showcasing the status of roads in nairobi presented during the launch ceremony of the nairobi...

46
SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng. M. S. M. KAMAU, CBS, HSC Permanent Secretary Ministry of Roads

Upload: sandra-dennis

Post on 19-Jan-2016

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng

SHOWCASING THE STATUS OF ROADS IN NAIROBI

PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2nd AUGUST, 2012

By: Eng. M. S. M. KAMAU, CBS, HSC

Permanent SecretaryMinistry of Roads

Page 2: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng
Page 3: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng

OUTLINE OF THE PRESENTATIONOUTLINE OF THE PRESENTATION

Introduction Ongoing Road Projects in Nairobi Planned Road projects in Nairobi Private Sector Participation in Development of Road

Infrastructure Opportunities for Private sector Participation Way Forward

Page 4: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng

1.0 INTRODUCTION1.0 INTRODUCTION Economic pillar of the Vision 2030 is founded on road

transport infrastructure as an enabler.

Connectivity through a network of roads, railways, ports, airports, water and sanitation facilities, and telecommunications.

How does RSIP affect the operations of Nairobi Business Park and the entire business environment?

Page 5: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng

1.0 INTRODUCTION1.0 INTRODUCTION

Vision 2030

Economic PillarSocial Pillar

Political Pillar

Sound Infrastructur

e

RoadsICT Ports and Harbours

Railways

EnergyTransport Telecommunications

Water & Sanitation

Airports

ICT Public sector

Reforms

Macro-economic Stability Security

Land Use

Reforms

Energy Human Resources Investme

nt

Page 6: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng

1.1 Role of Road Transport in Business Development

Efficient Road Transport vital for Business Mobility and access for people and goods Public Transport Linkages with other modes of transport Stimulate development of new undeveloped areas

1.0 INTRODUCTION1.0 INTRODUCTION

Page 7: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng

1.2 Challenges to Efficient Road Transport

Traffic congestion Low capacity of existing Roads Inefficient Junction designs Increased demand Low levels of Investment in roads Poor spatial planning Encroachment on Road reserves Unregulated public transport

1.0 INTRODUCTION1.0 INTRODUCTION

Page 8: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng

1.3 Ministry’s Approach to the Challenges Proper maintenance of existing roads Expansion of existing Roads Opening and Construction of Missing Link Roads Construction of Bypasses Introduction of Bus Rapid Transit (BRT) Systems Proper coordination of land use Traffic management measures Demarcation and Protection of road reserves Private sector participation in infrastructure development

and Maintenance

1.0 INTRODUCTION1.0 INTRODUCTION

Page 9: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng

NAIROBI MISSING LINKSNAIROBI MISSING LINKS

Page 10: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng

NAIROBI BYPASSES MAPNAIROBI BYPASSES MAP

2. NAIROBI EASTERN AND NORTHERN BYPASS

Page 11: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng

ONGOING PROJECTS ONGOING PROJECTS

Page 12: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng

1.1. THIKA ROAD PROJECTTHIKA ROAD PROJECT Financed by the African Development Bank and GoK. To ease congestion on the busy Nairobi – Thika corridor. Substantially complete Major challenges:

-Road safety-Driver/ Road user education necessary-Relocation of services-Encroachment on road reserve/Land acquisition

Page 13: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng

2. NAIROBI EASTERN &NORTHERN BYPASS2. NAIROBI EASTERN &NORTHERN BYPASS

Financed by GoK and Chinese Government

Channel traffic away from the city centre

Eastern Bypass connects the busy Mombasa Road to Thika-Road

Northern bypass connects Thika Road to Ruaka area and will eventually connect to Nairobi – Nakuru Highway.

Page 14: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng

PROJECTS ONGOINGPROJECTS ONGOING

2. NAIROBI EASTERN AND NORTHERN BYPASS

NK 0+000 - Start

EK 0+000 - Start

Page 15: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng

2.2 2.2 Nairobi Eastern and Northern Bypass Nairobi Eastern and Northern Bypass

Outering Road Overpass Bridge (Km 1+000) Eastern Bypass

Dual Carriageway + Footpaths (KM 1+400 – KM 4+400) Eastern Bypass

Page 16: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng

3. NAIROBI WESTERN RING ROADS3. NAIROBI WESTERN RING ROADS Part of the Missing Link Roads In Nairobi. Funded by the Government of Japan through a Grant of Kshs 1.9

Billion . Part of the missing link roads in Nairobi. Construction commenced in June 2011. Expected completion in March 2013 Connect:

-Ngong Road to James Gichuru through Kileleshwa-Gitanga Road to Waiyaki way through Kileleshwa

Page 17: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng
Page 18: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng

4. 4. UPGRADING OF LANGATA ROADUPGRADING OF LANGATA ROAD

Financed by the Government of Kenya Upgrading to two lane dual carriage Contract Sum Kshs 2,671,000,000.00 Underpass at Bomas Junction Pedestrian walkways and cycle tracks for cyclists Box culvert Other drainage works Completion by May 2013

Page 19: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng

\\

Page 20: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng

5. NAIROBI SOUTHERN BYPASS5. NAIROBI SOUTHERN BYPASS

Financed by the Chinese Government and the Government of Kenya

Contract sum Ksh.17,199,793,766.00 Separate grade intersections at Mombasa, Langata, Ngong and Kikuyu roads Commenced 2nd July, 2012 Contract period is expected to be 36 months Expected completion by July 2015

Page 21: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng

5. NAIROBI SOUTHERN BYPASS5. NAIROBI SOUTHERN BYPASSScope Of Works:

Construction of dual carriageway with a length of 28.6 kilometres

12 kilometre slip roads 8.5 kilometre service roads An extra 8 kilometre service roads whose location shall be

decided by the employer Three full interchanges at Bypass intersection with

Mombasa, Langata and Ngong roads Fly-overs (partial interchanges) at Community, Thogoto

and Dagoretti roads. Street lighting installation on the whole road

Page 22: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng

Interchange configuration on southern Bypass /Ngong Road JunctionInterchange configuration on southern Bypass /Ngong Road Junction

Ngong RoadSouthern Bypass Road

Ngong

Nairobi

Kikuyu

Langata

Page 23: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng

6. NON- MOTORIZED TRAFFIC FACILITIES 6. NON- MOTORIZED TRAFFIC FACILITIES

Statistics have shown that over 47% of Nairobi Residents walk to and from work.

Non-motorized traffic facilities have been integrated into the designs of all road projects.

NMT facilities include:-Walkways-Cycle Tracks -Foot Bridges

These also help to improve on road safety.

Page 24: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng

Cycle Track

Walkway

Page 25: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng

7. UPPER HILL ROADS7. UPPER HILL ROADS

Financed by Government of Kenya

Implementation in two phases:

-Phase 1: Currently under construction-Phase II: Currently under Design

Page 26: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng

7.1 UPPER HILL ROADS: Phase I7.1 UPPER HILL ROADS: Phase I

Involves expansion of the existing roads by either dualling or widening of the lanes

Financed by the Government of Kenya

Contract Sum : Kshs Kshs.2,002,892,599.00

Commenced on 22nd May 2012

Expected Completion: 22nd May 2014

Page 27: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng

7.2 UPPER HILL ROADS: Phase I7.2 UPPER HILL ROADS: Phase I The roads to be dualled are:

-Part of Hospital Road-Elgon Road-Kilimanjaro road-Upper Hill road -Bunyala road

Page 28: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng

8. OTHER ONGOING ROAD PROJECTS 8. OTHER ONGOING ROAD PROJECTS NO. PROJECT FUNDING START DATE COMPLETION DATE

1 Upgrading of Eastleigh Roads

GoK 13th March, 2012.

24th May 2013

2 Rehabilitation of South C Roads

GoK 4th Dec, 2012 2nd Dec, 2013

3 Upgrading of Syokimau – Katani Road

GoK 4th Dec, 2012 4th Dec, 2013

4 Upgrading of Kasarani-Mwiki-Githurai Link Road (Phase I)

GoK 19th Feb, 2012 20th Oct, 2013

Page 29: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng

8. 8. OTHER ONGOING ROAD PROJECTS OTHER ONGOING ROAD PROJECTS

The project for the improvement of Eastliegh roads cover the following roads with a total of 2.1km:

-2nd Avenue Eastleigh-15th Street and adjoining streets.

2nd Avenue Eastleigh and 15th Street link Juja Road to 1st Avenue Eastleigh.

Page 30: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng

8. OTHER ONGOING ROAD PROJECTS8. OTHER ONGOING ROAD PROJECTS The scope of works include:

-Drainage Works-Construction of Footpaths-Construction of Bus-bays -Reconstruction of the carriageway-Junction Repairs

-Road furniture

The project commenced on 13th March, 2012 and is expected to be completed by 24th May 2013

Page 31: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng

PLANNED PROJECTSPLANNED PROJECTS

Page 32: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng

1. PHASE II: ADAMS ARCADE – KAREN – 1. PHASE II: ADAMS ARCADE – KAREN – NGONG - BOMASNGONG - BOMAS Negotiations ongoing for Funding by Chinese Government

Upgrading 30km to Dual Carriage standards

Estimated cost Kshs 15 Billion

Separate Grade intersections at Dagoretti corner, Junction with Southern Bypass and Karen Shopping Centre

Page 33: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng

2. PHASE II: ADAMS ARCADE – KAREN – 2. PHASE II: ADAMS ARCADE – KAREN – NGONG – BOMAS (Cont’d)NGONG – BOMAS (Cont’d)

Dualling to four (4) Lanes Provision of service roads Provision for Walkways and cycle tracks Footbridges at selected points Detailed Engineering designs will be completed by end of

August 2012 Expected to commence in early 2013 with a contract

period of 36 Months Expected completion by early 2016

Page 34: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng

3. Dualling of Outer Ring Road3. Dualling of Outer Ring Road

Financing Agreement signed with African development Bank for Kshs 3.5 Billion

Estimated cost Kshs 6.0 Billion

Negotiations ongoing for additional funding

Detailed Engineering designs completed

Expected to commence in early 2013 with a contract period of 36 Months

Page 35: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng

4. EU Funded Missing Link Roads4. EU Funded Missing Link Roads

Financing Agreement signed with European Delegation to Kenya

Estimated cost Kshs 3.5 Billion (€ 32.5 Million) Total of 13.6km of Missing Link Roads and 11.7 km of Non-

motorized Traffic facilities Detailed Engineering designs completed Expected to commence in January 2013 with a contract

period of 36 Months Expected Completion by January 2015

Page 36: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng

3. EU Funded Missing Link 3. EU Funded Missing Link RoadsRoads

MISSING LINK No

NAME LENGTH (KM)

Missing Link Roads M-1 Accra Road to Ngara Road 0.7M-5 (Muratina St) General Waruingi St to Juja Road 3.0

M-10 Likoni Road Extension): Enterprise Road to Mombasa 1.8

M-15a Ring Road Parkland (Westlands Roundabout – Limuru Road)

4.0

M-15b Ring Road Parkland Extension: (Limuru Road to Thika road)

1.6

M-16

Quarry Road Extension: (Ladhies Road to Quarry Road)

2.5

Total 13.6km

Page 37: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng

3. EU Funded Missing Link Roads3. EU Funded Missing Link RoadsMISSING LINK No

NAME LENGTH (KM)

Non- Motorized Transport Routes

MISSING LINK No

NAME LENGTH (KM)

NMT-16 Footpaths and cycle tracks on Jogoo Road 4.0

NMT-17

Footpaths and cycle tracks on Lusaka Road

5.2

NMT-18 Footpaths and cycle tracks on Rabai Road 2.5

Total 11.7km

Page 38: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng

5. Nairobi Urban Transport Improvement Project5. Nairobi Urban Transport Improvement Project

Financing Agreement signed with the World Bank

Comprised of Six Components:-JKIA – Museum Hill - Rironi Road-Bus Rapid Transit for Nairobi BRT (Consultancy)-Traffic Management Systems for Nairobi-Mombasa Urban Transport Master Plan-Light Rail transit for Nairobi-Capacity Building Component

Page 39: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng

5. Nairobi Urban Transport Improvement Project5. Nairobi Urban Transport Improvement Project

BRT Corridors-Haile Selassie – Ring Road Pumwani Junction-Ring Road Ngara-Juja Road -Komarock Road to junction with Kangundo road-Outering Road from Kangundo Road Junction to -Komarock Road Junction

Page 40: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng

Juja Road

Outer Ring Road

Kangundo Road

Jogoo Road

Manyanja Road

Msa Road

Njiru

NCBD

Page 41: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng

6. GREATER EASTERN BYPASS6. GREATER EASTERN BYPASS

- To connect Mombasa Road (A109) at Lukenya Hills to Garissa Road (A2) at Kilimambogo.

- Detailed engineering designs are ongoing.

7. GREATER SOUTHERN BYPASS7. GREATER SOUTHERN BYPASS

- To connect Mombasa Road (A109) at Athi River to Narok Road (B3) at Suswa.

- Currently at planning Stage.

Page 42: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng

PRIVATE SECTOR PARTICIPATION IN PRIVATE SECTOR PARTICIPATION IN ROAD INFRASTRUCTURE ROAD INFRASTRUCTURE

DEVELOPMENTDEVELOPMENT

Page 43: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng

1. Funding Models for Road Infrastructure1. Funding Models for Road Infrastructure

Entire Government funding

Entire Private sector funding (PPP)

Joint funding by both Government and Private sector.

Page 44: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng

2. OPPORTUNITIES FOR PRIVATE SECTOR 2. OPPORTUNITIES FOR PRIVATE SECTOR PARTICIPATIONPARTICIPATION

Road maintenance

New Road development

Public Transport (Bus Rapid Transit Systems - BRT)

Toll Roads construction

Toll Bridge construction

Page 45: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng

WAY FORWARDWAY FORWARD1. Enhance investment in Road infrastructure 2. Proper maintenance of existing roads3. Promote Safety in our roads4. Encourage private sector participation in Infrastructure

financing and development5. Improve Public Transport6. Enhance good governance in Management of Roads.7. Protection of Road Reserves8. Proper coordination with other agencies with regard to

demarcation and protection of road corridors

Page 46: SHOWCASING THE STATUS OF ROADS IN NAIROBI PRESENTED DURING THE LAUNCH CEREMONY OF THE NAIROBI BUSINESS PARK EXTENSION HELD ON 2 nd AUGUST, 2012 By: Eng

Thank You!Thank You!