Solar-to-EV Project at the San Diego Zoo
Western Underground Conference
April 10, 2013
© 2013 San Diego Gas & Electric Company. All copyright and trademark rights reserved.
![Page 2: Solar-to-EV Project at the San Diego Zoo Western Underground Conference April 10, 2013 © 2013 San Diego Gas & Electric Company. All copyright and trademark](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649cbf5503460f9498560e/html5/thumbnails/2.jpg)
Sustainable Communities Program
Goal: Work with our customers to showcase energy efficient, sustainable projects that incorporate SDG&E-owned clean generation systems
• Integrate photovoltaics, plug-in electric vehicle (PEV) chargers and energy storage with advanced communications & control systems in support of SDG&E’s Smart Grid Deployment Plan
Systems – photovoltaics, fuel cells & energy storage
• Owned, maintained & operated by SDG&E
• Typically interconnected on utility side of the meter
• No effect on customer utility bill
• SCP now has 36 projects for a total of nearly 4.4 MW
• Includes a 400 kW fuel cell
Awarded the US Green Building
Council Leadership Award
![Page 3: Solar-to-EV Project at the San Diego Zoo Western Underground Conference April 10, 2013 © 2013 San Diego Gas & Electric Company. All copyright and trademark](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649cbf5503460f9498560e/html5/thumbnails/3.jpg)
Sustainable Communities Program
This is an innovative distributed-generation program in answer to adding more renewable energy to our grid
Potential Benefits to customer:
• Collaborate with SDG&E on a Smart Grid project
• Energy Dashboard Education for occupants and visitors
• Community partner to help provide locally generated clean power
• Public Recognition – Sustainable Communities Champion Award, website, advertisement recognition & case studies
• Possible LEED® points or payment for space occupied by photovoltaics system
Potential Benefits to utility:
• Clean, renewable distributed generation on the grid
• New advanced energy storage projects will:
• Reduce intermittency from PV• Offset PEV charging• Peak shave utility peak load
• Showcases SDG&E’s environmental stewardship
![Page 4: Solar-to-EV Project at the San Diego Zoo Western Underground Conference April 10, 2013 © 2013 San Diego Gas & Electric Company. All copyright and trademark](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649cbf5503460f9498560e/html5/thumbnails/4.jpg)
Steps in the process
Contract terms:
• 20 year lease with options at years 10 and 15 to renew, purchase the energy system or request removal of the system
• Lease payment (if applicable) is paid annually, but the first five years are paid upfront
– Lease payment is $0.01/kWh per year, calculated up front based on nameplate of PV
– e.g. 100 kW PV – annual lease payment of $1,700
PV/Clean Energy Installation:
1. SDG&E issues a RFP to approved solar vendors
2. SDG&E awards the bid
3. Solar vendor designs the PV/Clean Energy system
4. Solar vendor obtains permits
5. Work with construction schedule to install the system
6. Commission the system
![Page 5: Solar-to-EV Project at the San Diego Zoo Western Underground Conference April 10, 2013 © 2013 San Diego Gas & Electric Company. All copyright and trademark](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649cbf5503460f9498560e/html5/thumbnails/5.jpg)
SCP Installations to date: 36 Projects for a total of 4,380 kW
• They collectively generate enough energy at peak production to supply 2,855 homes.
• The energy produced prevents more than 8.9 million pounds of CO2 equivalent from entering the atmosphere each year.
• The GHG savings from the electricity produced is equivalent to not driving a car 11.6 million miles, or planting over 133,000 trees.
![Page 6: Solar-to-EV Project at the San Diego Zoo Western Underground Conference April 10, 2013 © 2013 San Diego Gas & Electric Company. All copyright and trademark](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649cbf5503460f9498560e/html5/thumbnails/6.jpg)
Solar-to-EV Project at the San Diego Zoo
Project Summary
• A solar photovoltaics system harnesses energy from the sun to charge cars, store solar power for future use and provide renewable energy to the community
– 10 solar canopies of 9 kW for a total of 90 kW
– 5 Plug-In Electric Vehicle charging stations (includes an ADA accessible charging station) installed and owned by a third party
– Advanced energy storage using Li-Ion batteries – 100 kW/100 kWh
• Reduce intermittency from PV• Offset PEV charging• Peak shave utility peak load
![Page 7: Solar-to-EV Project at the San Diego Zoo Western Underground Conference April 10, 2013 © 2013 San Diego Gas & Electric Company. All copyright and trademark](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649cbf5503460f9498560e/html5/thumbnails/7.jpg)
Solar-to-EV Project at the San Diego Zoo
• The Solar-to-EV project is a collaboration between the San Diego Zoo and Smart City San Diego
• Smart City San Diego combines the resources of SDG&E, City of San Diego, University of California San Diego, General Electric and CleanTECH San Diego to improve the region’s energy independence, reduce greenhouse gas emissions and assert San Diego as a clean energy leader.
• This Solar-to-EV project will serve as a new energy infrastructure blueprint that can be replicated in the San Diego region and beyond.
![Page 8: Solar-to-EV Project at the San Diego Zoo Western Underground Conference April 10, 2013 © 2013 San Diego Gas & Electric Company. All copyright and trademark](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649cbf5503460f9498560e/html5/thumbnails/8.jpg)
San Diego Zoo Plug-In Electric Vehicle Chargers
![Page 9: Solar-to-EV Project at the San Diego Zoo Western Underground Conference April 10, 2013 © 2013 San Diego Gas & Electric Company. All copyright and trademark](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649cbf5503460f9498560e/html5/thumbnails/9.jpg)
San Diego Zoo Wide Angle View
![Page 10: Solar-to-EV Project at the San Diego Zoo Western Underground Conference April 10, 2013 © 2013 San Diego Gas & Electric Company. All copyright and trademark](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649cbf5503460f9498560e/html5/thumbnails/10.jpg)
San Diego Zoo Aerial View
![Page 11: Solar-to-EV Project at the San Diego Zoo Western Underground Conference April 10, 2013 © 2013 San Diego Gas & Electric Company. All copyright and trademark](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649cbf5503460f9498560e/html5/thumbnails/11.jpg)
San Diego Zoo Energy Storage Schematic
11
KEY: # Energy Flows1 PV to Power Converter
2 Bi-directional Converter to Battery
3 Power Converter to EV
4 Bi-directional inverter to grid
1
2
3
4
PV Array
Multi-Port Converter/Inverter
AC
Battery
PV Port
ES Port ES
Port
Grid
EV Port
Port
Grid
GRID
Meter
Meter
DC
PowerConverter
![Page 12: Solar-to-EV Project at the San Diego Zoo Western Underground Conference April 10, 2013 © 2013 San Diego Gas & Electric Company. All copyright and trademark](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649cbf5503460f9498560e/html5/thumbnails/12.jpg)
San Diego Zoo Energy DashboardEducation
![Page 13: Solar-to-EV Project at the San Diego Zoo Western Underground Conference April 10, 2013 © 2013 San Diego Gas & Electric Company. All copyright and trademark](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649cbf5503460f9498560e/html5/thumbnails/13.jpg)
San Diego Zoo Energy DashboardGreen Features
![Page 14: Solar-to-EV Project at the San Diego Zoo Western Underground Conference April 10, 2013 © 2013 San Diego Gas & Electric Company. All copyright and trademark](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649cbf5503460f9498560e/html5/thumbnails/14.jpg)
San Diego Zoo Energy DashboardSDG&E’s Environmental Stewardship
![Page 15: Solar-to-EV Project at the San Diego Zoo Western Underground Conference April 10, 2013 © 2013 San Diego Gas & Electric Company. All copyright and trademark](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649cbf5503460f9498560e/html5/thumbnails/15.jpg)
Case Study - Energy Innovation Center
Roof Top Solar: 47 kW SDG&E-owned system
Six Solar Trees® create a Solar Grove®: 62 kW SDG&E-owned system
• Newly developed solar tracking technology will increase energy production ~20% compared to stationary systems
• Integrated with advanced energy storage
• Plug-in electric vehicle (PEV) chargers
©Envision Solar International, Inc.
Ted Walton Photography
![Page 16: Solar-to-EV Project at the San Diego Zoo Western Underground Conference April 10, 2013 © 2013 San Diego Gas & Electric Company. All copyright and trademark](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649cbf5503460f9498560e/html5/thumbnails/16.jpg)
Case Study - Energy Innovation Center
• Education dashboard showcasing the rooftop vs. the solar grove production
©Envision Solar International, Inc.
Ted Walton Photography
![Page 17: Solar-to-EV Project at the San Diego Zoo Western Underground Conference April 10, 2013 © 2013 San Diego Gas & Electric Company. All copyright and trademark](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649cbf5503460f9498560e/html5/thumbnails/17.jpg)
Newest Projects
• Click to add text
– Next level text here UC San Diego Structural Materials Engineering Bldg. 120 kW photovoltaic system – Seeking LEED® Gold
UC San Diego Charles David Keeling Apts.41 kW photovoltaic system – LEED Platinum
Sharp Rees-Stealy Medical Center Downtown120 kW photovoltaic system – Seeking LEED Gold
![Page 18: Solar-to-EV Project at the San Diego Zoo Western Underground Conference April 10, 2013 © 2013 San Diego Gas & Electric Company. All copyright and trademark](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649cbf5503460f9498560e/html5/thumbnails/18.jpg)
18
connected…..to the sun
• Two pilot programs: Share the Sun and SunRate
• Programs to add 20+ MW of local solar
• Pending Commission Approval
Integrating Renewable Energy into the Distribution System
Sustainable Communities Program
• Integrates utility owned clean generation and smart grid technologies within sustainable projects
• Participants “host” generation systems by leasing space to SDG&E
![Page 19: Solar-to-EV Project at the San Diego Zoo Western Underground Conference April 10, 2013 © 2013 San Diego Gas & Electric Company. All copyright and trademark](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649cbf5503460f9498560e/html5/thumbnails/19.jpg)
connected•••••to the sun
• 2/3 of customers can’t take advantage of rooftop solar
• Expands solar to all customers -- opens new market for solar developers
• Application filed to implement two pilot program elements:
• Share the Sun -- enables customers to invest in solar systems from a solar provider
• SunRate -- allows customers to purchase green energy from local solar projects under contract to SDG&E
Connecting Customers to Solar Energy
Share the Sun
For solar providers & customers
For customers
SunRate
![Page 20: Solar-to-EV Project at the San Diego Zoo Western Underground Conference April 10, 2013 © 2013 San Diego Gas & Electric Company. All copyright and trademark](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649cbf5503460f9498560e/html5/thumbnails/20.jpg)
20
connected•••••to the sunPotential Benefits
• Expands local solar access and greater alternatives to customers
– Removes site restrictions and building ownership as a hurdle to solar energy use
– Customers can lock-in their commodity price with a longer-term commitment
– Customers can take their solar subscription with them when moving
– Provides access to solar projects that have the benefits of optimal location, scope and scale
• Creates a sustainable market and new business opportunities for solar in SDG&E territory that does not rely on cross subsidies
![Page 21: Solar-to-EV Project at the San Diego Zoo Western Underground Conference April 10, 2013 © 2013 San Diego Gas & Electric Company. All copyright and trademark](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649cbf5503460f9498560e/html5/thumbnails/21.jpg)
Sustainable Communities Program
Questions?