A case illustrates how Manufacturing Execution Systems enable a manufacturer to keep track of the production progress and contribute to an optimized execution on the workfloor. A vision is posted on two possible future orientations of MES systems which lead to optimized and self-organizing execution on the shop floor.TRANSCRIPT
![Page 1: Sirris manufacturingday2011 future-of-mes-sirris](https://reader033.vdocuments.us/reader033/viewer/2022042714/54bd832e4a795948698b46d5/html5/thumbnails/1.jpg)
het collectief centrum van de Belgische technologische industrie
The future of Smart Manufacturing Execution
![Page 2: Sirris manufacturingday2011 future-of-mes-sirris](https://reader033.vdocuments.us/reader033/viewer/2022042714/54bd832e4a795948698b46d5/html5/thumbnails/2.jpg)
Positioning of MES systems(Manufacturing Execution Systems)
10-5-2011© Sirris | www.sirris.be | [email protected] | 2
Level 4
Level 3
Level 0, 1, 2
Business Management
Production Management(Resource Mgt,
Production Planning,…)
ProductionControl & Automation
ERP/MRP
Advanced Planning & Scheduling
PLC/ SCADA
MES Systems
MES Systems / APS integration
Feedback from Workfloor
![Page 3: Sirris manufacturingday2011 future-of-mes-sirris](https://reader033.vdocuments.us/reader033/viewer/2022042714/54bd832e4a795948698b46d5/html5/thumbnails/3.jpg)
Best Practice for Production Planning & Execution
10-5-2011© Sirris | www.sirris.be | [email protected] | 3
Customer- orders / forecast
ExecutionOptimises for
setups, nestings, colors, …
Planning Execution
Self organizingExecution system
Limited Work- In- Process= known lead time !
ERP MES/APS
METHODS
TOOLS
![Page 4: Sirris manufacturingday2011 future-of-mes-sirris](https://reader033.vdocuments.us/reader033/viewer/2022042714/54bd832e4a795948698b46d5/html5/thumbnails/4.jpg)
Customer- orders / forecast
ExecutionOptimises for
setups, nestings, colors, …
Planning Execution
Self organizingExecution system
Limited Work- In- Process= known lead time !
MES/APS
Best Practice for Production Planning & Execution
10-5-2011© Sirris | www.sirris.be | [email protected] | 4
ERP
METHODS
TOOLS
![Page 5: Sirris manufacturingday2011 future-of-mes-sirris](https://reader033.vdocuments.us/reader033/viewer/2022042714/54bd832e4a795948698b46d5/html5/thumbnails/5.jpg)
Difference Push - Pull
• A PUSH system plans production based on demand: it doesn’tlimit Work-In-Process. It’s allowed to keep adding (releasing) production orders
• A PULL system authorizes production based on system status: itDOES limit Work-In-Process
10-5-2011© Sirris | www.sirris.be | [email protected] | 5
M1 M2 M3
M1 M2 M3
Push
Pull
M1 M2 M3
M1 M2 M3
Push
Pull
![Page 6: Sirris manufacturingday2011 future-of-mes-sirris](https://reader033.vdocuments.us/reader033/viewer/2022042714/54bd832e4a795948698b46d5/html5/thumbnails/6.jpg)
GAP between Best Practices and Tools
• METHODS advise us to use PULL / Self Organizing systems
Until now no support within existing TOOLS
• Existing TOOLS for Advanced Planning & Scheduling withinMES (~ Finite Schedulers) are still PUSH systems
Because of variability in production a schedule can becomeinvalid from the moment it is released…
Implementations often fail
10-5-2011© Sirris | www.sirris.be | [email protected] | 6
![Page 7: Sirris manufacturingday2011 future-of-mes-sirris](https://reader033.vdocuments.us/reader033/viewer/2022042714/54bd832e4a795948698b46d5/html5/thumbnails/7.jpg)
APS & Finite Scheduling
• Only with help from BUFFER MANAGEMENT*, it is possible to make a scheduler work: using the right amount of time orcapacity buffer drastically increases delivery reliability
* Buffer Management: defining optimal combination of three buffers, time, capacity and inventory
10-5-2011© Sirris | www.sirris.be | [email protected] | 7
Aantal orders ~ levertijd
![Page 8: Sirris manufacturingday2011 future-of-mes-sirris](https://reader033.vdocuments.us/reader033/viewer/2022042714/54bd832e4a795948698b46d5/html5/thumbnails/8.jpg)
APS & Finite Scheduling
• Using APS & Finite Planning/Scheduling does not exclude the implementation of a Self Organizing PULL system on the workfloor:
Finite capacity Planning/Scheduling can be used also ‘in front of the wall’ (Planning level) for creating a valid plan and fororder promising towards customers
10-5-2011© Sirris | www.sirris.be | [email protected] | 8
Customer-orders / forecast
ExecutieOptimaliseert
ifv. setups, nestings, kleuren, …
Planning Executie
Self organizingExecution system
Limited Work-In-Process= known lead time !
![Page 9: Sirris manufacturingday2011 future-of-mes-sirris](https://reader033.vdocuments.us/reader033/viewer/2022042714/54bd832e4a795948698b46d5/html5/thumbnails/9.jpg)
Two future development paths for MES
1. Adding IT support for Self Organizing Pull systems to MES(Project Aldiss, De Clercq Solutions; Bosch Scharnieren)
2. Intelligent Holonic Manufacturing Execution System (HMES) based on exploring agents ‘ants’(K.U.Leuven, Paul Valckenaers, setting up O&O project with Sirris)
10-5-2011© Sirris | www.sirris.be | [email protected] | 9
![Page 10: Sirris manufacturingday2011 future-of-mes-sirris](https://reader033.vdocuments.us/reader033/viewer/2022042714/54bd832e4a795948698b46d5/html5/thumbnails/10.jpg)
1. MES and Pull Systems (Project Aldiss, De Clercq Solutions)
• Adding IT support to Self Organizing Pull systems at production execution level
• Easily defining Work-In-Process loops and WIP limits withinERP/MES system
10-5-2011© Sirris | www.sirris.be | [email protected] | 10
A 1 B 1
C 1
C 2
A1
B1
B1
C1
B1
C2
B1
C2
B1
C1
B1
C1
![Page 11: Sirris manufacturingday2011 future-of-mes-sirris](https://reader033.vdocuments.us/reader033/viewer/2022042714/54bd832e4a795948698b46d5/html5/thumbnails/11.jpg)
MES and Pull Systems (Bosch Scharnieren, monitoring system with touch screens)
• Adding algorithms for order mixing and balancing of production system
• Monitoring system at IT level on top of Polca / Conwip / Polwip card system – Allows for ‘behind the screens’ mixing of order sequence)
10-5-2011© Sirris | www.sirris.be | [email protected] | 11
+
![Page 12: Sirris manufacturingday2011 future-of-mes-sirris](https://reader033.vdocuments.us/reader033/viewer/2022042714/54bd832e4a795948698b46d5/html5/thumbnails/12.jpg)
2. Holonic Manufacturing Execution System(HMES - K.U.Leuven, Paul Valckenaers)
10-5-2011© Sirris | www.sirris.be | [email protected] | 12
• Agents explore all possible routings/solutions for productionexecution and an optimal solution is then selected.
• Based on distributed interactive simulation models of all resources – More robust compared to one single simulationmodel of the whole.
![Page 13: Sirris manufacturingday2011 future-of-mes-sirris](https://reader033.vdocuments.us/reader033/viewer/2022042714/54bd832e4a795948698b46d5/html5/thumbnails/13.jpg)
Holonic Manufacturing Execution System(HMES - K.U.Leuven, Paul Valckenaers)
10-5-2011© Sirris | www.sirris.be | [email protected] | 13
Level 4
Level 3
Level 0, 1, 2
Business Management
Production Management(Resource Mgt,
Production Planning,…)
ProductionControl & Automation
ERP/MRP
Advanced Planning & Scheduling
PLC/ SCADA
IntelligentHMESSched.Tool
![Page 14: Sirris manufacturingday2011 future-of-mes-sirris](https://reader033.vdocuments.us/reader033/viewer/2022042714/54bd832e4a795948698b46d5/html5/thumbnails/14.jpg)
Which system for your company?
10-5-2011© Sirris | www.sirris.be | [email protected] | 14
• Analysis based on Production Screening
• Proven methodology from Buffer Management Research Project and Industrial Cases for Self – Organizing Pull Systems
![Page 15: Sirris manufacturingday2011 future-of-mes-sirris](https://reader033.vdocuments.us/reader033/viewer/2022042714/54bd832e4a795948698b46d5/html5/thumbnails/15.jpg)
Contact
Mark Van PeeSirris – Advanced ManufacturingTel: +32 498 91 93 [email protected]
10-5-2011© Sirris | www.sirris.be | [email protected] | 15