development of disaster waste management plan
TRANSCRIPT
Development of Disaster Waste Management Plan
20 August 2018
Misuzu Asari ([email protected]) Makoto Tsukiji ([email protected])
A series of Discussion for DWM Guideline Development
3. 16th Expert Meeting on SWM in Asia and Pacific Islands in Dec. 2016, Tokyo (SWAPI)
Establish the editorial committee in Apr. 2016
4. Symposium on mainstreaming of DWM in Feb. 2017, Osaka (UN Env.)
5. 3rd Global Summit of Research Institutes for DRR in Mar. 2017, Kyoto (GADRI)
2. Regional partnerships to strengthen disaster risk management in the Pacific in Oct. 2016, Suva (UNISDR)
6. Environment and Emergencies Forum in Sep. 2017, Nairobi (UNISDR/UN Env.)
7. DWM workshop in Dec. 2017, Bangkok (UN Env.)
9. 17th Expert Meeting on SWM in Asia and Pacific Islands in Jan. 2018, Tokyo (SWAPI)
10. Asian Ministerial Conference on Disaster Risk Reduction (AMCDRR), Jul. 2018, Mongolia
1. 1st Clean Pacific Roundtable in Jul. 2016, Suva (SPREP)
11. 2nd Clean Pacific Roundtable in Aug. 2018, Suva
8. 11th TEMM (Japan, China and Korea Policy Dialogue), Dec. 2017, Tokyo
Some Recommendations
• Incorporate a DWM component in the national and municipal WM and DRM strategy and plan
• Need coordination to collaborate with other line Ministries and clusters
• Incorporate a DWM component in the PDNA cluster process
• Cooperation Agreement on DWM (City-City/Private contract)
• Capacity Development for government officer, community and local expert for DWM (Roster)
Level of Plan (Case of Japan)
Waste Management Law Disaster Risk Management Basic Law
Master Plan
Disaster Waste management Policy
DWM Master Plan
Waste Management Plan
Disaster Risk Management Plan (Regional/Prefectural) DWM Action Plan
Municipal Waste Management Plan
Disaster Risk Management Plan (City level)
DWM Action Plan
National
Regional Prefectural
City Town Village
DWM Policy
DWM Implementation
plan
Disaster
What Plan Do We Need ?
1. Normal Time “Preparedness” - What Preparedness? 1) Risk Reduction Plan 2) Contingency Plan 2. Disaster Time “Respond, Recovery, Reconstruction” - Need Speed & Efficiency 3) Implementation Plan
Schematic Image of Risk Reduction Plan (Incorporation of DWM component into WM system)
Concept Community Resilience Improvement of WM system incorporated DWM (in consideration
of Climate Change Adaptation)
Framework of the Plans
Normal Time Disaster Time
Reduction (RRP)
Disaster Time
FEEDBACK REQUEST
“For Disaster Waste Management Plan Development” Please give us your feedback on a website questionnaire at the following address.
goo.gl/vubNjp
Thank you for your cooperation