Site selection and setting out
Biogas ToT Course
May 10 – 15, Kampala, Uganda
![Page 2: Site selection and setting out Biogas ToT Course May 10 – 15, Kampala, Uganda](https://reader036.vdocuments.us/reader036/viewer/2022062511/55168c1b550346a2698b623c/html5/thumbnails/2.jpg)
Biogas Practice AreaBiogas Practice AreaBiogas Practice AreaSite selection
Main considerations
• Easy construction works– Water logging– Rock
• Minimum construction cost• Easy operation and maintenance
– Feeding– Use of main gas valve– Composing and use of slurry– Checking of gas leakage– Draining condensed water from pipeline.
• The site should guarantee plant safety
![Page 3: Site selection and setting out Biogas ToT Course May 10 – 15, Kampala, Uganda](https://reader036.vdocuments.us/reader036/viewer/2022062511/55168c1b550346a2698b623c/html5/thumbnails/3.jpg)
Biogas Practice AreaBiogas Practice AreaBiogas Practice AreaSite requirements I
• Constant, high ambient temperature• Even and smooth surface• Slightly in elevated than the surrounding• Close to:
– dung collection point– water point– gas application point
• 2 meter away from foundations• Space for plant and compost-pit• Away from wells to avoid ground water pollution
![Page 4: Site selection and setting out Biogas ToT Course May 10 – 15, Kampala, Uganda](https://reader036.vdocuments.us/reader036/viewer/2022062511/55168c1b550346a2698b623c/html5/thumbnails/4.jpg)
Biogas Practice AreaBiogas Practice AreaBiogas Practice AreaSite requirements II
• Sufficient distance to trees• Adequate distance from main trail or unsafe areas• Good bearing capacity of soil• Limited space: cattle shed on top of the plant after
proper backfill• Reasonably far from any machine producing
vibration on soil
![Page 5: Site selection and setting out Biogas ToT Course May 10 – 15, Kampala, Uganda](https://reader036.vdocuments.us/reader036/viewer/2022062511/55168c1b550346a2698b623c/html5/thumbnails/5.jpg)
Biogas Practice AreaBiogas Practice AreaBiogas Practice AreaSetting out
![Page 6: Site selection and setting out Biogas ToT Course May 10 – 15, Kampala, Uganda](https://reader036.vdocuments.us/reader036/viewer/2022062511/55168c1b550346a2698b623c/html5/thumbnails/6.jpg)
Biogas Practice AreaBiogas Practice AreaBiogas Practice AreaSetting out
![Page 7: Site selection and setting out Biogas ToT Course May 10 – 15, Kampala, Uganda](https://reader036.vdocuments.us/reader036/viewer/2022062511/55168c1b550346a2698b623c/html5/thumbnails/7.jpg)
Biogas Practice AreaBiogas Practice AreaBiogas Practice AreaLay-out example
Digester OutletInlet
Slurry Pit
Slurry Pit
Toilet
![Page 8: Site selection and setting out Biogas ToT Course May 10 – 15, Kampala, Uganda](https://reader036.vdocuments.us/reader036/viewer/2022062511/55168c1b550346a2698b623c/html5/thumbnails/8.jpg)
Biogas Practice AreaBiogas Practice AreaBiogas Practice AreaReference line
Reference line30 – 50cm above
ground level
> 20 cm
30 cm