slide 5-88 side a exposure side a walk-around 100 r street command sequence # 8
TRANSCRIPT
Slide 5-Slide 5-11
Side ASide A
Exposure Side AExposure Side A
Walk-around Walk-around 100 R Street100 R StreetCommand Command
Sequence # 8Sequence # 8
Slide 5-Slide 5-22
R StreetR Street
Sprinkler/StandpipeSprinkler/StandpipeConnectionConnection
Side ASide A
Walk-around Walk-around 100 R Street100 R StreetCommand Command
Sequence # 8Sequence # 8
Slide 5-Slide 5-33
Side BSide ASide A
Sides A and B
Walk-around Walk-around 100 R Street100 R StreetCommand Command
Sequence # 8Sequence # 8
Slide 5-Slide 5-44
Side C Walk-around Walk-around 100 R Street100 R StreetCommand Command
Sequence # 8Sequence # 8
Slide 5-Slide 5-55
Side DSide A
Sides A and D
Exposure D1
Exposure D2
Sprinkler/StandpipeSprinkler/StandpipeConnectionConnection
Walk-around Walk-around 100 R Street100 R StreetCommand Command
Sequence # 8Sequence # 8
Slide 5-Slide 5-66
Interior of Outlet StoreHeavy Fire Load
Walk-around Walk-around 100 R Street100 R StreetCommand Command
Sequence # 8Sequence # 8
Sprinkler PipingSprinkler Piping
Heavy Timber Mill
Construction
Slide 5-Slide 5-77
Walk-around Walk-around 100 R Street100 R StreetCommand Command
Sequence # 8Sequence # 8
Interior of Outlet StoreHeavy Fire Load
Sprinkler PipingSprinkler Piping
Heavy Timber Mill
Construction
Slide 5-Slide 5-88
COMMAND SEQUENCE # 8COMMAND SEQUENCE # 81ST ALARM RESOURCES1ST ALARM RESOURCES
• Engine 1Engine 1• Engine 2Engine 2• Engine 3Engine 3• Truck 1Truck 1• Squad 1Squad 1• Battalion Chief 1Battalion Chief 1
– – All companies staffed with four firefightersAll companies staffed with four firefighters– – Battalion Chief 1: 30-minute responseBattalion Chief 1: 30-minute response
Slide 5-Slide 5-99
Heavy fire, four windows second floor, Side A. Medium smoke upper floors. Occupants have been removed. Building contains sprinklers and standpipes.
Side BSide B
Side ASide A
100 R Street100 R StreetCommand Command
Sequence # 8Sequence # 8
SaturdayMarch 2Wind out of the South 15 MPHTemperature25°F
Slide 5-Slide 5-1010
N
Rail Road Right of Way
Perth Street
4-StoryBuilding
Outlet Warehouse6-Story
4 Bay LoadingDock – 1 story
Row houses2-1/2 Story
Row houses3-Story
Parking Lot
R Street
16th
STREET
A
B
C
DSprinkler/Stand-
pipeConnection
Slide 5-Slide 5-1111
WHAT IS THE SITUATION?WHAT IS THE SITUATION?(SIZEUP)(SIZEUP)
• On location at 100 R Street, six-story building, 75' x On location at 100 R Street, six-story building, 75' x 300', mill construction, occupied as outlet stores.300', mill construction, occupied as outlet stores.
• Heavy fire and smoke windows showing from four Heavy fire and smoke windows showing from four windows, second floor Side A.windows, second floor Side A.
• All occupants have been removed.All occupants have been removed.• Exposures Side A are three-story occupied dwellings Exposures Side A are three-story occupied dwellings
separated by a 20 foot street.separated by a 20 foot street.• Exposure D1 is a one-story loading dock, directly Exposure D1 is a one-story loading dock, directly
attached.attached.• Exposure D2 is 2-1/2-story occupied dwelling 25 feet Exposure D2 is 2-1/2-story occupied dwelling 25 feet
from building. from building. • No other immediate exposures.No other immediate exposures.• Engine 1 is establishing R Street Command.Engine 1 is establishing R Street Command.
Sizeup report example: Sizeup report example:
Slide 5-Slide 5-1212
WATER SUPPLY WATER SUPPLY FIXED SYSTEMS FIXED SYSTEMS
ACTION PLANACTION PLAN
Slide 5-Slide 5-1313
WHAT CAN BE WHAT CAN BE ACCOMPLISHED?ACCOMPLISHED?
INCIDENT OBJECTIVESINCIDENT OBJECTIVES
Contain and control fire in room/ Contain and control fire in room/ building of origin.building of origin.
Slide 5-Slide 5-1414
WHAT NEEDS TO BE DONE?WHAT NEEDS TO BE DONE?INCIDENT STRATEGY(IES)INCIDENT STRATEGY(IES)
• Exposure protectionExposure protection
• Confinement/ExtinguishmentConfinement/Extinguishment
• Special equipmentSpecial equipment
• VentilationVentilation
Slide 5-Slide 5-1515
HOW ARE YOU GOING TO DO IT? HOW ARE YOU GOING TO DO IT? INCIDENT TACTICSINCIDENT TACTICS
• Exposure protectionExposure protection– – Deploy large-diameter hoseline for water supplyDeploy large-diameter hoseline for water supply– – Deploy one 2-1/2-inch hoseline to Side A second floor for interior Deploy one 2-1/2-inch hoseline to Side A second floor for interior exposure protectionexposure protection– – Deploy one 1-3/4-inch hoseline to Side A third floor for exposure Deploy one 1-3/4-inch hoseline to Side A third floor for exposure protectionprotection
• Confinement/ExtinguishmentConfinement/ExtinguishmentDeploy two 2-1/2-inch hoselines to second floor Side A for Deploy two 2-1/2-inch hoselines to second floor Side A for confinement/extinguishmentconfinement/extinguishment
• Special equipmentSpecial equipmentDeploy two 2-1/2-inch hoselines to sprinkler/standpipe connection Deploy two 2-1/2-inch hoselines to sprinkler/standpipe connection Side ASide A
• VentilationVentilation– – Vent roof apertures of fire buildingVent roof apertures of fire building– – Horizontal ventilation all floors of fire buildingHorizontal ventilation all floors of fire building
Slide 5-Slide 5-1616
IMPLEMENT THE WATER SUPPLY IMPLEMENT THE WATER SUPPLY FIXED SYSTEMS ACTION PLANFIXED SYSTEMS ACTION PLAN
Communicate assignments clearly to Communicate assignments clearly to all resources operating on the all resources operating on the incident.incident.
Slide 5-Slide 5-1717
EVALUATE THE WATER EVALUATE THE WATER SUPPLY SUPPLY
FIXED SYSTEMS ACTION PLANFIXED SYSTEMS ACTION PLAN
• Evaluate progress every 10 minutes.Evaluate progress every 10 minutes.
• Obtain feedback reports from Obtain feedback reports from resources operating on the incident.resources operating on the incident.
Slide 5-Slide 5-1818
100 R Street100 R StreetCommand Command
Sequence # 8Sequence # 8
Side BSide B
Side ASide A
Heavy fire, four windows second floor, Side A.Medium smoke upper floors. Occupants have been removed.
Slide 5-Slide 5-1919
SALVAGE OPERATIONSSALVAGE OPERATIONS
Slide 5-Slide 5-2020
SALVAGESALVAGE
The tactical operation of protecting The tactical operation of protecting property from damage.property from damage.
Slide 5-Slide 5-2121
PRINCIPLES OF PRINCIPLES OF SALVAGESALVAGE
• To minimize damage to building To minimize damage to building and contentsand contents
• To protect building from structural To protect building from structural damage due to weight of waterdamage due to weight of water
Slide 5-Slide 5-2222
SALVAGE TACTICSSALVAGE TACTICS
Protect building contentsProtect building contents
• In placeIn place
• By removal By removal
• Control water flow within buildingControl water flow within building
• Remove water from buildingRemove water from building
Slide 5-Slide 5-2323
SALVAGE TACTICS SALVAGE TACTICS (cont'd)(cont'd)
• Ventilate to remove smoke and heatVentilate to remove smoke and heat
• Remove debris from buildingRemove debris from building
• Cover building openings to protect Cover building openings to protect from weatherfrom weather
Slide 5-Slide 5-2424
COORDINATION AND COORDINATION AND PLANNINGPLANNING
• Rapid extinguishment reduces loss.Rapid extinguishment reduces loss.
• Conserve water during firefighting Conserve water during firefighting operations.operations.
• Ventilate early.Ventilate early.
Slide 5-Slide 5-2525
WATER SUPPLY,WATER SUPPLY,FIXED SYSTEMS,FIXED SYSTEMS,
SALVAGESALVAGE700 29th STREET: 700 29th STREET:
Command Sequence # 9Command Sequence # 9
Slide 5-Slide 5-2626
REVIEW SIZEUP REVIEW SIZEUP REPORT OF REPORT OF
FIREGROUND FIREGROUND CONDITIONS CONDITIONS
Slide 5-Slide 5-2727
COMMAND SEQUENCECOMMAND SEQUENCE # 9 WALK-AROUND # 9 WALK-AROUND
PLOT PLAN PLOT PLAN
Slide 5-Slide 5-2828
SIZEUP REPORT OF SIZEUP REPORT OF FIREGROUND CONDITIONSFIREGROUND CONDITIONS
• Initial reportInitial reportTo be given immediately upon arrival on locationTo be given immediately upon arrival on location
• Exact location and conditions as observedExact location and conditions as observed– – Nothing showingNothing showing– – Size of structure--stories and dimensions--type of Size of structure--stories and dimensions--type of construction--occupied or vacantconstruction--occupied or vacant– – Smoke/Fire--location and densitySmoke/Fire--location and density– – Status of occupants--if knownStatus of occupants--if known– – Exposures---Sides A, B, C, D, or otherExposures---Sides A, B, C, D, or other– – Engine __ is establishing ___ Street Command.Engine __ is establishing ___ Street Command.
Slide 5-Slide 5-2929
SIZEUP SIZEUP REPORT OF FIREGROUND REPORT OF FIREGROUND
CONDITIONS (cont'd)CONDITIONS (cont'd)
• Subsequent reportSubsequent reportInformation not immediately reported Information not immediately reported and/or information developed upon and/or information developed upon investigation. To be given ASAP or investigation. To be given ASAP or within 5 minutes.within 5 minutes.
• Progress reportProgress reportTo be given by the IC every 10 minutes To be given by the IC every 10 minutes until fire is under control.until fire is under control.
Slide 5-Slide 5-3030
COMMAND SEQUENCE COMMAND SEQUENCE WATER SUPPLY, WATER SUPPLY,
FIXED SYSTEMS, SALVAGE FIXED SYSTEMS, SALVAGE ACTION PLANACTION PLAN
Command Sequence # 9Command Sequence # 9
Slide 5-Slide 5-3131
Side ASide A
Walk-around700 29th
StreetCommand Sequence
# 9
13-story high- 13-story high- rise building, rise building, 75' x 75',75' x 75', fire-resistive fire-resistive construction,construction,occupied as occupied as medical medical laboratory/laboratory/offices. offices. Standpipe Standpipe connections connections located in fire located in fire towers.towers.
N
Slide 5-Slide 5-3232
Walk-around700 29th
StreetCommand Sequence
# 9
Side ASide A
Side BSide B
Slide 5-Slide 5-3333
Side BSide BWalk-around
700 29th Street
Command Sequence # 9
StandpipeStandpipeConnectionConnection
Slide 5-Slide 5-3434
Walk-around700 29th
StreetCommand
Sequence # 9
Side CSide C
Side BSide B
Slide 5-Slide 5-3535
Walk-around700 29th
StreetCommand
Sequence # 9
Side CSide C
Slide 5-Slide 5-3636
Side DSide DWalk-around
700 29th Street
Command Sequence # 9
Slide 5-Slide 5-3737
COMMAND SEQUENCE # 9COMMAND SEQUENCE # 91ST ALARM RESOURCES1ST ALARM RESOURCES
• Engine 1Engine 1• Engine 2Engine 2• Engine 3Engine 3• Truck 1Truck 1• Squad 1Squad 1• Battalion Chief 1Battalion Chief 1
– – All companies staffed with four firefightersAll companies staffed with four firefighters– – Battalion Chief 1: 30-minute responseBattalion Chief 1: 30-minute response
Slide 5-Slide 5-3838
13-story high- 13-story high- rise, 75' x 75', rise, 75' x 75', fire-resistive fire-resistive construction, construction, occupied as a occupied as a medical medical laboratory/ laboratory/ office building.office building.Heavy fire, one Heavy fire, one window, sixth window, sixth floor, Side A. floor, Side A. Medium smoke Medium smoke upper floors. upper floors. All occupants All occupants have been have been removed.removed.
Activity700 29th
StreetCommand
Sequence # 9
Side BSide B Side ASide A
StandpipeStandpipeConnectionConnection
N
Slide 5-Slide 5-3939
700 29th St. Medical Laboratory Tower 13 Stories: 75' x 75'
Jon
es St.
Fire Tower
Fire Tower
Elevator
NParking Lot
Parking Lot
Side A
Side B
Side C
Side D
Standpipe Connection
700 20th St.
Sixth Floor
Slide 5-Slide 5-4040
WHAT IS THE SITUATION?WHAT IS THE SITUATION?(SIZEUP)(SIZEUP)
Sizeup report example: Sizeup report example: • On location at 700 29th Street, 13-story highrise On location at 700 29th Street, 13-story highrise
building 75' x 75', fire-resistive construction, building 75' x 75', fire-resistive construction, occupied as medical laboratory/office building.occupied as medical laboratory/office building.
• Heavy fire and smoke from one window, sixth Heavy fire and smoke from one window, sixth floor Side A, light to medium smoke upper floor Side A, light to medium smoke upper floors. floors.
• All occupants have been removed.All occupants have been removed.• No other immediate exposures.No other immediate exposures.• Engine 1 is establishing 29th Street command.Engine 1 is establishing 29th Street command.
Slide 5-Slide 5-4141
WATER SUPPLY,WATER SUPPLY,FIXED SYSTEMS,FIXED SYSTEMS,
SALVAGE SALVAGE ACTION PLANACTION PLAN
Slide 5-Slide 5-4242
WHAT CAN BE WHAT CAN BE ACCOMPLISHED?ACCOMPLISHED?
INCIDENT OBJECTIVESINCIDENT OBJECTIVES
Contain and control fire to room/ Contain and control fire to room/ building of origin.building of origin.
Slide 5-Slide 5-4343
WHAT NEEDS TO BE WHAT NEEDS TO BE DONE?DONE?
INCIDENT STRATEGY(IES)INCIDENT STRATEGY(IES)
• Exposure protectionExposure protection
• Confinement/ExtinguishmentConfinement/Extinguishment
• Special equipmentSpecial equipment
• VentilationVentilation
• SalvageSalvage
Slide 5-Slide 5-4444
HOW ARE YOU GOING TO DO IT?HOW ARE YOU GOING TO DO IT?INCIDENT TACTICSINCIDENT TACTICS
• Exposure protectionExposure protection– – Deploy large diameter hoseline for water supplyDeploy large diameter hoseline for water supply– – Deploy one 1-3/4-inch hoseline from seventh floor Deploy one 1-3/4-inch hoseline from seventh floor standpipe to seventh floor for exposure protectionstandpipe to seventh floor for exposure protection
• Confinement/ExtinguishmentConfinement/Extinguishment– – Deploy one 2-1/2-inch hoseline from sixth floor standpipe Deploy one 2-1/2-inch hoseline from sixth floor standpipe for confinement/extinguishmentfor confinement/extinguishment– – Deploy one 1-3/4-inch hoseline from fifth floor standpipe to Deploy one 1-3/4-inch hoseline from fifth floor standpipe to sixth floor for backup line supportsixth floor for backup line support
• Special equipmentSpecial equipment– – Stretch two 2-1/2-inch hoselines to standpipe connectionStretch two 2-1/2-inch hoselines to standpipe connection– – Deploy water-absorbent materials to reduce water damage Deploy water-absorbent materials to reduce water damage on sixth flooron sixth floor
Slide 5-Slide 5-4545
HOW ARE YOU GOING TO DO IT?HOW ARE YOU GOING TO DO IT?INCIDENT TACTICS (cont'd)INCIDENT TACTICS (cont'd)
• VentilationVentilation– – Vent stairwells to roof.Vent stairwells to roof.– – Horizontal cross ventilation all floorsHorizontal cross ventilation all floors
• SalvageSalvage– – Provide salvage cover protection to Provide salvage cover protection to floors and equipment below firefloors and equipment below fire– – Divert runoff water to prevent Divert runoff water to prevent contaminationcontamination
Slide 5-Slide 5-4646
IMPLEMENT THE WATER SUPPLY IMPLEMENT THE WATER SUPPLY FIXED SYSTEMS SALVAGE FIXED SYSTEMS SALVAGE
ACTION PLANACTION PLAN
Communicate assignments clearly to Communicate assignments clearly to all resources operating on the all resources operating on the incident.incident.
Slide 5-Slide 5-4747
IMPLEMENT THE WATER IMPLEMENT THE WATER SUPPLY FIXED SYSTEMS SUPPLY FIXED SYSTEMS
SALVAGE ACTION SALVAGE ACTION PLAN (cont'd)PLAN (cont'd)
• Evaluate progress every 10 minutes.Evaluate progress every 10 minutes.
• Obtain feedback reports from Obtain feedback reports from resources operating on the incident.resources operating on the incident.
Slide 5-Slide 5-4848
Side ASide B 13-story high- rise, 75' x 75', fire-resistive construction, occupied as a medical laboratory/ office building.Heavy fire, one window, sixth floor, Side A. Medium smoke upper floors. All occupants have been removed.
Activity700 29th
StreetCommand
Sequence # 9
StandpipeStandpipeConnectionConnection
Slide 5-Slide 5-4949
Activity 5.2Activity 5.2Scenario 1Scenario 1
SalvageSalvage122 M Street122 M Street
Slide 5-Slide 5-5050
Sides A and DSide A
122 M Street
Side D
Walk-around122 M StreetActivity 5.2Scenario 1
Slide 5-Slide 5-5151
Side B
Walk-around122 M StreetActivity 5.2Scenario 1
Slide 5-Slide 5-5252
Side C Walk-around122 M StreetActivity 5.2Scenario 1
Slide 5-Slide 5-5353
Side CSide C
Exposure C1Exposure C1Walk-around122 M StreetActivity 5.2Scenario 1
Slide 5-Slide 5-5454
Side DSide D
Exposure C2Exposure C2
Walk-around122 M StreetActivity 5.2Scenario 1
Slide 5-Slide 5-5555
ACTIVITY 5.2 SCENARIO 1 ACTIVITY 5.2 SCENARIO 1 1ST ALARM RESOURCES1ST ALARM RESOURCES
• Engine 1Engine 1• Engine 2Engine 2• Engine 3Engine 3• Truck 1Truck 1• Squad 1Squad 1• Battalion Chief 1Battalion Chief 1
– – All companies staffed with four firefightersAll companies staffed with four firefighters– – Battalion Chief 1: 30-minute responseBattalion Chief 1: 30-minute response
Slide 5-Slide 5-5656
Heavy fire and smoke third floor, Side C. All occupants have been removed. Second-floor occupancy directly below has an expensive art collection.
Side C
Walk-around122 M StreetActivity 5.2Scenario 1
Slide 5-Slide 5-5757
N
Exposure C1 Exposure C2
Parking
Side A
Side B
Side C
Side D
122 M St.
Slide 5-Slide 5-5858
LR
BR
BR
Ba K
45'
25'
Side A
Third Floor
Side B
Side C
Side D
122 M St.
Slide 5-Slide 5-5959
Activity 5.2Activity 5.2Scenario 2Scenario 2
SalvageSalvage246 10th Street246 10th Street
Slide 5-Slide 5-6060
Sides A and B
Side B Side A
Walk-around246 10th Street
Activity 5.2Scenario 2
Slide 5-Slide 5-6161
Side B
Side A
Sides A and B
Walk-around246 10th Street
Activity 5.2Scenario 2
Slide 5-Slide 5-6262
Side C
Walk-around246 10th Street
Activity 5.2Scenario 2
Slide 5-Slide 5-6363
Sides A and D
Side A
Side D
Walk-around246 10th Street
Activity 5.2Scenario 2
Slide 5-Slide 5-6464
ACTIVITY 5.2 SCENARIO 2 ACTIVITY 5.2 SCENARIO 2 1ST ALARM RESOURCES1ST ALARM RESOURCES
• Engine 1Engine 1• Engine 2Engine 2• Engine 3Engine 3• Truck 1Truck 1• Squad 1Squad 1• Battalion Chief 1Battalion Chief 1
– – All companies staffed with four firefightersAll companies staffed with four firefighters– – Battalion Chief 1: 30-minute responseBattalion Chief 1: 30-minute response
Slide 5-Slide 5-6565
Side B Side A
Sides A and B
246 10th Street Activity 5.1Scenario 2
Medium smoke second and third floors Side A and B. All occupants have been removed. First-floor occupancy uses various acids for mixing.
Slide 5-Slide 5-6666
Activity 5.2Scenario 2
246 10th Street
Heavy smoke second and third floors,Sides A and D. Medium smoke Side C.All occupants have been removed.
Sides A and D
Side A
Side D
Slide 5-Slide 5-6767
2-storyWarehouse
1-story 1-story
E
3-storyOffice
3-storyWarehouse
E 50'
Fire onSecondFloor
N
75'
E
Side A
Side B
Side C 246 10th St.
Side D
Slide 5-Slide 5-6868
Activity 5.3Activity 5.3Large Exercise 3Large Exercise 3
• Three-Story Bank/Office BuildingThree-Story Bank/Office Building• 900 16th Street900 16th Street
Slide 5-Slide 5-6969
Side ASide A
Walk-aroundLarge Exercise 3900 16th Street
Three-story bank building, 125' x 175', noncombustible construction, building is sprinklered and contains standpipe connections in stairways, occupied by 250 employees.
N
Slide 5-Slide 5-7070
Side ASide A
Walk-aroundLarge Exercise 3900 16th Street
Slide 5-Slide 5-7171
Sides A and BWalk-around
Large Exercise 3900 16th Street
Side ASide A
Sprinkler/Standpipe Sprinkler/Standpipe Connection Side BConnection Side B
Side B
Slide 5-Slide 5-7272
Side B
Walk-aroundLarge Exercise 3900 16th Street
Slide 5-Slide 5-7373
Side C
Sides B and C
Walk-aroundLarge Exercise 3900 16th Street
Side B
Slide 5-Slide 5-7474
Side C
Walk-aroundLarge Exercise 3900 16th Street
Slide 5-Slide 5-7575
Side C
Walk-aroundLarge Exercise 3900 16th Street
Slide 5-Slide 5-7676
Side C
Sides C and D
Walk-aroundLarge Exercise 3900 16th Street
Side DSide D
Slide 5-Slide 5-7777
Side DSide D
Walk-aroundLarge Exercise 3900 16th Street
Slide 5-Slide 5-7878
Side D
Sides A and D
Side ASide A
Walk-aroundLarge Exercise 3900 16th Street
Slide 5-Slide 5-7979
Side A
Side D
Sides A and D
Walk-aroundLarge Exercise 3900 16th Street
Slide 5-Slide 5-8080
Side A
Walk-aroundLarge Exercise 3900 16th Street
Slide 5-Slide 5-8181
LARGE EXERCISE 3LARGE EXERCISE 31ST ALARM RESOURCES1ST ALARM RESOURCES
• Engine 1Engine 1• Engine 2Engine 2• Engine 3Engine 3• Truck 1Truck 1• Squad 1Squad 1• Battalion Chief 1Battalion Chief 1
– – All companies staffed with four firefightersAll companies staffed with four firefighters– – Battalion Chief 1: 30-minute responseBattalion Chief 1: 30-minute response
Slide 5-Slide 5-8282
Side C Side C
Large Exercise 3Large Exercise 3900 16th Street900 16th Street
Conditions upon arrival: Friday 2 p.m. Heavy fire three windows, Conditions upon arrival: Friday 2 p.m. Heavy fire three windows, third floor, Side C. Report of occupants trapped on the third third floor, Side C. Report of occupants trapped on the third floor. Second floor is the main computer floor, National Bankfloor. Second floor is the main computer floor, National Bank ..
Slide 5-Slide 5-8383
3rd Floor Offset
Interior Elevator Shafts
Elevator Shafts
N
Drive-Through Teller
Parking
Parking
Sprinkler/Standpipe connection
Side A
Side B Side D
Side C
900 16th St.
Covered Truckway
Stairs Stairs
Slide 5-Slide 5-8484
Large Exercise 3900 16th Street
Conditions 15 minutes after arrival.
Side C
Slide 5-Slide 5-8585
Conditions 30 minutes after arrival.
Side C
Large Exercise 3900 16th Street
Slide 5-Slide 5-8686
Large Exercise 3900 16th Street
Side C
Conditions 40 minutes after arrival.
Slide 5-Slide 5-8787
TRANSFER OF COMMAND TRANSFER OF COMMAND REPORT PROCEDUREREPORT PROCEDURE
• Location and extent of fireLocation and extent of fire
• Control effortsControl efforts
• Deployment of resourcesDeployment of resources
• Need for additional resourcesNeed for additional resources
To be delivered to the next commanding To be delivered to the next commanding officer arriving at an incidentofficer arriving at an incident