shaping a better futurenabil ghoulam architects project management asam (ayman sanyoura architecture...
TRANSCRIPT
C O M P A N Y P R O F I L E Shaping a Better Future
3
TABLE OF CONTENTS
SECTION I: COMPANY OVERVIEW
CHAIRMAN MESSAGE
GROUP ORGANIZATION CHART
KEY PERSONNEL
SECTION II: ENGINEERING & CONSTRUCTION
SECTION III: WASTE MANAGEMENT
SECTION IV: FACILITY MANAGEMENT
SECTION V: OFFICIAL CLASSIFICATION
OFFICIAL CLASSIFICATION CERTIFICATES
OFFICIAL DOCUMENTS AND CLASSIFICATIONS
ISO/OHSAS CERTIFICATIONS
MAJOR PRIVATE / PUBLIC PROJECTS
SECTION V: OUR OFFICES
4
SECTION I:COMPANYOVERVIEW
5
SECTION I: COMPANY OVERVIEW
6
7
CHAIRMAN MESSAGE
As I look at the growth over the years since our inception in 1967, I am extremely proud of what we have achieved, and even more excited about our outlook and promising future.
At RAMCO, we are committed to building long lasting relationship based on integrity, performance, value, and client satisfaction. We provide the means to complete projects on time and within budget, whilst maintaining unparalleled safety and quality standards.
Over the past five decades, we have developed our skills and professional excellence of constructions-in hotels, residential, commercial, hospitals, schools, resorts, public parking, industrial factories, infrastructure, roads, bridges, soil retaining and pilling. We have also expanded our scope to include facility management and eco-friendly waste management projects where we foresee a sustainable growth potential.
I deeply thank all the clients we have served over the past decades and truly value our strong relationships. Staying true to our code of ethics, trustworthiness and professionalism are the common threads that bond our employees and RAMCO together. Our commitment to the construction, facility management and waste management industries is strong and we embrace our future with great enthusiasm!
WASSIM AMMACHECHAIRMAN & CEO
8
GROUP ORGANIZATION CHART
Information TechnologyDepartment
Human ResourceDepartment
Finance and AdministrativeDepartment
9
KEY PERSONNEL
DESIGNATION NAME
Chairman - CEO Wassim Ammache
DIVISION MANAGERS
Chief Financial Officer Tony Hourany
Projects Manager Fadi Mousaed
Commercial & Business Development Marwan Daher
Waste Management Project Manager Walid Bou Saad
Internal Auditor Charbel Daou
Legal Advisor Abdel Rahman Labban
HEAD OF DEPARTMENTS
Head of Vehicle Control Department Mohammad Ali Makki
Workshop Manager Ayman Hilal
Waste Management & Operation Manager Khaled Salman
Head of Accounting Department Ghada Esper
Head of HR Department Khalil Halawi
Head of IT Department Rustom Mabsout
Head of Plant & Equipment Management Toufic Mukhalalti
Head of Estimation Department Mona Wazzan
Head of Projects Control & Quality Management Department Wafaa Saab
Head of Quantity Surveying Department Fady Karam
Head of Procurement Department Rania Ardroumli
Head of HSE Department Ibrahim Haroun
10
SECTION II:ENGINEERING & CONSTRUCTION
11
DESCRIPTIONThe project consists of the construction of a Dormitory Building and a Classes Building at the Internal Security Force (ISF) Aramoun training academy Lebanon for the ISF student cadets. The Classes building consists of 1 basement, a ground floor, and 4 upper floors. The Basement, ground floor, and first two upper floors contain classrooms and multipurpose rooms while the 3rd and 4th upper floors contains two 130-seat auditoriums.The Dorms building consists of 2 basements, a ground floor, and 2 upper floors. Each floor
DORMITORY AND CLASSES BUILDINGS FOR INTERNAL SECURITY FORCES
LOCATIONAramoun, Lebanon
CLIENTUS Department of State
PROJECT DURATION 2 years
TYPE OF WORKSArchitecturalElectro-MechanicalCivil Works
contains dorm rooms and toilets and is capable of housing around 50 students.The area between the two main structures contains a technical area consisting of water tanks, boiler room and pump room. The total built-up area of the project is around 7,000sqm.
SECTION II: ENGINEERING & CONSTRUCTION
12
RETAIL& LEISURE COMPLEX1338
LOCATIONSector Mina El Hosn, Beirut Central District, Lebanon
CLIENTSolidere SAL – Araco SAL
CONSULTANTIDEP
PROJECT DURATION2 years
DESCRIPTIONPhase I Construction of Retail and Leisure Complex constituting 6 underground parking levels with all enabling works (concrete, waterproofing) finished with Epoxy Flooring and serviced with all related electro-mechanical items and provisions (Elevators, ventilation, BMS, Fire, V&D, access control, FM200, CCTV, PMS etc)
TYPE OF WORKSArchitecturalElectro-MechanicalCivil Works
COMMERCIAL CENTER
13
DESCRIPTIONThe Project consists of the construction of an educational facility building; Teacher’s academy and Conservatoire National des Arts et Métiers” known as CNAM which is in relation with the Lebanese University and CNAM, Paris. The project has a built-up area of approximately 26,500m², covering 4 super-structure levels in U-shape design, an open air courtyard at ground level, and 2 underground levels covering nearly the whole land area
CNAM & TEACHERS’ ACADEMY
LOCATIONBeirut – Lebanon
CLIENTThe Council for Development & Reconstruction (CDR)
CONSULTANTLDRS
PROJECT DURATION30 months
EDUCATIONAL FACILITY
TYPE OF WORKSDemolitionArchitecturalElectro-MechanicalCivil Works
14
DESCRIPTIONMajestic Tower is a high standard residential project facing the Mediterranean Sea. It is a 22 story building with 3 basements for car parking, a ground floor, a service floor, 3 main elevators and 2 service elevators.
TYPE OF WORKS• Reinforced Concrete: 20,000m3
• Excavation: 36,000m3
• Reinforcing Steel: 2,200Tons
MAJESTIC TOWER
LOCATIONAin Mreisse, Beirut, Lebanon
CLIENTJaroudi Management Group
CONSULTANTKhatib & Alami
PROJECT DURATION36 Months
15
DESCRIPTIONRas Beirut 493 is two residential tower blocks that come together to create a community. With apartments of 190m2, Hamra Garden tower rises on Makdesi street in an area that has always been a highly attractive location. Bustling with urban energy and a distinctive vibe, Hamra is known for its timeless elegance, and pedestrian friendly streets. Top-notch medical centers, renowned universities like AUB and cultural centers are also found in close proximity to Hamra garden.
HAMRA GARDEN
LOCATIONRas Beirut, Beirut, Lebanon
CLIENTJaroudi Management Group
CONSULTANTHawa Moujaes
PROJECT DURATION24 Months
RESIDENTIALS
16
DESCRIPTIONThe Tower is situated on the peak of Ras Beirut, overlooking Beirut Lighthouse with a breathtaking sea view that captures your vision from all its floors.Beirut 700 is situated at the peak of Ras Beirut. It overlooks the Beirut Lighthouse, and hosts a breathtaking sea view that captures your vision from all floors. This tower features different apartment sizes that vary from 325m2, 435m2 to 640m2, where everyone can enjoy the gardens and the recreational facilities; these include 4 swimming pools and 2 gymnasiums.
BEIRUT 700
LOCATIONAin Mreisse, Beirut, Lebanon
CLIENTOwners of Beirut 700
CONSULTANTKhatib & Alami
PROJECT DURATION48 Months
17
RESIDENTIALS
DESCRIPTIONCalifornia 615 is located in Ras Beirut on California Street. It blends prime location with breathtaking views and quality living space. California 615 is a 10-story building with three basements for parking (this entails 3 car stores and common electro-mechanical services). Each floor consists of one apartment of 310m2.TYPE OF WORKS• Reinforced concrete structure with 30cm• Hourdi Slab and Super Deluxe Finishing• Reinforced Concrete: 3,026m3
• Excavation: 6,600m3
• Reinforcing Steel: 450Tons
CALIFORNIA 615
LOCATIONCalifornia Street, adjacent to Bliss Street, Beirut
CLIENTJaroudi Management Group
CONSULTANTHawa Moujaes
PROJECT DURATION24 Months
18
DESCRIPTIONGray D’albion is located in a 920m2 plot in Ain Mreisseh, Beirut, Lebanon. The site connects Corniche area to the Beirut Central District and Beirut New Waterfront. The project is a 10 story building with a penthouse at its top. The lower floors are composed of 2 apartments per floor.The 7th, 8th and 9th floors of the building have one apartment per floor ranging from 450m2 to 550m2. The penthouse is a duplex apartment, and has private access to the roof with spectacular panoramic views of the Mediterranean Sea and Beirut City.
TYPE OF WORKS• Structural Concrete Works: 6,500m3
GRAY D’ALBION
LOCATIONAin Mreisse 38, Beirut, Lebanon
CLIENTDogmoch Real Estate
CONSULTANTKhatib & Alami
PROJECT DURATION30 Months
19
DESCRIPTIONRaouche 1090 is a 22-floor luxury apartments building, located on the coast facing Raouche Rocks. The building consists of 5 basements, a ground floor and a service floor with breathtaking landscape and water mirrors.
TYPE OF WORKS• Reinforced Concrete: 30,000m3
• Reinforcing Steel: 4,500Tons
RAOUCHE 1090
LOCATIONLot 1090, Raouche, Beirut, Lebanon
CLIENTLURC (Lebanese United Real Estate Company)
CONSULTANTKhatib & Alami
PROJECT DURATION36 Months
RESIDENTIALS
20
DESCRIPTIONThis building is located in Beirut Central District. It consists of 5 basement floors, a ground floor, and 16 upper floors with a total construction area of 11,500m2. The building has a vault area, fitness centre, gymnasium, cafeteria, auditorium, and a majestic entrance lobby.
MEDITERRANEE GROUP COMPLEX
LOCATIONDowntown, Beirut, Lebanon
CLIENTMed Bank
CONSULTANTMansour Jamal
PROJECT DURATION12 Months
21
DESCRIPTIONManara 587 is a 17 story prestigious residential building located in the heart of Beirut. With its anti-seismic design and double glazed facades, the building consists of 3 underground parking levels with automatic controlled entrance, independent air conditioning & heating systems, integrated central management systems and electric generator. Fire-fighting equipment, including CO2 total flooding system and close circuit television cameras are included to guarantee safety and optimum security at all times. The building also hosts 2 main elevators and 1 service elevator.
TYPE OF WORKSFinishing works include marble/parquet internal flooring, granite kitchens with marble tops, gypsum false ceiling, premium hardwood doors, and aluminum double glazed windows with electrical rolling shutter.
MANARA 587
LOCATIONManara, Beirut, Lebanon
CLIENTAmmache Group
CONSULTANTKhatib & Alami
PROJECT DURATION24 Months
RESIDENTIALS
22
DESCRIPTIONJawad building is a distinguished and renowned structure from the 19th century. It was chosen among the few remaining buildings to be renovated as part of the reconstruction of downtown Beirut.
TYPE OF WORKSThe works included demolishing, renovation, restoration, underpinning a, and new construction works, achieved with full respect of regulation, in order to preserve the original building architecture.
JAWAD BUILDING
LOCATIONManara,Beirut, Lebanon
CLIENTBankMed Jawad
CONSULTANTOGER s.a.l
PROJECT DURATION12 Months
23
RESIDENTIALS
DESCRIPTIONThe project consists of six basements, one ground floor, one ground floor mezzanine, one podium, one podium mezzanine, 11 upper floors, and roof.The project’s total built-up area is around 17118.76m 2.
TYPE OF WORKS• Architectural • Electro-Mechanical• Civil Works
MAR ELIAS BUILDING
LOCATIONMar Elias- Lot 1986, Beirut, Lebanon
CLIENTJCC
CONSULTANTCode
24
DESCRIPTIONThe project comprises the construction of a new building composed of one basement, Two semi basements and two floors and the roofThe total built-up area is approximate 1,229 m2
TYPE OF WORKS• Architectural • Electro-Mechanical• Civil Works
EMBASSY OF THE HASHEMITE KINGDOM OF JORDAN
LOCATIONBaabda, Lebanon
CLIENTJordanian Embassy
CONSULTANTDar Al Handasah
25
DESCRIPTIONPrime Gate project is a high end office building with total built-up area of 17500 m².The building consists of 4 basements, a ground floor, and 9 upper floors.
TYPE OF WORKS• Architectural works• MEP works• Civil works• Landscape works
BCD 1494PRIME GATE
LOCATIONSolidere – Beirut, Lebanon
CLIENTPrime Gate sal
CONSULTANTJo Geitani Architects
RESIDENTIALS
26
DESCRIPTIONThe project is located on two plots and defines the south-eastern corner of the Beirut Central District. It is within walking distance from its main business center, several shopping areas and educational institutions. Saifi Plaza I- Lot 1068 is comprised of two building blocks with four basements and six floors above the ground level each. The two building blocks are connected to each other via a panoramic glazed bridged walkway at each floor level. Saifi Plaza II- Lot 1059 is formed of one building with four basements and seven floors above the ground level.
TYPE OF WORKSReinforced concrete, MEP, Finishes for the core of the building, and the external skin made of a unique blend of stone and glass.
SAIFI PLAZA 1 & 2
LOCATIONDowtown, Beirut, Lebanon
CLIENTAL Mada sal,Saifi square sal
CONSULTANTNabil Ghoulam architects
PROJECT MANAGEMENTASAM(Ayman Sanyoura architecture and management)
PROJECT DURATION24 Months
27
DESCRIPTIONEnabling Works (shoring and excavation) on a 31,000m2 property to allow the construction of a Mixed Use Development of 400,000m2 built-up area for hotel, residential, office and commercial spaces.
ABRAJ SOURIA
LOCATIONBaramkeh, Damascus, Syria
CLIENTAbraj Souria
CONSULTANTKhatib & Alami
Completed 1st phase
TYPE OF WORKS• Reinforced Concrete: 5,000m3
• Excavation: 800,000m3
• Shoring Piles: 11,000lm• Shotcrete: 9,000m2
• Anchors: 55,000lm• Reinforcing Steel: 1,500Tons
COMMERCIAL CENTERS
28
DESCRIPTIONEnabling Works (shoring, excavation, foundation piles and permanent diversion of Barada River) on a 45,000m2 property to allow the construction of a Mixed Use Development of 200,000m2 built-up area for hotel, residential, office and commercial spaces.
TYPE OF WORKS• Reinforced Concrete: 6,000m3
• Excavation: 400,000m3
• Shoring Piles: 8,500lm• Shotcrete: 9,000m2
• Anchors: 7,500lm• Building Piles: 17,500lm• Reinforcing Steel: 2,500Tons
KIWAN MIXED USED DEVELOPMENT
LOCATIONBeirut Road, Damascus, Syria
CLIENTKiwan JointStock Company(Al Kharafi Group)
CONSULTANTKhatib & Alami
Completed 1st phase
COMMERCIAL CENTERS
29
VILLAS
DESCRIPTIONThe project is a private villa in Baadbat region.It includes one basement, ground floor and two upper floors. The approximate built up area is 3000m2 and 2000m2 landscaping area.
TYPE OF WORKSThe works comprise civil works, architectural, electro-mechanical and interior design works.
VILLA BAABDAT
LOCATIONBaabdat, Lebanon
CLIENTBaabdat Villa
CONSULTANTRafik Khoury & Partners
PROJECT DURATION2 Years
30
DESCRIPTIONThe project is located on two plots in the Neehmeh area directly on the sea side. It is composed of 20 blocks leading to 47 housing units (simplexes, duplexes and triplexes), as well as a health club. Each villa has its own pool and landscaping area. Total plot area 36,000m2 and built up area 26,000m2.
TYPE OF WORKSReinforced concrete, electro-mechanical works, finishing works.
NEEMEH 576-611
LOCATIONNeehme, Lebanon
CLIENTHiba Real estate
CONSULTANTYoussef HaidarArchitecte DPLG
PROJECT DURATION24 Months
31
RESORTS
DESCRIPTIONFaqra Hills is a unique private residential project perched in the hills overlooking Faqra’s mountain resort. The project consists of 7 buildings, each with 6 independent apartments and two underground car park floors. Faqra Hills also includes a hotel with sport facilities and parking spaces that are all connected to the hotel via underground tunnels.
TYPE OF WORKS• Reinforced concrete structure with 30cm• Hourdi Slab and Super Deluxe Finishing• Reinforced Concrete: 17,000m3
• Excavation: 66,000m3
• Shoring Piles: 1,500 lm• Anchors: 6,000lm• Reinforcing Steel: 1,500Tons
FAQRA HILLS
LOCATIONFaqra, Lebanon
CLIENTFaqra Hills for Tourism
CONSULTANTAbdul Wahad Chehab
PROJECT DURATION36 Months
32
DESCRIPTIONThe project is an extension of the existing Clemenceau medical center hospital; it is composed of 6 basements, a ground floor, an attic floor, 10 floors, a roof and a top of roof.
TYPE OF WORKS• Reinforced Concrete: 9480m3
• Architectural works at existing block• Finishing works at new extension block• Electro-mechanical Works
CLEMENCEAU MEDICAL CENTER (CMC) EXTENSION
LOCATIONBeirut-Clemenceau
CLIENTClemeceau Medical Center S.A.L
CONSULTANTKhatib & Alami
PROJECT DURATION20 Months
33
DESCRIPTIONThe project is an outpatient clinic building located next to the Clemenceau Medical Centre. The project comprises of 4 basements, a lower ground floor for parking and general services, an upper ground floor for lobby and offices, 8 typical floors for clinics, a roof and a rooftop.
TYPE OF WORKS• Reinforced concrete structure with 30cm• Solid Slab and Super Deluxe Finishing.• Reinforced Concrete: 3,088m3
• Reinforcing Steel: 618
CLEMENCEAU MEDICAL CENTER (CMC) OPD
LOCATIONBeirut-Clemenceau
CLIENTClemenceau Medical center
CONSULTANTKhatib & Alami
PROJECT DURATION12 Months
HOSPITALS
34
HOSPITALS
DESCRIPTIONThe hospital consists of a 5-story building with 40 hospital beds, 2 surgery rooms, a pharmacy and an emergency entrance. The total “built-up” area for the building is 3100m2 and 5,000m2 for landscaping.
TYPE OF WORKS• Reinforced concrete structure, Architecture Finishing
HABTOOR HOSPITAL
LOCATIONHrar , Akkar, North Lebanon
CLIENTSandouk Al Zakat
CONSULTANTArkan
PROJECT DURATION18 Months
35
DESCRIPTIONConstruction of a five star hotel consisting of 250 rooms, 60 suites, underground parking facility for 500 cars, 4 restaurants, a shopping centre,3 conference halls and a health club.
TYPE OF WORKS• Excavation Works• Concrete Construction• All Tiling Works• All Painting Works• All Wood Works• All Electro-Mechanical Works• All Kitchen Equipment• All Laundry Equipment• Swimming Pool• All Other Finishes Except for Furniture
SHERATON HOTEL (PM-RC)
LOCATIONAleppo, Syria
CLIENTBab Al-Faraj Company for Tourism and Hotels
CONSULTANTKahtib & Alami
PROJECT DURATION22 Months
HOTEL
36
DESCRIPTIONBeirut Northern Entrances.
TYPE OF WORKSTraining of Nahr Beirut, construction of pre-stressed concrete viaduct and crossings, and construction of a highway and service road.• Excavation: 390,000m3
• Fill: 220,000m3
• Concrete: 120,000m3
• Asphalt: 23,000m3
ROADS PARALLEL TO NAHR BEIRUT
LOCATIONKarantina,Jisr El Bacha,Beirut, Lebanon
CLIENTCouncil of Development and Reconstruction
CONSULTANTDar Al-Handasah Shair and Partners
PROJECT DURATION24 Months
37
DESCRIPTIONHighway and infrastructure construction, measuring 4.89Km in length and including two tunnels, retaining walls, U-sections and all related electro-Mechanical works.
KHALDEH-COCODI HIGHWAY
LOCATIONBetween Khaldeh-Choueifat and Cocodi, Lebanon
CLIENTCouncil of Development and Reconstruction
CONSULTANTDar Al-Handasah Shair and Partners
PROJECT DURATION14 Months
TYPE OF WORKSHighway and infrastructure construction, measuring 4.89Km in length including 2 tunnels, retaining walls, U-sections and all related electro-mechanical works (plumbing stations, transformers, UPS, lighting, CO monitoring system); in addition to complete storm and sewage networks. • Excavation : 900,000m3
• Concrete: 150,000m3
• Asphalt: 12,850m3
• Storm drain line: 7,000m• Sewer line: 5,100m
ROADS & UTILITY WORKS
38
DESCRIPTIONBeirut International Airport Car Park Facility.
TYPE OF WORKSParking facilities for BIA employees, passengers, and visitors. With a total capacity of 2,350 vehicles, the parking holds a capacity of 1,748 cars, in addition to a 30,000m2 surface area for 602 vehicles. An underground pedestrian tunnel connects the parking structure to the terminal building.• Excavation: 397,000m3
• Concrete: 34,000m3
• Asphalt: 20,000m3
BEIRUT AIRPORT CAR PARK
LOCATIONBeirut International Airport (BIA), Lebanon
CLIENTMohammad Adulmohsen Al Kharafi & Sons, WLL
CONSULTANTDar Al-Handasah Shairand Partners
PROJECT DURATION24 Months
39
DESCRIPTIONRehabilitation/renovation works in Beirut southern suburbs.
BEIRUT CITY SERVICE UPGRADING
LOCATIONBeirut City Services Upgrading, Lebanon
CLIENTConseil Executif des Grands Projects de Beyrouth
PROJECT DURATION24 Months
TYPE OF WORKSRehabilitation and upgrading of roads and utilities in 250 main and secondary streets within Beirut southern suburbs. Works included the installation of sewage and water supply networks, in addition to sidewalk and asphalt works. Excavation: 450,000m3
Asphalt: 26,000m3
Storm channels: 30,000mSewer Line: 26,000mWater Supply Lines: 6,000mSidewalks: 50,000m2
Curbstone: 35,000m
ROADS & UTILITY WORKS
40
TYPE OF WORKSConstruction and rehabilitation of existing civil, mechanical, and electrical infrastructure in Bourj Hammoud. Works included the separation of sewer from storm water networks, as well as the rehabilitation of storm, sewer and potable water networks. Work on road and street lighting were also carried out.Excavation: 41,500m3
Concrete: 5,500m3
Asphalt: 3,000m3
Sewer Lines: 9,000mPotable Water Lines: 5,000m
DESCRIPTIONRehabilitation works in Beirut Northern suburbs.
REHABILITATION WORKS
LOCATIONBourj Hammoud,Lebanon
CLIENTCouncil of Development and Reconstruction
CONSULTANTDar Al –Handasah(Shair& Partners)
PROJECT DURATION24 Months
41
DESCRIPTION100km dual carriageway between the cities of Lattakia and Ariha - Syria.
TYPE OF WORKSConcrete works include the construction of 92 bridges, 140 underpasses, 130,000km of safety barriers, and all ancillary works for a total of 1,000,000m3 of concrete.
LATTAKIA-ARIHA HIGHWAY(PM-RC)
LOCATIONSyrian Arab Republic
CLIENTMohammad Adulmohsen Al Kharafi & Sons, WLL
CONSULTANTKhatib & Alami
PROJECT DURATION5 Years
ROADS & UTILITY WORKS
42
DESCRIPTION100km Highway between the cities of Deir Ezzor and Al Hassakah - Syria.
TYPE OF WORKSConstruction of 4 bridges, 36 culverts and related safety barriers for the 95km newly constructed highway between Deir Ezzor and Al Hassakah.
DEIR EZZOR-AL HASSAKAH HIGHWAY(PM-RC)
LOCATIONSyrian Arab Republic
CLIENTPublic Establishment for Roads Communications.
CONSULTANTKhatib & Alami
PROJECT DURATION20 Months
43
DESCRIPTIONThe project is composed of Basement 7 allocated for water tanks and pump rooms, 6 basements (B6-B1) allocated for car parking, Ground floor allocated for guard rooms, utilities and gardens.
METROPOLITE AWDE GARDEN AND CAR PARK
CLIENTBeirut Municipality JCC SAL
CONSULTANTDar Al HandasahNazih Taleb
PROJECT DURATION18 Months
ROADS & UTILITY WORKS
TYPE OF WORKSThe works comprise:Architectural, electro-mechanical works and civil works.
44
SECTION III:WASTE
MANAGEMENT
45
SECTION III: WASTE MANAGEMENT
significance of a healthy and clean environment, which is why we offer waste management services to municipalities across Lebanon.
WHAT WE DO
WE PROVIDE WASTE MANAGEMENT SERVICES FOR ALL KINDS OF WASTE
We gather, haul, transfer and dispose of municipal solid waste including recycling materials. We deal in construction, excavation, packaging and electronic waste.
We have state of the art technologies for the management of waste. We believe in contributing to the environment through taking care of all kinds of municipal solid waste. We understand the
46
DESCRIPTIONYearly collection of 550,000ton of municipal solid and bulky waste including 1000km of daily mechanical and manual streets and highways sweeping.
SWEEPING AND MUNICIPAL WASTE COLLECTION
LOCATIONMetn & Keserouan, Lebanon
CLIENTCouncil for Development and Reconstruction
CONSULTANTDG Jones
PROJECT DURATION7 years
47
WASTE MANAGEMENT
48
SWEEPING AND MUNICIPAL WASTE COLLECTION
LOCATIONBeirut, Lebanon
CLIENTBeirut Municipality
CONSULTANTRafik El Khoury
PROJECT DURATION5 years
DESCRIPTIONYearly collection of 300,000ton of municipal solid and bulky waste. 600km of daily mechanical and manual sweeping of roads including the provision of hydraulically operated underground bins collection points.
49
equipped with advanced machinery making the drive and reach of remote garbage cans across the narrowest and busiest roads, a child’s play.We have highly trained and experienced staff along with the widest range of vehicles to take away the weight of wastage from the environment.Our fleet includes EURO5 Class vehicles, having the lowest noise and emission levels, in line with our belief in safety, security, cleanliness and healthy environment. We strongly insist on our personnel safety which is why we strictly follow the highest standards of EN 1501.
WHAT WE USE
WE WORK OUR MAGIC WHEN THE WORLD IS SLEEPING
We were the first company to introduce a wide variety of garbage collecting vehicles equipped with modern-day technology, hybrid systems, and hydraulic pressures. We believe in applying technological breakthroughs to achieve a more beautiful tomorrow. Our vehicles and garbage disposal systems are manufactured in the top notch industries of Europe.Our garbage collecting automobiles are
WASTE MANAGEMENT
50
OUR ACHIEVEMENTSWe aim at reducing all kinds of pollution and wastage including even noise, we hence take special care during the procedure of emptying of the garbage containers to minimize the annoyance.
We aim at creating service benchmarks for achieving a healthy world. We continuously strive to develop state-of-the-art vehicles to clean the streets of the city.
51
WASTE MANAGEMENT
52
OUR COMMITMENTSWe are devoted to taking care of the aesthetic value of the city while providing a clean and beautiful environment. Posters which are hung on the walls without permission and damaging the beauty of the streets are cleaned using pressurized water and special equipment.
53
WASTE MANAGEMENT
54
SECTION IV:FACILITY
MANAGEMENT
55
WHEN THE PROJECT IS COMPLETED AND COMMISSIONED, A NEW RELATIONSHIP BEGINS
Ramco gained experience in buildings construction and management during construction phase has facilitated the setup of facility management and maintenance services department (Ramco Facility Management) to handle projects at post construction phase.
We at Ramco Facility Management, ensure that our clients’ assets operate as efficient as possible. This means minimizing asset downtime
and maximizing their useful life. Our experienced facilities teams are focused on delivering the highest quality service, while ensuring absolute compliance with health, safety and environmental standards.
SECTION IV: FACILITY MANAGEMENT
56
DESCRIPTIONThe project is an extension of the existing Clemenceau medical center hospital; it is composed of 6 basements, a ground floor, an attic floor, 10 floors, a roof and a top of roof.
TYPE OF WORKS:Maintain the Hospital’s physical environment and providing maintenance services towards the goal of achieving excellence in the delivery of quality healthcare and patient service, and provide around the clock emergent maintenance service to the hospital.
CMC HOSPITAL
LOCATIONBeirut-Clemenceau
CLIENTClemeceau Medical Center
CONSULTANTKhatib & Alami
PROJECT DURATION3 years
57
DESCRIPTIONThe project is an outpatient clinic building located next to the Clemenceau Medical Centre. The project comprises of 4 basements, a lower ground floor for parking and general services, an upper ground floor for lobby and offices, 8 typical floors for clinics, a roof and a rooftop.
TYPE OF WORKSProvide maintenance and operational services for all installed finishing works including electromechanical systems.
CLEMENCEAU MEDICAL CENTER (CMC) OPD
LOCATIONBeirut-Clemenceau
CLIENTClemenceau Medical center
CONSULTANTKhatib & Alami
PROJECT DURATION3 years
FACILITY MANAGEMENT
58
DESCRIPTIONThe Tower is situated on the peak of Ras Beirut, overlooking Beirut Lighthouse with a breathtaking sea view that captures your vision from all its floors.Beirut 700 is situated at the peak of Ras Beirut. It overlooks the Beirut Lighthouse, and hosts a breathtaking sea view that captures your vision from all floors. This tower features different apartment sizes that vary from 325m2, 435m2 to 640m2, where everyone can enjoy the gardens and the recreational facilities; these include 4 swimming pools and 2 gymnasiums.
BEIRUT 700
LOCATIONAin Mreisse, Beirut, Lebanon
CLIENTOwner AssociationBeirut 700
CONSULTANTKhatib & Alami
PROJECT DURATION3 years
TYPE OF WORKSProvide operation and service maintenance to all installed finishing and electromechanical systems.
59
DESCRIPTIONManara 587 is a 17 story prestigious residential building located in the heart of Beirut. With its anti-seismic design and double glazed facades, the building consists of 3 underground parking levels with automatic controlled entrance, independent air conditioning & heating systems, integrated central management systems and electric generator. Fire-fighting equipment, including CO2 total flooding system and close circuit television cameras are included to guarantee safety and optimum security at all times. The building also hosts 2 main elevators and 1 service elevator.
TYPE OF WORKSProvide operation and service maintenance to all installed finishing and electromechanical systems.
MANARA 587
LOCATIONManara, Beirut, Lebanon
CLIENTOwner AssociationManara 587
CONSULTANTKhatib & Alami
PROJECT DURATION3 years
FACILITY MANAGEMENT
60
WE SCHEDULE PROGRAMMED PREVENTATIVE AND STATUTORY MAINTENANCE WORKSWe support our clients with a 24/7 reactive breakdown service. Our proven maintenance management system underpins our service delivery.
61
FACILITY MANAGEMENT
SERVICES• Preventive, predictive, and corrective maintenance• Environmental health and safety• Life cycle asset management • Critical support functions (i.e. help desk and call centers)• Cost management• Work order processing
In addition to our core self-performed management capability, we can scale to our clients’ needs through our subcontracting. This is achieved through Supply Chain Management,
whereby qualified suppliers are chosen based on their commitment to Ramco Facility Management mission and goals.
Some of the services that we procure through subcontract management, include:
• Janitorial services • Landscaping and grounds maintenance • Third party service provider maintenance
62
SECTION V:OFFICIAL
CLASSIFICATION
63
OFFICIAL CLASSIFICATION CERTIFICATES
64
65
OFFICIAL CLASSIFICATION CERTIFICATES
66
67
OFFICIAL CLASSIFICATION CERTIFICATES
68
69
OFFICIAL CLASSIFICATION CERTIFICATES
70
71
OFFICIAL CLASSIFICATION CERTIFICATES
72
73
OFFICIAL CLASSIFICATION CERTIFICATES
74
75
OFFICIAL CLASSIFICATION CERTIFICATES
76
77
OFFICIAL CLASSIFICATION CERTIFICATES
78
79
OFFICIAL CLASSIFICATION CERTIFICATES
80
81
OFFICIAL CLASSIFICATION CERTIFICATES
82
83
OFFICIAL CLASSIFICATION CERTIFICATES
84
85
SECTION V: OUR OFFICES
OUR OFFICESHuman Ressource [email protected]
LEBANONRAMCO MAIN OFFICESarroulla Bldg 7th flr, Hamra Street, Beirut, Lebanon
Tel : +961 1 354 635 / 6Fax: +961 1 347 [email protected]
RAMCO WASTE MANAGMENTBiakout-Metn highway Lot 214Hotline : +961 70 686 868
www.ramcoeng.com
SECTION V:OUR OFFICES