SOP for Receipt of Material at Ambernath Factory
Check points to be satised before gate entry Stamp is axed
1) A delivery challan / Tax Invoice must accompany the material.2) The delivery challan / Tax Invoice should be addressed in the name
of the company.3) Purchase rder !umber is mentioned on the challan / Tax Invoice.
After the !ate entry stamp is a xed
1) The "tamped #hallan / Tax Invoice / $xcise Invoice to be handed
over to "tores %eeper.2) The store &eeper shall ensure the fol lo'in(
• #onduct a physical chec& of the material received and tally the
items received 'ith the documents accompanyin( the same for
correctness.
• In case material is received a(ainst an $xcise Invoice* ensure+uplicate copy for Transporter is available before (eneratin( a
,oods -eceived !ote.
• The aterial -eceipt -) is then to be punched in the 0aan if
the receipt is a(ainst a valid Purchase rder.
• After the - is done in the system* the material is handed over
to uality Inspection team for physical verication and uality
inspection alon( 'ith a ,-! copy si(ned by the "tore %eeper.
• n completion of physical verication and acceptance of the
material the uality team shall put his remar&s on the ,-! so
received from the "tore %eeper and do the necessary entry in
0aan to conrm or re4ect the material received either partially
or completely.
• After ma& in( the ent ry i n 0aan the ua li ty team shal l
re(enerate the ,-! 'hich shal l be the nal ,-! copy after
receipt and Inspection is completed.
• This nal ,-! be printed in t'o copies and the same shall be
countersi(ned by "tore %eeper and the uality In5 char(e.
• ne copy to be retained by store5&eeper and the other copy to
be attached 'ith the Tax Invoice and sent to Accounts Team for
boo&in( the Tax invoice.
• In cases 'here ,-! is not (enerated due to deciency indocumentation* the instances to be captured separately and
reported to purchase team for corrective action.
"# $ime lines for completion of acti%ity is as follo&s
Sr'
(o'
Acti%ity $ime )imit
1. #reation of Initial ,-! by store
&eeper
+ay of -eceipt or
next day.
-
8/18/2019 SOP for Material Inward_Inspection_Accounting
2/2
2. Physical 6eri cation 7ithin t'o 'or&in(
days from the date
of receipt.3. 8pdatin( ,-! in 0aan post
uality Inspection
+aily activity
$veryday t'o
hours to be
allocated for
updatin( the
details in 0aan)