SLIDE 2• Contents
• WHY IS MAINTENANCE IMPORTANT IN DESIGN?
• PROJECT BACKGROUND
• DESIGN CONSIDERATIONS
• DEVELOPED CONDITIONS FLY OVER
• SPECIAL DESIGN CONSIDERATIONS FOR MAINTENANCE
• QUESTIONS?
![Page 3: Simpson Street Stormwater Management System](https://reader031.vdocuments.us/reader031/viewer/2022012301/61e1902e72ce9639d95d42df/html5/thumbnails/3.jpg)
• Different ways to
design infrastructure
• Great engineering
design &
construction
• Failure in
performance
• Maintenance
![Page 4: Simpson Street Stormwater Management System](https://reader031.vdocuments.us/reader031/viewer/2022012301/61e1902e72ce9639d95d42df/html5/thumbnails/4.jpg)
SLIDE 4• Maintenance in early stages
• Communication with asset owners and stakeholders
• Understanding of the limitations and capacities
• Understanding of the design preferences
• Preparation of the maintenance plan
• Simplifying the proposed infrastructure where possible
![Page 5: Simpson Street Stormwater Management System](https://reader031.vdocuments.us/reader031/viewer/2022012301/61e1902e72ce9639d95d42df/html5/thumbnails/5.jpg)
SLIDE 5• Project Background
• Potential Failure of Simpson Street Tunnel
• Flood Protection
• Stormwater Harvesting and Supply to WRC
• Stages of Works
![Page 6: Simpson Street Stormwater Management System](https://reader031.vdocuments.us/reader031/viewer/2022012301/61e1902e72ce9639d95d42df/html5/thumbnails/6.jpg)
••
SLIDE 6SLIDE 6
Simpson Street
Tozer Road and
Channel
Russel Creek
Existing Racecourse Outlet
Park Street Drainage Outlet
Racecourse Outlet
Joining the Creek
Racecourse Internal
Drainage
![Page 7: Simpson Street Stormwater Management System](https://reader031.vdocuments.us/reader031/viewer/2022012301/61e1902e72ce9639d95d42df/html5/thumbnails/7.jpg)
SLIDE 7• Design and Construction Stages
• Simpson Street Tunnel lining & protection
• Construction of box culvert under the
race track
• Construction of retarding basin &
associated infrastructure to cater for
existing catchment plus 24ha diverted
catchment
• Extension of retarding basin to cater for
additional 61ha
![Page 8: Simpson Street Stormwater Management System](https://reader031.vdocuments.us/reader031/viewer/2022012301/61e1902e72ce9639d95d42df/html5/thumbnails/8.jpg)
SLIDE 8• Design Considerations
• Diversion of runoff towards the retarding basin via pit and pipe
• Diversion of low-flow towards the sediment basin
• Diversion of 10% AEP flow to the retarding basin
• Management of 1% AEP overland flow-path
• Consideration of an emergency backup to avoid overflow on the
race track
• Maintenance of Park Street drainage
![Page 9: Simpson Street Stormwater Management System](https://reader031.vdocuments.us/reader031/viewer/2022012301/61e1902e72ce9639d95d42df/html5/thumbnails/9.jpg)
SLIDE 9•
Sediment Basin
Retarding Basin
Park St Swale
Tozer Road Swale
Storage Pond
Bypass SwaleSump
Designed infrastructure
• pipes & pits system
• The flowrate up to 10%AEP will be
diverted towards the retarding basin
• The flowrate higher than 10% AEP
will be directed to the Tozer Road
channel
• Sediment basin will cater for the flow
up to 3mnts (95% AEP)
• Higher flow, up to 10% AEP will be
directed to the Retarding Basin
• The existing outlet will cater for the
flow discharging from Park Street
drainage system and the Retarding
Basin
![Page 10: Simpson Street Stormwater Management System](https://reader031.vdocuments.us/reader031/viewer/2022012301/61e1902e72ce9639d95d42df/html5/thumbnails/10.jpg)
SLIDE 10• Developed Conditions Fly Over
![Page 11: Simpson Street Stormwater Management System](https://reader031.vdocuments.us/reader031/viewer/2022012301/61e1902e72ce9639d95d42df/html5/thumbnails/11.jpg)
SLIDE 11SLIDE 11
Special Design Considerations for Maintenance
![Page 12: Simpson Street Stormwater Management System](https://reader031.vdocuments.us/reader031/viewer/2022012301/61e1902e72ce9639d95d42df/html5/thumbnails/12.jpg)
SLIDE 12• Maintenance considerations
• Automatic diversion with minimum manual involvement
• Self cleaning factors
• Simplicity
• Safety
• Cost effectiveness
![Page 13: Simpson Street Stormwater Management System](https://reader031.vdocuments.us/reader031/viewer/2022012301/61e1902e72ce9639d95d42df/html5/thumbnails/13.jpg)
SLIDE 13• Key Elements & Proposed Layout Plan
Junction pit 5
Junction pit 4
![Page 14: Simpson Street Stormwater Management System](https://reader031.vdocuments.us/reader031/viewer/2022012301/61e1902e72ce9639d95d42df/html5/thumbnails/14.jpg)
SLIDE 14• Conclusion
• The goal of designing an infrastructure is to be able to use it when is required.
• Evolution of design vs construction/maintenance cost.
• Auto diversion of runoff reduces the risk of wash out during a major event.
• Communication with the relevant stakeholder and infrastructure owner.
• Considering the constructability & maintainability of the proposed infrastructure.
• Analysis of design safety.