social audit report - rflplastics.com · social audit report durable plastic ltd. 10 april 2012...
TRANSCRIPT
Social Audit Report
January 2009
BSCI 7-01/09
All rights reserved. No part of this publication may be reproduced, translated, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, be lent, re-sold, hired out or otherwise circulated without the FTA’s authority. Copyright © 2004 by FTA – Foreign Trade Association, Brussels – gsm Global Sustainable Management GmbH, Cologne – Migros-Genossenschafts-Bund, Zürich – Systain Consulting GmbH, Hamburg
© Copyright 2004 The English version is the legally binding one. BSCI 7-01/09
Name of Company Audit Date DBID number BSCI Social Audit Report Durable Plastic Ltd. 10 April 2012 29211 Page 2 of 12
1 Due to the sampling nature of the auditing exercise, absence of findings during an assessment does not assure the full compliance of the facility nor does it guarantee that violations may not appear in the future. BSCI and the auditing company do not accept responsibility for conditions at other locations that may be used in the supply chain of the relevant product or service since this report covers the production site listed under ‘’audited company’’ only.
Factory Name:
Durable Plastic Ltd.
Factory Address: Mulgaon, Kaligonj, Gazipur-1770, Bangladesh
Management Representative: S. M. Anwarul Islam Head of Compliance
Audit Results for BSCI Social Requirements Part B:
Good1 Improvement Needed Non-compliant
Audit Results for Best Practice for Industry Part C:
Good Improvement Needed
Audit initiated by: BSCI Member : Supplier:
Auditing Company Name: Euro Cert Audit report number: DPL010042012 DBID number: 29211 Lead Auditor’s name and SAAS certificate number:
Rashid M Akhter
Auditing Company Address: 15/A, Road 8, Gulshan-1, Dhaka-1212, Bangladesh
Audit Date: 10 April 2012 Date of the new BSCI to be started: (3
years from the initial audit)
11 April 2015
Number of Initial audits performed at this facility (Cycle number 1, 2, 3..):
0
Agreed date for closing the CAP (if
applicable):
N/A
Date, Signature & Stamp:
S. M. Anwarul Islam Head of Compliance 10 April 2012
Social Audit Report
© Copyright 2004 The English version is the legally binding one. BSCI 7-01/09
Name of Company Audit Date DBID number BSCI Social Audit Report Durable Plastic Ltd. 10 April 2012 29211 Page 3 of 12
Lead-Auditor
Rashid M Akhter Additional Auditor
Monjur Hossain
Audit Date
10 April 2012 Number of man days applied
2
A. Master Data – For full details on the business structure of the company, see complete Master Data in the Audit Questionnaire.
Location of audited Company
Basic Data
Name of Company
Durable Plastic Ltd. Year of foundation
2010
http://www.
Legal status Private Limited
Street
Mulgaon, Kaligonj Language(s) spoken in company
Bangla, English
City
Gazipur Total production capacity per month
2,040,000 Pcs
Zip Code
1770 Contact Person
Country Bangladesh Name Mr. S. M. Anwarul Isalm
Phone +88-02-9881792 Position / Language Head Of Compliance
Fax +88-02-8820256 Phone +88-01924357673
DBID Number 29211 E-mail [email protected]
Business Activities
Clothing:
Construction Material:
Electronic Groups:
Eyewear (Glasses):
Furniture:
Leather Goods (except shoes):
Machinery:
Other hard goods:
Shoes:
Textiles:
Toys:
Textiles raw material or accessories
Please fill in under results
2 = Good
1 = Improvements Needed
0 = Non-compliant
NA = Not Applicable
No deviation from requirements or only minor deviations and full protection of employees is given
Deviations in the minority of requirements and no crucial points
Deviations in 50% or in the majority of requirements or/and in crucial points (double framed)
Requirements do not match to the company structure
Name of Company Audit Date DBID number BSCI Social Audit Report Durable Plastic Ltd. 10 April 2012 29211 Page 4 of 12
B. Audit Assessment Part B BSCI Mandatory Social Requirements
Results
2 1 0 NA
B.1
Management Practice
B.2
Documentation
B.3
Working Time
B.4
Compensation
B.5
Child Labour / Young Employees
B.6
Forced Labour / Prisoner Labour / Disciplinary Measures
B.7
Freedom of Association / Collective Bargaining
B.8
Discrimination
B.9
Working Conditions
B.10
Health and Social Facilities
B.11
Occupational Health and Safety
B.12
Dormitories
B.13
Environment
Total Result:
Good
Improvements Needed
Non-compliant
Remarks The facility is a part of a very well renowned business group and is located in an industrial park along with other sister concerns with the group. Durable Plastic Ltd is located on the first floor of a 2nd building located on right side from the main entrance of the industrial park. All production processes of the facility are on the same floor. The main processes involved include Mixing, Injection moulding, printing, inspection, crushing of plastic waste and packing. The support process including raw material storage, maintenance and utilities are common for all group companies in the industrial park. Canteen and security are also common for all group companies. The audit was initiated with an opening meeting attended by the top management of the factory. The audit process was explained to the attendees of the meeting and audit plan was agreed.
Please fill in under results
2 = Good
1 = Improvements Needed
0 = Non-compliant
NA = Not Applicable
No deviation from requirements or only minor deviations and full protection of employees is given
Deviations in the minority of requirements and no crucial points
Deviations in 50% or in the majority of requirements or/and in crucial points (double framed)
Requirements do not match to the company structure
Name of Company Audit Date DBID number BSCI Social Audit Report Durable Plastic Ltd. 10 April 2012 29211 Page 5 of 12
The audited was conducted to collect the objective evidence of facility’s compliance with applicable laws, regulations and BSCI Code requirements. Facility tour was conducted, documents were checked and worker & management interviews were conducted. The facility's working hours and compensation documents were reviewed for peak, off-peak and recent months. The facility policies and procedures were found to meet all legal and BSCI code requirements. Training of employees are regularly conducted on all company policies and records for such trainings are maintained. Workers were found very happy and satisfied with the facilities provided by the facility and were found aware of the work rules and other policies of the company. The findings of the audit were discussed and agreed during Closing meeting that was attended by the top management if the facility.
Please fill in under results
2 = Good
1 = Improvements Needed
0 = Non-compliant
NA = Not Applicable
No deviation from requirements or only minor deviations and full protection of employees is given
Deviations in the minority of requirements and no crucial points
Deviations in 50% or in the majority of requirements or/and in crucial points (double framed)
Requirements do not match to the company structure
Name of Company Audit Date DBID number BSCI Social Audit Report Durable Plastic Ltd. 10 April 2012 29211 Page 6 of 12
Audit Corrective Action Plan (CAP) Part B BSCI Mandatory Social Requirements
Findings and Necessary Improvements
Implementation Date
Management Practice
No findings N/A
Documentation
No findings N/A
Working Time No findings N/A
Compensation
No findings N/A
Child Labour / Young Employees
No findings N/A
Forced Labour / Prisoner Labour / Disciplinary Measures
No findings N/A
Freedom of Association and Collective Bargaining
No findings N/A
Discrimination No findings N/A
Working Conditions
No Findings N/A
Health and Social Facilities
No Findings N/A
Occupational Health and Safety
No findings N/A
Please fill in under results
2 = Good
1 = Improvements Needed
0 = Non-compliant
NA = Not Applicable
No deviation from requirements or only minor deviations and full protection of employees is given
Deviations in the minority of requirements and no crucial points
Deviations in 50% or in the majority of requirements or/and in crucial points (double framed)
Requirements do not match to the company structure
Name of Company Audit Date DBID number BSCI Social Audit Report Durable Plastic Ltd. 10 April 2012 29211 Page 7 of 12
Dormitories N/A N/A
Environment No Findings N/A
10 April 2012 10 April 2012 Rashid M Akhter S. M. Anwarul Islam Date / signature / stamp Auditor Signature / stamp Company
Please fill in under results 2 = Good
1 = Improvements Needed
NA = Not Applicable
No deviation from requirements
Deviation from requirements
Requirements do not match to the company structure
© Copyright 2004 The English version is the legally binding one. BSCI 7-01/09
Name of Company Audit Date DBID number BSCI Social Audit Report Durable Plastic Ltd. 10 April 2012 29211 Page 8 of 12
C. Audit Assessment Part C Best Practice for Industry - Voluntary implementation but auditing is mandatory
Results
2 1 NA
C.1
Policy
C.2
Planning and Implementation
C.3
Management Review
C.4
Control of Subcontractors / Suppliers / Sub-suppliers
C.5
Control of Homeworkers
C.6
Compensation
C.7
Child Labour
C.8
Evasion
C.9
Outside Communication
Ripe for SA8000 Certification with regard to audit results B. and C.:
YES
x NO
Training and assistance necessary but SA8000 certifiable
YES
x NO
Remarks Management of the factory is not planning to go for SA8000 certification.
© Copyright 2004 The English version is the legally binding one. BSCI 7-01/09
Name of Company Audit Date DBID number BSCI Social Audit Report Durable Plastic Ltd. 10 April 2012 29211 Page 9 of 12
Audit Corrective Action Plan (CAP) Part C Best Practice for Industry
Agreed Findings and Necessary Improvements
Yes
No
Implemen- tation Date
Policy
C.1.1 Company has a documented policy for social accountability and labour conditions but it does not include commitment to continual improvement.
Need to discuss with Top management
Planning and Implementation
C.2.1 The company does not ensure tha the requirements of SA 8000 are understood and implemented at all levels of the organization. Non of the methods listed under C.2.1 a, b, c and d are in use.
Need to discuss with Top management
Management Review
C.3.1 Top management does not review the adequacy, suitability and continuing effectiveness of the company's policy, procedures and performance results vis-à-vis the requirements of the SA 8000 Standrad and other requirements to which the company subscribes. C.3.2 There is no method defined to implement system amendments and improvements if required.
Need to discuss with Top management
Control of Suppliers / Subsuppliers
C.4.1 The company does not have procedure to recruit subcontractors/suppliers/subsuppliers based on their ability to meet SA 8000 standrad. C.4.2 The company does not maintain appropriate records of subcontractolrs/suppliers/subsuppliers commitments to social accountability. Futher no written commitments are maintained for: a) conformance to all requirements of the SA 8000 Standard. b) participation in the companies monitoring activities c) promptly implment remedial and corrective actions to address any non conformance identified with regard to requirements of SA 8000 Standrad d) promptly and completely inform the company of any and all relevant business relationship(s) with own subcontractos/suppliers/subsuppliers.
Need to discuss with Top management
Control of Homeworkers
No Applicable N/A
Compensation
C.6.2 The basic Need Wage for the area is BDT 5400/- per month where as the company is paying a minimum wage of BDT 3000/-. There is no plan in place to increase the salary to increase the salaries to achieve the basic needs wage within a specified period of time.
Need to discuss with Top management
Child Labour
No Findings N/A
Evasion
No Findings N/A
Outside Communication
C.9.1 The company has their own publication and website where they communicate regularly with all interested parties data and other information regarding performance of the requirements of the management reviews and monitoring activities. But they need to make both publication informative and update regular basis.
Need to discuss with Top management
10 April 2012 10 April 2012 Rashid M Akhter S. M. Anwarul Islam
Date / signature / stamp Auditor Signature / stamp Company
© Copyright 2004 The English version is the legally binding one. BSCI 7-01/09
Name of Company Audit Date DBID number BSCI Social Audit Report Durable Plastic Ltd. 10 April 2012 29211 Page 10 of 12
© Copyright 2004 The English version is the legally binding one. BSCI 7-01/09
Name of Company Audit Date DBID number BSCI Social Audit Report Durable Plastic Ltd. 10 April 2012 29211 Page 11 of 12
List of Audit Attachments
Obligatory Attachments Attached?
1. Employees Interview Sheet
Yes
2 Photos: outside factory compound, production floor, canteen, dormitories, display of the code of conduct, nursery, etc.
Yes
3 Child Labour Record Sheet N/A
Required copies to be available as part of the audit pack, if no legal prohibition
for collecting the record, according to local law.
Available with the audit files?
4 Collective Bargaining Agreement
N/A
5 Personnel File sample
Yes
6 Time Record sample
Yes
7 Payslip sample
Yes
8 Payment to Social Insurance Fund
Yes
9 Wage List sample
Yes
10 Maternity Leave sample
Yes
11 Work Rules
Yes
12 Documentation on Health and Safety Training
Yes
13 Documentation on Social Issues made by officials or other social audit
Yes
14 Agreement with a union or other worker representative
N/A
15 Authorization for exemptions from statutory regulations
N/A
16
17
18
19
20
21
22
23
24