SIE/MR/HSERR/01,0:24/02/15
1
AboutSTREAM Industrial& Engineering
STREAM Industrial &Engineering
Pre-Qualification Document | SIE - 2018
2
• Stream Industrial & Engineering (SIE) was established in 1989 as one of Salam InternationalInvestment Ltd. subsidiaries.
• The name of Salam has been renowned and associated with excellence, achievement,growth and quality.
• SIIL continues to benefit from a strong human capital base and corporate culture. Thesehave assured the company’s continued growth and prosperity through capitalizing on itsinherent strengths; namely, its staff, expertise, exceptional client care and its continued drivefor improvement in all aspects of its operations.
• STREAM undertakes large to medium scale turnkey projects in both the Commercial andInfrastructure sectors.
STREAM Philosophy
We value the quality of our human resources that drive us to employ dedicated specializedengineers and highly qualified and trained individuals who comprise the empowered STREAMworkforce. After a careful selection and scrutiny to match the demanding lifecycle of anoverwhelming dynamics market structure, we empower each member as we ultimately believein leaders of today passing power to its successors, reliving the tradition of exemplarycompetence at all levels of the management hierarchy. In the workforce, every individual is ateam player vigorously trained to excel in keeping atop advancements among respective fieldsof operation and specialization, as we envision to be always ahead and at the pinnacle ofsuccess among major players in the downstream industrial market.
PRESTIGE
The prestige and prominence of projects has been executed in full contribution of dedicatedexperts in Engineering, Procurement & Construction. In our pledge to uphold industrystandards, we have been awarded with the prestige and trust of clientele in projectmanagement and execution among the building & infrastructure sectors. STREAM takes pridein the success as we took each step and progressively inched our way to final completionamong major awards.
AboutSTREAM Industrial& Engineering
STREAM Industrial &Engineering
Pre-Qualification Document | SIE - 2018
3
STRENGTHS
• Subsidiary of Salam International Investment Ltd.
• Stream employs dedicated specialized engineers.• STREAM has the references and capabilities to undertake reasonable size contracts on a
full turnkey basis.
• In house engineering capabilities
• “A” Grade Kahramaa contractor• “A” Grade Civil Defence contractor
• ASHGHAL approved M&E Contractor
• Major player in the Qatari market• ISO Certified:-
ISO 9001 ISO 14001 OHSAS 18001
ELEMENTS OF OPERATION
STREAM is part of the conglomerate that is central to the economic development of Qatar andthis gives the company an edge on all business fronts. As a local service and solutionsprovider, STREAM is capable of undertaking major contracts on a full turnkey basis and tocater in areas of Electrical and Mechanical Installation Works, Water Treatment Plants, StreetLighting and Electrical Power Generation and Distribution Projects.
This is matched by an intense competitive drive to maximize and take advantage of thegeographical assets, increasing the share of involvement in this multi-faceted and diverseindustry. This business drive is of course instrumental in Qatar’s industrial development.
STREAM’s organizational structure has been developed to focus on these key areas:
• Project Development• Contracts
STREAM Industrial &Engineering
Pre-Qualification Document | SIE - 2018
4
Vision
Become the leading contractor to the region’s Infrastructure & Commercial
development fueled in diversity resulting to infinite profitable growth.
Mission
• Enhancing our product portfolio and services in order to provide our valued
customers with quality, innovate & competitive solutions.
• Continuously improving our procedures and processes to deliver high quality
standards.
• Empowering our people to become the industry benchmark.
Values
Vision, Mission and
Values
· Enhance shareholder’s
ROI
· Exceed customer
expectations
· Value added skills &
capabilities
Principles
Processes
Performance
Peo
ple
Continuous
improvements
Short & Long - term
growth
Market Driven
Lean & Learning
Transparency
Integrity & fairness
Equal Opportunity
Employment
Respect to all
employees
Fair treatment
Highly talented
Quality Management
System
Balanced Scorecard.
ERP
Capabilities and Services
STREAM Engineering
STREAM Industrial &Engineering
Pre-Qualification Document | SIE - 2018
SIE vision, experience & capabilities guided the company to focus and be one
of the major market players in the following sectors:
Infrastructure Services:• Street Lighting
• Water, Power, Sewage
• Electrical Substations
• Telecommunications
• Storm Water & Chilled Water
• Firefighting
Mechanical Services:• Installation of complete air conditioning systems for commercial, residential &
industrial projects
• Building Management System
• Central Heating System
• Refrigeration System
• Ventilation System
Plumbing & Drainage Services:• Installation of a complete Water Supply System for commercial, residential &
industrial projects
• Installation of a complete Drainage System for commercial, residential &
industrial projects
• Solar Heating System
• Irrigation Networks
5
Capabilities and Services
STREAM Engineering
STREAM Industrial &Engineering
Pre-Qualification Document | SIE - 2018
Electrical Services:• Installation of complete electrical systems for commercial, industrial and
residential complexes
• LV Power distribution systems
• Fire Alarm & Voice Evacuation System
• Structured Cabling System
• Security Systems
• Home Automation Systems
• Public Address Systems
• Solar Power Systems
• Earthing and lightning protection
Fire Fighting Services:• Installation of a complete Fire Fighting System for commercial, residential &
industrial projects
6
7STREAM Industrial &Engineering
Pre-Qualification Document | SIE - 2018
STREAM Business
Sectors
STREAM Industrial &Engineering
Pre-Qualification Document | SIE - 2018
STREAM employs dedicated specialized engineers. We have the references and
capabilities to undertake reasonable size contracts on a full turnkey basis.
Manpower
Resources
Resources – Personnel
Management 15
Engineers 215
Technicians 1128
Supervisors / Foremen 167
Administration / Accounts 58
Drivers 45
Total 1,628
Management1% Engineers
13%
Technicians69%
Supervisors / Foremen10%
Administration / Accounts
4%
Drivers3%
MAN POWER
8
9STREAM Industrial &Engineering
Pre-Qualification Document | SIE - 2018
Organizational
Structure
11STREAM Industrial &Engineering
Pre-Qualification Document | SIE - 2018
STREAM Project
References
STREAM Industrial &Engineering
Pre-Qualification Document | SIE - 2018
Completed Projects List | SIE 2018
11
S. No. Project NameTender Value
(QRs)Completion
DateClient
MEP - RESIDENTIAL
1Construction of Health & Wellness Care Center at Al Wajbaand Muaither, Complete MEP & D including Fire Protection works.
76 Million 2018 ASHGHAL
2 DAFNA Villa – MEP Works 3.7 Million 2017Hisham Bin SalehAl-Hamad Al-Mana
3 Health & Wellness Care Center at Umm Salal 40 Million 2017 ASHGHAL
4 Al Wajba Residential Compound 40 Million 2017 Al Alfia Holding
5
Gabbro Terminal Expansion Project & 33KV Primary Substations - Detailed Design, Supply, Installations and Testing and Commissioning of Electrical/ELV and Mechanical System for Various buildings
35 Million 2017Qatar Primary Materials Company
6Design, Engineering, Testing & Commissioning of 250 TPD Calcium Carbonate Plant at Umm-Bab.
21.88 Million 2013Qatar National Cement Company
7 MEP Works at Salam Metacoat 5 Million 2011SALAM METACOAT (Factory)
8 MEP Works at QGC Factory 7.6 Million 2011Qatari German Switchgear Company
10EPIC of SCADA & Control for E12 S/S to transfer signals of E12 S/S Cement Plant 3
4.5 Miilion 2010Qatar National Cement Company
12
Al Wusyl Shooting Range ProjectSupply, Installation, Commissioning & Maintenance of Electronic Display and Target System Compact & Sporting, Trap & Skeet Equipment, Tower Launch
27.2 Million 2007Qatar National Olympic Committee
13Engineering, Supply & Supervision of Commissioning of Electro-Chlorination Plant for Halul Pump House / STDN
2 Million 2006 Qatar Petroleum
MEP – FIT-OUT
15 Al Jassimya Tower – Fit-out Works 4 Million 2018 Qatar Prosecution
16Harvey Nichols Store at Doha Festival City Construction Fit-Out Works: Stage 01 – White Box & Perimeter
35 Million 2018 Harvey Nichols
17 West Bay Medical Center – MEP Works 23 Million 2017SALAM International
18 Doha Bank Fit-Out works at new Branch in Al Gharafa 1.5 Million 2015 Doha Bank
19 Gate Mall (MEP FIT-OUT WORKS) 8.5 Million 2014Salam International Investment Limited
STREAM Industrial &Engineering
Pre-Qualification Document | SIE - 2018
Completed Projects List | SIE 2018
12
S. No. Project NameTender
Value (QRs)Completion
DateClient
MEP – FIT-OUT
20Supply, Installation, Testing & Commissioning of Plumbing, Drainage, Fire Fighting works, HVAC & Electrical
3.5 Million 2014Qatar 2022 Supreme Committee
21 Blink Shop at The Gate Mall (MEP FIT-OUT WORKS) 1 Million 2014 Blink Shop
22CP756 ( QN061), M&E including Scada works for Construction of Extension of Al Khor TSE Reuse.
2.5 Million 2014 ASHGHAL
23Supply, Installation and Commissioning of Complete Electrical works, Air-conditioning works, Fire Fighting Modification works
419,000 2012 Salam Denim Shop
24 Spicy Pickle at the Gate Mall 162,530 2012 Spicy Pickle
25Floors 4,5 and 6 at Salam Bay Tower II (MEP works)
12.7 Million 2012Salam International Investment Limited
26 Al Wakrah Hospital – Modification works Phase I & II 15 Million 2012Hamad Medical Corporation
27Supply, Installation and Commissioning of Complete Electrical works, Air-conditioning works, Fire Fighting Modification works
190,000 2012 7 For All Man kind Shop
28 Commercial Bank Building at Al Khartiyat 12 Million 2012 Commercial Bank
29Supply, Installation and Commissioning of Complete Electrical works, Air-conditioning works, Fire Fighting Modification works
241,000 2012 Boss Orange Shop
30
Supply, Installation and Commissioning of Electrical Works, Air-conditioning works, Plumbing & Drainage, Fire Fighting works
290,000 2012 MBCO Restaurant
31
Supply, Installation and Commissioning of Complete Electrical works, Air-conditioning works, Fire Fighting Modification works, Back Ground Music System and Networking and Cabling
267,000 2012 LA MARTINE
32Supply, Installation and Commissioning of Air-conditioning works, Fire Fighting Modification works and Complete Electrical Works, Music System
280,000 2012 JUST CAVALI BOUTIQUE
33Supply, Installation and Commissioning of Air-conditioning works, Fire Fighting Modification works and Complete Electrical Works
196,700 2012 CANALI Shop
34
Supply, Installation and Commissioning of Complete Electrical works, Air-conditioning works, Fire Fighting Modification works, Back Ground Music System and Networking and Cabling
185,000 2012 ROCCO BAROCO
STREAM Industrial &Engineering
Pre-Qualification Document | SIE - 2018
Completed Projects List | SIE 2018
13
S. No.
Project NameTender Value
(QRs)Completion
DateClient
STREET LIGHTING
35Roads & Construction in the North Part of New Salata(Zone 40)
7 Million 2017 ASHGHAL
36PWA/GTC/068/2011-2012 Street Lighting works in Doha South and Other Areas of Qatar
48 Million 2017 ASHGHAL
37Peripheral & Surrounding Roads at Qatar National Museum
3.43 Million 2016 ASHGHAL
38Development of Roads in Bani Hajer – Zone 51 – Street Lighting and Electrical works
26 Million 2015 ASHGHAL
39RIW in various areas of Greater Doha Phase – 2 (Site Instruction No. 20)
3.35 Million 2015 ASHGHAL
40EPIC for Road Upgrade from Station N to Khuff H/L within Dukhan Fields
15.96 Million 2014 Qatar Petroleum
41Street lighting and Electrical works for Construction of New Roads and Upgrading of Existing Roads in Dukhan
18.4 Million 2014 Qatar Petroleum
42Street Lighting and Electrical Substation Upgrade works for Road Upgrade Zikreet – Cluster2 within DukhanFields
4.9 Million 2013 Qatar Petroleum
43AL WAAB Complex Public Roads - Package 1,2&3 Street Lighting and Electrical
6.3 Million 2013 ASHGHAL
44Development of Roads in South Khalifa & MarkhiyaZone (34)
1.5 Million 2010 ASHGHAL
STREAM Industrial &Engineering
Pre-Qualification Document | SIE - 2018
Completed Projects List | SIE 2018
14
S. No. Project NameTender Value
(QRs)Completion
DateClient
SUBSTATIONS
45Substation for Workshop and Office Block for Gulf Steel Company
3 Million 2015 Gulf Steel
46Replacement of MV Panel at Sub-Station “C” QP Ras Abu Aboud, Doha
300,000 2014 Qatar Petroleum
47Barwa City - Supply, Installation, Testing, Commissioning & maintenance of Electrical Substations
23 Million 2014 ASHGHAL
48Replacement of Overhead Electrical Line of 6.6kV at Umm-Bab Seashore
3 Million 2011Qatar National Cement Company
49Design, Engineering, Supply, Installation, Testing and Commissioning of 6.6kV / 440 V Sub-Station for the Housing Estate at Umm Bab on Turnkey Basis
4.1 Million 2011Qatar National Cement Company
50
Tender No. : LTC 216/2007Replacement of 2 x 25 MVA, 66kV/11kV, 50 Tons Transformers along with Earthing Transformer at Old Ghanim S/S, including Dismantling, Termination T&C of 66kV & 11kV Cables, Re-Engineering of New Aux, MK & AVR Panels to operate with Existing Protection & Control Scheme at QG, Adding New Foundation & Trenches, T & C and Energization
2 Million 2010 KAHRAMAA
51Design, Engineering, Procurement, Installation, Testing & Commissioning of 33/6.6 kV Sub-Station for New Cement Plant No. 3 at Umm Bab
15.6 Million 2007Qatar National Cement Company
52EPIC Replacement of Main Distribution Board for Desalter System in Refinery No. 2 Unit 11 at QP Refinery, Messaeid
0.7 Million 2007 Qatar Petroleum
53Reinforcement works at Naeeja, Al Sowaidi & Abu Hamour Substation
74 Million 2005Qatar General Electricity and Water Corp.
54Engineering, Supply , Installation, Testing & Commissioning of New 6.6 kV Substation for QNCC in partnership with ASEC Automation Egypt
2.3 Million 2004Qatar National Cement Company
55 Education City for 38 Nos. 3.3kV Switchgear 11 Million 2003Trags ( QP -Education City for Qatar Foundation
56
Ras Laffan Common Cooling Water System Project consisting of :-Electrochlorination Plant -Fire Water Line-33KV Switchgear -Armour Rock-2X Transformer -Small size Butterfly Valves-MOV Valves -HVAC-Steel Structures
60.7 Million 2003 Qatar Petroleum
STREAM Industrial &Engineering
Pre-Qualification Document | SIE - 2018
Completed Projects List | SIE 2018
15
S. No.
Project NameTender
Value (QRs)Completion
DateClient
MISCELLANEOUS
57EPC of Transmission Network Reinforcements Related to Ras Abu Aboud Power & Desalination Station
60 Million 2004 Kahramaa
58Engineering, Design, Supply, Installation & Training of Kilns Dedusting System at Plant No. 1
15 Million 2004Qatar National Cement Company
59Engineering, Supply, Supervision & Commissioning of Modified Shell Linens and Diaphragms for Optimization of Production Capacity – Cement Plant II / Felon & Lange
2 Million 2004Qatar National Cement Company
60
Design, Manufacture, Supple, Erection, Supervision and Commissioning of ENVIRO Seal for Kiln #1 inlet for Qatar National Cement Company in Partnership with Phillips Kiln Services, India
0.4 Million 2001Qatar National Cement Company
61
Supply and Commissioning of 3 (Three) Nos. of Rotary Vane Compressors Row 300H (S) Equipped with Noise Enclosure and Oil Pump and Spare Parts Kit for Two Years Operation
1.4 Million 2001Qatar National Cement Company
62Engineering Consultancy Services for Qatar Transmission System Expansion Stage 1
18.1 Million 2001 Kahramaa
63 Erection and Installation Work for Water Treatment Plant 1.8 Million 1999
PreussagWassertechnik GmbH / Qatar Steel Company
64Erection and Installation Work for Electric Arc Furnace No. 3 of Qatar Steel Company
3.6 Million 1999Siemens AG / Qatar Steel Company
65Procurement, Installation, Supervision & Commissioning of Sea Water Pump for CC #3 Water Treatment Plant with Motor & Motor starter
1.1 Million 1998 Qatar Steel Company
STREAM Industrial &Engineering
Pre-Qualification Document | SIE - 2018
S. No.
Project NameTender Value
(QRs)Completion
DateClient
1Construction and Upgrade of Rayyan Road Project 7; Contract 2 West of Olympic R/A to West of Rayyan R/A Street Lighting works
32 Million 2018 ASHGHAL
2Roads & Infrastructure in Doha Industrial Area –Pkg 6 (QS001-P06)
47 Million 2018 ASHGHAL
3 Qatar Umm Al Haul Power PJT – HVAC Works 70 Million 2018 Umm Al Haul
4 Street Lighting System Throughout Qatar 45 Million 2018 ASHGHAL
5 Msheireb Phase 1B 150 Million 2018 Msheireb Properties
6 New Port Project (NPP) – 67 – MEP Works 550 Million 2018 New Port
7 Al Wakra Logistic City Access Road 16 Million 2018 ASHGHAL
8Birkat Al Awamer – Electricity and Street Lighting Works
14 Million 2018 ASHGHAL
9 Hamad Medical City Car Park – Electrical Works 5 Million 2018Hamad Medical
Corporation
10 R6 – Tunnel (Upgrade of Al Rayyan Road) 40 Million 2018 ASHGHAL
11 Al Waab City Central District - Phase 1 21 Million 2018 Al Waab City
12Ministry of Finance – Modification_ Office Building (B+G+3)-Fit Out Works
18 Million 2019 Ministry of Finance
13 Construction of Doha College Campus At Al Waab 45 Million 2020 Doha College
14Lusail West Phase 1 District Cooling Plant PACKAGE 648830-C-5006
19.5 Million 2019Lusail City District
Cooling Plant Company
15Lusail West Phase 1 District Cooling Plant PACKAGE 648830-C-7001
11.5 Million 2019Lusail City District
Cooling Plant Company
Ongoing Projects List | SIE 2018
16
17STREAM Industrial &Engineering
Pre-Qualification Document | SIE - 2018
Major Projects
The New Port Project (NPP) includes the development of the New Port (NP) for the handling ofthe containers, general cargo, bulk foodstuffs, livestock and offshore supply.
The scope of services for NPP0067 shall include, but not be limited to:
Design, supply, construction, installation, interface, coordination, configuration, integration,testing and commissioning of the new port operational, management, MSIC Port Enterprisesystems, solutions and applications comprising but not be limited to:
Modular Disaster Recovery Centre (MDRC) (to be used initially as the operational data centreand after the completion of the main data centre to be used as a disasterrecovery centre)
Project Integration Centre (PIC)
New Port Project 67Location: Mesaieed RoadSector: MEPClient: NPP Steering CommitteeValue: 550 Million
18STREAM Industrial &Engineering
Pre-Qualification Document | SIE - 2018
Major Projects
Operation and maintenance, including supply of experienced and qualified manpower, of theModular Disaster Recovery Centre (MDRC) and Project Integration Centre (PIC) under a servicelevel agreement (SLA) between SIE and NPP for a fixed term of 60 months with option for right ofrenewal at the end of the first term of the SLA,
Design, supply, construction, installation, interface, coordination, testing and commissioning of allassociated civil/building works, MEP services, generators, UPS, feeder substation, infrastructure,utilities, accessories, equipment, cabling, ducting, fixtures and fittings ,spares, inspection,maintenance chambers, etc
Obtaining all Local Authority and Governmental approvals,
Integration of all the systems
Liaison and coordination with all related NPP packages and Contractors, NPP Consultants, EndUsers, Stakeholders, Local and Governmental Authorities
Connection to the new port primary infrastructure and utility point of connections (POC)Statutory, signage, directional signage’s
New Port Project 67Location: Mesaieed RoadSector: MEPClient: NPP Steering CommitteeValue: 550 Million
19STREAM Industrial &Engineering
Pre-Qualification Document | SIE - 2018
Major Projects
Msheireb, will regenerate and preserve the historical downtown of Doha.A QR20 billion development, it will revive the old commercial heart of the city through a newarchitectural language that is based on community living, across a 31 hectare (76 acre) site.
The Msheireb project will blend traditional Qatari heritage and aesthetics with moderntechnology, and focus on sustainability and harmony with the environment.
Stream Scope is the final fit out , Testing and commissioning of package 1b The phase covers 15buildings, including the country’s first Mandarin Oriental Hotel comprising 158 rooms and 91service apartments, two office buildings with 52 retail units and 12 residential buildingsproviding a total of 180 apartments.
Musheireb Phase 1B Location: Musheireb CitySector: MEPClient: Musheireb PropertiesValue: 150 Million
20STREAM Industrial &Engineering
Pre-Qualification Document | SIE - 2018
Major Projects
This phase includes the larger part of both Barahat Msheireb and Al Kahraba areas, and willcomprise the true heart of the development, with hospitality, dining, Mandarin Oriental Hotel, theCultural Forum, a new mosque and an exclusive residential component.
This phase will further see the development of a unique mixed-use neighbourhood stretchingNorth to South along the Western boundary. The residential area of this phase will comprise abusiness and retail component and a school adjacent to the strategic Al Diwan Street.
Musheireb Phase 1B
21STREAM Industrial &Engineering
Pre-Qualification Document | SIE - 2018
Major Projects
Musheireb Phase 1B
Msheireb Properties will also preserve several existing heritage sites, including houses dating backto the beginning of the last century.
Msheireb Downtown Doha will revive the old commercial heart of the city through a newarchitectural language across a 31-hectare site.
The Msheireb Downtown project blends traditional Qatari heritage and aesthetics with moderntechnology, and a focus on sustainability and harmony with the environment.
22STREAM Industrial &Engineering
Pre-Qualification Document | SIE - 2018
Major Projects
Umm Al Houl Combined Cycle Power Plant is part of Qatar's biggest power and waterprojects and will be located in the Qatar Economic Zone 3, south of the capital city of Doha.The power plant will be able to supply up to 2.52GW of electricity and 590,000m³ (136million gallons) of drinking water a day to 2.5m homes in the area.
The project will be constructed in two phases with the first phase scheduled to becompleted by Q2, 2017, while the overall completion of the project is planned for Q3, 2018.
The project is being implemented under the government's Qatar National Vision 2030 andwill help to increase electricity and water output by 22% and 25% respectively.
STREAM scope to deliver a HVAC , Control System Plumbing and drainage.
Umm Al Houl Power PlantLocation: Qatar Economic Zone 3Sector: MEPClient: Samsung C&T Value: 70 Million
23STREAM Industrial &Engineering
Pre-Qualification Document | SIE - 2018
Major Projects
Street Lighting System Throughout QatarLocation: Various LocationsSector: InfrastructureClient: AshghalValue: 52 Million
A call off contract 2 with Ashghalincluding the supply and installation ofStreet Lighting, Lighting Poles,Underpass lighting, Luminaires, Poles,cut-out , cabling , …… etc.
STREAM is carrying out the projectsuccessfully as per the contract scopeand liabilities.
24STREAM Industrial &Engineering
Pre-Qualification Document | SIE - 2018
Major Projects
Al Rayyan Road Upgrade P7C1Location: Al Rayyan RoadSector: InfrastructureClient: AshghalValue: 65 Million
The project involves the construction and development works of the most critical part of 10,7 kmof Al Rayyan Road. The works are being performed on a section of 5,3 km that stretches from theWest of Olympic Roundabout to the West of New Al Rayyan Roundabout.
Within the scope of the project, not only F106-B3-R5-R6-R7 and R8 junction structures includingbridges and underpasses are being constructed and upgraded but also an electrical powerstation, a storm water drainage network and an intelligent transportation system, treated sewageeffluent networks, electrical and telecommunication networks and landscaping.
STREAM is carrying out the project successfully as per the contract scope and liabilities.
25STREAM Industrial &Engineering
Pre-Qualification Document | SIE - 2018
Completed Projects
Being part of the expansion of PHCC MedicalFacilities, Umm Slal Health Care Center isone of the well advanced and developedcenter with all MEP Services executed bySTREAM from HVAC System, Fuel, Drainage,Plumbing, Solar System, BMS, Fire Fighting,Fire Alarm, CCTV, Power, Lighting, UPS,Structured Cabling, SMATV, Access Control,Smoke Management System, PowerGenerator, Transformer, Water Chillers,Chilled Water Pumps, Submersible Pumps,Booster and Transfer Pumps, Leak DetectionSystem etc.
Umm Slal Health &
Wellness Care CenterLocation: Doha, QatarSector: Buildings – Health CareClient: ASHGHALConsultant: CEGValue: 40 Million
26STREAM Industrial &Engineering
Pre-Qualification Document | SIE - 2018
Completed Projects
Muaither & Wajba Health
Care CentersLocation: Doha, QatarSector: Buildings – Health CareClient: ASHGHALConsultant: DAR Al HandasahValue: 70 Million
Being part of the expansion of PHCCMedical Facilities, Muaither & WajbaHealth Care Centers are well advancedand developed centers with all MEPServices executed by STREAM from HVACSystem, Fuel, Drainage, Plumbing, SolarSystem, BMS, Fire Fighting, Fire Alarm,CCTV, Power, Lighting, UPS, StructuredCabling, SMATV, Access Control, SmokeManagement System, Power Generator,Transformer, Submersible Pumps,Booster and Transfer Pumps, LeakDetection System etc.
27STREAM Industrial &Engineering
Pre-Qualification Document | SIE - 2018
Completed Projects
Harvey Nichols, a leading global luxury retailer, and Harvey Nichols Doha LLC, a luxury retailcompany affiliated to the Saleh Al Hamad Al Mana (SHM) Group of Companies have signed anexclusive licence agreement for the development of a Harvey Nichols store in Qatar.
Targeted to open in Q4 2017 in Doha Festival City, the store will boast 80,000sft of retail spacefeaturing an exclusive edit of fashion, beauty, children’s wear, homeware and a range of hospitalityservices, according to a statement issued yesterday by SHM Group of Companies.
STREAM scope to deliver a complete MEP services for the store including :
1-HVAC
2-Switchgears
3-Secuirity System
4-Audio Visual System
5-Lighting Fixtures
Harvey Nichols Stores Location: Doha Festival CitySector: MEPClient: Saleh Hamad Al ManaValue: 32 Million
Completed Projects
28STREAM Industrial &Engineering
Pre-Qualification Document | SIE - 2018
Al Wajba Residential CompoundLocation: Al WajbaSector: MEPClient: DomopanValue: 40 Million
Completed Projects
Design of value engineering items, Engineering, Supply, Installation, Execution, Completion,Testing and Commissioning of MEP works for 146 Villas, 2 Clubhouses, 2 Nursery, 2Mosques, 5 Gate Houses, 7 Service Compounds, all external works including externalfirefighting network detailed as follows:
Electrical works including transformers, generators, switch-gears, main cables, earthingand electrical circuits.
Extra Low Voltage System (fire alarm, system, block wiring for telephone, data and TV).
Air conditioning & ventilation works including AC units, fans, ducting works, grills,diffusers, & necessary accessories.
Internal & External Firefighting works including fire pumps, fire hose reel & cabinets,sprinkler system, fire extinguishers, fire blankets, & automatic gas suppression system attelecom room.
Internal plumbing & drainage works including water tanks, water heaters, water filters,water pumps, & final connection with sanitary wares as per the approved bill of quantity.
29STREAM Industrial &Engineering
Pre-Qualification Document | SIE - 2018
Completed ProjectsSeawater Filter System including installation of GRP pipes
for QAFAC.
Design, Fabrication, Inspection, Testing
& Supply of Seawater Filter System
Including Installation of GRP Pipes.
30STREAM Industrial &Engineering
Pre-Qualification Document | SIE - 2018
Completed Projects250 TPD Calcium Carbonate Plant - QNCC
Design, Engineering, Testing
& Commissioning of 250
TPD Calcium Carbonate
Plant for QNCC @ Umm-
Bab.
Supply, Installation &
Commissioning of Saltreat RO
System for ALUTECH
Saltreat RO System
31STREAM Industrial &Engineering
Pre-Qualification Document | SIE - 2018
Completed ProjectsCommercial Bank Building at Al Khartiyat
Supply Installation , Testing
And Commissioning of
Electrical Works, Air-
conditioning Works, Plumbing
& Drainage, Fire Fighting
Works.
32STREAM Industrial &Engineering
Pre-Qualification Document | SIE - 2018
Completed Projects
AL WAAB Complex Public
Roads - Package 1, 2 & 3
Street Lighting Works
Thank You
For Further Information please contact us at:
P.O. Box 22647 Doha - Qatar Tel. : +974 40409111/ 44365415
Fax : + 974 4322193 [email protected] www.stream-qatar.com