session 3 disaster waste case studies

22
DW3 1 WASH Cluster – Emergency Training DW Session 3 Disaster Waste Case Studies Disaster Waste in Emergencies

Upload: redford

Post on 06-Feb-2016

30 views

Category:

Documents


2 download

DESCRIPTION

Disaster Waste in Emergencies. Session 3 Disaster Waste Case Studies. Case Study: Tsunami, Indonesia. Source: UNEP “Tsunami Waste Management Plan” Workshops 2005. Tsunami Waste Management, Indonesia. Large volumes of tsunami generated wastes - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Session 3 Disaster Waste Case Studies

DW3 1

WASH Cluster – Emergency Training DW

Session 3Disaster Waste Case

Studies

Disaster Waste in Emergencies

Page 2: Session 3 Disaster Waste Case Studies

DW3 2

WASH Cluster – Emergency Training DW

Case Study: Tsunami, Indonesia

Source: UNEP “Tsunami Waste Management Plan” Workshops 2005

Page 3: Session 3 Disaster Waste Case Studies

DW3 3

WASH Cluster – Emergency Training DWTsunami Waste Management, Tsunami Waste Management, IndonesiaIndonesia

• Large volumes of tsunami generated wastes

• Government capacity limited (loss of staff and waste vehicles)

• All Municipal Solid Waste systems stopped (dumped in street)

• Gov. contractors undertook initial clearance to recover bodies and improve access to impacted areas

• Majority of tsunami waste dumped in inappropriate areas – fish ponds, rice paddies, ditches, land close to residential areas

Page 4: Session 3 Disaster Waste Case Studies

DW3 4

WASH Cluster – Emergency Training DWTsunami Waste ProjectsTsunami Waste Projects

Mass salvaging of scrap commenced immediately following disaster with little or no Personal Protective Equipment or vaccinations

Page 5: Session 3 Disaster Waste Case Studies

DW3 5

WASH Cluster – Emergency Training DWTsunami Waste ProjectsTsunami Waste Projects

Small-scale NGO/UN

sponsored rubble

clearing “cash for work” programmes assisted

clearance in coastal areas and provided

immediate employment

Page 6: Session 3 Disaster Waste Case Studies

DW3 6

WASH Cluster – Emergency Training DW

Concrete & bricks sortedfrom the tsunami wastes

Timber sorted fromthe tsunami wastes

Tsunami Waste ProjectsTsunami Waste ProjectsTsunami Waste Recovery Management Programme (TWRMP): •aimed to provide means to resume garbage collection & complete tsunami waste clearance

Page 7: Session 3 Disaster Waste Case Studies

DW3 7

WASH Cluster – Emergency Training DW

Burning wastes at KP. Jawa landfill, Banda Aceh

Tsunami Waste ProjectsTsunami Waste Projects• Implement 2-3 new

sanitary landfills across the province

• Upgrade existing municipal dumps

Page 8: Session 3 Disaster Waste Case Studies

DW3 8

WASH Cluster – Emergency Training DW

Banda AcehInformal recovery

Tsunami Waste ProjectsTsunami Waste Projects

Page 9: Session 3 Disaster Waste Case Studies

DW3 9

WASH Cluster – Emergency Training DWTsunami Waste ProjectsTsunami Waste Projects

Metal Recovery

Page 10: Session 3 Disaster Waste Case Studies

DW3 10

WASH Cluster – Emergency Training DW

Tsunami Waste ProjectsTsunami Waste Projects

Oxfam Re-Use Centre

Page 11: Session 3 Disaster Waste Case Studies

DW3 11

WASH Cluster – Emergency Training DW

Tsunami Waste ProjectsTsunami Waste ProjectsBanda Aceh,Bricks ready for re-use

Page 12: Session 3 Disaster Waste Case Studies

DW3 12

WASH Cluster – Emergency Training DW

Rebuild capacity/ institutional change in government to ensure the programme is sustainable in the long term

Tsunami Waste ProjectsTsunami Waste Projects

Banda AcehNew bins for the streets

Page 13: Session 3 Disaster Waste Case Studies

DW3 13

WASH Cluster – Emergency Training DW

Summary of Experiences from Summary of Experiences from TsunamiTsunami• Waste management is a significant environmental & public

health issue.

• waste management is an important recovery phase issue

• Lack of baseline waste data indicates little or no waste assessment

• Emergency phase waste clean-up operations can worsen environmental problems and require remedial action

• Uncontrolled scavenging and inappropriate clean-up exposes workers to health and safety risks

• Waste management advice and projects are not coordinated and often sector specific

• The potential value of waste was not realised

• Lack of Waste Management skills at national and international level

• Global environmental impacts have been ignored

Page 14: Session 3 Disaster Waste Case Studies

DW3 14

WASH Cluster – Emergency Training DW

Case Study: Post Conflict Debris Re-Cycling,Kosovo

Page 15: Session 3 Disaster Waste Case Studies

DW3 15

WASH Cluster – Emergency Training DW

Following the hostilities: > 10 million tonnes of rubble Damage scattered over whole province Asbestos contamination widespread Limited resources in Kosovo to

perform demolition Massive reconstruction plans

Mobility is Key!

Post-Conflict Debris Re-Post-Conflict Debris Re-Cycling, KosovoCycling, Kosovo

Page 16: Session 3 Disaster Waste Case Studies

DW3 16

WASH Cluster – Emergency Training DW

Mobile DemolitionMobile Demolition

Page 17: Session 3 Disaster Waste Case Studies

DW3 17

WASH Cluster – Emergency Training DW

Transfer DepotsTransfer Depots

Page 18: Session 3 Disaster Waste Case Studies

DW3 18

WASH Cluster – Emergency Training DW

Manual SortingManual Sorting

Page 19: Session 3 Disaster Waste Case Studies

DW3 19

WASH Cluster – Emergency Training DW

Feeding the HopperFeeding the Hopper

Page 20: Session 3 Disaster Waste Case Studies

DW3 20

WASH Cluster – Emergency Training DW

Mobile CrushingMobile Crushing

Page 21: Session 3 Disaster Waste Case Studies

DW3 21

WASH Cluster – Emergency Training DW

Using the Re-Cycled ProductUsing the Re-Cycled Product

Page 22: Session 3 Disaster Waste Case Studies

DW3 22

WASH Cluster – Emergency Training DW

Appropriate Technology

Mobility is Key

Opportunities for revenue

generation

Servicing and maintenance

important

Training Training Training

Long term viability of systems

Access to reconstruction crucial

Key LessonsKey Lessons