simon turner presentation v1 finance asia › assets › presentations...take over end of life 1....
TRANSCRIPT
The Good: how can an IE maximise project value through knowledge of entire project life-cycle?
The Bad: What are the risks of investing in PV?
The Ugly: What can go wrong on projects?
6
Project Lifecycle
Development Construction Operation
Financial Investment Decision
Due Diligence Analysis
PlanningCommercial
Advisory
ProjectManagement /
Owners Engineering
AssetManagement
Feasibility Technical Advisory
ConstructionMonitoring
PerformanceOptimization
Take Over End of Life
1. Resource/Yield
2. Grid
3. Permitting/Land
4. Technology
5. Participants
6. Agreements
Risk Categories
natural energy insight
1. Resource/Yield
2. Grid
3. Permitting/Land
4. Technology
5. Proponents
6. Agreements
Risk Categories
natural energy insight
Risk Mitigants
natural energy insight
Contractual
Technological
Financial
11
ON SITE DATA MEASUREMENTS
ON SITE DATA MEASUREMENTS
Why important?
– Necessary to measure performance– Ability to claim LDs due to underperformance– Ability to capture upside– Ongoing management of plant
PERFORMANCE RATIO
�� % ����������������� �� � � 1 ��
� ��
������������������ �� �� �� � ������������ �� �
STATS
• >500MW• 100+ projects• 18 Contractors• 17 modules• 11 inverters
DATA
MONTHLY PERFORMANCE RATIO
ODE TO DR. HANS
• PRs vary widely depending on:– Design/Technology, – Sunshine, – Temperature, – Site, – Data Quality, – Availability, – Maintenance Regime
CONCLUSIONS
How to ensure PR is close to yield study:• Tight contractual guarantees (PR, availability, O&M
Contract)• High quality equipment/warranties• High quality design and installation• Suitable commissioning and testing procedures• Accurate monitoring
20
Thank You!