SL. NO. DESCRIPTION ISRO -SHAR SPECIFICATION VENDOR OFFER
Design, manufacture, testing, supply, erection,
commissioning and performance proving of 1Nos.
of Dual VVVF drive EOT CRANE [ 35t capacity
(flame proof)] Top running, double girder, along
SPECIFICATIONS CUM COMPLIANCE STATEMENT FOR SUPPLY OF EOT CRANES
Bidder shall completely fill the following format of technical specifications & supply conditions with the
mention of required details. If required Bidder can attach speperate sheets by giving point no. in this
format Inadequate /incomplete, ambiguous, or unsustainable information, against any of the clauses of
the specifications / requirements shall be treated as non-compliance to tender. Mentioning "as per
enclosed specification" is not acceptable and Vendor shall submit all the specifications by filling in the
following FORMAT only.
Bidder shall submit complete information asked in the following specification (clause no.7.1 to 7.5).
The offer meeting all the requirements & conditions in all respects would only be considered for further
processing.
DNAME & ADDRESS OF
THE VENDOR :
Deviations with respect to specifications given below are not acceptable. However Bidder can submit /
suggest improvements, if any, seperately by indicating the caluse no. in this specifications.
1.1 SCOPE OF SUPPLY
(flame proof)] Top running, double girder, along
with LT bridge rails and Cable Drag chain power
cable system as per the following specifications,
conditions given below and also in accordance with
latest editions of IS: 3177, IS: 807 & relevant
codes and standards.
1.2
Third party inspection
is in the scope of
supplier
Arranging the third party inspection is in the scope
of supplier for the entire scope of work as given
above and as per QAP enclosed. Supplier shall
engage third party inspection agencies like M/s
Mecons, M/s M.N.Dhastur, M/s Lloyds register, M/s
DNV . The finalization of third party agency shall be
done on mutual agreement between ISRO and
Vendor.
1.4 Application
These EOT cranes are used for handling of
dangerous / high value materials like rocket
motors, propellant containers, etc., for positioning
and assembly during process operations. In case
of any failure of crane, there will be loss to
property and life. Hence vendor shall design &
manufacture the crane with emphasis on quality,
35t x 18.65m Span EOT Crane : 01 no.
(flameproof)1.3
QUANTITY
REQUIRED
manufacture the crane with emphasis on quality,
reliability and safety and shall ensure smooth
operation of crane.
![Page 2: SPECIFICATIONS CUM COMPLIANCE STATEMENT …...cable system as per the following specifications, conditions given below and also in accordance with latest editions of IS: 3177, IS:](https://reader034.vdocuments.us/reader034/viewer/2022042217/5ec0f5a7388fc50dfa7ac023/html5/thumbnails/2.jpg)
Page:2 of 23
SL. NO. DESCRIPTION ISRO -SHAR SPECIFICATION VENDOR OFFER
1.5Usage period & desired
life of cranes
The crane will be put to use for 365 Days’
intermittent duty (Class II duty) with CT, LT and
Hoist movements. EOT Crane shall be designed
for minimum life of 30 years.
1.6
1.6.2 for 35t EOT Crane
The EOT crane shall be equipped with flame proof
electrical systems suitable for operating in
hazardous area classified as Zone 1, Gas group
IIA/IIB, T4 as per relevant IS/IEC standards
1.7Operating Environment
of Cranes
Operating environment is indoor, near to sea (i.e.,
saline atmosphere), with ambient temperature
50ºC and with relative humidity 95% . Weather
conditions are tropical. Vendor shall consider above
while design of EOT crane enclosures & painting of
crane & related parts.
II .2
2.2.1 Type of CraneDouble girder top running, Flameproof, Dual VVVF
drive EOT Crane for Indoor use
Hazardous area conditions
MAIN PARAMETERS OF 35t EOT CRANE (FLAMEPROOF)
2.2.1 Type of Cranedrive EOT Crane for Indoor use
2.2.2 Class & duty
Structural Class-II duty (M5) duty as per IS807.
Mechanisms: Class-II (M5) as per IS 3177 of latest
edition
2.2.3 EOT Crane capacity 35 tons (35000 kgs)
2.2.4 Span 18.65 meters approximately
2.2.5Lift Height (above
ground)18.0 meters
2.2.5aDuty Factor (Cdf) for
flameproof Crane
As crane is handling dangerous materials Duty
factor (Cdf) of 1.7 shall be taken in design of
components in hoist motion.
2.2.6
i) Hoist in meters/minuteMain -2.5 / Creep 0.25 (Through VVVF Drives) and
one stand by redundant drive
ii)Long travel in
meters/minute
Main-3.0 / Creep 0.3 (Through VVVF Drives) and
one stand by redundant drive
iii)Cross travel in
meters/minuteMain-3.0 / Creep 0.3 (Through VVVF Drives)
2.2.7 Side clearance minimum 450 mm (distance from centre of gantry
rail to nearest obstruction )
2.2.8 Head Room available
4 meters (maximum) (Vertical distance from top of
gantry rail to lowest overhead obstruction) - Slant
Operation Speeds (maximum) in meters/min
2.2.8 Head Room available gantry rail to lowest overhead obstruction) - Slant
roof Building
2.2.9Distance from floor to
top of gantry rail~ 20.1 meters
![Page 3: SPECIFICATIONS CUM COMPLIANCE STATEMENT …...cable system as per the following specifications, conditions given below and also in accordance with latest editions of IS: 3177, IS:](https://reader034.vdocuments.us/reader034/viewer/2022042217/5ec0f5a7388fc50dfa7ac023/html5/thumbnails/3.jpg)
Page:3 of 23
SL. NO. DESCRIPTION ISRO -SHAR SPECIFICATION VENDOR OFFER
2.2.10 Bay length in meters 31 meters
2.2.11 CT DSL side/Non DSL side : 3/ 2.1mm
2.2.12 LT Drive side/LT Non-Drive side : ~ 4.5m / 3.5m
2.2.13 CT Wheel diameter Not lesss than 320mm
2.2.14 LT Wheel Diameter Not less than 400mm
2..2.15Location of VVVF Pnales
for 35t EOT crane
VVVF dual drive panles (One for main
operationand one for redundancy), DBR units,
other electrical panels shall be kept in
separate room in ground level at one corner
of building along crane travel . All the power
and control cables shall be routed from this
room to top of flameproof EOT crane.
2.2.16Total Weight of EOT
Crane Vendor to Specify
2.2.17Weight of Bridge Girder
Vendor to Specify
2.2.18Weight of End Carriage
Vendor to Specify
2.2.19 Weight of trolley Vendor to Specify
Hook Appraches
2.2.19 Weight of trolley Vendor to Specify
2.2.20Weight of Electricals/
Panels Vendor to Specify
2.2.21CT Wheel load in tonnes
Vendor to Specify
2.2.22 LT wheel load in Tonnes Vendor to Specify
2.2.23Size of Cross Travel
Bridge Girder Rail
Crane Rails as per IS 3443 only shall be used.
Vendor to specify Size of Rail, position of the rail,
MS palte, Bracket. (Please refer annexure -1)
2.2.24
Size of Crane gantry
rails for Long Travel -
part of Crane vendor's
scope
Crane Rails as per IS 3443 only shall be used.
Vendor to specify Size of Rail.
II
2.15 LT Drive
Central drive with Horizontal type, standard
gearboxes and floating shafts. Single drive with
wheeled motors can be used for cranes with span
more than 16 meters.
2.16Number of wheels for
LT drive4
2.18 CT DriveCentral drive with Vertical type, standard make
gearboxes and floating shafts
PARAMETERS FOR CRANE
2.19Number of wheels for
CT drive4
![Page 4: SPECIFICATIONS CUM COMPLIANCE STATEMENT …...cable system as per the following specifications, conditions given below and also in accordance with latest editions of IS: 3177, IS:](https://reader034.vdocuments.us/reader034/viewer/2022042217/5ec0f5a7388fc50dfa7ac023/html5/thumbnails/4.jpg)
Page:4 of 23
SL. NO. DESCRIPTION ISRO -SHAR SPECIFICATION VENDOR OFFER
2.21
Platform for approach
for maintenance of CT
drives
Required
2.22Type of bearings for
LT/CT wheelsAnti-friction, double row Spherical Roller Bearings
2.23Type of mounting of
LT/CT wheels"L" type brackets
2.24Creep/Inching speed
control
Creep speed 10% of main speed shall be provided
thorugh VVVF drives
2.25Operations required
through
One Floor operated Pendant and two pendents fixed
in the assembly platforms for independent
operation as shown in Annexure-2
2.26 Pendent
One number floor operated pendent shall be
movable type and two fixed on the assembly tower
(Refer:Annexure-2)
2.27 Duty cycle 60% CDF for all motions
2.34Clearance Diagram for
EOT crane
Hook approches and clearances are given in
enclosed figure & values shall be accomplished
3 MECHANICAL ELEMENTS DETAILS3
3.1 Factor of Safety
The design of all mechanical components shall be
done as per IS3177 and technical specifications
given and on the basis of ultimate tensile strength
with factor of safety of not less than 5.
3.2 Hoist hook type
Forged, Ramshorn hook with safety latch, swiveling
on anti friction Thrust Bearing, as per IS: 5749 /
1970 (latest version)
3.2a Hook specification
Rating: 40 tonnes (As per IS5749-1971, Table -1),
Dimenssions, material manufacturing and inspection
shall be as per IS standard IS 5749-1971. (load
testing shall be carried out as per IS)
3.2b Lubrication of hook
Structural Class-II duty (M5) duty as per IS807.
Mechanisms: Class-II (M5) as per IS 3177 of latest
edition
3.3Number of falls for
Hoist4
3.4
Rope Drum shall be of fabricated type of IS2062
steel with stress relieved or heavy duty seamless
pipe as per ASTM A106 . No circumferential weld
joints are allowed.
3.5Rope drum diameter shall be minimum 36 times the
diameter of wire rope.
Rope drum shall be provided with not fewer than Rope Drum
3.6
Rope drum shall be provided with not fewer than
three dead turns at each anchored end and at
least one spare groove at the other end. Grooves
shall be finished smooth.
Rope Drum
![Page 5: SPECIFICATIONS CUM COMPLIANCE STATEMENT …...cable system as per the following specifications, conditions given below and also in accordance with latest editions of IS: 3177, IS:](https://reader034.vdocuments.us/reader034/viewer/2022042217/5ec0f5a7388fc50dfa7ac023/html5/thumbnails/5.jpg)
Page:5 of 23
SL. NO. DESCRIPTION ISRO -SHAR SPECIFICATION VENDOR OFFER
3.7
Rope dead ends shall be clamped with minimum
three clamping wedges with two numbers of
bolts on each clamp . The bolts shall be at the
centre of clamp and shall be wire locked.
3.8 Hoist wire rope
M/s USHAMARTIN make, Hot dip Galvanized,
6X36, Hyflex wire rope, core IWRC, Grade 1960
MPa. Minimum Factor of safety on wire rope
shall be 6.
3.9 Rope Sheaves
All sheaves shall be of forged steel only. Sheave
diameters shall be minimum 24 times rope
diameter. Sheave guards shall be provided.
3.9 aBearings for Sheaves
/Pulleys
All the sheaves & pulleys shall be provided with
double row sheave bearings
3.9b Lubrication of PulleysArrangement shall be provided for periodical
lubrication/ greasing of pulley bearings.
3.9cEqualizer Pulley
mounting
Equalizer pulley shall be mounted on swivelling
arrangement
3.10 Gear Boxes for HOISTStandard Helical type, parallel shaft gearboxes,
Crane duty shall be used for hoist motion.
3.11 Gear Boxes for CT & LT
Wheel mounted geared motor drives with Hollow
shaft mounted (or) Helical parallel shaft gearboxes,
Crane duty shall be used for CT & LT drives.
3.11 aMaterial of gears &
Pinions, Shafts
All are Forged Alloy Steel (Preferably Case
hardening steels, or En-19 for gears, En-24 for
Pinions and shafts)
3.11b
Torque rating of
Gearboxes/ Pinions /
Gears
Gearboxes shall have torque rating equal to 2
times the Full load torque rating of selected motors.
Braking torque shall also shall be considered in
selection of Gearboxes.
3.11 c Details of gearboxes
with quotation
Details of gearboxes like size, centre distances,
Power in kW, Max. torque rating, and shall be
submitted along with quotation.
3.12Standard make of
Gearboxes
Heavy Crane duty gearboxes of Elecon / Shanti/
GREAVES (Premium transmission)/ Flender-
Siemens only. Other make & Own make
gearboxes are not acceptable. Vendor shall
confirm the acceptance. Tender will be rejected for
not meeting this requirement.
Drawings and Details of gear boxes, selection
3.13Selection/drawigns for
gearboxes
criteria, Power rating & torue rating calculations,
bearing details, data sheets from supplier shall be
submitted for TPIA/ Purchaser approvals during
design phase.
![Page 6: SPECIFICATIONS CUM COMPLIANCE STATEMENT …...cable system as per the following specifications, conditions given below and also in accordance with latest editions of IS: 3177, IS:](https://reader034.vdocuments.us/reader034/viewer/2022042217/5ec0f5a7388fc50dfa7ac023/html5/thumbnails/6.jpg)
Page:6 of 23
SL. NO. DESCRIPTION ISRO -SHAR SPECIFICATION VENDOR OFFER
3.14 HOIST BRAKES
Two nos. of imported electro hydraulic flameproof
thruster brakes with Manual release. Make :M/s
Bubenzer Bremsen, M/s Galvi, Italy, M/s
Wittonkramer, UK / M /s Seigerland Bremsen
(SIBRE) Germany/ M/s SIME Stromag. Thruster :
ATEX/ PTB Certified Ex proof, thrusters make :
EMG-Automation/ Brook crompton/ Galvi only.
ATEX/ PTB Certificates shall be submitted for
Approvals.
3.15 Hoist Brake Rating
Torque rating of Each thruster brakes shall be
minimum 2 times motor full load torque.Hoist
brakes shall be provided with operating delay of 1
sec from brake to brake.
3.16Braking distance/brake
path
Hoist components and brake shall be selected such
that the braking distance for lowering motion shall
not be more than 17mm with one brake at full
rated speed. Necessary calculations shall be
submitted in this regard during design phase.
3.17 Brakes for CT & LT
With Geared motors in built Fail safe Disc Brake
shall be used. (OR) If with separate standard 3.17 Brakes for CT & LT
Gearboxes, EHT brakes of approved make shall be
provided.
3.18
Brake rating/
adjustment for CT and
LT motions
In travel motion retardation with brakes shall not
exceed 7cm/sec2 . Necessary calculations shall be
submitted in this regard during design phase.
3.19 Brake drums
shall be forged/cast steel/ SG iron. Drums shall be
completely machined and Static & dynamically
balanced. Hardness of surface of finished drum shall
be 38-43 Rc Width of the brake drum shall be 5
to10mm more than the width of the brake shoes.
3.20 Mounting of equipment
All the gearboxes, motors, brakes, bearing
pedestals, etc. shall be mounted on machined and
leveled surfaces. If shims are needed only
Stainless steel shims shall be used.
3.21
Couplings between
motor, brake drum and
gearbox
Flexible Full geared couplings. Make of Couplings
shall be of FENNER/ LOVEJOY
3.22
Couplings between
gearbox and rope drum
for hoists
Geared coupling with self alignment provision.
3.23 Travel WHEELS
All crane wheels shall be made from forged steel
C55Mn75 and minimum hardness shall be 320 BHN
for a case depth of 10mm.
3.24 Travel WHEELS
Wheels shall be double flanged with straight tread
with 12 deg taper flanges with adequate flange 3.24 Travel WHEELS with 12 deg taper flanges with adequate flange
thickness.
![Page 7: SPECIFICATIONS CUM COMPLIANCE STATEMENT …...cable system as per the following specifications, conditions given below and also in accordance with latest editions of IS: 3177, IS:](https://reader034.vdocuments.us/reader034/viewer/2022042217/5ec0f5a7388fc50dfa7ac023/html5/thumbnails/7.jpg)
Page:7 of 23
SL. NO. DESCRIPTION ISRO -SHAR SPECIFICATION VENDOR OFFER
3.25 DRIVE SHAFTS
Shafts shall be of forged steel C45. Angular
deflection of the shaft at torque corresponding to
1.33 motor rated torque during acceleration shall
not exceed 0.10deg./m of shaft length.
3.26 Fasteners
Galvanized, high tensile fasteners of tensile quality
8.8 or more shall be used in crane parts, except for
Fit bolts of Girder. Make of all fasters shall be of
M/s TVS; M/s UNBRAKO ;M/s LPS
3.26aFasteners for Couplings
and Plummerblocks
High tesile Fit bolts (as per IS3640) of Property
class min 8.8 shall be used for Couplings, Plummer
blocks etc.,
3.27 Lubrication of Crane
Localised lubrication system with easy approach for
all pedastal bearings, couplings, wheel bearings
etc.,
3.28Maintenance
accessibility & Safety
Safe access for maintenance and removal of all
mechanical and electrical parts must be ensured
without any additional scaffolding. All parts
requiring replacement or inspection or lubrication
shall be easily accessible.
4.0 STRUCTURAL DETAILS OF EOT CRANE
4.1Design of structural
work
The crane should be rigid, robust, vibration free,
and of sturdy construction. The design of all
structures shall be done as per IS807 - Class -II
and as per this technical specifications.
4.2 Material of structurals
All the structural plates used in fabrication of
Girders, Trolleys and End carriages, machine
bases shall be of minimum 8 mm thick of IS 2062
Gr. A./Gr. B. Checquered plates for trolley and
platforms shall be minimum of 6mm
4.3 Girders Bridge Girders shall be of double Girder, Box Type
construction having Minimum vibrations.
4.4 Deflection of Girders
The bridges shall not deflect more than 1/1000 of
span with safe working load on the trolley, with
trolley stationed at mid span and excluding
deflection due to dead load.
4.5 Girder Joints
No splice joint – Girder is to be of single piece only.
Number of weldable butt joints along the total
length of the girder should not exceed two.
4.6 Ratio of span to depthFor Box Girders Span to Depth ratio shall not
exceed 18.
4.7Local Buckling of top
flange
Local buckling of top flange and compression
members shall be considered and necessary
calculation shall be submitted for approval.
4.8 End Carriages
End carriage shall be fabricated as solid box section
made from rolled steel plates IS2062, except for
essential openings which shall be reinforced.
![Page 8: SPECIFICATIONS CUM COMPLIANCE STATEMENT …...cable system as per the following specifications, conditions given below and also in accordance with latest editions of IS: 3177, IS:](https://reader034.vdocuments.us/reader034/viewer/2022042217/5ec0f5a7388fc50dfa7ac023/html5/thumbnails/8.jpg)
Page:8 of 23
SL. NO. DESCRIPTION ISRO -SHAR SPECIFICATION VENDOR OFFER
4.9 Structural bolted Joints
Fit Bolts (as per IS3640 ) with property class 5.6
and reamed holes shall be used for all structural
joints between girder, & end carriages, wheel L-
bracket & end carriages etc.,
4.10 Trolley
The trolley frame shall be built up of rolled sections
and plates to form a rigid structure and shall be
arranged to afford maximum accessibility to
mechanical and electrical parts place on it.
4.11Top chequered plate of
trolley
The top of the trolley frame shall be fully covered
with 6mm chequered plate all over except for
openings required for the ropes for bottom block
etc., to pass. All the mechanical and electrical
equipment shall be placed above trolley top plate
only .
4.12
Safe distance between
trolley & top pulley
block
Trolley and top pulley block shall be designed such
that at the highest position of hook there shall be a
clear distance of 700 mm between the lowest point
of trolley obstruction and the highest point of
bottom block.
4.13CT maintenance Maintenance platform shall be provided under the
4.13CT maintenance
platform
Maintenance platform shall be provided under the
CT mechanism (i.e below CT gearbox).
4.14 Hand rails for trolleyHandrails of 1000mm height shall be provided on all
the four sides of the trolley.
4.15 CT rail wear plate
Full length wearing plate of minimim 8mm should
be provided under the trolley rails and should be 10
to 12mm lesser in width more than the rail base as
per IS807.
4.16 CT rail welding
CT Rails shall be made continuous by welding
standard lengths. Welding shall be done as per
standard procedure approved by Third Party
Inspection Agency and department.
4.17 CT & LT rail clamping
CT & LT Crane rails shall be clamped to the girders
with double bolt clamping plates of M/s GANTREX
make. The rail clamps shall be spaced not more
than 900mm apart. Alignment blocks at spacing of
450mm shall be provided
4.17aRail Clamps for CT & LT
rails
All the rail clamps & fasteners shall be of standard
make of M/s GANTREX only.
4.17bResilient Rubber Pad
under CT & LT rails
M/s GANTREX make, long life, good
quality,continuous resilient rubber pads shall be
provided for CT & LT rails.
4.18Rail stoppers /Wheel
ramps
CT & LT Rails shall be prevented from creeping in
the longitudinal direction by welded rail stops and
Wheel ramps.
4.19 Jacking pads
Suitable jacking pads should be provided on end
carriages and trolley for jacking up the crane for
changing track wheels
![Page 9: SPECIFICATIONS CUM COMPLIANCE STATEMENT …...cable system as per the following specifications, conditions given below and also in accordance with latest editions of IS: 3177, IS:](https://reader034.vdocuments.us/reader034/viewer/2022042217/5ec0f5a7388fc50dfa7ac023/html5/thumbnails/9.jpg)
Page:9 of 23
SL. NO. DESCRIPTION ISRO -SHAR SPECIFICATION VENDOR OFFER
4.20 Safety Pads
Under the end carriages and crab to prevent the
crane from falling more than 25mm in the event of
breakage of a track wheel/axle.
4.21 End buffersSpring/Rubber buffers are to be provided for long
travel and cross travel.
4.22Mertic Component
Systems
All components including fasteners should be in
metric system only
4.23 Locking of fasteners Bolts in rotating parts shall be locked with lock
nuts.
4.24Make of steel raw
materials
All the structural raw materials (plates, angles,
beams) shall be NEW and of reputed make of M/s
SAIL/ M/s JINDAL/ M/s ESSAR/ M/s TATA STEEL
only.
4.25 Welded joints
All butt joints shall be 100% X- rayed for both
compression and tension joints and in flanges /
Webs. All other weld shall be DP tested
4.26 Platforms
Full length chequered platform of width 750mm
shall be provided on both bridge Griders with hand
rails of height 1000mm. The platforms shall be bolt
jointed. jointed.
4.27 Toe gaurds
Toe gaurds shall be provided for all openings, on
trolley and on bridge platforms with minimum
height of 100mm.
4.27Machine bases on
trolley / LT
Parts of steel frames carrying machinery should be
provided with doubling plates (including stiffners)
of adequate thickness welded and machined to
true surface.
4.28Cable Drag chian beams
& supportsIn the scope of Supplier
4.29Cable Drag Chain
maintenancecage
Repair cage shall be provided for attending to the
DSL / Cable Drag chain maintenance.To be provided
at suitable height with ladder.
4.30Protection Gaurds for
rotating equipment
Guards: All the moving parts should be duly
covered with guards as per safety norm. Proper
guard / cover / tray to prevent falling of bolts from
coupling etc should also be provided, wherever
required.
5
5.1 Hazardous Area Class
All electrical equipments suitable for Hazardous
Area Zone 1, Gas Group II A / II B, T4 as per IS
5572
5.2Electical equipment
environment
All equipments shall be supplied for tropical and
humid climate. Derating of drive motors, power
cables etc., shall be done for ambient temperature
of 50°C.
ELECTRICAL EQUIPMENT
5.3 Power Supply at DSL
Power Supply : 415 ± 10% Volts, 3 phase, 4 wire,
50 ± 3% Hz located at 1meter above FFL at centre
of crane travel bay
5.4 Motors 3 phase, 415 V, 50 Hz / A.C
![Page 10: SPECIFICATIONS CUM COMPLIANCE STATEMENT …...cable system as per the following specifications, conditions given below and also in accordance with latest editions of IS: 3177, IS:](https://reader034.vdocuments.us/reader034/viewer/2022042217/5ec0f5a7388fc50dfa7ac023/html5/thumbnails/10.jpg)
Page:10 of 23
SL. NO. DESCRIPTION ISRO -SHAR SPECIFICATION VENDOR OFFER
5.4.1 Space heaterFor main Hoist motor Space heater shall be
provided.
5.5 Control voltage
1 phase, 110 Volts AC (all the switchgears inside
the panel)deriaved from suitable control
transformer with redundancy
5.6Auxiliary
voltage/Sockets
1 phase, 230 Volts AC (FLP Sockets in case of FLP
Crane or Normal socketes for Non FLP Cranes)
5.7
For Push buttons,
Indication lamps and
limit switches
24V, Intrinsic Safe Package Supply ( M/s P&F) only
for FLP Cranes. For Non FLP Crane it can be of 110
V AC supply
5.8
Power distribution for
Crane along Long
travel
The power supply shall be through PVC flexible
tinned copper conductor cable by means of "Cable
Drang Chain" M/s IGUS / Lapp make shall be
provided.And all the cable shall be routed on a tray
over the gurders.
5.9 Chain for PendantStainless steel chain. No other material is
acceptable.
5.10Power distribution to
trolley(Festonning)
Cable Drag Chain, Make: IGUS/ Lapp make
shall be used for all the trailling cables
5.11 Connection to pendentTrailing cable supported on anti-friction wheeled
trolleys 5.11 Connection to pendent
trolleys
1. Individual panels to be provided as follows.
a. Protective panel - one
b. Hoist panel - one
c. CT panel - 1no
d. LT Panel - one
2. Ferrules (Cable tags) to be provided for cable
connections as per circuit diagram. 3. Individual isolating switch to be provided for each
panel. M/s RITTAL/siemens /ABB make only
5.12 a VVVF Drive
KW rating of the VVVF Drives selected shall be
20% more than the selected motor rating KW.
Necessary line and load chokes and input filters are
to be used. For Hoist motors encoders are to be
used (FLP encoders in case of FLP Crane). The
selected drive should be capable of working in
vector control with suitable DBR. All drives are to be
with redundant drives of same rating fully wired and
ready to change over with suitable selector switch
facility. Make of Drives : M/s Siemens/ ABB
5.12 b
Location of VVVF drives
for 35t Flameproof
Crane
VVVF controls & Panels shall be located in a
separate room with proper ventilation system. This
room is located in building at ground level at one
corner. All power & control cables shall be routed
from this room to motors & brakes on top of crane.
5.12 Panel :
![Page 11: SPECIFICATIONS CUM COMPLIANCE STATEMENT …...cable system as per the following specifications, conditions given below and also in accordance with latest editions of IS: 3177, IS:](https://reader034.vdocuments.us/reader034/viewer/2022042217/5ec0f5a7388fc50dfa7ac023/html5/thumbnails/11.jpg)
Page:11 of 23
SL. NO. DESCRIPTION ISRO -SHAR SPECIFICATION VENDOR OFFER
VVVF drive output shall be based on drive motor
output requirement as per the following formula:
VVVF Drive output (kW) = k X Pm
e X P.F
Where k= inverter correction factor i.e. 1.20 as per
point no. 5.12 a
Pm =Motor output (kW)
e = motor efficiency
P.F= motor power factor
Drive continuous rated current must be 20 % more
than full load motor current.
Inverter overload current capacity shall be 1.5
times the full load motor current.
VVVF drive capacity shall be selected by derating it
to ambient temperature condition of 50 deg.
Centigrade.
5.13Mounting of panels and
resistance boxes
To be rigidly mounted on supporting frames
fabricated from ISMC Channels with antivibration
pads
5.14 Switchgears Make: SIEMENS only
5.12 cVVVF drive capacity
selection
5.15 Contactors AC4 Duty
5.16 Protection
The contactors shall be able to withstand 15 times
their rated current for one second without welding /
fusing of the contacts
5.18 TPN MCCB. Manually operable
5.19 Rated ValueCombined full load currents of all the three motions
on the crane having largest power
5.21 Fuses
Hoist, CT and LT motor power supply to be routed
through Semi conductor Fuses of adequate rating
only.
All the live parts to be covered properly in order to
avoid the possibility of in advent touching of the
same during operation and maintenance.
All the insulated materials used in the construction
of the panel shall be non-hygroscopic, duly treated
to withstand the effect of high humidity, high
temperature and tropical ambient service conditions
5.23 Isolating Switches
Separate control is required for the following: 1.
Under Slung Lights (In pendent)
2. Hand lamps socket outlets on the bridge (In
Protective panel)
3. Control circuits (In pendent)
Switchgear and
Terminal Blocks5.22
3. Control circuits (In pendent)
![Page 12: SPECIFICATIONS CUM COMPLIANCE STATEMENT …...cable system as per the following specifications, conditions given below and also in accordance with latest editions of IS: 3177, IS:](https://reader034.vdocuments.us/reader034/viewer/2022042217/5ec0f5a7388fc50dfa7ac023/html5/thumbnails/12.jpg)
Page:12 of 23
SL. NO. DESCRIPTION ISRO -SHAR SPECIFICATION VENDOR OFFER
5.24
All Motors shall be heavy Crane duty, squirrel cage
induction motors, INVERTOR duty, 60% CDF, min
of with 300 starts per hours, IP55.
5.24a
Pull out torque of motors shall be not less than
2.75 times of full load torue and shall be specifically
crane duty application
5.24b
Flameproof motors shall be used for 35t FLP EOT
crane. For this crane, all motors shall be provided
with Thermistors for temperature monitoring and
shall have interlock with drive/power supply. If
motor surface temperature is more than T4
classification, the drive shall trip the motor.
5.24c
Maximum permissible operating speed shall be
250% of synchronous speed or 2000 rpm whichever
is less. Over load capacity 150% of full load current
for 2 minutes without damage or permanent
deformation from zero to base speed.
5.24dAll switch gears are to be minimum two times then
the normal rating of the motor rated current
Motors
5.24eAll contactors are to be minimum 150% of the rated
of the motor rated current.
5.25 Speed rating of Motors
Hoist motor shall be 8 pole with ~720 rpm
speed and Travel motors shall be 6 pole with ~980
rpm.
5.26Details of to be
provided
Vendor shall provide other details like No. of
motors, Power of motor, Frame size, make, duty,
no. of starts/hr, type and No. of poles, amb.temp,
as given Annexure-I
5.27Current drawn by
motors
Maximum Current drawn by all motors with SWL
should not exceed 80 % of the full load rated
current
5.28 Torque rating of motorsMotor full load torque rating shall be min. 120% of
calculated torque with duty factors as per IS3177
5.29 Brakes
Electro Hydraulic Thruster Brakes for all motions.
For CT & LT, in case of wheel mounted geared
motors in built disc brakes can be used . Rated
duration and frequency of operation shall be
mentioned.
5.30Socket Outlets at all the
panels.
1. Two nos sockets with ON/OFF switchshall be
provided.
2. 230 V AC work socket for Handlamp
![Page 13: SPECIFICATIONS CUM COMPLIANCE STATEMENT …...cable system as per the following specifications, conditions given below and also in accordance with latest editions of IS: 3177, IS:](https://reader034.vdocuments.us/reader034/viewer/2022042217/5ec0f5a7388fc50dfa7ac023/html5/thumbnails/13.jpg)
Page:13 of 23
SL. NO. DESCRIPTION ISRO -SHAR SPECIFICATION VENDOR OFFER
5.31 Push button station
PBS shall be provided with push buttons for
controlling main and creep of all motions, UP/down,
CT : right/left, LT forward/reverse. shall be
provided with Key way switch Lockable at OFF,
Emergency OFF, and Intrinsic Lamp – Powered
through Intrinsic Safe circuit. PBS shall also provide
with 2-way Switch for Under Bridge Lights. At least
30 % Spare Core shall be provided in PBS. For
control ON command push button shall be of
illuminated push button and lamp should glow after
energising the main contactor in protective panel.
Interlock shall be provided as given below for all the
motions as mentioned above
Pendent push button level
Contactor level (which is used for issuing the
command to the VVVF Drive)
Programming logic level in the VVVF drive
Gravity limit switch should control the entire EOT
Crane power supply
Rotary limit switch should control the HOIST
5.31a Interlock
Rotary limit switch should control the HOIST
operation in the respective direction
1. Indication lamps shall be provided for all three
phases for both incomer feeder.
2. Indicating lamps shall be of Cluster LED type
only, provided with translucent lamp covers.
3. Lamps and lenses shall be easily replaceable
from the front.
4.Cluster LED module shall be suitable for direct
operation on 230 V, 50 Hz AC in general
5.32 Limit Switches for Hoist
Rotary Limit Switch – 1no. (to control both UP /
DOWN operation of HOIST)
Gravity Limit Switch – 1no
5.33Limit Switches for CT &
LTLever type - 2nos for CT & 2nos for LT
All wiring for power control, lighting etc., shall be
carried out with 1.1.K.V grade XLPE Armoured
copper conductor cables. Minimum size 4 mm sq. in
power circuit and 2.5 mm sq in control circuit. All
inter connecting wiring to be done neatly through
perforated trays from the panel to the top junction
boxes (if any) fixed in suitable places.
Wiring shall be neatly bunched, adequately
supported and properly routed to allow easy access
5.31b Indication lamps
Power and Control
Cables5.34
and maintenance.
Wires shall be identified by numbered ferrules at
each end.
![Page 14: SPECIFICATIONS CUM COMPLIANCE STATEMENT …...cable system as per the following specifications, conditions given below and also in accordance with latest editions of IS: 3177, IS:](https://reader034.vdocuments.us/reader034/viewer/2022042217/5ec0f5a7388fc50dfa7ac023/html5/thumbnails/14.jpg)
Page:14 of 23
SL. NO. DESCRIPTION ISRO -SHAR SPECIFICATION VENDOR OFFER
The ferrules shall be of the ring type and of non-
deteriorating material.
Terminal blocks shall be of 750 Volts grade of the
stud type and shrouded.
Insulating barriers shall be provided between
adjacent terminals.
Provisions shall be made for label inscriptions for
the easy identification of terminal blocks.Labels shall be of anodised aluminium with white
engraving on black background / computerized
labels.
ON/OFF/TRIP inscriptions shall be clearly marked
over the individual panel with clear marking of
direction of the operation of handle apart from the
standard marking provided by the switchgear
manufacturer.
Enamel Danger plates / stickers of size and
descriptions as recommended in the relevant IS,
shall be provided on the Panel inscribed in Telugu,
Hindi and English languages mainly. The same to be
indicated the G.A after getting the order and before
proceeding for fabrication.
Terminal blocks and
labels5.34a
5.35 Earthing
The crane rails, structures, motor/brake frames,
metal enclosures of all electrical equipment, conduit
and trays shall be effectively grounded with double
earthing and shall be conneted to building earth
though gantry rails.
5.36Identification of Circuit
& Cables
1. Labels of permanent nature to be specified. 2.
All power and control cables, etc are to be tagged at
both the ends.
6.0
6.1 Surface Cleaning
The entire surface of fabricated materials, girders,
frames, platforms, trolley, end carriage, wheels
etc., are to be sand/grit/abrasive blasted to white
metal finish (SA 2½ quality) and cleaned properly
off rust, grease, & dirt .
6.2
Painting with Epoxy
Primer (Total thickness
of 80 microns)
Two coats of epoxy primer (Apcodur CP 680 of M/s
Asian Paints or equivalent) shall be applied to a Dry
Film Thickness (DFT) of 80 microns.
6.3
Painting Epoxy Paint (
Total thickness 120
microns)
Two coats of epoxy paint Golden Yellow colour
(Apcodur CF 693 of M/s Asian Paints or equivalent)
shall be applied to a Dry Film Thickness (DFT) of 80
micron and 40 micron for first and second coats
with proper drying in between coats. Final touching
shall be done after erection & commissioning at
site. Paninting quality shall ensure austhetic looking
of crane.
Not less than 200 microns, This will be tested
PAINTING OF CRANE (DFT shall be measured at the time of final
inspection)
6.4Total Paint Thickness
Including Primer
Not less than 200 microns, This will be tested
during final inspection at supplier works/ at the time
of despatch.
![Page 15: SPECIFICATIONS CUM COMPLIANCE STATEMENT …...cable system as per the following specifications, conditions given below and also in accordance with latest editions of IS: 3177, IS:](https://reader034.vdocuments.us/reader034/viewer/2022042217/5ec0f5a7388fc50dfa7ac023/html5/thumbnails/15.jpg)
Page:15 of 23
SL. NO. DESCRIPTION ISRO -SHAR SPECIFICATION VENDOR OFFER
7
7.1
7.2
7.3
7.4
7.5
Bidder shall submit following INFORMATION/DOCUMENTS ALONG
WITH QUOTATION : List of documents to be submitted along with
offer (offer will be rejected unless these information/ documents
are submitted) 7.1 to 7.5
GA drawing showing full details of cranes with dimensions, end clearances
(between centre of LT rails to column face of building), overhead clearance
from LT rails, hook approach limits, lift height, etc. with crane weights &
wheel loads.
Technical details of Major components selected/ considered by Vendor for
these cranes for quotation. As per Annexure -I
Submission of Prices along with cost of two year spare parts strictly as per
the PRICE BID FORMAT given in Annexure -II.
Technical Specifications with Point-wise Specifications to all points as
given in this specification ( in given this FORMAT). Generalized statements
like crane shall be manufactured as per your specifications or as per IS
standards etc. are not adequate. Otherwise, it may result in rejection of the
tender. Vendor shall comply with this & submit quotation in this format only.
Any deviations with respect to this specifications are not acceptable.
However Bidder can submit / suggest improvements, which increas safety &
reliability of crane, if any, seperately by indicating the caluse no. in this
specifications.
8.0
8.1
8.2
8.3
8.4
8.5
8.6
8.7
All the drawings and caclulations and data sheets shall be submitted at a
time within one month from Order date for verification & approvals.
All the load bearing structure & drive mechanisms shall be designed by
taking dead loads, operational loads, erection loads, loads due to sudden
actuation of brakes and acceptance testing loads.
Bidder shall submit following list of drawings/ calculations / documets for
approval before manufacture of crane within one month after palcement of
purchase order. (8.6 to 8.23)
Note: It is the responsibility of the supplier to get the drawings/documents
approved from TPIA/ Purchaser.
DESIGN APPROVALS : DRAWINGS /DOCUMENTS TO BE SUBMITTED
AFTER PLACEMENT OF ORDER
specifications.
Design of load bearing structures shall be as per IS 807 and drive
mechanisms as per IS 3177 and also as per technical specifications in to
consideration.
At the same time, Supplier shall be responsible for proper submisssion of
following drawings & calculations along with technical specifications to Third
party inspection agency and get Deisgn Approvals from them .
General Arrangement (GA) drawing of crane to scale with dimensions, Bill of
materails & makes
Three sets of following drawings/ calaclations shall be submitted to
Department/ Purchaser (ISRO) for review.
GA Assembly Drawing of Trolley with all components8.7
8.8 GA Drawing of individual drive mechanisms for Hoist, CT and LT
GA Assembly Drawing of Trolley with all components
![Page 16: SPECIFICATIONS CUM COMPLIANCE STATEMENT …...cable system as per the following specifications, conditions given below and also in accordance with latest editions of IS: 3177, IS:](https://reader034.vdocuments.us/reader034/viewer/2022042217/5ec0f5a7388fc50dfa7ac023/html5/thumbnails/16.jpg)
Page:16 of 23
SL. NO. DESCRIPTION ISRO -SHAR SPECIFICATION VENDOR OFFER
8.9
8.10
8.11
8.12
8.13
8.14
8.15
8.16
8.17
8.18Electrical/electronic circuit diagrams for total crane containing details of
componenets with rating, make, type and settings
Claculations for drive shafts and plummer block bearings.
Quality Assurance Plan for total crane manufacture, erection & testing as
given in Annexre-I.
Claculations for selection of wheels, bearings and Calculations for
selection of CT & LT rails.
Constructional Drawings of Girder, end carriage, and trolley their
connections
Sub-assembly drawings for rope drum assembly, wheel assemblies, hook
blocks, pulley system etc.,
GA drawings, details and selection criteria, power & torue calculations for
gear boxes with manufaturer data sheets
Calculation for bridge girder with deflection & camber, trolley frame, end
carriage, with weight breakup and wheel loads.
Calculation for selection of motors and brakes with manufacturer motor
/brake datasheets & Exproof certificates.
Claculations for selection of Mechine elements like wire rope, rope drum,
couplings, wire ropes, pulleys etc.,
8.19
8.20
8.20a
8.21
8.22
8.23
9.1
9.2
9.3
9.4 2 No. spare parts manuals
4 sets of as built Drawings of all systems of crane as mentioned above
GA drawing of electrical, VVVF panels, DBR Panels and layout of components
within the panels.
QAP/Inspection reprot document showing Third party design approvals,
manufacturer test certificates., all stage & final inspection reports, load test
reports as per QAP and TPIA report on final inspection at works & clearance
report.
Bridge Girder CT rail arrangement drawing to scale with BOM.
Test certificates of all items like rawmaterials, hooks, wire ropes, motors
etc and for all crane parts certified by "Competent person of third party
agency" as per QAP & standards.
4 sets of Cranes operation & maintenance manuals
LT rail arrangement (on Ganrty Girders) drawing to scale with Bill of
Materials (BOM).
Bidder shall submit following along with supply of EOT Crane : List of
Manuals / drawings/ documents/ certificates to be submitted at the time
of inspection of crane at supplier's works and at the time of commissioning
at ISRO, SHAR ( clause 9.1 to 9.10 )
Flameproof approval certificates for motors, all electrical componets and
brake thrusters
Selection criteria/ calculations for VVVF drives and related components
Selection of Cable sizes selection and ratings
9.5
9.6
4 sets of as built Drawings of all systems of crane as mentioned above
aprroval drawings.
Manufacturer maintenance manuals, test certificates and Warranty /
Guarantee Cards for all Bought-Out-Items.
![Page 17: SPECIFICATIONS CUM COMPLIANCE STATEMENT …...cable system as per the following specifications, conditions given below and also in accordance with latest editions of IS: 3177, IS:](https://reader034.vdocuments.us/reader034/viewer/2022042217/5ec0f5a7388fc50dfa7ac023/html5/thumbnails/17.jpg)
Page:17 of 23
SL. NO. DESCRIPTION ISRO -SHAR SPECIFICATION VENDOR OFFER
9.7
9.8
9.9
9.10
10
10.1 Span over LT wheels + 4mm maximum
10.2 Diagonal on wheels ± 5mm maximum
10.3 Parallelism of Girders<1/1000 of wheel gauge (measured at every 1m
interval)10.4 Verticality of Girders <2mm (measured at every 1m interval)
10.5Verticality of End
Carriages< 1mm (measured at every 1m interval)
10.6 Trolley wheel gauge ± 2mm (measured at every 1m interval)
10.7Difference in height
between trolley rails<1/1000 of wheel gauge maximum at 1m interval
10.8CT Rail alignment w.r.t
Girder centre±1 mm (measured at every 1m interval)
Final test certificate of EOT crane from TPIA with inspection report
Trouble Shooting Chart for Main and all Sub-Systems.
VVVF drive drives manuals soft copy & Hardcopy.
VVVF drive parameters list soft copy and hard copy
Tolerances : Vendor shall ensure that the crane shall be
manufactured as per the tolerances specified below.
Girder centre
10.9Tilt of wheels ( both
horizontal & vertical)< D/ 1000mm where D = diameter Of wheels
10.10CT/LT wheel
displacement<2mm (measured at all wheels) Wheel alignment
10.11Squareness of Girders
to End carriageswithin 1.60mm ( for wheel base of ~4000mm)
10.12 Travelling speed +10% -5% of specified speed.
10.13 Hoisting speed +10% -5% of specified speed.
10.14 Lowering speed +20%-5% of specified speed
11.
11.1
DESIGN / DRAWINGS
APPROVALS &
CERTIFICATE from TPIA
before crane
manufacture.
Supplier shall obtain APPROVALS for all design
calculations & drawings from third party inspector
(TPIA) and/or ISRO before starting crane's
production. Crane & components shall be
manufactured & inspected as per the approved
drawings only. All inspection/test repots shall be
made with respect to approved drawing with ref.
no.
11.2QAP & Thirdparty
agency
INSPECTION and testing shalll be carried out as
per QAP enclosed here with in Annexure -III .
Supplier shall hold the manufacturing at specified
"HOLD" places and call for inspection. The Schedule
of Inspections shall be strictly adhered to and shall
be witnessed by THRID PARTY and/or ISRO. All the
INSPECTION & TESTING DURING MANUFACTURE OF CRANE
agency be witnessed by THRID PARTY and/or ISRO. All the
critical inspections and load testing shall be done in
the presence of TPIA and /or ISRO
![Page 18: SPECIFICATIONS CUM COMPLIANCE STATEMENT …...cable system as per the following specifications, conditions given below and also in accordance with latest editions of IS: 3177, IS:](https://reader034.vdocuments.us/reader034/viewer/2022042217/5ec0f5a7388fc50dfa7ac023/html5/thumbnails/18.jpg)
Page:18 of 23
SL. NO. DESCRIPTION ISRO -SHAR SPECIFICATION VENDOR OFFER
11.3
Raw materials
identification &
stamping
Raw material identification for structures, wheels,
hoist members, Gears, load pins etc., shall be done
by Third party inspectorate and/or department.
Raw material test certificates, traceability of
materials with identification marks shall be made
available during identification.
11.4Welding inspection &
Testing
All Butt Welded Joints (both compression & tension
flanges / web joints) shall be subjected to 100% X-
Ray Testing and X-Ray Films to be produced for
TPIA and/or ISRO/SHAR for evaluation and shall
form part of the quality documentation.
11.5Inspection major parts
and records
Inspection of Bridges, End – Carriages, trolley,
railsgauge, Wheels and Measurement of Camber,
mechanical assemblies checking as per QAP.
11.6
Dimensional inspection
& alignment checking &
records
Inspection of Span & Diagonal Dimensions (10 Kg
pull should be applied while checking), Checking
bridge & end carriages' squareness, Checking of
Wheel Alignments, Mechanical drive Assemblies
alignment and Pulley blocks alignmentt.
11.6 a Record of inspection
All the inspections made shall be made with drawing
representation like span, diagonal, wheel
strightness, rail alignement, with dimensions &
tolerances mentioned.
11.7
No load test, Dynamic tests at Rated Load and
Deflection measurement as per as per QAP and as
per IS 3177
11.8
Testing of Crane at OVER-LOAD (125% SWL)
capability Check and Permanent Set Measurement.
All motions of the crane shall be tested with 25%
over load in which case the specified speeds need
not be attained but the crane shall show itself
capable of dealing with the over load without
difficulty.
11.9 Clearance for despatch
The equipment shall be despatched only after
satisfactory testing/ inspection at supplier's works
and on written clearance from ISRO
12
12.1 At ISRO- SHAR worksPart of supplier's scope. Inspection/testing during
erection & commissioning as per QAP
12.2 Erection Supervision
Supplier shall depute qualified personnel i.e., one
supervisor, one fitter, two riggers, and one
electrician and two helpersfor carrying out quality
erection work at our site.
12.3
Material (lifting
equipment, lifting
tackles, etc) required
Part of supplier's scope. All lifting machines/tackles
of standard make used shall be tested & certified
as per standards before their use for lifting the
Load tests
ERECTION & COMMISSIONING OF EOT CRANE
12.3tackles, etc) required
during erection.
as per standards before their use for lifting the
crane.
![Page 19: SPECIFICATIONS CUM COMPLIANCE STATEMENT …...cable system as per the following specifications, conditions given below and also in accordance with latest editions of IS: 3177, IS:](https://reader034.vdocuments.us/reader034/viewer/2022042217/5ec0f5a7388fc50dfa7ac023/html5/thumbnails/19.jpg)
Page:19 of 23
SL. NO. DESCRIPTION ISRO -SHAR SPECIFICATION VENDOR OFFER
12.4
Initial lubricants and
commissioning spares
Initial filling of lubricants and spare parts required
for commissioning at site shall be provided by the
supplier.
12.5
Performance Proving &
Smooth running of EOT
crane
Proving out for the Crane’s Capacity and Smooth
Functioning of the Crane at Full load (SWL) and
Over load (125%SWL) shall be the responsibility of
the supplier.
12.6Test/Clearance
certificates for crane
Part of supplier's scope. To be inspected and
certified by "Competent Person of Thrid party
Inspection Agency " as per Industrial Laws and shall
provide Certification from Third Party Inspection
Agency for fianl clearance & regular usage of EOT
crane .
13
13.1GEAR BOXES and
Geared Motors
Elecon / Shanti/ GREAVES (Premium transmission)
/ Flender- Siemens only.
13.2
Structural Steel
Materials Plates, rolled
sections
SAIL/ JINDAL/ TATA/ ESSAR/ VIZAG-RINL
MAKE OF THE BOUGHT-OUT ITEMS
13.3
Forged steel materials
like wheels, shafts,
keys, gears,
SAIL/ JINDAL/ TATA/ ESSAR/ VIZAG-RINL/ BHARTH
FORGE/ VIKRANT FORGE
13.4 Wire Rope Usha Martin 6x36, Grade 1960 Mpa
13.5 Bearings SKF / FAG / TIMKEN/ INA
13.6Thruster Brakes for
Hoist Motion
BUBENZER-BREMSEN(Thrusters of EMG-
Automation)/ SIBRE/ WITTON KRAMER/ GALVI /
SIME-Stromag
13.7Thruster Brakes for
Travel Electromag, KATEEL
13.8 HooksEEK/Hercules-INDEF/IRIZAR-FORJAS/SMRITHI
FORGINGS/ VIKRANTH FORGE/ CROSSBY
13.9 Couplings FENNER/ LOVEJOY
13.10 Crane RailsSAIL/JINDAL/TATA/ESSAR/IISCO/ ACCELOR-
MITTAL
13.10a Rail clamps Gantrex
13.11 Motors (Squirrel cage)Kirloskar, Crompton Greaves, Bharat Bijilee, LHP,
Siemens, Havells
13.11a VVVF Controls M/s SIEMENS/ABB Only
13.12 Connectors Elmex / Wago/ Connect Well
13.13 SWITCH GEAR SIEMENS only
13.14 Grounding SystemAll the panels and the electrical apparatus shall be
double grounded
13.15 Limit Switches Siemens/SPEED-O-CONTROL/EMM
13.16 Intrinsic Safe realys MTL/ P&F
![Page 20: SPECIFICATIONS CUM COMPLIANCE STATEMENT …...cable system as per the following specifications, conditions given below and also in accordance with latest editions of IS: 3177, IS:](https://reader034.vdocuments.us/reader034/viewer/2022042217/5ec0f5a7388fc50dfa7ac023/html5/thumbnails/20.jpg)
Page:20 of 23
SL. NO. DESCRIPTION ISRO -SHAR SPECIFICATION VENDOR OFFER
13.17 Flameproof Panels BALIGA/FCG make only
13.19 CablesIGUS/LAPP/Polycab/Finolex/Incab as approved by
the department
13.21 Paints Asian Paints/Berger
14
14.1
14.2
14.3
14.4
The successful Vendor is required to visit our site and measure all necessary
dimensions i.e. Span, Head Room, Clearances between rail center to existing
column and rail size etc, at site before starting of the crane design /
manufacturing.
General TERMS & CONDITIONS during supply and installation :
Delivery Schedule:The cranes shall be supplied with in 6 months from date
of Order and shall be erected & commissioned with in 2 months from date of
supply.
Arrangements shall be made by the supplier for the inspection and testing of
the crane during different stages of its manufacture starting form the raw
materials till the completion of the crane by the SDSC,SHAR and/or Third
In the design of Crane, all indian standards, all safety regulations as
applicable under provision of factory Act, Indian Electricity rules etc. as
prevailing in the country / State of Andhra Pradesh (site of installation) shall
be taken into consideration.
14.4
14.5
14.6
14.7
14.8
14.9
14.10
14.11
14.12
Free electricity and water will be provided by the purchaser for the erection,
testing and commissioning of the crane at the site.
The supplier should satisfy himself about the site condition beforehand to
avoid any difficulty during erection and commissioning of the crane
Dimensions of all parts used on crane shall conform to metric standards
During the erection, testing and commissioning of the crane at site in
Sriharikota, the supplier has to make his own arrangements for boarding,
lodging, transportation of his men and materials. However, hostel
accommodation may be provided by the purchaser on chargeable basis, if
available.
No cast iron part should be used on the crane except for electrical
equipment. Similarly wood or combustible material and Bush bearing should
not be used in any part of the crane. Open gears should not be used in any
drive / motion.
Supplier shall submit complete erection plan with details of erection loads &
pattern of wheel loads that will act on building civil structure, erection
procedure, material handling procedure etc.
materials till the completion of the crane by the SDSC,SHAR and/or Third
Party Agency at the suppliers site as per the QAP schedule.
Before starting the site work, the contractor shall provide insurance to crane
parts and to all his personnel working at site in Sriharikota against accidents/
or loss of material.
Assembly at site is to be kept as minimum as possible to enable early
commissioning of the crane. Welding at site is to be avoided as far as
possible.
or loss of material.
![Page 21: SPECIFICATIONS CUM COMPLIANCE STATEMENT …...cable system as per the following specifications, conditions given below and also in accordance with latest editions of IS: 3177, IS:](https://reader034.vdocuments.us/reader034/viewer/2022042217/5ec0f5a7388fc50dfa7ac023/html5/thumbnails/21.jpg)
Page:21 of 23
SL. NO. DESCRIPTION ISRO -SHAR SPECIFICATION VENDOR OFFER
14.13
14.14
15
15.1
15.2
The transfer of title of Crane to the purchaser/ISRO will take place only after
satisfactory erection, testing and commissioning of the crane by the supplier
and fully acceptance by the purchaser/ISRO.
The quotation for all these crane should be submitted in two parts.
1) Part –I: Technical and commercial bid along with copy of the price
bid without prices but indicating % of taxes & duties
2 ) Part –II: Price bid. as per format given in Annexure- B.
Note : Each part should be in separate sealed covers superscripted as Part I
and Part II respectively. Both parts should be submitted at the same time
before the tender due date.
Supply Prices shall be at Ex- works. Transportation charges shall be indicated
A toolbox containing all necessary tools (e.g., torque wrench, hand grease
gun, set of spanners, screwdrivers, hyd jack etc.) required for the
maintenance of the crane should be furnished along with the Crane.
Delivery : 8 months for total work. The crane (35t) shall be supplied
within 6 months from date of Order and shall be erected & commissioned
with in 2 month from date of supply.
COMMERCIAL TERMS & CONDIONS :
15.3
15.4
15.5
15.6
15.7
15.8
15.9
15.10
15.11Advance along with
Order30% of supply value against Bank guarantee
15.12Payment after crane
reciept at site 60% of supply value along with taxes and duties
Supply Prices shall be at Ex- works. Transportation charges shall be indicated
seperately as given in Price Bid Format Annexure - B
Guarantee period shall be for a period of 12 calendar months, commencing
from the date of acceptance & taken over by the purchaser at our site.
During this period any defect noticed on design, materials, workmanship
shall be replaced/rectified by the supplier at free of any cost.
Payment Terms in three stages. Vendor shall comply with.
Performance Bank guarantee (PBG) for 10% of total cost of the crane
shall be provided by the Vendor for a period of 12 months from the date of
commissioning and acceptance of the crane at purchaser’s site at
Sriharikota,
All Taxes (like sales tax, VAT, service tax etc.,) and duties applicable shall
be indicated clearly in quotation.
Excise duty (ED) exemption Certificate will be issued by the purchaser for
the crane. Hence ED shall be NIL..
Transportation & Transit Insurance are fully in the scope of supplier, NO
transit insurance will be paid by department.
Liquidates Damages (LD) : Department will levy a penalty for delayed
delivery @ 0.5% per week and part thereof subject to a maximum of 10% of
the value of unexecuted portion of the order.
15.13
Final & Balance Pament
after completion of
erection &
commissioning
10% of supply value+ 100% TPIA charges +100%
errection & comissioning charges againest
submission of performance Bank guarantee as per
clause 15.9
![Page 22: SPECIFICATIONS CUM COMPLIANCE STATEMENT …...cable system as per the following specifications, conditions given below and also in accordance with latest editions of IS: 3177, IS:](https://reader034.vdocuments.us/reader034/viewer/2022042217/5ec0f5a7388fc50dfa7ac023/html5/thumbnails/22.jpg)
Page:22 of 23
SL. NO. DESCRIPTION ISRO -SHAR SPECIFICATION VENDOR OFFER
15.14
15.15
Validity of Offer shall be minimum period of 3 (Three) months from the
tender due date.
Kind attention to the Vendors EARNEST MONEY DEPOSIT (EMD) is included
in continuation to the attached RFP under the Arrangement of Bid. a.
EARNEST MONEY DEPOSIT (EMD)/BID SECURITY • The tenderer has to
submit an Earnest Money Deposit (EMD) for Rs. 1 lakhs in a single
installment through Demand Draft (DD)/Banker’s Cheque/ Fixed Deposit
Receipts or Bank Guarantee from any of the Scheduled Banks executed on
non-judicial stamp paper of appropriate value. In case of Bank Guarantee, it
shall be valid for a period of 45 days beyond the final tender validity date. It
shall be taken in favour of Sr. Accounts Officer, SDSC SHAR payable at State
Bank of India, Sriharikota branch. Any tender not accompanied with EMD
shall be treated as invalid tender and rejected. • Foreign vendors, registered
vendors or vendors who have already applied for renewal of registration,
Central PSUs/PSEs/Autonomous Bodies, Micro and Small Enterprises, KVIC,
National Small Industries Corporation, etc., shall be exempt from the
payment of EMD. Vendors seeking exemption from payment of EMD shall
submit necessary documentary proof. • EMD of a vendor shall be forfeited if
the tenderer/Contractor withdraws or amends his tender or deviates from
the tender in any respect within the period of validity of the tender. Failure
to furnish securitydeposit/performance bond by a successful vendor within
the specified period shall also result in forfeiture of EMD. • EMD shall be
refunded to all the unsuccessful vendors within thirty days after placement of
Date
Signature & Office Seal of
the bidder
the Purchase Order. EMD shall be refunded to the successful
tenderer/Contractor after payment of the Security Deposit or may be
adjusted against the Security Deposit. EMD shall be refunded to all the
participants in cases where the tender is cancelled or withdrawn by the
Centre/Unit, within thirty days from the date of such cancellation or
withdrawal.