centricabusinesssolutions.com © 2017 Centrica plc. Registered office: Millstream, Maidenhead Road, Windsor, Berkshire. SL4 5GD. Registered in England & Wales No 3033654 CS-2017-5 Why choose Solar? Generate your own electricity using energy from the sun – even on cloudy days Cut your carbon footprint and demonstrate your corporate responsibility credentials Lower electricity bills – solar can form part of an electricity generation plan for your business that means you buy less from a supplier Create an income – a FiT can pay for energy you produce and let you sell any excess to the National Grid from commission to completion installed now powered by the sun 17,000 PV MODULES 4 MONTHS 5% OF THE PLANT’S ENERGY They were looking for a greener solution Toyota wanted a partner to create a turnkey project for the UK’s largest factory-connected solar PV installation. This was to help power their first European Model Sustainable Plant at Burnaston. We completed the project in just four months Following our commission, there was a change in the government Feed-in Tariffs (FiT) scheme for large-scale systems – a programme that promoted the uptake of renewable and low-carbon electricity generation technologies. This change allowed us to significantly accelerate the project with installation and commissioning being completed in less than four months from project approval. What we did We were responsible for the full development of the site including environmental studies and planning support. During the 10-week construction programme we installed nearly: • 17,000 PV modules • 240 inverters • 140km of cabling and associated HV works How it works The electricity generated via the solar panels is sent via long cables to a power inverter where it’s converted from direct current (DC) to alternating current (AC). It’s then ready to be used directly by the business, just like electricity that’s bought from a supplier. The funding for the project This was a funded project providing the project finance through a funding vehicle. Toyota receive all the electricity generated, and the funding vehicle takes any FiT revenue. The results The PV system is now providing 5% of Toyota’s site energy consumption, helping to cut costs and reduce the carbon footprint. The installation has now been sold to Bluefield LLP, a specialist investor in UK renewable energy and solar PV. MANUFACTURING Solar Using the sun to power the plant We created the UK’s largest factory-connected solar photovoltaic (PV) system for Toyota, allowing them to generate their own power, naturally.

Upload: others

Post on 21-Nov-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Solar Using the sun to power the plant · 2017. 8. 29. · The electricity generated via the solar panels is sent via long cables to a power inverter where it’s converted from direct

centricabusinesssolutions.com

© 2017 Centrica plc. Registered office: Millstream, Maidenhead Road, Windsor, Berkshire. SL4 5GD. Registered in England & Wales No 3033654 CS-2017-5

Why choose Solar?

• Generate your own electricity using energy from the sun – even on cloudy days

• Cut your carbon footprint and demonstrate your corporate responsibility credentials

• Lower electricity bills – solar can form part of an electricity generation plan for your business that means you buy less from a supplier

• Create an income – a FiT can pay for energy you produce and let you sell any excess to the National Grid

from commission to completion

installed now powered by the sun

17,000PV MODULES

4MONTHS

5%OF THE PLANT’S

ENERGY

They were looking for a greener solution Toyota wanted a partner to create a turnkey project for the UK’s largest factory-connected solar PV installation. This was to help power their first European Model Sustainable Plant at Burnaston.

We completed the project in just four months Following our commission, there was a change in the government Feed-in Tariffs (FiT) scheme for large-scale systems – a programme that promoted the uptake of renewable and low-carbon electricity generation technologies.

This change allowed us to significantly accelerate the project with installation and commissioning being completed in less than four months from project approval.

What we didWe were responsible for the full development of the site including environmental studies and planning support. During the 10-week construction programme we installed nearly:

• 17,000 PV modules

• 240 inverters

• 140km of cabling and associated HV works

How it worksThe electricity generated via the solar panels is sent via long cables to a power inverter where it’s converted from direct current (DC) to alternating current (AC).

It’s then ready to be used directly by the business, just like electricity that’s bought from a supplier.

The funding for the projectThis was a funded project providing the project finance through a funding vehicle. Toyota receive all the electricity generated, and the funding vehicle takes any FiT revenue.

The resultsThe PV system is now providing 5% of Toyota’s site energy consumption, helping to cut costs and reduce the carbon footprint.

The installation has now been sold to Bluefield LLP, a specialist investor in UK renewable energy and solar PV.

MANUFACTURINGSolar

Using the sun to power the plantWe created the UK’s largest factory-connected solar photovoltaic (PV) system for Toyota, allowing them to generate their own power, naturally.