social audit report - rflplastics.com · social audit report durable plastic ltd. 10 april 2012...

15
Social Audit Report January 2009 BSCI 7-01/09 All rights reserved. No part of this publication may be reproduced, translated, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, be lent, re-sold, hired out or otherwise circulated without the FTA’s authority. Copyright © 2004 by FTA – Foreign Trade Association, Brussels – gsm Global Sustainable Management GmbH, Cologne – Migros-Genossenschafts-Bund, Zürich – Systain Consulting GmbH, Hamburg

Upload: others

Post on 23-Sep-2019

2 views

Category:

Documents


0 download

TRANSCRIPT

Social Audit Report

January 2009

BSCI 7-01/09

All rights reserved. No part of this publication may be reproduced, translated, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, be lent, re-sold, hired out or otherwise circulated without the FTA’s authority. Copyright © 2004 by FTA – Foreign Trade Association, Brussels – gsm Global Sustainable Management GmbH, Cologne – Migros-Genossenschafts-Bund, Zürich – Systain Consulting GmbH, Hamburg

© Copyright 2004 The English version is the legally binding one. BSCI 7-01/09

Name of Company Audit Date DBID number BSCI Social Audit Report Durable Plastic Ltd. 10 April 2012 29211 Page 2 of 12

1 Due to the sampling nature of the auditing exercise, absence of findings during an assessment does not assure the full compliance of the facility nor does it guarantee that violations may not appear in the future. BSCI and the auditing company do not accept responsibility for conditions at other locations that may be used in the supply chain of the relevant product or service since this report covers the production site listed under ‘’audited company’’ only.

Factory Name:

Durable Plastic Ltd.

Factory Address: Mulgaon, Kaligonj, Gazipur-1770, Bangladesh

Management Representative: S. M. Anwarul Islam Head of Compliance

Audit Results for BSCI Social Requirements Part B:

Good1 Improvement Needed Non-compliant

Audit Results for Best Practice for Industry Part C:

Good Improvement Needed

Audit initiated by: BSCI Member : Supplier:

Auditing Company Name: Euro Cert Audit report number: DPL010042012 DBID number: 29211 Lead Auditor’s name and SAAS certificate number:

Rashid M Akhter

Auditing Company Address: 15/A, Road 8, Gulshan-1, Dhaka-1212, Bangladesh

Audit Date: 10 April 2012 Date of the new BSCI to be started: (3

years from the initial audit)

11 April 2015

Number of Initial audits performed at this facility (Cycle number 1, 2, 3..):

0

Agreed date for closing the CAP (if

applicable):

N/A

Date, Signature & Stamp:

S. M. Anwarul Islam Head of Compliance 10 April 2012

Social Audit Report

© Copyright 2004 The English version is the legally binding one. BSCI 7-01/09

Name of Company Audit Date DBID number BSCI Social Audit Report Durable Plastic Ltd. 10 April 2012 29211 Page 3 of 12

Lead-Auditor

Rashid M Akhter Additional Auditor

Monjur Hossain

Audit Date

10 April 2012 Number of man days applied

2

A. Master Data – For full details on the business structure of the company, see complete Master Data in the Audit Questionnaire.

Location of audited Company

Basic Data

Name of Company

Durable Plastic Ltd. Year of foundation

2010

http://www.

Legal status Private Limited

Street

Mulgaon, Kaligonj Language(s) spoken in company

Bangla, English

City

Gazipur Total production capacity per month

2,040,000 Pcs

Zip Code

1770 Contact Person

Country Bangladesh Name Mr. S. M. Anwarul Isalm

Phone +88-02-9881792 Position / Language Head Of Compliance

Fax +88-02-8820256 Phone +88-01924357673

DBID Number 29211 E-mail [email protected]

Business Activities

Clothing:

Construction Material:

Electronic Groups:

Eyewear (Glasses):

Furniture:

Leather Goods (except shoes):

Machinery:

Other hard goods:

Shoes:

Textiles:

Toys:

Textiles raw material or accessories

Please fill in under results

2 = Good

1 = Improvements Needed

0 = Non-compliant

NA = Not Applicable

No deviation from requirements or only minor deviations and full protection of employees is given

Deviations in the minority of requirements and no crucial points

Deviations in 50% or in the majority of requirements or/and in crucial points (double framed)

Requirements do not match to the company structure

Name of Company Audit Date DBID number BSCI Social Audit Report Durable Plastic Ltd. 10 April 2012 29211 Page 4 of 12

B. Audit Assessment Part B BSCI Mandatory Social Requirements

Results

2 1 0 NA

B.1

Management Practice

B.2

Documentation

B.3

Working Time

B.4

Compensation

B.5

Child Labour / Young Employees

B.6

Forced Labour / Prisoner Labour / Disciplinary Measures

B.7

Freedom of Association / Collective Bargaining

B.8

Discrimination

B.9

Working Conditions

B.10

Health and Social Facilities

B.11

Occupational Health and Safety

B.12

Dormitories

B.13

Environment

Total Result:

Good

Improvements Needed

Non-compliant

Remarks The facility is a part of a very well renowned business group and is located in an industrial park along with other sister concerns with the group. Durable Plastic Ltd is located on the first floor of a 2nd building located on right side from the main entrance of the industrial park. All production processes of the facility are on the same floor. The main processes involved include Mixing, Injection moulding, printing, inspection, crushing of plastic waste and packing. The support process including raw material storage, maintenance and utilities are common for all group companies in the industrial park. Canteen and security are also common for all group companies. The audit was initiated with an opening meeting attended by the top management of the factory. The audit process was explained to the attendees of the meeting and audit plan was agreed.

Please fill in under results

2 = Good

1 = Improvements Needed

0 = Non-compliant

NA = Not Applicable

No deviation from requirements or only minor deviations and full protection of employees is given

Deviations in the minority of requirements and no crucial points

Deviations in 50% or in the majority of requirements or/and in crucial points (double framed)

Requirements do not match to the company structure

Name of Company Audit Date DBID number BSCI Social Audit Report Durable Plastic Ltd. 10 April 2012 29211 Page 5 of 12

The audited was conducted to collect the objective evidence of facility’s compliance with applicable laws, regulations and BSCI Code requirements. Facility tour was conducted, documents were checked and worker & management interviews were conducted. The facility's working hours and compensation documents were reviewed for peak, off-peak and recent months. The facility policies and procedures were found to meet all legal and BSCI code requirements. Training of employees are regularly conducted on all company policies and records for such trainings are maintained. Workers were found very happy and satisfied with the facilities provided by the facility and were found aware of the work rules and other policies of the company. The findings of the audit were discussed and agreed during Closing meeting that was attended by the top management if the facility.

Please fill in under results

2 = Good

1 = Improvements Needed

0 = Non-compliant

NA = Not Applicable

No deviation from requirements or only minor deviations and full protection of employees is given

Deviations in the minority of requirements and no crucial points

Deviations in 50% or in the majority of requirements or/and in crucial points (double framed)

Requirements do not match to the company structure

Name of Company Audit Date DBID number BSCI Social Audit Report Durable Plastic Ltd. 10 April 2012 29211 Page 6 of 12

Audit Corrective Action Plan (CAP) Part B BSCI Mandatory Social Requirements

Findings and Necessary Improvements

Implementation Date

Management Practice

No findings N/A

Documentation

No findings N/A

Working Time No findings N/A

Compensation

No findings N/A

Child Labour / Young Employees

No findings N/A

Forced Labour / Prisoner Labour / Disciplinary Measures

No findings N/A

Freedom of Association and Collective Bargaining

No findings N/A

Discrimination No findings N/A

Working Conditions

No Findings N/A

Health and Social Facilities

No Findings N/A

Occupational Health and Safety

No findings N/A

Please fill in under results

2 = Good

1 = Improvements Needed

0 = Non-compliant

NA = Not Applicable

No deviation from requirements or only minor deviations and full protection of employees is given

Deviations in the minority of requirements and no crucial points

Deviations in 50% or in the majority of requirements or/and in crucial points (double framed)

Requirements do not match to the company structure

Name of Company Audit Date DBID number BSCI Social Audit Report Durable Plastic Ltd. 10 April 2012 29211 Page 7 of 12

Dormitories N/A N/A

Environment No Findings N/A

10 April 2012 10 April 2012 Rashid M Akhter S. M. Anwarul Islam Date / signature / stamp Auditor Signature / stamp Company

Please fill in under results 2 = Good

1 = Improvements Needed

NA = Not Applicable

No deviation from requirements

Deviation from requirements

Requirements do not match to the company structure

© Copyright 2004 The English version is the legally binding one. BSCI 7-01/09

Name of Company Audit Date DBID number BSCI Social Audit Report Durable Plastic Ltd. 10 April 2012 29211 Page 8 of 12

C. Audit Assessment Part C Best Practice for Industry - Voluntary implementation but auditing is mandatory

Results

2 1 NA

C.1

Policy

C.2

Planning and Implementation

C.3

Management Review

C.4

Control of Subcontractors / Suppliers / Sub-suppliers

C.5

Control of Homeworkers

C.6

Compensation

C.7

Child Labour

C.8

Evasion

C.9

Outside Communication

Ripe for SA8000 Certification with regard to audit results B. and C.:

YES

x NO

Training and assistance necessary but SA8000 certifiable

YES

x NO

Remarks Management of the factory is not planning to go for SA8000 certification.

© Copyright 2004 The English version is the legally binding one. BSCI 7-01/09

Name of Company Audit Date DBID number BSCI Social Audit Report Durable Plastic Ltd. 10 April 2012 29211 Page 9 of 12

Audit Corrective Action Plan (CAP) Part C Best Practice for Industry

Agreed Findings and Necessary Improvements

Yes

No

Implemen- tation Date

Policy

C.1.1 Company has a documented policy for social accountability and labour conditions but it does not include commitment to continual improvement.

Need to discuss with Top management

Planning and Implementation

C.2.1 The company does not ensure tha the requirements of SA 8000 are understood and implemented at all levels of the organization. Non of the methods listed under C.2.1 a, b, c and d are in use.

Need to discuss with Top management

Management Review

C.3.1 Top management does not review the adequacy, suitability and continuing effectiveness of the company's policy, procedures and performance results vis-à-vis the requirements of the SA 8000 Standrad and other requirements to which the company subscribes. C.3.2 There is no method defined to implement system amendments and improvements if required.

Need to discuss with Top management

Control of Suppliers / Subsuppliers

C.4.1 The company does not have procedure to recruit subcontractors/suppliers/subsuppliers based on their ability to meet SA 8000 standrad. C.4.2 The company does not maintain appropriate records of subcontractolrs/suppliers/subsuppliers commitments to social accountability. Futher no written commitments are maintained for: a) conformance to all requirements of the SA 8000 Standard. b) participation in the companies monitoring activities c) promptly implment remedial and corrective actions to address any non conformance identified with regard to requirements of SA 8000 Standrad d) promptly and completely inform the company of any and all relevant business relationship(s) with own subcontractos/suppliers/subsuppliers.

Need to discuss with Top management

Control of Homeworkers

No Applicable N/A

Compensation

C.6.2 The basic Need Wage for the area is BDT 5400/- per month where as the company is paying a minimum wage of BDT 3000/-. There is no plan in place to increase the salary to increase the salaries to achieve the basic needs wage within a specified period of time.

Need to discuss with Top management

Child Labour

No Findings N/A

Evasion

No Findings N/A

Outside Communication

C.9.1 The company has their own publication and website where they communicate regularly with all interested parties data and other information regarding performance of the requirements of the management reviews and monitoring activities. But they need to make both publication informative and update regular basis.

Need to discuss with Top management

10 April 2012 10 April 2012 Rashid M Akhter S. M. Anwarul Islam

Date / signature / stamp Auditor Signature / stamp Company

© Copyright 2004 The English version is the legally binding one. BSCI 7-01/09

Name of Company Audit Date DBID number BSCI Social Audit Report Durable Plastic Ltd. 10 April 2012 29211 Page 10 of 12

© Copyright 2004 The English version is the legally binding one. BSCI 7-01/09

Name of Company Audit Date DBID number BSCI Social Audit Report Durable Plastic Ltd. 10 April 2012 29211 Page 11 of 12

List of Audit Attachments

Obligatory Attachments Attached?

1. Employees Interview Sheet

Yes

2 Photos: outside factory compound, production floor, canteen, dormitories, display of the code of conduct, nursery, etc.

Yes

3 Child Labour Record Sheet N/A

Required copies to be available as part of the audit pack, if no legal prohibition

for collecting the record, according to local law.

Available with the audit files?

4 Collective Bargaining Agreement

N/A

5 Personnel File sample

Yes

6 Time Record sample

Yes

7 Payslip sample

Yes

8 Payment to Social Insurance Fund

Yes

9 Wage List sample

Yes

10 Maternity Leave sample

Yes

11 Work Rules

Yes

12 Documentation on Health and Safety Training

Yes

13 Documentation on Social Issues made by officials or other social audit

Yes

14 Agreement with a union or other worker representative

N/A

15 Authorization for exemptions from statutory regulations

N/A

16

17

18

19

20

21

22

23

24

© Copyright 2004 The English version is the legally binding one. BSCI 7-01/09

Name of Company Audit Date DBID number BSCI Social Audit Report Durable Plastic Ltd. 10 April 2012 29211 Page 12 of 12

25