Page 1: Development of Disaster Waste Management Plan

Development of Disaster Waste Management Plan

20 August 2018

Misuzu Asari ([email protected]) Makoto Tsukiji ([email protected])

Page 2: Development of Disaster Waste Management Plan

A series of Discussion for DWM Guideline Development

3. 16th Expert Meeting on SWM in Asia and Pacific Islands in Dec. 2016, Tokyo (SWAPI)

Establish the editorial committee in Apr. 2016

4. Symposium on mainstreaming of DWM in Feb. 2017, Osaka (UN Env.)

5. 3rd Global Summit of Research Institutes for DRR in Mar. 2017, Kyoto (GADRI)

2. Regional partnerships to strengthen disaster risk management in the Pacific in Oct. 2016, Suva (UNISDR)

6. Environment and Emergencies Forum in Sep. 2017, Nairobi (UNISDR/UN Env.)

7. DWM workshop in Dec. 2017, Bangkok (UN Env.)

9. 17th Expert Meeting on SWM in Asia and Pacific Islands in Jan. 2018, Tokyo (SWAPI)

10. Asian Ministerial Conference on Disaster Risk Reduction (AMCDRR), Jul. 2018, Mongolia

1. 1st Clean Pacific Roundtable in Jul. 2016, Suva (SPREP)

11. 2nd Clean Pacific Roundtable in Aug. 2018, Suva

8. 11th TEMM (Japan, China and Korea Policy Dialogue), Dec. 2017, Tokyo

Page 3: Development of Disaster Waste Management Plan

Some Recommendations

• Incorporate a DWM component in the national and municipal WM and DRM strategy and plan

• Need coordination to collaborate with other line Ministries and clusters

• Incorporate a DWM component in the PDNA cluster process

• Cooperation Agreement on DWM (City-City/Private contract)

• Capacity Development for government officer, community and local expert for DWM (Roster)

Page 4: Development of Disaster Waste Management Plan

Level of Plan (Case of Japan)

Waste Management Law Disaster Risk Management Basic Law

Master Plan

Disaster Waste management Policy

DWM Master Plan

Waste Management Plan

Disaster Risk Management Plan (Regional/Prefectural) DWM Action Plan

Municipal Waste Management Plan

Disaster Risk Management Plan (City level)

DWM Action Plan

National

Regional Prefectural

City Town Village

DWM Policy

DWM Implementation

plan

Disaster

Page 5: Development of Disaster Waste Management Plan

What Plan Do We Need ?

1. Normal Time “Preparedness” - What Preparedness? 1) Risk Reduction Plan 2) Contingency Plan 2. Disaster Time “Respond, Recovery, Reconstruction” - Need Speed & Efficiency 3) Implementation Plan

Page 6: Development of Disaster Waste Management Plan

Schematic Image of Risk Reduction Plan (Incorporation of DWM component into WM system)

Concept Community Resilience Improvement of WM system incorporated DWM (in consideration

of Climate Change Adaptation)

Framework of the Plans

Normal Time Disaster Time

Reduction (RRP)

Page 7: Development of Disaster Waste Management Plan

Disaster Time

Page 8: Development of Disaster Waste Management Plan

FEEDBACK REQUEST