRESSURES OVER SPILLWAY CREST
MODEL B
Pressures, 1 Pressures S illway Gates 1 through 5 erating Gates ~erati!:ej
Piezo:m- Pie.zom- Disch, 50,000 Cfs Disch, 1 ,000 Cfs Disch, 1 ,000 Cfs Disch, 193,000 Cfs Disch, 2 3,000 ~fs Disch, 300,000 Cfs Disch, ~7,000 Cfs eter meter Pool Elev, 466.0 Pool Elev, 445.0 Pool Elev, 466.0 Pool Elev, 466.0 Pool Elev, 466.0 Pool Elev, 468.6 Pool Elev, 473.0
Number Zero Gates Open 6.0 Ft Gates Open FUll Gates Open 14.0 Ft Gates 0Een 28.0 Ft Gates OEen 33.75 Ft Gates Open Full Gates Open Full
1 411.71 55.29 26.29 52.29 39.29 37.29 18.70 27.00
2 416.42 49.58 17.58 43.58 30.58 23.58 13.58 14.60
3 418.00 45.00 12.00 33.00 21.00 17.00 7.00 6.00
4 413.42 - o.42 6.58 - o.42 5.58 4.58 2.58 1.60
5 401.46 1.54 3.54 0.54 1.54 1.54 1.54 0.50
6 382.92 1.08 2.08 0.08 0.08 1.08 0.08 0.10
7 358.31 4.69 3.69 4.69 6.69 4.69 5.69 4.70
8 328.96 4.o4 5.o4 5.o4 8.o4 8.o4 lO.o4 11.00
9 299.11 2.89 4.89 4.89 6.89 7·89 8.89 10.90
10 269.26 2.74 3.74 3.74 5.74 6.74 7.74 8.70
Notes: Pressures are recorded in prototype feet of water. Piezometer locations are shown on plate 27.
TYPE NUMBER
2
3
4
5
6
7
Table 4
MODEL B STILLING BASIN DESIGNS INVESTIGATED
SECTION ALONG CENTERLINE
--~~ STA 13+19.4fJ
~~~ I £LEV 2a7.3!
~~~0.0~ TOP OF WALL EU:V 210.00
IJ.-1 ~I ~ 0.6 £LEV I6J.B2 STA 13+20.90 ~ ~
EU:V 130~~ r 250.00' "> ~ 4 £LEV 119.~~l £LEV 115.00 £LEV 120.f2S!. lr-;;,
STA 12f-30.PO lsTA 12+94,80
ii: :'It:... STA 13+111.46
~: I £LEV 261.31 ~ ' :t: o'fl.M ~
:::: \~ lrop OF WALL £LEV 210.00 ~
REFERENCE
Photographs 30-33
Plates 27-44
PhotogrepbB 34-37
Plates 45-46
E1L-V £ (DENTATES 16 FT WIDE
~ SPACED ON 32·FT CENTERS
./ STA 13+.50.90 STA 15+1$4.10 a
EUV 140.oo 9.95 ( · I ELEV 115.00 L I - EUV 130.00
STA 12'39.70 I STA 14+46.90 I ' STA 14f8LSO 82.40'1
1
,. ~~ srA 13+/IMe Iii: ~~0 •
CS .,,..~ I~ ~~
1 ~~~ .p.~o "';!; ..... :ot r,O·o ....
0-67 't;;,I~~OP OF WALL ELEV 210.00
,I ELCV/83. 225.00' STA 13f20.!JO
ELEV 130.00\t:_ ELEV/19.35 -
~ ST.4 15-1-39.10 6 EL€VI30.00 I 1--
1 £LEV 115.00---- r--I STA 12f-94.80
<> ~I:~ ISTA 13+19.46 I~
~ ">,;;. ~:EUV 267.31 ;! "'
I I.JOI~ •fl." C.,.._
~Q..:!::ot !.o.o !!:!
0.67 ..... t; \ TOP Of" WALL £LEV 210.00
ELEVIB:J. (7 ~IrA 1u2o.9o ~, 21JO:Oo' ~ STA 151-14.10
£LEV 130.00 \"-=- 6 ELEV 130.00 I ELEV 1/9.35 £LEV 115 00 ,..,/H',
I STA 12+94.80
£LEV 130.00 '\:'L: 6 f STA 14+BS.IO ELEV 130.00 £LEV /I!J,35- ~_l ELEV 115.00
I STA 12+94.80
~ ~ ;!~~ ~ STA 13+19.46 ~ I \, , "' ... 0 I ELEV 267.31 ~ ~ 'U ~~ ~.~~,. !!! o os~"' t:!\<JJ:o 1:!1~ • «., TOP OF WAU. ELEV 210.00 c., ~
£LEVIe3.a2 / i/ :}EEN!!TAET)Es 1e FT WIDE I~ \. SPACED ON 32-FT CENTERS I to:
EL£11140.00 ~ 9.95 82.40'
ELEV/15.00 :\...._ I 1
£L£V125.Dt?~~ STA 131-50.90 I ,...-
STA 14•4e.go I cs.o'l_srA 14'88.50
t:!,~ ~ ..,~ ~
~:0~~~1'~0~P~IJ~F~W.f10:!!L~L:..;E~L:!E:.!V:..!.21:!0::!.0:!0'-::::-::7~l I ;;;: £LEV 00.26
\ ~ 3.33 1o2.go'
o.er , ---......... ] 1 J \\_ ELEV 1/S.OO-------- _EL_E_V_I3_0_.0_0 1-
STA 14+68.0~TA 15+,4.10 I
Photographs 38-40
PhotograpbB 41-43
REMARKS
Stilling basin aa originally deeigned
1-<>n-9.95 eloping basin beginning at ata 12+39-70 at elev 14o .00 and ending at eta 14+88. 50 at elev 115 .00. Placed on the slope at sta 13+50.9 were denta.tes 16 ft wide, 8 -rt high, and 96 ft long. At tb.e end of the ba.sin1 eta 15+64 .10, was located a 15-ft end sill.
Same as type 1 design, except the end sill was 25 f't upstream at eta 15+ 39 .1.0 and was 15 f't high vi th 30 degree sloping front face
Same as type 1 design, except end sill vas 50 t't upstream at eta 15+14 .10 and was 15 f't high with 30 degree sloping front face
Same as type 1 design, except end sill was 75 f't upstream at eta 14+89.10 and was 15 ft high with 30 degree sloping front face
Same as type 2 design, except 10-f't vertical sill replaced 15-ft eloping sill
1-on-3.33 sloping basin beginning at eta ll+83.1lo at elev 200.26 and ending at eta 14+68.00 at elev ll5.00Jat ond of basin at eta 15+64,10 was a 15-ft-high end sill
TYPE NUMBER
8
9
/0
II
12
13
14
Table 4 ( Cont_ 'd)
MODEL 8
STILLING BASIN DESIGNS INVESTIGATED
SECTION ALONG CENTERLINE
lil ~ : STA 13-f/9.4G Q
~~~ ~ I £LEV 267.31 ~
I ._.._ .~~~1-!l !!!
~::: oo :"'t
0.67 \fJ • TOP OF WALL £LEV 210.00 t; EL£¥183.82 /// 220.90'
"-. STA 13+50.00 ~Ec!o~:cEV~1!.;!5~3.c!4!J!6_ ''-?.._ I STA 15+-64.10
STA 12+2(.79 I I ELEVI/S.OO ~~~
I
STA 13+19.46
~~ I ~~~~~ ~~~O< ELEV 267.3/
~ oP 0. 6 7 \c;: TOP OF WALL ELEV P/0.00
~~ 7 STA /31-50.00
~----~2~2~~i,go~·~~~ ELEV 143.9 4 J sr:L'i::.;';}.gO I STA 12•34.091 ~ ELEV/1500 ____ ~
<:>
"'l;:cl STA !3+19.48 ~ ~ ~ I ELEV 287.31 ~ ~ ... ~,~~ ~ :::::~ 0 ....
"l OP OF WALL ELEV 2/0,00 ~
ELEVI83.82 'I i leL£Vt75.oo 1sr:L':::~:o ~ £LEV 130.00\[ I
ELEV /19.35-- ELEV 115.00 ELEV /20.00
STA 12.,..94.80 l lsTA /3f20.90
STA 11-183.80 STA 14+88.00
~I srA !!+ 9~.69 I STA 16+56.80, ~
~'{ 1 188.8o' .]~
I .1\1 TOP Of' WALL ELEV 210.00 I r---J ~ "\"" " ELEV 200.28 I I~
0.67\ ~ !l.i \ .331 v
'LEV, /30.00 ELEV 115.00 ~ m
F=i.
1\.' ~~~~ ~~~<;L;~·;:;.:I I~ Cl..... ~~1'-0 0-6~ \fJ0'
0 TOP OF WALL EL£V 210.00 ~
ELEVI83.8 , I ELEV 147.50 "/ 8 STA 15+64.10 I STA !2+28.50 I £LEV 1/S.OO I ELEV 130.00 -
STA 14•88.50 I
;:!1: 5 STA 13+19.48
~;:;! 0 I £LEV 267.31
I~ \0:1~~ .p'~~ o,a~ '!ft71 TOP Of' WALL ELEV 210.00 ~
ELEV 183.82 7 ELEV 148.70 7.
25 STA !5+84.10
STAI2+28./5 I ELEVI!5.oo-J.!-- ~~~
REFERENCE
Photographs 44-46
Photographs 47-50
Photographs 51-53
Photographs 54-56
Pl.atee 47-49
Pl.etee 50-52
REMARKS
J..-on-3.33 eloping basin beginning at eta l2+2L79 at el.ev 153.46 and ending at eta 13+50.00 at elev ll5 .00; at end of basin at eta 15+64.10 was a 15-ft-high end sill
1-on-4 sloping basin beginning at eta 12+34.09 at elev 143.97 and ending at eta 13+50 at elev 1151 at end of basin at eta 15+64.10 was a 15-ft-high end sill
Same as tYile l design_, except for left training wall lowered as shown
1-on-3.33 sloping basin beginning at ate. 11+83.80 at elev 200.26 and ending at eta 14-t-68 .00 at elev 115 .oo; at end of basin at eta 16+50.00 was a 15-f't-high end sill
1-on-8 sloping basin beginning at eta 12+28.50 at elev 147.50 and ending at eta 14+88.50 at elev 115 .oo; at end of basin at eta 15+64.10 was a 15-ft-high end sill
1-on-7 .25 sloping basin beginning at eta 12+28.15 at elev 148.7 and ending at sta 14+72.48 at elev ll5.00i-at end of basin at ate. 15+64.10 was a 15-f't-high end sill
1-on-8 sloping basin beg1nning at sta 12+16.10 at elev 1.58.5 and ending at eta 15+64,1.0 at elev H5.00; at end of basin at sta 15+64.10 was a 15-ft-high end sill
TYPE NUMBER
15
16
17
18
19
20
21
Table 4. ( Cont 'd)
MODEL B
STILLING BASIN DESIGNS INVESTIGATED
SECTION ALONG CENTERLINE
;:';~ s STA 13+19.46 i I \' ~ ~ I ELEV 267.31 ~ ~~ Q. ~ o'ay· ~
0.6 7 ~ \~TOP OF WALL EL£V 210.00 c.,
£LEV/8J.62~:/ c1£NTATES 16FT WIDE ---- SPACED ON32-FTCENTERS
ELEV/58.50 __,.$(0' STA/SI-64.10
srA 12+16.to I I 11
8 1 EL<Vt.Jo.ool ~.-,
STA 12+ 77.00 . ELEV liS.
STA 13+45.00
~'1; STA /J + /9.46 ~
D, ~~ ~~ cLcv 267.31 ~ ~ I !::.;: 1 ~,_; ....._:
6~'-) \t;O O TOP OF WALL ELEV 2/0.00 ~ ;
£LEV 18 / s•DENTATES 16FT WIDE ~ ---- SPACED ON 32~FT CENTERS Cl)
£LEVI /0 1
STA 12+16./0 I I ,5 8 ELEV140.0~~ ~ STA 12i-7T.OO . I
srA t3+4s.oo \cLEV/25·00 I srA t.tf-84.10
I STA 14+44.10
~ ~~ STA /3.,.19.41
1\., ~:... I EL£V287.31
~~ "~; .o·# 0.~~ \\.~ ~/TOP OF WALL EL£V 210.00
EUVI~~.oN77 \. srA t5+tJ4.to
<UV147.5o'-.. 8 FLFVI~a.no l STA IUZ8.50 I -I £ ~
I STA 14+0R.46
~ "t s STA 13f-tg.4~ ~ .,.... I " u~:!:: O £LEV 261.31 .,. ~
I :_i;:'l~("~ ~:
~ .... ~ 0 0 :STA 12+94.00 ~ ;..
0.6 \.~ '" ''I TOP OF WALL ELEV 210.00 .,., ~ I /~ ~ I ~ENTATES 16 T W/ut. ~ ~ \_V SPAcED ON 32-FT Ci!NTERS "'
EUV 140.00 I ~ <LEV 147.50 8 I <'8 , • ~;:A_ It' STAI2f26.50 I~·""' ~ ......
STA 13+94.00 I I I ' I.,.. "'" STA 14+09.461 ISTA ..
;:';~~: STA 13+/9.48
1\.~ '~~~ 0 I EUV267.JI 1~ "-':'t .o'W
0 4~ .... t; \~/TOP OF WALL ELEV 210.00 ~ £LEV163 _, / ---- • / STA 15+64.10
~LEV 147.50 14.9.! ELEVI.ffi.OO I STA/2+28.50 I ELEV/25.00
REFERENCE
Plate 53
Plate 54
Plate 55
Plates 56-59
Plate 6o
REMARKS
Same as type 14 design, except dentates 10 ft high, 16 f't wide added on 32-ft centers at sta 12+77 .00
1-on-8 sloping basin beginning at eta 12+16 .10 at elev 158.5 and ending at eta 11++84.10 at el.ev 125.00. Placed on the l-on-8 sloping ramp at eta 12+77 .00 were dentatee 10 ft high and 16 ft wide on 32-ft centers; at end of baein,sta 15+64.1,-wae a 15-ft-high end ail~
Same as type 16 design with dentatea removed
1-on-8 eloping basin beginning at eta 12+28.50 at el.ev 147.5 and ending at sta 14+09.46 at elev l25: at end of basin at eta 15+64.10 was a 15-ft .. h!gh end sill
same as type 18 except a row of dentates 8 i't high, ~6 ft wide and 9'6 ft long was placed on the l-on-8 sloping ramp and 2 rows of baffle piers 8 ft high were added to the horizontal portion of the basin at eta 14+50.00 and sta 14+90 .00
l-on-14.9+ sloping basin beginning at sta l2+28.5Q at elev 147.50 and ending at sta ~5+64.10 at elev 125.00;at end of basin at sta. 15+64.10 was a 15-ft-hli!h end sill
l.-on..S eloping be.ain, 142 ft rtde1 beginning at sta l2+29 .06 at elev 147.20 and ending at sta 14+06 .66 at elev 125.0. On the right and left sides a 1-on-47.5 s~oping basin, 50 ft wide, beginning at sta 12+29.06 at elev 147.20 and ending at sta 15+70.90 at elev 14o.OO. On the end of tbe basin on both aides and 9enter section vaa an end s111 15 ft high
TYPE NUMBER
2.2
23
24
25
Table 4 (Cont'd)
MODEL 8
STILLING BASIN DESIGNS INVESTIGATED
SECTION ALONG CENTERLINE
.. "' "'
~ ~, ~ 'D~~ ~ ~
EL£V 210.00 ~
O.~ 7 o' "'<l! TOP OF WALL £LEV 160.00 lit
ELEV/58.95 ~ STA 151-54.20 _( 4
£LEV /40.00 ~ :.:.EV 137.1~ £LEV 130.00 ]l!f=:; STA 12+11.50 lf I £ltV If .00
STAs';,t~~~0•83 I sr..c 141-24.20
~ ~I ~ 1'\'\~ ~ ~ 'U' ~ ~ M~ELEV 210.00 ~
0Q ~ TOP OF WALL ELEV/80.00 c,..
£LEV 158.§5 ~ ELEV 137./T STA 151-64.20
ELEVI40.00!t'' 8 EUV{30.00 ll.6 sri/it//:Sof .._ ---"....;I £LEV 123.00 \_~ STA 12 + 24.20 ELEV 115.00 I
STA 12+48.13 STA t4r2s4f.ft.:g:.eollsrA 15+02.20
StA 14+.94.20
~~~~ ~I ~ ~ I ;;) c; ~ ~ ELEV 210.00 ~ ~
0.6-1\_ ~:.O~~ TOPOFWALLELEV/83.00 "'
ELEV 158.9~~~\J. STA~S+~4.20 ELEV 140.00 ~ 8 ELEV 1.30.00 I
STAI2+1/.SOfi ~~ STA 12+24 20! EL~~.:~:.;~24 201
srA t2+46.IJ3 srA 14 .,.94,20 I lsrA tS+t6.2
REFERENCE
Photographs 57-61
Plate a 61-66
Plate 67
Photographs 62-64
Plates 68-73
Plate 74
REMARKS
1-on-8 sloping basin beginning at eta 12+46 .83 at elev 137.17 and ending at sta 1424.20 at el.ev ll5.00; on the end of basin was a 15-:ft-high end sill
Same as type 22 design, except a rov of baffles 8 ft high added at sta 14+94.2
Same as type 22 design, except a row of bai'fles 10 ft high added at eta 14+94 .2
Same as type 22 design, except a row of baffles 12 ft high added at sta 14+94 .2 and left training wall revised
Table 5
PRESSURES ON TRAINING WALL, HIGH BUCKET
Ty];le A \-1 all Type B Wall Type C Wall Head on Piez Piez Piez Piez Piez Piez
Crest, Ft 1 2 1 2 1 2
23.8 Air 6.4
32.2 Air 23.0 Air 12.0
35.8 2.0 32.0 Air 31.0 0.8 21.6
46.6 30.8 65.6 8.4 47.0 25.6 47.2
55.6 62.4 91.2 19.6 67.0 43.2 64.8
Note: Locations of piezometers are shown on plates 75 and 76. Pressures are recorded in prototype feet of water.
PHOTOGRAPHS
Photograph 2 . Spillvay gates l through 5 open 14 ft; crest dischg, 1o8, 000 cfs; penstock dischg, 7, 000 cfs; pool elev, 466. 0; tailv.ater e1ev, 179 .2
Photograph 1. Spillvay gates 1 through 5 open 6 ft; crest dischg, 50, 000 cfs ; penstock dischg, 7 , 000 cfs ; pool elev, 466.0; t a ilvater elev, 176. 5
Photograph 3. Spillvay gates 1 through 5 open 28 ft; crest dischg, 193, 000 cfs; penstock di schg, 7 , 000 cfs; pool elev, 466.0; tailvater elev, 196.0
F1ov conditions below the bucket of original design for discharges of 50,000, 1o8,ooo, and 193,000 cf s
Photograph 4. Spillvay gates 1 through 5 OpeD 33.75 ft; crest discbg, 243,000 cfs; penstock d1schg 1 71 000 cfs; pool elev 1 466 .0; tailvater elev1 205 .4
Photograph 6. Spillvay gates 1 through 8 opeo full; crest dischg, 567,000 cfs; penstocks closed; pool elev, 473 .80; tailwater elev, 242 .0
Photograph 5. Spillvay gates 1 through 5 open full; crest dischg1 300,000 cfs ; peDS tocks closed; pool e lev, 469. 4; tailvater elev 1 212.6
Flow conditions below the bucket of origina l design for discharges of 2431 000, 300, 000, aod 567, 000 cfs
Photograph 7 . Area removed on left bank downstream from main spillway bucket of original design
Photograph tl . Fiow cona1~1ons oeiow oucket of original design with contour area altered on the left bank . Spillway gates 1 through 5 open
14ft. Crest dischg1 108,000 cfs j penstock dischg , 7 , 000 cfs ; pool elev, 466 .0; tailwater elev, 179 .2
Photograph 9 . Gates 1 through 5 open 28 ft; crest dischg, 193, 000 cfs; penstock dischg, 7,000 cfs; pool elev , 466. 0; tailvater elev, 196 .0
Photograph 10. Gates 1 through 5 open full; crest dischg, 300 ,000 cfs; penstocks closed; pool elev, 469 .4; tailvater elev, 212 .6
Flov conditions belov bucket of original design vith contour area downstream from main spillvay bucket altered on left bank
Photograph ll. Flov conditions dovnstream fran flip bucket after one -hour scour
Photograph 12 . Jet a ction belov scoured basin
Spillway gates 1 t hrough 5 open 14 ft . Crest dischg , 108, 000 cfs; penstock dischg, 7 , 000 cfs ; pool elev, 466. 0; tailvater elev , 187.0
Photograph 13. View of bed downstream from original flip bucket before scour test . Note large gravel as a bed material. replacing pea gravel
Photograph 14. View of bed downstream fran original flip bucket after one-hour scour . Spillway gates 1 through 5 open 14 ft; crest dischg ,
loB,OOO cfs; penstock dischg , 7,000 cfs; pool elev, 466 .0; tailvater elev, 179.2
Photograph 16. Jet action of bucket .
Gates 1 through 5 open 14 ft ;
crest dischg, 1o8,ooo cfs ;
penstock dischg, 7 , 000 cfs ;
pool elev, 466.0;
tailva ter elev, 179.2
Photograph 15 • Flow conditions vith:
gates 1 through 5 open 14 ft;
crest discbg, loB , 000 cfs;
penstock dischg, 1,000 cfs ;
pool elev, 466 . 0;
tailwa ter elev, 179 .2
Photograph 17. Flov conditions vith :
gates 1 through 5 open 28 ft;
crest dischg, 193,000 cfs ;
penstock dischg, 1,000 cfs;
pool elev, 466, 0;
tailwa.ter elev, 196:o
Flow conditions and jet action of flip bucket having a 30-degree terminal angle at elev 180.0 (type 2 bucket)
Photograph 18. Jet action of bucket .
Gates 1 through 5 open 28 ft;
crest dischg, 193 ,000 cfs ;
penstock dischg, 7, 000 cfs ;
pool elev, 466 .0;
tailwater elev, 196. 0
Photograph 20. Jet action of bucket.
Gates 1 through 5 open full ;
cres t discbg, 300,000 cfs;
penstocko closed.;
pool elev, 469 .4;
tailwater elev, 212 . 6
Photograph 19 . Flow conditions with:
gates 1 through 5 open full;
crest d i schg., 300,000 cfs;
penstocl'..s closed;
pool elev, 469 .4;
tailwa ter elev, 212 . 6
Downstream flow conditions and jet action of type 2 bucket
Photograph 22 . Jet action of bucket.
Gates 1 through 5 open 28 ft;
crest dischg, 193 , 000 cfs ;
penstock dischg, 7,000 cfs;
pool elev, 466. 0;
tailwater elev, 196. 0
Jet action o~ the type 3 flip bucket
Photograph 21. Jet action of bucket.
Gates 1 through 5 open 14 ft;
crest dischg, 1o8,000 cfs;
penstock dischg, 71 000 cfs;
pool elev, 466.0;
tailvater elev, 179.2
Photograph 23 . Jet action of bucket.
Gates 1 through 5 open full ;
crest dischg, 300,000 cfs;
penstocks closed ;
pool elev, 469 . 4;
tailvater elev 1
212 . 6
Photograph 24 . Jet action of bucket .
Gates 1 through 5 open 14 ft;
crest dischg, lo8, 000 cfs;
penstock discbg, 1,000 cfs;
pool elev, 466. 0;
tailwa.ter elev 1
179.2
Photograph 26. Jet action of bucket.
Gates 1 through 5 open full;
crest dischg, 300,000 cfs;
penstocks closed;
pool elev 1
469. 4; tailva ter elev, 212 . 6
Jet action of the ~ 5 flip bucket
Photograph 25 . Jet action of bucket.
Gates 1 through 5 open 28 ft;
crest dische , 193,000 cfs;
penstock dischg, 1,000 cfs;
pool elev, 466.0;
tailvater elev, 196.0
Photograph 28. Jet action of bucket .
Gates 1 through 5 o:pen 28 ft ;
crest dischg, 193 , 000 cfs;
penstock dischG, 7,000 cfs;
pool elev, 466. 0;
tailwater elev, 196 . 0
Jet action of the ty:pe 6 flip bucket
Photograph 27 . Jet action of bucket.
Gates 1 through 5 o:pen 14 ft ;
crest discbg, 108,000 cfs;
penstock discbg, 7,000 cfs ;
pool elev, 466.0;
tailwater elev, 179.2
Photograph 29 . Jet action of bucket .
Gates 1 through 5 open full;
crest discbg, 300, 000 cfs;
penstocks closed ;
pool elev, 469 .4;
tailva ter elev , 212. 6
Photograph 30. Spillway gates 1 through 5 open 6 ft; crest dischg, 50,000 cfs; penstock dischg, 7,000 cfs; pool elev, 466.0;
tailwater elev, 176.5
Photograph 31. Spillway gates 1 through 5 open 14 ft; crest dischg, 1o8,000 cfs; penstock dischg, 7,000 cfs; pool elev, 466. 0;
tailwater elev, 179 . 2
Flow conditions below stilling basin of origillal design for discharges of 50, 000 and lo81 000 cts
Photograph 32 . Spillvay gates 1 through 5 open 28 ft ; crest dischg, 193,000 cfs; penstock dischg, 7, 000 cfs ; pool elev, 466 .0 ;
tailwater elev, 196 . 0
Photocraph 33. Spillway G~tes 1 through 5 open full ; crest dischg, 300, 000 cf~; penstocks closed; pool elev, 468. 6; tailwater elev, 212 . 6
Flow conditions below stilling basin of original design for discharges of 193 , 000 and 300,000 cfs
Photograph 34 . Cates 1 through 5 open 14 f t ; crest dischg, lOS, OOO cfs ; penstock dischg, 7 , 000 cfs ; pool elev, 466. 0; tailvater elev , 179 .2
Photograph 35 . Gate~ 1 through 5 open 28 ft ; crest dischg, 193 , 000 cfs ; penstock dischg, 7 , 000 cfs; pool elev, 466 . 0; tailvater elev, 196. 0
StillinB-ba~in action in the type 2 stilling basin
Photograph 36. Flow conditions below the type 2 stilling basin
Photograph 37. Stilling-b asin action in the type 2 stilling basin
Spillway gates l through 5 open full; crest dischg, 300, 000 cf s ; penstocks closed; pool elev, 468.6; tailwater elev, 212 . 6
Photograph 38. Flow conditions
of basin with : gates 1 through 5 open 14 ft;
crest dischg, lo8,ooo cfs ;
penstock dischg, 1,000 cfs;
pool elev, 466 . 0;
tailwater elev, 179 . 2
Photograph 40. Flow conditions
of basin v ith: gates 1 through 5 open full ;
crest discbg, 300, 000 cfs ;
penstocks closed;
pool elev, 468.6;
tailwater elev, 212.6
Photograph 39 . Flow conditions of basin with:
gates 1 through 5 open 28 ft;
crest dischg, 193,000 cfs;
penstock dischg, 1, 000 cfs;
pool elev, 466. 0;
tailwater elev, 19 6 . 0
Stilling-basin action in the type 5 stilling basin
Photograph 42 . Flow conditions
of basin vith: gates l through
5 open 28 ft; crest dischg, 193,000 cfs;
penstock discbg, 1,000 cfs;
pool elev, 466.0;
tailvater elev, 196.0
Photograph 41. Flow conditions of basin vith :
gates l through 5 open 14 ft;
crest dischg, 108,000 cfs;
penstock discbg, 7,000 cfs ;
pool elev, 466.0;
tailvater elev, 179.2
Photograph 43 . Flow conditions
of basin vi th: gates l through 5 open full ;
crest discbg, 300, 000 cfs ;
penstocks closed;
pool elev, 468.6;
tailwater elev, 212.6
Stilling-basin action in t he type 7 sti lling basin
Photograph 44. Flov conditions
of basin with: gates 1 through
5 open 14 ft; crest dischg, 108,000 cfs ;
penstock dischg, 7,000 cfs;
pool elev, 466. 0;
tailwater el.ev 1
179.2
Photograph 46. Flow conditions of basin with :
gates l through 5 open full ;
crest dischg, 300,000 cfs;
penstocks closed;
pool elev, 468.6;
tailwater elev, 2l2 .6
Photograph 45 . Flow conditions
of basin with: gates 1 through 5 open 28 ft;
crest dischg, 193,000 cfs;
penstock dischg, 7,000 cfs ;
pool elev, 466 .0;
tailwater elev, 196.0
Stilling-basin action in the type 9 stilling basin
Photograph 47 . Gates 1 through 5 open 14 ft; crest dischg, lo8, ooo cfs ; penstock dischg, 7 , 000 cfs ; pool elev , 466 . 0 ; tailvater elev, 179 .2
Photograph 48. Gates 1 through 5 open 28 ft; crest di schg, 193,000 cfs; penstock discbg , 7,000 cfs; pool elev, 466 . 0; t ailvater e1ev, 196. 0
Stilling-basin action in the type 10 stilling basin for discharges of 108,000 and 193, 000 cfs
Photograph 49 . Gates 1 through 5 open full; crest dischg 1 3001000 cfs ; penstocks closed; pool elev 1 468.6; tailvater elev 1 212 . 6
Photograph 50. Gates 1 through 8 open full; crest dischg 1 5671 000 cfs ; penstocks closed; pool elev 1 473 . 0 ; tailvater elev, 242 . 0
Stilling-basin action in the type 10 stilling basin for discharges of 3001 000 and 5671 000 cfs
Photograph 52 . Flov conditions
of basin vith: gates 1 through
5 open 28 ft ; crest dischg,
193 , 000 cfs; penstock dischg, 7, 000 cfs;
pool elev, 466.0;
tailwater elev, 196. 0
Photograph 51. Flov conditions
of basin with: gates 1 through
5 open 14 ft ; crest dischg, lo8 1 000 cfs ;
penstock dischg, 7,000 cfs;
pool elev, 466.0;
tailwater elev, 179 . 2
Photograph 53 . Flov conditions
of basin v ith : gates 1 through
5 open full; crest dischg,
300,000 cfs ; penstocks
closed; pool elev, 468.6;
tailvater elev, 212 .6
Stilling-basin a ction in the type 11 stilling basin
Photograph 54. Flow conditions
of' bas in vith: gates 1 through 5 open 14 ft;
crest discbg, 108, 000 cfs ;
penstock discbg, 7, 000 cfs;
pool elev, 466.0;
tailvater elev, 179.2
Photograph 56. Flow condi tioos
of basin v i th: gates 1 through
5 open full; crest dischg,
300, 000 cfs ; penstocks closed;
pool elev , 468. 6;
tailvater elev, 212 . 6
Photograph 55 . Flow conditions of basin vith :
gates 1 through 5 open 28 ft;
crest discbg , 193,000 cfs;
penstock discbg, 7, 000 cfs;
pool elev, 466.0;
tailvater elev, 196.0
Stilling- basin action in t he type 12 stillina b asin
Photograph 58. Fl01o1 conditions of basin vith:
gates 1 through 5 open 28 ft;
crest dischg, 193, 000 cfs;
penstock dischg 1
7,000 c fs; pool elev, 466.0;
tailvater elev, 196. 0
Photograph 57. Fl01o1 cond1 t1ons
of bas in vi th: gates 1 through
5 open 14 ft; crest dischg 1
loB , 000 cfs; penstock dischg, 7,000 cfs ;
pool elev, 466 .0;
tailwater elev, 179 .2
Photograph 59 . Fl01o1 conditions of bas 1n with:
gates 1 through 5 open full;
crest dischg, 300, 000 cfs ;
penstocks closed;
pool elev1 468.6;
ta1lwater elev, 212.6
Stilling-basin action in the type 22 stilling basin
Photograph 60. Stilling- basin action in the type 22 stilling 'basin
Photograph 61. Flow conditions below the type 22 stilling basin
Gates 1 through 8 open full; crest discbg, 567,000 cfs; penstocks close<; pool elev, 473.8; tailwater elev, 242.0
Hlotograph 63. Flow conditions
of basin with : gates 1 through
5 open 28 ft ; crest dischg ,
193 , 000 cfs ; penstock dischg, 7,000 cfs ;
pool elev, 466.0;
tailwa ter elev, 196. 0
Photograph 62 . Flow conditions of bas in with :
gates 1 through 5 open 14 ft ;
crest dischg , lo8, 000 cfs ;
penstock dischg , 7 , 000 cfs ;
pool elev, 466.0;
tailwater elev, 179 . 2
Photograph 64 . Flow conditions
of bas in with : gates 1 through 5 open full ;
crest dischg , 300, 000 cfs ;
penstocks closed;
pool elev, 468. 6 ;
tailwater elev, 212 . 6
Stilling-=basin action in the type 24 stilling basin
Photograph 65 . Details of the type A center training wall
Photograph 66 . Details of the type B center training wall
Photograph 67. Details of type C center training wall
Photograph 68. Flow conditions along type B center training wall. Gates 1 through 8 open full. Crest dischg , 567,000 cf s ; pool elev, 473.8
PLATES
\_RIGHT WING DAM\
SPILLWAY FLOOD POOL EL£V 475.40
D
SECTION A-A THROUGH STILLING BASIN
SCALE
STA 11+61.49 £LEV 315.00
DOWNSTREAM ELEVATION
SECTION B-B THROUGH FLIP BUCKET
£LEV 183.00
~ l!U:V 1/SJJO
-----LEFT WING DAM__.,...
£LEV 466.00
£LEV 408.00
SECTION C-C TYPICAL NON-OVERFLOW SECTION
~
ELEVATION AND SECTIONS PROPOSED DESIGN
~0
----1
GENERAL PLAN SCALE
0 50 ~ 200 250FT
I I I I I I I I I
"U r ~
e•x4•vE~
a•suPP Y LINE
CONCRETE WALL
19.34 1
POOL GAGE
~ -~-il(
19.34'
,, ,, ,, ,, ,, l: " ,, :: ,, ,, ':
" •: \,~~~--=-~-:;.
£LEV4l54
6JT'
REFERENCE RAIL
SPILLWAY fLOOD POOL
PLAN
,, I.! SAND. fILLER j·i
ELEVATION ALONG CENTER LINE
25.44'
MODEL A MODEL LAYOUT ~ :L_ ____________________________________________________________ __ PROTOTYPE 100
MODEL
o · 100 200 300 rT 0 3 4fT
6X.Jj" VENTURI
Yi;Sl/PPLY -~~~~!;
- <> - .] X tJ --t-T---"""'>'"--1-~~
PLAN
REFERENCE RAIL ELEV 350
'' '' '' '' TAILRACE
CHANNEL (
I'" ,, '' ,,
ELEVATION ALONG CENTER LINE
TAILGATE
MODEL B MODEL LAYOUT
SCALES PROTOTYPE
100
MODEL
0
0
100 200 300 rT
2 3 4FT
UPSTREAM ELEVATION
ELEV484,0 ELEV 48125
-~ .... ~if··· !t , .. <17. I ,. .... j /.OIJ:t:'·s' 2.75' 1.0' 2.1s'
p~A-· 3EfE-±-3I PLAN
SIDE ELEVATION
• --·-I! :::
I! t!
Q
::
DOWNSTREAM ELEVATION
DETAILS OF SPILLWAY CREST MODELS A AND B
490
t:;p,
470
GR
...J 460 IJ)
:::!:
1-UJ UJ ll. 450 I z
0
~ > 440 UJ ...J UJ
...J 0 0 430 a.
y)
~~ 420 I'
410
'I WAV F/, )nn >nm °Ft Fl 47 4
~ """ .A
)SSP OOL 'ELEV 46 ;o ,/; ~r;or
~7 _.,-: ~
~ ~ e ure:D) ~ ~
o~f? 7 ~ ~ D I AY J-~ ,#' ~6~y5
0 D sC ~RG£
/ .> o,scH
.;) T .Y y
~~ ,/'
100
~ 0 MODEL A X MODEL B
'PI/ UAV CRn 'T.FI FV
200
IRn
300 DISCHARGE IN 1,000 CFS
NOTE: ALL GATES OPEN FULL
_..1-:;::i f::::=:8
-::::P ~-
400
490
480
t:::= .,;::-.......
_.,,.--:::::: ·- 470
460 ...J IJ)
::!
1-UJ UJ
450 ll. I z 0
~ 440 >
UJ ...J UJ
...J 0
430 0 a.
420
410
500
DISCHARGE CURVES ORIGINAL DESIGN
-' If)
:::;;
1-.... .... lL
~
z Q 1-~ .... -' ....
SOOr-~---.--~---r~---,p~~~E~R.~--.---.---,---,---,---,--,---,---,--~---r---r--.---.---.---r-~r--,---,--~---.---r--,---,500
y
\
4oor--+--,_--r-r.1~~~-~~\~,\T-r-~--+-_,---+--+---~~--+-~~-+--+-_,~~--+-~--~--+-_,--~--+--4--~--+-~4oo .... ,:,.~ \
300
200
~·· ..
. ' . . ' . ;::'J'.
.. '·\\\ .•·
: ::·~1\'v-~WATER SURFACE
: 0:~1\\\ . ·.: :\\\
: ::~. \\ .· .. \\\ :_ ·.: ~\ ~ rTOP 0 WALL
. -~· :'·:~ 'X-1-L- ..-.-c.----· .. :.\ .....-:-.-:;_ 1- ---....... ~ /..- -~
-AXIS OF OAM .o· .· .. ,,,. --. ---..., ,_ - -STATION 9+97.60·,· ·.'-',·. 0: ....., -...;;:::::: L
, :~·:: :.:'):·::.·.q:c. ::.v.: ·:.:.~: ..... q.
300
200 --- -- --- - -r-
100~~~~---+--~--~--~--4---+---+---+---~--~~--~---+---+--~--~--+---+---+---~~~~---+---+---+--~--~--1100
~+~0-0~~-9~+-0-0~--~-0~+0-0--~-I-1+~00--~--12~+-00--~-I-3+~0-0--L--14-+~0-0~---15~+0-0--~-I-6~+0-0--L--17~+LO-O~--I-8~+-00--~-I-9+~0-0~L-2-0-'+-0-0~--2-I~+-OO--L-2-2~+~00~~~2~3+g0
STATIONS IN FEET ALONG CENTER LINE
TEST CONDITIONS ORIGINAL DESIGN PENSTOCKS POOL ELEV TAILWATER ELEV CONDUITS CLOSED
7,000 CFS 466.00 FT 179.20 FT
5 BAYS OPEN 14.e ± fT (6,7 &8 CLOSED)
MODEL A
WATER-SURFACE PROFILE TYPE I (ORIGINAL) DESIGN
DISCHARGE 108,000 CF'S
-' If)
:::;;
1-.... lU lL
~
z 0
~ .... -' ....
..J 1/)
:::0
t-UJ UJ IL
~
z 0 t= ~ UJ ..J UJ
500,--,---,---,--~~--~,p~~~E~R~--.---,---r---r--.---.~-.---.---,---,--,---,---,---.---r--.r--.---.---.---.---.--,---,---,500
.A
I(\ ·'\
4oor-~---;---t~~~~~~·~· ~lrr\~--~--+---~--~~--~r--+---+---+---+--~--,_--+---t---r-~r--;---+---+---+---r--~--~--;4oo ~· •. :-\ 1\ \ .· .... _:·t>. I~\
300
•> . . . ·:::-.' ,\ :< . .':t\ :\ > :.' · · ::.:.·~\\_,I--WATER SURFACE
,q·:
.··.::.\~ .. :·."-\ ':\
·::-\n
:):l\\ :. :.: ~~\\ \ rTOP 0 WALL
300
:.: .. { ···~:~ ~ ~ ----'r ---......_ !"'---....__~ Vl----"' __...- - ---..- -.. 200 1-
200 - '--- ~ 1---:~:.:: ";~l.f.fo,J~/t7~0·Y'; :.=:·:·:.~; "-.or---.....,. -:-t'-' ~ -- -r-- ---::::::... r>:Y//, - 'IN (N
.·.: · .. :4·.:: :.:'il:·::.·,q:c. ::.v.: c~:.v: :::c.
loor-~r-~---+---t---+---r--~--,_--+---t---r---r--;---;---t---t---r--~--,_--+---+---~~~~---+---+---+---r--~__, 100
OL-~~~--~--~--~--~--~--~--~--~--~--~~---J--~--~--~--~--~--~--~--L-~~_..J __ -J __ -L __ _L __ ~--~--..~0
8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00
TEST CONDITIONS
ORIGINAL DESIGN PENSTOCKS POOL ELEV TAILWATER ELEV CONDUITS CLOSED
1,000 CFS 466.00 FT 196.00 fT
5 BAYS OPEN 28.0 FT (6,7 1!.8 CLOSED)
STATIONS IN FEET ALONG CENTER LINE
MODEL A
WATER-SURFACE PROFILE TYPE I (ORIGINAL) DESIGN
DISCHARGE 193,000 CF'S
..J 1/)
:::0
t-UJ UJ IL
~
z 0
~ UJ ..J UJ
.J If)
::ii
.... "' "' IL
~
z Q .... ~ "' .J
"'
500r---r--or--;--~~~~P~/~E~R,_--,---,---~--~--,---,--,---,---,---,---,---r--,---,---~--.---r--.---.---,---,---,---,--,500
~ 1(. \ ' \
4oor-~--_,---t~~~~~~·~· ~~~~--4---+---t---t-~r-~r-~--~---+---+--~--1---+---+---t---r--4---4---+---+--~--~--4---4400 ~·. :~) \\
300
200
•> . . ·:.:-.. i\
.·.·~ \\
::.:.'~\\,_I--WATER SURFACE
:~·.,: :.:~;~:·. :.·.•:.·. ::.fl.: ·:.:.v: :::q.
loor-~--_,---t--~--~--~--4---+---t---t-~--~r-~---+---+---+--~--1---+---+---t---r--4--~---+---+--~--~--4-__,IOO
~+~0-0~---9~+-00--~-10-+~0-0--~-I~I+~OO--~-I-2~+--00-L--13-+~0-0~~-14~+~0-0~--I-5~+0-0--~-I-6+~0-0~~-17.J+_O __ O~-I-B+~O-O--L--19-+~0-0__; __ 2_0.J+_00--~-2-I+~O-O--L-2-2~+~00--.J--2-J3+g0
STATIONS IN FEET ALONG CENTER LINE
TEST CONDITIONS
ORIGINAL DESIGN PENSTOCKS 7,000 CFS POOL ELEV 466.00 FT TAILWATER ELEV 205.40 FT CONDUITS CLOSED 5 BAYS OPEN 33.75 FT (6,7 &8 CLOSED)
MODEL A
WATER-SURFACE PROFILE TYPE I (ORIGINAL) DESIGN
DISCHARGE 243,000 CFS
.J If)
::ii
flU
"' IL
1J r ~ , 0
.J <I)
::i
1-UJ UJ IL
~
z Q 1-~ UJ .J UJ
500r--,---,--~-,~~~PD~uE~R,_--,--,---,--.---r--,---,--.---,--,---,--,---r-_,--,---~-,---,--,---,--,---,--.--,500
A'
;~ \\ 4oor--4---i---t-4~~~~.~:~~:)~~~~~~-i---t---r---r--~--~--+---+---+---+-~~~---t---+--~--~--4---4---+---+---+---~~---44oo
•:'[· . :.\ ~ : ;.·.) " I.--WATER SURFACE
300 . · .. \ ~ 300
~··
;:·,. :):l\\ :. :_:!~\ \\ r;:-TOP 0 WALL ./
,_. ----:-"" -~ ...... ~ ~
200 ~ - 1----- f..- 200
.::--- - '-- - f---------- t---- -- _,...... -----. ~ - r;:::-
--- ------'
:q·,: :.: .. :·::.·.9:.·. :::v.: ·:.:.v: ·::q.
IOOr-~--~---t--~---r---r--f---t---r---r-~~~r--+---+---t---+---r--4---f---t---+---+-~---4---+---f---+--~--4---4100
o~~--~--~--~--~--~--~--~--~--~~--~~~--~--~--~---L--~--~--~--L---L-~--~--~--~---L---L--~--~0 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00
TEST CONDITIONS
ORIGINAL DESIGN POOL ELEV 469.40 FT TAILWATER ELEV 212.60 FT PENSTOCI<.S & CONDUITS CLOSED 5 BAYS OPEN FULL (6
17 & 8 CLOSED)
STATIONS IN FEET ALONG CENTER LINE
MODEL A
WATER-SURFACE PROFILE TYPE I (ORIGINAL) DESIGN
DISCHARGE 300,000 CFS
.J UJ
:::;
1-UJ w "-
~
z 0
~ UJ .J w
"0 r ~ (11
.J U)
::!:
1-
"' "' lL
~
z 0 j: ~ "' .J
"'
500r--,--~---r--T~---,P~I~E~R~--,---,--,--~---,--,---,---,--,--~--,---,---.--,--~---.--,---,---,--,---,--,---,--,500
300
200
I
. ·-~A 1\ :-.: :.' · ·. : :_:.') \_r-WATER SURFACE .. . ·: ·.,, ~
:.· . :· .. 1-.\ \\
~- .. - ·,
:<: ·.·.· .·
.· ·.: :.\'
.. : ~- \\
.. · ... \\ .' ·.:!'~ \\ .--TOP 0 WALL ./ •. ·!•:\ \\ .1. ,......... ......- -----
-
300
/..--r-- ----- 1>-- - v/
1- ....._
--- 200
-1-- -- ----
loor-~---+---r--+---r-_,---+--~--+---+-_,--~---+---r--+---+-_,---+--~--+---+-_,r--+---l---4---+---r-_,---+~IOO
~+~0-0~---9+~00--~--IO~+-OO--~-I~I+~00--~-12-+~00--~-I-3+~0-0~--I-4~+-00--~-15~+0~0~--I-6+~0-0~--1~7~+0-0--~~18~+~00~~-19~+~0~0~~20-+~0~0~--2~1~+~00~~2~2~+~00~~2~3+80
TEST CONDITIONS
ORIGINAL DESIGN POOL ELEV 473.80 FT TAILWATER ELEV 242.00 FT PENSTOCKS & CONDUITS CLOSED 8 BAYS OPEN FULL
STATIONS IN FEET ALONG CENTER LINE
MODEL A
WATER-SURF'ACE PROF'ILE TYPE I (ORIGINAL) DESIGN
DISCHARGE 567,000 CFS
.J U)
::!:
1-
"' "' lL
~
z 0
~ "' .J
"'
- L.--------------------------------------------------------------------------------------------------------------------------~
"'0 r ~ rn
N
TYPE I BUCKET ORIGINAL DESIGN
TYPE 4 BUCKET
TYPE 6 BUCKET
" ... ~ ... .., 0 0
.,; ... "' " "' "' ., 0.66 "' + + +
. :-~\]1.00 ~ ~ ~ ~
. :··:·.. ~ ~ ;:! ;:! .. "' "' "'
TYPE 2 BUCKET
TYPE 5 BUCKET
~~~ ~_j_
~
TYPE 3 BUCKET
I
I
8 DENTAT£132.0~ O.C. £LEV 180.16
~ELEV/80.16
' :l ' I I L ________________________ J
UPSTREAM ELEVATION
TYPE 5 BUCKET
BELEVI7/.16 MODEL A
ALTERNATE BUCKET DESIGNS DETAIL OF DENTATE IN TYPE 5 BUCKET TYPE I TO 6
SCALE: I"= 10'
PROTOTYPE 8
'ii~-=--==-----MODEL
..J II)
:::> 1-w w ... I
z 0 I-
~ w ..J w a: w I-
~ ..J
~
260
250
240
230
220
210
200 -
190
180 -170
160
150 I L I
140
I 130 l
0
1-,..... ~
....., 1-- -~ 1-... ).-- '--""' .--DEVELOPED BY SACRAMENTO DISTRICT, C OF E
~ .... ,.....- ;...--- 1-- l---~ -.... >-- _..., ;..- ;..-
1\. .-~ ;.--~ ~-----__.... :::-l-- ;.-......
,... :::::. I--: -y-
..........: ~ .-:--: ~ FOR POWERHOUSE FLOWS UP TO 7,000 CFS ~ k: v y- i\ SLACK WATER AT TOE OF DAM CONTROLLED
\ BY ROCK LEDGE'- . ....-.:: ;:/: ._,..
'C-DEVELOPED BY US. BUREAU OF RECLAMATION
~~ v 1\ I I I I I I I I I
J I« ~ v,.
"' AVERAGE CUR~E ~SEb I~ M~DiLS lA JND I B / .cr ~ ~ - .(). !-<>- ().--'
~ ")>' .,-<10 ..,
p ,11
v
25 50 75 100 125 150 175 200 225 250 275 300 325 350 375 400 425 450 475 500 525 550 575 600 DISCHARGE- 1000 CFS
NOTE: TAIL WATER RATINGS AT STATION 29 +50.
U.S.C.E. TAILWATER RATING CURVE USED IN THE MODEL FOR DISCHARGES BELOW 100,000 CFS.
MODELS A AND 8 TAILWATER RATING CURVES
"U r ~ fTl
100
z 000 w u ::!; 0 0: 160 ... t;
100 180
~ ;;
'" ~ 200 < 1-VI 15
13+00 14+00
TEST CONDITIONS
ORIGINAL DESIGN PENSTOCKS POOL ELEVATION TAILWATER ELEVATION CONDUITS CLOSED GATES I THRU 5 OPEN BAYS 6, 7 AND 8 CLOSED
7,000 C FS 466.0 FT 176.5 FT
6.0 FT
/60
NOTE: BED MOLDED IN CEMENT MORTAR TO NATURAL CONfiGURATION.
100
000
w z :::i a: w 1-z w u ::!; 0 a:
200 ... 1-w w ..._
;;
300 tl
700
MODEL A
WATER-SURFACE CURRENT DIRECTIONS
TYPE 1 (ORIGINAL) DESIGN DISCHARGE 50,000 CFS
z < 1-VI 15
""0 r ~ rn (}I
300
200
100 w z ::J 0: w /
!z 000 4Q_ w u 140 ::; 0 E 160
>- 100
"' 180
::: ;; w ~ 200 ~ >-V>
0
13+00 14+00
TEST CONDITIONS
ORIGINAL DESIGN PENSTOCKS 7,000 C FS
466.0 FT 179.2 FT
POOL ELEVATION TAILWATER ELEVATION CONDUITS CLOSED GATES I THRU 5 OPEN BAYS 6, 7 AND 8 CLOSED
14.0 FT
IS+OO
STATIONS IN FEET ALONG CENTER LINE
NOTE: BED MOLDED IN CEMENT MORTAR TO NATURAL CONFIGURATION.
100
000
"' ~ .J
a: "' 100 lz "' u
:::0 0 a:
200 ... l;j ... ... ~
300 t: ~ 0
MODEL A
WATER-SURFACE CURRENT DIRECTIONS
TYPE 1 (ORIGINAL) DESIGN DISCHARGE 108,000 CFS
'"'0 r )> ......j rn -0>
w z :J a: 41
~000~----4t~~F7~====--~~ ~~::==:t~~====~ u ::!;
~
8 IOO~::::J±tttil~~::::::~~~~~~~~~~====~=-l=~~~ ... ;;!; 41
~ 200 1-<1)
i'i
13+00 14+00
TEST CONDITIONS
ORIGINAL DESIGN PENSTOCKS 7,000 CFS
466.0 FT 196.0 FT
POOL ELEVATION TAILWATER ELEVATION CONDUITS CLOSED GATES 1 THRU 5 OPEN BAYS 6, 7 AND 8 CLOSED
28.0 FT
15+00
NOTE: BED MOLDED IN CEMENT MORTAR TO NATURAL CONFIGURATION. MODEL A
;;!; 300 41
u
~ "' 0
700
WATER-SURFACE CURRENT DIRECTIONS
TYPE 1 (ORIGINAL) DESIGN DISCHARGE 193,000 CFS
"'0 r ~ rn
300
200
100 w z :J a: w 1-tjiOOO U·
JE 0 e: 160 1- 100 w 180 w ... ;!:
w ~ 200
~ 15
13+00 14+00
TEST CONDITIONS
ORIGINAL DESIGN PENSTOCKS 7,000 C FS
466.0 FT 205.40 FT
POOL ELEVATION TAILWATER ELEVATION CONDUITS CLOSED GATES 1 THRU 5 OPEN BAYS 6, 7 AND 8 CLOSED
33.75:!: FT
15+00
NOTE: BED MOLDED IN CEMENT MORTAR TO NATURAL CONfiGURATION.
100
000 w
·Z :J a: "' 100 1-z tj
JE 0 a:
200 ... t;; w ... :!:
~ z .. t; i5
MODEL A
WATER-SURFACE CURRENT DIRECTIONS
TYPE 1 (ORIGINAL) DESIGN
~ L-------------------------------------------------------------------------------------------------------~D~IS:C~H:A:RG~E_:2:4~3~,0~0~0~C~F~S~----------J
'1J r )> -1 fJ1
(X)
200
100 w z ::i a: w ~ 000 w <.J
;l; 0
e: t- 100 w :::' :;; w ~ 200 < t-<J)
0
300
13+00 14+00 15+0C
TEST CONDITIONS
ORIGINAL DESIGN PENSTOCKS CLOSED POOL ELEVATION TAILWATER ELEVATION CONDUITS CLOSED 8 BAYS OPEN FULL
4 73.80 FT 242.0 FT
NOTE: BED MOLDED IN CEMENT MORTAR TO NATURAL CONfiGURATION.
100
000
w z :J
:;;
300 ~
700
MODEL A
WATER-SURFACE CURRENT DIRECTIONS
TYPE 1 (ORIGINAL) DESIGN DISCHARGE 567,000 CFS
z < t-<J)
0
'"'0 r ~ rn
-co
w z J a: w 1-
~ u ::; 0 a: ... 1-w w ... t-w w ... ~ w u z ~ "' 0 400
13+00 14+00 15+00
NOTE: S LOCATIONS OF WAVE RODS FOR MEASURING SURGE AND FREQUENCY OF WAVE ACTION VICINITY OF POWERHOUSE.
ELEVATIONS ARE IN FEET REFERRED TO MEAN SEA LEVEL.
AREAS OUTSIDE OF MOVABLE BED LIM ITS FIXED IN CEMENT MORTAR.
300
200
100
ltJo
000
w z 100 J
a: w t-z w u
200 ~ a: ... t-w w ...
300 ~
w u z ~ "' 400 5
MODEL A
NATURAL BED CONFIGURATION
"U r
~ JTl
N 0
"' z :::;
"' "' ~ooo~----~~~~~t===---t=~ ~r==---=h~r~==~~~-r~~---------t u
~ LL
8 IOO~====~tttllj::1::::::±:~~~::~~~ LL
!';
"' ~ 200
~ U)
0
13+00 14+00
TEST CONDITIONS
ORIGINAL DESIGN PENSTOCKS 7,000 CFS POOL ELEVATION 466.0 FT TAILWATER ELEVATION I 76.5 FT CONDUITS CLOSED GATES I THRU 5 OPEN BAYS 6, 7 AND 8 CLOSED
6.0 FT
15+00
NOTE: VELOCITIES ARE IN PROTOTYPE FEET PER SECOND 2 FEET OFF BOTTOM.
BED MOLDED IN CEMENT MORTAR TO NATURAL CONriGURATION.
MODEL A
"' z ::;
"' 100 ~ z "' u ::0 a1
200 ... ,... "' "' ... ;!;
300 tj z
~ 0
700
BOTTOM VELOCITIES TYPE 1 (ORIGINAL) DESIGN
DISCHARGE 50,000 CFS
w z :::; 0: w 1--
i5 000 u :; 0
"' "-1--w w "-
~ w u z
"' 1--<fl
0
100
200
13+00 14+00
TEST CONDITIONS
ORIGINAL DESIGN PENSTOCKS 7,000 CFS
466.0 FT 179.2 FT
POOL ELEVATION TAILWATER ELEVATION CONDUITS CLOSED GATES 1 THRU 5 OPEN BAYS 6, 7 AND 8 CLOSED
14.0 FT
15+00
NOTE: VELOCITIES ARE IN Pf'lOTOTYPE FEET PER SECOND 2 FEET OFF BOTTOM.
BED MOLDED IN CEMENT MORTAR TO NATURAL CONFIGURATION.
'<t 0 I')
100
000
..; z :::;
"' 100 ~ z w u
t-w w "-
~
300~
700
MODEL A
BOTTOM VELOCITIES TYPE 1 (ORIGINAL) DESIGN
DISCHARGE 108,000 C F S
z "' t-<fl 0
w z :J 0: w !z ooo 1-----h-1!-'-+lli=Lb w u ::l; 0 0:
.... 100 1------H+-:---Hi-+-+-t:i t:' ;;; w u z " I-V)
0
13+00
TEST CONDITIONS
ORIGINAL DESIGN PENSTOCKS 7,000 CFS
466.0 FT 196.0 FT
POOL ELEVATION TAILWATER ELEVATION CONDUITS CLOSED GATES 1 THRU 5 OPEN BAYS 6, 7 AND 8 CLOSED
28.0 FT
STATIONS IN FEET ALONG CENTER LINE
NOTE: VELOCITIES ARE IN PROTOTYPE FEET PER SECOND 2 FEET OFF BOTTOM.
BED MOLDED IN CEMENT MORTAR TO NATURAL CONFIGURATION.
MODEL A
100
w z :J 0: w
100 !z w u ::l; 0 0:
20C ~ w w .... ;;;
30C tJ ~ !--
"' 0
BOTTOM VELOCITIES TYPE I (ORIGINAL) DESIGN
DISCHARGE 193,000 C F S
""0 r ~ fTI
!'\) w
"' z ::i a:
"' ~ 000~----~~tHF=~====---r~ft' t! ::; 0 e: t;i "' ... IOO~::::j!tt!j:t~======~~~::~=:~~
;!!;
"' u 200
~ 0
300
400
500
13+00 14+00
TEST CONDITIONS
ORIGINAL DESIGN PENSTOCKS POOL ELEVATION TAILWATER ELEVATION CONDUITS CLOSED
7,000 C FS 466.0 FT 205.4 FT
GATES 1 THRU 5 OPEN 33.75 ± FT BAYS 6, 7 AND 8 CLOSED
15+00 STATIONS IN
NOTE: VELOCITIES ARE IN PROTOTYPE FEET PER SECOND 2 FEET OFF BOTTOM.
BED MOLDED IN CEMENT MORTAR TO NATURAL CONFIGURATION.
MODEL A
BOTTOM VELOCITIES TYPE 1 (ORIGINAL) DESIGN
DISCHARGE 243,000 CFS
... z :::;
a: w
100 !z "' u
::; ~
200 ~ "' .., ... ~
"' 300 :;! ~ "' 2i
500
600
700
~ooo~~-H~~~~=--1==~~~=---~~==~~--~~--------~~~~~~~~-------z w u ::; 0
e: 100 ~----1-H-+-1--ti ~ ~
tJ 200
! <J)
i5
13+00 14+00
TEST CONDITIONS
ORIGINAL DESIGN PENSTOCKS 0 C FS
469.4 FT 212.6 FT
POOL ELEVATION TAILWATER ELEVATION CONDUITS CLOSED GATES I THRU 5 OPEN BAYS 6, 7 AND 8 CLOSED
FULL
15+00
NOTE: VELOCITIES ARE IN PROTOTYPE FEET PER SECOND 2 FEET OFF BOTTOM.
BED MOLDED IN CEMENT MORTAR TO NATURAL CONFIGURATION.
MODEL A
BOTTOM VELOCITIES TYPE 1 (ORIGINAL) DESIGN
DISCHARGE 300,000 CFS
w z ::;
"' w 100 !z
w u ::; 0
"' ... 200 ~
"' ~ ~ w
300 u z .. lii 0
700
'"0 r )> -f m
::; 0 "' "-1-w
•W ,.._ :~ w u z <( 1-if)
0
300
200
13+00 14+00
TEST CONDITIONS
ORIGINAL DESIGN PENSTOCKS 0 C FS
4 73.8 FT 242.0 FT
POOL ELEVATION TAILWATER ELEVATION CONDUITS CLOSED GATES I THRU 8 OPEN FULL
15+00
STATIONS IN FEET ALONG CENTER LINE
NOTE: VELOCITIES ARE IN PROTOTYPE FEET PER SECOND 2 FEET OFF BOTTOM.
BED MOLDED IN CEMENT MORTAR TO NATURAL CONFIGUATION.
MODEL A
w z :J 0:
tOO~ z w u :2 0 a:
200 "-1-w ::' ~
300 ~
700
z <( IV)
0
BOTTOM VELOCITIES TYPE 1 (ORIGINAL) DESIGN
DISCHARGE 567,000 CFS
~L---------~------------------------------------------------------------------------~
"'0 r ?:i ITI
N Q')
200
100 w z :::; It w ~,ooo u ::;; 0
~~ 100 w
~~ wl ~:zoo
" 1-(/)
i5
13+00 14+00
TEST CONDITIONS
ORIGINAL DESIGN PENSTOCKS POOL ELEVATION TAILWATER ELEVATION CONDUITS CLOSED
7,000 C F S 445.0 FT
179.2 FT
GATES I THRU 5 OPEN FULL BAYS 6, 7 AND 8 CLOSED
15+00
NOTE: VELOCITIES ARE IN PROTOTYPE FEET PER SECOND 2 FEET OFF BOTTOM.
- _. VELOCITIES TAKEN AFIER ONE HOUR SCOUR.
- VELOCITIES BEFORE SCOUR.
100
000
w z :::; It
100 ~ z w u ::;; 0 It
200 ... 1-w w ... ~
300 t:l
MODEL A
BOTTOM VELOCITIES TYPE 1 (ORIGINAL) DESIGN
DISCHARGE 108,000 CFS
z
" 1-(/)
i5
..J <II
::!:
t-UJ UJ ,..
~
z 0 i= ~ UJ ..J UJ
500 ~-----~~~~---*---+~~--~--,_--+---+---+--; ~PIER
400
300
\
:·.::' ··.--:\\\ ~- '.: ' ;q;\\
· .. A\1\ :. ::~~1\ \
<i~\\ ' :-\\\ .. :&\\
500r----.---.----.----.----r---~500
STATIONS IN FEET ALONG CENTER LINE
PIEZOMETER NO. PRESSURE
52.29 2 43.58 3 33.00 4 -0.42 5 0.54 6 0.08 7 4.68 8 5.04 9 4.89 10 3.74
NOTE: PRESSURES ARE RECORDED IN PROTOTYPE FEET OF WATER.
:· ·.-.:~ ,\ / WATER SURFACE ~~r-~---+~::~-:~--r---r-~~~---+---+--~--~--~--~--.---~--r-~~_,---,--~--~---r---r---.--~--~--.---r-~260
~":-:~~ ':<7··:
TOP OF WALL "'\..
'
..J V)
~
200 _·._:· . .,.__AXIS OF DAM ·:)\'
1-~f--t---t+-':-':"'~·tt-STATION 9+97.60·i."'l\ .. \\t\--~--~--~--+--+---t---t-l--r--!f--t---t---t---t---+--~--,_--+--+---t---t---f--t 200 l;j '·,_; ·-.~ ~
r.: '>~ ..... .-::::::---:... -=~ I'\ \--::/- --- -r-- -r--- __::~
60 L-~~--'--~---L--~--~---'---~--~--L---~--'~~--~--~--~--~--~---'---~--~--~--L---~~~--'--~--~--~--~ 60 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00
TEST CONDITIONS
ORIGINAL DESIGN PENSTOCKS 1,000 CFS POOL ELEV 446.00 FT TAILWATER ELE:V 179.20 FT CONDUITS CLOSED 5 BAYS OPE:N 14.0 FT (6, 7 & 8 CLOSED)
STATIONS IN FEET ALONG CENTER LINE
MODEL B
WATER- SURFACE AND PRESSURE PROFILES
TYPE 1 (ORIGINAL) DESIGN DISCHARGE 108,000 CF'S
soor---~----~--~----~--~--~soo
PIEZOMETER NO. PRESSURE
I 39.29 '(f
2 30.58 3 21.00
4 5.58 5 1.54
6 0.08 7 6.69
8 8.04 9 6.89 10 5.74
NOTE: PRESSURES ARE RECORDED IN PROTOTYPE FEET OF
STATIONS IN FEET ALONG CENTER L1 NE WATER.
260 ..J
"' :::E ~:.. 01;}..\\ TOP OF WALL "'\.
200 f-w w -- "-
~"'« C«'-~
z 0 f-<( >
100 w ...J
100 w
60 22+00 23+00
6~+~0~0--L--9-+~0-0 __ L__IO~+L0-0--~-I-I+L0-0--~-12_+L0-0--~-I-3L+-OO--L--14-L+-OO--L--I-5~+-00--~--16J+_O_O_J ___ I7J+_O_O_J ___ I8~+LO-O--L--19-+LO-O--L-2-0-+L0-0--~-2-I+LO_O __ L_ __ L_ __ L___J
TEST CONDITIONS
ORIGINAL DESIGN PENSTOCKS 7,000 CFS POOL ELEV 466.00 FT TAILWATER ELEV 196.00 FT OONDUITS CLOSED 5 BAYS OPEN 28.0 FT (6,7 &8 CLOSED)
STATIONS IN FEET ALONG CENTER LINE
MODEL B
WATER-SURFACE AND PRESSURE PROFILES
TYPE 1 (ORIGINAL) DESIGN DISCHARGE 193
1000 CFS
..J 1/1
:lE
1-UJ UJ ...
= z Q 1-~ UJ ..J w
( \
400
300 . :-\. '\\ . . ·.b\ \
soor---~--~----~--~----~--~soo
STATIONS IN FEET ALONG CENTER Ll NE
PIEZOMETER NO. PRESSURE
I 37.29
2 23.58
3 17.00 4 4.58 5 1.54 6 1.08 7 4.69
8 8.04 9 7.89
10 6.74
NOTE: PRESSURES ARE RECORDED IN PROTOTYPE FEET OF WATER.
;~:: ... __ :~.'~\/WATER SURFACE r-~~-i---+~.9~::t---r---~:~::t~l~\\-i---t---t---t---r--.---,---,---.---,---r---r--.---.---.---.---.---,--,---,--,---.---4260
q:.. ·::}..\\ TOP OF WALL '.
200 200 t;; UJ ...
6~+~0=0~~~9~+~070~~IO~+LO~O~~~I~I+~0~0~--1~2~+-00--~-1~3+~0-0--~-14~+~00--~--15~+-00--~--16~+-00--L--17-+LOO---L--18~+-0-0_J __ I_9~+-00--~-2-0+L0-0--~-2~1+~0-0~--2-2~+-0-0~--2~3+0~0
TEST CONDITIONS
ORIGINAL DESIGN PENSTOCKS 7,000 CFS POOL ELEV 466.00 FT TAILWATER ELEV 205.40 fT CONDUITS CLOSED 5 BAYS OPEN 33.75:!: FT (617 &8 CLOSED)
STATIONS IN FEET ALONG CENTER LINE
MODEL B
WATER-SURFACE AND PRESSURE PROFILES
TYPE 1 (ORIGINAL) DESIGN DISCHARGE 243,000 CF'S
""CJ r )> -l m (,.) 0
...J Ill
Ji
1-
"' "' "-
~
z 0 i= ~ "' ...J
"'
500
400
300
200
..L::;'" PIER 500r----.---.----~---.----,---,500
.·.\ ~ • ".b-\ STATIONS IN FEET ALONG CEN,TER LINE
PIEZOMETER NO. PRESSURE
18.70 2 13.58 3 7.00 4 2.58 5 1.54 6 0.08 7 5.69 8 10.04 9 6.69 10 7.74
NOTE: PRESSURES ARE RECORDED IN PROTOTYPE FEET OF WATER.
;~:: . :.\~\--WATER SURFACE r---r--i---i-r~---T---r~~\-~--+---t---t---r-~r--.---.---.---.---.---.--.---,---,---~--.---.---r-~r--.---.---i260
:)7: :.<t \
SJ~ ~~ ~~~--~~ ~ ~~-~~ ~ __ __,.... e----_1--' ;;,~
...J (I)
::1
~
z 2 1-
·:v.;; ·>~·::·:·:·A.c.· :;"f.:·;::":···:. ::'.4: .:· ·:; < 100 r---r--i---+---t---+---r---r--~--t---t-~t-~~~~~~~~-+---t---r--~---r--,_--+---+---t---r---r-~r-_,---+---i 100 ~
...J
"' 6o ~--~-...J--~---L--~--~--~--~--~--~--~--~-...J~-...J--~--~--~--~--~--~--~--~--~--~--~--L--...J~~--~--..J6o
8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00
TEST CONDITIONS
ORIGINAL DESIGN POOL ELEV 468.60 F'T TAILWATER ELEV 212.80 F'T PENSTOCKS &CONDUITS CLOSED 5 BAYS OPEN FULL (6,7&8CLOSED)
STATIONS IN FEET ALONG CENTER LINE
MODEL B
WATER- SURFACE AND PRESSURE PROFILES
TYPE 1 (ORIGINAL) DESIGN DISCHARGE 300p00 Cf"S
...J 1/1
::E
1-UJ UJ ... ~
z 0 t= ~ UJ ...J UJ
500 r-~~_,---t--~--~~~--,_--+---t---t---r--; ~PIER
400
300
200
Sl~
.·) \
.. ·.\ ' .. ·.b\
soor---.----.----.----r---,,---,soo
STATIONS IN FEET ALONG CENTER LINE
PIEZOMETER NO. PRESSURE
I 27.00
2 14.60 3 6.00 4 1.60
5 0.50 6 0.10 7 4.70 8 11.00
9 10.90 10 6.70
NOTE: PRESSURES ARE RECORDED IN PROTOTYPE FEET OF WATER.
-200 tu
UJ ... ~
z 0
··:v.: .:.:/.>:.:.':•: ·.·. P.: .. : ·.:··A:·: . .. A··:·::: ~ 100 r---r-~---t--~---r---r--,_--+---t---t-~r-~~~~_,~~~-t---+---r--,_ __ ,_ __ +---+---t---r---r-~--_,---+---+--1100 j
UJ
60 ~--~~--~---L---L--~--~--~--~--~--~~~~--~--~--~---L--~--~---'---~--~--~--~--~~--~--~---L--~60 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00
TEST CONDITIONS
ORIGINAL DESIGN POOL ELEV TAILWATER ELEV
473.00 FT 242.00 FT
PENSTOCKS & CONDUITS CLOSED 8 BAYS OPEN F"ULL
STATIONS IN FEET ALONG CENTER LINE
MODEL B
WATER- SURFACE AND PRESSURE PROFILES
TYPE 1 (ORIGINAL) DESIGN DISCHARGE 567,000 CF"S
230
220
...J (/) 210 ::.!:
1-
"' "' "-
!: z 2 1-
200 < > "' ...J
"' a:: "' 1-<
"' ...J
< 1-
190
180
17 0
/ v/v v -OBSERVED JUMP -HEIGHT CURVE
/ v/
I
I I
r; I I
100
/I v I
I I I J -coMPUTED TAILWATER CURVE
I I I
I / v / /
6
~ ~SPRAY ACTION CURVE
/
200 300
DISCHARGE IN 1000 C F S
400 500
NOTE: EXIT AREA FIXED IN CEMENT MORTAR TO NATURAL CONFIGURATIONS.
JUMP-HEIGHT CURVE INDICATES TAILWATER ELEVATION AT WHICH BEST JUMP ACTION OCCURS.
SPRAY ACTION CURVE INDICATES TAILWATER ELEVATION AT WHICH SPRAY OCCURS.
5 SPILLWAY BAYS OPEN FULL.
PLATE 32
MODEL B
TAILWATER RATING CURVES
TYPE 1 (ORIGINAL) DESIGN
"0 r ~ rn
w w
"' z .J
0: UJ 1-z UJ u
~ 0 0: IL
1-UJ UJ IL
!: uJ u z < 1-~ 0
TEST CONDITIONS
ORIGINAL DESIGN PENSTOCKS POOL ELEV TAILWATER ELEV CONDUITS CLOSED
7,000 CFS 468.00 FT 176.50 FT
$ BAYS OPEN 6.0 FT (617 &6 CLOSED)
18+00 20+00
STATIONS IN FEET ALONG CENTER LINE
22+00
200
"' z :::i
100 0: UJ 1-z "' u
~ 0 0: IL
1-UJ
"' 100 IL
!: uJ u z
200 < 1-~ 0
300
24+00
MODEL B
WATER-SURFACE CURRENT DIRECTIONS TYPE I (ORIGINAL) DESIGN
DISCHARGE 50,000 CFS
-o r )> -1 ITI
"' z ::::;
a:
"' 1-z w u :::; 0 a: u.
1-
"' w u.
~ w u z <( .... ~ 0
13+00
TEST CONDITIONS ORIGINAL DESIGN
14+00
PENSTOCKS 7,000 CFS POOL ELEV 466 .00 FT TAILWATER ELEV 179.20 FT CONDUITS CLOSED 5 BAYS OPEN 14.0 FT(6,7 &8 CLOSED)
15+00 18+00 20+00 22 +00
STATIONS IN FEET ALONG CENTER L1 NE
200
"' z ::::;
100 a:
"' 1-z "' u
:::; 0 a: ... .... "' "' 100 u.
~ w u z
200 <( 1-1/)
0
300
24+00
MODEL B
WATER-SURFACE CURRENT DIRECTIONS TYPE I (ORIGINAL> DESIGN
DISCHARGE 108,000 CFS
'"U r ~ rn
w (Jl
w z ::::i a: w f-z UJ u
:::!: 0 a: u.
f-w w ....
::0: UJ u z < f-~ 0
TEST CONDITIONS
ORIGINAL DESIGN PENSTOCKS POOL ELEV
7,000 CFS 466.00 FT
TAILWATER ELEV 196.00 FT CONDUITS CLOSED S BAYS OPEN 28.0 FT (617 &8 CLOSED)
18+00 20+00
STATIONS IN FEET ALONG CENTER LINE
22+00
400
300
200
w z ::::i
100 a: w f-z w u
000 :::!: 0 a: .... f-w UJ
100 ....
::0: UJ u z
200 < f-If)
0
300
400
24+00
MODEL B
WATER-SURFACE CURRENT DIRECTIONS TYPE I <ORIGINAL> DESIGN
DISCHARGE 1931000 CFS
w z :::i a: "' f-z UJ u
J! 0 a: u..
1-UJ UJ IL
~ UJ u z < 1-'!2 0
14+00
TEST CONDITIONS
ORIGINAL OCSIGN PENSTOCKS POOL ELEV
1,000 CFS 466.00 fT
TAILWATER ELEV 205.40 fT CONDUITS CLOSED 5 BAYS OPEN 33.75:!: fT (6,7 &8 CLOSED)
18+00 20+00
STATIONS IN FEET ALONG CENTER LINE
22+00
400
300
200
1&.1 z :::i
100 a: 1&.1 f-z 1&.1 u
000 J! 0 a: IL
f-UJ UJ
100 IL
~ UJ u z
200 < f-!!! 0
300
400
24+00
MODEL B
WATER-SURFACE CURRENT DIRECTIONS TYPE I (ORIGINAL) DESIGN
DISCHARGE 243,000 CFS
"U r )> -i m w -...)
"' z ::::i
a: "' 1-z "' u
::li 0 a: IL
1-
"' w IL
!: w u z < 1-!!! 0
13+00
TEST CONDITIONS
ORIGINAL DESIGN
14+00
POOL ELEV 473.00 FT TAILWATER ELEV 242.00 fT CONDUITS AND PENSTOCKS CLOSED 8 BAYS OPEN fULL
15+00 16+00 16+00 20+00
STATIONS IN FEET ALONG CENTER LINE
400
300
200
"' z ...J
100 a: 11.1 1-z "' u ::li 0 a: IL
1-
"' w 100 IL
~ w u z
200 < 1-!!! 0
300
400
24+00
MODEL B
WATER-SURFACE CURRENT DIRECTIONS TYPE I <ORIGINAL> DESIGN
DISCHARGE 567,000 CfS
"'0 r
~ fTl
w z ..J
0: w 1-z w u
:::! 0 0: u.
1-w w u.
~ w u z <( 1-II)
0
13+00 14+00
TEST CONDITIONS
ORIGINAL DESIGN PENSTOCKS 7,000 CFS POOL ELEV 466.00 fT TAILWATER ELEV 176.50 FT CONDUITS CLOSED 5 BAYS OPEN 6 FT (6,7 &8 CLOSED)
15+00 18+00 20+00
STATIONS IN FEET ALONG CENTER LINE
NOTE VELOCITIES ARE IN PROTOTYPE FEET PER SECOND 2 FT OFF BOTTOM.
BED MOLDED IN CEMENT MORTAR TO NATURAL CONFIGURATION.
22+00
200
w z ..J
100 0: w 1-z "' u ::,; 0 0:: u.
1-w w
100 ... ~ w u z
200 <( 1-'1 0
300
24+00
MODEL B
BOTTOM VELOCITIES TYPE I (ORIGINAL> DESIGN
DISCHARGE 50,000 CFS
., r ~ JTI
w tO
w ~ ..J
a: w 1-z w u
:::!! 0 a: u..
1-w w u..
~ UJ u z <( 1-~ a
13-t-00 14+00
TEST CONDITIONS ORIGINAL. DESIGN PENSTOCKS POOL. EL.EV TAIL.WATER ELEV CONDUITS CLOSED
7,000 CFS 445.00 FT I 79.20 FT
5 BAYS OPEN (617 & 8 CL.OSED)
15+00 18+00 20+00
STATIONS IN FEET ALONG CENTER LINE
NOTE: VELOCITIES ARE IN PROTOTYPE FEET PER SECOND 2 FT OFF BOTTOM.
BED MOL.DED IN CEMENT MORTAR TO NATURAL CONFIGURATION.
22+00
200
w z ::i
100 a: w 1-z w u
:::!! 0 a: ... 1-w w
100 LL
~ UJ u z
200 <( 1-~ a
300
24+00
MODEL B
BOTTOM VELOCITIES TYPE I (ORIGINAL) DESIGN
DISCHARGE 1081000 CF'S
~ 0
... z ..J
a: ... .... z ... u
::1: 0 0 a: u.
.... ... ... u.
z ... u z <( .... !!! 0
13+00 14+00
TEST CONDITIONS
ORIGINAL DESIGN PENSTOCKS 71000 CFS
466.00 FT 196.00 FT
POOL ELEV TAILWATER ELEV CONDUITS CLOSED 5 BAYS OPEN 28 I'T (6,7&8 CLOSED)
15+00 16+00 18+00 20+00
STATIONS IN FEET ALONG CENTER LINE
NOTE: VELOCITIES ARE IN PROTOTYPE fEET PER SECOND 2 fT Off BOTTOM.
BED MOLDED IN CEMENT MORTAR TO NATURAL CONFIGURATION.
22+00
200
... z :::i
100 a: ... .... z ... u
::1: 0 a: u.
.... ... ... 100 u.
~ w u z
200 <( .... !!! 0
300
24+00
MODEL B
BOTTOM VELOCITIES TYPE I <ORIGINAL) DESIGN
DISCHARGE 1931090 CF'S
.... z
.J
a: Ill .... z Ill v
::ll 0 a: u.
.... .... .... u.
~ w v z <( .... ~ 0
13+00 14+00
TEST CONDITIONS ORIGINAL-DESIGN PENSTOCKS POOL ELEV TAILWATER ELEV CONDUITS CLOSED
7,000 C F'S 468.00 FT 205.40 FT
5 BAYS OPEN 33.75 rT (6,7 &8 CLOSED)
15+00 16+00 18+00 20+00
STATIONS IN FEET ALONG CENTER LINE
NOTE: VELOCITIES ARE IN PROIUTYPE FEET PER SECOND 2 FT OFF BOTTOM.
BED MOLDED IN CEMENT MORTAR TO NATURAL CONFIGURATION.
22+00
400
300
200
100
100
200
300
400
24+00
MODEL B
BOTTOM VELOCITIES TYPE I <ORIGINAL> DESIGN
DISCHARGE 243,000 CF"S
Ill z :::i a: Ill .... z Ill 0
::ll 0 a: u.
.... Ill w u.
~ w 0 z <( .... ~ 0
'1l r ~ IT]
1&1 z :::i a: 1&1 1-z
.1&1 u
:::!: 0 a: u.
1-UJ ... ... z 1&1 u z < I-~ 0
TEST CONDITIONS ORIGINAL DESIGN POOL ELEV 468.60 fT TAILWATER ELEV 212.60 fT CONDUITS & PENSTOCKS CLOSED 5 BAYS OPEN (6,7&8 CLOSED)
18-tOO
STATIONS IN FEET ALONG CENTER LINE
NOTE; VELOCITIES ARE IN PROTOTYPE fEET PER SECOND 2 fT Off BOTTOM.
BED MOLDED IN CEMENT MORTAR TO NATURAL CONFIGURATION.
22-tOO
200
1&1 z ::::i
100 a: 1&1 1-z 1&1 0
~ 0 a: ... 1-... 1&1
100 IL
z UJ u z
200 < 1-!!.! 0
300
24-tOO
MODEL B
BOTTOM VELOCITIES TYPE I (ORIGINAL> DESIGN
DISCHARGE 3001000 CfS
"' ~ ..J
a:
"' 1-z w u
::!; 0 a: ... 1-
"' "' IL
~ w u z < 1-<I)
Ci
TEST CONDITIONS ORIGINAL DESIGN POOL ELEV 473.00 F'T TAILWATER ELEV 242.00 FT CONDUITS & PENSTOCKS CLOSED 8 BAYS OPEN FULL
STATIONS IN FEET ALONG CENTER LINE
NOTE; VELOCITIES ARE IN PROTOTYPE fEET PER SECOND 2fT OH BOTTOM.
BED MOLDED IN CEMENT MORTAR TO NATURAL CONFIGURATION.
22-t-00
200
"' z ..J
100 a:
"' 1-z "' u
::I! 0 a: ... 1-
"' 1&1
100 .... z w u z < 200 1-!! 0
300
24-t-00
MODEL B
BOTTOM VELOCITIES TYPE I <ORIGINAL> DESIGN
DISCHARGE 567,000 CF'S
.J (/)
::li!
ti ILl
260
2&0
240
230
.... 220 ~ z 0
~ > ILl .J ILl
::; 210
!( ~ ~
200
IGO
180
;:>
¢ /
_(( "' v I /i
I L I I I
( :~ ~~ J f
I r LEGENQ
i/ I : Q =100,000 CfS. --C5 BAYS OPEN FULL l ,:~ <~ Q =200,000 CfS. -- C5 BAYS OPEN FULL)
I I ~ Q=250,000CFS.---C5 BAYS OPEN 33.75FTl
J ), ,( t Q = 300,000 C.FS. ----- C5 BAYS OPEN FULL)
I I 1 ~ 0 = 363,000 CFS. ---- C5 BAYS OPEN FULL)
1\ 1 1 I I 9 lo
\ I I I
,). l. NORMAL TAIL WATER
r l, £LEV.= 220.0 I
! ! I
I 16 p ::t I I I I I I
I I '· NORMAL TA/LWATER ELEV.=2/2.6
r"' I I I 1\ ~-1--1--l ..
\ \ NORMAL TAILWATER .,
!il r<. ELEV. = 205.4 1',
! \ ., (
,( ( '"0. .........
r '•r-.. ... ~. -!--
1 .. - - f? r-.. ... ~ 1 -r-·r--c~. "t \ \_ NORMAL TAILWATER t
ELEV. =196.0 "-, \ I
I 1"-- jo.., ...1'"\ -.... ~ ~ I ...
~'-· I""" I I
n ) ' I j_ ~ ) ~ :
\ o' ~ {_
NORMAL TAIL WATER I
,... ., ll ELEV.=/78.7
25 50 75 100 125
VELOCITY IN FEET PER SECONO- PROTOTYPE
NOTE: VELOCITIES MEASURED AT END OF APRON ON TOP OF 5.0 FT. END SILL. BED FIXED IN CEMENT MORTAR TO MODEL B NATURAL CONFIGURATIONS.
-----
150
EFFECT OF TAILWATER ELEVATIONS ORIGINAL DESIGN
PLATE 44
"'0 r )> ..; fT]
~
..J II)
::li
1-l&J l&J ... ! z Q 1-
~ l&J ..J l&J
370
330
290
250 \
210 TOP OF WALL
I 70
130
90
50
11+00 12+00
ELEV 210.0-..._
_,c_300,000 C F S
.-o----
370
330
290
250
210
170
-n,--~ii==="~ ~~r-~ >-·---. ~ ._L9llf2!L.C F S __ --· ____,
----<~==-:: p-------b-~ ...!..<Z.!.P!!..<?._£[_§__ -;11------------<~-------- --1
13+00 14+00 15+00 16+00
STATIONS IN FEET ALONG CENTER LINE
130
90
50
17+00 18+00 19+00
MODEL B
WATER- SURFACE PROFILES TYPE 2 DESIGN
..J II)
::li
1-l&J l&J ... ~
z Q 1-
~ l&J ..J l&J
~ ~--------------------------------------------------------------------------------------------------------~
'"U r )> ~ m
w z :::; a: w 1-z UJ u
~ 0 a: IL
1-UJ w IL
~ UJ u z <( 1-~ 0
13+00
TEST CONDITIONS
TYPE 2 DESIGN
14+00
PENSTOCKS 7,000 CfS POOL ELEVATION 466.00 fT TAILWATER ELEVATION 196.00 fT
CONDUITS CLOSED 5 BAYS OPEN 28.0 fT (8,7 &II CLOSED)
15+00 16+00 18+00 20+00
STATIONS IN FEET ALONG CENTER LINE
NOTE: VELOCITIES ARE IN PROTOTYPE fEET PER SECOND 2.0 fEET OfF BOTTOM.
BED MOLDED IN CEMENT MORTAR TO NATURAL CONfiGURATION.
22+00
400
300
200
100
200
24+00
MODEL B
BOTTOM VELOCITIES
TYPE 2 DESIGN DISCHARGE 193,000 CfS
11.1 z J a: w 1-z .... u
~ 0 a: IL
1-UJ UJ IL
z UJ u z <( 1-!!! 0
, r ~ ITI
\~ ~ ~ a: "" ~-r--- ~
~ "' ... ... ... ~ ~ ~ ~
~-r--~
..J
300 "' ::;
.... w
..J
"' 3 00 ::;
.... UJ
~ ~· V)l _..-£LEV . 210.0 V)
V)
~WATER SURFACE PROFILE w "-
UJ ...
-_ELEV /4~-~ -~ f--"'" --=--~ TYPE 13 E:LE 130.0
~ T , I- SCOUREO BED -- -U~ llEV !50 I-- --------II ,/
OR(GINAf oy/GN( Oi/GINIL 810 I
200 !!: z 0
100 ~ w ..J w
!'; 2 00
z Q !;( > UJ I 00 ..J w
11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00
STATIONS IN FEET ALONG CENTER LINE
PROFILE
~~_j_l_l_j___l_~sblw~l_LJ__L_Lj_LJ~
~~~~~~ L !15 0
" ~ 120~ I ~ ~ ~ ~ ... ... ~ ~
/!: ~ V) V)
200
w z ..J 100
a: w .... z UJ u
200
UJ z
100 ::i a: w f-z w u !iC?2 ~
~ --~
~ ~ ~ 0
::; 0
::; 0 a: "-
.... UJ 100 UJ "-
~ w u
200 z < .... ~ 0
30011+00 12+00
TEST CONDITIONS
TYPE 13 DESIGN
13+00
PENSTOCKS 0 crs POOL. EL.EVATION 466.00 FT
TAILWATER EL.EVATION I 76.50 FT
CONDUITS CL.OSED
5 BAYS OPEN 14.0 FT (6,7 &8 CLOSED)
14+00 15+00
, __ .. /
!20
~ '\- ~s ~ "'
8" BRICK WALL
~~--
16+00 17+00 18+00 19+00 20+00
STATIONS IN FEET ALONG CENTER LINE
PLAN
NOTE: SAND MOLDED fLAT TO ELEVATION 115.0 FT MSL
0 a: ...
~ 100 .... UJ UJ "-
t ;<: w
200 u z < .... "' 0
21+00 22+00 23+00 24+00 25+00 300
MODEL B
WATER-SURFACE PROFILE AND SCOUR PATTERN
TYPE 13 STILLING BASIN DISCHARGE 108,000 CFS
., r )> -4 JTI
~ C»
...J
"' 300 :::;
.:. UJ w ... ~ 200
z Q !:( > w 100 _J w
r\~ ~ ~ c "' ... ~
~ "' ' ... ... \\ ~ ;!; '!:! VH ~T£R SUR!> CEP roFIL
"' ~ ~ .., v "' ...,.-£LEV . 210.0
'\ kl f--T !-
£L£ 148.;', --~ 'E 13 sco R£0 ~£0 ... = p!._ 1£. !"V/30 / -- l. V/15. -· f--. 7 ·-1- 1-- 1--1--I-
OR~GINAf oytGN( O'i/GINIL BfO 7
I
_J
300 "' :::;
>-w w ...
200 ~
z 0
100 ~ w ...J w
11+00 12+00 13+00 14+00 15+00 16+00 + 17 00 18+00 + 19 00 20+00 21+00 22+00 23+00 24+00 25+00
STATIONS IN FEET ALONG CENTER Ll NE
PROFILE
300 l~lt~0~0~--1~2~+~0~0~~~3~t~O~O~~I~4~+~00~L-~15~+~0~0~~~~6L+O~O~L-~17~+~0~0~~1~8+L0~0~--1~9~t~O~O-L~2~0+L0~0~--2~1~+~00~L-~22~+L0~0~~2~3~+700~~2~4~+~070~~275+L0~0~ 300
TEST CONDITIONS
TYPE 13 DESIGN PENSTOCKS 0 CFS POOL ELEVATION 466.00 FT
TAILWATER ELEVATION. 195.00 FT
CONDUITS CLOSED 5 BAYS OPEN 28.0 FT (8,7 &8 CLOSED)
STATIONS IN FEET ALONG CENTER LINE
PLAN
NOT!:: SAND MOLDED FLAT TO ELEVATION 115.0 FT MSL
MODEL 8
WATER-SURFACE PROFILE AND SCOUR PATTERN
TYPE 13 STILLING BASIN DISCHARGE 193,000 CFS
"'0 r )> -f JTI
..J II) 300 :::;;
~ UJ
~ ~ ~ l~ ~ I~
UJ "- ~ t; _.....'!LEV. 2/0.:W
~ 2 00
z 0
\ ~ __.-!-""' ELE~ :/48.71 f.-TV:
~ > ---. - t::; t-UJ 100 ..J UJ DESiw• / T -1 I
w z ..J
a: w ... z UJ u :::;; 0 a: IL
... UJ UJ IL
200
100
0
100
I I •00 12+00
~ ll.i ... ~
~
"'
TEST CONDITIONS
TYPE 13 DESIGN
13+00
POOL ELEVATION 468.60 FT TAILWATER ELEVATION 212.60 rT
CONDUITS I. PENSTOCKS CLOSED S BAYS OPEN FULL (117&11 CLOSED)
14·
'E 1.1
·00
fiJ.. 'f.X)I,
15·>00
I~
~ v-"m "PR 'F"ILE
&;I- L -- r--
~ED
f-r-- --- ·-r-·-0~ L~l.8f~-;
16·>00 17·>00 18+00 19+00 20· •oo STATIONS IN FEET ALONG CENTER LINE
STATIONS IN FEET ALONG CENTER LINE
PLAN
NOTE: SAND BED MOLDED rLAT TO ELEVATION IIS.D rT MSL
..J
300 II)
:::;;
... UJ UJ ...
200 ~
z 0
·-...__ r-100 ~ w
..J UJ
21· >00 22 ·00 23· ·00 24· fOO 25· >00
200
UJ z
100 ::; a: UJ ... z w
0 u :::;; 0 a: "-
100 ... w w ... ~ w
200 u z < ... II)
a
MODEL.B
WATER-SURFACE PROFILE AND SCOUR PATTERN
TYPE 13 STILLING BASIN DISGHARGE 300,000 C F S
"'0 r ~ (TI
(]I 0
..J
"' 300 ::E ,.. "' "'
i'\~ Q
~ ~ :;: ..
\\ !)! ~ ~
..J
300 "' ::E ,.. UJ ... ~"' __.ELEV. 210.00
.., ----WATER-SURFACE PROFILE UJ ...
200 ~
5 ~
'\ ;::_ry LEV 158.50 L
' I -- -- 8.7
"' 100 ..J UJ ORt/NAf DiS/GN(
11+00 12+00
200
"' z :::i 100
a: IIJ ,..
g ... !)!
z UJ 1.)
0 ::E 0
~ -I
a: ... ,.. "' 100
"' ... ~ IIJ 1.)
200 z <( ,.. ~ 0
30011+00 12+00
TEST CONDITIONS
TYPE 14 DESIGN PENSTOCI\5
13+00
-
13+00
o crs POOL ELEVATION 466.00 FT TAILWATER ELEVATION 176.50 FT CONDUITS CLOSED 5 BAYS OPEN 14.0 FT (8,7 &8 CLOSED)
14+00
-
14+00
bE I~ .1" 200
~
z I ELEII 130. v scou EDt jED -1::::-= l-lf-1- f- ·-f--~- - f- 1------
Oi/GIN~L B~D-1
0
~ 100 >
UJ ..J IIJ
15+00 18+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00
STATIONS IN FEET ALONG CENTER LINE
PROFILE
1,-----L__LLI_l___L~s~w:d--LLJ=.II-r=D-=h_
~10~ [ f.- 115
~="~~ t ~~ I ... ~~~~ .
-
LJ L="s I-
~ I-
~~~~ ~ 7/10015~ J 8" 8 ICK W-!I,.L
200
UJ z
100 :::i a: UJ ,.. z "' 0 1.)
::;; 0 a: ...
100 ,.. "' "' ... ~
"' 200 u z <( ,.. "' a
15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 300
STATIONS IN FEET ALONG CENTER LINE
PLAN MODEL B
NOTE: SAND BED MOLDED FLAT TO
ELEVATION 115.0 FT M S L
WATER-SURFACE PROFILE AND SCOUR PATTERN
TYPE 14 STILLING BASIN DISCHARGE I 08,000 C F S
"'J r ~ JT1
(JI -
.J U) 300 :::!! ' ...
~ Q
~~ :;: !)!
UJ UJ IL
~ 200
z
~I; _.-£LEV. 210.00
\ -""' TYPI. J-r,;-
__... ru-v '58.50 I'-.
0
~ > UJ
" 8 ELEo 1.10.1 -- -- I '7' ~· ::::-100
.J UJ ORtNAt DJSIGN(
11+00 12+00
200
UJ z .J 100 ~ a: UJ ...
~ ... !)!
z .... ~ u
0 :::!! 0
., ~
a: IL
... UJ 100 UJ IL
~ UJ u 200 z ~ !!! 0
300 11+00 12+00
TE:ST CONDITIONS
TYPE 14 DESIGN
13+00
-
13+00
PENSTOCKS 0 Cf'S
14+00 15+00
-
14+00 15+00
i _J
~ .. 300 II)
::; ~
I! 1--UJ ., !---;'WATER-SURFACE PROFILE UJ IL
200 ~
SCGI REO ~EO z ..c.
r-- ·- ·-r ·- --r--r- 1---f----1--
OjiGINIL SiD I
0
100 ~ UJ .J UJ
16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00
STATIONS IN FEET ALONG CENTER LINE
PROFILE
,---L_L l_l_l_ _L ~Bb)W~ j_ L_l_j__j_ LLJ~
--------'::--,oo~~ ------ L
!hrn~ \ ~, -
200
UJ z
00 :::; a: UJ t-z UJ
0 u ::;
• r'~ ,,, j"' 1-
1-
~ t 8" BRICK WJ!k..L
0 a: "-
100 t-UJ UJ IL
~ UJ
200 u z <( 1--II)
Ci
16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 300
STATIONS IN FEET ALONG CENTER LINE
PLAN MODEL 8
POOL ELEVATION 4118.00 f'T TAILWATER ELEVATION 186.00 f'T
NOTE: SAND BED MOLDED FLAT TO
ELEVATION 115.0 FT M S L
WATER-SURFACE PROFILE AND SCOUR PATTERN
TYPE 14 STILLING BASIN DISCHARGE 193,000 CF S
CONDUITS CLOSED 5 BAYS OPEN 28.0 f'T (11,7 ol II CLOSED)
"'0 r ~ fTI
()I [\)
_J II) 300 ::=;
1-
"' "'
r-,~ <> ~ ~
~~ i ... ~ _.-w. TER- URFA E p~ joFtU ~ L" ... ~ r-ELEV. 210.00 .- "'r- -.
~ 200
z 0
~ >
\ ['......_ ..---~ -ELEV "58.50 TYP~
,, I !'------ - IL7
"' I 00 _J
"' OR(GINAf DEt'GN(
"' z :::; a: "' 1-z "' u ::=; 0 a: .... 1-
"' "' ...
11+00
200
100
0
100
30011+00
12+00
!;! !!! ... ~
>! .,
12+00
TEST CONDITIONS
TYPE 14 OESIGN
13+00
13+00
POOL ELEVATION 468.60 FT
TAILWATER ELEVATION· 212.60 FT
CONDUITS L PENSTOCKS CLOSED 5 BAYS OPEN FULL (6 7&8 CLOSED)
14+00
14+00
'" ELEV 30.0 __..-sco URED BED
= 1-r-- 7
O'i'GJNIL sri 15+00 16+00 + 17 00 + 18 00 + 19 00 20+00
STATIONS IN FEET ALONG CENTER LINE
15+00 16+00 17+00 18+00 19+00 20+00
STATIONS IN FEET ALONG CENTER LINE
PLAN
NOTE: SAND BED MOLDED FLAT TO ELEVATION 115.00 FT MSL
J
300 II)
:::;
1-
"' w ... 200
~
z 0
1-·- ·-r-- -1---1--;::
100 ~ "' _J w
21+00 22+00 23+00 24+00 25+00
200
w z :::; a: w 1-z w
0 u
::;; 0 a: ...
100 1-w w ... ~ w
200 u z .. 1-~ a
21+00 22+00 23+00 24+00 25+00 300
MODEL B
WATER-SURFACE PROFILE AND SCOUR PATTERN
TYPE 14 STILLING BASIN DISCHARGE 300,000 C F S
~ ~ () ~ :::l
~~ :;: .... ' ~ ... ~ ~ !!!
~
...J
300 "' ::!
f-UJ
...J
"' 300 ::! ,... UJ UJ ~ ~:;; ~ __-'ELEV. 210.00 "' /""'W. TER- ~(!RFA E p~ 'OFIL
UJ "-"-
\\ rlo.J:r ELEV 158.5 ~ 2 00
z 0 ...
T-rl----~ >
OR(G/NAf DEISIGN(
UJ 100 ...J UJ
11+00 12+00
200
w z :::i 100 Q
!!! ... !!!
a: UJ ,...
~ z w
"' \ 1.)
0 ::! 0 a: .....
f-UJ 100 w "-
~ w 1.)
200 z < f-~ 0
300 I 1+00 12+00
TEST CONDITIONS
TYPE IS DESIGN
13+00 14+00
~c=J ~ c:::=:J_L ~ c:::=:J Lr6.0'
"'.------. ~' _rl6.0
c:::=:JT c=::J
13+00 14+00
PENSTOCI\5 0 crs POOL ELEVATION 466.00 f"T
TAILWATER ELI:VATION 176.50 fT CONDUIT5 CL05ED
5 BAYS OPEN 14.0 fT (817 &8 CLOSED)
-
L TYPE 15
200 ~
z LEV '.JO.O f--SC VRE BED
f- ·-I- 1---I--~- I-- ·- 7 Oi/GINIL BiOI
0
100 ~ UJ ...J UJ
15+00 16+00 17+00 + 18 00 + 19 00 20+00 21+00 22+00 23+00 24+00 + 2:. 00
STATIONS IN FEET ALONG CENTER LINE
PROFILE
1,---l __L j_!_j_ _j__ ~Bk)w:d-- . Ll __l-__L__ L D~ 200
~~~o~ 2:>- 115 125 ~ .. 5:1 "' .':\ ... c!!7 ~"' ~, v~ f/0
~~-'o t) ~~ ~ ~~~
8" BRICK WALL
15+00 16+00 17+00 18+00 19+00 20+00
STATIONS IN FEET ALONG CENTER LINE
PLAN
NOTE: SAND BI:D MOLDED fLAT TO ELEVATION 115.00 fT MSL
r ~ -
UJ z
100 :::i 0: UJ f-z UJ
0 1.)
~ ::! 0 0: "-
100 ,... UJ UJ "-
J ~ UJ
200 1.) z < f-<I)
0
21+00 22+00 23+00 24+00 25+00 300
MODEL B
WATER-SURFACE PROFILE AND SCOUR PATTERN
TYPE 15 STILLING BASIN DISCHARGE I 08,000 C F S
"'0 r ~ m 01 .boo
_J
"' 300 :::; ;_ "' w ...
~ a Q i
' f--~
~ ~ ... ... ~
.... :)!: !!! !'- !\!
~ ~~--- -~ ~ r--~ "' "' .--ELEV. 210.00 !---WATER StmFACE PROFILE:
_J
300 "' :::;
... w UJ ...
~ 2 00
z 0
\ ~ J- TYA 16 to·-~ ---E:IIV /58.50
FYJc
200 ~
z ~ > "' 100 _J UJ
r---- -- ·:r OR(GINAf DISIGN~~ 12500
lltOO 12+00 13+00 14+00
300 11+00 12+00 13+00 14+00
TEST CONDITIONS
TYPE 18 DESIGN PENSTOCKS ·0 CI'S
POOL ELEVATION 468.00 I'T TAILWATER ELEVATION 1711.$0 I'T
CONDUITS CLOSED 5 SAYS OPEN 14.0 I'T (6,7 && CLOSED)
I "p-~ <:._J COUR 0 BEp
r- r-Oi/G/Nt BiD I
15+00 18+00 17+00 18+00 19+00 20+00
STATIONS IN FEET ALONG CENTER Ll NE
PROFILE
15+00 16+00 17+00 18+00 19+00 20+00
STATIONS IN FEET ALONG CENTER LINE
PLAN
NOTE: SAND BED MOLDED FLAT TO ELEVATION 115.00 I'T MSL
0
·------ ----- ~ 100 > w
_J UJ
21+00 22+00 23+00 24+00 25+00
200
UJ z
100 :::; a: UJ ... z w
0 u :::; 0 a: ...
100 ... "' w ... ~ w
200 u z <( ... "' a
21+00 22+00 23+00 24+00 25+00 300
MODEL B
WATER-SURFACE PROFILE AND SCOUR PATTERN
TYPE 16 STILLING BASIN DISCHARGE I 08,000 C f S
~~ ~ Q i ~~ 1:;: ~ ... ~ ::t '!!
~~ "" ~ _.-£LEV. 210.0 "' ./'!---WATER-SURFACE PROFILE
\ ~ TY~/7 ~ ~ L
ELEV 58.5 ,.-- !-----' lEV !<Ia
' I r--- ·ri· F- ---.......:: f.-S OUR~ 0 BE -- 7
8 ~- ·c= I-
OR G/Ni li:Sii-f"' EL£ 12S:Clli Oi/GINIL BID I
..J
"' 300 :::;
;... "' "' ... ~ 2 00
z 0
~ "' 100 ..J
"' 11-100 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00
UJ z ...J 100
a: UJ 1-z UJ u
TEST CONDITIONS
TYPE 17 DESIGN PENSTOCKS •0 crs POOL ELEVATION 488.00 FT TAILWATER ELEVATION 178.50 rT CONDUITS CLOSED
5 BAYS OPEN 14.0 FT (8,7 &8 CLOSED)
STATIONS IN FEET ALONG CENTER LINE
PROFILE
STATIONS IN FEET ALONG CENTER LINE
PLAN
NOTE: SAND BED MOLDED FLAT TO
ELEVATION 115.0 FT M S L
--I- - t---
21+00 22+00 23+00 24+00
MODEL B
I-- -
25+00
300
200
100
200
100
..J
"' :::;
1-
"' "' ... ~
z 0
~ > "' ..J
"'
UJ z :::; a: UJ 1-z UJ u
:::; 0 a: ...
100 I;; "' ...
WATER-SURFACE PROFILE AND SCOUR PATTERN
TYPE 17 STILLING BASIN DISCHARGE I 08,000 C F S
'"0 r )> -1 fT1
(J1 0)
..J
"' 300 ::;
1-w w
I\~ ~
~ ~
~\\ '11 ... ... ~ ~ ~
..J
300 "' ::;
1-w
... ~ ~ _.ELEV . 210.00 "' vWA 'ER- URFA E:Pfl FILE UJ IL
!!: 200
z 0
\ \::: ~TY/ f: 18
/ ·EL '~'"" ·~·/
~ > w
' - I £. - -- 'T It·--100
..J UJ OR[GINAJ OttGN(
ST.
11+00 12+00 13+00
200
UJ z ::; 100
a: ~ ~
w 1-z w u
0
.,_ ~
~ -::; 0 a: IL
1-w 100 UJ IL
~ UJ u 200 z < 1-
"' Q
300 11+00 12+00 13+00
TEST CONDITIONS
TYPE 18 DESIGN PENSTOCKS •0 CFS
POOL ELEVATION 466.00 FT
TAILWATER ELEVATION 176.50 FT
CONDUITS CLOSED
5 BAYS OPEN 14.0 FT (6,7 &8 CLOSED)
14+00
~ .,; 0 .,._ ~
>! "' ~
14+00
/ rVt:fi -./)()
200 ~
z v 125. 00_ -~ 1---s OUR 'D BE£ -- - ·-.---·-1--I--f-- - f---I-- -
14t-O .46 OriNJL s~o----1
0 ;::
100 ~ UJ ..J w
15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 2!'>+00
STATIONS IN FEET ALONG CENTER LINE
PROFILE
,---1 __l__ l_l__j_ _L ~s~w:d-- _L L_1 ___L _l_ j_LJ~
0--~~~ L !Ol IS~ I
!~\~~ ~ \ :q ,!.). J ~
J£ ~ -
~ 5 -
,,~
t ~ 8" BRICK WALL
200
w z
100 ::; a: w 1-z w
0 u
::;; 0 a: ...
100 1-w w ... ~
w 200 u
z <( 1-<I)
0
15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 300
STATIONS IN FEET ALONG CENTER LINE
PLAN MODEL 8
NOTE: SAND BED MOLDED FLAT TO
ELEVATION 115.0 FT MSL
WATER-SURFACE PROFILE AND SCOUR PATTERN
TYPE 18 STILLING BASIN DISCHARGE I 08,000 C F S
""0 r )> -f FTl
1\~ c
~" lli ~
_j !I) 300 ::;
;.. ILl ILl ~ ~ .;-ELEV. 210.00 "' ...
\ N -~ E 18 -IELE ~7.5£ ./ EL
~ 200
z 0
' - I EL -- - -rt· ~ >
ORtiNAt DjSIGN ( ST.
ILl 100 _j
ILl
11+00 12+00
200
UJ z
~ ~
J 100
a: UJ ... z UJ I.)
0 II)
::; 0 a: ... ... UJ 100 ILl ... ~ ILl I.)
200 z < ... ~ a
300 11+00 12+00
TEST CONDITIONS
TYPE 18 OESIGN PENSTOCKS
13+00
-
13+00
o crs POOL ELEVATION 466.00 fT TAILWATER ELEVATION 195.00 FT CONDUITS CLOSED S BAYS OPEN 26.0 FT (8,7 &8 CLOSED)
14+00
~ ~ ... ::! ~
"' -
14+00
V/4 .00
Vl .00 r-
141-0 .46
15+00
1~00
i _j
<:) ... .. 300 !I)
::; ~ ;! ...
l1J
"' 1--W. TER SURF. ~E Pli ~ILt _, l1J u.
200 ~
f--SC URE 11£0 z -<--i--
I- T ·-r- t- t--r-- f-
OiiGIN~L 810 I
0
100 ~ ILl _j ILl
16+00 17+00 16+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00
STATIONS IN FEET ALONG CENTER LINE
PROFILE
,--l __l_ l_l_l_ _j_ ~skJ-w-.J--l_ Ll _.1_ _j_ l_L_j~
~~,'-gs/ __/ ~ / L Y/o 100 115
~~\~)' ~ ~~ .. C ..
- -
'~~~ r-
r-
t " BRICK WALL
200
UJ z
100 J a: ILl t-z UJ
0 I.)
::; 0 a: ...
100 t-UJ ILl ... ~ UJ
200 I.) z < t-!I)
0
16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 300
STATIONS IN FEET ALONG CENTER LINE
PLAN MODEL B
NOTE: SAND BED MOLDE:D FLAT TO E:LE:VATION 115.0 rT MSL
WATER-SURFACE PROFILE AND SCOUR PATTERN
TYPE 18 STILLING BASIN DISCHARGE 193,000 C f S
, r > -i ['1'1
(11 ()D
_J U) 300 ::i
1-w
~ 51
~ ~ ~ w "- ~ t; ...-ELEV. 210.00
~ 200
z 0
\ ~ ~ ~T~
E 18 r-EI.EV /.f.7.5G El.
~ ' I EL -- -- -rlt· w 100 _J w ORIGINAl 015/GN(
ST.
11+00 12+00
200
w z :::i 100
a: w 1-z ;!: w 1.)
0 ..,
::i 0 a: "-1-UJ 100 UJ ... ?: UJ 1.)
200 z < 1-"1 0
300 11-t-00 12-t-00
TEST CONDITIONS
TYPE 18 DESIGN
13+00
13+00
POOL ELEVATION 468.60 fT
TAILWATE:R ELEVATION 212.60 fT CONDUITS L PENSTOCKS CLOSED 5 BAYS OPEN fULL (6 7&8 CLOSED)
14+00
14-t-00
V/4 oo· V/2 .oo·
• l.f.fl '.46
15+00
15+00
~ ~ ... ~
i'! .., k -WA ER- URFA EP 'OF/I.
k f--S OURE: BEl
- -- ·-·- ·-Oi/GIN11. BID-I
16+00 17+00 18+00 19+00 20+00
STATIONS IN FEET ALONG CENTER LINE
16+00 17+00 18+00 19-t-00 20+00
STATIONS IN FEET ALONG CENTER LINE
PLAN
NOTE:: SAND MOLDE:D FLAT TO E:LE:VATION 115.0 fT MSL
_J
300 U)
::i
1-UJ UJ "-
200 ?: z 0
- -- ·-;-- -I--r-100 ~ w
_J w
21+00 22+00 23+00 24+00 25+00
200
UJ z :::i a: w 1-z w
0 1.)
:::; 0 a: "-
100 1-w w "-
;;: w
200 1.) z <( 1-"1 0
21+00 22+00 23+00 24+00 25+00 300
MODEL B
WATER-SURFACE PROFILE AND SCOUR PATTERN
TYPE 18 STILLING BASIN DISCHARGE 300,000 CFS
400
300
200
"' z ::;
100 a: w ... z ... u ::; 0 0 a: ... ... ... "' .. ~ 100
w u z <( ... "' Ci 200
300
400
-
r -
(/ """ /TOP OF WALL
!-£LEV 210.0
WATER-SURF'AC£ PROF'JL£
200
~ ~ 200
IT f I I II {~ -
~ 100 12+00 13+00 14+00 15+00 16+00 17+00 16+00 19+00 100
400
300
STATIONS IN FEET ALONG CENTER LINE
- - 200
/ '1-r--T--~ ~ 11---- ~- f!--
==== ~ ~ 7 " !U~ .!.2J.-- ~ ~ K 00 -
------I
I ~ ~ ' r- ~ =· '--- / ~ ( ~ -/ ~ ~ ~ ~ ~-90.7 ~~ ""?3'- ~ ~ .. -- r---- --r--· -- --
~ I ... - -/ rz I~ ~ ~ !!1 ~ ~ ~
~ ~ ~ ., ~ ~ ' "' ~ .!!!_., E .,
• j - ~ ~ "- ~0 ~ ~ ~ 1\ ~ ~
-I -'--'=" :::.._. ....... , "==== ..
y ' ' m:hd::: .... ~~ ~~ ~ 1\ ' - ----, r-~ -~[' I I Ill L( ~
- -_,,~~)
~ - pENS t-- ~ ~ I --- ----, r-
~ __ , () ) 7. r----- TAILRACE CHANNEL
k !'~;NST()(;I< N . --- ,....__/ r- .... 0
----, t--::::_ --- -., ()) t-- A l l l 1 l UJ
-N OCI< NO- r-- 0 ;;; :::: ,_./ t-- rr ~
II~ ~ ..
~ ACCESS ...... ~ ' ~ Q i=; PARKING
~r~ ~ ~ II
~ ~ -
'-'J l I ·11 --.... - ~
0
00
200
300
400
13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00
TEST CONDITIONS
TYPE Ill DESIGN PENSTOCKS 7,000 CFS POOL ELEVATION 466.00 FT
TAILWATER ELEVATION 196.00 FT CONDUITS CLOSED 5 BAYS OPEN 28.0 FT (e171.e CLOSED)
STATIONS IN FEET ALONG CENTER l-INE
NOTE: VELOCITIES ARE IN PROTOTYPE FEET PER SECOND 2.0 FEET OFF BOTTOM.
BED MOLDED IN CEMENT MORTAR TO NATURAL CONFIGURATION.
MODEL B
BOTTOM VELOCITIES TYPE 18 STILLING BASIN
DISCHARGE 193,000 CfS
... z ..J
a: w ... z w u ::; 0 a: .. ... ... ... ... ~ ... u z <( ... "' Ci
.., r
400
~ rn
0) 300
0
200
.... z :::i 100 0: .. 1-z "' v
:1 0 0 0: ... 1-w .. IL
~ 100
w v z < 1-Cl)
0 200
300
400
:----
r ,_
(/ -
[ J j I 1T ---......;_
400
300
,_
~ ;I -
~ ~ ~ / ~ ~ ~ F= = -- 1.2
~ ..... gzz:gtT.6., v-- ~ -I
~~ ~ = - / " "' fL- ~ ~ Ill Ill
/ " Ill JllODa.t:" £Lev rY------ " ~ 1/$.00 ., --1---- ---
~ "' ~
p.L-~ l'llOID ~ :!4. ~ fl--____.,... "'
~ "' _"'-,. ...... 5.12~ ~ ~ -.... -......; ~ r\
-I
6= \. ~ ~
~l:J:: ~
::.___ ----, r--~ I I Mil rr f_[ P:
-_pEN I --- -~\~~) f--
R - ----, f-- ~ TAILRACE CHANNEL
pEN~~~: __ ,C.'}
' .... --" r-- 1-- o- I~
~ ----, f--- _, C•) f-- A l 1 1 1 j [I
-
~~~~~~ ~ ,_,..., r-- rrr ::>
~ ~ ~ ACCESS ~
R: I o PARKING AREA
~r~ ~ (> -
~J Jill ----..... ~~ '---- ~
200
00
0
00
200
300
400
13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00
TEST CONDITIONS
TYPE 19 DESIGN PENSTOCKS 7,000 CF'S POOL ELEVATION 466.00 FT TAILWATER ELEVATION 196.00 FT CONDUITS CLOSED 5 BAYS OPEN 28.0 FT (8,7 &8 CLOSED)
STATIONS IN FEET ALONG CENTER L1 NE
NOTE: VELOCITIES ARE IN PROTOTYPE FEET PER SECOND 2.0 FEET OFF BOTTOM.
BED MOLDED IN CEMENT MORTAR TO NATURAL CONfiGURATION.
MODEl B
BOTTOM VELOCITIES TYPE 19 STILLING BASIN
DISCHARGE 193,000 CFS
w z :::i 0: .. 1-z ... u
:1 0 0: IL
1-w w IL
~ w v z < 1-d)
0
"0 r )> -1 fTI
0>
"' z J a: "' 1-z ... u
:::! 0 a: ... 1-... ... ...
w u z ~ Cl)
Q
;--400 r-
"'[ I 1 1 1 T( 200 r-
F= 100-
100
200
300
400
-"===
--~
--~ -
....___ 13+00 14+00
TEST CONDITIONS
TYPE 22 OESIGN PE N$TOCKS 7,000 CFS POOL ELEVATION 466.00 FT TAILWATER ELEVATION 179.20 FT
CONDUITS CLOSED
15+00
5 BAYS OPEN 14.0 FT (6,7 &6 CLOSED)
/
18+00
\[ST. u•H.OO STA 121-60.00 I~
l 200 ~zeee
100 12+00 13+00 14+00
STATIONS
17+00 IIS+OO 19+00 20+00 21+00
STATIONS IN FEET ALONG CENTER LINE
NOTE: VELOCITIES ARE IN PROTOTYPE FEET PER SECOND 2.0 FEET OFF BOTTOM.
BED MOLDI!O 11'0 CEMENT MORTAR TO NATURAL CONFIGURATION.
1!1+00 IN FEET
22+00
1- 400
~-..,-f-- WATER- SURFACE PROFILE 200
(--
16+00 ALONG CENTER
23+00
17+00 18+00 19+00 100
LINE
1- 300
- 200
- 100
- 100
"' z ..J
a: "' 1-z ... u
1-
"' ... ... '!: ... u z
~ -200 Q
- 300
- 400
24+00 25+00 26+00 27+00
MODEL B
BOTTOM VELOCITIES TYPE 22 STILLING BASIN
DISCHARGE 1081000 CFS BED MOLDED TO NATUR[\L CONFIGURATION
'"0 r )> -1 m 0') [\)
... z :::; a: "' 1-z "' u
:1 0 a: ... I
"' "' .. !!:
"' u z ~ "' 0
-400-
200-
;;;====·
100-
100 1-
3.1.6
21.6
~
29.6
L / ~ p!-
7.6 p2.4 ~
p.!
~~ IO.Q
"' ... ~
~~ f!41
116 10.1
1- 400
200
SIMULATED SCOUR ----·
IOOL~~--~~~n-~==~;;==~:;~;::::: .... ~~~~~~=:==~~--J--,ft±~--~100 12+00 13+00 14+00 IS+OO 16+00 17+00 18+00 19+00
1- 300
STATIONS IN FEET ALONG CENTER LINE
-200
~ ~
~ -I 00
.i:L
--+-- ---f-- --+-- --+---·--·- ·- 0 ~ ~
-· ·-!---·
~ ~
~ -100
"' z .J
a:
"' 1-z "' u
1-
"' ~ !!:
F==
200 r-t---I=--
W::::t~ :,,:;::\~ ~ I I , - I I ~-L-L~~-L~~-L~L
~ .. I"
w u z < 1-'!2
-200 °
300
400
t---F--r-t---
--- ----, _, ()) ~, _ _.....
- 300 -=/
a:~ a 1-
..___
PARKING AREA
~ ~~~!ill~ '--. ~"' ~ - 400
13+00 14+00
TEST CONDITIONS
TYPE 22 DESIGN PENSTOCKS 7,000 CfS POOL ELEVATION 466.00 fT
TA1LWATER ELEVATION 179.20 fT CONOU ITS CLOSED
15+00
5 BAYS OPEN 14.0 FT (&,7 &8 CLOSED)
16+00 17+00 16+00 19+00 20+00 21+00
STATIONS IN FEET ALONG CENTER LINE
NOTE: VELOCITIES ARE IN PROTOTYPE FEET PER SECOND 2.0 FEET OFF BOTTOM.
BED MOLDED IN CE:MENT MORTAR TO SIMULATED SCOUR.
22+00 23+00 24+00 25+00 26+00 27+00
MODEL B
BOTTOM VELOCITIES TYPE 22 STILLING BASIN
DISCHARGE 108,000 CFS BED MOLDED TO SIMULATED SCOUR
"' z J a: UJ
ti: "' u
~ 0
ft .... "' "' .. ... u z <( .... "'
-400-
200-
=== 100-
'
100-
"===
0 200--~
300-
400~ 13+00 14+00
TEST CONDITIONS
TYPE 22 OESIGN PENSTOCKS 7,000 CFS
POOL ELEVATION 466.00 fT TAILWATER ELEVATION 196.00 fT
CONDUITS CLOSED
15+00
S BAYS OPEN 28.0 rT (8,7 &8 CLOSED)
16+00
~~€~;~g· 200 STA r.J+ZOOO
<£ ,..,
~ -100
12+00 13+00 14+00 STATIONS
-4_ FL f4-
~ ~ ~
17+00 18+00 19+00 20+00 21+00
STATIONS IN FEET ALONG CENTER LINE
NOTE: VELOCITIES ARE IN PROTOTYPE FEET
PER SECOND 2,0 FEET OFF BOTTOM.
BED MOLDED IN CEMENT MORTAR TO NATURAL CONFIGURATION.
1~+00 IN FEET
~
22+00
~I~L-WATER -SURFACE
1- 400 PROFILE
200 '
111+00 ALONG CENTER
~
23+00
17+00 18+00 19+00 100
LINE
1- 300
- 200
-I 00
-100
"' !': -' a: UJ .... z "' u
.... "' "' ... !':
"' u z <( .... !!!
- 200 °
- 300
- 400
24+00 25+00 26+00 27+00
MODEL B
BOTTOM VELOCITIES TYPE 22 STILLING BASIN
DISCHARGE 193,000 C F S BED MOLDED TO NATURAL CONFIGURATION
'1J r > -i f'Tl
"' z J a: w 1-z "' u
::l! 0 a: ... 1-w w ... ~ w u z < 1-., Q
400
300
14+00
TEST CONDITIONS
TYPE 22 DESIGN PENSTOCKS 7,000 crs POOL ELEVATION 486.00 FT TAILWATER ELEVATION 196.00 FT CONDUITS CLOSED S BAYS OPEN 28.0 fT (8,7 &8 CLOSED)
100 12+00 1+00
20+00
WATER-SURFACE PROFILE
14+00 15+00 16+00 17+00 STATIONS IN FEET ALONG CENTER LINE
21+00 22+00
19+00
27+00
ALONG CENTER LINE
NOTE: VELOCITIES ARE IN PROTOTYPE FEET PER SECOND 2.0 FEET OFF BOTTOM.
BED MOLDED IN CEMENT MORTM TO SIMULATED SCOUR.
MODEL B
BOTTOM VELOCITIES TYPE 22 STILLING BASIN
DISCHARGE 193,000 CFS BED MOLDED TO SIMULATED SCOUR
w z ..J
"' w 1-z w u
::l! 0 a: ... 1-w w ... ~ w u z < 1--
"' Q
400
300
200
.. z .J 100 a: "' I-z "' u
:1 0 0 a: ... I-w ~
:!': 100
200
300
400
r---
r - / - 400 ~A t2+IJO.DO ;:ATER-SURFACE PROFILE
~
( 200 ~+2<?.00 ~~STAf5+Tf.OO 200
IT I I I IT 1- 300
__u. td. 100 100 12+00 13+00 14+00 15+00 16+00 17+00 IB+OO 19+00 --= STATIONS IN FEET ALONG CENTER LINE
-~
~ ~
- 200 _..Jb
~ f~ / ~ ~ ~ ~ ===== 1!!1. &U__ ~ ..,___ ="-- 33.6. - -I 00 ---- ~ ~ ~ 69.6- ~ ~ ' ~ = '=/ ~ ~ !QL__ '\ / ~ ~ ~ .. ·- ~ 81J.I 6U ~ .4 4 .7
~-.,..,
r--- r--- 0 -· / ~-- ....._-- --
~ ~ - ~ ~ "-~ ~ ~ I' "' 67.9 E.L"' ~ ~~ ' \ ~ .....
~ ~ '-" -~ zu_ 77. ::""-"=- ...... ~ ~ 1\ ~
-I 00
"'==== '"'"' '\ \. ~\ ~
~D= ,
~<!I \ ----, "'l I I I ll Q_ t( ~ - --\~~) r-
~ - 200
~
~~~---r-
' !>
~ ----.... ~ TAILRACE ~ ..
__ ,C.'} r- CHANNEL
t I' PENS --- ,..__-/ f-- ., ----z,;
K ----, f---
1 i~~I;_-_, ()) f-- A 1 1 1 l j lD IT ~
- 300 ?;; ~ ,_..,.. f-- ,, ..
~ ~ ACCESS ~
Q ~
a: PARKING
AA,. Kr ~ \
~ ~ 0 II
f>- ~; - 400
~1 l I 11 ~l": ---.
....__ ~ f<.. 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00
TEST CONDITIONS
TYPE 22 DESIGN POOL ELEVATION 486.60 F'T TAILWATER ELEVATION 212.80 FT CONDUITS L PENSTOCKS CLOSED
5 BAY$ OPEN FULL (6,7&8 CLOSED)
STATIONS IN FEET ALONG CENTER LINE
NOTE: VELOCITIES ARE IN PROTOTYPE FEET PER SECOND 2.0 FEET OFF BOTTOM.
BED MOLDED IN CEMENT MORTli<R TO NATURAL CONFIGURATION.
MODEL B
BOTTOM VELOCITIES TYPE 22 STILLING BASIN
DISCHARGE 300,000 CFS BED MOL.DED TO NATURAL. CONFIGURATION
"' z :J a: "' I-z "' u
:1 0 a: ... I-w w "-
:!':
400
300
200
"' z :::;
100 a: "' .... z ... u
::! 0 0 a: "-.... "" ... "-
~ 100
w u z <( .... "' 0 200
300
400
-
r - i
/ 1-' 400 I~A/2+00.00 WATEH-SUHI'ACC PfiCFILC
-· LEV ZIO.O ~TAI$.,.71.00"'"-...,. i 200
~ ~ 200
IT r I 0 ,--
r f IT /SIMULATED SCOUR 1- 300
-...;,_ 100 100
\~ '!!- 12+00 1;>+00 14+00 15+00 16+00 17+00 18+00 19+00 STATIONS IN FEET ALONG CENTER LINE
- ~ t tZ ~ - 200
~ ~
k-p / h-r-.- ~ ;;=== 76.0 7S.~ ~Ms ~ - I 7.2'" -I 00
tt !!!. ~ tffl li:i .r ~ ( ' ,. ~./.3 51.3 ~lru 1;.4 -· ~
70.0 ~· --t--· --1------ --
'1 A 0
~ >!! ~ ~
~ "' ~ IP.L ~"' 1m I ..2!. _fl i- ~§U_ ~ ~ ~
-I 00 6=
'\.I ~ ~ I- ...
ll~L ,
rU
f l l ----, ~ I l ~ {_( P:
1- _, ()) f-- - 200 I-- r-1=-- PEN I --- ,...__/
\ R ----, r;, rA\ ~ACE CHAM r!_L r-~N~---__ , ()}
I-- , __ , ~
~ I-- ----, I--1- '"'\ ()) ~ / l l l 1 j lD
- 300 r- 7~~rrr ~,_...,. rr ti ~ ACCESS """' ~
R: ~ I o PARKING AREA
~ r ~ 1-
~ II f> ~ - 400
~I I I'll ~ ---...
'---13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00
TEST CONDITIONS
TYPE 22 OESIGN POOL ELEVATION 468.80 fT
TAILWATER ELEVATION 212.60 fT CONDUIT$ & PENSTOCK$ CLOSED 5 BAY$ OPEN FULL (6,7&8 CLO$EO)
STATIONS IN FEET ALONG CENTER LINE
NOTE: VELOCITIES ARE IN PROTOTYPE FEET PER SECOND 2.0 FEET OFF BOTTOM.
BED MOLDED IN CEMENT MORTAR TO SIMULATED SCOUR.
MODEL B
BOTTOM VELOCITIES TYPE 22 STILLING BASIN
DISCHARGE 300,000 CFS BED MOLDED TO SIMULATED SCOUR
... z :::; a: "' .... z "" u
::! 0 a: "-.... ... ... "-
~ ... u z < ,_ "' 0
"'0 r)> -+ rn.
m . ...,_
"' z :::; a: "' ,_ z "' u
,_ "' "' ...
uJ u z < ,_ "'
r-400 f-.
300 [ . I 200 f-.
I=== 100 1-
lOOf-
t-==
I I T r/ iil
I " ~ ~
>! "'
~
~ ~
ELEV ~ 115.00- ~
~ ~ i
0 2001-1--I=--
1-300~
1=------a 400 f-.
13+00 14+00
TEST CONDITIONS TYPE 23 DESIGN PENSTOCKS POOL ELEVATION TAlLWATER ELEVATION CONDUITS CLOSED
7,000 CFS 466.00 FT 196.00 FT
1!1+00
!> BAYS ()PEN 28.0 FT (11,7 &8 CLOSEO)
16+00
200
1-400
1-300 r I STA 12+60.00 ~
v 210.0
~ ?WATER-SURFACE PROrtLE
200 ~
~+94.20 ::v- STA 14+24.20 ~ ~ I €LEV 115.0
~ 100 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00
STATIONS IN FEET ALONG CENTER LINE
- 200
-100
~ !---·-+--- --+--·-r--·----1-- ---+-- --+-- --+--·-1---·- ·- 0
-100
w z :::; a:
"' ,_ z ... u
:!; 0 a: ... ,_ "' "' ... ~ w u z
~ - 200 °
17+00 18+00 19+00 20+00 21+00
STATIONS IN FEET ALONG CENTER LINE
NOTE: VELOCITIES ARE IN PROTOTYPE FEET PER SECOND 2.0 FEET OFF BOTTOM.
BED MOLDED IN CEMENT MORTAR TO NATURAL CONFIGURATION.
22+00 23+00
- 300
- 400
24+00 25+00 26+00 27+00
MODEL B
BOTTOM VELOCITIES TYPE 23 STILLING BASIN
DIS.CHARGE 193,000 CFS
'"'0 r
400 )> -1 m
en 300
Q)
200
... z :::i 100 a: "' .... z "' 1.)
::! 0 0 a: ... .... "' ~ :! 100
"' 1.)
z < .... ~ c 200
300
4DO
.----1- / L
:tr~ U.+-1!1.~ ~
-----L £LEV 2100 ~
200 srA tJ+-i_0.9.JJ. ~WArER-SIJRFACE PROFILE 200
( I
[ I I I I ...--- S7"A 14+14.20 (--- -.....
100 12+00 13+00 14+00 1!>+00 16+00 17+00 18+00 19+00 100
400
300
STATIONS IN FEET ALONG CENTER LINE
1- ~ ~ ~ -,. ;:; ;:: ~ ... ... ~ ~ ~
~ ~ ~ ~ ~ /
!!Y--- ~ "' "' "' I=== r.;;-;- §iU o.;,; ~ K 1- .JS., 29.6 ...--- ~ -I
tt~8 p?;?.. ~
33.6 :~ ~ u / !Ed_.._ ~ ~ K ~ ~ !K.
/ ~ ~ c---- <rL t---· --r-· ·-·-0 ~ - -/. .!L__ K K ~ """~o § 4 ~ ~ ~ -11(..._ ~
"---.. ~ ~ ~ 1\ r- 34. zs.g ~ M. 14.3 .........
' \ ~ -I
I-== '-I r [\
~rJ~~ ' ~ ~ - -~
~ I I ~ l I fl L£ ~ ~ r- -·~_5~) - -
1--- - 1\ =---- pE.N I --- ----,
& yl-- r;); ~ --1 C.') TAILRACE CHANNEL - PENSTOCK NO. --- , __ ,..,
~ - --- ----, ----<
l 1 1 1 j -
['~~~ -, ()) t--< A []
-- ~,_...,. t--<
liT R ~ ~ ACCESS ""':~ PARKING AREA
~ ~ 0 ~r($1 - II
~ ~ -
~l 1 I .ll ----. ~ j ..._
200
00
0
DO
20D
3DD
4DO
13+DO 14+00 1!>+00 16+00 17+DO 18+00 19+00 2D+OO 21+00 22+00 23+DD 24+0D 25+DO 26+00 27+DD
TEST CONDITIONS
TYPE 24 DESIGN
PENSTOCKS 71000 CFS
POOL ELEVATION 466.00 FT
TAILWATER ELEVATION 179.20 fT CONDUITS CLOSED 5 BAYS OPEN 14.0 FT {6,7 &8 CLOSED)
STATIONS IN FEET ALONG CENTER LINE
NOTE: VELOCITIES ARE IN PROTOTYPE FEET
PER SECOND 2.0 FEET OFF BOTTOM.
BED MOLDED IN CEMENT MORTAR TO NATURAL CONFIGURATION.
MODEL B
BOTTOM VELOCITIES TYPE 24 STILLING BASIN
DISCHARGE 108,000 CFS BED MOLDED TO NATURAL CONFIGURATION
"' z ..J
a: "' .... z "' 1.)
::! 0 a: ... .... "' "' ... ~
"' 1.) z <( .... 1/)
0
400
300
200
"' z _J 100 a:
"' '" z "' u
::! 0 0 a: ... '" "' "' ... ~ 100
"' u z "' '" "' 0 200
300
400
,...- rr r-
/ ~ 1-
~ ELEV 210.0 /WATER-SURFACE PROFILE 200
~000 200
( ~
[ I I I T STA 14 ~g4.20 ~S/MULAT£0 SCOUR 1-h
-..........;_ 100 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00
100
400
300
STATIONS IN FEET ALONG CENTER LINE
<:> ~ ~ "' -r- " IJ: " ~ ..
1- 1-:t :t !Q
200
~ ~ ~ / ~ ~ P- ~
I=== "' "> ">
- 8.G 35.6 s 1/.4 ~3 ~ -I
F£ ~~ ~ 5~ e;! ~
[ ?.:!-~
1--· 5 24.9 [ ~ 0 .I ft.-f---· ·-r--· ·-t--·- ·-
~ ~ ~ ~ o ~~ § u ~ E.... ~
r- ~ I~ ~ ~ -I
~ ~0 3~ [ ';.
~I ~ ~J:J,::: ' <fe ...
----, ~ I 1 I I 1'-
I_[ P: r- --, C)) f----< -r---
PH' I --- ' .... _ ... f----<
K F--~~-()"} h TAILRACE CHANNEL
PEN~--- .I 7 ,...._ __ /
~ ---- ..... f----<
r- -1 c_:.) f----< / l l l l I UJ -
['~~~-;- m , _ _..... f----<
U! ~ ACCESS .._,~
R [I rz: ~ 0 PARKING AREA
~r~ ~ ~ II
~ ~ -
~J 11 1 l ............
~ - ~ lA
00
0
00
200
300
400
13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00
TEST CONDITIONS
TYPE 24 DESIGN PENSTOCKS 7,000 crs POOL ELEVATION 466.00 FT TAILWATER ELEVATION 179.20 F'T CONDUITS CLOSED
5 BAYS OPEN 14.0 FT (&,7 &8 CLOSED)
STATIONS IN FEET ALONG CENTER LINE
NOTE: VELOCITIES ARE IN PROTOTYPE FEET PER SECOND 2.0 fEET OFF BOTTOM.
BED MOLDED IN CEMENT MORTAR TO SIMULATED SCOUR
MODEL B
BOTTOM VELOCITIES TYPE 24 STILLING BASIN
DISCHARGE 108,000 CfS BED MOL.DED TO SIMUL.ATED SCOUR
"' z :::i a:
"' 1-z "' u
::! 0 a: .. 1-
"' "' ... ~
"' u z "' 1-!!! c
1J r ~ fl1
..,. z ..J
a: "' 1-z w u
-400-
/ ,,I r r 1 1 T( 200-
==== 100-
~ or--+t---a: ... 1-
"' "' ....
"' u z < 1-
"'
100 f-~
Q 200 r-~ F--
300 t-
tr 400 f-
13+00 14+00
TEST CONDITIONS
TYPE 24 DESIGN PENSTOCKS 7,000 CFS POOL ELEVATION 466.00 FT TAILWATER ELEVATION 196.00 FT
CONDUITS CLOSED
15+00
5 BAYS OPEN 28.0 fT (6,7 &6 CLOSED)
16+00
l .STA 12+60.00 TA 1$+ 71.00
J ELEV 210.0 /WATER-SURFACE PROFILE
~ ~~~~s=~='=J•=~~®:-~~~~:£a1fc~v~-,~~~o-:~~-r~--~~--~--~--~~--~--~---4 200 200
~ S7AI4+H20 ~ ~ 100~12cl+~oon-~-=:13:+:oo:=====~~4~+boo;:::::~l5~+~oo;;:::!~l6"-+boov.-4--,1~7+t.oov.--'~,l;e+±ooN>--'~,I"s±+~oo.-~_j 100
STATIONS IN FEET ALONG CENTER LINE
1-400
1- 300
- 200
-100
-100
uJ z ..J
a: "' 1-z uJ u
~
~ ....
uJ u z < 1-'!?
-200 °
17+00 18+00 19+00 20+00 21+00
STATIONS IN FEET ALONG CENTER LINE
NOTE: VELOCITIES ARE IN PROTOTYPE FEET
PER SECOND 2.0 FEET OFF BOTTOM.
BED MOLDED lN CEMENT MORTAFt TO NATURAL CONFIGURATION.
22+00 23+00
-300
-400
24+00 25+00 26+00 27+00
MODEL B
BOTTOM VELOCITIES TYPE 24 STILLING BASIN
DISCHARGE 193,000 CFS BED MOLDED TO NATURAL CONFIGURATION
"tl r ). -1 m
u.t z :::i a: w 1-z ... u
1-w ... ...
... u z < ,._ "'
...-400 f.-
2oof--
I=== 100 f-
rr----T-~~~[(~/r-r----rr-~::;:i::::;:=::::::::::::;:=::;::;::=::;:STA /~Sn/00 ==;::r::::::::;:;:::c=;:::::::::::;::::::;--r, - 400 j sELCV 2~:.~ WATER- SURFACE PROFILE
200 ·Ls~~~'3t'2~a~.oot---~~ -c--~~~=~:~t-~--~~~--~~--~--~--~--~ 200 ......, f £LEV 1~0.0 ..----
~ I sr• ,., ... o ,.... rf--C'MuLArco scouR 1 - 3oo
~~--L-~~-L--~~--~---*---~~ I I00~12~+~00~~--~v.~~~~==::~~~~~ob~====~~====~~~~~~~-L_j100
~fl ~ !:.!,..
~ /!T-r
""'<, 13+00 14+00 15+00 16+00 17+00 18+00 19+00 STATIONS IN FEET ALONG CENTER LINE
- 200
- 100
0 1----1-J..+---- ~--+---- --+--·-!---· -----1-- ---+--- ---1--- -----4----f---- -- 0
I' ~ f2.- ~
I 00 f.-F== 0./ - 100
... z ..J
a: ... 1-z ... u ::!; 0 a: ... 1-w "' ... '!:
"' u z
0 2001-
~ !!!
- 200 ° ~ F---
~ F----
300 f.F---a
4001-
13+00 14+00
TEST CONDITIONS
TYPE 24 DESIGN PENSTOCKS 71000 CFS POOL ELEVATION 466,00 F"T
TAILWATER ELEVATION 196.00 fT CONDUITS CLOSED
15+00
5 BAYS OPEN 28.0 fT (6,7 &8 CLOSED)
16+00 17+00 18+00 19+00 20+00 21+00
STATIONS IN FEET ALONG CENTER LINE
NOTE: VELOCITIES ARE IN PROTOTYPE FEET PER SECOND 2.0 FEET OFF BOTTOM.
BED MOLDED IN CEMENT MORTAR TO SIMULATED SCOUR.
22+00 23+00
- 300
- 400
24+00 25+00 26+00 27+00
MODEL B
BOTTOM VELOCITIES TYPE 24 STILLING BASIN
DISCHARGE 193,000 CFS BED MOLDED TO SiMULATED SCOUR
'"tl r ~ 111
ut z ::; a:
"' ... z "' u
I
"' .. IL
"' u z < I-
"'
-400 f-
/ ,.[ I I I rr( 200-
=== 100-
•
100-
"====
0 200--~
--300-
:I 400-
- 13+00 14+00
TEST CONDITIONS
TYPE 24 DESIGN
POOL ELEVATION 468.60 fT
15+00
TAILWATER ELEVATION 212.60 fT
CONDUITS L PENSTOCKS CLOSED ~BAYS OPEN FULL (6 7&8 CLOSED)
16+00
l. 200
100 12+00 13+uu
y-WATEI?-51./I?F'ACE PROFILE
14+00 1~+00 16+00 17+00 STATIONS IN FEET ALONG CENTER LINE
18+00
-400
200
-300
19+00 100
- 200
-100
-::--:--·-+--- --+--·--· --+- --+-- --+-- --\-- --t-·- ·- 0 ...!:.!-
17+00 16+00 19+00 20+00 21+00
STATIONS IN FEET ALONG CENTER LINE
NOTE: VELOCITIES ARE IN PROTOTYPE FEET PER SECOND 2.0 FEET OFF BOTTOM.
BED MOLDED IN CEMENT MORTAR TO NATURAL CONFIGURATION.
22+00 23+00
-100
-200
-300
-400
24+00 25+00 26+00 27+00
MODEL B
BOTTOM VELOCITIES TYPE 24 STILLING BASIN
DISCHARGE 3001000 CFS BED MOLDED TO NATURAL CONFIGURATION
"' z ...J
a: "' 1-z "' u
:l; 0 a: IL
I"' "' IL
"0 r ~ m
"' z :::; a: "' 1-z "' u
:li 0 a: ... .... "' "' ...
"' u z ~ !!!
-400-
200 r-
F= 1001-
0-·-t--!----
100-!!==
Q 200-~
~
300-
400~ 13+00 14+00
TEST CONDITIONS
TYPE 24 DESIGN POOL ELEVATION 488.60 fT
TAILWATER ELEVATION 212.60 FT CONDUITS I. PENSTOCKS CLOSED
15+00
S BAYS OPEN FULL (6 7&8 CLOSED)
..
16+00
L 200 200
srA 14+u.zo r.... ~SIMULATED scou~·
100LI2d+""oo,---'-:1:3+:oo:==~~4~+~oo;:::;::=;::;l5~+~oo;;:::::::;:~lll:+~oo~::=~~7~+~oo~::~1~e+:oo::=~""l9-"+'-oo,.--'-J 100 STATIONS IN FEET ALONG CENTER LINE
-400
- 300
-200
-100
-100
"' z ..J
a: "' 1-z "' u
1-
"' "' ... ~
"' u z < I;;
- 200 ii
17+00 18+00 19+00 20+00 21+00
STATIONS IN FEET ALONG CENTER LINE
NOTE: VELOCITIES ARE IN PROTOTYPE FEET PER SECOND 2.0 FEET OFF e<>TTOM.
BED MOLDED IN CEMENT MORTAR
TO SIMULATED SCOUR
22+00 23+00
-300
-400
24+00 25+00 28+00 27+00
MODEL 8
BOTTOM VELOCITIES TYPE 24 STILLING BASIN
DISCHARGE 300,000 CfS B£0 MOLDED TO SIMULA"t£0 SCOUI'!
"' z :::; a: .. ~ ... u
~ il: ... .. w ...
~ z ~ II)
200 ,__
F= 100 f-
'
100 f-lo==
Q 200 f~ 1=--
~ 300~
1=--
400~ 13+00 14+00
TEST CONDITIONS
TYPE 25 DESIGN PENSTOCKS 71000 crs POOL ELEVATION 486.00 F'T TAILWATER ELEVATION 196.00 FT CONDUITS CLOSED
15+00
5 SAYS OPEN 28.0 F'T (8,7 &II CLOSED)
16+00
- 200
w z
-100 ~ a: w 1-z w u fl-f----+--- --+--- ---If-- ---+-- ----l-- ---1-- --+- ----l--- -- 0 l!
~
17+00 18+00 19+00 20+00 21+00
STATIONS IN FEET ALONG CENTER LINE
NOTE: VELOCITIES ARE IN PROTOTYPE FEET PER SECOND 2.0 FEET OFF BOTTOM.
BED MOLDED IN CEMENT MORTAR TO NATURAL CONFIGURATION.
22+00 23+00
.. 1-::l ...
-100 :!: .. ~ ~
-200 Q
- 300
- 400
24+00 25+00 211+00 27+00
MODEL B
BOTTOM VELOCITIES TYPE 25 STILLING BASIN
DISCHARGE 193,000 CPS
"' .. 0 +
PIEZ NO. ~ E L, 2 85. 6
PIEZ. NO. 2. EL. 281.2
LEFT TRAINING WALL
~ .... om 'It ~ + 0 -"' <(_j 1-"' Ul
0 E L.
Q.
ELEVATION
2 .; '?
..;, .... Ul
.J "'
N .,; ....
= .( .... Ul
0 "'
c.;; iii . -.r. .... Ul
EL. 280.0
MODEL B
PIEZOMETER LOCATIONS
TYPE A TRAINING WALL
ORIGINAL DESIGN
"'0 r )> -1 ITI
--..1 0)
"' • 0 +
... "' ,..:
+
CENTER TRAINING WALL
~ en :1
_,_E~;:-:·-----"'=-2&'"". 9~8~_
01 :.·I
..Q·
-,o .... ~I Cl
I :nj : EL. 310.00 /'") "!
1/ ..: "' '~t>J /1 :n +
<t-~ I u ..:
: oi :nL TYPE c TRAINING WALL
' I '--:r-- _ _ _ _ _ ___ EL. 285.00 PIEZ. NO. I, El. 288.0
2P~IE~Z~·~N~0.~2~,E~L~·~2~8~li~.O~----',
\
TYPE B TRAINING WALL /
/ /
PIEZ._!!O._L _ll._!.8.~4- _/ /
PIE~N.Q., 2_,_E'=._ 2.!_0.~ _/
ELEVATION MODEL B
PIEZOMETER LOCATIONS
TYPES B AND C TRAINING WALL