skott, diana, crp. tafe projects in progress. no. 1. tafe ...inforviation for this serie4-as well as...

128
ED 220 657 AUTHOR TITLE INSTITUTION PUB DATE NOTE AVAILABLE FROM JOURNAL CIT' EDRS'PRICE DESCRIPTOliS DOCUMENT RESUME CE 033 555 Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE National Cehtre for-Research and Development, Payneham (Australia). Aug 82 - 128p. TAFE National Centre f or Research and Development, 296 Payneham Road, Payneham, South Australia 5070 ($2.00). TAFE Projecta in Progress; nl Aug 1982 MF01/PC06 Plus Postage. - ,*Educational Development; *Educational Research; Foreign Countries; Postsecondary Education; *Program ,Content; *Program Descriptions; Secondary Edubation; Technical Education; *Vocational Education IDENTIFIERS *Australia ABSTRACT This publication contains a listing of educational ' research'and development projects, currently in progress in Australia, which is the,first of a planned twice-yearly listing of projects in progress.: Projects are listed by territories and'are indexed by author and by subject. Information supplied for each project includes a reference number, project title, contact persoh, contact address, -project status, proposed completion date, estimated co§t, ahpi a short desdription of the project. The projects cover alrfields of .education. A sample of subjects include the following{ language needs of migrants in Darwin; development of external studies-materials; computer-based screening and diagnostic testing system; a review of the carpentry and joinery course; assessing community needssfor further education; training for teachers in the instrdctional systems model ol curriculum development; associate diploma in coal mining; a case study of a Peninsula Comdunity College foundation course; guidelines for curricialum writers; and an ocdupativnpl analysis of the printing trade.) A list of persons who can be contacted for information in subject or geographical areas is included in the e pu8lication. (KC) ********************************************************************** * ReproductIons suPplied by EDRS are the best that can be made * i from the original document. * t**************-********************************************************

Upload: others

Post on 26-May-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

ED 220 657

AUTHORTITLEINSTITUTION

PUB DATENOTEAVAILABLE FROM

JOURNAL CIT'

EDRS'PRICEDESCRIPTOliS

DOCUMENT RESUME

CE 033 555

Skott, Diana, Crp.TAFE Projects in Progress. No. 1.TAFE National Cehtre for-Research and Development,Payneham (Australia).Aug 82 -

128p.TAFE National Centre for Research and Development,296 Payneham Road, Payneham, South Australia 5070($2.00).TAFE Projecta in Progress; nl Aug 1982

MF01/PC06 Plus Postage. -

,*Educational Development; *Educational Research;Foreign Countries; Postsecondary Education; *Program

,Content; *Program Descriptions; Secondary Edubation;Technical Education; *Vocational Education

IDENTIFIERS *Australia

ABSTRACTThis publication contains a listing of educational '

research'and development projects, currently in progress in Australia,which is the,first of a planned twice-yearly listing of projects inprogress.: Projects are listed by territories and'are indexed byauthor and by subject. Information supplied for each project includesa reference number, project title, contact persoh, contact address,-project status, proposed completion date, estimated co§t, ahpi a shortdesdription of the project. The projects cover alrfields of.education. A sample of subjects include the following{ language needsof migrants in Darwin; development of external studies-materials;computer-based screening and diagnostic testing system; a review ofthe carpentry and joinery course; assessing community needssforfurther education; training for teachers in the instrdctional systemsmodel ol curriculum development; associate diploma in coal mining; acase study of a Peninsula Comdunity College foundation course;guidelines for curricialum writers; and an ocdupativnpl analysis ofthe printing trade.) A list of persons who can be contacted forinformation in subject or geographical areas is included in the

epu8lication. (KC)

*********************************************************************** ReproductIons suPplied by EDRS are the best that can be made *

i from the original document. *

t**************-********************************************************

Page 2: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

TAPE NATIONAL CENTRE

-FOR RESEARCH

AND VEVELOPMENT

TATE PROJECTS IN PROGRESS

U.S. DEPARTMENT OF EDUCATION .

NATIONAL INSTITUTE OF EDUCATION

EDUCATIONAI RESOURCES INFORMATION

CENTER tERICI

Thrs document has been reproduced as

received from the person or organuation

originating itMinor changes has* been made to rmprove

reproduction quality

Points of vreAr or opinions stated in this docu

meS do not necessarily reprosent official NIE

Position Or poky.

NO. 1

AUGUST 1982 "PERMISSION TO REPRODUOE THISMATERIAL HAS BEEN GRANTED BY

/614,/,TO THE EDUCATIONAL RESOURCESINFORMATION CENTER (ERIC)."

Page 3: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

oh

"X

TA' ::.:tional Centre

iOr neseanch And Development

Australia, August; 1982

ISSN 0729-5324

,TD.537 THC 4.2

Com011ed by TAFE National Centre For Research And Development

D.J. Woolman, 'Government

Printer, South Australia

(4

Page 4: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

PREFACE

As part of' its commitment to the dissemination of

.information ir TAFE, the TAFE National Cenere for Research' and

Development publishes Initiatives in Teohnical and Further

Education. This booklet epntains information On reslarch

reports, technical'reports, evaluative stddies, and other

completed projects.

'Initiatives' provides a Valuable service to TAFE, ind it

wal felt that_ a similar publication listing research ind

development projects currently in prOgress would be a useful

addition.

Informdtion about such projects has been obtained.from TAFE

Authoeities and the present publidation isathe first in what is

envisaged will be a twice rarly listing of projectS in progress.

Contributions fro:11 TAFE perionnel to the second -issue for

1982 and subsequent iieues are invited and can be made by

contacting, in the first instance, the TAFE Clearinghouse Officer

in your State.

I gould like to Shank TAFE Authorities for prIviding

inforviation for this serie4-as well as Diana Skott for compiling

ithe project listing, Giulia Reveruzzi Cor typing the documgt and

Tim Pulsford for his publication a'ssistance.

For further information regarding this publication, Please

contact Diana Skott; TAFE National Centre

Development,, 296 Payne/16m Road, PAYREHAM,

Copies of this document can be purchased from

for $2.00 each.

G.A. Hermann

CO-ORDINATOR

for

Ph:

the

Research and

(08) 42 7905,

above address

Page 5: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

a

Preface

.4g

teCONTESTS

-

Page

4

;

Contact Persons ,

Projects.in Progress

NorthereTerritory

Tasmania 5

Queenslaid 17:

New South Wales 47

Western Australia 71

South Australia .79. -

Victoria 101

TAPE National Centre 111

Australian Capital Territory 117

Author Index 121

Subject Index 2>1

124

gr

Page 6: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

CONTACT PiRSONd

Below is aNlist of people in TAFE lelo caninfortlation in the areas indicated.

NORTHERWTERRITORT

Initial contact:9

Director TAFENT Depdrtment.of Educ.p.ionP 0 Box 4821 .1DARWIN (089) 80 4211

' TASMILNIA

Head Office contact.11,

Mr Graham VertiganCo-ordinator of services and courses 41Division of Further EducationEquiq House110 Murray StreeeHOBART 7000

/1COURSE COORDINATORS

Tasmania College of Hospitality

Baker/Pastry CookButcheryCookeryFood and Beverage.

r- Hobart Technical College

BricklayingEstate kgencyGlass Reinforced Plastics/PlasteringiTiling'Health SurveyingH.V.A.C.National Parks and Rangers,Paint./Decor./GlazingPolice and Transport AdministrationprintingPhotography Afr.

.64

RadiographyRefrigerationWood Machining

Burnie Community College

Agriculture.Instrument Mechanic

11,.st Coast Commnitv Colleke

Mining Eng./Mine Suveyi ''s

6

be eontcted for4

Mr F PfisterMr G FaganMr H Stauffer %

Mr P Roulesfbn

,

Mr LMr DMr.BMr HMr CMr pMr NMr DMr MMr FMr GMr D

Wiggins

Murphy (Acting)HuxleyMullerBishop.

BurrowsLaLhamvon Bertouch'LongStronachRowleY

MitchellBell

Mr R BrownMr D Anderson

Mr J,Cornish

1

Page 7: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

STATE COORDINATORS

Hobart Technical College!.

Building/Architecture .:- it A Gardner

Business Studies lir A Bond

Cabinet Making Mr D SherwoodChemical/Lab. Technology Mr J AshtonCivil Engdurvey Dvaftihg Mr R Marshall

,Commerce SecAtarial . ,Mr I Tongs

Diesel Fitting5:2'

Mr G Davis

Electrical Engineering/Electronics and- . *

COmmunications Mr T"DavisonFashion t Mrs A TiffinHairdressing Mr K Donovan

. Mech./Marine and Aero Engineering Mr R Alexander

Metal FAbrict4tio.n. Mr M Fox'Motor Mechanics ". Mr A Yeoland

Panel Beat./Veh Pairp ' Mr T RoperRadio/TV/Indusi. Electronics Mr E BaynesSheetmetal ' Mr J Wiltshire'

Small F.ngines Mr R Fo'ster

. Welfare' Mr R Snashall

CONTACT' PERSONS.

-

Launceston Community College

Art . Mr A ChaffeyAuto Electrician Mr M ScolyerCarpentry and'vloinery Mr A.Gray

Child Care Mrs H MurrellElectrical Mechanics Mr J Simmons

Horticulture Al''T Barbour

Library Techniclan Mrs R Talbot,

Plumbing Mr I Goodluck

Alanvale Community, College.

and'Hachining Mr I Burrows

gygnsLAND

OFFICERS RESPONSIBLE FUR CURRICULUM PLANNING DEVELOPMENT ANDREVIEW

TAFEC Fields Of Study - Officer(s)

Applied Science Alan Bowen

Art and DesIgn Bryan EatonBuilding Alan Bowentrusiness Studies Bryan EatonEngineering Alan BowenRural and Horttcult.ire,, AlakBowenM130, Bryan Elton

Alan Bow.ni

Industrial 3nrvinon Alan Boits.n

-Irvin Rat-1-n

1.q./1-01 Brvan Tirnn

40nPr41 rv1n it)n

Phone No.

224 7099224 7288

64-

Page 8: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

Na,

Other Course Categories

Transition Educalsion

Aegess (disabled, disadvant-aged, ethnic, wamen'sprograma, *etc.)

0.

CONfACTERSONS

John Stevensch

Alan BowenBryan EatonJohn Stevenson:Aldn BowenNBryan Eatoa

Curriculum Policy And Practice*

s

Overall curricalum policyand practice

CUrriculum evaluation and' research

Methodology and media

John Stevenson

John'SWenson

John Stevenson

f t

224 7960

4

'NEW 80(IiH WALES

AND. .

OFFICERS RESPONSIBLE FCR CURRICULUM PLANNING DEVELOPMENTREVIEW

4,hone No.TAFEC Fields Of Study Officer(s) -;

Applied Science David Haworth 219 9444Chief Educ.Officer

Art and Design Tub Salasoo Acting 219 9457Mr- C.E.O.

Building Tiiu Salasoo A/C.E,0 INBusiness Studies Tiiu Salasoo A/C.E,0Enginapring David Haworth C.E.0Rural and Horticultural Tiiu Salasoo A/C.L.0Para..medlcal David Haworth C.E.O.General Studies David Haworth C.E.0 kirf

4

Other Course Categories

Transition EducatiOn Paul Wer Head Trans.. 219 932Ed.Anit

Access (disabled, disadvant-Fred Rob A/C.E.s0.aged, ethnic, women's (Special Groups)

219 9477,

etc.) 'Jenni Neary Coordinator 21.9 9341

.of Women's ProgramsKeithCampbell Head 219 9661

0 Aboriginal Ed. Unit

Curriculum Policy and Practice

Overal1 curriculum poliey Dr S Humphrey, Assistantand practice Dir. (Curr. Assessment)

Curriculumevaluation and Caof Hawke A/C.E.O.research

219 9386

Methodology Ad media Alan Craig C.E.O. , 219 9358Ron King O.I.C. Ed. 219 9403Resources Branch.

Page 9: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

WESTERN AUSTRALIA

CONTACT PERSONS

OFFICERS RESPONSIBLE FOR CURRICULUM PLANNING DEVELOPMENT ANDREVIEW

Phone No..TAFEC Fieldt Of Study Officer(s)

Applied Science Supt. K Brehaut 420 4090Art and Design.- Supt. R Hprner 420 4098Building Supt. J Baker 420 4097Bugiriess Stuclies Aupt. R HornerEngineering Supt. I Kauler 420 4100Rural and HorticultuPal Supts. K Wdterhouse & 420 4935

K Brehaut 42? 4096Para-medical Supt. K BrehautIndustrial Services %Supt. C Burking. 420 4102General Studies Supt. F Whitmore 420 4104

Other Course'Categories

Transition Education Supt. F WhitmoreB Brand S.E.O. 420 4201

Access (disabled; disadvIntT Supt. F Whitmore'age-dosethnic, women's programs etc.)

Aboriginal Access R Cain S.E.O. 420 4083Adult Literacy Supt. F Whitmore

M Lynch E.O. 420 4141Migrant Educ-ation L Drake-Brockman 420 4089

Officer in Chgrge

Curriculum Policy And PracticeA

Overall curriculum policy R T,.orogood 420 5088and practice 9irector of Studies and

T Goode S.E.O. 420 4109Curriculum evaluation and R Thorogood and T Goode

researchMethodology and Media R Thorogood ane f Goode

SOUTH AUSIRALIA

oFFicas REsEctism& FOR DINRICULUM PLANNING DEVELOPMENT ANDREVIEW

TAFEC Fields Of Study

loplied Science'Art and DesignBuildingBusiness StudiesEngineeringRural and Horticultural'music

Para-medicalIndustrial, Services

Atrcraft/marinetlothing, textiles,

footwear'

Officer4)

David FurberJohn MitchellJohn McCarthyColin ThornJohn McCarthyColin ThornJohn MitchellJohn McCarthy

John McCarthy

John Mitchell

Phone No.

227 4667227 4222227 4621227 4199

_

Page 10: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

A

Food processingPrintingWatch and clook making

Personal ServicesFood presentation,waitingHairdressingLibr:ary

Home eoonomics/Physical Education

General Studies

Other Course Categories

Transition EducationAccess .(disabled, disadvant-

aged groups, ethnic,women's programs etc).

Curriculum Policy And Practice

Overall curriculum policyand practice

Curriculum evaluation andresearoh

Methodology and media

VICTORIA 4

CONTACT PARSONS

Colin Thorn:John Mitchell

John McCarthy

Colin ThornJohn MitchellJohn MitohellJohn MitchellJohn MitchellJVin Mitohell

Roger: MAthers

John Mitchell

Rogqr Mather*

Dean KuhlJohn MitchellBrian Kenworthy

r

227 4199

Is A

227 4928

227 3295

OFFICERS RESPONSIBLE FOR CURRICULUM PLANNING DEVELOPMENT ANDREVIEr

TAFEC Fields Of Study

Applied Science

Art and DesignBuilding .

Business StudiesHpral and HorticulturalMusicPara-medicalIndustrial ServicesPersonal ServicesGeneral Studies

Othe? Course CategoriesA

Transition EducationAccess (disabled, disadvant-

aged, etbnic, women'sprograms etc4

Officer(s)

Alan DanielPeter CoughlinKeith HancockAlan SilverPeter EsdalePeter Co ghlinAlan DanielPat HadenPat HadenGraham Stevenson

Mr Mike SmithTAFE Manp.ement Unit021 Coppin Grove

HAWTHORN 3122

Phona.No.

783 957088 8551

569 0421555 0044'810 1722

88926)

329 7288ext 16

Page 11: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

Curriculum Policy And Practice

Overall curriculum policyand practice

Curriculum evaluation andresearch

Methodology and media

AUSTRALIAN CAPITAL TERRITORY

CONTACT PERSONS

Mr P Cutter

General Manager ProgramsTAFE Management Unit21 Coppin GroveHAWTHORN 3122

DirectorOffice of ACT Further EducationP 0 Box 826RODEN ACT 2606

ATransition Education Ms J Chapman 89 7455Adult Migrant Education

f aMr 3"mungoven 30 /028

Roden TAFE ColleneP 0 Box 666 ,

WOOER ACT 2606

Business studies M Flanagan 83 4602.1. Denton, 83 4589

Secretarial Macathlan 83 4603Engineering

Automotive Painting W Roberts 80 6177Panel Beating L Robinson 80 61Z7

Rural and Horticulttral

Hortieulture P Unger 88 4877Agriculture L Fletcher 88 4877

. Turf Management M Clune 88 4877Industrial Services

Fashion J Sapieha 83 4592Personal Services M Moore 83 4612

Home Science J Coburn 83 4604General Studies M More

Curriculum Policy And Practice

Overall"curriculum policy C Hughesarid practice

83 4553

Curriculum evaluatioh andresearch

K'Birkin6 83 4679

Methodology and media A Barr '83s^%

M680

.

Page 12: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

1

s

+.,

1

C..

ol

3

lit

4

44

PROJECTSIR°

PgOORESS

A

IIORTHER,11 TERRITOR T

/

A

Page 13: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

NORTHER? 'ERRITORT

Reference number: I

Project title: Survey of language needs of migrantsDarwin

Contact person: Principal, Adult Misrant Educeatloh Centre

Contact address: PO Box 4821DARWIN 5794

Project status: 3/4 completed

Proposed completion date: May 1982

Eitimateil coat of project: $11,000 - $40,000

in

ReMarkE Department of Immigration bld Ethnic Affairs-fundedsurvey of language need:: of migrants in Darwin.Involved Timorese (including Portuguese and Chinesespeakers), Italians and Greeks. Followed from Galballyrecommendations.

Reference number: 2; NT: Filo 81/124

Project title: Evaluation of Aboriginal Adult Education inthe NT

Contaet person: John Weatherhead

Contact address: Department of EducationPO Box 4821DARWIN 5794

Project status: Planned

proposed completion date: End 1983

Estimated cost of project: $11,000 - $40,000

Remarks: Tertiery Education Commission-funded study of the roleana effectiveness of adult educators in Aboriginalcommunities in the Northern Territory.

Reference number:

Project title:

Contact'person:

Contact address:

3; NT: File 82/790

Itgleof TAPE teachers in the Northern

John Weatherhead-

prgmtnlof Education

DARWIN 5794

project,status: Planned

Proposed completion date: End 1982

Estimated cost of project: less than $2,000

Remarks: This is a simplified replication in the NT of a morecomplex study carried out in 1980 in WA by a team fromWAIT and reported in Education Deparcment of WesternAustralia's cooperative research series No 4, The TAFEProject, by Oaite, Ryan et aa. 1980. This stOR7 UTITalso examine the need for technologicaI updating andretraining Of TAFE staff.

n

14.

Page 14: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

CN

NORTHERN TERRITORY

Reference number: 4

Project title: Evaluation of Batchelor College program

Contact person: Principal, Batchelor College

Contact address: Ratchelor CollegeBATCHELOR 5791

Project status: Planned

Proposed completion date: End 1982

Estimated cost of project: $11,000 - $40,000

Remarks: This study is funded by TEC recurrent grants and isintended to provide developmental information for theCollege

Reference number: 5

Project title: Development of external studies materials

Contact person: H. V. Osborne

Contact address: Batchelor CollegeBATChELOR

Projeot status: 1/2 completed

Proposed 2211121211211 date: November 1982

Estimated cost of project: $11,000 - $40,000

Remarks: To provide appropriate support materials for the firstyear of a Remote Area Teacher Education course inAboriginal Communities of the NT.

Page 15: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

9-

N.

.....

Page 16: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

Reference number: 6

Project title: Computer based screening and diagnostictesting system

Contact person: me Malcolm

Contact address: Division of FurehZr Educationc/- Curriculum Centre57 Brisbane Street .HOBART 7000

Project status: 3/4 completed

Proposed completion date: December 1982

Estimated cost of RE11121: WOW - $40,000bp.

Remarks: To preftide a testing/screening device for students whoare entering TAPE. This screening will identifystudents wlio will be requiring assistance withmathematics and reading-in order to cope with collegecourses. The computer programs also _provide adiaghostic service to indicate-the nAture of the help,they need. Materials include test booklets,administratfVe handbooks, ansWer sheets and computersoftware. While the scheme provides for ,pre-coersemass testing of students, tests also can be usedindependently by teachers at any time throughout theyear. ,

,Reference number: 7

Project title: A review of.the Carpentry and Joipery comma

Contact person: , Mr Jim Walsh

Contact address: School of Wood Working TradesHobart Technical College75 Campbell StreetHOBART

Project status:. 1/2 completed

Estimated cost of project: $11,000 - $40,000

Remarks: To review the Carpentry and Joinery curriculum in orderto make the relationship between the learning programand the job mors-mxplio--A-sample of employers and

. tradesmen in the carpentry and joineri-trade in eachState was surveyed to determine what they consideredwere the essential duties and tasks of the trade. Inresponse to the survey rindings a new training modewas instituted. Training obiectives and learningprograms have been completed or 12 weeks of the 18week apprenticeship course. lbe new syllabus is beingAeveloped on the processes and techniques of theinstructional systems model.

Reference number:

Project title\

Contact pereon:

Contact address:

Project status:

8

Participation of 1981 grade 10 students inrurther education

Peter Hoult -

Research BranchEducation Department of TasmaniaPO Box 1698HOBART 7001

1/4 completed

Page 17: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

TASMINIA

ProOosed completion date: End 1982

kRemarks: The phase in pro reaa is an analysis of the Further

Edpcation partic pation of the Grade 10 cohort from1981 Asing a samp e Of eight urban or semi-urban highschools which demonstrate neither disadvantage noradvantage on a socio - economic index.

Reference number: 9

Project title: An analysis of evaluation aethodologies forTAPE progrvas

Contact person: Mrs Helen Hocking

4 Contact address: Research Branch4 Education Department of Tasmania

116 Bathurst StreetHOBART 7000

Project,statu;: 1/4 completed

,Proposed completion date: December 1982

Remarks: The project encompasses a 'survey of the recent andcurrent evaluation skelho4s adopted in TAFE inAustralia. ,As well as Tome assessment of the sCopeadopted compared wits the range of evaluationstrategies available, the study will analyse thepurposes and uses by management. A paper 'directedprincipally towards administrators is planned.

Methodology: Collection of reports, discussion withTAFE staff throughout Australia on issues in evaluationin the TUE context. +

Reference number:

Project title:

Contact ,person:

Contact address:

JO

A demonstration and experimental facility totest solar collectors outdoors

Mr Chris Bishop

Plumbing DepartmentClaremont Community Collegec/- Hobart Technical College75 Campbell street -HOBART 7000

Project status: 3/4 completed

Estimated cost of project: $11,000 - $40,000

Remarks: The alp of this project is to monitor the thermalperformance characteristics of soldr collectors underTasmanian conditions. It is also to be used as aneducation facility for the teaching-of solar orientatedcourses run by Phe Division of Further Education.Syllabi have been prepared for these courses. Theproject also aims to provide information regardinginstallation and maintenance of solar collectors underTasmanian conditions.

Audio/visual material: 3/4 Sony + 1/2" Philips colour videotapeentitled "The Air Conditioning and-SolarTest Rigs at Claremont, Tasmania". '21minutes. This hils been produced.

8

Page 18: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

%.

Reference humbert

PrOject title:

.Contact persons:

Contact address:

Project status:

' TASMANIA

11

'Assessing conaumity needs for furthereducstfon: A paricipative approach

Mrs Paddef Mrs Helen Hocking

Researc RkanchEducatioeftpartment of TasmanSa116 Bathurst StreetHOBART 7000

1/2 completed

Proposed completion date: December ,1982

Estimated cost of project:. $2,000 $10,000

Remarks: The project seeks to use eci5ting community groups toassess needs and means of provision in such a way thatnon-participants might be encouraged to return toeducation. The project Will explore theoretical andphilosophical problems related to community basedcontinuing education as well as practical analysis offorma of provision. it will document needs ofcommunity groups in a disadvantaged area (e.g. high

,migrant, low SES area). ,

Reference number:

Project title:

Contact person:

Contact address;

12.

Training'. for TAFEinstructional eystemsdevelopment

Mr Frank McMahon

Division of Further EducationEquity House110 Murray StreetHOBART 7000 (

teachers in themodel of curriculum

.Project status: 1/2 completed

Estimated cost of pr:ojects $11,000 - $40,000

Remarks: To provide appropriate training for TAFE teachers andservice persconel in the Instructional Systems Model ofVocational Curriculum Development. This project willtake the form of shdrt courses to enable teachers tobecome proficient in curriculum development activities.This is necessary because of' the need to reviewexisting courses, especially in the light oftechnological advance. This project is on-going until

4 demand is satisfied.

Reference number:

project title:

Contact person:

Contact address:

Project status:

13

Researoh and evaluation skills 'for TAFEOfficers

Mr Frank McMahon

Division of Further EducationEquity House110 Murray StreetHOBART 7000

Planned,

Estimated cost of project: $11,000 - $40,000

Page 19: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

'Minn

Remarks: A purpose built programme designed to improve researchand evaluation skills for practising TAFE teachers andappropriate Head Office staff.

Refdrence number:

Project titles

Contact person:

Contact address:

14

Industrial Release Program

Mr Frank McMahon

Division Further EducationEquity House110 Murray StreetHOBART 7000.

Project status: Planned

proomd completion date:

Estimated cost

Remarks: 1.

2.

3.

of project:

1982 +

over $40,000

To provide a range of activities to help teachersupgrade their technical competence.To provide for teacher replacement so thatcolleges will be encouraged to release staff.To enable teachers to return to industry for shortperiods.

Reference number: 15; TAS: DT4/82

Project title: Engineering drawdpg - self-paced learningProgracts

Contact person: Mr. D. Manterfield, Head of Engineeringa

Contact address: Devon Community College, TAFE SectionPO Box 396DEVONPORT 7310

Project status: Planned0

Estimated cost of project: $2,000 - 410,000

Remarks: To prepare and pilot self-paced learning courses in thesubjects of Engineering Drawing 1 & 2 at the DevonCommunity College (TAFE Campus). The Program isteacher developed akong the lines of the Keller (PS1)learning theory model.4

Reference number:-

Project title:

Contact person:

Contact address:

!!:2..lect

16

A demonstnation and expehmental watercollection (water storage, water distribu=tion) solar system for fpace heating

Mr Chris Bishop

Plumbing DenartmentClaremont Cbmmunity Collegec/- Hobart Technical College75 Campbell StreetHOBART 7090

3/4 completed

Proposed comletIon date: September 1982

FstImated cost of project: $11000 - $40,400

1 0

Page 20: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

TASMANIA

. .

Remarks: This system provisles a working demonstration of solarhea us/og a concrete floor as the thermal store whichwi I show the potential and limits of using solar fortp ce heating. .

Reference number:

Project title:

Contact person:

Contact address:

-17r-1AS: H1'/14/82-

The :use and effectiveneas of videotapes inteaching

Bea Kerrie Haines

Hobart Technical College Library75 Campbell Street -HOBAaT 7000

Project states: Planned

Estimated cost of project: 82,000 - $10,000

Re:pal-Ks: To research the nature and extent of instruction usingvideo systems_by TAPE-teachers. To develop methods orimproving TAFE-teaChers' use of video programs in theclassroom:---A report written by an interstateconsultant will,be prepared.

Reference nueber: 18; TAS: 1/18/81

Project title: Electronic Mechanics (Business Machines).

Contact persons: B.S. Baynes, & M.E. Woodaansee

Contact address: Hobart Tech College Curriculum Centre75 Campbell Street 57 drisbane StreetHOBART 7000 HOBART 7000

Project status: 1/2 completed

Estimated cost of project: $11,000 - $40,000

Remarks; In recent years a numLer of trade areas have beenundergoing radical changes due to the introduction ofnew technology, consequently manufacturers and serviceorganisations have found the need for their apprenticesand servicemen to receive appropriate training. It wasbecause TAPE had no appropriate courses to offer inthis area that the sublission was made.

The submission (electrical/electrod,c trades) proposeda two-year program in which research and planning tothe initial stage of producing a detailed operativeproposal for imp1ementation is completed in the firstyear followed by a limited trial, evaluation andteacher development ptogram in the second year.

In broad terms the program of work for 1981 comprisedthree stages. The first stage involved collectingfacts, figures and opinions, the second stage involvedanalysing the skills required by competent servicemenand the third stage involved preparing performanceobjectives, learning units, syllabi, lists of teachingaids, teaching times, etc, to enable limited trialsand evaluation to commence in 1982. The work- is nowsufficiently advanced for limited trials and evaluationto commence.

Page 21: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

Reference number:

Project title:

Contact persons:

Contact address:

project status:

Estimated

Remarks:

a

TASMANIA

19; TAS: HT4/82

Pattern making in the clothing courses

Mrs G Oakes

Hobart Technical College75 Campbell StreetHOBART 7000

Planned

cost of project: $2,000 - $10,000

To provide teachers with the opportunity and resourcesto prepare teaching materials for the 'Pattern Making'subject in the Clothing Course. In particular, theRundschase pattern'making method would be introducedand student reference book will be developed.

Reference numbeF: 20

Project title:

Contact person:

Contact address:

- Project status: '

Estimated cost of

Remarks:

resource materials for the Bakery Course

Mr Fred Pfister .

School ofilospitalityDrysdale House59 Collins StreetHOBART 7000

Planned

project: $24100 - $10,000

To provide teachers with the opportunity and resourcesto prepare teaching materials for the Bakery Course.A series of self-instructional booklets Aill bedeveloped.

Reference number: 21; TAS: LT 8/82

Project title: Study skills for small group (LCC TAPE)

Contact person: R A Sutherland

Contact address: Student ServicesLaunceston Community College (TAFE Seciion)Paterson StreetLAUNCESTON 7250

Project status: Planned

Estimated cost of project: $2,000 - $10,000

Remarks: To trial a study skills development program with smallgroups of TAFE students at the Launceston CommunityCollege. To develop a core curriculum of study skills.To produce an evaluative report.

- --

Reference number: 22

project title: TAPE needs in the Scottsdale region

ntact Rerson: Barry Nation

Contact address!, Launceston Community Calloco (TAFE ,ertion)Automotive DepartmontPaterson 3treet"AUNC83CON 7250

12

Page 22: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

TISHANIA

Project atatus: Planned

EatiMated cost bf project: $2,000 - 10,000

Remarka: To determine the educational/training needs in theScottsdale region by conducting a research study whichwill'gather information by interviews with a aample ofemployers. The information gathered will assist theLaunceston Community College 4plan for'future coursedevelopment.

,

Reference number:

projeCt title:

Contact person:

Contact address:

23

Ana1y3i34af skills

.Graeme Vertigmn

Division of Further EducationEquity House110 Murray StreetHOBART 7000 .

Project status: Planned

Estimated

Remarks:

coat of project: $11,000 - $40,000

To undertake a aubstantial industry review of the woodmachining trade and requirements of employers. Thesurvey and report would he preliminary to a review ofthe Wood Machining Syllabus. It is being undertaken inconjunction with the Tasmanian Timber Industry TrainingCommittee.

Reference number: 24

Project title: Burnie Community College - Online Catalogue

Contact persons: Ma Judith nabs; MS Mary-Anne Banks

Contact address: Diviaion of Further EducationEquity House110 Murray StreetHOBART 7000

Project status: 1/4 completed

Estimated cost orproject: $2,000 - $10,000

Remarks: To develop and implement a computerised catalogue foruse by TAFE teachers and students. The catalogue willbe able to produce bibliographies-for teachers, providean interface with a circdlation system'and form thebasi s. for a union catalogue for Tasmanian colleges.

Reference number:

Project title:

Contact person:

Contact address:

Project status:

Estimated cost of

25

Resource aanagement projects

Ms Judith Timbs

Division of Further EducationEquity House110 Murray StreetHOBART 7000

1/14 completed

project.: $11,000 $40,000

Page 23: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

TAZMAXIA

Remarks': There aro a series of projects which ire assistingteachers :o organiae their teaching learning resourcesfor use. The projects art currently beineconduoted inseveral colleges in the following departments -Plumbing, Commerce, Electrical Trades, Automotive andBuilding Tradesr Evaluative reports for all projectswill be written.

Reference number:

Project titl'e.

Contact persons:

Contact address:

Project status:

26

CIRhYS - Conputerieed circulation :system foroollego libraries

Me Judith Tielbs and Mr Warwick Lee

Division of Further Educationuity House110 Murray Street

HOBART 7000,

Planned

Estimated cost of project: $2,000 $10,000

Remarks: CIRSYS is a computerised ciroulation system developedby the State Library an'd modified oy the EducationDepartment fcr use with schools and colleges. A trial

\ project was conducted at Launceston Community College, and as a result of the successful use of this system,

CIRSYS has now been extended for use to other colleges.It is currently being implemented at Pobart TechnicalCodlege.

Reference number:

Project title:

Contadt person:

Contact address:

Project status:

Proposed completion

27

Reviewof course and syllabus content of dataprocessing coursea

Mr J Chawla

Burnie Community CollegeTechnical StudiesPO Box 841BURNIE 7320

1/4 completed

date: December 1982

Estimated cost of project: $11,000 - $40,000

/Relaarks: This project involves three Business Studies teachersfrom three Tasmanian Technical Colleges participating .in a joint review ofj.b.currerit data peocessing courseand syllabus. A w curriculum to bp operational atthe beginning of 1983 is a planned outcome of thereview.

.

Reference number: 28 -

Project title: Business Studies Course review

Contact ppraon: Mr Keith Stacey

Contact address: School of Business StudiesHobart Technical.College

48Campbell StrMet

BABT 7000

Project status: 1/4 completed

14

fa

Page 24: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

TASMANIA

Proposed completion date: December 1982,

Estimatem coSt of project: $2,000 - $10,000

Remarks: The project aiMs to iden ify the vocational skillsrequired by Business S udles graduates. It iscurrently collecting data y surveying employers, pastgraduates and current stu nts. The projeot also aimsto develop a joint Tasanin and Victorian data base ofcurriculum guidelines and materials as a source Correviewing teaching methods.

Reference number:

Project title:

Contact person:

Contact address:

Project status:

29

Computer augmented aoconntancy, ,

lir Andrew Bond

School of Business StudiesHobart TeohnicalCollege75 Campbell StreetHOBART 7000

Planned

Proposed completion date:

Estimatedlcost of project:,

Remarks: An update of,traditional accounting methods to reflectthe current impact of computers -Pit his field. Anoutcome of the review will be the rewr

)ing of syllabus

documents tot...the elcisting courses and,. ubjects.

December 1982

$2,000 - $10,000

215

Page 25: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

.1

,

Page 26: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

Q1112111SUID,

Refermhce number: 30; QLD: D82/1

Project title: Investigation and implementation of a schemefor the improvement of assessment of students-in TAFE

Centact.person: D A Mitchell

Contact addrese: TAFE Curriculum BranchDeparthent of Education Queensland41 Merivalt StreetSOUTH BRISBANE 4401

Project status: 1/4 completed

Remarks: AIMS:7777 To describe current- assessemint, strategies and

procedures.2. To-evaluate these.3. To determine the ext.rlt of the use cf assessment

in learning.To improve assessment procedures.

,

Reference number:

Project title:

'Contact person:

Contact addrese:

Prdject status:'

31; QLD:,A81/17

AssesaMent procedures under CAM

D A Mitchell.

TAFE Curriculum BranchDepartment of Education41 Herivale StreetSOUTH BRISBANE '4101

On-going

Queensland

Remarks: Constantly tc monitor colleg -pasedinstruments and procedures and to easisttheir role in assessing students.

assessmentcolleges in

Reference number:

Project title:

Contact person:

Contact address:

32; QLD: A81/20

Evaluation of School to Work TranaitionEducation Program

D A Mitchell

TAFE Curriculum BranchDepartment cf Education Queensland41 Merivale StreetSOUTH BRISBANE 4101

Project status: 1/4 completed

Proposed completion date: 1983

Remake: ic--Z:1";ibe and evaluate transition programmes inQueensland.

Curriculum Branch personnel will consider the findingein relation to subject and course development.

0

Reference number: 33; QLD: D82/7 0

ProJect title: Participation in Commonwealth-State Evalua-tion of Transition Courses

Contact person: D A Mitchell

-4.

1 9

Page 27: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

Contact address:

rroject status:

Proposed comoletion date: Late 1982

Remarks: Refer Dr. Denis Davis, Macquarie University.

QUEEISLIND

TAPE Curriculum BranchDepartment of Education Queensland41 MeriVale StreetSOUTH BRISBANE 4101

1/4 completed

Reference number:

Project title:

Contact person:

Contact address;

project status:

34; QLD: 082/2

Davelopnent of tents for aptitudes suitablefor selection of TAPE itudents

A Bright

6/- TAFE Curriculum Branch41 Merivale StreetSOUTH BRISBANE 4101

Planned

Proposed completion date: 1982

Remarks: lhe development of an instrument suitable forpredicting students, ability to succeed in TAFECourses.

Reference numbers

Project title:

Contact persop:

Contact address:

Project status:

351 (NM: D82/5

Investigation of connon skills required byinduatrrand commerce

A Bright

c/- TAFE Curriculum Branch41 Merivale StreetSOUTH BRISBANE 4101

Planned ,

Proposed completion date: 1982

Reference number:

Project title:

Contact persons: .

Contact address:

Project status:

Proposed -completion

36; QLD: 79/47

Communication skills required prior to entryto trade apprenticeship courses

J X Sharrock, D A Mitchell

Curriculum Services Sub-SectionCurriculum BranchDivision of TAFE41 Merivale StreetSOUTH BRISBANE 4101

3/4 completed

date: June 1982

Remarks: To determine the communication skills required bystudents before, during and after trade apprenticeshipcourses.

20

Page 28: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

'Reference number:

Project title:

Contact persons:

Contact address:

Trejebt Statue:

371 QLD: D8213

Evaluation of CM007 Pre-vocational Engineer-ing/Construction 9curse

J X Sharrock; D A\Mitchell

Curriculum Services\Sub-SectionCurriculum BranchDivision of TAFE41 Merivale Street \SOUTH BRISBANE 4101

174-compl6a

Proposed completion date: November 1982

Remarks: 1. To provide an evaluation of the MOOT course beingpiloted this year at South Brisbane College ofTAFE.

2. In particular to study assessment in the course.

Reference number:

Project

Contact persons:

Contact address:

30; QLD: D82/4

Evaluation of existing teaching and learningin colleges of 'APE

.1tX Sharrock; D A Mitchell

Curriculum Services Sub-SectionCurriculum BranchDivision Jf'TAFE41 Merivale StreetSOUTH BRISBANE 4101

Project status: Planned

ProAosep completion date: December 1982

Remarks: 1.

2.

To develop an overall understanding of existingteaching and learning in colleges of TAFE.To establish whether existing teaching and'learn,-ing in colleges of TAFE are consiatent with theobjectives determined by Curriculum Branch

Reference number: 39; QLD: D82/8

?reject title: Participation in National Project -Classification of TAPE Courses

Contact person: Peter Mountney

Contact address: TAFE Curriculum Branch41 Merivale StreetSOUTH BRISBANE 4101

Project status: 3/4 completed

Proposed completion date: May 1982

Remarks: It is the focus of the current study into theclassification of TAFE courses throughout Australia toassess the feasibility of using the educationalobjectives of those courses as classificatory criteria.

Reference number: 40; OLD: A80/60

Project title: Resource unit on learning and :study

Contact person: John Seery

21 20

Page 29: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

Contact address:

QUEDISLA16

TAFE Currioulum Branch'Department of Education Queensland41 Merivale StreetSOUTH BRISBAUE 4101

Project status: 1/4 completed

Proposed, completion date: Stage 1. 1982

Remarks: The aim of this project is to produce a series ofpackages on elements of Learning and Study for use by

, all student* in TAFE Colleges., The packages will bedeveloped in five stages with the first stage focussing-upon-Traded. PaoMge-conteatlyttl-inoludamtutly ktrlsard habits, examination techhAte, schematic interpre-tation reading and writing skills, oral communication,etc.

Audio/visual material: Audio cassette/Video. Duration not yetfinalised.

Reference number:

Project title:

Contact person:

Contact address:

Project status:

41; QLD: D82/6

Inveatigation and identification of attritionrates ln TAPE part-tiae courses

A1

John Seery

TAFE Curriculum BranchDepartment of Education Queensland41 Merivale StreetSOUTH 1SRISBAf3 4104

Planned

Proposed completion date: 1982

Remarks: The aim of this projdotsis to ascertain the reasonsstudents are dropping out of part-time courses Thecourses will be broken down into categories and eachwill be looked at in turn. The findings will beproduced in a report format.

Reference number:

Project title:

Contact person:

Contact address:

project status:

PropoSed completion

Remarks:

42; QLD: 80/21

An Evaluation of a Pre-vocationalUrban Horticulture

KieIy

TPFE Curriculum BranchDepartment of Education Queensland41 Merivale StreetSOUTH BR/SBAHE 1101

3/4 completed

date: Fpb 1982

A,

Course in

To determine how effectively the Pre-Vocational UrbanHorticulture (Operator.) Course achieved the statedCOUr3e objectives.

Referenoe number:

Project title:

Contact"person:

43; QLD: A79/61

Processing or results from Distance EducationSurvey

P. Mountney

22

Page 30: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

tontact address:

QUEUSLAND

TAFE Curriculum41 Merivale StreetSOUTH BRISBANE 4101

Project stitus: Planned

groomed completion date: Dec 1982

Reference number: 44; OLD: A80/43

Project title: Pre-Vocational Maritlee Courae

COntadt peOson: John Middleton

Contact address; Curriculum Brancb.Division of TAFE41 Merivale StreetSOUTH BRISBANE 4101

Project status: Planned

Proposed Completion date: 6/83

Remarks: To develop a prevocational syllabus for the maritimeand fishing Industries.

---Re;farcnca-numbar1---457--GLD. A80743--

Project title: Review of IntroductoryPeraonnel

Contact person: John Middleton

Contact address: Currioulum BranchDiviaion of TAFE41 Merivale StreetSOUTH BRISBANE 4101

Project status: 1/4 completed

Courae for Sea-Going

proposed Completion date: September 1982

Remarks: To review the syllabus in view of recommendStions fromteaching staff. This is currently a pre-employmentcourae of two weeka duration.

Reference number:

Projeot title:

Contact person:

Contadt address:

Project status:

'Proposed completion

46; OLD: 81/25

Development of Aboriginal and IslanderAmaiatant Teacher Certificate Course

Mergaret Hardy

TAFE Curriculum Branch41-Merivale..StreetSOUTH BRISBANE -4101 ._

3/4 completed

date: May 1982

Remarks: To provide a recognised award for assistant teacherm onTorres Strait lalanda and in remote Ahorigina1communities.

23

Page 31: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

Reference number:

Project title:

Contact person:

Contact address:

Project status:

PropOsed com6letion

Remarks: Report on

47; QLD: 79/25

Report 2 - Pre-vocational course in BusinessStudies

Margaret Hardy

TAFE Curriculum Branch41 Merivale StreetSOUTH BRISBANE 4101

3/4 completed

date: June 1982

pilot course offered in 1981, at one College.

Reference number:

Project title:--7^-

Contact person:

Contact address:

Project status:

Proposed completion:

Remarks:

48; QLD: A80149

Life and Employment Preparation COurse

Delphine Roseasart

Curriculum Branch (TAPE) Qld41 Merivale StreetSOUTH- BRISBANE 4101

3/4 completed

May 19E4

Aim to produce a syllabus document. Course is designedfor students from special sohools: to provideopportunities to learn trade tasks, trade measurement,'language, interaction with workers. Work experience isincluded.

Reference number:

Project title:

Contaot person:

Contact address:

Project status:

Eroppati completion

Remarks: Review an

49; QLD: A79/43

Assessment and Review of Diploma of Arts

Delphine Rouessart

Curriculum Branch TAFE Qld41 Merivale Street '

SOUTH BRISBANE 4101

3/4 completed

date: July 1982

existing course syllabus:

RefAence number:

t!csigst title:

cntast person:

Oetast aikintav

Frjeet status:

50; QLD: A80/33

Hairdressing - Student Assessment Procedure

Delphine Rouessart

Curriculum Branch TAFE Qld41 Merivale StreetSOUTH BRISBANE 4101

Planned

Proposed completion date: September 1982

Hernm.ks: Aim to have a resource file/bank of exam papers/testsquestions.

ifi211

Page 32: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

Referbnce number:

project title:

Contadt person:

Contact address:

project status:

51; QLD: A80/30

Revision of Syllabus for Skills for Living.and Working

Delphine Rpuessart

Curriculum Branch (TAPE) Qld41 Merivale StreetSOUTH BRISBANE 4101

1/2 complete'd

Proposed completion date: Dec 1982

Remarks: Review of existing course syllabus.

Reference number:

Project title:

Contact person:

Contact address:

52; QLD: A80/56

General Access Course

Delphine Rouessart

Curriculum Branch TAFE Qld41 Merivale StreetSOUTH BRISBANE 4101

Project status: 1/4 completed

Propoped comPletion date: September 1982

Remarks: Aim to produce a syllabus document for a course whichgives access to TAFS courses by giving students tuitionin subjects at an introductory level.

Reference number:

Project title:

Contact perlon:

Contact addre33:

Project status:

Proposed completion

Remarks: Existingsyllabus.

53; QLD: A81/19

Review of Work-Related Liberal Studies Pre-vocational Courses

Delphlne Rouessart

Curriculum Branch TAFE Qld41 Merivale StreetSOUTH BRISBANE 4101

Planned

date:, December 1982

course reviewed for possible changes to

Reference number:

Project title:

Contact person:

Contact address:

Project status:

Proposed completion

54;, QLD:. A80/31

Review of Library Teehnician's CertificateCourse

Delphine Rouessart

Curriculum Branch TAFE Qld41 Merivale StreetSOUTH BRISBANE 4101

Planned

date: December 1982

Remarks: Review existing course syllabus.

25 32

Page 33: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

Reference number:

Project title:

Contact person:

Contact address:

ProJeet status:

Proposed completion

-QatilSIAND

55; QLD: A80/47

Review of Studio Cersaics.Course

Delphine Rouessart

Curriculum Branc41 Merivale StreSOUTH BRISBANE 4101

Planned

date: Dec;:mber 1982

.

Remarks: Revision of existing course syllabus

CV

Reference number:

Project title:. .

Contact person:

Contact address:

Project status:

56; QLD: A801 38

Post Trde Courses Graphic Arts

Bill Bowen

TAFE Curriculum Branch41 Merivale StreetSOUTH BRISBANE 4101

Planned

PJ:22,9191F541-1-0-11-1111tif. 1 82--

Remarks: To develop syllabi for Post Trades Courses of thePrinting Industry. This is particularly necessaryfollowing the reclassification of trades for thePrinting Industry.

Reference number:

Project title:

Contact person:

Contact address:

57; QLD: A81112

Fruit, Vegetable and Cut Flowers IndustryCourse

Mr Kerry Kreis

Curriculum BranchDivision of TAeE41 Merivale StPeetSOUTH BRISBANE 4101

Project status: 3/4 complete&

Proposed completion date: June 1982

Remarks: To develop a suitable part-time course to meet theneeds of personnel employed in the growing, transport,marketing, wholesaling And retailing areas of theindustry.

----------

Reference number: 58; QLD: A82/2

Project title: Investigation of the leducational needs ofhospital personnel from domestics and ward-aides to middle-level management.

c9Aact MEM): Mr Kerry Kreis

contact addres,!: Curriculum BranchDivision of TAFE41 Merivale StreetSOUTH BRISBANE 4101

project, ItAtu2: Planned

3 3 -

Page 34: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

Propelea completion date: Dec.1982

Reference number: 59; QLD: A82/4

prolect title: Hotel and Catering Certificate Course

Contact person: Mr Kerry Kreis

Contact address: Curriculum BranchDivision of TAFE41 Merivale StreetSOUTH BRIsun

Project status: 0/4 completed,

Pralosed completion date: September 1982

Remarks: To de,elop a Certificate level course for the Hotel andCatering Industry as a logical extension of theexisting Practices course.

.

4

Reference number: 60; OLD: A81/27

Project title: Review of CH009 Pre-vocational course inCatering and Hospitality Practices

0

Ceniaet address: Currieulum.BranchDivision of TAFE41 Merivale StreetSOUTH BRISBANE4101

Project status: 1/4 completed

Remarks: To determine the suitability of existing'strInds of thecourse and if necessary to develop appropriatereplacement or additional strands.

lieference number: 61; QLD: A82/7

Loilsr, title:

Contact person:

Contact address:

Project'status:

Combined Breadbaking and Pa8trycookin4k TradeSyllabus

Mr Kerry kreis

Curriculum BranchDivision of TAFE41 Merivale StreetSOUTH BRkSBANE 4101

Planned

Remarks: The industry has indicated its decision to have acombined course to the Industry and Commerce TrainingCommission.

Reference number:

Project tiile:

Conbact person:

Contact address:

ProJect status:

62; OLD: A8216

Advanced Woed Processing Course

Mr Kerry Kreis -

Curriculum BranchDivision of TAFE '

41 Merivele StreetSOUTH BRISBANE 4101

Planned

27 34

Page 35: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

QUEENSLAND

Remarks: To develop a course to logically Sollow the elistingIntroduction to Word Processing Course.

,

Referen0 number:

Project title:

Contact person:

Contact addregs:

---

Project status:

Proposed completio

63; OLD: A80/61

Major Review of Management and CommerceCerti4cate Courses

Mr Kerry Kreis:

Curriculum BranchDivision of TAPE.

Merivale StreetSOUTH BRISBANE 4101

Planned

n date: September 83

Remarks: To review two related major courses which haveoffered for over five years.

been

Reference number:

Project title:

64; OLD: A79/25

Monitoring of fre-vocationalBusiness Stddies

Course in

.44,

Contact person:

Cohtactoaddress:

Zrolest status:

Mt Kerry Kreis

Curriculum BranchDivision of TAPE41 Merivale-StreetSOUTH BRISBANE 4101

1/2 completed

Remarks: The Pre-Vocational Course :n Business Studies was firstpiloted at the Bald Hills College-in 1981. In 1982Bald Hills and Toowoomba Colleges are continuing thepilot.

Reference number:.

Project title:

Contact person:

Contact address:

Project status:

65; QLD: A80/8

Projection paper for TAPE Courses in theTourism and Hospitality Industry

At Kerry Kreis

CurriculumAranchDivision of TAPE41 Merivale StreetSOUTH BRISBANE 4101

3/4 completed

Reference number:

Project title:

Etr5on:

contact address:

trejmt

66

Course for selected skills for school-leaverswho successfully completed a CommercialCourse at secondary school

Pam Hartley

,t)irriculqm AranehDivision or rAFE41 MerivalP StreetS9111i PRIIBANE 4101

'flanned

Page 36: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

QUEDISLIND

Proposedycompletion date: September 1982--"C"

ReTerence number:. 67; QLD: A82/5

Project title: %, Office Studiei Refresher Cburse

Contact person: Pas Hartley

Contact address: Curriculum BranchDivision of TAFE41 Merivale StreetSOUTH BRISBANE 4101 .

Project statu3-:-----12 7;-o-mpleted

Proposed'complttion date: June 1982

Remarks: To develop a'short course for people wishing to re-, eatar the workforce and who need td improve skills or

acquire more skills.

Reference number: 68; .QLD: A81/5

Project title: Associate Diploma ip Real altate Valuation byExternal Mode

ontact-p-SYSth. Bill Bourns .

Contaot address: TAFE Curriculum Branch41 Merivale StreetSOUTH BRISBANE 1101

Project status: 3/4 completed

Proposed completion date: 9A82

Remarks: To develop a UG3 level course leading to the award ofAssociate Diploma in Real Estate Valuation. Thiscourse will replace an existing certificate coursepresented by TAFE. This course will be offered subjectto obtaining prior approval of the Bgard of AdirantedEducation (Queensland). An internal \part-time courseat this level has been approved.

Reference number:

Project title:

Contact person:

Contact address:

69; QLD: A81/23 and A80/39

Review/development of coursea for Rpal EstatePractices

Bill Bowen

TAFE Curriculum Branch41 Merivale StreetSOUTH BRISBANE 4101

Project status: Planned

Proposed completion date: 10/82

Remarks: To review the course currently offered to those seekingto obtain a Real Estate Agents Licence. The require-ments and courae needs for Saiespersons and BranchManagers will also be considered inithe review.

3 . .e, .29

0 ^

Page 37: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

Reference number:

Project title:

'Cbntact person:

Contact address:

QUEEICSLIXD

70t; OLD: 184/24

Revishon of Mariners Courses (Sea Going)

Bill Bowen

TAFE Curriculum Branch41 Merivale StreetSOUTH BRISBANE 4101

Project status: ,,1/4 completed

proposed completion daEes On-going

-Remarks:. The_revision_of ad_courne. syllabi to conform to thenew Marine Regulations in line with Uniferm-ShiPpingLaws Code will take into consideration the nationalcore curriculum developed by the Australian MaritimeConference. ,

Reference number: 71; QLD: A81/15

Project title: "iootwear - Clioking ,

Contact persons Bill Bowen

Contact address: TAFE Curriculum Branoh41 Merivale StreetSOOTH BRISBANE-4404

Project status: 1/2 completed -\

Proposed completion date:- 10/82,

Remarks: Followingta request from the Industry and Commercep . Training Commission and the Footwear Industry Training

Sub-Committee a draft syllabus is being prepared for a28 hour Service Course. The course has been piloted bythe South Brisbane College of TAFE.

Reference number:

Project title:

fontaot person:

Contaci address:

Project status:

Proposed

'Remarks:

72;--RLD: A80/42

Revisionof Signwriting Trade Syllabus

Bill Bowen

TAFE Curriculum Branch41 Merivale StreetSOUTH BRISBANE 4101

1/4 completed

completion date: 6/83

A survey of industry followed by meetings with IndustryAssociations, TAFE college staff and curriculum staffhas resulted in a recommendation that a 3rd Stage bedeveloped for the Signwriting Trade Course.

A submission to the Industry and Commerce TrainingCommission has requested a change to the Industry andCommerce Training Act.

Reference number: 73; QLD: A81/6

project title: Revision of Ticketwriting Course

Contact person: Bill Bowen

3 30

Page 38: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

QUITOISLIND

Contaot address: TAFE Curriculum Branc%41 Herivale StreetSOUTH BRISBANE 4101

Project,:status: Planned

Proposed completion date: 6/83

Remarks: To revise the existing syllabus for the current CN509Ticketwriting Course.

Reference number: 74; OLD: 81/22-

Project title: Preparatory Programme for Course,in Practices ,

of Orapbio Arts

Bill Bowen

tAFE Curriculum Branch41 Herivale StreetSOUTH BRISBANE 4101

prolnt status: Planned

Propos3d completion date: 6/83

Remarks: The course will provide additional time in numeracy andIkteracy as well as developing vocational skillsrequIFFd for a graph1W-ET57UCCupat1onr.

Contaot person:

Contact address:

Reference number:

Project title:

Contact person:

CPP:aeoccstted:IdaortmFle:tiOn

75; QLD: A80/37

Revision of Post Trade Courses forSignwriting and Screen Printing

Bill Bowen

TAFE Curriculum Branch41 Herivale StreetSOUTH BRISBANE 4101

Planned

date: 6/83

Reference number: 76; OLD: A80/46

Projeot title: Training Programme for Haohipists

Contact persons: Rosamond Nutting

Contact address: Curriculum BranohDivision of TAFE41 Herivale StreetSOUTH BRISBANE 4101

prolect status: 3/4 completed

Proposed completion date: 14/5/82E

Remarks: Development of skills in machining techniques to a pre-employment level of skills to equip students with theskills necessary to enable them to become employed infour industry areas: Clothing industry, Furniture andupholstery industries, Canvas industry and the FootWearindustry.

31

3s

Page 39: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

QUEENSLAND

Reference number: 77; OLD: A82/9

Projeot, title:

Contact person:

Contact address:

IhroJect status:

%.

,

Personal Development Course Tor Aboriginesand Inlanders in the Public Service

Roaamond Nutting

Curriculum BranchDivision of TAFE41 Merivale StreetSOUTH BRISBANE 4101

3/4 completed

prop_ciscA completion date; June 1982

Remarks: To equip students with,the personal and jobneeded to compete for employment on the openmarket.

skillslabour

Reference number:

Project title:

Contact person:

Contact address:

Project status:

78; QLD: A82/8

Reviaion of Butchery Trade Course

J Weller

Curriculum BranchDivision of TAFE'41 Merivale StreetSOUTH BRISBANE 4101

1/2 completed

Proposed completion date: September 1982

Remarks: The aim of ths project is to produce a reviaed coursefor teaching trade skilla to apprentice butchers in

' Queensland.

Reference number:

Project title:

Contact person:

Contact address:

79

Materials Handling Course

Mr Kerry Kreia

Curriculum BranchDivision of TAFE41 Merivale StreetSOUTH BRISBANE 4101

Project status; 1/4 completed

Remarks: The development of an additional subject in thematerials handling area and the inclusion of amaterials handling endorsement in the ManagementCertificate Course.

Reference number: 80; QLD: C39

Project title: CN816 Independent Business Owner's ManagementCourse - Builders

Contact person: H K Keene

Contact address: Division of TAFETAFE Curriculum Branch41 Merivale StreetSOUTH BRISBANE 4101

Project status: Awaiting approval

32

Page 40: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

1-'

Proposed completion date: October 1983

Remarks: To provide a specialist stream namely "Builders" to theexisting Independent Business Owner's ManagementCourse.

Reference number:

Project eitle:

,Contact person:

Contaot address:

81; OLD: C53 0

Shop, Office Fitting and Furniture InddstryPre-vocational Course

K Keene

Division of TAFETAFE Curriculum Branch41 Herivale StreetSOUtH BRISBANE 4101

Project status: Investigation

Remarks: Investigations are being carrled out into industryrequirements with respect to the pre-employmenttraining in shop and office fitting and furnituremanufacturing industries.

Reference number:

Project title:

Contact person:

Contact address:

.82; OLD: C50

CW007 Pre-Vocatiouml Course in Engineer-ing/Construction

H K Keene

Division of TAFETAFE Curriculum Branch41 Merivile StreetSOUTH BRISBANE 4111

Project status: 3/4 completed

Proposed completion date: July 1982

Remarks: This course is designed to enhance the employmentopportunities of 'at risk' students.

Reference number:

Project title;

Contact person:

Contact address:

Proiect status:

83; QLD: C8

CN339 Woodmachining (Master Craftsman)

H K Keene

, Division of TAFETAFE Curriculum Branch41 Merivale StreetSOUTH BRISBANE 4101

3/4 completed

Proposed completion date: October 1982

Remarks: This course is an update of the existing Advanced TradeCourse - Woodmachining. The designation "MasterCraftsman" is in line with the new classification ofTAFE courses in Queensland.

Reference number:

Project title:

Contact person:

84; QLD: C51

Appendix 4, to the Building Act i975-79

M K Keene

334 0

Page 41: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

Contact address:

17/201SAID

Division of TAPETAPE CurriJulum Branch41 Merivale StreetSOUTH BRISBANE 4101

Project status: ' Planned

Proposed completion date: Auguat 1982

Remarks: To provide a service to industry onand implementation of Appendixdwelling construction.

the interpretation4 in relation to

Reference number:

Project titles' ak

Contuct person:

Contact address:

,85; CILD: C52.

Certificate of Management 'Timber

M K Keene

Division of TAPETAFg Curriculum Branch41 Merivale Streetsoma BRISBANE 4101.

Project status: InvestigatiNn

Proposed completion date: fctober.1982

Remarkai A akills analysis has been completed. It is proposedto develop a course to provide entry and exit points atVari01.13 levels of achievement to suit the needs oflower.and middle management personnel employed in thetimber industry.

Rvference number: 86

Project titles Hastercraftsman Certificate in OpticalMechanics

Contact person: J Sparshott

Contact address: TAPE CUrricultna Branch41 Merivale StreetSOUTN BRISBANE 4101

ProjLet s'atus:

Proposal completion

Remarks:

Planned

date: January 1983

The aim is to train optical mechanics to assist inoptical dispensing and to also provide for anescalation of high level skills which are now evidentin this

Reference number:

1.oject title:

Contr person:

Contact address:

Project status:

87

Certificate Course in Urban Horticulture

Paul EVerett

TAFE Curriculum Branch41 Merivale StreetSOUTH BRISBANE 4101

Planned

EEmata completior, date; 1983

Remarks': To develop a course which will provide graduates of thePractices Course in Urban Horticulture with theopportunity of expanding their knowledge, increasing

4.1

Page 42: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

their depth of :Wills in specific areas and increasing' their superviaion and management expertise.

ileference number: 88

Project title: ' Prevocatione Urban Horticulture coursereview

Paul Everett

TAFE Curriculum Branch41 Merivale StreetSOUTH BRISBANE 4101

Project status: Planne&

Proposed completion date: * 1983

Remarks: To conduct a review of this course which was introducedin 1981. '

Contact person:

Contact address:

Reference number:'

=sat title:

Contact person:

Contact address:

89

Courses in produ.:tion Horticulture

Paul Everett

TAFE Curriculum Branch41 Merivale StreetSOUTH BRISBANE 4101

Project atatus: Planned

Remarks: To design a course which will deal with the production,ti.ansport, storage, wholesale and retail marketing of arange of produce including: flowee,s, fruit, vegetables.

Reference number:

Project title:

Contact ,persons:

Contact.address:

90

Courses for rural trainees.(Stago 1)

Trevor Sterling; Warren McLaren

TAFE Curriculum Branch41 Merivale StreetSOUTH BRISBANE 4101

Project status: Planned

Proposed completion date: 1983

Remarks: To develop courses which will satisfy the need anddemand for full time training courses in rural areas.These courses can provide transition from school towork and also a transition from city to rural living.

Contact person:

costact address:

Project status:

Proposed completio

91

Preemployment courzo inrShearing (Review)

Warren McLaren

TAFE Curriculum Branch41 Merivale StreetSOUTH BRISBANE 4101

1/2 completed

n date: c1982

35: 42

Page 43: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

QUESICLAND

Remarks: To conduct a review of this course which ran as a pilotin 1981.

Reference number:

Troject title:

Contaot person:

Contact address:

Project status:

Remarks:

92

Courses in Milk and Milk Products

Warren McLaren

TAFE Curriculum Branch41 Merivale StreetSOUTH BRISBANE 4101

1/4 completed

A total review of existing courses to satisfy thechanging needs of industry, the regulatory requirementsof the State Department of Primary Industries and thenational accreditation by the State Directors ofDairying.

.Reference number: 93; QLD: C42

Project title: Plant Operation (Swimming Pool)

Contact 211112n: J. Sparahott

Contact address: TAFE Curriculum Branch41 Merivale StreetSOUTH BRISBANEe 4101

Project status: 1/4 completed

Proposed completion date:. January 1983-

Remarks: A need exists to train persons in the 4hove field.Most large swimming pool plants come under the controlof the Local Government Department in conjunction withthe Health Department.

Reference number: 94; OLD: C43

Project title: CN715 Plant Operation (Water Supply)

Contact person: J. Sparshott

Contact address: TAFE Curriculum Branch41 Merivale StreetSOUTH BRISBANE 4101

Project status: 1/4 completed

Proeoaed completion date: January 1983

Remarks: A need exists to trainepersons in the above field.There is a growing concern that plant operation ingeneral should be looked at from a National level with

/reciprocity between States.

Reference number:

Project title:

Contact person:

Contact address:

95; QLD: B80

CN541 Certificate Course in Drafting Studies

M. N. Crouch

TAFE Curriculum Branch.41 Merivale StreetSOUTH BRISBANE 4101

36

Page 44: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

QUEENSLAND

Projeot status: 3/4 completed

Proposed completion date: August 1982

Remarks: The revision of this course provides for the creationand addition of multi-discipline drafting strandcompiled from subjects from the specialist strands.4 The revision also provides for a substitution ofphysics subjects; the addition of civil draftingelectives and the minimization of pre-requisites.

Reference number: 96; QLD: 1189

Project title: C14540 Detail Drafting

Contact person; Mr. N. Crouch

Contact address: TAFE Curriculum Branch41 Merivale StreetSOUTH BRISBANE 4101

Proleot status: 3/4 completed

Proposed completion date: August 1982

Remarks: This new Practices Award Course is to enable studentsto gain "Hands On" drafting skills. The nuoleus of thecourse is comprised of the practical drafting subject,.of CN541 Certificate Course in Drafting Studies.

Reference number:

project title:

Contact person:

Contact address:

97; QLD: B58

01105 Metal Fabrication/Boilermaking

Hr. N. Crouch

TAPE Curriculum Branch.41 Merivale StreetSOUTH BRISBANE 4101

Project status: 1/1' completed

Proposed completion date: June 1983

Remarks: The syllabus for this Apprenticeship course has beenrewritten in objective form, awaiting further advice onthe possibility of a change-in legislation to allow anincrease in time for Stage 2 of this course. Anotherconsideration which may influence this course syllabuswill be the National Core Curriculum being developed bya Task Force of State/Territory TAFE Authorities. Theinitial Task force meeting has been held in Melbournein April and the next meeting will be held in Brisbanein July 1982.

Reference number:

Project title:

Contact perions:

Contact address:

Project status:

Proposed completion

98v QLD: B85

CN420 Associate Diploma in Electrical andElectronic Engineering

B.W. Nielson and T. Knobel

TAFE Curriculum Branch41 Mdrivale StreetSOUTH BRISBANE 4101

Planned

date: Decemoer 1982.1y./

Page 45: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

IVEEX:31.1110

Remarks: This course wai. designed to provide an educationalprogramme for those who wish to work as EngineeringAssoci.tes. Although the Board of Advanced Educationhas accredited this course at UG3, minor modificationsto its structure and syllabus content are needed.

Reference number:

Project title:

Contact person: Brice W. Nielson

contact address: TAFE Curriculum Branch41 Merivale StreetSOUTH BRISBANE 4101

Project status: .3/4 completed

Proposed completion date: September 1982

Remarks: This course is being developed to meet the needs of theelectrical and mining industry in Queensland forelectrical cable joivters. The court: will only beavailable by corresponaenci;

99; QLDi B74

CH8O5 Electrical Jointers

Jleference number: 100; QLD: B113

Project title: 01007 Pre Vocational Course in Engineer-ing/Construction

Contact persons; Brice Nielson and Mel Keane

Contact address: TAFE Curriculum Branch41 Merivale StreetSOUTH BRISBANE 4101-

Project status: 1/2 completed

Proposed completion date: July 1982

Remarks: This course is being developed for persons who aspireto work as tradespersons but who have been unable tosecure an apprenticeship.

Reference number:

Project title:

Contact persons:

Contact address:

Project status:

Proposed completion

101; QLD: 8109

Prevocationslyleotronies

Too Knobel and Brice Nielson

TAFE Curriculum Branch41 Merivale StreetSOUTH BRISBANE 4101

Planned

date: October 1982

Remarks: This course is being developed to meet the diverseneeds of a wide range of industries which employtechnical assistants. It is expected that this coursewill be appropriate for persons who have not been'able

, to secure an apprenticeship. Preliminary/ investigations are being carried out to determine the

needs and demands of students who would undertake thipprogramme of study.

4,38

Page 46: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

Reference number: 102; OLD0107

Project title: Maateroraftsman Certificate in Refrtgetagionand Airoonditioning

Contaot person: 1. Oxenford

Contact address: TAFE Curriculum 4ranch41 Merivale StreetSOUTH BRISBANE 4101

Project status: Planned

Proposed completion date: September 1982

Remarks: This post apprenticoahip course is being developed tomeet a need for advanoed and apeeifio knowledge andskills in the fields of refrigeration and airoonditioning. A preliminary meeting has been held withstaff at Yeronga College of TAFE to establish areas ofinterest to the industry. Meetings are planned withindustry to establish speoifio needs and desired levelof training.

Referenoe number:

Project title:

Contaot person:

Contaot address:

103; QCD: 8101

C11413 fellowabip Certificate in Electricaland Electronic Engineering.

Tom Knobel

TAFE Curriculum Branoh41 Merivale StreetSOUTH BRISBANE 4101

Project status: 1/4 completed

Proposed oompletion date: Ootober 1982

Remarks: This ()our:to is for persona in Mt. Isa -who desire acareer as an engineering associate in theelectrical/electronic engineering industry.

Reference number:

Project title:

Contact persons:

Contaot address:

Project status:

104; QLD: 868

CM548 Associate Diploma in Coal Mining

Tom Knobel and Brice Nielson

TAFE Curriculum Branch41 Merivaj.e StreetSOUTH BRISBANE 4101

1/2 completed

Propoaed completion date: October 1982

Remarks: This course is being developed to meet the requirementaof either a 1st Claes or Limited Mine Manager'sCertificate of Competency in Queensland. It isexpected that this course will be accredited at 003.

Reference number:

Project title:

Contaot persona:

Contact address:

105; QLD: 884

015117 Certificate in Coal Mining

Tom Inobel and Brice Nielson

TAFE Curriculum Branch41 Merivale StreetSOUTH BRISBANE 4101

4 639

Page 47: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

Project status: 314 completed

Proposed completion date: June 1982

Remarks: This course io being developed to meet the requirementsof a 2nd Class Coal Mine Manager's Certificate ofCompetency of the Board Of Examiners or the Departmentof Mineo.

Reference number: 106; QLD: R100

Project title: Mpoltercraftsman Certifioate in ElectricalEngineering

Contact persons: Brice Nieloon and YON Knobel

Contact addreess TAFE Curriculum Branch41 Merivale StreetSOUTH BRISBANE 4101

Project status: Planned'

Proposed cm's/It:Jon date: December 1982

Remarks: This program is being developed for those who havecompleted their apprentioeship otudieo but mash toextend their knowledge and skills into specialistareas, to acquire skills as apprentice trainers and inbusiness operation.

Reference number:

Projeat title:

Contact. peraon:

Contact adaress:

Project statuo:

107; QLD: 13;2

C114811 Boatyard Operation

Brian Hutohisen

TAFE Currioulum Branch41 Merivale StreetSOUTH BRISBANE 4101

314 completed

Proposed completion date: July 1982

This practices course deals with boat and ship designand conotruotion and boat yard operation. It isdesigned for boat building and shipbuilding tradesmen,othei industries and also for members of the public.

Remarks:

Reference number: 108; OLD: 850

Project title: C1859 Service Course in Fluid Power

Contact person: R.G. Partridge

Contact address: TOE Curriculum Branch41 Merivale StreetSOUTH BRISBANE 4101

Project status: Planned

Proposed completion date: June 1982

Remqrkl: This service course is being revised to enable theoffering of an elective subjeot that is specifically

mining) of fluid.power systems.related to the mobile application (agriculture, marine,

4.40

Page 48: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

,Reference number:

Project title:

Contact person:

Contact address:

project status:

QUEEEELAK;

109; QLD: 1371

CH759 Fellowship Certificate/AssociateDiploma in Nechamiml Engimering

R.G.Rartridge

TAFE Curriculum Branch41 Merivale StreetSOUTH BRISBANE 4101

3/4 completed

propmed completion date:

Remarks:

December 1982

This course is aimed at personnelcareer as an engineering associateassociated industries.

who aspire to ain the sugar and

Contact person:

Contact address:

Project status:

Proposed completion

110

CHOlit Provocations/ Engineering Course

R.G. Partridge

TAFE Curriculum Branch41 Merivale StreetSOUTH BRISBANE 4101

3/4 completed

date: July 1982

Remarks: This is a prevocational course for untrained personnelwho wish to gain acbess to engineering trades andassociated occupations.

Reference number:

Project title: .

Contact person:

Contact address:

111; QLD: B56

CH401 Engineering Supply Sales

B.G. Partridge

TAFE Curriculum Branch41 Merivale StreetSOUTH BRISBANE 4101

PrOject status: 3/4 completed

Proposed completion date: July 1982

Remarks: This Practices Courses is designedinvolved in the sales of equipment toindustry.

Reference number:

Project title:

Contact person:

Contact address:

112; OLD: B116

iteelerated Skills Programme

R. Oxenford

TAFE Curriculum Branch41 Merivale StreetSOUTH BRISBANE 4101

for personnelthe engineering

Project status: Planned

Proposed completion date: September 1982

Remarks: This )rogramme provides for accelPrated trlining inapprenticeships for bollermaking, rIttino

14 1

Page 49: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

machining, fitting (diesel and heavy earthmovingequipment) and electrical fitting. 9

Reference number:

Project title:

Contact person:

Contact address:

113; OLD: B85

C11807 Air Coiditioning and Refrigeration(Service Course)

R.Oxenford

TAPE Curt'1ou.1 m Branch41 Merivale StreetSOUTH BRISBANE 4101

Project status: 3/4 completed

Proposed completion date: July 1982

iemarks: The revision of this service course involves theaddition of a new subject intended to provide a basicunderstanding of the air conditioning industry andoperation to non-tradesmen employed in this area.

Reference number:

Project title:

Contact person:

Contact address:

114; OLD: B115

CN121 Fitting and Machining

R. Oxenford

TAPE Curriculum Branch41 Herivale Street,SOUTH BRISBANE 4101

Project status: 1/4 completed

13221 completion date: August 1982

Remarks: This apprenticeship course is being revised to providefor further refinement in specialist areas. Apreliminary survey has been conducted involving staff,students and employers concerned with the pilotmachining stream conducted at Toowoomba College ofTAFE. A" further survey is to be conducted inJuly/August 1982.

Reference number: 115; OLD: B111

Project title: C11815 Service Course.in Illumination

Contact persdn: Brice Nielson

Contact aduress: TAFE Curriculum Branch41 Merivele StreetSOUTH BRISBANE 4101

Proitct status: Planned

proposed completion date: November 1982

Remarks: Advanced subjects are being included in this .servicecourse so that persons who have reached "TechnicalAssociate" level may achieve membership 'tatus of theIlluminating Engineers Society of Australia.

4 5

Page 50: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

Referenee number:

Projeot title:

6ontact person:

Contact address:

Project status;

QUESIMAND

11$: QLD: 13103

CM651 certifictie Course in Geology

Howard Robertson

TAPE Curriculum Branch41 Merivale StreetSOUTH BRISBANE 4101

Planned.

Proposed,completion date: November 1982

Remarks: This course is designed to provide an educationalprogramme for geology teohnicians in both laboratoryand,exploration w6rk. Revisions are being made to thecourse to ensure that it meets the needs of industryand government departments.

Heference number: 117: QLD: 8106'

Project title: Maetercriftsann Certificate in AutomotiveEngineering

Contact person,: Howard Robertson

Contact address: TAFE Curriculum Branch41 Merivale StreetSOUTH BRISBANE 4101

Project status: Planned

Proposed completion date: November 1983

Remarks: Thia post apprentioeship course is to be designed tomeet the needa\for advanced specific knoyledge andskills in the fields of motor mechanic light vehicleand motor mechanic heavy commercial vehiole. It villalso provide skilla in training apprentioes and insmall business operation.

Reference number:

Project titles

Contact person:

Conact address:

118; OLD: B112

01301 Advanced Trade Courae Automotive "A"

Howard Robertson

TAFE Curriculum Branch41 Merivale StreetSOUTH BRISBANE 4101

Project status: 3/4 completed

Propoaed completion date: July 1982

Remarks: This post apprenticeship course is being modified toinclude specialist knowledge and skills in suapensionsand steering for the motor mechanic.

Reference number:

Project title:

Contact plagn:

Coitact address:

119; OLD:.8100

CM166 Mechanic (Motor Mowers and Agridulturaland Industrial Engines)

Howsrd Robertson

TAFE Curriculpm Branch41 Merivale StreetSOUTH BRISBANE 4101

43

Page 51: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

QUEENSLAND

Project status: 3/4 completed

Proposed completion dates. September 1982

Remarks: This new apprenticeship course is designed to provideskills for the motor mower etc. repair industry needs.A skills analysis session has been conducted withrepresentatives from industry and further developmentis awaiting approval.

Reference number: 120; QLD: 01,

Project title:. CN153.Meohania.(Lighi Marine Engines)

Contact person: Howard Robertson

Contact addresgb TAFE Curriculum Branch41 Merivale,StreetSOUTH BRISBANE 4101

Project status: 3/4 completed

Proposed coppletion date: September 1982

Remarks: This apprenticeship course is being revised to provideskills current to the light marine industryJneeds. Askills analysis session has been conducted withrepresentatives from industry and further developmentis awaiting approval.

Reference nuMber:

Project title:

Contact person:

Contact address:

Project status:

Proposed completion date:

121; QLD: B60

CH152 MechanicMaohines)

(Motor Cycle and similar

NHovard Robertson

TAFE Curriculum Branch.41 Merivale StreetSOUTH BRISBANE 4101

3/4 completed

September 1982

Remarks: This apprenticeship course is being revised to provideskills relative to the motor cycle repair industryneeds. A skills analysis session has been conductedwith representatives from industry and furtherdevelopment is awaiting approval.

Reference' number:

project title:

Contact person:

122; QLD: B62

CH131 Moulding Trade

Howard Robertson

Contact address: , TAFE Curriculum Branch41 Merivale StreetSOUTH BRISBANE 4101

Project status: 1/2 completed

Proposed completion ddte: November')982

Rzmarks:. This apprenticeship course 13 being revised to provideSkills for the apprentice moulder current to thefoundry industry needs. A skills analysis Session has',gen conducteq with representatives from industry anddevelopment of the syllsbus is proceeding.

44

Page 52: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

Reference number;

Projeot title:

Contact person:

Contact address:

QUEENSLAND

123; CILD:.8105 ,

CM102 Airoiaft Mechanics

Seward Robertson

TAFCCurrioUlum Branch41 Herivale StreetSOUTH BRISBANE 4101

Project status: 1/4 completed

Proposed completion date: ,Deoember 1982

,Remarks: This apprenticeship oourso is being revised to provideskills relative to the aircraft industry needs. Askills analyis session has been conducted withrepresentatives from industry and development of thesyllabus is proceeding.

Reference number:

Project title:

Contact person:

Contact address:

Project status:

Remarks:

124; CNA): B55

CN130 Motor Mechanios

Howard.Robertson

TAFE Curriculum Branch41 Herivale StreetSOUTH BRISBANE 4101

3/4 completed

This apprenticeship course is being revised to provideskills relative to industry's needs. It provides foran increase in time for the training of the Stage 3apprentice as well as elective streaming into the lightvehicle area or heavy commercial vehicle area.

Reference number:

Project title:

Contaot person:

Contact address:

Project status:

Proposed completion

125;. ULD: B69

CN122 Fitting, Diesel and Heavy EarthmovingEquipment

Howard Robertson

TAFE Curriculum Branch41 Herivale StreetSOUTH BRISBANE 4101

3/4 completed

date: July 1982

Remarks: The regsion of this apprenticeship course is to ensurean educational programme relevent to the needa of theearthmoving and agricultural machinery repair industry.

"..

45

5,2

Page 53: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

:71

NEW SOUTH WALES

4753

Page 54: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

ION SOOTH VILES

Reference number: 126

project title: Review of Central Meat Region

Contact person: Boner Bachmann (02) 219 9456

Contact address: Educational Planning BranchDepartment of Technical and Further Education

NINIT 2003

project. status: 3/4 completed

Proposed completion date: July 1982

Estimated coat of project: $2,000 - $10,000

Reference number:

project title:

Contact person:

-Contact address:

Project status:

127

Review of Bunter Region

Bruce Toms (02) 21§ 9302

Educational Planning BranchDepartment of Technical and Further Education

RWR227 2001

3/4 completed

Proposd completion date: July 1982

Estimated cost of project.: $2,000 - $10,000

Reference number:

Project title:

Conta9t person:

Contact address:

128

Sydney South and South Meat

Ian Kerr (02) 219 9338

Educational Planning BranchDepartment of Technical and Further Education

HAYMARKET 2001

Project status: 1/2 completed

Proposed completion date: JUly 1982

Estimated cost of project: $11,000 - $40,000

Reference number: .129

Project title:

Contact pereon:

Contact addreis:

Review of Metal Fabrication needs

Jenny Carr (02) 215 9302

Educational Planning BranchDepartment of Technical and Further EducationBox K638HAYMARKET 2001

,Project status: Planned

Pronosed completion date: December 1982

Estimated cost Of project: $2,000 - $10,000

119

a

Page 55: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

Reference number: 130

project title: Review of Toolmaking trade

Contact peFson: Honor Bachmann (02) 219 9456

Contact address: Educational PlarthiWWanorDepartment of Technical and Further Education

WMPAVIT 2001

Projeot status: Planned

Proposed completion date: December 1982

Estimated cost of proJects $2,000 - $10,000

Reference number: 131

Project title: Review of Fitting and Haohining trade

Contact person: Honor Boehm= (02) 219 9456

Contact address: Educational Planning BranchDepartment of Technical and Further EducationBox K638HAYMARKET 2001

Project status:

Propose, completion

Estimated cost of project:

Planned

date: December 1982

$2,000 - $10,000

Reference number:

Project title:

Contact person:

Contact address:

132

Required planning data for 1982 -metropolitan and country areas

Ian Kerr (02) 219 9338

Educational Planning BranchDepartment of Technical and Further EducationBox K638HAYMARKET 2001

project status: 1/2 completeA

Proposed completion date: September 1982

Estimated cost of project: $11,000 - $40,000

Reference numbers

Project title:

Contact person:

Contact address:

133

Review of Plumbing and Sheetmetal

Margaret Putt (02) 219 9425

Educational Planning BranchDepartment of Technical and Further Education

nicalT 2001

Project status: 1/2 completed

proposed completion date: December 1982

Estimated cost of project: $2,000 - $10,000

t-o 50

Page 56: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

101 SOUTH WI=

Referenoe number: 134

Pro!ect title: Illmwarra report

Contact person: Bruce Tons (02) 219 9302

Contact address: Educational Planning BranchDepartment of Technical and Further Education

MX& 2001

-Project status: 3/4 completed

Proposed completion date: July 1982

Estimated cost of project: $2,000 - $10,000

Reference number: 135

Project title: A review of the western corridor of Sydney

Contact person:

Contact address:

Project status:

Proposed completion

Estimated cost of project:

tan Kerr (02) 219 9338

Educational Planning BranchDepartment of Technical and Further EducationBox K638MYMARKET 2001

3/4 completed

date: July 1982

$2,000 - $10,000

Reference number:

Project title:

Contact person:

Contact address:

136

Survey of Pre-apprentice courses/students1981

Ann Montague (02) 219 9301

Educational Planning BranchDepartment of Technical and Further EducationBox K638HAYMARKET 2001

Project status: 1/4 completed

Proposed completion date: December 1982

Estimated cost of prolect: $2,000 - $10,000

Reference number:

Project title:

Contact person:

Contact address:

tE21221 status:

137

Evmluation of full-time Secretarial Studiescoursea/students

Ann Mbotagne (02) 219 9301

Educntional Planning BranchDepartment of Technical and Further EducationBox K638HAYMARKET 2001

1/4 completed

Proposed completion date: December 1982

Estimated cost of project: $11,000 - $40,000

51 5 6

Page 57: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

Reference n4mber:

Project title:

Contact peron:

Contact addr.ss:

EW SOUTR MAUS

138

Review of Pre-apprenticeship 1980

Margaret Putt (og) 219 9425

Educational PlannirA BranchDepartment of Technical and Farther Education

WANT 2001

Project atatus: 3/4 completed

Proposed completion date: July 1982

Estimated coat of project: $11,000 - $40,000

7Reference number:

Praject title:

Contact person:

Contact addreas:

Project atatus:

139

Needs ror TAPE facilitica for coalnining

un Kerr (02) 219 9338

Educational Planning BranchDepartment of Technical and Further EducationBox K638HAYMARKET 2001

1/2 completed

Proposed completion date: 1983

Estimated cost of project: $11,000 - $40,000

Reference number:

Project title:

Contact person:

Contact address:

140

Australia-wide review of library resourcecentre provision in TAPE

Gaye Stinson (02) 219 9425

Educational Planning BranchDepartment of Technical and Further EducationBox K638HAYMARKET 2001

-roject atatus: Planned

Proposed completion date: December 1982

Estimated cost of prolect: $11,000 - $40,000

Reference numbez:

Project title:

Contact person:

Contact address:

141

Automotive and Aircraft Engineering Trades:item banking

Bob Smith (02) 219 9421

Curriculum Reaearch BranchDepartment of Technical and Further EducationBox K638HAYMARKET 2000

Project atatus: 1/4 completed

proposed completion date: December 1982

Estimated cost of project: $2,000 - $10,000

52

Page 58: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

I

Reference number:

project title:

Contact person:

Contact address:

KEW SOUTH WALES

142

Review of Drafting and Tracing coursen

Ron Neilson (02) 219 9437

Curriculum Research BranchRegartmeg3gf Technical ard Further Education

HAYMMET 2000

Project status: 1/2 completed

Proposed completion date: September 1982

Estimated cost of project: $2,000 - $10,000

Reference number:

italta title:

Contact person:

Contact address:

Project status:

Pro osed completion

143

Development of a third clans welding coursefor intellectually handicapped persona

Fred RoPP (02) 219 9477

Curriculum Researeh BranchDepartment of Technical and Further EducaGionP 0 Box K638HAYMARKET 2000

1/4 completed

date: September 1982

Estimated cost of project:

Reference number:

Project title:

Contact person:

Contact address:

Project status:

$2,000 - $10,000

144

Revision of Pladt Mechanics

David Haworth (02) 219 9444

Curriculum Research BranchDepartment of Technical and Further EducationP 0 Box 1(638HAYMARKET 2000

1/4 completed

Proposed completion date: September 1982

pE molest: $2,000 - $10,000

Reference number:

Proleet title:

Contact person:

Contact address:

project status:

145

Curriculum developtsent of courses forphysically handicapped persona: SummerlandHowse with No Steps

Fred Ropp (02) 219 9477

Curriculum Research BranchDepartment of Technical and Further EducationP 0 Box K638HAYMARKET 2000

Planned

Proposed completion date: December 1982

Estimated cost ot proiect: $2,000 - $10,000

53

Page 59: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

KEW SOUTH VALES

Reference number: 146_

Project title:

Contact person:

Contact address:

Industrial Relations Training for Apprentices

144 Grannall (02) 219 9417

urriculum Research Branchpartment of Technical and Further Education

P 0 Box K638HAYMARKET 2000

Project status: Planned

Proposed completion date: September 1982

Estimated cost of projeot: $2,000 - $10,000

Reference number:

Project title:

Contact person:

Contact address:

Project status:

147

Curriculum development of Industrial MachineSewing for intellectually handicapped persons

Fred Ropp (02) 219 9477

Curriculum Research BranchDepartment oflechnical and Further EducationP 0 Box K638'HAYMARKET 2000

1/4 completed

proposed completion date: December 1982

Estimated cost of project: $2,000 - $10,000

Reference number:

Project title:

Contact person:

ContaCt address:

Rroject status:

148

Simulation of an Office

Ann MacCann (02) 219 9423

Curriculum Research BranchDepartment of Technical and Further EducationP 0 Box K638HAYMARKET 2000

1/2 completed

Proposed completion date: September 1982

Estimated cost of project: $2,000 - $10,000

Reference number:

Projedt title:

Contaot person:

Contact address:

talast status:

149

Secretarial Studies Review

Margaret Heys

Curriculim Services DivisionNSW Department of TAPE

'Waal* 2000

1/4 completed

Prorosed completion date: July 1983

Estimated cost of project: over $40,000

5 4

Page 60: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

NEW SOUTH WALES

Remarks: To evaluate present courses particularly in the light--of-teohnologival change a:Abe 611111WiWrole of women.IndUatry survey will provide information on employers'requirementa, whilst surveys of past students providesinformation from the employees' poiqt of view.Curriculum development will follow in 1983. Nationalconference is hoped for.

Reference number: 150

ProJeot title; Revision of Textiles Bigher Certificate.Course: rewriting of ayllabus

Contact person: Ron Anderson (02) 219 9417

Contact address: Currioulum Research BranchDepartment of Technical and Further EducationP 0 Box K638HAYMARKET 2000

Project status: Planned

Proposed completion Atet Dece4er 1982

Estimated cost of project: $2,000 - $10,000

Reference number:

Project title:

Contact person:

Contact address:

Project status:

151

Sheep and Wool cOure: assessment offieldwork

Goof Hawke (02) 219 9386

Curriculum Research BranchDepartment of Technical and Further EducationP 0 Box K638HAYMARKET 2000

Planned

Proposed completion date:

Estimated cost of project:

December 1982

$2,000 - ;loom

Reference number:

Project title:

Contact person:

Contact address:

152

Use of computers in Fara Technology

Paul Brady (02) 219 9461

Curriculum Research BranchDepartment of Technical and Further EducationP 0 Box 1(638HAYMARKET 2000

project status: Planned

Proposed completion date: July 1982

Estimated cost of project: less than $2,000

Reference number:

Project title:

Contact person:

153

Review of Sheetmetal Trade course

Vivienne Soo (02) 219 9539

55 6 t)

Page 61: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

NW SOUTH MEd

Contact address: Curriculum-Research Branch# Department of Technical and Further Education

P 0 Box K638HAYMARKET 2000

Project status: 3/4 completed

Proposed completion date: December 19829

Estimated oost of project: $11,000 - $40,000

Reference nueJer:

Projeot title:

Contact person:

Contact address:'

Project status:

154

Development of a teaching/learning approachfor Mechanical Technology 1

Margaret Ruth (02) 219 9321

Curriculum Research BranchDepartment4of Technical and Further EducationP 0 Box K638HAYMARKET 2000

1/4 completed

Proposed completion date:

Estimated cost of project:

December 1982

$2,000 - $10,000

Reference number:

Project title:

Contact person:

Contact address:

Project status:

155

Home Science Ccrtificate course

Ron Anderson (02) 219 9417

Curriculum Research BranchDepartment of Technical and Further EducationP 0 Box K638HAYMARKET 2000

1/4 e'clAtted

Proposed completion date: December 1982

Estimated cost of project: $2,000 - $10,000

Reference number:

P-oject

Contact person:

Contact address:

project status:

proposed completion

Estimated cost of project: $2,000 - $10,000

156

Review of Photography course

Tony Anderson (02) 219 9437

Curriculum Research BranchDepartment of Technical and Further EducationP 0 Box K638HAYMARKET 2000

3/4 completed

'July 1982

Befe_see number:

Prc,ject title:

Con t

157'

1..-.

Mathematics 1: sylla a development forBielogy/Pathology Technic ens course

!t, ETAT): Bob Ellis (02) 219 9321

61 56

Page 62: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

NEW SOUTH VALES

Contant addrenst____Curricalum_Research_BranchDepartment of Technical and FUrther EducationP 0110x 1(638HAYMARKET 2000

Project status: 114 completed

Proposed completion date: December 1982

Estimated cost of project: $2,000 - $10;000

Reference number: 158

Project title: Life Oriented Studies: subject review

Contact-person: Margot Pearson (02) 119 9475

Contact address: Curriculum Research BranchDepartment of Technical and Further EducationP 0 Box 1(638HAYMARKET 2000

project status: 1/4 completed

Proposed lespleuen date: December 1982

Estimated cost of project: $11,000 - $40,000

Reference number: 159

Project status: Library Tecbnioians course: fieldassessment

Contact person: Geof Hmwke (02) 219 9386

Contact address: Currioulum Research BranchDepartmen' of Technical and Further EducationP 0 Box K638HAYMARKET 2000

Project status: Planned

Proposed completion date: Decembbr 1982

Estimated cost of project: less than $2,000

work

Reference number: 160

project title: Review of Child Care courses incorporatingthe short course

Contact person: Ken Dun (02) 219 9440

Contact address: Curriculum Reseerch Branch. Department of Technical and Further EduPationP 0 Box K638HAYMARKET 2000

Project status: 1/4 completed

propomed completion date: December 1982

Est*mated cost of project: $2,000 - $10,000

5762

Page 63: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

HEW SOUTH WALES

Raferenoe p4nOnt 161

Project ititle: Proposed.Retail Dressmaking course: syllabusdevelopment

vContact person: Ann Hobbs (02) 219 9417

Contact address: Curriculum Research BranchDepartment of Technical and Further-EducationP 0 Box 1(638HAYMARKET 2000

Proje status:4,2

1/4 completedt

P.,..opos d completion date: December 1582

Estimated coit of project: $2,000 - $10,000

Reference number: 162 ,

Project itle: Teachers guide tib Fitting and Machining(Stage 1)

Contact rson: Bob Ellie (02) 219 9520

Contact a cfress: Curriculum Research BranchDepartment of Technical and Further EducationP 0 Box K638HAYMARKET 2000

Project status: 1/2 completed

Proposed completion date: December 1982

Estimated cost of project: " $2,000 - $10,000

Reference number: 163

Project title: Fitting and Machining: item banking

Contact person: Goof Hawke (02) 219 9386

Contact address: Curriculum Research BranchDepartment 9f Technical and Further EducationP 0 Box K638HAYMARKET 2000

project status: 1/2 completed

Proposed spepletion date: December 1982to

Estimated Coet of project: $2,000 - $10,000

Rrference number:

Pr0j,2ct title:

toptact erson:

y-±ptlft address:

Pr°11't ;1,1_qq.1:

!9J.121q.i9

21.

164

Review of Refrigeration Mechanics course

Vivienne Soo (02) 219 9539

Curriculum Research BranchDepartment of Technical and Further PlcationP 0 Box K638HAYMARKET 000

1/2 completed

p otv i December 1982

ecl: $11,000 - $40,000

6 ts 58

Page 64: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

NEW SOUTH VILLES

Reference numbers 165

tEalE2t-titlot Review of Fitting-and-Machining-

Contact person: Vivienne Soo (02) 219 9539

Contactaddress: Curriculum Research BranchDepartment of Technical and Further EducationP 0 Box K638HAYMARKET 2000

Project status: 3/4 completed

Proposed completion date: December 1982

Estimated cost of project: over $110,000

Reference number:

Project title:

Contact person:.

Contact address:

project status:

166

Computer Service Technology

Ron Neilson (02) 219 9437

Curriculum Research BranchDepartment of Technical and Further EducationP 0 Box K638HAYMARKET 2000

1/4 completed

Proposed completion date: December 1982

Estimated cost of project: $2,000 - $10,000

Reference number: 167

Project title:

Contact person:

Contact address:

\Project status:

OReview of Electronic and Electrical Engineer-ing Certificates and syllabus deveiopment

Ron Neilson (02) 219 9437

Curriculum Research BranchDepartment of Technical and Further EducationP 0 Box K638HAYMARKET 2000

3/4 completed

Proposed completion date: September 1982

Estimated cost of project: over $40,000

Reference number:

project title:

Contact Lerson:

Contact address:

Project status:

168

Coalnining courses (including AssociateDiplom new course)

David Haworth (02) 219 9444

Curriculum Research BranchDepartment of Technical and rurther EdurationP 0 Box K638HAYMARXET 2000

Planned

Proposed completion date: September 1982

Estimated cost of project: less than $2,000

59 6

Page 65: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

Reference number:

Project title:

Cbntact person:1------tigontact address:

Project status:

KEW SOUTH WALES

169

Chemistry Certificate review

Bruce Meldrum (02) 219 9455

Curriculum Research BranchDepartment of Technical and Further EducationP 0 Box K638HAYMARKET 2000

Planned

Proposad completion date:

Estimated cost of project:

July 1983

$2,000- $10,000

Reference number: 170

Project title: Metallurgy course review

Contact person:

Contact address:

Project status:

Paul Gordon-Saith (02) 219

Currioulum Research BranchDepartment of Technical andP 0 Box K638HAYMARKET 2000

1/2 completed

Proposed completion date:

Estimated cost of project:

number:

title:

Contact person:

Contact address:

Project status:

Proposed completion

December 1982

$2,000 - $10,000

9471

Further Education

171,

Metal Finishing Certificate tElectrolyticFinishing) review

Vivienne Soo (02) 219 9539

Curri-ulum Research BranchDepartment of Technical and Further EducationP 0 Box K6q8HAYMARKET 2000

1/2 completed

date: December 1982

Estimated cost of project: $11,000 - $40,000

Rrene

Contact person:

Contact address:

172

Review of Food Teohnology course and syllabusdevelopment

Bruce Moldrum (02) 219 9455

Curriculum Research BranchDepartm4ht of Technifml lnd F,rther E,!vrtAtionP 0 Blx K638HAYMARKET /000

3/4 ,cmpi-.p4

fn?P')3,P1:).-..mber 118,

,r 3",000 - $10,0nq

6')

Page 66: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

Referenae numbers

prolt04 title:

Contact person:

Contact address:

10tW SOUTH WALES

173

Sighwriting and Painting and Decorating majorre/15110 _

Paul Gordon,Saith (02) 219 9471'

Curriculum Research BranchDepartment of Technical and Further EducationP 0 Box K638HAYMARKET 2000

Project status: 1/2 completed

Proposed completion date: December 1982

Estimated cost of proje.ct: $2,000 - $10,000

Reference number:

Project title:

Contact person:

Contact address:

174

.Applied Heat andl,Fluids; item banking

David Matheson (02) 219 9388 -

Curriculum Research BranchDepartment of Technical and FurtherP 0 Box K638HAYMARKET 2000

project status: 1/4completed

Proposed completion date: December 1982

Estimated cost of project: $2,000 - $10,000

EducationAs.

Reference number:

Project title:

Contact person:

Contact address:

Project status:

175

-Review of Cabinetmaking courses

Paul Gordon-Smith (02) 219 9471

Curricultip Research BranchDepartment or Technical and Further EducationP 0 Box K638HAYMARKET 2000

1/2 completed

Proposed completion date: December 1982

Estimated cost of project: $2,000 - $10,000IP

RPC:otonejtEE7p:::::

Contact addre33:

project status:

176

Approach to teaching Communication in theSchool of Business and Administrative Studies

Margot Pearson (02) 219 9475

Curriculum Research BranchDepartment of Technical and Further EducationP 0 Box K638HAYMARKET 2000

Planned

Proposed completion date:

Estimated cost of project:

December 1982

$2,000 - $10,000

61

Page 67: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

MEW SOUTH.WALES

Ileference number: 1/7

ProJeat title: Examination of'the changea to the CompaniesAct

Contact person: Ron Anderson (02) 219 9417

Contact address: Curriculum Research Branch. , Deartment of Technical and Further Education

P 0 Box K638HAYMARKET 2000

Project status: , 1/4 completed

Proposed completion date: July 1982

Estimated cost of project: .$2,000 - $10,000

Reference number)

Project title:

Contact perbon:

Contact address:

Project status:

178

Evaluation of the Real Estate and StrataProperty Management coursest

Ron Anderson (02) 219 9417

Curriculum Research BtanchDepartment of Technical and Further EducationP 0 Box K638HAYMARKET 2000

1/4 completed ,

Proposed completion date: December 1982

Estimated cost of project: $2,000 - $10,009

-e-

Reference number:

Project title: Reviaion or Accounting coursea

Contact person: Ron Anderson (02) 219 9417

Contact address: Curriculum Research BranchDegartment of Technical and Furtfier Education

EAYMARM632000

Project status: Planned

Proposed completion date: December 1982

Estimated cost of project: $2,000 - $10,000

179

Reference mimber: 180

Project title: Review of Insurance bourses

Contact person: Fain Anderson (02) 219 9417

Contact address: Curriculum Research BranchIii,egagtmen.3Fif Technical and Further Education

HAYMARKET 2000

pmi.e_pa status: 1/2 completed

Proposed comeletion date: September 982

Estimated cost or project: $2,000 - $10,000

62

Page 68: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

KEW 'SOUTH MAIM

Reference number: 181

Project titles Review of Transport Administration Courses

-Contact persons_ Ren_knderson (02) 219 9417

Contact address: Curriculum Research Branchilegaggeg3gf Trchnical and Further Education

HAYMARKET 2000

Project status: 3/4 completed

,Proposed.completion.dates July 1982

Estimated cost of project: $2,000 - $10,000

Reference number: 182

Project title: Review of Travel and Tourism courses

Contact person: Paul Brady (02) 219 9461

Contact address: CurriculuraReseach BranchDepartment of Technical and Further EducationP 0 Box K638HAYMARKET 2000

Project status: 1/2 completed

Proposed cdmpletion date: July 1982

Estimated cost of project: $2,600 - $10,000

Reference number:

Project title:

Contact person:

Contact address:

project status:

183

Review of Welfare Wore Certificate course

Les Oorloff (02) 219 9334

Curricukum Research BranchDepartment of TeOhnical and Furtner EduaationP 0 Box K638HAYMARKET 2000

1/2 completed

Proposed completion date: December 1982

Estimated cost of project: $11,000 - $40,00

Reference number:

Project title:

Contact person:

Contact address:

184

Chiropody/Podiatry Technicians course reviewand syllabus development

David Haworth (02) 219 9444

Curriculum Research BranchDepartment of Technical and Further EducationP 0 Box K638HAYMARKET 2000

Froject status: 3/4 completed

propond completion date: July 1982

Estimated cost of project: $11,000 - $40,000

63

Page 69: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

Reference number:

project title:

Contact person:

Contact address:

project status:

Proposed completion

185

Biology/Pathology Technicians coursessyllabus development

David Haworth "(02) 219 9444

Curriculum Research BranchDepartment'of Technical and Further EducationP 0 Box K638HAYMARKET ?000

3/4 completed

data: July 1982

Estimated cost of project: over $40,000

Reference number:

Project title:

Contact person:

Contact address:

project .tatus:

.Proposed completion

Eatimated cost of

Reference number:

Project title:

Contact person:

Contact address:

186

Review of Animal Care courses

Bruce Heldrum (02) 219 9455

Curriculum Research BranchDepartment of Technical and Further EducationP 0 Box 1(638HAYMARKET 2000

3/4 completed

date: July 1982

21:21e21: $11,000 - $40,000

---

187; NSW: 82/S47/14037

Ceramics resources development project

Ian Tudor (02) 219 9543

EducAtional Resources BranchDepartment of Technical and Further EducationBoxHAUXIT 2000

Project status: Planned

froposed completion date: 1983

Estimated cost of project: $2,000 - $10,000

Remarks: To demonstrate a field trip: involving geologicalmaterials survey: use of local materials, ciav et-;building of a kiln for firing from local materials.

Audlo/visual material: Film

Reference number:

froject title:

Contact person'

Cont.,ct address:

P:29.1ect ststuj:

188; NSW: 80/S204/41486

Jewellery trades: course resource materxals

Ian Tudor _(02) 219 9543

Educational Resources branchDepartment of Techni,11 and Further Ed.1,4tonbox K6)8HAYMARKET '000

/17 ,ompleted

Page 70: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

NEN SOUTH VALES

Proposed completion date: December 1982

Estimated coat of project: $2,000 - $10,000

Remarks: A demonstration type of videotape developed out of adetailed skills analysis of trade practices inpreparing forms from precious metals.

Audio/visual material: Video

Reference number: 189; NSW: 81/S61/61305

Project title: Re"S;urces on areas of Child Care Placement

Contact person: Andrew Chodkiewioz (02) 219 9543

Contact address: Educational Resources BranchDepartment of Technical and Further Education

=AT 2000

Project status: 1/2 completed.

Proposed completion date: December 1982

Estimated cost of project: less than42,000

Remarks: Actual instances. Care patterns include day care andlong placement.

Audio/visual material:. Video

Reference number:

Project title:

Contact person:

Contact address:

Project status:

190; NSW: 81/S211/61210

Preparation'of resources for Floral Art

Ian Tuder (02) 219 9543

Educational Resources BranchDepartment of Technical and Further EducationBox K638HAYMARKET 2000

1/2 completed

Proposed completion date: December 1982

Estimated cost of project: less than $2,000

Remarks: To provide slide materials and notes for teachers ofFloral Art, whose work needs to be distinguished fromthat of teachers or Commercial Floristry.

Audio/visual material: Slide sets

Reference number:

Project title:

Contact pe:son:

Contact adCresa:

191; NSW: 81/561/60369

Workshop techniques: Metal Fabrication

Margaret Rush (02) 219 9321

Teaching/Learning UnitDepartment of Technical and Further EducationBox K638HAYMARKET 2000

Project status: 1/2 completed

proposed completion date: December 1982

Estimated cost of project: less than $2,000

65 7 0

Page 71: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

NEU SOUTH WALES

Remarko: The subject of workshop technique, in Metal Fabricationia undergoing methodological examination. Resourcematerialo are envisaged ao an outcome when the firotphaoe lo complete.

Audio/vioual material: Diagrams

Reference number:

Project title:

Contact peraon:

Contact address:

192; NSW: 80/S201/41624

Feasibility study of requirements for tuitionof students in isolated areas

James Owen (02) 219 9358

Teaching/Learning UnitDepartment of Technical and Further EducationBox K638HAYMARKET 2000

1/2 completed

date: December 1982

Project status:

Proposed completion

Estimated coot Of project:

Remark,:

$2,000 - $10,000

Analyois and organioation of written and other reoourcematerials to aosiot with the teaching of oubject 1127A-Radiographic Teoting in the School or Chemiotry andMetallurgy.

Audio/vioual material: Various

Reference number:

Project title:

Contaot Eproon:

Contact addreoo:

193; NSW: 80/S61/40363

Development of resource materials for thoSchool of Hairdressing

Stewart Barnett (02) 219 9660

Educational Resources BranchDepartment of Technical and Further EducationBox K638HAYMARKET 2000

Project otatuo: 1/4 completed

Propooed completion date: December 1982

Eotimated coot of project: $2,000 - $10,000

Audio/vioual material: Videocaooette, 20 min, 3/4" U Matic.Three videotape, to illuotrate eoaentialskill proceooes have been planned. Thioitem will illuotrate the okills of BaoicFace Shaving, following a akillsanalyoio.

Reference number:

Project title:

Contact peraon:

Contact addreos:

Project otatuo:

194; NSW: 81/S61/60070

Design and development of student-centredlearning kits in Library Technology

Trevor Wilson (02) 219 9308'

Educational Resources BranchDepartment of Technical and Further EducationBox K638HAYMARKET 2000

1/2 completed

66

Page 72: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

NEW SOOTH WALES

Propoaed completion date: December 1982

Estimated coct of project: lesa than $2,000

Remarka: To develop student-centred resource materiala for theLibrary Techniciana course in areaa auch aa the cardcatalogue, bibliographic aearching, etc. (WorkboOka)

Reference number:

Project title:

Contact peraon:

Contact addreaa:

195; NSW: 82/S47/14470

Directed private study material forCertificate Entrance Sciecce

Jamea Owen (02) 219 9358

Teaching/Learning UnitDepartment of Technical and Further EducationBox K638HAYMARKET 2000

Project atatua: Planned

Propoaed completion date: December 1982

Estimated coat of project: $2,000 - $10,000

Remarks: To develop modulea in basic concept areaa for Certifi-cate Entrance Science to enable atudenta with aomebackground in Science to attempt the final examinationafter a aemeater of atudy.

Reference number:

Project title:

Contact peraon:

Contact addreaa:

Project atatua:

Propoaed completion

196; NSW: 82/S113/14387

Reaource aateriala for the teaching of theRefrigeration Mechanida Trade Course Stage 1

Alan Craig (02) 219 9358

Teaching/Learning UnitDepartment of' Technical andBox K638HAYMARKET 2000

Planned

date: December 1982

Eatimated coat of proiect: $2,000 - $10,000

Remarks:

Further

Examination of teaching methodology inteaching of the firat atage aubjectaRefrigeration Mechanica Trade Courae.

Education

relation to thein the reviaed

Reference number:

Project title:

Contact person:

Contact addreaa:

197; NSW: 82/S47/14398

Development of a teachers' guide kit, inbagineering Trades

Alan Craig (02) 219 9358

Teaching/Learning UnitDepartment of Technical and Further EducationBox K638HAYMARKET 2000

Project atatua: Planned

Proposed completion date: December 1982

Eatimated coat of project.: leaa than $2,000

67

Page 73: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

Reference number:

Project title:

Contact person:

Contact address:

NEW SOUTH WALES

198; NSW: 82/S47/14397

Development of drawing examinee for theLocksmiths' Trade Couree

Margaret Rush (02) 219 9321

Teaching/Learning UnitDepartment of Technical and Further EducationBox K638HAYMARKET 2000

Project status: Planned

Proposal completion date: December 1982

Eatimated cost of project: less than $2,000

Remarks: To develop exercise materials appropriate for Stage 1

Drawing in the Locksmiths' Trade course

Audio/visual material: Diagrams

Reference number:

Project title:

Contact person:

Contact addrese:

199

Mount Druitt Evaluative Studiee

Greg Woodburne (02) 211 5766

Camel HouseBulwarra RoadULTIMO 2007

Project status:. 3/4 completed

Proposed dbmpletion date: June 1982

Estimated cost of project: over $40,000

Reference number:.

Project title:

Contact person:

Contact aUtress:

Project status:

Proposed completion

Estimated

Remarks:

200; NSW: 82/S47/14485

Direct Pattern-Making in Fashion

Trevor Wilson (02) 219 9308

Educational Research BranchDepartment of Technical and Further Education

MMINET 2000

Planned

date: December 1982

cost of project: $2,000 - $10,000

To develop material providing iupport to the learningof generalised sets of principles which will makestudents more adaptable to circumstances found incommercial settings.

Audio/visual material: Video

Reference number:

Project title:

Contact person:

201

National Course Claesification andNomenclature

Perce Butterworth (02) 219 9407

1,i68

Page 74: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

Contact addresa: Level 9rDepartment or Technical and Further EducationBox K638HAYMARKET 2001

\ projeci status: 3/4 completed

Proposed completion date; July 1982

Estimated cost of projeCt: over $40,000

I

-I

.

7 I i

k

Page 75: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

.,

WESTERN RUST [IRWIN

,

I.

i

Page 76: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

WESTERN AUSTRALIA

Reference number: 102; WA: CRF 6/82

Projeot titlel Certificate and Diploma in Real RotateManagement

Contact person: T. McDonald

Contact address: Curriculum Research and DevelopmentTechnical Education Division151 Royal StreetEAST PERTH -0

projeot status: 1/2 c aeted

Proposed compIetion.odel: December 1982

Estimated cost of project: $11,000 - $40,000

Remarks: Revision of courses and subjects. Provision of shortcourses.

Reference number: 20; WA: CRF 3/82

project title: Carpentry and Joinery

Contact person: J. Isherwood

Contact address: Technical Education Division151 Royal StreetEAST PERTH

project, status: 1/2 completed

Proposed completion date: December 1982

Estimated cost of project: $11,000 - $40,000

Remarks: National common core curriculum syllabi and teachingguides. Core notes for various modulea.

Reference number: 204; NA: 2478/82

Prbject title: Word Processing Systems

Contact person: T. McDonald

Contact address:

Project status:

Oirriculum Research and DevelopmentTechnical Education Division151 Royal StreetEAST PERTH

complete

Proposed completion date: May 1982

Estimated cost of project: less than $2,000

Remarks: The planning, definition, design, installation andmaintenance of a Nord Processing System for CurrieulumResearch and Development.

Reference number: 205; WA: 2475/82

Projcct title: Relevelopment of all Management Courses andSubjects

Contact person: T. McDonald

71 70'

Page 77: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

WE=111 ADSTRALIA

Contact address: Curriculum Research and DevelopmentTeohnical Education Division151 Royal StreetEAST PERTH

Project status: 1/2 completed

Proposed completion date: December 1982

Estimaied cost of project: $11,000 - $40,000

Remarks: Redevelopment of all subjects and courses in theManagement Study area', TE 78's - 80's.

:erfoejre::c:irr:

Contact peraon:

Contact address:e4r&al E ucaVion 112vis2on151 Royal StreetEAST PERTH

Project status: 3/4-comp1ete

Estimated cost of project: $2,000 - $10,000

Remarks: Survey of Industry. Modularization of courses.Provision of short courses.

206; WA: 2474/82

Apparel Design and Manufacture Certificateand Diploma

J.R. Par-y

fur ulum gese ch d D velopment

Reference number:

Pro ct

Con

title:

pers,u2:

Co act address:

Project status:

207; WA: 2470/82

Furniture Tradea review

R. La Planohe

Curriculum Research and DevelopmentTechnical Education Division151 Royal StreetEAST PERTH

1/4 completed

proposed completion date: December 1982

Estimated co,L ,f project: $11,000 - $40,000

Remarks: Stages 1, 2 and 3 of: Cabinet Making, Wood Machining,Timber Machining, Chair Making, French Polishing,Upholstery.

Reference number: 208; WA: 2468/82

Prglect title:

Contact attlon:

Contact addreas;

Refrigeration and Airoonditioning Stage 3.Short intensive courses

J. Stanley

Perth Technical College. (Annex)St Georges TerracePERTH

Prt!leot statul: 1/? completed

pruEo,sed compietion date: November 1982

F3t1mated c03t of uoject: le33 than $2,000

72

Page 78: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

Remarkss

WESTISRA AUSTRALIA

To produce a complete set of updated practical projectsend assessment sheets in file format for stage 3apprentices.

Reference number:

project title:

Contact persOns:

Contact address:

Prolect status:

209; WA: 2466/82

Panel Heating and Spray Painting/Self-pacedlearning programs

I. Paisley and D. Hay

Currieululm Research and DevelopmentTAFE151 Royal StreetEAST PERTH

1/2 completed

Proposed completion date: December 1982

Estimated cost of project: over $40,000

Remarks: To pilot self paced individualised instruction in stage3 of the Panelbeating and Spraypainting Apprenticeshipcourses.

Reference number:

Project title:

Contact oerson:

Contact address:

project status:

Proposed completion

210; WA: 2465/82

Electrical Trades.. Resource materials formodularised courses

R. Hayward

Curricuium Research and DevelopmentTechnical EdUtation Division151 Royal StreetEAST PERTH

1/2 completed

date: December 1982

Estimated cost of preJect: over $40,000

Remarks: Preparation of resource materials for the modularisedcourses in the electrical and associated trades.

Reference number:

project title:

Contact person:

Contac, address:

project status:

211; WA: 2464/82

Pre-Apprentice and Apprentice Courses: Elec-trical Fitting/Installing; Instrument Fit-ting; Radio and TV servicing

R. Hayward

Curriculum Research and DevelopmentTechnical Education Division151 Royal StreetEAST PERTH

1/2 completed

Proposed completion date: December 1982

Estimated cost of project: $2,000 - $10,000

Remarks: Overview, develop, implement and monitor apprenticecourses in Electrical Fitting, Installing, Radio TVInstrument Fitting, Post-Trade and Pre-Apprentice andother related areas.

Page 79: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

Reference number:

Project title:

Contact person:

Contact address:

Project status:

Propo;ed completion

Wbolftan AtAinALLA

212; WA: 2462/82

Meat Apprentices (Butchers) Course Stage

T. McDonald

Curriculum Research and DevelopmentTechnical Edueation Division151 Royal StreetEAST PERTH

1/2 completed

date: December 1982

Estimated cost of project: $?,000 - $10,000

Remarks:

1

To update Stages 1 and 2 of the Meat Apprentices Course- to raise standards to those of Commonwealth and tofurther raise quality by providing post-apprenticeshipcourses.

Reference number:

Prolect title:

Contact person:

Contact address:

Project status:

213; WA: 2461/82

Cooking Trades Apprentice Stage 2, survey forStage 3

T. McDonald

Curriculum Research and DevelopmentTechnical Education Division151 Royal StreetEAST PERTH

1/2 completed

Estimated cost of project: $2,000 - $10,000

Remarks: To update courses in the Cooking Tradesaccordance with industry requirements.

Reference number:

Prolut title:

Contact person:

Contact address:

area tn

214; WA: 2455/82

Agricultural Heeds Analysis Survey/SearchConferences

M. Jefferson

Curriculum Research .nd DevelopmentTechnical Education Division151 Royal StreetEAST PERTH

Project status: 1/2 completed

Propoaed completion date: December 1982

Estimated cost of project: less than $2,00

Remarks: To conduct a series of needs analysis surveys V33Search Conferences in the major Agricultural areas ofWestern Australia. To Aentify far each area communitygoils for agricultural training. Establish the mostlikely (to all concerned) means of achieving thele(training) goal,.

7 4

Page 80: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

Reference number:

Projeot title:

Contact person:

Contact address:

Project status:

Amami 22E2121122

z.ai1.nsi ALOJAAALAA

215; WA: 2402/82

Needs of oomputing industry - Research1roject/Survey

T.W. Goode

Curriculum Research and DevelopmentTechnical Education Division151 Royal StreetEAST PERTH

1/4 completed

date: May 1982

Estimated cost of project: $11,000

Remarks: Report to be produced.

$40,000

Reference number:

project title:

Contact person:

Contact address:

Project status:

216; WA: 2405/82 :

Laboratory Programa for Eleetri-al.Engineering I D

B. Sargent "

Thornlie Technical CollegeHurslem DriveTHORNLIE

1/4 completed

Proposed completion date: July 1982

Estimated cost of project,: less than $2000

Remarks: Preparation of laboratory programs for Electrical'------- Engineering I D Stage 2.

Reference number:

Project title:

Contact person:

Contact address:

Project status:

217; WA: 2422/82

Pitting and Machining Apprenticeship/Examquestions and answers

L Boetelran

Curricllum Research and DevelopmentTechnical Education Division151 Royal StreetEAST PERTH

1/2 completed

Estimated cost of project: $11,000 - $40,000

Remarks: To develop exam questions for block release allstages and key answers for exam questions.

Reference number:

Project title:

Contact person:

Contact address:

project status:

218; WA: 2424781

Fitting and Machinery/Self paced learningpackages

Bob Randall

Hunbury Technical CollegeRobertson DriveHUNBURY

1/4 completed

15

Page 81: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

WW115MA AUZAKAL1A

-

Proposed completion date: December 1982

Estimated oost of projeot: $2,000 - $10,000

Remarks: ilevelop self.paced learning in hydraulics for thefitting and machining area.

Reference number: 219; WAn 2426/82

Project title: Sheetmetal/Apprentice, Pre-Apprenticeship,Post Zrade Short Courses

Contact person: D. Tookinsonr

Contact address: Curriculum Research and DevelopmentTnchnical Education Division1,1 Royal StreetEAST PERTH

Project status: 1/4 completed

Proposed completion date: December 1982

Estimated cost or Eroject: $11,000 - $40,000

Remarks: 1. Develop four nhort courses for Sheetmetal Work.2. Review the pre-apprentideship course.3. Complete the apprenticeship course (commenced in

1981)

Reference number: 220; WA: 2428/82

Project title: Metal Construotion/Welding

Contact person: L. Pyke

Contact address: Curriculum Research and DevelopmentTechnical Education Division151 Royal StreetEAST PERTH

Project status: 1/2 oompleted

Proposed oompletion date: November 1982

Estimated cost of project: $11,000 - $40,000

Remarks: Revise Boilermaking Apprenticeship Course and WeldingApprenticeship Course. Develop exam banks, andimplement survey results.

Reference number:

Project title:

Contact person:

Centact address:

Project status:

Estimated cost of

221; WA: 2430/82*

Building Construdtion

R. Mazzucchelli

Curriculum Researen and DevelopmentTechnical Education Division151 Royal StreetEAST pERTH

1/2 completed

project: $11,000 $40,000

Remarks: Review of Certificate in BuiLding Construction.Development of Short Courses.

(j 7 6

Page 82: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

Beference number:

Projeot title:

Contact person:

Contact address:

VESTERNIUSTRIL/A

222;* WA: 2431/82

Quantities 2B C.A.I.

T. McDonald

Curriculum4Besearch and DeielopmentTechnical Education Division151 Royal StreetEAST PERTH

project status: \,1/2-completed

Proposed completion dae: August 1982

Estimated cost of project: $2,000 - $10,000

Remarks: Develop Computer Asaisted Instruction for Quantitieswhich is a subject in the Diploma of Building.

Reference number:

project title:

Contact person:

Contact 'address:

Project status:

223; WA: 2432/4

Certificate and DiAloaa in HospitalityOperation."

Dr. E. von forger

Curriculum Research and DevelopmentTechnical Educatilon Division151 Royal StreetEAST PERTH

, 3/4 complete

Proposed completion date: August 1982

Estimated cost of proAct: $2,000 - $10,000

Remarks: Reformulate the Certificate and Diploma in Catering andHotel Management following the requirements of industryto the Certificate/Diploma in Catering and HotelOperation.

Devefop short couraes as an essential part of theCertificate and Diploma courses.

Reference number: 224; WA: 2433 and 2434/82

Project title: Commercial Studieta

Contact ppraqp: Hrs. J. Sweet'

Contact address: Curriculum Research and DevelopmentTechnical Education Division151 Royal StreetEAST PERTH

EmItsi. status: 3/4 completed

ProPosed comoletion date: December,1982

Estimated

Remarks:

cost of project: over $40,0o0

Res,tructuring of Commercial Studies Ceurses. Designspecifications for written and audio-yisual self-pacedlearning modules for word-processing, auto-keyboarding. Modules for Typing 1, 2, 3. Modules forOffice Practice 1 & 2.

1 7

Page 83: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

Reference number:

Project title:

Contact person:

Contact address:

Project status:

!MUM LOSTRALTA

225; WA: 2435/82

Mon-Dentruotive Testing/Sew CertificnteCourae

T. McDonald

Curriculum Research and DevelopmentTechnical Education Division151 Royal StreetEAST PERTH

3/4 complete

Proposed completion date: Hay 1982

Estimated cost of project: less than $2,000

Remarks: Attend the NAT course and prepare notes after attendingthe course for the new Certificate in Non-DestructiveTesting.

i .0+Reference number:

Project title:

Contact person:

Contacc address:

226; WA: 2451/82

Woolclassing - Owner Classer

M. Jefferson

Curriculum Research and DevelopmentTechnical Education Division151 Royal StreetEAST PERTH

Project status: 1/2 completed

Proposed .c,ompletioq date: June 1982

Estimated cost of project: less than $2,000

Remarks: To enable documentation of the newly developed Owner-Classer coarse in current standard TE 76-80 format.

Reference number: 227; WA: CRF 5/82

project title:

Contact 22112D:

Contact address:

Project status:

Proposed completion

Fitting and Machining

L. Pike

2urriculum Resemrch and De-elopmentTechnical Education Division151 Roxal StreetEAST PL74TH

3/4 complete

date: May 1982

Estimated cost of project: leas than $?,0°0

Remarks: Development of training .,xercilos Nr comp..t.r lAststelpr,,grivting for Nr maohine tolls.

78

Page 84: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

SOUTH AURTRALIA

8 .i79

Page 85: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

Reference number:

Project title:

Contact person:

Centact address:

SOOTH AUSTRALIA

228

Footwear Industrial Sewing Machinist Course

Doug Newlyn

Marleston College of Technical andFurther EducationWest Beach RoadMARLESTON

Project statue: 3/4 completed

Proposed completion date: October 1982

Remarks: This course 18 designed to train footwear industrialsewing machinists on 4 basic skills, to meet the demandindicated by the footwear industry.

The trainees will be taught the skills and knowledge ofall types of leathers and synthetics for sewing in thefootwear industry.

Audio/visual material: 5 videos are being produced by theKilkenny Open College. These videos aredesigned to co-ordinate with thesyllabus for training induetrial sewingMachinists.

Reference number: 229

Project title: Footwear machinists' training needs

Contact persons: D. Newlyn and D. H. Kuhl

Contact rddrese: Department of Technical and Further Education31 Flindere StreetADELAIDE 5000

Project atatus: 3/4 completed

Proposed completion date: July 1982

Remarks: To prepare a case for funding under Commonwealth grant.

Reference number:

Project title:

Contact persons:

Contact address:

Project status:

Proposed completion

230

Analysis of the wine industry and sone alliedcomponenta of it along with a general des-cription of the nature and flizto ol the educa-tion/training need

R. Fielke: D.H. Kuhl

Department of Technical and Further Education31 Flinders StreetADELAIDE 5000

3/4 completed

date: late 1982

Remarks: Project document in preparation

Reference number:

Project title:

231

Analysis of industry and occupation compon-ents of the carpentry and joinery and alliedvwations - relevance to ex'ating cournes

81

Page 86: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

Contact persons:

Contact address:

Project status:

SOUTH AUSTRALIA

D.H. Kuhl, A. Lothian, D. WAIliams;K. Parklmon

Principal Education OfficerResearch BranchDepartment ot Technical and Further Education31 Flinders StreetADELAIDE 5000

3/4 completed

Proposed completidn date: July 1982

Remarks: Project document in preparation.

Reference number:

Project title:

Contact persons:

Contact address:

Project status:

Proposed completion

232

Survey of furnishing tradea industry trainingrequirements for Cabinetmaking

G. LeDuff, A. Walls

Principal Education OfficerResearch BranchDepartment of Technical and Further Education31 Flinders StreetADELAIDE 5000

3/4 completed

date: late 1982

Remarks: Project document completed. Research publicationspreparation.

in

Reference number:

Project title:

Contact person:

Contact address:

Project status:

233

Evaluation of the Vocational PreparationProgramme 1981

D.L. Hailstone

Research BranchDepartment of Technical and Further Education31 Flinders StreetADELAIDE 5000

3/4 completed

Proposed completion date: June 1982

Remarks: lne project represents an evaluation of the VocationalPreparation Programme of courses conducted by the SADepartment of TAFE in 1981. Vocational Preparationcourses were funded under the CommonwePlth's School-to-Work Transition Programme and represer's one componentof the Department's range of 1981 Transition Educationofferings.

Reference number:

Project title:

Contact person:

Contact address:

234

Evaluation or 1981 pre-vocational (Metal andElectrical trades) programme

J. S. Grosvenor

Research BranchDepartment of Technical and Further Education31 Flinders StreetADELAIDE 5000

Project status: 3/4 completed

Co82

Page 87: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

SOUTH AUSTRALIA

Erosaled completion date: 31 July 1982

Remarks: Final evaluation report is in preparation.

Reference number: 235

Project title: A case study evaluation of the Eyre PeninsulaCommunity College Foundation Course

Contact person: J.S. Grosvenor

Contact address: Research BranchDepartment of Technical and Further Education31 Flinders StreetADELAIDE 5000

Project status: 3/4 completed

Proposed completion date: 31 July 1982

Remarks: Final evaluation report is In preparation.

Reference number: 236

Project title: Drawing skills for fitting and machiningapprentices (basic trade)

Contact persons: perry Raymond; Dean Kuhl; John McCarthy

Contact address: Research BranchDepartment of Technical and Further Education31 Flinders StreetADELAIDE 5000

Project status: 1/4 completed

Proposed completion date: Stage 1, December 1992; Stage 2December 1983.

Remarks: Stage 1: to survey industry with the purpose of deter-mining the drawing skills/requirements of an occupa-tional group under the broad heading "fitters andmachinists".

Stage 2: (1) to develop materials as a result of thesurvey(2) to construct a drawing ability test(3) to develop modules in different areas e.g. tool-making, jigs and fixtures etc.

Contact person:

Contact address:

Project status:

237

Evaluation of the Cost and Social and Educa-tional Effectiveness of Alternative Attend-ance Requirements for Country Apprentices

K.S. Seidel

Re,earch BranohDepartment of Technical and Further Education31 Flinders StreetADELAIDE 5000

1/2 completed

Proposed completion dale: August 1982

Estimated cost of project: $11,000 - $40,000

83

Page 88: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

SOUTH AUSTRALIA

Remarks: To evaluate the SOCIAL, FINANCIAL and EDUCATIONAL COSTSandsBENEFITS of alternative attendance requirements ofcountry apprentices.

The primary emphasis is placed on a comparison of localcountry/regional trade training with metropolitanprovision of trade training for country apprentices. Acomparison of day and block release forms a secondaryresearch emphasis. Data from surveys of countryapprentices, employers and parents is presented andanalysed. The Riverland and South East regions ofSouth Australia were used as study regions for thisstudy.

Reference number:

Project title:

Contact person:

Contact address:

238; SA: FE 2007/78, FE 1175/81

Evaluation of the implementation of theNational Cosson Core Course in Flushing, Gas-fitting and Drainage

Mr K. Poole

Research BranchDepartment of Technical and Further Education31 Flinders StreetADELAIDE 5000

Prolect status: 1/2 to 3/4 cOmpleted

Proposed completion date: January 1983

Estimated cost of project: $11,000 - $40,000

Remarks: This is a CTEC funded project. An evaluatinn is beingcarried cut to determine the processes used to developand implement the National Common Core Course inPlumbing throughout Australia. A repbrt will bedeveloped which will cover both State and Nationalfindings.

Reference number:

Project title: c

Contact person:

Contact address:

239

Review of Architectural and Buildings StudiesTehnician Certificate Couraes

Mr G. LeDuff

Research BranchDepartment of Technical and Further Education31 Flinders StreetADELAIDE 5000

Project status: , 1/4 completed

Proposed completion date: December 1982

Remarks: Research report to be prepared. Aims:(1) to identify client group;(2) verify the education and training needs and

demands;(3) verify that the graduates from the two Certificate

Courses are suitably trained;(4) verify 'the quality of the educational programmes

of each course;(5) to make lerricllem changes on the basis of the

findings;(6) prepare full accreditation documentation.

Page 89: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

SOUTH it.STRALLA

Reference number: 240

Project, title: Port Augusta College of Technical and FurtherEducation: An Educational Needs Analysis

Contact'person: Mr B.J. Nerd

Contact,address: Research BranchDepartment of Technical and Further Education31,Flinders StreetADELAIDE 5000

Pro 4e:et status: 3/4 completed

Proposed completion date: July 1982

Eltimated cost of proJect: $2,000 - $10,000

Rtmarks: To investigate the level and nature of need for furthereducation in the Port Augusta region includingindustry, commerce and the general population.

The present college faoilities are known to havedeficiencies and this study i3 aimed at providing acomprehensively researched data base for decisionmaking and possible deoign of new facilities. Accountis to be taken of other colleges in the Iron TriangleRegion and a variety of options will be examined.

Reference number: 241

Project title: Statewide Co-ordinators

Contact person: Roger Hatboro

Contact addreeo: SuperintendentCurriculum Development Branch \

Department of Technical and Furtper Education31 Flinders StreetADELAIDE 5000

Estimated cost of project: over $40,000

Remarks: Appointment of college staff to accept re ponsibilityfor curriculum development in specified are 3 of study.Equivalent to 6 people full time at deputy head/seniorlecturer level.

Reference number:

project title:

Contact person:

Contact address:

Project status:

242

Equal Opportunity-Disabled

Dick Willing

Curriculum Development BranchDepartment of Technical and Further Education31 Flinders StreetADELAIDE 5000

Planned

Estimated cost of project: $2,000 - $10,000

Remarks: Preparation of a bridging course to allow the dilahledto enter main stream TAFE courses. Priortty 4.

85

8,J

c::* I

Page 90: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

,Reference number:

ProJeot title:

Contact person:

Contact address:

Project status: ,

SOUTH Atonal'.

243

Equal Opportunity - Multicultural

Diok Willing

Curriculum Development BranchDepartment of Technical and Further Education31 Flinders StreetADELAIDE 5000

Planned

Estimated cost of project: $2,000 - $10,000

Remarks: Development of acce.s courses for persons from non-English speaking backgrounds to enrol in mainstreamTAFE courses. Priority 4.

Reference number: 244

project title: Home Economics

Contact person: Dick Willing

Contact address: Curriculum Development Branch .Department of Technical and Further Education31 Flinders StreetADELAIDE 5000

Project status: 3/4 completed

Estimated cost of project: $2,CJ0 - $10,000

Remarks: Development and review of courses. Preparation ofdocumentation for nee certificate.

Pojerrele

Contact person:

Contact address:

24c

Residential Care/Special Care

Dick Willing

Curriculum Development BranchDepartment of Technical and Further Education31 Flinders StreetADELAIDE 5000

Preject status: 1/4 completed

Proposed completion date: December 1982

Estimated cost of pro,lect: $2,000 - $10,000

Remarks:Wiedleneln&raen dCerT:teivf :awt e ol;riaoristayn 7 rkcionug r Z7t1;the Disabled Priority 1; Occupational TherapistsPriority 4; NCCC Child Care Priority 4.

Reference number:

Project title:

Contact person:

Conte:A addr,ns:

Proje_et status:

_

246

Hairdressing Project

Dick Willing

Curriculum Development BranchDepartment of Technical and Further Education31 Flinders StreetADELAIDE 5000

Planned

86

Page 91: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

SOUTH AUSTRALIA

Proposed completion date: December 1982

Estimated cost of project: $2,000 - $10,000

Remarks: Revise basic trade curriculum and integrate with in-dustry. Raist, 'Log Book' for student/college/industry.Review advanced certificate. Priority 2.

Reference number: 247

Project title:

Contact persons:

Contact

,Travel and Tourism Course Review

David Furber; Lee Lechlietner

address: Head OfficeCurriculum Development BranchDepartment of Technical and Further Education31 Flinders StreetADELAIDE 5000

Project status: Planned

Proposed completion date: June 1983

Estimated cost of project: $4,000

Remarks: To develop advanced modules/courier in Travel andTourism to meet the needs of-the industry (the traveloperations certificate recently underwent a majorreview). Priority 2.

Reference number:

Project title:

Contact person:

Contact address:

248

Clothing and Textiles Certificates

Dick Milling

Curriculum Development BranchDepartment of Technical and Further Education31 Flinders StreetADELAIDE 5000

Project status: 1/4 completed

Proposed completion date: December 1982

Estimated cost of project: $2,000 - $10,000

Remarks: Revision and production of curriculum documentatton forTAFE 4 Awards; TAFE 3 Fashion and TAFE 3 Non-industrial; TAFE 2 Design, Construc,ion andMerchandising.

.-.Reference number:

Project title:

Contact person:

Contact address:

249

Rural Studies - Revised course approval-accreditation procedures

Robert Hodge

Head OfficeCurriculum Development BranchDepartment of Technical and Fucther Edu,1110n31 Flinders StreetADELAIDE 5000

Project status: 1/? completed

Proposed compLetion date: December 198

Eitimated cost of prplect: 41,000

879

Page 92: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

SOUTH AUSTRALIA

Remarks: To develop, through consultation with colleges and the

rural community, revised procedures for the approval -accreditation of courses to meet the diverse needs offarmers.

Reference numbe:

Project title:

Contact person:

Contact address:

Frolect status:

250

National Core Curriculum - Timber Studies

Robert Hodge

Head OfficeCurriculum Development BranchDepartment of Technical ane Further Education31 Flinders StreetADELAIDE 5000

Planned

E.?timated cost of project: $5,000

Remarks: 1.

2.

Preparation of a proposal for the development of anational core cureiculum in Timber Studies.Involvement of State Repretentative on NationalTask Force. Priority 2.

Reference numbtr:

EIM29 z

Contact address:

251

Wool Courses Review

Robert Hodge

HeadNOfficeCurriculum Development BranchDepartment or Technical and Further Education31 Flinders StreetADELAIDE 5000

Proje.:t status: Planned

Pr922sed completion date: June 1983

Estimated cost of project: $4,500

kemarks: Review ,>f departmr...t's wool courses and developm-nt,where appropriate, or new courses to meet indu try

needs. Priority 2.

ft,frence number: 252

Proltrot title:

, Int AO t person:

att 3,1.1re?,n:

Horticulture (Amenity) Review

Robert Hodge

Head Officerurrt.hlum Development BranchDepartment of Technical and Further Education11 Flinders Street4DPLA1DE c(100

Planned

t'r I ,erp:et c i Op;

)fDecember 1082

$4,500

4,mtrkl: T vew tne current course offering in horticultureht.,1 of re,ent investigation into industry

Priority

88

Page 93: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

Reference number:

EroAect title:

Contact person:

Contact address:

Project status:

Proposed completion

SMITH AUSTRALIA

253

Pastoral Studies Review

Robert Hodge

Head OfficeCurriculum Development BranchDepartment of Technical and Further Education31 Flinders StreetADELAIDE 5000

Planned

date: December 1982

Estimated cost of project: $4,750

Remarks: Development of certificate and other courses to meetthe needs of the industry. Proposed course structureshave been endorsed by the Rural Studies CurriculumCommittee. Development of course curricula isconditional on the appointment of a Rural Studies Co-ordinator at Port Augusta College of TAFE. Priority 2.

-

Reference number:

Project title:

Contact person:

Contact address:

-

254

Winery Cellar Procedures CertificateEvaluation

Robert Hodge

Head OfficeCurriculum Development BranchDepartment of Technical and Further Education31 Flinders StreetADELAIDE 5000

Estimated cost of project: $200

Remarks: To monitor and evaluate he presentation of the WtneryCellar procedures course at huriootpa. (This is a newcourse, recently approved, to meet the local needs ofthe Wine industry). Committed.

Reference number: 255

troj221 title: Mining Industry Courses - Review

Contact persons: David Furber; Bruce Brawny

Contact address: Head OfficeCurriculum Development BranchDepartment of Technical and Further Educ:tion31 Flinders StreetADELAIDE 5000

P12,1fel statql: Planned

Proposed cogpletion date: December 1982

Estimated cost of project: $4,000

Remarks: To develop a series of courses as a career pattern.Study programme in geology, surveying, drafting andisaooiated areas to meet the needs of the minintinduatry. Priority 2.

--------------

89

Page 94: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

SOUTH AUSTRALIA

Reference number: 256

Project title: Maritime Studies

Contact person: J. McCarthy

Contact address: Curriculum Development BranchDepartment of Technical and Further Education31 Flinders StreetADELAIDE 5000

Project status: Planned

proposed completion date: Edd 1982

Estimated cost of project: $3,000

Remarks: Develop content of Maritime Studies Programme.

Reference number: 257

prollst title: HCCC Automotive Mechanics

Contact persons: A.P. Pox; D. Furher

Contact address: O'Halloran Hill College of Technical andFurther EducationMajors RoadO'HALLORAN H/LL 5158

Project status: 1/4 completed

Proposed completion date: End 1982

Estimated cost of project: $1,500

Remarks: Development of NCCC for Automotive Mechanic B/TCourses.

Reference number:

Project title:

Contact persons:

Contact address:

Project status:

258

Panel Beating B/T

B. Chapman; J. McCarthy

Croydon Park College of Technical andFurther EducationGoodall AvenueCROYDON PARK 5008

1/4 completed

Proposed completion date:

Estimated cost of project:

End 1982

less than $2,000

Remarks: Development of modular course based uponTechnical College, Victoria, model.

Reference number:

Project title:

Contact person:

Contact address:

Richmond

259

Review of Automotive Trades Courses

A.P. Rhodes

Currkeuldm novolopment Branch -

0epartment of Technical and Further Education31 Flinder.) StreetADFLAIDE WY)

90

Page 95: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

SOUTH AUSTRALIA

Proposed eompletion date: Mid 1983

Estimated coat of project: $9,000

Remarks: Investigation of a broad-based approach to tradecourses allied to Automotive Mechanics.

Reference number:

Project title:

Contact persona:

Contact address:

?mit* status:

260

Automotive Mechanic B/T

A. Fox; J. McCarthy

O'Halloran Hill College of Technical andFurther EducationMajors R)adO'HALLOhA HILL 5158

3/4 completed

Proposed completion date: End 1982

Estimated cost or project: $1,500

Remarks: Completion of materials and content development foradditional 80 hours.

Reference number: 261

Project title: Electronic B/T

Contact person: D. Murphy

Contact address: hegency Park Community CollegeCorner Regency Road & Days RoadREGENCY PARK 5010

Project status: 1/4 completed

Proposed completion date: Mid 1983

Estimated cost or project: $3,000

Remarks: Survey industry; develop content in lightPrepare documentation for accreditation.

Reference number: 262

Project title: Instrument Mechanic B/T

Contact amp: D. Biggs

.Contact address: Regency Park Community CollegeCorner Regency Road & Days Road.REGENCY PARK 5010

!!_r_o_11.q.1 112121: 1/2 completed

or survey.

Proposed completion date: End 1982

Est,mated cost or proJect: $600

Rem.Irkl: Develop content or BIT course. PreparA documentation.

91

Page 96: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

SOUTH AUSTRALIA

Reference nemer: 263

Project title: HdCC Electrical B/T

Contact person: R.L. Windsor

Contact address: Regency Park Community CollegeCorner Regency Road and Days RoadREGENCY PARK 5010

Project status: 1/4 completed

Proposed completion date: End 1982

Eatimated cost of,proleet: $2,200

Remarks: Survey Electrical Industry in SA as part of NationalProject.

Reference number: 264

Project title: Refrigeration B/T

Contact person: A.P. Rhodes

Contact address: Curriculum Development BranchDepartment of Technical and Further Education31 Flinders StreetADELAIDE 5000

Project status: 1/2 completed

Proposed completion date: End 1982

Estimated cost of project: $5,000

Remarks: Develop content; prepare documentation for approval andaccreditation.

Reference number:

Project title:

Contact persons:

Contact address:

265

Teehoological Change

J.McCarthy; C. Paton

Regency Park Community CollegeSchool of Mechanical EngineeringCorner Regency Road and Days RoadREGENCY yARK 5010

Proiect status: Planned

Est.mated cost of project: $2,800

qema,ks: Development of CAD/CAM materialEngineering Technical Courses.

f-"orerce number:

Project title:

Contact person:

Contac2t addmsa:

Project statul:

Proposed cospietion

for Mechanical

266

Pitting and Machining B/T

P. Ihtraond

Panorama Community CollegeSchool of Technical gtudies621 Goodwood RoadPANORAMA

1/4 completed

date: End 1982

N

tr(1

9 2

Page 97: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

SOUTH ACISTRALIA

Estimated cost of project: less than $2,000

Remanks: Development of engineering drawingupon industry requirement.

component, based

Reference number: 267

Project title: NCCC Metal Fabrication

Contact persons': R. Kemp; J. McCarthy; D. Furber

Contact address: Elizabeth Community CollegeSchool of Technical StudiesWoodford RoadELIZABETH 5412

Project status: 1/2 completed

Proposed completion date: End 1982

Estimated cost of liroject: $1,500

Remarks: 4tve1opment of MCCC for Metal F:abricabion B/T course.

tReference nUmber:4 268

Project title:

Contact persons:

Contact address:

4

National Core Curriculum COmmittee,Sheetmetal

N. Fyffe; J. McCarthy; D. Furber

Regency Park Community CollegeSchool of PlumbingCorner Regency Road and Dam RoadREGENCY PARKe 5010

Project status: 1/2 completed.

Pr:oposed completion date: End 1982

Estimated cost of project: $1,500

Remailcs: Devolopmtnt,of Nationa'l Common Core Curriculum forSheetmstal B/T Courses.

Referenct number:

Project title:

Contact 'persons:

Contact address:

ZL9

Shectmetal Basic Trade

A.P. Rhoden; J. Corbett

A.P.4,Rhodes Curriculum Development BranchSouth Australian Department of Technical andFurther Education31 Flinders StreetADELAIDE 5000

J. CorbettRegency Park Community CrillegeSchool of PlumbingCorner Regency toad andREGENCY PARK 5010

Frojeot status:' 1/4 completed

Estimated cost of project: $2,500

Remark:: Preparation of resouf.ce materials.

.4

Days Road

ad

Page 98: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

4,

Reference number:

Project titles'

, Contact person:

Contact address:

4roject status:

SWTH AUSTRALIA

270

National Core CUrriculum - Accounting MakForce

Colin Thorn

Training arid Development Centre46 Greenhill RoadWAYVILLE 5934

Planned '

Proposed completion date:

Estimated cost ef prOject:

'ReMarks: To enable Departmental lecturers in accounting toassist in the development of a national curriculum inaccounting.

June 1983

$1,000

Reference number: 271

Project title: National Core CurriculuM - National Standards

Contact person: Bob Williams

Contact address: Curriculum Development BranchDepartment of Technical and Further Education31 Flinders StreetADELAIDE 5000

Project status: 3/4 completed

Proposed completion date: .31/12/82

Estimated cost of pgject:

Remarks:, To produce draft national standard in.the testing ofshorthand and typing speeds. Costs: travel/accommoda-tion. Committed.

$700

Reference number:

Project title:

Contact person:

Contact address:

Project-status:

272

National Core Curriculum - Business StudiesConsultative Committee

Colin Thorn

Training and Development Centre46 Greenhill ROPiWAYVILLE 5034, .

.Continuing

Proposed completion date:" Ongoing

Estimated cost of project: $1,000

Remarks: To act as State.,representative on a Natijnal Task Forceinvolved in the development of National Core CuOriculain the Business Studies area. Committed.

Reference number: 273

Project title: - National Core Curriculum Committee, Plumbing

Contact person$: Dr. 1); Atkinson; Poole

3 9 4

6

Page 99: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

______7 Regdnoy Park Community CollegeSchool of PlumbingCorner Regency Road and Days RoadREOEHOls PARK 5010

Estithted cost of prolest:

Contact address:

eustagn

Reference number:

Project title:

Contact person:

Contact address:-

Project status:

Proposed completicn

274. .

Business Certificate Accounting Review

Bob Williaam

Curriculum Development BranchSouth Australian Department ofand Further Education31 Flinders StreetADELAIDE 5000 .

%

Technical

1/4 completed

date: 30/6/83

Estimated.cost of project: '$1,200

Remarks: To continue rewrite of Accounting Courses in the lightof review by B. Craig, National Core Curriculum andreview of Acoouhting Coursed by DIAE/ICTC workingparty. Committed.

Reference number:

Project title:

Contact persons:

Contact address:

Project status:

Estimated cost of

275

National Core Currieulua Building StudiesCossittee

J. McCarthy, V. Kangur

Curriculum DevAlopment Branch/South Australian Department ofand Further Education31 Flinders StreetADELAIDE 5000

Ongoing

project: $1,500

Technical

Remarks: Planning development of core curricula in BuildingStudies area.

Reference number:

Prolact title:

Con/act persons:

Contact addresses:

Prolect statusr

276

Revision of Boatbuilding B/T Course

V. Kangur; J. Antbonr

V. Kangur Curriculum Development BranchSouth Australian Department of Tecnnical'and Further Education31 Flinders StreetADELAIDE 5000

J. Anthony Marleston College of Technical -and ?Other Education .254 West Beach RoadMARLESTON 5033

1/4,comp1eted

Propoaed completion date: End 1982

95

Page 100: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

SOOTH AUSTRALIA

Estimated cost of project: $3,650

r -,

Remarks: Revise Coatbuilding B/T course to meet -present dayneed. Prepare curriculum documentaticn.

Reference number:

Projsct title:

Contact persons:

Contact address:

Project status:

277

Duilding Architectural Technician CertificateCourse Review

J. McCarthy; G. Sevier( *G. LeDuff

J. McCarthy Curriculum Development BranchSouth Australian Department of Technicaland Further EducWon31 Flinders Stree5ADELAIDE 5000

.o.G. Sawyer Gilles Plains Community College.Blacks RoadGILLES PLAINS 5086

G. Leduff Research BranchSouth Australian Departmentand Further Education31 Flinders StreetADELAIDE 5000

1/2tompleted

proposed completion date: Mid 1983

Estimated'cost of project: $3,000

Remarks:

of Technical

Survey industry to determine relevance of Building TCand Architectural TC courses. Review existing coursesin the light of survey findings; prepare curriculumdocumentation for accreditation purposes.

Reference number:

Project title:

Contact person:

Contact address:

Project status:

278

Commercial Art

Dick Willing

Curriculum Developmedt-BranchDepartment of Technical and Further Education31 Flinders StreetADELAIDE 5000

3/4 completed

Proposed cOmpletion date: December 1982

Esiimated cost of project: less than $2,000

Remarks: Development and review. PriO944' 1.

Reference number:

Project title:

Contact person:

Contact address:

Project status:

279

Protocols for C D

Dick Willing

Curriculum Development BranchDepartment of Technical and Farther31 Flinders StreetADELAIDE 5000

Planned

96

Education

Page 101: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

SOUTH AUSTRALIA

4

Remarks: Conversion of the new c]ligfication project (TAFEC-

funded) to a book of protocols for thb Development,sofTAFE curricula.

Reference number:

ProSeot title:

Contact person:

Contact a4dress:

Projeot'status:

280

Deelared vocations yithout coursee

Jeanie Armitage

Curriculum Development BimnchSouth Australian Department of Technicaland Further Education31 Flinders StreetADELAIDE 5000

Planned

Estimated cost ofe,project:

iemarks:

leis than $2,000

To review existing basic trade courses to determinewhether selected units could be "repackaged" to provideappropr.iate courses for the declared vocations.

Reference number:

Project title:

Contact person:

Contdct address:

281'

Curriculum Delegations and

Alby Rhode3

Approvalik4c,

Curriculum Development BranchSouth Australian Department of Technicaland Further Education31 Flinders Street '

ADELAIDE 5000

project status: 1/4 completed

Estimated cost of project:

Remarks: Revise bbe delegaCions to head offiRe'and co llegeprincipals and staff ooncerning approval andaccreditation of courses.

less thak $2,000

Re:erence number:

Project title:

Contact person:

Contact address:

Project status:

282

Common firat.year automotive basic trade

Alby Rheees

Curriculum Development BranchSouth Aqstralian Department of Technicaland Further Education'31 Flinders StreetADELAIDE 5000

Planned

Estimated cost of prolect: les3 VI/in $2,000

Remarks: To determine the feasibility of havi!ngyear basic automotive course..

'

a common firsi

Refereuce number: 283

Project title: Credit Point Syetem

Contact person: David Furber

a

Page 102: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

\

Contact address:, -Curriculum Development BranchSouth Australian Department of Technicaland Furthyr Education31 Flinders StreetADELAIDE 5000

Project status: 1/2 completed

.m.

Estimated

Remarks:

cost of projeck: less than $2,000

Establish a credit pqtnt system for all Onusualsubjects to enable fleklble approaches to structuringCourses.

Reference number: 284

Project title: Classification und Mornolature

Contact person: Reser Mathers -

Contact address: Curriculum Development_BranchDepartment of Technical and Further Education31 Rlinders Street ...

ADELAIDE 5000,

Project ateltul: 1/2 completed

Estimated cost of project,: ,6as than $2,000

Remarks: Establishment of a S.A. classification system forDeparpoental awards, and appropriate nomenclature foreach level of classification.

Reference number:

PrOject title:

Contact person:

Contact address:

Project statur.:

Estimated cgst of

Remarks:

285

Curriculum Documentation Guidelines

John Mitohdll

Curriculum Development BranchDepartment of Technical and Further Educafton31 Flinders StreetADELAIDE 5000

3%4 completed

prqject: less than $2,000

Development of standard format and procedures for allcurriculum documentation for- submission for approvaland accreditation.

.

Reference number:

Project title:

Contact 011122:

Contact address:

ProJect status:

286 $t*

Redocumentation of Departmental Awards

John Mitchell,

Curriculum Development BranchDepartment of Technical and Further ucation31 Flinders StreetADELAIDE 5000

1/4 completed

Proposed completion date: End of 1984

Estimated cost of project: $11,000 - $40,000

98

. b

-77

Page 103: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

Remarks:

SOOTH tUSTAILLIA

00,

Preparation of a curricUlum document in standard formatfor all Departmental awards.

Reference number:

Projeot title:

Contaot person:

Contact address:

Project status:

ProPosed comabtion date:..

Estiaated cost of project: lase than $2,000

Remarks:' Preparation'of gufdes for use by ataff who are involgedin curriculum Asrojects. Essentially "how to db it"assistance.

Together with the local curriculum model, glosaary oftermA, description of curriculum! "products".

287

Curriculum guides '

John Mitchell

Curriodlum Development BrangDepartment of Tgnhnical and Furthsr Education '31 Flinders Street

$ ADELAIDE 5000

1/4 completed

End 1982

,

Reference number: 288

Project title: Aeoreditattom Board

".

Contact person: Roger Hathevs

Contact address: Curriculum Development BranchDepartment of Technical ahd FerthEducation31 Flinders StreetADEbAIDE 5000 ,

Project status: , Planned

Estimated cost of projeCt: $2,000 - $10,600

Remarksi Establishment of AccreAtation Board for acoreditatiohof Departmental awards.

Page 104: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

S

t

d

6

4

,

%

9

-^.......n.

I.

/

,

1'

)

VI ORIA

1 Odi

I

,-,

or

.,... .

'or

N

e-

1.

I

..

t.

vo

Page 105: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

..^1

.

V/CTORIA

Referenge nurbert

P;.oject title:

Contact person:

Contact address:

289

.' Set and Property Design yechngoianCertificate

G. SaiCh.

MeitOurtill College of Dectration>SW-Lt. Lonsdale Street

MELBOURNE 3000

Pi.o act status: Planned'

..

Pro osed Completion date: Unknown, still in the initialplanning stage

$2,00a - $10000 .Es(imated cost of projects°

Remarks: AIM: To train assistants,in Set & Property Dergn.MATERIALS: Still under investigation and wi I depend

.on industry needs.

Reference number:

Project titles'

Contact person:,

Contact address:

Project status:

290

Module rewrite: Signwriting

Brian O'Leary'

Melbourne College Of Decoratiai528 Lt. Lonsdale StreetMELBOURNE 3000

1/2 completed.

proposed completion date: 1983

Estimated cost of project: $11,000 - $40,000

Remarks: To produoe a aet of 24 modules and relesmnt supportmaterials aS teaching aids for the instruction ofSignwriting Apprentices.

abAudio/Visual material: Film, video and slide programs.

Approximately 1/2hour. A numher or A/xitems have.been and'are constantly beingproduced in relation to the trade

. t modules.

Reference number: 291

Project title& Module rewrite: Painting and Decorating

ConLet person: Robert Barden

Contact address: Melbourne College of Decoration528 Lt. Lonsdale StreetMELBOURNE 3000

Project status: 3/4 comiketed

Proposed completion date: 1983

Estimated cost of project: $11,006 - $40,000

Remarkh: To produce a set of 20 modules plus 9 electives 4ndrelevant support material for the instruction ofPainting & Decorating Apprentices.

a

Audio/visual material: Film, Video and'slide programme.'"Approximately 1/2 hour. A number of A/Vitems have been and are eonitantlyproduced in relation to th tr44P.modules.

Page 106: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

Reference number:

Project title:

Contact person:

'Contact address:

Ploject seatus:

"^TICTORL1L

292

Literaoy, lumeracy and Apprentices.

Co-ordinator, Compensatory Education Otkit,Swinburne Technical College

Swinburne Technical CollegeP 0 Box 218HAWTHORN 3122 /

Oftgoing-

EstiMated cost of project: $2,000 - $10,000

Remarks: An on-going research program which examines issuesrelated to literacy and numeracy skills in tradeapprentices and instructional materials designed forthem. Findings of.the research are publishedperiodically in reports, conference papers and journalarticles. All documents are available from the contactperson listed above.

Reference number:

Project title:

Contact,persoo:

Contact address:

Project status:

Proposed, completion date$4 December 1982

Estimated cost of project: less than $2,000

Remarks: The project is intended to result in the pro uction ofa booklet containing notes, drawings references, etc.for use by students in mechanical design.

293

Development and compilation of gauge draftingnotes for students in cot mechanical design

Head of Department, Machines and Materials

Swinburne4echnical CollegeP 0 Box 218HAWTHORN 3122

1/4 completed

Reference number: 294

Project title: *Production of Workbook for Top Economics

Contact person: Head of Department, Business Stydies

Contact address: Swinburne Technical CollegeP 0 Box 218

.HAWTHORN 3122

Project status: '1/4 completed

Proposed completion date: December 1982

Estimated cost of project: less than $2,000

Remarks: The pi'oject will result in the production of a newstudent workbook of approximately 200-pages. It willcontain--notes, glosbar9 'of terms, practice testquestions and exercises. The workbook will be trialledin 1983 and revised as necessary.

104

Page 107: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

417

Reference number:

Project title:

Contact person:

Contact address:

Project status:

Proposed completion

VICTORIA

295

Analysis of visual teachinfiVlearning trendsat Swinburne Teohnical College

Education Services Co-ordinator

Swinburne Technical CollegeP 0 Box 218HAWTHORN 3122

1/2 co4leted

date: 'October 1982

Remarks: A questionnaire was developed and utilized imorder tomeasure the opinions and knowledge of teaching staffabout the effectiveness and usefulness of Variousvisual instructional media, and about the nature oflearning fia visual information.

Based on the responses to this qbesteonnaire, a reportwili Oe prepared which identifies preferred visualmedia and indicates areas in which in-service trainingin visual technology and/or principLes of visuallearning and teacbing might be appropriate. .

Reference number: 296

Project title: Planning of new polar 4fiergy:techniciancourse

Contact person: Head of Departmea, Plumbing and MechanicalServices

' Contacl'address: Swinburne Technical College1, 0 Box 218HAWTHORN 3122

Project status: 1/4 completed

Proposed completion date: December 1982

Estimated cost of project: $2,000 - $10,000

o Remarks: This project will result in the production of teachingmaterials in solar energy. The materials will includeprint items (notes, references etc) and audio-visualitems (i.e. wall obarts, slides, video programs, OHPtransparencies, and colour photographic prints).

Audio/visUal material: Video (U-matic), slides (35mm), wallcharts, OHP transparencies.

Reference number:

Proiect title:

Contact pe'rson:

Contact address:

tE2..ta.

Proposed completion

Estimated cost of =jest:

297

Development of introductory courses egachool laboratory technicians

Head of Department, Matbematics and Science

Sw1nburne Technical CollegeP 0 Box 218HAWTHORN 3122

1/2 completed0

date: Dpcember 1482

$2,000 - $10,000

Page 108: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

7

VICTORIA /

Remarks: This project will produce a task ana:ysis of thelaboratory. technician job, behavioural objectives foreach task and listings of content of topics. Alsosuggested learning activities and resources for eachobjective. The new course will be trialled andevaluated, and a report will be prepared. .

Reference number:

Project title:

Contact persons:

Contact address:

Project status:

298

OccUpationeh analysie of printing trades

I. Haysom, Head of Gtudy (Printing); F.'Wall, Executive Officer (Printing StandingCommittee)

Melbourne College of Printing and

CTICItii:egg:rry StreetNORTH MELBOURNE 3051

1/2 completed

Estimated cost of project: 13$2:700"- 1$91:2,000

Proposed completion date:

Remarks: To determine training needs of binding and finishing,to prodcce survey document, conduct survey and peesentreport.

Reference number:

?roject title:

299

Occupational Analysfa of Priniing4

Contact persons: I. Haysom; F. Wall

Contact address: Melbourne College of Printing andGraphic Arts603 Queensberry StreetNORTH MELBOURNE 3061

Project statils: 1/4 comp16ted-

Propose4 completion date: December 1982

Estimated cost of project: $2,000 - $10,000

Trades

Remarks: To Oetermine training needs of graphic reproduction, toproduce s.urvey document, conduct survey and presentreport.

Reference nusiber:

Project title:4.

Contact persons:

Contact address:

Eriplest status:

300

Occupational AnalySia of Printigg Trades

I. Haysom; F. Wall

Melbourne College of Printing andGraphic Arts603 Queensberry StreetNORTH MELBOURNE 3051

1/4 completed

Proposed completion date: December 1982

Estimated cost of project: $2,000 - $10,000

Remarks: To determinr training needs of composing, to producesurvey locument, conduct survey'snd present report.

0.

3

106

Page 109: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

L

VICTORIA

Reference number: 301

Project titAo: Occupational Analysia of Printing Trades

Contact persona: I. Raysoni F. lia4

Contact address: Melbourne College of Printing andGraphic Arts603 Queensberry StreetNORTH MELBOURNE 3051

Project status: 1/2 completed

Proposed completion date: December 1982

Estimated co8 4 of project.: $2,000 - $10,000

1 -

amarks: To latermine training needs of screen,printing, topro uce survey document, conduct surve, and presentreport.

Reference number:

Project title:

Contact persons:

Contact address:

Project status:

PropoAd completion

302

Mati-cultural task force

Iva Stepan, Hope Kynoch, Macre Swann, MikeBurp^

Moorabbin College of TAFEHerne CloseMOORABBIN 3189

1/4 completed

date: December 1982 - June 1983

Eatimated cost of project: $11,000 - $40,000

Remarks: 1. Access of more multi-cultural groupo into TAFCColleges and*Moorabbin in particular.2. Need for all teachers to develop strategies foreffective teaching in a polyethnic classroom withintheir own subjct areas.

1. A survey of students to determine factors leadingto success/failure of the students.2. Action based research Stream 1-63. Policy guidelines for 1983 and beyond.

Reference number:

Froject title:

Contact person:

Contact address:

Project status:

303

Self-paced learning programscate of Woolclassing

Peter /Wadden

Nangaratta College of TAFP 0 Box 237'NANGARATTA 3677

1/4 completed

fm, tte Certifi-

Proposed completion date: On-going

Estimated cost of project: over $40,000

Remarke: To initially produce supportive learning units, then toreview, rewrite and validate the matirials on anongoing basis. Overall, Nangaratta is worxing with thehead of study and project team to produce learningresources which will allow the oertificate ofwoolclassing to become fully self-paced in a few years.

107

Page 110: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

VICTORIA

Audio/visual material: Medium and duration vary as demanded bythe topic. MG.dia may be slide/tape,audio tape, video, paper base, etc, butall requiring interactive responses.Self correcting where possible.

*Please note - at the moment materials are being trialled at 6pilot denttes and are not available on a state-wide basis tillevaluation is completed.

Reference number:

Project title:

Contact persons:

Contact address:

LE2j22/ status:

Proposed complet3cn

304

Needs of Disabled children

Graham Stevenson; Coralie Mathews

Whitehorse College of TAFE1000 Whitehorse RoadBOX HILL

1/2 completed

date: December 1982

Estimated cost of project: $2,000 - $10,000

Remarks: To evaluate and analyse the needs and skills requiredin the care of children w!th disabilities (physical andmental). To implement a course for untraned workersin this field and parents of disabled children.

Reference number: 305

Project title: Self-paced Learning Programs for GarmentConatruction

Contact person: Helen Gardner

Contact address: Whitehorse College of TAFE1000 Whitehorse RoadBOX HILL 3128

tElimi. status: Planned

Proposed completion date: December 1982

Estimated cost of project: $2,000 - $10,000

Remarks: To provide for individual students to progress at their:own rate in Garment Construction.

Reference number: °306

Project title:

Contact persons:

Contact address:

Project status:

Horse Husbandry Course

Peter Esdale; Frank Toman

Whitehorse College of TAFE1000 Whitehorse RoadBOX HILL 3128

1/4 completed

proposed Completion date: December 1983

Estimated cost of project: $11,000 - $40,000

Remarks:, Development of a curriculum for a Horse HusbandryCourse to train people employed in horse husbandry. Todetermine the most appropriate method and length ofcourse.

t 108

Page 111: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

Reference number: 307

Projectstitle: Needs of children in residential care

Contact perons: Mr Graham Stevenson; Mrs Coralie Mathews

Contact address: Whitehorse College of TAFE1000 Whftehor$e RoadBOX HILL 3128

prollet status: 1/2 completed

Proposed completion date: December 1982

Estimated cost of project: less than $2,000

Remarks: To assess, purchase and develop resource materials inorder that courses relating to residential child care,.can be expanded.

Reference number:

Projeet title:

Contact persons:

Contact address:

122J2.21 21422;

308

Survey of current and future needs of thefloristry industry

Kr Peter Coughlin; Mrs Lois Fraser

Whitehorse College of TAFE1000 Whitehorse RoadBOX HILL 3128

1/4 completed

Proposed completion date: Deeember 1982.

Estimated cost of project: $2,600 - $10,000

Remarks: To survey the floristry indu-stry in orderprogress of the current course offered.

Reference number:

Project title:

Contact ptrson;:

Contact address:

Project stetus:

to evaluate

of a

309

Following a review in 1981, developmentnew course for library technicians

Graham Stevenson; Lois Ganderton

Whitehorse College of TAFE1000 Whitehorse-RoadBOX HILL 3128

1/2 completed

Proposed completion date: End of September 1982

Estimated cost of project: $11,000 - $40,000

Remarks: A new syllabus document will be the 'main outcome ofthis project.

Reference number:

Project title:

Contact persons:

Contact address:

310

Preparation of audio visual materials foranimal technicians and veterinary nursingcourses

John Nevada; Sue Lewis

Whitehorse College of TAFE1000 Whitehorse RoadBOX HILL 3128

109

Page 112: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

VICTORIA

Project status: 1/2 completed

Proposed completion date:

Estimated cost of project:

Remarks:

December 1982 (Submission for ron-tinuation.of project in 1983.

$2,000 -,$10,000

To investigate the A.V. , resourcek in similarinstitutions in Australia, U.K. and U.S.A., evaluatesome selectedaprogrammes and purchase the most suitablematerial.

To cataenue all A.V. resources already existing atWhitehorse College of TAPE.

Reference number: 311

Project title: Ibt" Farming Tsades

Contact person:

, Contact address:

Project status:

Andrew Dennis

McMillan RuralSoutK RoadWARRAGUL 3820

3/4 completed

- Course Design

Studies Centre

December 1982

$40,000

Remarks: of course documentation ready for trialling.Rev_sed course to be trialled in all centrei in 1983.Ful implementation proposed for 1984.

110

Page 113: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

4

0

A

.A

.A.

A

A

"AAA

J. o

A

TAFE NATIONAL CENTRE. F 0 1

RESEARCH AND DEVELOPMENT4

113

Page 114: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

Reference numbe'r:

Projeot title:

Contact person':

Contact adOrets:

Project status:

Proposed comPletion

TAPE NATIONAL CENTRE

312i- TNC: C3

Common Skills Occupational Education - Iasuea(previously known as Broad Based OccupationalEducation)

Dr. R.G. Schliling

TAPE National Centre for Researchand Development296 Payneham RoadPAYNEHAN 5070

1/4 completed

date:

EstimaLed cost or projeot:

Remarks:

January,1983

$11,0(10 - $40,000

To investigate the feasibility of developing andpresenting apprentioeship/trade education programsbased on skills that are common across (allied) trades.

will be given to two program levels:(1 Tre-vooational (trade based); and(2 Apprenticeship/trade.

Reference number: 313; THC: T6

Prdject title: *Readinito Learn" Developmental Programae

7\Contaot person: Bev Beasle;

Contact address: TAPE Nationa Centre for Researchand Development296 Payneham RoadPAYNEHAH 5070 or34 Gorge RoadBELLEVUE HEIGHTS 5050

Prolnt status: 3/4 comp16ted

,Proposed completion date: End Jtily

Estimated cost of mlest: $11,000 - $40,000*

geharks: To provide theory, access skills programme, staffdevelopment struotures, case studies, resource papers.

Reference number: 314; TNC: T6

Project title:1 Ouldelinea to Currioulum Writers

Contact personl' Bev Beasley

Contact address: TAPE HationalTentre for Researohand Development296 Payneham RoadPAYNEHAM 5070

Project status: Planned

Proposed completion date: End August

Estimated cost of projeot: less than $2,000

Remarks: To develop models of currioulum design, effectivewriting to an audience and implementation programme.

113

114

Page 115: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

Reference number:

Project title:

Contact person:

Contact address:

Project statue':

TAFE NATIONAL CENTRE

315; TNC: C4

An Evaluation olt. the Development andImplementation of National Core Curricula inAustralian TAM.

Nail Jones

TAFE National Cent,e for Researchand Development296 Payneham RoadPAYNEHAM 5070

1/2 completed

Proposed completion date: January 1983

,Estimated cost of project: over $40,000

Remarks: To assess utility of future development of TAFENational Core Curricula (NCC).

To design a methodology for development and implementa-tion of NCC in Auatralian TAPE.

Reference number: 316; TNC: T6

Project title: 4 Trade Mathematics Rattan!,

Contact person: Roaemary Osman

Contact address: TAFE National Centre for Researchand Development296 Payneham Road*PAYNEHAM 5070

Project status: 3/4 completed

Proposed completion date: End 1982

Eaiimated cost of project: $11,000 - $40,000

Remarks: This*Oroject reviews recent research inte teaching andlearning mathemat4es with implications for TAFE. Onthe basis of the research findings, a report on theteaching and learning of trade mathematics has beenproduced. A series of videos which illustrate variousaspects raised in the report are currently beingdeveloped. This material and proposals for facilita-ting change will be diacussed at a nationalworkshop (sponsore d. by the TAPE National Centre) forTAFE teacher educators and staff development officers.

* Audio/visual material: Videos suitable for use in ataffdevelopment programmes on teaching trademathematics for conceptual understandingare being produced.

Reference number:

Project title:

Contaa persons:

Contaot address:

317

Glossary of term used in TAFE

Diana Meat and Graham Hermann

TAFE National Centresfor Researehan4 Development296 Payneham RoadPAYNEHAH 5070

Projeot status: 3/4 completed

Proposed completion date: 482

11 '611'4

orn

Page 116: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

TAPE NATIONAL CEsTRE

stimated cost of project: /42,000 - $10,000

Remarks: The glossary of terms is being prepared for use in theAEC project invelving.,the development of a Thesaurus ofAustralian Educational Terms, and in National TAFSClearinghouse booklets.

Reference number:

Project title:

Contact person:

Contact address:

318; TNC: C1'

Analysis of relative awvantages of differentattendance patterns for ,trade preparation

Tim Padford

TAFE National Centre for,Reaeamphand Development296 Paypeham RoadPAYNENAM 5070

project statue: 1/2 completed

epropoled completion date: Jenuary-1983-

Estimated cost of projects . $11,000 - $40,000

Remarks: This project considers educational, industrial,economic, and social factors; teaching methodologies;and the possible roles of skill centres and of work

_experience in basic trade training..

115

Page 117: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

a

4

AO 3 TR ALIAN CAPITAL TERRITORY*

A

Page 118: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

AostEK1! CAPITAL TERRITORY

Reference number:. 319

Prolect title: , Dovelopsiont plan for ACT FUrther Education

Contact person: E H MeConchie

Project status: 3/4 completed

Proposed Completion date: Dec 1982

Reference number: 320

Project title: An investigation oL attrition rates incomputing stvdies at Cffnberra TAFE College

Contact person: Mt D Adams .

Froject status: 3/4 completed

Proposed completion date: End 1982

0

Reference number: 321

Project title: Streaming: a possrle expectation effect

Contact person: mr D AdamsA

Voject status: 3/4 completed

l'roposed'completion date: End 1982

Reference number: 322

Project title: Testing for streaming of secretarial studiesstudents: a factor analytical approach

Contact person: Dr R Lee

Project status: 2/3 completed

Proposed completion date: Early 1983

Reference number: 323

Project title: ACT Further Education graduates destinationssurvey

Contact person: Mr A H Vheoley

Project status: 1/8 completed

Proposed completion date: Feb 1983

se

Page 119: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

AUTHOR Inn

The numbers liated are the project reference numbers

A

Adams, D; 320, 321Adult Migrant Education Centre

- kT;

Anderson, Ron; 150, 155, 177-181

Anderson, Tony; 156Anthony, J; 276Armitage, Joanie; 280Atkinson, D; 273

0

Bachmann, Honor; 126, 130, 131Banks, Mary-Anne; 24Barden, Robert; 291Barnett, Stewart; 193Batchelor College - NT; 4Baynes, B E; 18Beasley, Bev; 3, 314Biggs, B; 262Bishop, ChriA 10, 16Bond, Andrew; 29 .

Bostelman, L; 217Bowen, Bill; 56, 68-75Brady, Paul; 152, 182Brammy, Bruce; 255Bright, A; 34, 35Burge, Mike; 392Butterworth, Perce; 201Byers, Paddy; 11

Carr, Jenny; 129Chapman, B; 258Chawla, 1; 27

Chodkiewicz, Andrew; 189Corbett, J; 269Coughlin, Peter; 308Craig, Alan; 196, 197Crouch, N; 95-97

Dennls, Andrew; 311Dun, Ken; 160

Sllis, Bob; 157, 162Esdale, Peter; 306Everett, Paul; 87-89

F

Fielke, R; 230Fox, A P; 257, 260Fraser, Lois; 308Furber, David; 247, 255, 25,'

267, 268, 283,

Fyffe, 140268

Ganddrton Lois; 309Gardner, Helen; apsGoode, T W; 215Gordon-Smith, hul; 170, 173, ,

175Grannall, Ray; 146Grosvenor, J S; 234, 235

a

Hailstone, D L; 233Haines, Kerry; 17Hardy, Margaret; 46, 47Hartley, Pam; 66, 67Hawke, Geof; 151, 159, 163Haworth, David; 144, 168p 184,.

185

Haysom, I; 298-301Hiirward, R; 210, 211

Hermann, Graham; 317Heys, Margaret; 149Hobbs, Ann; 161Hocking, Helen; 9, 11Hodge, Robert; 249-254Hoult, Peter; 8

Hutchison, Brian; 107

Isherwood, J; 203

J.

Jefferson, M; 214, 226Jones, Neil; 315

Kangur, V; 275, 276Kays, Malcolm; 6Keene, Mel K; 80-85, 100Kemp, R; 267Kerr, Iani.-128r, 132, 135, 139

. Kiely, E; 42 .

Page 120: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

4

I

AUTHOR INDEX

Knobel,,T0m; 98, 101, 103-106Kreisf Kerry; 57-65, 79Kuhl, Dean H; 229-211, 236

Kynoch, Hope; 302

L

La Planche, R;f207Lechlietner, Lee; 247Leduff, G; 232, 239, 277eee, R; 322Lee, Warwick; 26Lewis, Sue; .310

Lothian, A; 231

McCann, Ann; 148Manterfield, D; 15

Mathers, Roger; 241, 284, 288Matheson, David; 174Mathe4s, Coralie; 304, 307May, D; 209Mazzucchelli, R; 221sMcCarthy, John; 236, 256, 258,

260, 265, 267, 268, 275,277

McConchle, E M; 319McCudden, Peter; 303McDonald, T; 202, 204C 205,

212? 213; 222, 2McLaren, Warren; 90-92 0McMahon, prank; 12-14'Meldrum, Bruce; 169, 172, 186Middleton, John; 44, 45Mitohell, D A; 30-33, 36-38Mitchell', John; 285-287Montagbe,.Ann; 135, 137

Mountney, Peter; 39, 43Murphy, D; 261

Nation, Barry; 22Neilson, Ron; 142, 166, 167Nevada, john; 310Newlyn, Doug; 228, 229Nielson, Brice W; 98-101, 104-

106, 115Hutting, Rosamond; 76, 77

0

Oakes, G; 19

O'LearyBrian; 290<-4 Oorloff, Les; 183

- Osborne, M; 5Osman, Ro3emaryh16Owen, James; 19?, 195 1.

Oxenford, R; 102, 112-1114A,

Paisley, I; 209Parkinson, K; 231Parry, J R; 206 tiPartridge, R G; 10 111

Paton, C; 265Pearson, Margot; 158, 176Pfister, Fred; 20Poole, K; 238, 273Pulsford, Tim; 318Putt, Margaret; 133, 138

Pyke, L; 220, 227

Randell, Bob; 218\Raymond, Perry; 236, 266Rhodes, A P; 259, 264, 269t

281, 282fobertsorf, Howard; 116-125Ropp, Fred; 143, 145, 147Rouessart, Delphine; 48-55Rush, Margaret; 154, 191, 198"

Sargent, B; 216Sawyer, G; 277Schilling, R G; 312Seery, John; 40, 41Seidel, K E; 237Sharrock, J N; 36-38Skott, Diana; 317Smith, Bob; 141Smith, G; 289Soo, Vivienne;15'1,

17)

Sparshott, J; 86,

Stacey, Keith; 28Stanley, J; 208Stepan, Iva; 30aSterling, Trevor; 90Stevenson, Graham; 304,

309

Stinson, Gaye; 140Sutherland, R A; 21Swann, Maeve; 302Sweet, J; 224 .

Swinburne Technical College292-297

164,

93,94

165

307

Thorn, Colin; 270, 272Timbs, Judith; 24-26Toman, Frank; 306Tomkinson,.D; 219

.122

Page 121: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

AUTHOR INDEX

0 '

TO03, Bruce; 127, 134

Tudor, /an; 187, 188, 190

V

Veriigan, Graeme;.23von Perger, E; 223

W

Wall, F;298-301Walls, A; 232Walsh, Jim; 7Ward, B J; 240Weatherhead, John; 2, 3Weller, J; 7.8WhWeley, A H; 323Williams, Bob; 271, 274Williams, D; 231Willing, Dick; 242-246; 248,

, 278, 279.

%Wilson, Trevor; 1914, 200

Windsor, 11 L; 263

f Woodburne, Greg; 199Wupdmansee, M E; 18

Jr.

.94

123

V

er

Page 122: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

' ?1111=IIIMMIIRSUBJECT IUDEX

The numbers listed are project reference 71ters

A

Accelerated training; 112ACC033 to education (see also: Bridging Couraea);

243, 302Accountancy; 29, 1790 270, 274 r;

Accreditation; 261, t64, 277', 281, 283-286; 288

Adult educators; 2Agrioultural Needs Analysis; 214Air conditioning; 102, 113, 208Aircraft Engineering; 141 '

Aircraft reohanics; 123Animal Cara Courae; 186 .

Applied Heat and Fluids; 174Aaaeaament ace: Student alseAment, College.-baaed aaaeaamentAasooiate trAploma-codrsea4 08, 98, 104, 109, 168.

Attendanoe patterns; 237; 318,Audio viaual materials; 1b, 17,-40, 224, 228, 290, 291, 295, 296,

303, 310, 316Auatralian Aboriginal education; 2, 5, 46, 77

AUtomotive tl..ade; 25, 117, 118, 121, 124, 141, 209, 257-g60, 282

8, 5? 242,

Baking induatry;.20, 61Batohelor College; 4Biology/Pathology Teohniciana Courae; 157, 185

Block releaae; 217, 237, 318Boat &Wing; 107, 276Boilerpaking see Metal FabricationBridging ooursea tsee alao: Acceaa to education); 52, 195, 242

Building; 7, 25, 80, 84, 221, 222, 231, 239, 275, 277

Building Act; 84 ,

Burnie Community College; 24Buaineas studies (set ale(); Commercial studies); 18, 25, 27, 28,

47, 63, 64, 66, 67, 80, 117, 137, 176, 224, 272, 274

Butchering; 78, 212

Cabinetmaking; 175, 207, 232

Canberra TAFE College; 320Carpentry and joinery; 7, 76% 81, 175, 203, 207, 231Career entry oourses; 32, 42, 44, 45, 47, 52, 53, 60, 64, 74, 76,

81, 82, 88, 91, 100, 101, 110, 234

Cataloging; 24, 310Central West Region - NSW; 126

Ceramics; 55, 187Certificate coursea aee: fechnician couraeaChemistry; 169Child care; 160, 189, 245, 304, 307

Chiropody; 184

CIRSYS: 26Classification; 39, 201, 279, 284Clothing couraes; 19, 76, 161, 200, 206, 248, 305

College based aaaeasment; 31

124

Page 123: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

lID

Colleges see: TAPE collegesCommeroial art; 278Commeroial Studies (see also: Business studies); 25, 63, 66, 224Common skills; 21, 35, 259, 282, 312

Communication skills; 36, 176Community education; 11Companies Act; 177Computer assisted instruction; 222Computer aasisted testing; 6Computer oriented programs; 27, 29, 152, 166, 222, 227, 293, 320

Computer Service Technology; 166Computing industry; 215Cooking Trades; 213Core curriculum see: Hatinal core curriculum, Common skillaCorrespondence study (see also: External study programs); 99Courae evaluation aee also: Course review and speoific subject

area 32, 33, 37, 42, 137,.178, 233-235, 254, 308Course review (acre also: Courpe evaluation and specific subject

area); 7, 27-29, 45, 49, 51, 53-55, 60, 63, 64, 69, 73, 75,

78, 88, 91, 92, 97, 98, 121-123, 125, 142, 144, 149, 153,156, 158, 160, 164, 165, 167, 169-173, 175, 179-186, 202,

205, 207, 211, 213, 219, 221, 239, 244-248, 251, 252, 255,

. 259, 276-278, 280Courses; 9, 39, 41, 65, 201, 249, 201, 283

Credit point system; 283Curriculum development (aee also: Course .aview, Material

development, and specific subject area), 12, 241, 279, 285-

287Curriculum guides; 28, 285-287, 314

'Dairying; 92Date proceasing; 27Day release; 237, 318Declared vocations; 280Diagnostic tests; 6Diploma of Arta; 49Diaabilities; 143, 145, 147, 242, 304

Distance education see: External study programsDrafting; 95, 96, 142, 236, 255, 293

Earthmoving;Educa%Aonal demand; 1, 11, 22, 58, 101, 126-128, 135, 139, 192,

230, 240Educational mobility; 8

Educational planning; 4, 22, 126-128, 132, 135, 138, 192, 199,

302, 319Educational resources see: Material developmentElectrical and Electronic Engineering; 98, 103Electrical Engineering; 106, 167, 216

Electrical trades; 18, 25,-98, 99, 101, 103, 106, 112, 167, 210,

211, 2,6, 261, 263

.41Electronic Meohanics (Business Machines); 18Electrical Jointers; 99Engineering (see also: Electrical engineering, mechanical

engineering); 37, 82, 98, 100, 109, 110, 111, 117, 197

1g1 2 3

Page 124: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

SUBJECT INDEX

assessment,

Engineering Drawing; 15, 266Equipment evaluation; 10, 16Evaluation (see Also: Course evaluation, Student

Institutional evaluation); 2, 9, 13, 17, 38, 199, 237, 295Evaluation methods; 9Extension education; 5 1

External studies materials; 5External study programs; 43, 68Eyre Peninsula Community College; 235

Farming trades (see also: Rural Education); 91,152, 214, 226, 249, 251, 253, 311

92, 119, 151,

Farm technology; 119, 125, 152Fellowship certificate; 103, 109Field studies; 151, 159Fitting and Machining; 112, 114, 125, 131, 162, 163, 165, 217,

218, 227, 236, 266Floral art; 190Floristry; 57, 89, 308Fluid mechanics; 108Food Technology Course; 172Footwear; 71, 76, 228, 229Foundries; 122Furniture trades; 207, 232

Galbally Report (1978); 1

Generic skills see: Common skillsGeology; 116Glossaries; 287, 294, 317Graphic arts; 56, 74

Hairdressing; 50, 193, 246Handicapped aee: Disabilities

Home economics education; 155, 213, 244Horse Husbandry Course; 306Horticulture; 42, 57, 87-89, 190, 252, 308Hospitality; 59, 60, 65, 213, 223Hospital personnel; 58

Hotel and catering courses; 59, 60Hunter Region; 127

Illawarra Report; 134Illumination; 115Immigranta; 1

Individualized inatruction see: Self paced learningIndustrial machine sewing; 147, 228, 229Induatrial relations training; 146Industrial Release Program; 14Inplant prosrams; 191Institutional evaluation; 4Instructional materials; 40

1"126

Page 125: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

SUBJECT INDEX

Instructional aystema; 7, 12Inatrument Fitting; 211

Inatrument Mechanics; 262Insurance; 180Iaolated stiidents; 2, 5, 46, 192Item banka; 28, 50, 141,-163, 174, 220

Jewellery trades; 188

I.

Laboratory technicians; 297Liberal Studies; 53Librariea; 24, 26; 54, 140, 159,Library studies; 54, 309Life Oriented Studies; 158Literacy; 74, 292, 313, 314Looksmitha Trade Course; 198 ,

Machining (see also: Fitting and machining Wood machining); 23,76, 83, 114

Management studies; 63, 80, 85, 176, ro, 181, 205Maritime courses; 44, 45, 70, 1071 120, 256Maatercraftsman; 83, 86, 102, 106, 117Material development (see also specific subject area); 5, 6, 19,

20, 25, 40, 162, 187-190, 193-198, 200, 203, 210, 236, 260,265, 269, 293, 294, 296, 307, 313,

Material-s-Nandling-CoursaT-79-

Mathematics; 6, 74, 292, 316Mechanical Design; 293

Mechanical Engineering (see also:/ttgineering); 109,-225, 265Mechanical Teohnology; 154Mechanics (see also: Automotive trades); 119-121, 124, 125Metal fabrication; 97, 112, 120, 129, 191, 267Metal Finishing Certificate; 171Metallurgy; 170Migrant education; 1, 243Mining; 104, 105, 139, 168, 255Modular courses; 195, 203, 206, 210, 224 236, 258, 290, 291Motor cycles; 121Moulding Trade; 122Mount Druitt; 199

National core curriculum; 70, 97, 203, 238, 250, 257, 263, 267,268, 270-275$ 315

Needs assessment; 35, 58, 81, 129-131,133, 139, 192, 214, 215,229-231, 240, 304

Nomenclature; 39, 201, 284Non destructive testing; 225

Page 126: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

SOLIRCT nem

0

Occupational surveys; 7, 28, 72, 206, 214, 215, 232, 236, 261,

03, 277, 298-301, 308Occupational updating; 3, 14, 67Office studies (see also; Cosmercial studies, Secretarial

studies); 67, 148, 224

Online systems; 24, 26Opticil mechanics; 86

Painting and Decorating; 173, 291Panelbeatihg; 209, 258Part-time students; 41, 57Pastoral studies; 253Pathology Techniciani-Course: see Biofogy Technicians Course

Pattern making; 19, 200Personal Developmant Conrse; 77

Photography; 156Planning Seef Educational planning

Plant Mechanic:sr-144

Plant Operation; 93, 94 -

Pldibing; 10, 16, 25, 133, 238, 273Podiatry; 184Port Augusta College of TAPE; 240Posttrade courses; 56, 75, 83, 86, 102, 106, 117, 118, 212, 219

Pre apprenticeship courses; 136, 138, 211, 219Prevocational education (see also; Career-entry courses, School

to work transition, Transition programa); 48, 77

Prevocational Engineering/Construction Course; 37, 82, 100-Prevocat4rnal-(trads*based)course31_324822_ 100, 234

Printing; 56, 298.301

Reading to Learn; 313, 314Real estate; 68, 69, 178, 202Refresher courses; 3, 14, 67Refrigeration; 102, 113, 164, 196, 208, 264Remote Arta Teacher Education Course; 5Research skills; 13Residential care; 245, 307Resource managiment; 25, 192Resources see: Material developmentRetail Dressmaking course; 161Rural education.(see also: Farming trades); 90, 214, 249, 253

Sales occupations; 57, III .

School to work transition (see also: Transition programs); 32,

33, 48, 51, 77, 90Scottsdale Region; 22Screening tests; 6Secondary school students; 8Second language learning; I

Secretarial Studies; 137, 149, 322Self paced learning; 15, 20, 195, 2C9, 218, 224, 303, 305

1 212 8

Page 127: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

SUBJECT /MX

Set and Property Design; 289gbeariim; 91, 151, 251Sheep and Wool Course (see also: Woololassing); 151, 251Sheetmetal; 133, 153, 219, 268, 269Signwriting; 72, 75, 173, 290Simulation; 148Skill analysis? 23, 36, 119Solar Energy Technician Course; 296Solar heating; 10, 16Special care; 245Spraypainting; 209 .

Staff developsent; 3, 12-14, 313, 314, 316Statewide co-ordinators; 241Streaming; 321, 322Student assessment (see also: Test construction); 6, 30, 31, 34,

37, 50, 151, 159, 208, 217, 220, 271, 294, 322Student attrition; 41, 302, 320Studenta sea: TAFE students, Secondary school studentsStudio Ceramics Couree; 55Study skills; 21, 40Survey; (ties also: Occupational surveys); 1, 43, 114, 136, 302,

323

Swinburne Technical College; 295Swimming pools; 93Sydney South and South West; 128

,Sydney Western corridor; 135

TAFE colleges; 4, 38TAFE course5 see: Courses

---TAFE-atudents; 8, 34, 136TAFE teachers; 3, 12-14Teaoher aides; 46Teacher developed material; 19, 20, 25Teacher education; 5Teachers see: TAFT teachersTeaching guides; 162, 197, 203

Teaching methods; 17, 38, 154, 176, 191, 295Technician courses; 46, 54, 59, 63,

116, 150, 155, 157, 159, 167,

225, 239, 265, 277, 289, 296,Technological advancement; 12, 18,

87, 95, 103,

169, 183-185,

309, 31029, 265

105,

195,

109,

206,115,

221,

Tertiary Education Commiasion; 2, 4Tertiary Orientation Program; 294Test construction (see also: Item banks, Diagnostic tests); 6,

34, 217, 236Textiles; 150Ticketwriting; 73Timber industry; 85, 250Toolmaking; 130Torres Strait Islanders; 46, 77Tourism; 65, 182, 247Tracing; 142Trade oourses; 36

Transition education see: School to 'work transition, Transitionprograms, Career-entry couraea, Prevocational eduoation

Transition programa; 233Transport Administration Courses; 181

129 127

Page 128: Skott, Diana, Crp. TAFE Projects in Progress. No. 1. TAFE ...inforviation for this serie4-as well as Diana Skott for compiling ithe project listing, Giulia Reveruzzi Cor typing the

_

k,Travel. and Tourism Course; 182, 247

V

Veterinary training; 310

W.

Welfare Work Certificate Course; 183Nelding; 143, 220Wine industry; 230, 254Wood machining; 23, 83, 207Woolclassing; 226, 251Wool coupes; 451Word processing; 62, 204, 224Work experience programs; 48

128