skku lab - meeting
DESCRIPTION
SKKU Lab - Meeting. SKKU Lab-meeting, 05 .March.2014 Dong- hyun Kim on behalf of the cern-904 team Department of physics, sungkyunkwan university, korea. Content. 1. Status of Korea-Chambers 2. Plan 3. Status of Data-analysis 4. Plan. 1. Status of Korea-Chambers. - PowerPoint PPT PresentationTRANSCRIPT
1
SKKULab - MeetingSKKU LAB-MEETING, 05.MARCH.2014
DONG-HYUN KIM ON BEHALF OF THE CERN-904 TEAM
DEPARTMENT OF PHYSICS, SUNGKYUNKWAN UNIVERSITY, KOREA
3 1. Status of Korea-Chambers Built a 1st Chamber( waiting to Cosmic-ray test)
No Part Number
1 Gaps BO77 / TW088 / TN073
2 Cooling Circuit RE42-080-27112013-1400h.plw
3 Front End Board A-10385 / B-10367 / C-10569
4 Adapter Board A-00571,00572 / B-00574,00573 / C-00575,00576
5 Distrib. Power 00148
51. Status of Korea-Chambers 1st Chamber Leak test results
0.15 mbar0.2 mbar
< Top – part > < Bottom – part >
7 1. Status of Korea-Chambers
Proceed construction - 2nd & 3rd Chambers with Bottom gap
< BO78 & BO80 Leak Test graph > < BO78 & BO80 Dark current Test graph >
82. Plan
Cosmic-ray test with 1st Korea-Chamber
Start build 2nd & 3rd Chamber with Bottom gap on today
Next week, provide QC4 with 3 Chambers
( Until 7.March provide 1st chamber
Until 12.March provide 2nd & 3rd chamber )
93. Status of Data-Analysis
W boson study
Search MC data samples( 13TeV )- Pythia 6 & pythia 8
- dataset=/*WToMuNu*13TeV_pythia*/*/*AOD*
- PYTHIA 6: /WToMuNu_TuneZ2star_13TeV-pythia6/Summer13dr53X-PU25bx25_START53_V19D-v1/AODSIM
-> Download has a problem (Tier1 site)
- PYTHIA 8: /WToMuNu_Tune4C_13TeV-pythia8/Fall13dr-tsg_PU20bx25_POSTLS162_V2-v1/AODSIM
-> Download