sgef 173 maps of lee county noticed general permit …nsgl.gso.uri.edu/flsgp/flsgpm08002.pdf ·...

55
i Maps of Lee County Noticed General Permit Trafficshed Channels and Secondary Channels SGEF-173 30 October 2008 Gustavo A. Antonini Robert A. Swett David A. Fann

Upload: vonhu

Post on 24-Jan-2019

220 views

Category:

Documents


0 download

TRANSCRIPT

i

Maps of Lee County Noticed General PermitTrafficshed Channels and

Secondary Channels

SGEF-17330 October 2008

Gustavo A. AntoniniRobert A. SwettDavid A. Fann

ii

This publication was supported by the National Sea Grant College Program of the U.S. Department of Commerce’s National Oceanic and Atmospheric Administration (NOAA), Grant No. NA16RG-2195. The views expressed are those of the authors and do not necessarily reflect the view of these organiza-tions. Additional copies are available by contacting Florida Sea Grant, University of Florida, PO Box 110409, Gainesville, FL, 32611-0409, (352) 392.2801, www.flseagrant.org.

iii

Maps of Lee County Noticed General PermitTrafficshed Channels and

Secondary Channels

SGEF-17330 October 2008

Gustavo A. AntoniniRobert A. SwettDavid A. Fann

ii

Foreword

This document is a collection of maps, prepared by Florida Sea Grant, that depict channels included in the Lee County Noticed General Permit (NGP)1 . Each map shows either (a) channel segments within an NGP trafficshed (boat source area, the vessels berthed in which exit via a common channel to a secondary channel or directly to deep, open water) or (b) segments in an NGP secondary chan-nel system (contains channels that route vessels from one or more trafficsheds to deep, open water).

Channel segments are symbolized by line thickness to highlight those for which dredging is antici-pated under the NGP. The symbology is determined by subtracting the measured MLLW2 depth of each channel segment from the NGP depth (determined for the entire trafficshed or secondary chan-nel system). If the difference is greater than zero, the status “NGP Dredging Anticipated” is assigned. Otherwise, the status is “NGP Dredging not Anticipated.” Each map includes a summary table of total NGP channel length, total length of channel segments for which NGP dredging is anticipated, and NGP dredge depth.

The channel segments are waterway centerlines constructed from depths measured in the Lee County Regional Waterway Management System project, Phase 1 (2000)3 , Phase 2 (2001)4, and Phase 3 (2002)5.

1 Rule 62-341.494, F.A.C., “Noticed General Permit for Maintenance of Public Navigation Channel and Canal Infrastructure by the West Coast Inland Navigation District within Lee County”

2 Mean Lower Low Water

3 Swett, R.A., D.A. Fann, G.A. Antonini, and L. Carlin Alexander, 2000. Regional Waterway Man-agement System for Lee County, Phase 1: Estero Bay, Florida Sea Grant TD3, Gainesville, FL: Florida Sea Grant College Program, 2000.

4 Swett, R.A., D.A. Fann, G.A. Antonini, and L. Carlin Alexander, 2001. Regional Waterway Manage-ment System for Lee County, Phase 2: Pine Island Sound, Florida Sea Grant TD4, Gainesville, FL: Florida Sea Grant College Program.

5 Fann, D.A., R.A. Swett, L. Carlin Alexander, and G.A. Antonini, 2002. Regional Waterway Manage-ment System for Lee County, Phase 3: Caloosahatchee River, Florida Sea Grant TD5, Gaines-ville, FL: University of Florida Sea Grant College Program.

ii

iii

1. Back Channel-South Estero Bay (SC)2. Big Carlos Pass & Vicinity (SC)3. Bokeelia East4. Bokeelia West5. Caloosa Isle Marina6. Cape Coral Southwest7. Central Estero Bay (SC)8. Chantry Canal9. Compass Rose10. Deep Lagoon11. Demere Key12. East Fort Myers13. Estero Island-Bayside (SC)14. Everest Canal15. Fish Tale Marina16. Fish Trap Bay 217. Fort Myers Yacht Basin18. Franklin Locks East19. Getaway20. Hancock Creek21. Hogue (SC)22. Hurricane Bay East (SC)23. Hurricane Bay West (SC)24. Imperial River-Lower

25. Imperial River-Upper26. Imperial Shores27. Marsh Point28. Matanzas Harbor (SC)29. Matlacha-Northwest30. Matlacha-Southwest31. Matlacha Isles/Cape Coral-Northwest32. Mullock Creek33. Normandy Canal34. North Matlacha (SC)35. Orange River36. Pelican Landing37. Plato Canal38. Punta Rassa/Connie Mack Island39. Redfish Point40. Rookery Trace (SC)41. Roosevelt Channel-Bayside42. Roosevelt Channel-North43. Saint James City-East44. Saint James City-South45. Siesta Isles46. South Estero Bay (SC)47. South Matlacha (SC)48. Sunset Bay

Trafficshed and secondary channel (SC) maps

iv

Trafficshed and Secondary Channel System Overview

Lee County

All Lee NGP Channels

Lee NGP Trafficsheds

0 105Mile

Ft. Myers

Cape Coral

Sanibel Is.

PineIs.

1

0 0.50.25Mile

Back Channel-South Estero Bay

Secondary Channel

Total NGP channel length 18,252 ftAnticipated dredge length 178 ftNGP dredge depth 3 ft

BigCarlosPass

ChannelLocation

NGP Dredging not Anticipated

NGP Dredging Anticipated

Figure 1. Back Channel-South Estero Bay

2

0 0.50.25Mile

Big Carlos Pass& Vicinity

Secondary Channel

Total NGP channel length 9,354 ftAnticipated dredge length 0NGP dredge depth 4.5 ft

Ft Myers Beach

ChannelLocation

Big Carlos Pass

NGP Dredging not Anticipated

NGP Dredging Anticipated

Figure 2. Big Carlos Pass & Vicinity

3

0 0.50.25Mile

Bokeelia East

Total NGP channel length 8,499 ftAnticipated dredge length 535 ftNGP dredge depth 4.5 ft

NGP Dredging not Anticipated

NGP Dredging Anticipated

TrafficshedLocation

Pine Island

Figure 3. Bokeelia East

4

00.

50.

25M

ile

Boke

elia

Wes

t

NG

P D

redg

ing

not A

ntic

ipat

ed

NG

P D

redg

ing

Ant

icip

ated

Traf

ficsh

edLo

catio

n

Pine

Isla

nd

Tota

l NG

P ch

anne

l len

gth

13,8

07 ft

Antic

ipat

ed d

redg

e le

ngth

1,9

82 ft

NG

P d

redg

e de

pth

3.5

ft

Figure 4. Bokeelia West

5

00.

50.

25M

ile

Cal

oosa

Isle

Mar

ina

NG

P D

redg

ing

not A

ntic

ipat

ed

NG

P D

redg

ing

Ant

icip

ated

Traf

ficsh

edLo

catio

n

Cap

eC

oral

Ft.

Mye

rs

Tota

l NG

P ch

anne

l len

gth

8,34

3 ft

Antic

ipat

ed d

redg

e le

ngth

2,5

39 ft

NG

P d

redg

e de

pth

5 ft

Figure 5. Caloosa Isle Marina

6

0 10.5Mile

Cape Coral Southwest

NGP Dredging not Anticipated

NGP Dredging Anticipated

TrafficshedLocation

CapeCoral

PineIsland

Lock

Total NGP channel length 10,603 ftAnticipated dredge length 1,521ftNGP dredge depth 6 ft

Figure 6. Cape Coral Southwest

7

0 10.5Mile

CentralEstero Bay

Secondary Channel

Total NGP channel length 18,437 ftAnticipated dredge length 385 ftNGP dredge depth 2.5 ft

NGP Dredging not Anticipated

NGP Dredging Anticipated

BigCarlosPass

ChannelLocation

Figure 7. Central Estero Bay

8

01

0.5

Mile

Cha

ntry

Can

al

Tota

l NG

P ch

anne

l len

gth

11,3

15 ft

Antic

ipat

ed re

dge

leng

th 4

58 ft

NG

P d

redg

e de

pth

4.5

ft

NG

P D

redg

ing

not A

ntic

ipat

ed

NG

P D

redg

ing

Ant

icip

ated

Traf

ficsh

edLo

catio

nC

ape

Cor

al

Ft.

Mye

rs

Figure 8. Chantry Canal

9

0 0.10.05Mile

Compass Rose

Total NGP channel length 1,172 ftAnticipated dredge length 0NGP dredge depth 4.5 ft

NGP Dredging not Anticipated

NGP Dredging Anticipated

Ft Myers Beach

TrafficshedLocation

San CarlosIsland

Figure 9. Compass Rose

10

0 0.50.25Mile

Deep Lagoon

Total NGP channel length 9,242 ftAnticipated dredge length 491NGP dredge depth 6 ft

NGP Dredging not Anticipated

NGP Dredging Anticipated

TrafficshedLocation

RedfishPoint

Figure 10. Deep Lagoon

11

01

0.5

Mile

Dem

ere

Key

Tota

l NG

P ch

anne

l len

gth

19,7

21 ft

Antic

ipat

ed d

redg

e le

ngth

1,0

52 ft

NG

P d

redg

e de

pth

3.5

ft

NG

P D

redg

ing

not A

ntic

ipat

ed

NG

P D

redg

ing

Ant

icip

ated

Traf

ficsh

edLo

catio

n

Pine

Isla

nd

Figure 11. Demere Key

12

00.

50.

25M

ile

East

For

t Mye

rs

Tota

l NG

P ch

anne

l len

gth

2,58

8 ft

Antic

ipat

ed d

redg

e le

ngth

1,6

22 ft

NG

P d

redg

e de

pth

7 ft

NG

P D

redg

ing

not A

ntic

ipat

ed

NG

P D

redg

ing

Ant

icip

ated

Traf

ficsh

edLo

catio

n

FtM

yers

Nor

th F

tM

yers

Figure 12. East Fort Myers

13

0 10.5Mile

Estero Island-BaysideSecondary Channel

Total NGP channel length 11,955 ftAnticipated dredge length 853 ftNGP dredge depth 4.5 ft

NGP Dredging not Anticipated

NGP Dredging Anticipated

ChannelLocation

Ft Myers Beach

Figure 13. Estero Island-Bayside

14

01

0.5

Mile

Ever

est C

anal

Tota

l NG

P ch

anne

l len

gth

4,92

8 ft

Antic

ipat

ed d

redg

e le

ngth

2,4

94 ft

NG

P d

redg

e de

pth

5 ft

NG

P D

redg

ing

not A

ntic

ipat

ed

NG

P D

redg

ing

Ant

icip

ated

Traf

ficsh

edLo

catio

n

Cap

eC

oral

FtM

yers

Red

fish

Pt.

Figure 14. Everest Canal

15

00.

10.

05M

ile

Fish

Tal

e M

arin

a

Tota

l NG

P ch

anne

l len

gth

1,84

9 ft

Antic

ipat

ed d

redg

e le

ngth

0N

GP

dre

dge

dept

h 4

ftN

GP

Dre

dgin

g no

t Ant

icip

ated

NG

P D

redg

ing

Ant

icip

ated

Big

Car

los

Pass

Traf

ficsh

edLo

catio

n

Figure 15. Fish Tale Marina

16

0 0.10.05Mile

Fish Trap Bay 2

Total NGP channel length 3,213 ftAnticipated dredge length 520 ftNGP dredge depth 2.5 ft

NGP Dredging not Anticipated

NGP Dredging Anticipated

TrafficshedLocation

BonitaSprings

Figure 16. Fish Trap Bay 2

17

00.

10.

05M

ile

Fort

Mye

rs Y

acht

Bas

in

Tota

l NG

P ch

anne

l len

gth

7,94

1 ft

Antic

ipat

ed d

redg

e le

ngth

4,9

87 ft

NG

P d

redg

e de

pth

7 ft

NG

P D

redg

ing

not A

ntic

ipat

ed

NG

P D

redg

ing

Ant

icip

ated

Traf

ficsh

edLo

catio

n

Fort

Mye

rs

Figure 17. Fort Myers Yacht Basin

18

01

0.5

Mile

Fran

klin

Loc

ks E

ast

Tota

l NG

P ch

anne

l len

gth

2,47

8 ft

Antic

ipat

ed d

redg

e le

ngth

1,4

05 ft

NG

P d

redg

e de

pth

5 ft

NG

P D

redg

ing

not A

ntic

ipat

ed

NG

P D

redg

ing

Ant

icip

ated

Traf

ficsh

edLo

catio

n

Fran

klin

Lock

s

Hendry County

Hendry County

Figure 18. Franklin Locks East

19

Figure 19. Getaway

20

0 10.5Mile

Hancock Creek

Total NGP channel length 26,613 ftAnticipated dredge length 2,778 ftNGP dredge depth 5 ft

NGP Dredging not Anticipated

NGP Dredging AnticipatedTrafficshed

LocationFt Myers

NorthFt Myers

Figure 20. Hancock Creek

21

00.

10.

05M

ile

Hog

ueSe

cond

ary

Cha

nnel

Tota

l NG

P ch

anne

l len

gth

3,11

5 ft

Antic

ipat

ed d

redg

e le

ngth

345

ftN

GP

dre

dge

dept

h 4

ft

NG

P D

redg

ing

not A

ntic

ipat

ed

NG

P D

redg

ing

Ant

icip

ated

Cha

nnel

Loca

tion

Big

Hic

kory

Pass

Figure 21. Hogue

22

0 0.50.25Mile

Hurricane BayEast

Secondary Channel

Total NGP channel length 8,602 ftAnticipated dredge length 917 ftNGP dredge depth 4.5 ft

NGP Dredging not Anticipated

NGP Dredging Anticipated

ChannelLocation

Ft Myers Beach

San Carlos Island

Figure 22. Hurricane Bay East

23

0 0.250.125Mile

Hurricane Bay WestSecondary Channel

Total NGP channel length 8,750 ftAnticipated dredge length 1,369 ftNGP dredge depth 5 ft

NGP Dredging not Anticipated

NGP Dredging Anticipated

Ft Myers BeachChannelLocation

Figure 23. Hurricane Bay West

24

Figure 24. Imperial River-Lower

25

01

0.5

Mile

Impe

rial R

iver

-Upp

er

Tota

l NG

P ch

anne

l len

gth

9,91

3 ft

Antic

ipat

ed d

redg

e le

ngth

713

ftN

GP

dre

dge

dept

h 2.

5 ft

NG

P D

redg

ing

not A

ntic

ipat

ed

NG

P D

redg

ing

Ant

icip

ated

Traf

ficsh

edLo

catio

n

Boni

ta S

prin

gs

Estero Bay

Figure 25. Imperial River-Upper

26

00.

10.

05M

ile

Impe

rial S

hore

s

Tota

l NG

P ch

anne

l len

gth

4,10

6 ft

Antic

ipat

ed d

redg

e le

ngth

1,6

85 ft

NG

P d

redg

e de

pth

2.5

ft

NG

P D

redg

ing

not A

ntic

ipat

ed

NG

P D

redg

ing

Ant

icip

ated

Traf

ficsh

edLo

catio

n

Este

roBa

y

Figure 26. Imperial Shores

27

0 0.50.25Mile

Marsh Point

Total NGP channel length 5,729 ftAnticipated dredge length 1,201 ftNGP dredge depth 3 ft

NGP Dredging not Anticipated

NGP Dredging Anticipated

TrafficshedLocation

FortMyers

NorthFort

Myers

Figure 27. Marsh Point

28

00.

250.

125

MileM

atan

zas

Har

bor

Seco

ndar

y C

hann

el

Tota

l NG

P ch

anne

l len

gth

5,10

3 ft

Antic

ipat

ed d

redg

e le

ngth

66

ftN

GP

dre

dge

dept

h 5.

5 ft

NG

P D

redg

ing

not A

ntic

ipat

ed

NG

P D

redg

ing

Ant

icip

ated

Ft M

yers

Bea

chC

hann

elLo

catio

n

Figure 28. Matanzas Harbor

29

0 0.250.125Mile

Matlacha-Northwest

Total NGP channel length 1,457 ftDredge length 654 ftNGP dredge depth 4.5 ft

NGP Dredging not Anticipated

NGP Dredging Anticipated

TrafficshedLocation

LittlePine

IslandCapeCoral

Mat

lach

a P

ass

Figure 29. Matlacha-Northwest

30

0 0.10.05Mile

Matlacha-Southwest 2

Total NGP channel length 2,719 ftAnticipated dredge length 180 ftNGP dredge depth 3.5 ft

NGP Dredging not Anticipated

NGP Dredging Anticipated

LlittlePIne

Island

CapeCoral

TrafficshedLocation

Figure 30. Matlacha-Southwest 2

31

Matlacha Isles/Cape Coral-Northwest

Total NGP channel length 14,057ftAnticipated dredge length 1,729 ftNGP dredge depth 4 ft

0 10.5Mile

TrafficshedLocation

CapeCoral

PineIsland

NGP Dredging not Anticipated

NGP Dredging Anticipated

MatlachaPass

BoatLift

Figure 31. Matlacha Isles/Cape Coral-Northwest

32

Figure 32. Mullock Creek

33

00.

50.

25M

ile

Nor

man

dy C

anal

Tota

l NG

P ch

anne

l len

gth

11,8

78 ft

Antic

ipat

ed d

redg

e le

ngth

4,0

68 ft

NG

P d

redg

e de

pth

5 ft

NG

P D

redg

ing

not A

ntic

ipat

ed

NG

P D

redg

ing

Ant

icip

ated

Traf

ficsh

edLo

catio

nC

ape

Cor

al

FtM

yers

Red

fish

Poin

t

Figure 33. Normandy Canal

34

02

1M

iles

Nor

thM

atla

cha

Seco

ndar

yC

hann

el

Tota

l NG

P ch

anne

l len

gth

62,8

64 ft

Antic

ipat

ed d

redg

e le

ngth

84

ftN

GP

dre

dge

dept

h 4.

5 ft

NG

P D

redg

ing

not A

ntic

ipat

ed

NG

P D

redg

ing

Ant

icip

ated

Boke

elia

Boke

elia

Cap

eC

oral

Cha

nnel

Loca

tion

Pine Island

Figure 34. North Matlacha

35

01

0.5

Mile

Ora

nge

Riv

er

Tota

l NG

P ch

anne

l len

gth

3,59

5 ft

Antic

ipat

ed d

redg

e le

ngth

100

ftN

GP

dre

dge

dept

h 6.

5 ft

Traf

ficsh

edLo

catio

n

Ft M

yers

NG

P D

redg

ing

not A

ntic

ipat

ed

NG

P D

redg

ing

Ant

icip

ated

Figure 35. Orange River

36

00.

10.

05M

ile

Pelic

an L

andi

ngTo

tal N

GP

chan

nel l

engt

h 3,

992

ftAn

ticip

ated

dre

dge

leng

th 1

,169

ftN

GP

dre

dge

dept

h 2.

5 ft

NG

P D

redg

ing

not A

ntic

ipat

ed

NG

P D

redg

ing

Ant

icip

ated

Traf

ficsh

edLo

catio

nEs

tero

Bay

Big

Car

los

Pass

Figure 36. Pelican Landing

37

01

0.5

Mile

Plat

o C

anal

Tota

l NG

P ch

anne

l len

gth

18,5

20 ft

Antic

ipat

ed d

redg

e le

ngth

5,4

87 ft

NG

P d

redg

e de

pth

5.5

ft

NG

P D

redg

ing

not A

ntic

ipat

ed

NG

P D

redg

ing

Ant

icip

ated

Traf

ficsh

edLo

catio

nC

ape

Cor

al

Red

fish

Poin

t

Figure 37. Plato Canal

38

01

0.5

Mile

Punt

a R

assa

/Con

nie

Mac

k Is

land

Tota

l NG

P ch

anne

l len

gth

14,8

69 ft

Antic

ipat

ed d

redg

e le

ngth

4,0

84 ft

NG

P d

redg

e de

pth

5 ft

NG

P D

redg

ing

not A

ntic

ipat

ed

NG

P D

redg

ing

Ant

icip

ated

Pine

Isla

nd

Sani

bel

Isla

nd

Traf

ficsh

edLo

catio

n

Figure 38. Punta Rassa/Connie Mack Island

39

Figure 39. Redfish Point

0 0.250.125Mile

Redfish Point

Total NGP channel length 13,023 ftAnticipated dredge length 4,436 ftNGP dredge depth 6 ft

NGP Dredging not Anticipated

NGP Dredging AnticipatedTrafficshed

LocationCapeCoral

Ft.Myers

40

00.

250.

125

Mile

Roo

kery

Tra

ceSe

cond

ary

Cha

nnel

Tota

l NG

P ch

anne

l len

gth

8,49

6 ft

Antic

ipat

ed d

redg

e le

ngth

1,0

28 ft

NG

P d

redg

e de

pth

3.5

ft

Cha

nnel

Loca

tion

Big

Car

los

Pass

NG

P D

redg

ing

not A

ntic

ipat

ed

NG

P D

redg

ing

Ant

icip

ated

Figure 40. Rookery Trace

41

00.

10.

05M

ile

Roo

seve

lt C

hann

el-B

aysi

de

Tota

l NG

P ch

anne

l len

gth

1,50

9 ft

Antic

ipat

ed d

redg

e le

ngth

0N

GP

dre

dge

dept

h 3

ft

NG

P D

redg

ing

not A

ntic

ipat

ed

NG

P D

redg

ing

Ant

icip

ated

Blin

dPa

ss

Traf

ficsh

edLo

catio

n

Figure 41. Roosevelt Channel-Bayside

42

Figure 42. Roosevelt Channel-North

43

00.

50.

25M

ileSain

t Jam

esC

ity-E

ast

Tota

l NG

P ch

anne

l len

gth

16,1

37 ft

Antic

ipat

ed d

redg

e le

ngth

3,2

66 ft

NG

P d

redg

e de

pth

5 ft

NG

P D

redg

ing

not A

ntic

ipat

ed

NG

P D

redg

ing

Ant

icip

ated

Sain

t Jam

esC

ity

Pine

Isla

ndTr

affic

shed

Loca

tion

Figure 43. Saint James City-East

44

0 0.50.25Mile

Saint James City-South

Total NGP channel length 18,385 ftAnticipated dredge length 6,531 ftNGP dredge depth 5 ft

NGP Dredging not Anticipated

NGP Dredging Anticipated

TrafficshedLocation

PIneIsland

Figure 44. Saint James City-South

45

0 0.20.1Mile

Siesta Isles

Total NGP channel length 1,088 ftAnticipated dredge length 713 ftNGP dredge depth 5 ft

NGP Dredging not Anticipated

NGP Dredging Anticipated

TrafficshedLocation

San CarlosIsland

Figure 45. Siesta Isles

46

0 0.50.25Mile

South Estero BaySecondary Channel

Total NGP channel length 27,694 ftAnticipated dredge length 327 ftNGP dredge depth 4 ft

NGP Dredging not Anticipated

NGP Dredging AnticipatedChannelLocation

BigCarlosPass

Figure 46. South Estero Bay

47

SouthMatlacha

SecondaryChannels

0 10.5Mile

NGP Dredging not Anticipated

NGP Dredging Anticipated

Total NGP channel length 71,465 ftAnticipated dredge length 889 ftNGP dredge depth 3.5 ft

ChannelLocation

CapeCoral

San CarlosBay

Figure 47. South Matlacha

48

0 0.10.05Mile

Sunset Bay

Total NGP channel length 2,440 ftAnticipated dredge length 376 ftNGP dredge depth 2.5 ft

NGP Dredging not Anticipated

NGP Dredging Anticipated

TrafficshedLocation

SunsetBay

Figure 48. Sunset Bay