LiftPro Introduction Three gas lift wells in Indonesia were selected for application of the LiftPro* artificial lift optimization service following a rigorous examination program that identified produc- tion inefficiencies. Key to the examination process were the PhaseTester* portable well testing unit and Vx* multiphase testing technology. The mul- tiphase flowmeter provided artificial lift engi- neers with real-time flow and well-test data with minimal interference to well operations. PhaseTester equipment also allowed multi- rate tests to be recorded with real-time response to a variable injection rate. The three wells were producing a com- bined 4,800 BOPD with continuous gas lift. Objectives for the LiftPro service were to improve stability increase production make more efficient use of gas lift resources show fast results. Challenge Previous conventional well tests were unsuc- cessful because of lags in response time and inconsistent results following changes in the operation of the wells. Solution The LiftPro service was chosen to diagnose the downhole gas lift equipment operation and pro- duction performance at varied surface settings. Results The overall production gain resulting from the LiftPro optimization service was 385 BOPD. Additionally, at the operating points determined by the service to be optimum, water production from the three wells fell by 157 B/D. A 20% reduction in the gas-injection rate was possible once problems that had been identified in the wells by the LiftPro service were corrected, and a revenue increase of USD 179,000/month was realized through opti- mized operation of the three gas lifted wells. Case study: Indonesia Highlights Immediate 385-B/D increase in oil production Water-production decrease of 157 B/D Injection gas reduction of 20% Overall revenue gain of $179,000/month Flow measurements from the PhaseTester unit, made using Vx multiphase well testing technology, monitor gas lift performance. Well-by-well optimization of gas lift wells

Upload: jahangir-malik

Post on 19-Nov-2015

213 views

Category:

Documents


0 download

DESCRIPTION

Shlumberger Liftpro Cs 2

TRANSCRIPT

  • LiftPro

    IntroductionThree gas lift wells in Indonesia were selectedfor application of the LiftPro* artificial liftoptimization service following a rigorousexamination program that identified produc-tion inefficiencies.

    Key to the examination process were thePhaseTester* portable well testing unit andVx* multiphase testing technology. The mul-tiphase flowmeter provided artificial lift engi-neers with real-time flow and well-test datawith minimal interference to well operations.PhaseTester equipment also allowed multi-rate tests to be recorded with real-timeresponse to a variable injection rate.

    The three wells were producing a com-bined 4,800 BOPD with continuous gas lift.Objectives for the LiftPro service were to

    improve stability

    increase production

    make more efficient use of gas liftresources

    show fast results.

    ChallengePrevious conventional well tests were unsuc-cessful because of lags in response time andinconsistent results following changes in theoperation of the wells.

    SolutionThe LiftPro service was chosen to diagnose thedownhole gas lift equipment operation and pro-duction performance at varied surface settings.

    ResultsThe overall production gain resulting fromthe LiftPro optimization service was 385BOPD. Additionally, at the operating pointsdetermined by the service to be optimum,water production from the three wells fell by 157 B/D.

    A 20% reduction in the gas-injection ratewas possible once problems that had beenidentified in the wells by the LiftPro servicewere corrected, and a revenue increase ofUSD 179,000/month was realized through opti-mized operation of the three gas lifted wells.

    Case study:IndonesiaHighlights

    Immediate 385-B/D increase in oil production

    Water-production decrease of 157 B/D

    Injection gas reduction of 20% Overall revenue gain of

    $179,000/month

    Flow measurements from the PhaseTester unit, made using Vx multiphase well testing technology, monitor gas lift performance.

    Well-by-well optimization of gas lift wells

  • AL_03_138_0 Schlumberger

    April 2004 *Mark of Schlumberger

    Produced by Oilfield Marketing Communications, Houston

    www.slb.com/oilfield

    Liquidrate

    (STB/D)GOR

    (cf/STB)

    1,200

    1,100

    1,000

    900

    800

    700

    600

    500

    Gas andinjection

    rate(MMcf/D)

    4.2

    3.6

    3.0

    2.4

    1.8

    1.2

    0.6

    0450 500 550 600 650 700

    Oil rate Water rate GOR Gas rate Injection rate

    Casing pressure (psi)

    Through the LiftPro service, it was determined that the optimum operating point for this well is at a casingpressure of approximately 550 psi.