Low Voltage Lighting Control Equipment Section: … Project: … File# … CONSTRUCTION STANDARD SPECIFICATION SECTION 13811 LIGHTING CONTROL EQUIPMENT VS LONWORK NETWORKED SYSTEM GENERAL 2 1.1. RELATED DOCUMENTS..........................................2 1.2. SUMMARY....................................................2 1.3. SUBMITTALS.................................................3 1.4. QUALITY ASSURANCE..........................................3 1.5. WARRANTY...................................................3 1.6. EXTRA MATERIALS............................................3 PRODUCTS 4 1.7. MANUFACTURERS..............................................4 1.8. LIGHTING CONTROL SYSEM, GENERAL............................4 1.9. RELAYS.....................................................4 1.10...................................PRE-ASSEMBLED RELAY PANELS ...........................................................4 1.11..................................CONTROL ELECTRONICS DEVICES ...........................................................5 1.12..............................................NETWORK MANAGER ...........................................................6 1.14.............................................SATELLITE PANELS ...........................................................7 1.15....................................LOW VOLTAGE WALL SWITCHES ...........................................................8 1.16............................0-10V DIMMER SWITCHES ( OPTIONAL) ...........................................................8 1.17............................................OCCUPANCY SENSORS ...........................................................8 1.18.................................EXTERIOR PHOTOMETRIC SENSORS ...........................................................8 1.19.................................INTERIOR PHOTOMETRIC SENSORS ...........................................................9 1.20....................................DIMMABLE DAYLIGHT SENSORS ...........................................................9 1.21...........................................LOW VOLTAGE WIRING ...........................................................9 EXECUTION 9 1.22.................................................INSTALLATION ...........................................................9 1.23..................................CONTROL WIRING INSTALLATION ..........................................................10 Page 1 of 16

Upload: others

Post on 14-Feb-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SNL Spec Template 2005 - Gentec - Accueil · Web viewSpecial Project Warranty Period: 12 months beginning on the date to start-up or 18 months from the Manufactuer delivery date

Low Voltage Lighting Control Equipment Section: …Project: … File# …

CONSTRUCTION STANDARD SPECIFICATION

SECTION 13811

LIGHTING CONTROL EQUIPMENT VS LONWORK NETWORKED SYSTEM

GENERAL 2

1.1. RELATED DOCUMENTS................................................................................................21.2. SUMMARY.........................................................................................................................21.3. SUBMITTALS....................................................................................................................31.4. QUALITY ASSURANCE..................................................................................................31.5. WARRANTY.......................................................................................................................31.6. EXTRA MATERIALS........................................................................................................3

PRODUCTS 4

1.7. MANUFACTURERS.........................................................................................................41.8. LIGHTING CONTROL SYSEM, GENERAL.................................................................41.9. RELAYS..............................................................................................................................41.10. PRE-ASSEMBLED RELAY PANELS............................................................................41.11. CONTROL ELECTRONICS DEVICES..........................................................................51.12. NETWORK MANAGER....................................................................................................61.14. SATELLITE PANELS.......................................................................................................71.15. LOW VOLTAGE WALL SWITCHES..............................................................................81.16. 0-10V DIMMER SWITCHES ( OPTIONAL)..................................................................81.17. OCCUPANCY SENSORS...............................................................................................81.18. EXTERIOR PHOTOMETRIC SENSORS......................................................................81.19. INTERIOR PHOTOMETRIC SENSORS.......................................................................91.20. DIMMABLE DAYLIGHT SENSORS...............................................................................91.21. LOW VOLTAGE WIRING................................................................................................9

EXECUTION 9

1.22. INSTALLATION.................................................................................................................91.23. CONTROL WIRING INSTALLATION..........................................................................101.24. FIELD QUALITY CONTROL.........................................................................................101.25. CLEANING AND ADJUSTING......................................................................................101.26. DEMONSTRATION........................................................................................................111.27. COMMISSIONING..........................................................................................................111.28. AS-BUILT DRAWINGS..................................................................................................11

Page 1 of 12

Page 2: SNL Spec Template 2005 - Gentec - Accueil · Web viewSpecial Project Warranty Period: 12 months beginning on the date to start-up or 18 months from the Manufactuer delivery date

Low Voltage Lighting Control Equipment Section: …Project: … File# …

CONSTRUCTION STANDARD SPECIFICATION

SECTION 13811

KAMELEON K8 SERIES LIGHTING CONTROL SERIES EQUIPMENT

LONWORK BASE

SCOPEThe following specifications detail the minimum standards for components and material used in the Lighting Control System (LCS) proposed for this project. The LCS shall be capable of switching incandescent, magnetic low voltage, fluorescent, solid state electronic ballast fluorescent, HID, neon, cold cathode, 2-way motor, outlets, LEDs, and solid state electronic/transformer low voltage loads. Loads shall be able to be controlled individually and/or in groups of different control points. All switch and load assignments shall be programmed through Windows-based application softwareprovided by the LCS.

WORK INCLUDEDA. The contractor shall provide all necessary wiring, enclosures, control modules, power supplies,

control stations, central control unit (CCU), and special dimmers as needed to ensure a complete and properly functioning system as indicated on the drawings and specified in this document. The contractor and/or low voltage contractor shall install the system in accordance with the manufacturer’s instructions and recommendations.

B. The electrical contractor shall complete all line voltage wiring, low voltage wiring, and installation of control stations, receptacles, and fixtures indicated on the drawings and defined as part of the LCS project.

C. The contractor shall program the LCS and troubleshoot the control system after the program is installed in the system in accordance with the manufacturer’s instructions and recommendations.

GENERAL

1.1. RELATED DOCUMENTS

1.1.1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections apply to this Section.

1.2. SUMMARY

1.2.1. This Section includes the following types of lighting controls:

1.2.1.1. Low voltage manual type momentary override switches

1.2.1.2. Programmable lighting control systems

1.2.1.3. Photo sensors

1.2.1.4. Power relays and contractors

1.2.1.5. Low voltage wiring

1.2.2. Low voltage is defined as 24 VAC + - 10% HZ for purposes of this section.

Page 2 of 12

Page 3: SNL Spec Template 2005 - Gentec - Accueil · Web viewSpecial Project Warranty Period: 12 months beginning on the date to start-up or 18 months from the Manufactuer delivery date

Low Voltage Lighting Control Equipment Section: …Project: … File# …

1.3. SUBMITTALS

1.3.1. General: Submit the following according to provisions of Standard Section xxxx.

1.3.2. Supply manuals on system components to permit ease of installation, system operation and maintenance including, but not limited to the following:

1.3.2.1. Lighting control system step-by-step operating instructions.

1.3.2.2. Relay panel schedules indicating circuits connected, inputs assigned, area controlled, panel location and panel equipment details.

1.3.3. Maintenance data for products for inclusion in Operating and Maintenance Manual specified in Division 1.

1.3.4. Record of field tests for tests specified in Part 3 of this Section.

1.3.5. Programming documentation for software.

1.4. QUALITY ASSURANCE

A. Approved LCS manufacturers shall have an established reputation in control systems (10 or more years).

B. Approved LCS manufacturers shall be ISO 9001-2000 certifiedC. All devices shall be UL, and CSA approved.D. Any components used in the system manufactured by a company other than the manufacturer of

the LCS must have documented compatibility with the LCS. The LCS manufacturer shall provide, upon request, compatibility and integration data applying to stated devices made by other manufacturers.

1.5. WARRANTY

1.5.1. Project Warranty: A written warranty mutually executed by manufacturer and the principal Installer, agreeing to replace programmable lighting control system components that fail in materials or workmanship within the special Project warranty period specified below. This warranty shall be in addition to, and not a limitation of, other rights and remedies the Owner may have against the Contractor under the Contract Documents.

1.5.2. Special Project Warranty Period: 12 months beginning on the date to start-up or 18 months from the Manufactuer delivery date.

1.6. EXTRA MATERIALS

1.6.1. Furnish extra products as described below. Package with protective covering for storage and identify with labels describing contents. Deliver extra materials to the Owner as Manufactuer recommandation.

1.6.1.1. Relays: Single-pole mechanically held, 1 for every xxx installed.

1.6.1.2. Occupancy Sensors and Power Supply/Relay Packs: 1 for every xxx installed

1.6.1.3. Low-voltage light switch: 1 for every xxx installed

Page 3 of 12

Page 4: SNL Spec Template 2005 - Gentec - Accueil · Web viewSpecial Project Warranty Period: 12 months beginning on the date to start-up or 18 months from the Manufactuer delivery date

Low Voltage Lighting Control Equipment Section: …Project: … File# …

PRODUCTS

1.7. MANUFACTURERS

1.7.1. All components are to be supplied by same manufacturer. Manufacturer is to be a supplier of this type of equipment for over 10 years:

1.7.1.1. Low voltage control system shall be manufactured by:

1.7.1.1.1. The Kameleon series from Gentec Inc.

1.8. LIGHTING CONTROL SYSEM, GENERAL

1.8.1. Provide a complete low voltage lighting control system for the building shown on the plans and specified herein.

1.8.2. Lighting control system shall utilize networking technology based upon “LonWorks” and be LonMark certified. System shall be able to operate as a stand-alone entity with the option of using a K8Lon software or web server device so that programming and viewing of status can be accomplished by any PC connected to the same LAN or via the internet.

1.8.3. All relay panel interiors shall be pre-assembled complete with the necessary relays, transformers and devices. Relay panels that are wall mounted shall have interiors separate from enclosure so as to permit easy mounting, conduit installation and wire pull to enclosures. Enclosures mounted in the ceiling space are not required to have separate interiors.

1.9. RELAYS

1.9.1. Lighting control relays shall be mechanically latching and shall come complete with a manual ON/OFF switch. The mechanical switch shall continuously display the true state of the relay’s internal contacts. Relays requiring control power for manual operation and/or status feedback are not acceptable.

1.9.2. Single pole relays shall be rated and UL listed for 120, 277 and 347 VAC lighting loads at 20 amps.

1.9.3. Double pole relays shall be rated and UL listed for 208, 240 or 480 VAC lighting loads at 20 amps.

1.9.4. Each lighting control relay shall be contained in an individual molded casing and shall be capable of containing a short circuit fault current of 14,000 amperes. Relays with exposed electronic devices are not acceptable

1.9.5. Each lighting control relay shall be capable of controlling incandescent, fluorescent, electronic ballast and MHID lighting loads.

1.9.6. Lighting control relays shall include captive, color-coded screw terminals for both the line voltage and the low voltage connections.

1.9.7. Enclosure shall be type 1, 12, 3R or 4X as mentionned to the drawing

1.10. PRE-ASSEMBLED RELAY PANELS

1.10.1. Where indicated on the drawings, provide a factory pre-assembled relay panel. The panel’s enclosure shall be for surface or flush installation, with a screw-on cover or hinged door assembly as required.

1.10.2. The panel shall consist of a pre-assembled interior insert; UL/CSA approved with capacities for 8, 16, 32, 48 and 64 relays as required. Panel enclosure must be UL/CSA Approved.

Page 4 of 12

Page 5: SNL Spec Template 2005 - Gentec - Accueil · Web viewSpecial Project Warranty Period: 12 months beginning on the date to start-up or 18 months from the Manufactuer delivery date

Low Voltage Lighting Control Equipment Section: …Project: … File# …

1.10.3. Panel interior shall have the following pre-assembled and pre-wired:

1.10.3.1. Suitable divider separating class1 and class 2 compartments

1.10.3.2. Control transformer, UL/CSA approved for class 2 circuits

1.10.3.3. Low voltage relays as required by switched circuits shown on plans or schedules

1.10.3.4. Control devices as required

1.11. CONTROL ELECTRONICS DEVICES

A. Relay panels are to include the following control modules:1. Main Clock module: Gentec Model KC8112. Relay command module: Gentec Model KC8313. Switch module: Gentec Model KC821

B. All these modules are to be programmable and stand-alone; they will interact through the Lonwork communication network, unshielded twisted pair as recommended by Echelon.

C. Overview of Network nodesRelay panels that are networked together with Gentec Scanners and Network nodes shall be able to operate as a stand-alone system or shall be able to be integrated as a part of a LonWorks Building Automation System that includes other functions of the building such as HVAC and Security.

D. They will hold data on the lighting operation as transmitted by one of the central computers. These data will include:

1. Relay grouping2. Operation of programmable input data3. Data on schedule function4. Individual response time (ON) of devices connected either to programmable input data or

directly to relays5. Warning time, specific to each relay, before setting OFF.

E. TIME CLOCK CONTROLLER

This unit includes mainly the system real-time clock. This clock is to be set automatically to standard and daylight time and it must include an astronomical clock. It must also incorporate the following features:

1. Possibility of programming daily, weekly, or monthly events. 2. Events based on day and week: for example; third Thursday of October or first Monday of

September. 3. Events that follow standard time, before or after sunrise.4. Clock synchronization. When a network includes more than one panel, one clock is to be

considered as master and the other clocks will copy its time.5. Digital/analog converter, for photocell reading. 6. Automatic hour management for daylight saving7. Many options are to be available:

The main module will be the KC-811 type from GENTEC .

Page 5 of 12

Page 6: SNL Spec Template 2005 - Gentec - Accueil · Web viewSpecial Project Warranty Period: 12 months beginning on the date to start-up or 18 months from the Manufactuer delivery date

Low Voltage Lighting Control Equipment Section: …Project: … File# …

F. RELAY CONTROL MODULE

This module is to be used to command the lighting relays, and to get readings on the status (2-wire relays only). The latter function will allow commanding many relays depending on the status read. Other characteristics include:

1. Possibility of connecting up to i. 16 two-wire relays or ii. 8 three wire relays, like GE.

2. Each relay is to be commanded individually3. Following functions can be programmed: relay grouping, commanding relays connected with

other LonWork control modul and devices, ON and OFF response time, warning time4. Time-on extension after normal business hours (typically 2 hours)5. Locking of or unlocking of switch6. Locking or unlocking of schedule

The relay command module will be the KC-831 type from GENTEC .

G. SWITCH CONTROL MODULE

1. Either low voltage switches or dry contacts (as BAS) may be connected to this unit. These inputs will command any relay or group of relays. Other characteristics include:

2. It is possible to connect up to 8 / 16 low voltage switches, with or without indicator lamp. 3. Indicator lamps must monitor the actual status of the relay controlled by the switch.4. NO or NC contacts may be connected. 5. Programming the maintenance function will prevent one or many groups of relays from

operating.The switch module will be the KC-821 type from GENTEC.

All electronic control devices shall have a node. The network node shall use LonWorks technology and shall be LonMark certified. This node shall be capable of connecting to an FTT-10A data line to communicate with other scanners in different relay panels or with other vendors using LonWorks technology.

1.12. NETWORK MANAGER

The centralized KAMELEON lightning control system Software will incorporate main frames and a flexible number of relay boxes. The main frames will be used for:

1. editing the graphics monitor;2. editing setting of control strategies;3. transferring data to satellite relay boxes;4. commanding and displaying lighting status;5. Displaying statistics.

The main frames are not to be necessary for standard operation. Hour commands will be executed directly by the relay panels control devices without the main frames having to be up all the time. Moreover, each relay panel can work as stand-alone to execute control sequences pre-programmed by the main frames, without monitoring. Under setting mode, the main frames will be used for editing control strategies, for compiling, and for transmitting data to satellite panels.

Page 6 of 12

Page 7: SNL Spec Template 2005 - Gentec - Accueil · Web viewSpecial Project Warranty Period: 12 months beginning on the date to start-up or 18 months from the Manufactuer delivery date

Low Voltage Lighting Control Equipment Section: …Project: … File# …

1.12.1.1. The Kameleon software includes user management functionality: the user level for daily operations, the operator level for changes to strategies, and the manager level. New user can be created and given a certain restriction level and password.

1.12.1.2. Allow Photo sensors to be connected on the data line and to assign multiple set points to different groups of relays

1.12.1.3. Provide Astronomic time clock capability

1.12.1.4. Display relay panels individually and allow relays to be assigned to groups by simple point and click

1.12.1.5. Schedules allow for 1024 events and 16 unique holiday schedules

1.12.1.6. Groups can be configured to have user settable flick warn, time out and cleaning variables

1.12.1.7. Flick warn and time out durations are user settable on an individual relay basis

1.12.1.8. Allow switches to control groups spanning all panels in the system

1.12.1.9. Security access available with different levels

1.12.1.10. Diagnostic tools for queries of status of network devices, relays and log reports

1.12.1.11. Full backup and restore capabilities

1.13. ETHERNET REMOTE COMMUNICATION (OPTIONAL)

1.13.1. Provide an Ethernet communication capability for remote lighting control management.

1.13.1.1. The Ethernet capability will be provided by a Loytec NIC709-IP3E100 Ethernet LonWorks adapter using TCP/IP. Multiple remote networks can be connected to the KAMELEON LNS Server. The NIC709-IP3E100 adapter is a free topology model TP/FT-10 transmitter.

1.14. SATELLITE PANELS

1.14.1. Where indicated on the drawings, all panel will be provide with control module in each Satellite Panel complete with xxx latching relays capable of switching 20 amp lighting loads and rated for 120/277/347VAC. Each panel is to be connected on to the data line network and configured using the Echelon Network Manager and shall contain the following hardware features:

1.14.1.1. 2 – 24VDC inputs for occupancy sensors requiring DC voltage

1.14.1.2. 1 DC power supply rated for 250ma for supplying power to occupancy sensors

1.14.1.3. 2 digital inputs for accepting signals from one or group of photo sensors capable of sensing 0 – 6,000 footcandles.

1.14.2. Switch inputs are to be capable of switching individual relays, local groups of relays within the panel or global groups of relays system wide. Each switch input can be configured for connection to standard Gentec switches, momentary 24VAC switches or maintained contract 24VAC switches. Each input can also be configured to be ON or OFF only. The inputs may also be configured to have interlocking logic so that if the photo sensor has switched a relay off it is possible to set an input so a local wall switch cannot override the photo sensor relay on unless there is insufficient light.

1.14.3. In rooms with photo sensor control, it shall be possible to set relays to switch at different light levels so that as the amount of daylight changes, different amounts of artificial light can be switched on or off. It shall be possible to set a sequence of switching 3 lamp fixtures with a relay each for the single lamp and outer lamps as follows: As daylight increases, the single lamp relay is switched off first. The next step requires the outer lamp relay OFF and the single

Page 7 of 12

Page 8: SNL Spec Template 2005 - Gentec - Accueil · Web viewSpecial Project Warranty Period: 12 months beginning on the date to start-up or 18 months from the Manufactuer delivery date

Low Voltage Lighting Control Equipment Section: …Project: … File# …

lamp relay ON simultaneously. As daylight passes the maximum threshold, the single lamp relay is switched off. This sequence is reversed as daylight declines.

1.14.4. The Satellite Panels shall accept either 24VDC or 24VAC occupancy sensors. The inputs may be configured for OFF only or ON/OFF switching scenarios. It shall be possible to link the photo sensor control with occupancy sensing so that when light levels are high enough, the occupancy sensor will not switch the photo sensor controlled relays ON.

1.15. LOW VOLTAGE WALL SWITCHES

1.15.1. Low voltage control switches and switch hardware shall mount to standard wall boxes.

1.15.2. Switch modules shall be available with 1, 2 and 3 switches per gang and shall fit into standard ‘Decora’ style switch plates.

1.15.3. Individual switches shall include an integral tri-state LED to indicate both ON and OFF states (red=ON, green=OFF).

1.15.4. Each switch shall be clearly identified with a paper switch label. The label shall be held in place with a clear plastic cap and shall be field replaceable should the operation of the switch change. Permanently etched switches are not acceptable.

1.15.5. Switches shall have color coded captive screw terminals. Use #18 AWG solid conductors.

1.15.6. Where required provide keyed switches to control lights. Switches shall include an integral tri-state LED to indicate both ON and OFF states (red=ON, green=OFF).

1.16. 0-10V DIMMER SWITCHES ( OPTIONAL)

1.16.1. Dimmer switches shall be compatible with dimming ballasts using the 0-10V control protocol.

1.16.2. An LED indicator bar shall display the proportional level of the connected ballasts.

1.16.3. UP & DOWN buttons shall permit the operator to raise and lower the light level as required.

1.16.4. Where indicated on the lighting plans, the dimmer switches shall be combined with daylight sensors to limit the maximum electric light level. Manual dimmers cannot exceed the light level determined by the daylight sensor.

1.16.5. Each switch shall be capable of controlling up to 50 dimming ballasts.

1.17. OCCUPANCY SENSORS

1.17.1. Where required, provide a dual technology or infrared occupancy sensor. The occupancy sensor be connected to a KC-821 input controller. It shall also be possible to connect wall switches in parallel to each relay for occupant override if required

1.17.2. Occupancy sensor to include the following features:

1.17.2.1. Adjustable time out (30 sec to 30 min) and sensitivity

1.17.2.2. Coverage of 1600 sq. ft., Indoor ceiling mount, ceiling heights 8’ to 16’ max

1.17.2.3. Function select – on/off switching or off-only switching

1.18. EXTERIOR PHOTOMETRIC SENSORS

1.18.1. Provide where required an exterior photometric sensor capable of sensing from 1-60,000 lux. The sensor shall be connected to the lighting control network via a 4-wire (2 power + 2 data) dataline.

Page 8 of 12

Page 9: SNL Spec Template 2005 - Gentec - Accueil · Web viewSpecial Project Warranty Period: 12 months beginning on the date to start-up or 18 months from the Manufactuer delivery date

Low Voltage Lighting Control Equipment Section: …Project: … File# …

1.18.2. The ambient light level shall be continuously monitored and be displayed by the Network Manager.

1.18.3. One exterior sensor shall be capable of controlling one, some or all relays in the entire lighting control network shall permit different relays to switch at different light levels. Lights shall be controlled by ‘sensor only’ or by a combination of time& light level.

1.19. INTERIOR PHOTOMETRIC SENSORS

1.19.1. Provide where required an interior photometric sensor capable of sensing from 1-60,000 lux. The sensor shall be connected to the lighting control network via a 4-wire (2 power + 2 data) dataline.

1.19.2. The ambient light level shall be continuously monitored and be displayed by the K8Lon Network Manager

1.19.3. Each interior sensor shall be capable of controlling one, some or all relays in the entire lighting control network and shall permit different relays to switch at different light levels. Lights shall be controlled by ‘sensor only’ or by a combination of time & light level.

1.20. DIMMABLE DAYLIGHT SENSORS

1.20.1. Provide where required and indoor daylight sensor for applications that harvest daylight by regulating the electronic dimmable fluorescent ballasts. The sensor shall regulate the ballast so that when natural light is bright the lamp is dim and when natural light is dim the lamp is bright. The sensor shall be ceiling mounted and measures light reflected upward from the surface below. The sensor shall have a range setting and a set-point slider located under the front faceplate.

1.20.2. The sensor shall be compatible with Phillips/Advance Mark VII, Motorola Helios or any other ballast that uses the same 0-10V dimming control method. The sensor shall connect with 2 wires connected in parallel to a maximum of 50 ballasts. No other connections to the sensor are required for the dimming function.

1.21. LOW VOLTAGE WIRING

1.21.1. All wiring shall meet UL - CSA and NEC - CEC standards.

1.21.2. All low voltage wiring shall be 18-guage (#18AWG) unless otherwise specified. Color coded as per manufacturers recommendations. All low voltage wiring shall be run in EMT conduit. No exposed wiring will be allowed.

1.21.3. Dataline wiring between relay panels shall be 18 gage 2 conductor shielded. Color coded as red/black/shield. All low voltage wiring shall be run in EMT conduit. No exposed wiring will be allowed.

EXECUTION

1.22. INSTALLATION

1.22.1. General: Install equipment according to manufacturer’s written instructions.

1.22.2. Mount control equipment according to manufacturer’s instructions and Section 16001, “Electrical Work”.

1.22.3. Mounting heights indicated are to bottom of unit for suspended items and to center for wall-mounted ones.

Page 9 of 12

Page 10: SNL Spec Template 2005 - Gentec - Accueil · Web viewSpecial Project Warranty Period: 12 months beginning on the date to start-up or 18 months from the Manufactuer delivery date

Low Voltage Lighting Control Equipment Section: …Project: … File# …

1.23. CONTROL WIRING INSTALLATION

1.23.1. Install wiring between control devices as specified in Division 16 Section “Electrical Work” for hard wire connections.

1.23.2. Bundle, train, and support wiring in enclosures.

1.24. FIELD QUALITY CONTROL

1.24.1. Manufacturer’s Field Services: Arrange and pay for the services of factory-authorized service representatives to test, adjust and program the lighting control systems. Programming shall include assigning all switch inputs to the required relays in each panel to ensure proper lighting operation. At the conclusion of programming, the contractor shall provide Sandia with an as-built drawing of all cabinets which will include a list of termination locations for all low-voltage switches.

1.24.2. Reports: Prepare written reports of tests and observations. Report defective materials and unsatisfactory test results. Record repairs and adjustments.

1.24.3. Test Labeling: Upon satisfactory completion of tests and inspections, apply a label to tested components indicating test results, date, and testing organization and person.

1.24.4. Schedule visual and mechanical inspections and electrical tests within 7-days’ notice

1.24.5. Visual and Mechanical Inspections: Include the following inspections:

1.24.5.1. Inspect for defects and physical damage, labeling, and nameplate compliance with current project drawings

1.24.5.2. Check tightness of electrical connections with torque wrench calibrated within the previous 6 months. Use manufacturer’s recommended torque values

1.24.5.3. Verify proper protective device settings and fuse types and ratings

1.24.5.4. Verify settings of photoelectric devices with photometer calibrated to NIST standards within the past 6 months

1.24.5.5. Exercise mechanical parts and operable devices according to manufacturer’s instructions to verify proper operation.

1.24.6. Electrical Tests: Exercise particular caution when testing devices containing solid-state components. Perform the following tests according to manufacturer’s instructions:

1.24.6.1. Insulation resistance tests of conducting parts of control components and connecting supply, feeder, and control circuits. Insulation resistance less than 100 megohms is not acceptable.

1.24.6.2. Continuity test of circuits.

1.25. CLEANING AND ADJUSTING

1.25.1. Remove paint spatters and other spots, dirt, and debris. Touch up scratches and mars of finish to match original finish. Clean equipment and devices internally and externally using methods and materials recommended by manufacturers.

1.25.2. Occupancy Adjustments: Upon request within 1 year of date of substantial completion, adjust light levels, make program changes, and adjust sensors and controls.

Page 10 of 12

Page 11: SNL Spec Template 2005 - Gentec - Accueil · Web viewSpecial Project Warranty Period: 12 months beginning on the date to start-up or 18 months from the Manufactuer delivery date

Low Voltage Lighting Control Equipment Section: …Project: … File# …

1.26. DEMONSTRATION

1.26.1. Training: Arrange and pay for the services of a factory-authorized service representative to demonstrate programmable lighting control system and train Owner’s maintenance personnel. Allow a minimum of 1 working days for this training.

1.26.2. Train Owner’s personnel to operate, service and maintain equipment and system components. Allow at least 4 hours to conduct training. Schedule training with at least 7 working days’ notice.

1.27. COMMISSIONING

1.27.1. Operational Tests: Energize systems, program control, and check each controlled are for light levels and lamp and component noise. Use light meters appropriate for the test and calibrated to NIST standards. Adjust components and revise installation as required to correct deficiencies. Operate the system to prove compliance with requirements.

1.27.2. Correct malfunctions and retest until proper operation is achieved.

1.28. AS-BUILT DRAWINGS

1.28.1. The drawings issued for construction are representative of the work to be performed and of existing equipment. As part of this contract, the Contractor shall provide Sandia National Laboratories with a set of “red-marked” prints, including all equipment relating to the fire protection system, both existing and contractor installed. The lighting drawings consist of plans, wiring, diagrams, and controller panel schedule. The marked-up prints shall show all junction boxes, conduit sizes, devices, and any other information relevant to the as-built condition. Conduit and junction box locations shall be shown on the as-builts if they were shown on the original plans.

END OF SECTION