Sixth Northwest Conservation & Electric Power Plan
Proposed Wind Plant Capital Cost Assumption
Jeff KingNorthwest Power and Conservation Council
Portland, OR
August 21, 2008
August 21, 2008 2Northwest
Power andConservation
Council
NorthwestPower andConservation
Council
Wind resource cost elements
• Capital costWind plant development and construction cost (uniform)
Transmission development and construction cost (WRA-specific)
• Operating costsFixed wind plant operation and maintenance (uniform)
Fixed transmission operation and maintenance (WRA-specific)
Variable wind plant operation and maintenance (uniform)
Variable transmission operation and maintenance (WRA-specific)
• System integration costsRegulation & load following
Storage & shaping
August 21, 2008 3Northwest
Power andConservation
Council
NorthwestPower andConservation
Council
Windpower Cost Assumptions(2006 dollar values)
5th Plan
(2004)
Biennial Report (2006)
Preliminary 6th Plan
(Q1 2008)
Proposed 6th Plan
Overnight wind plant development and construction cost ($/kW)
$1170 $1500 $1650 $1950
Transmission ($/kW/yr) $23 Unchanged $20 To be addressed at later GRAC
Fixed O&M ($/kW/yr) $23 $30 $22 To be addressed at later GRAC
Learning effects on real fixed costs (20 yr average)
-2%/yr None in near-term
See following slide
To be revisited at later GRAC
Variable O&M ($/MWh) $1.16 $1.50 $1 To be addressed at later GRAC
Regulation & Load-following ($/MWh)
$5.20 - 11.20 Unchanged $5.10 - 10.90 Initial discussion to
follow
August 21, 2008 4Northwest
Power andConservation
Council
NorthwestPower andConservation
Council
Preliminary thinking on forecast construction cost escalation (to be revisited at later GRAC)
0
200
400
600
800
1000
1200
1400
2005 2010 2015 2020 2025 2030
Vintage of construction contract (YOL-1)
Over
nig
ht
con
stru
ctio
n c
ost
(2
006$
/kW
)Escalation continues at declining rate through 2009; levels off 2010 - 11
Real costs decline to ~ 130% of 2004 values 2012 - 15
Recent cost escalation
2015 > Resumption of historical real cost reduction
August 21, 2008 5Northwest
Power andConservation
Council
NorthwestPower andConservation
Council
Normalizing reported plant costs
• NPCC database contains reported plant costs (estimates or completion costs) for 36 WECC projects totalling 4450 MW. 2001- present
• Reported costs were normalized to "overnight" 2006 dollar valuesUnless otherwise stated, reported costs are assumed to be construction costs less project
development cost and financing fees.
The cost vintage is assumed to be the year reported or, for completion costs, the beginning of 12 mo construction period (one year prior to service year)
Overnight (instantaneous) construction cost were backcast using appropriate financing (COU, IOU, IPP) with the Council's MICROFIN model.
Project development cost of 1.3% of total capital cost was added to the estimate
• Capacity-correlation:Slight (12%) negative correlation of cost to project capacity was observed
Capacity-weighting was approximated by rounding to nearest 100 MW and plotting each 100 MW multiples separately.
August 21, 2008 6Northwest
Power andConservation
Council
NorthwestPower andConservation
Council
Normalized utility-scale wind project cost
R2 = 66%
$1,000
$1,200
$1,400
$1,600
$1,800
$2,000
$2,200
$2,400
1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Year of estimate
Ove
rnig
ht
con
stru
ctio
n c
ost
(20
06$/
kW) Proposed 6th Plan draft: $1950/kW
"Overnight", 2006$, 2009 service
5th Plan
Biennial Assessment
Prelim 6th Plan
August 21, 2008 7Northwest
Power andConservation
Council
NorthwestPower andConservation
Council
Other recent surveys and estimatesCEC Comparative Costs of California
Central Station Electricity Generation Technologies
Jun 07 $1900 "Instant" cost, 2006$
EPRI Engineering & Economic Evaluation of Renewable Energy Technology
Jun 07 $2039 100 MW Total plant (overnight) cost, Dec 06 $
LBL Annual Report on U.S. Windpower Installation, Cost and Performance Trends: 2006
May 07 $1480 (range $1150 - 2240)
Reported costs, 16 U.S. projects, 1326 MW
LBL Annual Report on U.S. Windpower Installation, Cost and Performance Trends: 2007
May 08 $1710 (range $1240 - 2600)
Reported costs, 16 U. S. projects, 7600 MW ($1660 in 2006$)
USDOE 20% Wind Energy by 2030 May 08 $1650 2006$, overnight (Black & Veatch)
Windpower Monthly
Annual power cost comparison Jan 07 €1175 ($1490 @ 1.27)
Reported costs, 40 global projects, 3400 MW
Windpower Monthly
Annual power cost comparison Jan 08 €1300 ($1755 @ 1.35; range $1439 - 2068)
Reported costs, 40 global projects, 3000 MW
August 21, 2008 8Northwest
Power andConservation
Council
NorthwestPower andConservation
Council
Comparison to other surveys & estimates
R2 = 66%
$1,000
$1,200
$1,400
$1,600
$1,800
$2,000
$2,200
$2,400
1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Year of estimate
Ove
rnig
ht
con
stru
ctio
n c
ost
(20
06$/
kW)
WM
LBL
DOE
WM
LBL
EPRI
CECProp. Dft 6th Pln