DIGITAL INPUT OUTPUT LIST
HHR‐1 PACU 1A & 1B (380KV GIS Building) DI DO AI AO Filter Dirty Status 3 Fire Alarm Control Panel 1 Return Air Damper Status 2 Return Air Damper CMD 2 SCADA 1 Compressor 1&2 Trip Status 4 Compressor 1&2 CMD 4 Heater Trip Status 2 Heater Trip CMD 6 Supply Fan Trip Status 2 Supply Fan CMD 2 Supply Fan Flow Status 2 Supply Air Damper Status 2 Supply Air Damper CMD 2 Supply Air Temperature 1 Return Air Temperature 1 Fire Smoke Dampers Status 1 Fire Smoke Dampers CMD 1
Cable Tunnel‐1 under 380KV GIS Supply Fan and Exhaust Fan Supply Fan Trip Status 2 Supply Fan CMD 2 Supply Fan Flow Status 2 Exhaust Fan Trip Status 2 Exhaust Fan CMD 2 Room Temperature 1 Humidity Sensor 1
26 21 4 0
Total With 20% Spare 31 25 5 0
PACU 2A & 2B (380KV GIS Building) DI DO AI AO Filter Dirty Status 3 Fire Alarm Control Panel 1 Return Air Damper Status 2 Return Air Damper CMD 2 SCADA 1
![Page 2: Signal List Al-fanar Project HHR-1 to HHR-6](https://reader034.vdocuments.us/reader034/viewer/2022050809/55cf94b6550346f57ba3ed96/html5/thumbnails/2.jpg)
Compressor 1&2 Trip Status 4 Compressor 1&2 CMD 4 Heater Trip Status 2 Heater Trip CMD 6 Supply Fan Trip Status 2 Supply Fan CMD 2 Supply Fan Flow Status 2 Supply Air Damper Status 2 Supply Air Damper CMD 2 Supply Air Temperature 1 Return Air Temperature 1 Fire Smoke Dampers Status 1 Fire Smoke Dampers CMD 1 Room Temperature 1 Humidity Sensor 1
20 17 4 0
Total With 20% Spare 24 20 5 0
PACU 3A & 3B (110KV GIS Building) DI DO AI AO Filter Dirty Status 4 Fire Alarm Control Panel 1 Return Air Damper Status 2 Return Air Damper CMD 2 SCADA 1 Compressor 1&2 Trip Status 4 Compressor 1&2 CMD 4 Heater Trip Status 4 Heater Trip CMD 4 Supply Fan Trip Status 2 Supply Fan CMD 2 Supply Fan Flow Status 2 Supply Air Damper Status 2 Supply Air Damper CMD 2 Supply Air Temperature 1 Return Air Temperature 0 Fire Smoke Dampers Status 2 Fire Smoke Dampers CMD 2
Cable Tunnel‐3 from Control Building to 110KV Supply Fan and Exhaust Fan Supply Fan Trip Status
![Page 3: Signal List Al-fanar Project HHR-1 to HHR-6](https://reader034.vdocuments.us/reader034/viewer/2022050809/55cf94b6550346f57ba3ed96/html5/thumbnails/3.jpg)
Supply Fan CMD 1 Supply Fan Flow Status 1 Exhaust Fan Trip Status 1 Exhaust Fan CMD 1 Thermostat/ Humidstat Status 1 Thermostat/ Humidstat CMD 1
27 18 3 0
Total With 20% Spare 32 22 4 0
PACU 4A & 4B (110KV GIS Building) DI DO AI AO Filter Dirty Status 4 Fire Alarm Control Panel 1 Return Air Damper Status 2 Return Air Damper CMD 2 SCADA 1 Compressor 1&2 Trip Status 4 Compressor 1&2 CMD 4 Heater Trip Status 4 Heater Trip CMD 4 Supply Fan Trip Status 2 Supply Fan CMD 2 Supply Fan Flow Status 2 Supply Air Damper Status 2 Supply Air Damper CMD 2 Supply Air Temperature 1 Return Air Temperature 0 Fire Smoke Dampers Status 2 Fire Smoke Dampers CMD 2 Thermostat/ Humidstat Status 1 Thermostat/ Humidstat CMD 1
24 16 3 0
Total With 20% Spare 29 19 4 0
PACU 5A & 5B (13.8 KV Switchgear Building) DI DO AI AO Filter Dirty Status 3 Fire Alarm Control Panel 1 Return Air Damper Status 2 Return Air Damper CMD 2 SCADA 1 Compressor 1&2 Trip Status 4
![Page 4: Signal List Al-fanar Project HHR-1 to HHR-6](https://reader034.vdocuments.us/reader034/viewer/2022050809/55cf94b6550346f57ba3ed96/html5/thumbnails/4.jpg)
Compressor 1&2 CMD 4 Heater Trip Status 2 Heater Trip CMD 6 Supply Fan Trip Status 2 Supply Fan CMD 2 Supply Fan Flow Status 2 Supply Air Damper Status 2 Supply Air Damper CMD 2 Supply Air Temperature 1 Return Air Temperature 1 Fire Smoke Dampers Status 1 Fire Smoke Dampers CMD 1 Room Temperature 1 Humidity Sensor 1
20 17 4 0
Total With 20% Spare 24 20 5 0
PACU 6A & 6B (33KV Switchgear Building) DI DO AI AO Filter Dirty Status 3 Fire Alarm Control Panel 1 Return Air Damper Status 2 Return Air Damper CMD 2 SCADA 1 Compressor 1&2 Trip Status 4 Compressor 1&2 CMD 4 Heater Trip Status 2 Heater Trip CMD 4 Supply Fan Trip Status 2 Supply Fan CMD 2 Supply Fan Flow Status 2 Supply Air Damper Status 2 Supply Air Damper CMD 2 Supply Air Temperature 1 Return Air Temperature 1 Fire Smoke Dampers Status 1 Fire Smoke Dampers CMD 1 Room Temperature 1 Humidity Sensor 1
20 15 4 0
![Page 5: Signal List Al-fanar Project HHR-1 to HHR-6](https://reader034.vdocuments.us/reader034/viewer/2022050809/55cf94b6550346f57ba3ed96/html5/thumbnails/5.jpg)
Total With 20% Spare 24 18 5 0
PACU 7A & 7B (380KV Control Building) DI DO AI AO Filter Dirty Status 6 Fire Alarm Control Panel 3 Return Air Damper Status 2 Return Air Damper CMD 2 SCADA 1 Compressor 1&2 Trip Status 4 Compressor 1&2 CMD 4 Supply Fan Trip Status 2 Supply Fan CMD 2 Supply Fan Flow Status 2 Supply Air Damper Status 2 Supply Air Damper CMD 2 Supply Air Temperature 2 Return Air Temperature 1 Electrical Duct Heater Trip Status 1 Electrical Duct Heater CMD 3 Fire/Smoke Damper Status 6 Fire/Smoke Damper CMD 6 Room Temperature 1 Space Humidity 1 Mixing Humidity Space 1 Exhaust Fan Trip Status 2 Exhaust Fan CMD 2 30 22 6 0
Total With 20% Spare 36
26 7 0
PACU 8A & 8B (380KV Control Building) DI DO AI AO Filter Dirty Status 6 Fire Alarm Control Panel 3 Return Air Damper Status 2 Return Air Damper CMD 2 SCADA 1 Compressor 1&2 Trip Status 4 Compressor 1&2 CMD 4 Supply Fan Trip Status 2 Supply Fan CMD 2
![Page 6: Signal List Al-fanar Project HHR-1 to HHR-6](https://reader034.vdocuments.us/reader034/viewer/2022050809/55cf94b6550346f57ba3ed96/html5/thumbnails/6.jpg)
Supply Fan Flow Status 2 Supply Air Damper Status 2 Supply Air Damper CMD 2 Supply Air Temperature 2 Return Air Temperature 1
Cable Tunnel‐2 from Control Building to 380KV GIS Supply Fan and Exhaust Fan Supply Fan Trip Status 1 Supply Fan CMD 1 Supply Fan Flow Status 1 Exhaust Fan Trip Status 1 Exhaust Fan CMD 1 Electrical Duct Heater Trip Status 1 Electrical Duct Heater CMD 3 Fire/Smoke Damper Status 6 Fire/Smoke Damper CMD 6 Room Temperature 1 Space Humidity 1 Mixing Humidity Space 1 31 22 6 0
Total With 20% Spare 37
26 7 0
HHR‐2 PACU 1A & 1B (380KV GIS Building) DI DO AI AO Filter Dirty Status 3 Fire Alarm Control Panel interlock 1 Return Air Damper Status 2 Return Air Damper CMD 2 SCADA 1 Compressor 1&2 Trip Status 4 Compressor 1&2 CMD 4 Heater Trip Status 2 Heater Trip CMD 6 Supply Fan Trip Status 2 Supply Fan CMD 2 Supply Fan Flow Status 2 Supply Air Damper Status 2 Supply Air Damper CMD 2 Supply Air Temperature 1
![Page 7: Signal List Al-fanar Project HHR-1 to HHR-6](https://reader034.vdocuments.us/reader034/viewer/2022050809/55cf94b6550346f57ba3ed96/html5/thumbnails/7.jpg)
Return Air Temperature 1 Fire Smoke Dampers Status 1 Fire Smoke Dampers CMD 1
Cable Tunnel‐1 under 380KV GIS SF‐1&2 EF‐1&2 Supply Fan Trip Status 2 Supply Fan CMD 2 Supply Fan Flow Status 2 Exhaust Fan Trip Status 2 Exhaust Fan CMD 2 Cable Tunnel‐4 from 380KV GIS to 110KV GIS SF‐5 & EF‐5) Supply Fan Trip Status 1 Supply Fan CMD 1 Supply Fan Flow Status 1 Exhaust Fan Trip Status 1 Exhaust Fan CMD 1 Room Temperature 1 Humidity Sensor 1
29 23 4 0
Total With 20% Spare 35 28 5 0
PACU 2A & 2B (380KV GIS Building) DI DO AI AO Filter Dirty Status 3 Fire Alarm Control Panel 1 Return Air Damper Status 2 Return Air Damper CMD 2 SCADA 1 Compressor 1&2 Trip Status 4 Compressor 1&2 CMD 4 Heater Trip Status 2 Heater Trip CMD 6 Supply Fan Trip Status 2 Supply Fan CMD 2 Supply Fan Flow Status 2 Supply Air Damper Status 2 Supply Air Damper CMD 2 Supply Air Temperature 1 Return Air Temperature 1 Fire Smoke Dampers Status 1 Fire Smoke Dampers CMD 1 Room Temperature 1
![Page 8: Signal List Al-fanar Project HHR-1 to HHR-6](https://reader034.vdocuments.us/reader034/viewer/2022050809/55cf94b6550346f57ba3ed96/html5/thumbnails/8.jpg)
Humidity Sensor 1 20 17 4 0
Total With 20% Spare 24 20 5 0
PACU 3A & 3B (110KV GIS Building) DI DO AI AO Filter Dirty Status 4 Fire Alarm Control Panel 1 Return Air Damper Status 2 Return Air Damper CMD 2 SCADA 1 Compressor 1&2 Trip Status 4 Compressor 1&2 CMD 4 Heater Trip Status 4 Heater Trip CMD 4 Supply Fan Trip Status 2 Supply Fan CMD 2 Supply Fan Flow Status 2 Supply Air Damper Status 2 Supply Air Damper CMD 2 Supply Air Temperature 1 Return Air Temperature 0 Fire Smoke Dampers Status 2 Fire Smoke Dampers CMD 2
Cable Tunnel‐3 from Control Building to 110KV GIS SF‐4 EF‐4 Supply Fan Trip Status 1 Supply Fan CMD 1 Supply Fan Flow Status 1 Exhaust Fan Trip Status 1 Exhaust Fan CMD 1 Thermostat/ Humidstat Status 1 Thermostat/ Humidstat CMD 1
27 18 3 0
Total With 20% Spare 32 22 4 0
PACU 4A & 4B (110KV GIS Building) DI DO AI AO Filter Dirty Status 4 Fire Alarm Control Panel 1 Return Air Damper Status 2 Return Air Damper CMD 2
![Page 9: Signal List Al-fanar Project HHR-1 to HHR-6](https://reader034.vdocuments.us/reader034/viewer/2022050809/55cf94b6550346f57ba3ed96/html5/thumbnails/9.jpg)
SCADA 1 Compressor 1&2 Trip Status 4 Compressor 1&2 CMD 4 Heater Trip Status 4 Heater Trip CMD 4 Supply Fan Trip Status 2 Supply Fan CMD 2 Supply Fan Flow Status 2 Supply Air Damper Status 2 Supply Air Damper CMD 2 Supply Air Temperature 1 Return Air Temperature 0 Fire Smoke Dampers Status 2 Fire Smoke Dampers CMD 2 Thermostat/ Humidstat Status 1 Thermostat/ Humidstat CMD 1
24 16 3 0
Total With 20% Spare 29 19 4 0
PACU 5A & 5B (13.8 KV Switchgear Building) DI DO AI AO Filter Dirty Status 3 Fire Alarm Control Panel 1 Return Air Damper Status 2 Return Air Damper CMD 2 SCADA 1 Compressor 1&2 Trip Status 4 Compressor 1&2 CMD 4 Heater Trip Status 2 Heater Trip CMD 6 Supply Fan Trip Status 2 Supply Fan CMD 2 Supply Fan Flow Status 2 Supply Air Damper Status 2 Supply Air Damper CMD 2 Supply Air Temperature 1 Return Air Temperature 1 Fire Smoke Dampers Status 1 Fire Smoke Dampers CMD 1 Room Temperature 1 Humidity Sensor 1
![Page 10: Signal List Al-fanar Project HHR-1 to HHR-6](https://reader034.vdocuments.us/reader034/viewer/2022050809/55cf94b6550346f57ba3ed96/html5/thumbnails/10.jpg)
20 17 4 0
Total With 20% Spare 24 20 5 0
PACU 6A & 6B (33KV Switchgear Building) DI DO AI AO Filter Dirty Status 3 Fire Alarm Control Panel 1 Return Air Damper Status 2 Return Air Damper CMD 2 SCADA 1 Compressor 1&2 Trip Status 4 Compressor 1&2 CMD 4 Heater Trip Status 2 Heater Trip CMD 4 Supply Fan Trip Status 2 Supply Fan CMD 2 Supply Fan Flow Status 2 Supply Air Damper Status 2 Supply Air Damper CMD 2 Supply Air Temperature 1 Return Air Temperature 1 Fire Smoke Dampers Status 1 Fire Smoke Dampers CMD 1
Cable Tunnel‐5 from 33KV SWGR to Transformer SF‐6 & EF‐6 Supply Fan Trip Status 1 Supply Fan CMD 1 Supply Fan Flow Status 1 Exhaust Fan Trip Status 1 Exhaust Fan CMD 1 Room Temperature 1 Humidity Sensor 1
23 17 4 0
Total With 20% Spare 28 20 5 0
PACU 7A & 7B (380KV Control Building) DI DO AI AO Filter Dirty Status 6 Fire Alarm Control Panel 3 Return Air Damper Status 2 Return Air Damper CMD 2 SCADA 1
![Page 11: Signal List Al-fanar Project HHR-1 to HHR-6](https://reader034.vdocuments.us/reader034/viewer/2022050809/55cf94b6550346f57ba3ed96/html5/thumbnails/11.jpg)
Compressor 1&2 Trip Status 4 Compressor 1&2 CMD 4 Supply Fan Trip Status 2 Supply Fan CMD 2 Supply Fan Flow Status 2 Supply Air Damper Status 2 Supply Air Damper CMD 2 Supply Air Temperature 2 Return Air Temperature 1 Electrical Duct Heater Trip Status 1 Electrical Duct Heater CMD 3 Fire/Smoke Damper Status 6 Fire/Smoke Damper CMD 6 Room Temperature 1 Space Humidity 1 Mixing Humidity Space 1 Exhaust Fan Trip Status 2 Exhaust Fan CMD 2 30 22 6 0
Total With 20% Spare 36
26 7 0
PACU 8A & 8B (380KV Control Building) DI DO AI AO Filter Dirty Status 6 Fire Alarm Control Panel 3 Return Air Damper Status 2 Return Air Damper CMD 2 SCADA 1 Compressor 1&2 Trip Status 4 Compressor 1&2 CMD 4 Supply Fan Trip Status 2 Supply Fan CMD 2 Supply Fan Flow Status 2 Supply Air Damper Status 2 Supply Air Damper CMD 2 Supply Air Temperature 2 Return Air Temperature 1 Electrical Duct Heater Trip Status 1 Electrical Duct Heater CMD 3 Fire/Smoke Damper Status 6
![Page 12: Signal List Al-fanar Project HHR-1 to HHR-6](https://reader034.vdocuments.us/reader034/viewer/2022050809/55cf94b6550346f57ba3ed96/html5/thumbnails/12.jpg)
Cable Tunnel‐2 from Control Building to 380KV GIS SF‐3 & EF‐3 Supply Fan Trip Status 1 Supply Fan CMD 1 Supply Fan Flow Status 1 Exhaust Fan Trip Status 1 Exhaust Fan CMD 1 Fire/Smoke Damper CMD 6 Room Temperature 1 Space Humidity 1 Mixing Humidity Space 1 31 22 6 0
Total With 20% Spare 37
26 7 0
HHR‐3 PACU 1A & 1B (380KV GIS Building) DI DO AI AO Filter Dirty Status 3 Fire Alarm Control Panel 1 Return Air Damper Status 2 Return Air Damper CMD 2 SCADA 1 Compressor 1&2 Trip Status 4 Compressor 1&2 CMD 4 Heater Trip Status 2 Heater Trip CMD 6 Supply Fan Trip Status 2 Supply Fan CMD 2 Supply Fan Flow Status 2 Supply Air Damper Status 2 Supply Air Damper CMD 2 Supply Air Temperature 1 Return Air Temperature 1 Fire Smoke Dampers Status 1 Fire Smoke Dampers CMD 1
Cable Tunnel‐1 under 380KV GIS SF ‐1 & 2 EF ‐1 & 2 Supply Fan Trip Status 2 Supply Fan CMD 2 Supply Fan Flow Status 2 Exhaust Fan Trip Status 2
![Page 13: Signal List Al-fanar Project HHR-1 to HHR-6](https://reader034.vdocuments.us/reader034/viewer/2022050809/55cf94b6550346f57ba3ed96/html5/thumbnails/13.jpg)
Exhaust Fan CMD 2 Room Temperature 1 Humidity Sensor 1
26 21 4 0
Total With 20% Spare 31 25 5 0
PACU 2A & 2B (380KV GIS Building) DI Do AI Ao Filter Dirty Status 3 Fire Alarm Control Panel 1 Return Air Damper Status 2 Return Air Damper CMD 2 SCADA 1 Compressor 1&2 Trip Status 4 Compressor 1&2 CMD 4 Heater Trip Status 2 Heater Trip CMD 6 Supply Fan Trip Status 2 Supply Fan CMD 2 Supply Fan Flow Status 2 Supply Air Damper Status 2 Supply Air Damper CMD 2 Supply Air Temperature 1 Return Air Temperature 1 Fire Smoke Dampers Status 1 Fire Smoke Dampers CMD 1 Room Temperature 1 Humidity Sensor 1
20 17 4 0
Total With 20% Spare 24 20 5 0
PACU 6A & 6B (33KV Switchgear Building) DI Do AI Ao Filter Dirty Status 3 Fire Alarm Control Panel 1 Return Air Damper Status 2 Return Air Damper CMD 2 SCADA 1 Compressor 1&2 Trip Status 4 Compressor 1&2 CMD 4 Heater Trip Status 2 Heater Trip CMD 4
![Page 14: Signal List Al-fanar Project HHR-1 to HHR-6](https://reader034.vdocuments.us/reader034/viewer/2022050809/55cf94b6550346f57ba3ed96/html5/thumbnails/14.jpg)
Supply Fan Trip Status 2 Supply Fan CMD 2 Supply Fan Flow Status 2 Supply Air Damper Status 2 Supply Air Damper CMD 2 Supply Air Temperature 1 Return Air Temperature 1 Fire Smoke Dampers Status 1 Fire Smoke Dampers CMD 1 Room Temperature 1 Humidity Sensor 1
20 15 4 0
Total With 20% Spare 24 18 5 0
PACU 3A & 3B (380KV Control Building) DI Do AI Ao Filter Dirty Status 6 Fire Alarm Control Panel 3 Return Air Damper Status 2 Return Air Damper CMD 2 SCADA 1 Compressor 1&2 Trip Status 4 Compressor 1&2 CMD 4 Supply Fan Trip Status 2 Supply Fan CMD 2 Supply Fan Flow Status 2 Supply Air Damper Status 2 Supply Air Damper CMD 2 Supply Air Temperature 2 Return Air Temperature 1 Electrical Duct Heater Trip Status 1 Electrical Duct Heater CMD 3 Fire/Smoke Damper Status 6 Fire/Smoke Damper CMD 6 Room Temperature 1 Space Humidity 1 Mixing Humidity Space 1 Exhaust Fan Trip Status 2 Exhaust Fan CMD 2 30 22 6 0 Total With 20% Spare 36 7 0
![Page 15: Signal List Al-fanar Project HHR-1 to HHR-6](https://reader034.vdocuments.us/reader034/viewer/2022050809/55cf94b6550346f57ba3ed96/html5/thumbnails/15.jpg)
26
PACU 4A & 4B (380KV Control Building) DI Do AI Ao Filter Dirty Status 6 Fire Alarm Control Panel 3 Return Air Damper Status 2 Return Air Damper CMD 2 SCADA 1 Compressor 1&2 Trip Status 4 Compressor 1&2 CMD 4 Supply Fan Trip Status 2 Supply Fan CMD 2 Supply Fan Flow Status 2 Supply Air Damper Status 2 Supply Air Damper CMD 2 Supply Air Temperature 2 Return Air Temperature 1
Cable Tunnel‐2 from Control Building to 380KV GIS SF‐3 and EF‐3 Commands Supply Fan Trip Status 1 Supply Fan CMD 1 Supply Fan Flow Status 1 Exhaust Fan Trip Status 1 Exhaust Fan CMD 1 Electrical Duct Heater Trip Status 1 Electrical Duct Heater CMD 3 Fire/Smoke Damper Status 6 Fire/Smoke Damper CMD 6 Room Temperature 1 Space Humidity 1 Mixing Humidity Space 1 31 22 6 0
Total With 20% Spare 37
26 7 0
HHR‐4 PACU 1A & 1B (380KV GIS Building) DI DO AI AO Filter Dirty Status 3
![Page 16: Signal List Al-fanar Project HHR-1 to HHR-6](https://reader034.vdocuments.us/reader034/viewer/2022050809/55cf94b6550346f57ba3ed96/html5/thumbnails/16.jpg)
Fire Alarm Control Panel 1 Return Air Damper Status 2 Return Air Damper CMD 2 SCADA 1 Compressor 1&2 Trip Status 4 Compressor 1&2 CMD 4 Heater Trip Status 2 Heater Trip CMD 6 Supply Fan Trip Status 2 Supply Fan CMD 2 Supply Fan Flow Status 2 Supply Air Damper Status 2 Supply Air Damper CMD 2 Supply Air Temperature 1 Return Air Temperature 1 Fire Smoke Dampers Status 1 Fire Smoke Dampers CMD 1
Cable Tunnel‐1 under 380KV GIS SF ‐1 & 2 EF ‐1 & 2 Supply Fan Trip Status 2 Supply Fan CMD 2 Supply Fan Flow Status 2 Exhaust Fan Trip Status 2 Exhaust Fan CMD 2 Room Temperature 1 Humidity Sensor 1
26 21 4 0
Total With 20% Spare 31 25 5 0
PACU 2A & 2B (380KV GIS Building) DI Do AI Ao Filter Dirty Status 3 Fire Alarm Control Panel 1 Return Air Damper Status 2 Return Air Damper CMD 2 SCADA 1 Compressor 1&2 Trip Status 4 Compressor 1&2 CMD 4 Heater Trip Status 2 Heater Trip CMD 6 Supply Fan Trip Status 2
![Page 17: Signal List Al-fanar Project HHR-1 to HHR-6](https://reader034.vdocuments.us/reader034/viewer/2022050809/55cf94b6550346f57ba3ed96/html5/thumbnails/17.jpg)
Supply Fan CMD 2 Supply Fan Flow Status 2 Supply Air Damper Status 2 Supply Air Damper CMD 2 Supply Air Temperature 1 Return Air Temperature 1 Fire Smoke Dampers Status 1 Fire Smoke Dampers CMD 1 Room Temperature 1 Humidity Sensor 1
20 17 4 0
Total With 20% Spare 24 20 5 0
PACU 6A & 6B (33KV Switchgear Building) DI Do AI Ao Filter Dirty Status 3 Fire Alarm Control Panel 1 Return Air Damper Status 2 Return Air Damper CMD 2 SCADA 1 Compressor 1&2 Trip Status 4 Compressor 1&2 CMD 4 Heater Trip Status 2 Heater Trip CMD 4 Supply Fan Trip Status 2 Supply Fan CMD 2 Supply Fan Flow Status 2 Supply Air Damper Status 2 Supply Air Damper CMD 2 Supply Air Temperature 1 Return Air Temperature 1 Fire Smoke Dampers Status 1 Fire Smoke Dampers CMD 1 Room Temperature 1 Humidity Sensor 1
20 15 4 0
Total With 20% Spare 24 18 5 0
PACU 3A & 3B (380KV Control Building) DI Do AI Ao Filter Dirty Status 6 Fire Alarm Control Panel 3
![Page 18: Signal List Al-fanar Project HHR-1 to HHR-6](https://reader034.vdocuments.us/reader034/viewer/2022050809/55cf94b6550346f57ba3ed96/html5/thumbnails/18.jpg)
Return Air Damper Status 2 Return Air Damper CMD 2 SCADA 1 Compressor 1&2 Trip Status 4 Compressor 1&2 CMD 4 Supply Fan Trip Status 2 Supply Fan CMD 2 Supply Fan Flow Status 2 Supply Air Damper Status 2 Supply Air Damper CMD 2 Supply Air Temperature 2 Return Air Temperature 1 Electrical Duct Heater Trip Status 1 Electrical Duct Heater CMD 3 Fire/Smoke Damper Status 6 Fire/Smoke Damper CMD 6 Room Temperature 1 Space Humidity 1 Mixing Humidity Space 1 Exhaust Fan Trip Status 2 Exhaust Fan CMD 2 30 22 6 0
Total With 20% Spare 36
26 7 0
PACU 4A & 4B (380KV Control Building) DI Do AI Ao Filter Dirty Status 6 Fire Alarm Control Panel 3 Return Air Damper Status 2 Return Air Damper CMD 2 SCADA 1 Compressor 1&2 Trip Status 4 Compressor 1&2 CMD 4 Supply Fan Trip Status 2 Supply Fan CMD 2 Supply Fan Flow Status 2 Supply Air Damper Status 2 Supply Air Damper CMD 2 Supply Air Temperature 2 Return Air Temperature 1
![Page 19: Signal List Al-fanar Project HHR-1 to HHR-6](https://reader034.vdocuments.us/reader034/viewer/2022050809/55cf94b6550346f57ba3ed96/html5/thumbnails/19.jpg)
Cable Tunnel‐2 from Control Building to 380KV GIS SF‐3 and EF‐3 Commands Supply Fan Trip Status 1 Supply Fan CMD 1 Supply Fan Flow Status 1 Exhaust Fan Trip Status 1 Exhaust Fan CMD 1 Electrical Duct Heater Trip Status 1 Electrical Duct Heater CMD 3 Fire/Smoke Damper Status 6 Fire/Smoke Damper CMD 6 Room Temperature 1 Space Humidity 1 Mixing Humidity Space 1 31 22 6 0
Total With 20% Spare 37
26 7 0
HHR‐5 PACU 1A & 1B (380KV GIS Building) DI DO AI AO Filter Dirty Status 3 Fire Alarm Control Panel 1 Return Air Damper Status 2 Return Air Damper CMD 2 SCADA 1 Compressor 1&2 Trip Status 4 Compressor 1&2 CMD 4 Heater Trip Status 2 Heater Trip CMD 6 Supply Fan Trip Status 2 Supply Fan CMD 2 Supply Fan Flow Status 2 Supply Air Damper Status 2 Supply Air Damper CMD 2 Supply Air Temperature 1 Return Air Temperature 1 Fire Smoke Dampers Status 1 Fire Smoke Dampers CMD 1
![Page 20: Signal List Al-fanar Project HHR-1 to HHR-6](https://reader034.vdocuments.us/reader034/viewer/2022050809/55cf94b6550346f57ba3ed96/html5/thumbnails/20.jpg)
Cable Tunnel‐1 under 380KV GIS SF ‐1 & 2 EF ‐1 & 2 Supply Fan Trip Status 2 Supply Fan CMD 2 Supply Fan Flow Status 2 Exhaust Fan Trip Status 2 Exhaust Fan CMD 2 Room Temperature 1 Humidity Sensor 1
26 21 4 0
Total With 20% Spare 31 25 5 0
PACU 2A & 2B (380KV GIS Building) DI Do AI Ao Filter Dirty Status 3 Fire Alarm Control Panel 1 Return Air Damper Status 2 Return Air Damper CMD 2 SCADA 1 Compressor 1&2 Trip Status 4 Compressor 1&2 CMD 4 Heater Trip Status 2 Heater Trip CMD 6 Supply Fan Trip Status 2 Supply Fan CMD 2 Supply Fan Flow Status 2 Supply Air Damper Status 2 Supply Air Damper CMD 2 Supply Air Temperature 1 Return Air Temperature 1 Fire Smoke Dampers Status 1 Fire Smoke Dampers CMD 1 Room Temperature 1 Humidity Sensor 1
20 17 4 0
Total With 20% Spare 24 20 5 0
PACU 6A & 6B (33KV Switchgear Building) DI Do AI Ao Filter Dirty Status 3 Fire Alarm Control Panel 1 Return Air Damper Status 2
![Page 21: Signal List Al-fanar Project HHR-1 to HHR-6](https://reader034.vdocuments.us/reader034/viewer/2022050809/55cf94b6550346f57ba3ed96/html5/thumbnails/21.jpg)
Return Air Damper CMD 2 SCADA 1 Compressor 1&2 Trip Status 4 Compressor 1&2 CMD 4 Heater Trip Status 2 Heater Trip CMD 4 Supply Fan Trip Status 2 Supply Fan CMD 2 Supply Fan Flow Status 2 Supply Air Damper Status 2 Supply Air Damper CMD 2 Supply Air Temperature 1 Return Air Temperature 1 Fire Smoke Dampers Status 1 Fire Smoke Dampers CMD 1 Room Temperature 1 Humidity Sensor 1
20 15 4 0
Total With 20% Spare 24 18 5 0
PACU 3A & 3B (380KV Control Building) DI Do AI Ao Filter Dirty Status 6 Fire Alarm Control Panel 3 Return Air Damper Status 2 Return Air Damper CMD 2 SCADA 1 Compressor 1&2 Trip Status 4 Compressor 1&2 CMD 4 Supply Fan Trip Status 2 Supply Fan CMD 2 Supply Fan Flow Status 2 Supply Air Damper Status 2 Supply Air Damper CMD 2 Supply Air Temperature 2 Return Air Temperature 1 Electrical Duct Heater Trip Status 1 Electrical Duct Heater CMD 3 Fire/Smoke Damper Status 6 Fire/Smoke Damper CMD 6 Room Temperature 1
![Page 22: Signal List Al-fanar Project HHR-1 to HHR-6](https://reader034.vdocuments.us/reader034/viewer/2022050809/55cf94b6550346f57ba3ed96/html5/thumbnails/22.jpg)
Space Humidity 1 Mixing Humidity Space 1 Exhaust Fan Trip Status 2 Exhaust Fan CMD 2 30 22 6 0
Total With 20% Spare 36
26 7 0
PACU 4A & 4B (380KV Control Building) DI Do AI Ao Filter Dirty Status 6 Fire Alarm Control Panel 3 Return Air Damper Status 2 Return Air Damper CMD 2 SCADA 1 Compressor 1&2 Trip Status 4 Compressor 1&2 CMD 4 Supply Fan Trip Status 2 Supply Fan CMD 2 Supply Fan Flow Status 2 Supply Air Damper Status 2 Supply Air Damper CMD 2 Supply Air Temperature 2 Return Air Temperature 1
Cable Tunnel‐2 from Control Building to 380KV GIS SF‐3 and EF‐3 Commands Supply Fan Trip Status 1 Supply Fan CMD 1 Supply Fan Flow Status 1 Exhaust Fan Trip Status 1 Exhaust Fan CMD 1 Electrical Duct Heater Trip Status 1 Electrical Duct Heater CMD 3 Fire/Smoke Damper Status 6 Fire/Smoke Damper CMD 6 Room Temperature 1 Space Humidity 1 Mixing Humidity Space 1 31 22 6 0 Total With 20% Spare 37 7 0
![Page 23: Signal List Al-fanar Project HHR-1 to HHR-6](https://reader034.vdocuments.us/reader034/viewer/2022050809/55cf94b6550346f57ba3ed96/html5/thumbnails/23.jpg)
26
HHR‐6 PACU 1A & 1B (380KV GIS Building) DI DO AI AO Filter Dirty Status 3 Fire Alarm Control Panel 1 Return Air Damper Status 2 Return Air Damper CMD 2 SCADA 1 Compressor 1&2 Trip Status 4 Compressor 1&2 CMD 4 Heater Trip Status 2 Heater Trip CMD 6 Supply Fan Trip Status 2 Supply Fan CMD 2 Supply Fan Flow Status 2 Supply Air Damper Status 2 Supply Air Damper CMD 2 Supply Air Temperature 1 Return Air Temperature 1 Fire Smoke Dampers Status 1 Fire Smoke Dampers CMD 1
Cable Tunnel‐1 under 380KV GIS SF ‐1 & 2 EF ‐1 & 2 Supply Fan Trip Status 2 Supply Fan CMD 2 Supply Fan Flow Status 2 Exhaust Fan Trip Status 2 Exhaust Fan CMD 2 Room Temperature 1 Humidity Sensor 1
26 21 4 0
Total With 20% Spare 31 25 5 0
PACU 2A & 2B (380KV GIS Building) DI Do AI Ao Filter Dirty Status 3 Fire Alarm Control Panel 1 Return Air Damper Status 2 Return Air Damper CMD 2 SCADA 1
![Page 24: Signal List Al-fanar Project HHR-1 to HHR-6](https://reader034.vdocuments.us/reader034/viewer/2022050809/55cf94b6550346f57ba3ed96/html5/thumbnails/24.jpg)
Compressor 1&2 Trip Status 4 Compressor 1&2 CMD 4 Heater Trip Status 2 Heater Trip CMD 6 Supply Fan Trip Status 2 Supply Fan CMD 2 Supply Fan Flow Status 2 Supply Air Damper Status 2 Supply Air Damper CMD 2 Supply Air Temperature 1 Return Air Temperature 1 Fire Smoke Dampers Status 1 Fire Smoke Dampers CMD 1 Room Temperature 1 Humidity Sensor 1
20 17 4 0
Total With 20% Spare 24 20 5 0
PACU 6A & 6B (33KV Switchgear Building) DI Do AI Ao Filter Dirty Status 3 Fire Alarm Control Panel 1 Return Air Damper Status 2 Return Air Damper CMD 2 SCADA 1 Compressor 1&2 Trip Status 4 Compressor 1&2 CMD 4 Heater Trip Status 2 Heater Trip CMD 4 Supply Fan Trip Status 2 Supply Fan CMD 2 Supply Fan Flow Status 2 Supply Air Damper Status 2 Supply Air Damper CMD 2 Supply Air Temperature 1 Return Air Temperature 1 Fire Smoke Dampers Status 1 Fire Smoke Dampers CMD 1 Room Temperature 1 Humidity Sensor 1
![Page 25: Signal List Al-fanar Project HHR-1 to HHR-6](https://reader034.vdocuments.us/reader034/viewer/2022050809/55cf94b6550346f57ba3ed96/html5/thumbnails/25.jpg)
20 15 4 0
Total With 20% Spare 24 18 5 0
PACU 3A & 3B (380KV Control Building) DI Do AI Ao Filter Dirty Status 6 Fire Alarm Control Panel 3 Return Air Damper Status 2 Return Air Damper CMD 2 SCADA 1 Compressor 1&2 Trip Status 4 Compressor 1&2 CMD 4 Supply Fan Trip Status 2 Supply Fan CMD 2 Supply Fan Flow Status 2 Supply Air Damper Status 2 Supply Air Damper CMD 2 Supply Air Temperature 2 Return Air Temperature 1 Electrical Duct Heater Trip Status 1 Electrical Duct Heater CMD 3 Fire/Smoke Damper Status 6 Fire/Smoke Damper CMD 6 Room Temperature 1 Space Humidity 1 Mixing Humidity Space 1 Exhaust Fan Trip Status 2 Exhaust Fan CMD 2 30 22 6 0
Total With 20% Spare 36
26 7 0
PACU 4A & 4B (380KV Control Building) DI Do AI Ao Filter Dirty Status 6 Fire Alarm Control Panel 3 Return Air Damper Status 2 Return Air Damper CMD 2 SCADA 1 Compressor 1&2 Trip Status 4 Compressor 1&2 CMD 4 Supply Fan Trip Status 2
![Page 26: Signal List Al-fanar Project HHR-1 to HHR-6](https://reader034.vdocuments.us/reader034/viewer/2022050809/55cf94b6550346f57ba3ed96/html5/thumbnails/26.jpg)
Supply Fan CMD 2 Supply Fan Flow Status 2 Supply Air Damper Status 2 Supply Air Damper CMD 2 Supply Air Temperature 2 Return Air Temperature 1
Cable Tunnel‐2 from Control Building to 380KV GIS SF‐3 and EF‐3 Commands Supply Fan Trip Status 1 Supply Fan CMD 1 Supply Fan Flow Status 1 Exhaust Fan Trip Status 1 Exhaust Fan CMD 1 Electrical Duct Heater Trip Status 1 Electrical Duct Heater CMD 3 Fire/Smoke Damper Status 6 Fire/Smoke Damper CMD 6 Room Temperature 1 Space Humidity 1 Mixing Humidity Space 1 31 22 6 0
Total With 20% Spare 37
26 7 0