Project Title:
“QIP to Optimize DC Backup for OPEX Saving”
Intern: Kashif Amanat Supervisor: Muhammad Hassan 24th Aug, 2015
![Page 2: SIP Project Presentation - Copy](https://reader034.vdocuments.us/reader034/viewer/2022052313/58ee29971a28ab53738b465b/html5/thumbnails/2.jpg)
Abstract
Introduction to C-II Introduction to Project DeliverablesConclusion
![Page 3: SIP Project Presentation - Copy](https://reader034.vdocuments.us/reader034/viewer/2022052313/58ee29971a28ab53738b465b/html5/thumbnails/3.jpg)
Introduction to Project
QIP to Optimize DC Backup for OPEX Saving
Methods and Measures Used Importance of DC Backup OPEX Saving Distribution of the Project into Deliverables
![Page 4: SIP Project Presentation - Copy](https://reader034.vdocuments.us/reader034/viewer/2022052313/58ee29971a28ab53738b465b/html5/thumbnails/4.jpg)
Deliverable 1
TITLEData to be Compiled for Each Site in C-II with
Site Status/Dependents
Data Compilation Introduction to The Servers
![Page 5: SIP Project Presentation - Copy](https://reader034.vdocuments.us/reader034/viewer/2022052313/58ee29971a28ab53738b465b/html5/thumbnails/5.jpg)
Deliverable 1 (cont.)
Introduction to M2000
![Page 6: SIP Project Presentation - Copy](https://reader034.vdocuments.us/reader034/viewer/2022052313/58ee29971a28ab53738b465b/html5/thumbnails/6.jpg)
Deliverable 2
TITLEEnsure Uniform availability of BB on all Urban Sites with Healthy DGs. Also ensure Intelligent
timer's operation where PTML independent
Site Visits Intelligent Timer
![Page 7: SIP Project Presentation - Copy](https://reader034.vdocuments.us/reader034/viewer/2022052313/58ee29971a28ab53738b465b/html5/thumbnails/7.jpg)
Deliverable 3
TITLE Identify weak backup along with the options to
swap BB
BB (Battery Backed-up) Issues Monitoring of Weak Backup
on the server
![Page 8: SIP Project Presentation - Copy](https://reader034.vdocuments.us/reader034/viewer/2022052313/58ee29971a28ab53738b465b/html5/thumbnails/8.jpg)
Deliverable 3 (cont.)
Reasons and Effects of Low Battery Voltages
Battery Voltage Level
BTS position
-53V to -47V The site runs normally
-46V The site gives Low Battery Voltage Alarm, and most of the times, the BTS itself is down but if it is a HUB site, it maintains the ongoing traffic
-43.5V At this level the BTS is completely on outage i.e. MW links are also Disabled
![Page 9: SIP Project Presentation - Copy](https://reader034.vdocuments.us/reader034/viewer/2022052313/58ee29971a28ab53738b465b/html5/thumbnails/9.jpg)
Deliverable 4TITLE
Major HUB, PTCL Guest, DC Shared, Low Voltage Area, Problematic Owner, Fuel theft etc... sites to
be secured for better availability
Priority of Sites Importance of Healthy DG’s and BB on Priority Basis
![Page 10: SIP Project Presentation - Copy](https://reader034.vdocuments.us/reader034/viewer/2022052313/58ee29971a28ab53738b465b/html5/thumbnails/10.jpg)
QIP Proposal
Current Power Problems in Telecom Sector
Power availability is a major challengeRural areas conventional grid power not available (Sahiwal: 4531)Wherever WAPDA supply is available, power quality is poor and erraticPower availability is less than 12 hours a day in rural areas and up to 18 hours in urban areas
![Page 11: SIP Project Presentation - Copy](https://reader034.vdocuments.us/reader034/viewer/2022052313/58ee29971a28ab53738b465b/html5/thumbnails/11.jpg)
QIP Proposal (contd.)
Backup Plans for Maintaining Continual Service
DG Set+ Its LimitationsNumber of BTS sites in C-II
929
DG Diesel Consumption
~= 2.75Litres/hour
DG running hours 8-12 hours/ day if BB is not available
1 liter diesel emits 2.68kg of CO2
![Page 12: SIP Project Presentation - Copy](https://reader034.vdocuments.us/reader034/viewer/2022052313/58ee29971a28ab53738b465b/html5/thumbnails/12.jpg)
QIP Proposal (contd.)
Backup Plans for Maintaining Continual Service
Inverter Battery Backup (BB) + Its Limitations
![Page 13: SIP Project Presentation - Copy](https://reader034.vdocuments.us/reader034/viewer/2022052313/58ee29971a28ab53738b465b/html5/thumbnails/13.jpg)
QIP Proposal (contd.)
Alternate Power Solutions(Importance)
![Page 14: SIP Project Presentation - Copy](https://reader034.vdocuments.us/reader034/viewer/2022052313/58ee29971a28ab53738b465b/html5/thumbnails/14.jpg)
QIP Proposal (contd.)Alternate Power Solutions
Solar Photo Voltaic (SPV)Wind Turbine GeneratorFuel CellsBio MassHybrid Solutions
![Page 15: SIP Project Presentation - Copy](https://reader034.vdocuments.us/reader034/viewer/2022052313/58ee29971a28ab53738b465b/html5/thumbnails/15.jpg)
QIP Proposal (contd.)
Suitable Energy Resource for C-II
Solar Energy???
![Page 16: SIP Project Presentation - Copy](https://reader034.vdocuments.us/reader034/viewer/2022052313/58ee29971a28ab53738b465b/html5/thumbnails/16.jpg)
QIP Proposal (contd.)How SPV Cells Can Help to get
High CAPEX & Low OPEX?
1KWp SPV cell generates 3.5 to 4 kWh/dayArea Required for installation: 10-12 sq mt /Kwp SPVNo maintenance required (only cleaning of panels is necessary)Cost of Installation: $2000/KWpLife up to 25 Years Payback period: approximately 4 years
![Page 17: SIP Project Presentation - Copy](https://reader034.vdocuments.us/reader034/viewer/2022052313/58ee29971a28ab53738b465b/html5/thumbnails/17.jpg)
QIP Proposal (contd.)
Case study
There are Solar Powered Sites in Pakistan such as in Bahawalpur, C-III.Site 5338 in C-II
is solar powered The Case Study
Presented here is
from Indian State
Karnataka.
![Page 18: SIP Project Presentation - Copy](https://reader034.vdocuments.us/reader034/viewer/2022052313/58ee29971a28ab53738b465b/html5/thumbnails/18.jpg)
QIP Proposal (contd.)
Case study Site Description
![Page 19: SIP Project Presentation - Copy](https://reader034.vdocuments.us/reader034/viewer/2022052313/58ee29971a28ab53738b465b/html5/thumbnails/19.jpg)
QIP Proposal (contd.)Case study(Installation)
![Page 20: SIP Project Presentation - Copy](https://reader034.vdocuments.us/reader034/viewer/2022052313/58ee29971a28ab53738b465b/html5/thumbnails/20.jpg)
QIP Proposal (contd.)Case study(OPEX Comparison)
![Page 21: SIP Project Presentation - Copy](https://reader034.vdocuments.us/reader034/viewer/2022052313/58ee29971a28ab53738b465b/html5/thumbnails/21.jpg)
QIP Proposal (contd.)Case study(Pay Back Period)
![Page 22: SIP Project Presentation - Copy](https://reader034.vdocuments.us/reader034/viewer/2022052313/58ee29971a28ab53738b465b/html5/thumbnails/22.jpg)
QIP Proposal (contd.)
Conclusions from The Case Study To what extent is this possible to introduce the same in C-II sites?
![Page 23: SIP Project Presentation - Copy](https://reader034.vdocuments.us/reader034/viewer/2022052313/58ee29971a28ab53738b465b/html5/thumbnails/23.jpg)
Conclusion
Importance of QIP Converting Solar Energy to Electricity,
Remarkable Solution in Remote Sites SPV’s, A solution to Increasing Carbon in Air Low OPEX of SPV installation makes it
Attractive for Telecom Sector But Operators Look for Incentives from the Government due to High CAPEX of its Installation
OPEX vs. CAPEX
![Page 24: SIP Project Presentation - Copy](https://reader034.vdocuments.us/reader034/viewer/2022052313/58ee29971a28ab53738b465b/html5/thumbnails/24.jpg)