LiftPro
IntroductionThree gas lift wells in Indonesia were selectedfor application of the LiftPro* artificial liftoptimization service following a rigorousexamination program that identified produc-tion inefficiencies.
Key to the examination process were thePhaseTester* portable well testing unit andVx* multiphase testing technology. The mul-tiphase flowmeter provided artificial lift engi-neers with real-time flow and well-test datawith minimal interference to well operations.PhaseTester equipment also allowed multi-rate tests to be recorded with real-timeresponse to a variable injection rate.
The three wells were producing a com-bined 4,800 BOPD with continuous gas lift.Objectives for the LiftPro service were to
improve stability
increase production
make more efficient use of gas liftresources
show fast results.
ChallengePrevious conventional well tests were unsuc-cessful because of lags in response time andinconsistent results following changes in theoperation of the wells.
SolutionThe LiftPro service was chosen to diagnose thedownhole gas lift equipment operation and pro-duction performance at varied surface settings.
ResultsThe overall production gain resulting fromthe LiftPro optimization service was 385BOPD. Additionally, at the operating pointsdetermined by the service to be optimum,water production from the three wells fell by 157 B/D.
A 20% reduction in the gas-injection ratewas possible once problems that had beenidentified in the wells by the LiftPro servicewere corrected, and a revenue increase ofUSD 179,000/month was realized through opti-mized operation of the three gas lifted wells.
Case study:IndonesiaHighlights
Immediate 385-B/D increase in oil production
Water-production decrease of 157 B/D
Injection gas reduction of 20% Overall revenue gain of
$179,000/month
Flow measurements from the PhaseTester unit, made using Vx multiphase well testing technology, monitor gas lift performance.
Well-by-well optimization of gas lift wells
-
AL_03_138_0 Schlumberger
April 2004 *Mark of Schlumberger
Produced by Oilfield Marketing Communications, Houston
www.slb.com/oilfield
Liquidrate
(STB/D)GOR
(cf/STB)
1,200
1,100
1,000
900
800
700
600
500
Gas andinjection
rate(MMcf/D)
4.2
3.6
3.0
2.4
1.8
1.2
0.6
0450 500 550 600 650 700
Oil rate Water rate GOR Gas rate Injection rate
Casing pressure (psi)
Through the LiftPro service, it was determined that the optimum operating point for this well is at a casingpressure of approximately 550 psi.