serc rainawari

Upload: bilal-ahmad

Post on 03-Apr-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/28/2019 SERC Rainawari

    1/48

    S.No Month

    Energy Input

    Billed and losses Hawal Rainawari K.K.Moulla Khanyar Zakura

    Total for

    the Division

    Input (LU's) 113.81 113.81

    Billed (LU's) 60.93 60.93

    Losses % 53.54 53.54

    Input (LU's) 117.67 117.67

    Billed (LU's) 62.30 62.30

    Losses % 52.94 52.94Input (LU's) 0.00

    Billed (LU's) 0.00

    Losses % 0.00

    Input (LU's) 0.00

    Billed (LU's) 0.00

    Losses % 0.00

    Input (LU's) 0.00

    Billed (LU's) 0.00

    Losses % 0.00

    Input (LU's) 0.00

    Billed (LU's) 0.00

    Losses % 0.00

    Input (LU's) 0.00Billed (LU's) 0.00

    Losses % 0.00

    Input (LU's) 0.00

    Billed (LU's) 0.00

    Losses % 0.00

    Input (LU's) 0.00

    Billed (LU's) 0.00

    Losses % 0.00

    Input (LU's) 139.35 139.35

    Billed (LU's) 39.50 39.50

    Losses % 72.00 72.00

    Input (LU's) 141.82 141.82

    Billed (LU's) 40.16 40.16Losses % 72.00 72.00

    4

    5 August

    May

    Form # 1: Monthly Energy-Kashmir

    MONTHLY ENERGY INPUT, ENERGY BILLED & LOSSES FOR THE YEAR 2001-11(For Achievement under Triparitite MoU and for progress to SERC)

    April1

    7 Jan-12

    8

    June

    2

    September6

    July

    3

    Feb-12

    8

    October

    November

    7

    9 December

  • 7/28/2019 SERC Rainawari

    2/48

    Input (LU's) 129.18 129.18

    Billed (LU's) 39.83 39.83

    Losses % 69.00 69.00

    *

    Mar-129

  • 7/28/2019 SERC Rainawari

    3/48

    orm # 2: Monthly Meters-Kashmir

    S.No Month

    Total consumers

    electronic metering

    level and % metering at

    end of month Hawal Rainawari K.K.Moulla Khanyar Zakura

    Total Consumers 10567

    Meters Installed 6685

    % Metering 63.26

    Total Consumers 10582

    Meters Installed 6700% Metering 63.32

    Total Consumers

    Meters Installed

    % Metering

    Total Consumers

    Meters Installed

    % Metering

    Total Consumers

    Meters Installed

    % Metering

    Total Consumers

    Meters Installed

    % MeteringTotal Consumers

    Meters Installed

    % Metering

    Total Consumers

    Meters Installed

    % Metering

    Total Consumers

    Meters Installed

    % Metering

    Total Consumers 10363.00

    Meters Installed 370.00

    % Metering

    Total Consumers 10481.00

    Meters Installed 650.00

    10 January

    4 July

    9 December

    6 September

    7 October

    8 November

    MONTHLY TOTAL CONSUMERS, ELECTRONIC METERS INSTALLED AND %age ELECTRONIC FOR THE YEA(For Achievement under Triparitite MoU and for progress reporting to SERC)

    1 April

    5 August

    2 May

    3 June

  • 7/28/2019 SERC Rainawari

    4/48

    % Metering

    Total Consumers 10371.00

    Meters Installed 720.00

    % Metering

    February

    March

    11

    12

  • 7/28/2019 SERC Rainawari

    5/48

    Total for

    the Division

    2011-12

  • 7/28/2019 SERC Rainawari

    6/48

  • 7/28/2019 SERC Rainawari

    7/48

    Form # 3: Monthly Revenue-Kashmir

    S.No Month

    Monthly Revenue

    Realised, Pure & ED

    (Rs. In lacs) Hawal Rainawari K.K.Moulla Khanyar Zakura

    Total for

    the Division

    Revenue Pure 4.85

    ED 1.06

    Total (Rs. In lacs) 5.91

    Revenue Pure 46.47

    ED 10.20Total 56.67

    Revenue Pure

    ED

    Total

    Revenue Pure

    ED

    Total

    Revenue Pure

    ED

    Total

    Revenue Pure

    ED

    Total

    Revenue Pure

    ED

    Total

    Revenue Pure

    ED

    Total

    Revenue Pure

    ED

    Total

    Revenue Pure 57.359

    ED 12.59

    Total 69.95Revenue Pure 60.64

    10 January

    4 July

    9 December

    6 September

    7 October

    8 November

    MONTHLY REVENUE REALISED (PURE AND ED) FOR THE YEAR 2011-12(For Achievement under Triparitite MoU and for progress reporting to SERC)

    1 April

    5 August

    2 May

    3 June

  • 7/28/2019 SERC Rainawari

    8/48

    ED 13.31

    Total 73.95

    Revenue Pure 262.29

    ED 57.58

    Total 319.87

    11

    12

    February

    March

  • 7/28/2019 SERC Rainawari

    9/48

    S.No Month

    Monthly

    Connections added

    metered and flat rate

    (No's) Hawal Rainawari K.K.Moulla Khanyar Zakura

    Total for

    the Division

    Metered 12

    Flat Rate 0

    Total 12

    Metered 15

    Flat Rate 0

    Total 15

    Metered

    Flat Rate

    Total

    Metered

    Flat Rate

    Total

    Metered

    Flat Rate

    Total

    Metered

    Flat Rate

    Total

    Metered

    Flat Rate

    Total

    Metered

    Flat Rate

    Total

    Metered

    Flat Rate

    Total

    Metered 100.00

    Flat Rate 18.00

    Total 118.00

    Metered 105.00

    8 November

    10 January

    9 December

    6 September

    7

    4 July

    5 August

    October

    Form # 4: Monthly Connection-Kashmir

    2 May

    3 June

    MONTHLY CONNECTIONS ADDED (METERED AND FLAT RATE) FOR THE YEAR 2011-12(For Achievement under Triparitite MoU and for progress reporting to SERC)

    1 April

  • 7/28/2019 SERC Rainawari

    10/48

    Flat Rate 15.00

    Total 120.00

    Metered 98.00

    Flat Rate 12.00

    Total 110.0012 March

    11 February

  • 7/28/2019 SERC Rainawari

    11/48

  • 7/28/2019 SERC Rainawari

    12/48

    Description

    Category Hawal Rainawari K.K.Moulla Khanyar Zakura

    Total for

    the Division

    Domestic

    N.Dom/Commercial

    Iri/Aggri.

    State / Central

    Publ;ic LightingLT Industries

    HT Industries

    HT P. Inten.

    LT Pub. WW

    HT Pub. WW

    Gen. Bulk

    Temporary

    Total

    Domestic

    N.Dom/Commercial

    Iri/Aggri.

    State / Central

    Publ;ic LightingLT Industries

    HT Industries

    HT P. Inten.

    LT Pub. WW

    HT Pub. WW

    Gen. Bulk

    Temporary

    Metered

    Flat Rate

    Total

    Domestic

    N.Dom/Commercial

    Iri/Aggri.State / Central

    Connectionsason31

    .05.2010

    EnergyBilledason31.0

    5.2010

    Lac's

    Form # 5: Category Detail-Kashmir

    MONTHLY CONNECTIONS ENERGY SALES AND REVENUE FOR THE YEAR 2010-11(For Achievement under Triparitite MoU and for progress reporting to SERC)

  • 7/28/2019 SERC Rainawari

    13/48

    Publ;ic Lighting

    LT Industries

    HT Industries

    HT P. Inten.

    LT Pub. WW

    HT Pub. WW

    Gen. Bulk

    Temporary

    Metered

    Flat Rate

    Total

    Revenueason31.05.2010

  • 7/28/2019 SERC Rainawari

    14/48

    S.No Name of Feeder Energy Pumped Energy Billed

    Energy Billed in

    Rs (Lac's) Losses (LU's) %age Losses

    Energy Realised

    (LU's)

    1 Feeder-1 Habak 14.00 7.50 37.50 6.50 46.42857143

    2 Feeder-2 Habak 16.80 9.00 27.00 7.80 46.42857143

    3 Feeder-3 Habak 3.06 1.64 4.02 1.42 46.40522876

    4 Feeder-5 Habak 15.68 8.40 20.58 7.28 46.42857143

    5 Feeder-1 Kathidarwaza 10.84 5.80 14.21 5.04 46.49446494

    6 Feeder-2 Kathidarwaza 12.10 6.48 15.88 5.62 46.44628099

    7 Feeder-3 Kathidarwaza 2.85 1.50 7.50 1.35 47.36842105

    8 Feeder-5 Kathidarwaz 15.13 8.12 19.89 7.01 46.33179114

    9 Feeder-1 Rainawari 2.23 1.20 6.00 1.03 46.18834081

    10 Feeder-2 Rainawari 4.43 2.37 5.81 2.06 46.50112867

    11 Feeder-3 Rainawari 5.34 2.85 6.98 2.49 46.62921348

    12 Feeder-4 Rainawari 11.35 6.07 14.87 5.28 46.51982379

    113.81 60.93 180.24 52.88

    S.No Name of Feeder Energy Pumped Energy Billed

    Energy Billed in

    Rs (Lac's) Losses (LU's) %age Losses

    Energy Realised

    (LU's)

    1 Feeder-1 Habak 18.80 12.85 64.25 5.95 31.64893617

    2 Feeder-2 Habak 16.40 7.72 23.16 8.68 52.92682927

    3 Feeder-3 Habak 3.04 1.43 3.50 1.61 52.96052632

    4 Feeder-5 Habak 15.55 8.52 20.87 7.03 45.20900322

    5 Feeder-1 Kathidarwaza 11.20 6.27 15.36 4.93 44.01785714

    6 Feeder-2 Kathidarwaza 11.80 5.55 13.60 6.25 52.96610169

    MONTH WISE AUDIT OF INDYSTRIAL FEEDERS FOR THE MONTH OF APRIL, 2010

    (For Achievement under Triparitite MoU and for progress reporting to SERC)

    Total

    MONTH WISE AUDIT OF INDYSTRIAL FEEDERS FOR THE MONTH OF MAY, 2010(For Achievement under Triparitite MoU and for progress reporting to SERC)

  • 7/28/2019 SERC Rainawari

    15/48

    7 Feeder-3 Kathidarwaza 2.63 1.84 9.20 0.79 30.03802281

    8 Feeder-5 Kathidarwaz 14.93 7.03 17.22 7.90 52.91359678

    9 Feeder-1 Rainawari 2.24 1.05 5.25 1.19 53.125

    10 Feeder-2 Rainawari 4.37 2.06 5.05 2.31 52.8604119

    11 Feeder-3 Rainawari 5.41 2.55 6.25 2.86 52.8650647

    12 Feeder-4 Rainawari 11.53 5.43 13.30 6.10 52.90546401

    117.9 62.30 197.02 55.60

    S.No Name of Feeder Energy Pumped Energy Billed Losses (LU's) %age Losses

    1 Feeder-1 Habak

    2 Feeder-2 Habak

    3 Feeder-3 Habak

    4 Feeder-5 Habak

    5 Feeder-1 Kathidarwaza

    6 Feeder-2 Kathidarwaza

    7 Feeder-3 Kathidarwaza

    8 Feeder-5 Kathidarwaz9 Feeder-1 Rainawari

    10 Feeder-2 Rainawari

    11 Feeder-3 Rainawari

    12 Feeder-4 Rainawari

    13 Feeder-8 Khanyar

    14 Feeder-1 Zakura

    (For Achievement under Triparitite MoU and for progress reporting to SERC)

    MONTH WISE AUDIT OF INDYSTRIAL FEEDERS FOR THE MONTH OF JULY, 2010

    Total

    Total

    MONTH WISE AUDIT OF INDYSTRIAL FEEDERS FOR THE MONTH OF JUNE, 2010

  • 7/28/2019 SERC Rainawari

    16/48

    S.No Name of Feeder Energy Pumped Energy Billed Losses (LU's) %age Losses

    1 Feeder-1 Habak

    2 Feeder-2 Habak

    3 Feeder-3 Habak

    4 Feeder-5 Habak

    5 Feeder-1 Kathidarwaza6 Feeder-2 Kathidarwaza

    7 Feeder-3 Kathidarwaza

    8 Feeder-5 Kathidarwaz

    9 Feeder-1 Rainawari

    10 Feeder-2 Rainawari

    11 Feeder-3 Rainawari

    12 Feeder-4 Rainawari

    13 Feeder-8 Khanyar

    14 Feeder-1 Zakura

    S.No Name of Feeder Energy Pumped Energy Billed Losses (LU's) %age Losses

    1 Feeder-1 Habak

    2 Feeder-2 Habak

    3 Feeder-3 Habak

    4 Feeder-5 Habak

    5 Feeder-1 Kathidarwaza

    6 Feeder-2 Kathidarwaza

    7 Feeder-3 Kathidarwaza

    (For Achievement under Triparitite MoU and for progress reporting to SERC)

    Total

    MONTH WISE AUDIT OF INDYSTRIAL FEEDERS FOR THE MONTH OF AUGUST, 2010

    (For Achievement under Triparitite MoU and for progress reporting to SERC)

  • 7/28/2019 SERC Rainawari

    17/48

    8 Feeder-5 Kathidarwaz

    9 Feeder-1 Rainawari

    10 Feeder-2 Rainawari

    11 Feeder-3 Rainawari

    12 Feeder-4 Rainawari

    13 Feeder-8 Khanyar

    14 Feeder-1 Zakura

    S.No Name of Feeder Energy Pumped Energy Billed Losses (LU's) %age Losses

    1 Feeder-1 Habak

    2 Feeder-2 Habak

    3 Feeder-3 Habak

    4 Feeder-5 Habak

    5 Feeder-1 Kathidarwaza

    6 Feeder-2 Kathidarwaza

    7 Feeder-3 Kathidarwaza8 Feeder-5 Kathidarwaz

    9 Feeder-1 Rainawari

    10 Feeder-2 Rainawari

    11 Feeder-3 Rainawari

    12 Feeder-4 Rainawari

    13 Feeder-8 Khanyar

    14 Feeder-1 Zakura

    Total

    MONTH WISE AUDIT OF INDYSTRIAL FEEDERS FOR THE MONTH OF OCTUMBER, 20(For Achievement under Triparitite MoU and for progress reporting to SERC)

    MONTH WISE AUDIT OF INDYSTRIAL FEEDERS FOR THE MONTH OF SEPTEMBER, 20

    (For Achievement under Triparitite MoU and for progress reporting to SERC)

    Total

  • 7/28/2019 SERC Rainawari

    18/48

    S.No Name of Feeder Energy Pumped Energy Billed Losses (LU's) %age Losses

    1 Feeder-1 Habak

    2 Feeder-2 Habak

    3 Feeder-3 Habak

    4 Feeder-5 Habak

    5 Feeder-1 Kathidarwaza

    6 Feeder-2 Kathidarwaza7 Feeder-3 Kathidarwaza

    8 Feeder-5 Kathidarwaz

    9 Feeder-1 Rainawari

    10 Feeder-2 Rainawari

    11 Feeder-3 Rainawari

    12 Feeder-4 Rainawari

    13 Feeder-8 Khanyar

    14 Feeder-1 Zakura

    S.No Name of Feeder Energy Pumped Energy Billed Losses (LU's) %age Losses

    1 Feeder-1 Habak

    2 Feeder-2 Habak

    3 Feeder-3 Habak

    4 Feeder-5 Habak

    5 Feeder-1 Kathidarwaza

    6 Feeder-2 Kathidarwaza

    7 Feeder-3 Kathidarwaza

    8 Feeder-5 Kathidarwaz

    9 Feeder-1 Rainawari

    10 Feeder-2 Rainawari

    MONTH WISE AUDIT OF INDYSTRIAL FEEDERS FOR THE MONTH OF NOVEMBER, 20

    (For Achievement under Triparitite MoU and for progress reporting to SERC)

    Total

  • 7/28/2019 SERC Rainawari

    19/48

    11 Feeder-3 Rainawari

    12 Feeder-4 Rainawari

    13 Feeder-8 Khanyar

    14 Feeder-1 Zakura

    S.No Name of Feeder Energy Pumped Energy Billed Losses (LU's) %age Losses

    1 Feeder-1 Habak

    2 Feeder-2 Habak

    3 Feeder-3 Habak

    4 Feeder-5 Habak

    5 Feeder-1 Kathidarwaza

    6 Feeder-2 Kathidarwaza

    7 Feeder-3 Kathidarwaza

    8 Feeder-5 Kathidarwaz

    9 Feeder-1 Rainawari

    10 Feeder-2 Rainawari

    11 Feeder-3 Rainawari

    12 Feeder-4 Rainawari13 Feeder-8 Khanyar

    14 Feeder-1 Zakura

    S.No Name of Feeder Energy Pumped Energy Billed Losses (LU's) %age Losses

    1 Feeder-1 Habak

    (For Achievement under Triparitite MoU and for progress reporting to SERC)

    MONTH WISE AUDIT OF INDYSTRIAL FEEDERS FOR THE MONTH OF JANUARY, 201

    (For Achievement under Triparitite MoU and for progress reporting to SERC)

    Total

    MONTH WISE AUDIT OF INDYSTRIAL FEEDERS FOR THE MONTH OF DECEMBER, 20

    Total

  • 7/28/2019 SERC Rainawari

    20/48

    2 Feeder-2 Habak

    3 Feeder-3 Habak

    4 Feeder-5 Habak

    5 Feeder-1 Kathidarwaza

    6 Feeder-2 Kathidarwaza

    7 Feeder-3 Kathidarwaza

    8 Feeder-5 Kathidarwaz

    9 Feeder-1 Rainawari

    10 Feeder-2 Rainawari

    11 Feeder-3 Rainawari12 Feeder-4 Rainawari

    13 Feeder-8 Khanyar

    14 Feeder-1 Zakura

    S.No Name of Feeder Energy Pumped Energy Billed Losses (LU's) %age Losses

    1 Feeder-1 Habak

    2 Feeder-2 Habak

    3 Feeder-3 Habak4 Feeder-5 Habak

    5 Feeder-1 Kathidarwaza

    6 Feeder-2 Kathidarwaza

    7 Feeder-3 Kathidarwaza

    8 Feeder-5 Kathidarwaz

    9 Feeder-1 Rainawari

    10 Feeder-2 Rainawari

    11 Feeder-3 Rainawari

    12 Feeder-4 Rainawari

    13 Feeder-8 Khanyar

    14 Feeder-1 Zakura

    Total

    MONTH WISE AUDIT OF INDYSTRIAL FEEDERS FOR THE MONTH OF FEBRUARY, 201(For Achievement under Triparitite MoU and for progress reporting to SERC)

    Total

  • 7/28/2019 SERC Rainawari

    21/48

    S.No Name of Feeder Energy Pumped Energy Billed Losses (LU's) %age Losses

    1 Feeder-1 Habak

    2 Feeder-2 Habak3 Feeder-3 Habak

    4 Feeder-5 Habak

    5 Feeder-1 Kathidarwaza

    6 Feeder-2 Kathidarwaza

    7 Feeder-3 Kathidarwaza

    8 Feeder-5 Kathidarwaz

    9 Feeder-1 Rainawari

    10 Feeder-2 Rainawari

    11 Feeder-3 Rainawari

    12 Feeder-4 Rainawari

    13 Feeder-8 Khanyar

    14 Feeder-1 Zakura

    Total

    MONTH WISE AUDIT OF INDYSTRIAL FEEDERS FOR THE MONTH OF MARCH, 2011(For Achievement under Triparitite MoU and for progress reporting to SERC)

  • 7/28/2019 SERC Rainawari

    22/48

    Form # 6: En. Aud. Ind.

    Energy Realised

    in Rs (Lac's)

    Whether KVAH

    Based tariff

    implemented

    Form # 6: En. Aud. Ind.

    Energy Realised

    in Rs (Lac's)

    Whether KVAH

    Based tariff

    implemented

  • 7/28/2019 SERC Rainawari

    23/48

    Form # 6: En. Aud. Ind.

    Whether KVAH

    Based tariff

    implemented

    Yes

    Form # 6: En. Aud. Ind.

  • 7/28/2019 SERC Rainawari

    24/48

    Whether KVAH

    Based tariff

    implemented

    Yes

    Form # 6: En. Aud. Ind.

    Whether KVAH

    Based tariff

    implemented

  • 7/28/2019 SERC Rainawari

    25/48

    Yes

    Form # 6: En. Aud. Ind.

    Whether KVAH

    Based tariff

    implemented

    Yes

    0

    10

  • 7/28/2019 SERC Rainawari

    26/48

    Whether KVAH

    Based tariff

    implemented

    Yes

    Whether KVAHBased tariff

    implemented

    0

  • 7/28/2019 SERC Rainawari

    27/48

    Yes

    Whether KVAH

    Based tariff

    implemented

    Yes

    Whether KVAH

    Based tariff

    implemented

    1

    0

  • 7/28/2019 SERC Rainawari

    28/48

    Yes

    Whether KVAH

    Based tariff

    implemented

    Yes

    1

  • 7/28/2019 SERC Rainawari

    29/48

    Whether KVAH

    Based tariff

    implemented

    Yes

  • 7/28/2019 SERC Rainawari

    30/48

    Hawal Rainawari K.K.Moulla Khanyar Zakura

    Total for

    the Division

    0

    Energy SuppliedKWH) 0

    Energy Billed(KWH) 0

    Amount Billed(Lacs) 0

    Revenue Collectted(Lacs) 0% of RevenueCollection 0

    Energy SuppliedKWH) 0

    Energy Billed(KWH) 0

    Amount Billed(Lacs) 0

    Revenue Collectted(Lacs) 0

    % of RevenueCollection 0

    Energy SuppliedKWH) 0

    Energy Billed(KWH) 0

    Amount Billed(Lacs) 0

    Revenue Collectted(Lacs) 0

    % of RevenueCollection 0

    Energy SuppliedKWH) 0

    Energy Billed(KWH) 0

    Amount Billed(Lacs) 0

    Revenue Collectted(Lacs) 0% of RevenueCollection 0

    MONTHLY ENERGY ACCOUNT & REVENUE REALISATION FOR INSTALLATIONS HAVING LOAD 25 KVA &

    ABOVE FROM APRIL, 2010 TO JUNE, 2010

    Form # 7

    Energy Account

    for the Month of

    June, 2010

    Energy Account

    for the Month of

    July, 2010

    No. of Consumers

    Energy/Revenue

    Details

    Energy Account

    for the Month of

    April, 2010

    Energy Account

    for the Month of

    May, 2010

  • 7/28/2019 SERC Rainawari

    31/48

    Hawal Rainawari K.K.Moulla Khanyar Zakura

    No

    KVA

    Required

    (KVAR)

    Installed

    (KVAR)

    Deficiency

    (KVAR)

    %

    Deficiency

    Status of KVAR Compensation for Installations having Load 25 KVA & Above as on 31-05-2010(For achievement under Tripartite MoU and for progress reporting to SERC)

    Format # 8

    Electric Division-IV, Khanyar

    KVAR Compensation Details

    Electric Division-IV, Khanyar. Total for the

    Division

    Connections with load 25

    KVA & Above

    KVAR

    Compensation through

    Shunt Capacitor

    Executive Engineer

  • 7/28/2019 SERC Rainawari

    32/48

    Month of

    the year

    2007-08

    Computerized

    Billing Hawal Rainawari K.K.Moulla Khanyar Zakura

    Total for

    the Division

    Total Energy Biled (LU's)

    Energy Billed through computer(LU's)

    %age computerised Billing #DIV/0!Total Energy Biled (LU's)

    Energy Billed through computer(LU's)

    %age computerised Billing #DIV/0!

    Total Energy Biled (LU's)

    Energy Billed through computer(LU's)

    %age computerised Billing #DIV/0!

    Total Energy Biled (LU's)

    Energy Billed through computer(LU's)

    %age computerised Billing #DIV/0!Jul-09

    Form # 9

    Apr-09

    May-09

    Jun-09

    Monthly detail of Computerised Billed Energy From April, 2010 to June, 2010

    (For Achievement under Triparitite MoU and for progress reporting to SERC)

  • 7/28/2019 SERC Rainawari

    33/48

    DiVision:

    N.A LT3Ph

    17510 N.A N.A Name of 3

    Computer Code: 9386 N.A N.A Feeder No

    Sanctioned Load: 30 HP

    S.No Month

    KVAH Units

    supplied

    KWH Units

    supplied

    KVAH Units

    recorded /

    computed

    KWH Units

    recorded

    AV-Power

    Factor

    Max. Demand

    Recorded KVA Opening Balance

    Energy Charges / F.R

    Charges billed

    (In Rs.)

    Demand

    charges billed

    (In Rs. )

    ED Bille

    (In Rs

    A B C D E=D/C F G H I J

    1 Apr-11 N.A 0 N.A 20.00 N.A N.A 145010.10 47.30 805.00 10.41

    2 May-11 N.A 0 N.A 0.00 N.A N.A 148061.00 0.00 805.00 0.00

    3 Jun-11 N.A 0 N.A 80.00 N.A N.A 151098.99 189.20 805.00 41.62

    4 Jul-11 N.A 0 N.A 0.00 N.A N.A 154436.04 0.00 805.00 0.00

    5 Aug-11 N.A 0 N.A Locked N.A N.A 157569.66 118.25 805.00 26.02

    6 Sep-11 N.A 0 N.A Locked N.A N.A 160907.62 7590.00 805.00 1669.8

    7 Oct-11 N.A 0 N.A Locked N.A N.A 174237.35 11385.00 805.00 2505.0

    8 Nov-11 N.A 0 N.A Locked N.A N.A 190949.26 11385.00 805.00 2505.0

    9 Dec-11 N.A 0 N.A Locked N.A N.A 207911.85 11385.00 805.00 2505.0

    10 Jan-12 N.A 0 N.A Locked N.A N.A 220169.58 0.00 805.00 0.00

    11 Feb-12 N.A 0 N.A Locked N.A N.A 224289.20 0.00 805.00 0.00

    12 Mar-12 N.A 0 N.A Locked N.A N.A 228470.61 0.00 805.00 0.00

    1

    2

    3

    4

    5

    1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

    Asstt. Exe. Engineer

    Rainawari

    Please attach circle-wise and Divisional wise Abstracts with each energy account.

    Note:

    Electric Division-IV, KhanyarCircle:

    In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing

    Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

    Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

    KVAH and demand readings will be required for load more than 100KW only.

    Installation No: Meter Rated Current: Meter Type:

    ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE M

    Name of Installation:- Nazir Ah. Zargar

    EM & RE Circle-Ist, Srinagar

    Note:

    Capacitor Installed: Y/N Rating of Capacitor:

    Type: MetCT Ratio:Category: LT Indust. Supply Type:

  • 7/28/2019 SERC Rainawari

    34/48

    DiVision:

    N.A LT3Ph

    18334 N.A N.A Name of

    Computer Code: 10074 N N.A Feeder N

    Sanctioned Load: 70 KW

    S.No Month

    KVAH Units

    supplied

    KWH Units

    supplied

    KVAH Units

    recorded /

    computed

    KWH Units

    computed

    AV-Power

    Factor

    Max. Demand

    Recorded KVA Opening Balance

    Energy Charges / F.R

    Charges billed

    (In Rs.)

    Demand

    charges billed

    (In Rs. )

    ED Bil

    (In Rs

    A B C D E=D/C F G H I J

    1 Apr-11 16232.05 13797.24 16232.04619 13797.24 0.85 N.A 1943230.38 67468.50 13280.00 14843

    2 May-11 19409.38 16497.98 19409.38289 16497.98 0.85 N.A 2075629.8 80675.10 13280.00 17748

    3 Jun-11 18450.04 15682.54 18450.0421 15682.54 0.85 N.A 2227587.5 76687.60 13280.00 16871

    4 Jul-11 18027.93 15323.74 18027.93215 15323.74 0.85 N.A 2376519.0 74933.10 13280.00 16485

    5 Aug-11 18626.56 15832.58 18626.56081 15832.58 0.85 N.A 2525349.9 77421.30 13280.00 17032

    6 Sep-11 18626.56 15832.58 18626.56081 15832.58 0.85 N.A 2679724.0 77421.30 13280.00 17032

    7 Oct-11 18626.56 15832.58 18626.56 15832.6 0.85 N.A 2284240.5 95951.79 16600.00 21109

    8 Nov-11 18626.56 15832.58 18626.56 15832.6 0.85 N.A 2463024.0 95632.35 16600.00 21039

    9 Dec-11 18626.56 15832.58 18626.56 15832.6 0.85 N.A 2102933.3 95672.28 16600.00 21047

    10 Jan-12 18626.56 15832.58 18626.56 15832.6 0.85 N.A 2278624.7 95672.28 16600.00 21047

    11 Feb-12 18626.56 15832.58 18626.56 15832.6 0.85 N.A 2456951.5 95672.28 16600.00 21047

    12 Mar-12 18626.56 15832.58 18626.56 15832.6 0.85 N.A 2637953.2 95672.28 16600.00 21047

    1

    2

    3

    4

    5

    1

    Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

    KVAH and demand readings will be required for load more than 100KW only.

    Please attach circle-wise and Divisional wise Abstracts with each energy account.

    Asstt. Exe. Engineer

    Rainawari

    Meter Rated Current: Meter Type:

    Type: Me

    Installation No:

    Category:

    Note:

    Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

    ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE

    Circle: EM & RE Circle-Ist, Srinagar Electric Division-IV, Khanyar

    Note:

    LT Water Works

    Name of Installation:- Executive Engineer, UEED

    In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing

    Capacitor Installed: Y/N Rating of Capacitor:

    Supply Type:CT Ratio:

    Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

  • 7/28/2019 SERC Rainawari

    35/48

  • 7/28/2019 SERC Rainawari

    36/48

    DiVision:

    N.A LT3Ph

    75858A N.A N.A Name of

    Computer Code: 10039 N N.A Feeder N

    Sanctioned Load: 53 KW

    S.No Month

    KVAH Units

    supplied

    KWH Units

    supplied

    KVAH Units

    recorded /

    computed

    KWH Units

    recorded

    AV-Power

    Factor

    Max. Demand

    Recorded KVA Opening Balance

    Energy Charges / F.R

    Charges billed

    (In Rs.)

    Demand

    charges billed

    (In Rs. )

    ED Bil

    (In Rs

    A B C D E=D/C F G H I J

    1 Apr-11 7971.76 6776.00 7971.764706 6776 0.85 N.A 7303734.5 2667121.00 1060.00 586766

    2 May-11 7972.94 6777.00 7972.941176 6777 0.85 N.A 10963164.85 2673066.75 1060.00 588074

    3 Jun-11 7974.12 6778.00 7974.117647 6778 0.85 N.A 14685397.96 2649371.00 1060.00 582861

    4 Jul-11 7975.29 6779.00 7975.294118 6779 0.85 N.A 18434122.10 2663187.00 1060.00 585901

    5 Aug-11 7975.29 6779.00 7975.294118 6779 0.85 N.A 22253998.99 2661874.25 1060.00 585

    6 Sep-11 7975.29 6779.00 7975.294118 6779 0.85 N.A 26132327.73 160875.00 1060.00 35392

    7 Oct-11 17352.94 14750.00 17352.94118 14750 0.85 N.A 3989135.00 93334.31 1272.00 20533

    8 Nov-11 18541.18 15760.00 18541.17647 15760 0.85 N.A 4104274.00 99725.34 1272.00 21939

    9 Dec-11 18541.18 15760.00 18541.17647 15760 0.85 N.A 4228478.0 99725.24 1272.00 21939

    10 Jan-12 18541.18 15760.00 18541.17647 11000 0.85 N.A 4360479.9 69605.25 1272.00 15313

    11 Feb-12 18541.18 15760.00 18541.17647 12000 0.85 N.A 4489744.5 75933.00 1272.00 16705

    12 Mar-12 18541.18 15760.00 18541.17647 7000 0.85 N.A 4582837.9 46546.50 1272.00 10240

    1

    2

    3

    4

    5

    1

    Note:

    Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

    Rainawari

    Meter Rated Current: Meter Type:

    Asstt. Exe. Engineer

    KVAH and demand readings will be required for load more than 100KW only.

    In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing

    Please attach circle-wise and Divisional wise Abstracts with each energy account.

    Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

    Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

    Capacitor Installed: Y/N Rating of Capacitor:

    Note:

    Installation No:

    Category: State CT Ratio: Supply Type: Type: Me

    Circle: EM & RE Circle-Ist, Srinagar Electric Division-IV, Khanyar

    ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE

    Joint Director PoultaryName of Installation:-

  • 7/28/2019 SERC Rainawari

    37/48

    DiVision:

    N.A LT3Ph

    14260A N.A N,.A Name of

    Computer Code: 10043 N N.A Feeder N

    Sanctioned Load: 300 KW

    S.No Month

    KVAH Units

    supplied

    KWH Units

    supplied

    KVAH Units

    recorded /

    computed

    KWH Units

    recorded

    AV-Power

    Factor

    Max. Demand

    Recorded KVA Opening Balance

    Energy Charges / F.R

    Charges billed

    (In Rs.)

    Demand

    charges billed

    (In Rs. )

    ED Bil

    (In Rs

    A B C D E=D/C F G H I J

    1 Apr-11 119983.76 101986.20 119983.7604 101986.2 0.85 N.A 3792883.5 498712.50 6000.00 109716

    2 May-11 118693.61 100889.57 118693.6124 100889.6 0.85 N.A 4519440.0 493350.00 6000.00 108537

    3 Jun-11 119983.76 101986.20 119983.7604 101986.2 0.85 N.A 5249759.7 498712.50 6000.00 109716

    4 Jul-11 117403.46 99792.94 117403.4645 99792.94 0.85 N.A 5998169.3 487987.50 6000.00 107357

    5 Aug-11 118693.61 100889.57 118693.6124 100889.6 0.85 N.A 6743534.7 493350.00 6000.00 108537

    6 Sep-11 118693.61 100889.57 118693.6124 100889.6 0.85 N.A 7507215.8 493350.00 6000.00 108537

    7 Oct-11 143529.41 122000.00 143529.4118 122000 0.85 N.A 3965135.5 771985.50 7200.00 169836

    8 Nov-11 143529.41 122000.00 143529.4118 122000 0.85 N.A 1384055.0 759330.00 7200.00 167052

    9 Dec-11 143529.41 122000.00 143529 122000 0.85 N.A 2317638.0 759330.00 7200.00 167052

    10 Jan-12 143529.41 122000.00 143529 122000 0.85 N.A 3320250.6 759330.00 7200.00 167052

    11 Feb-12 143529.41 122000.00 143529 122000 0.85 N.A 573093.2 759330.00 7200.00 167052

    12 Mar-12 143529.41 122000.00 143529 122000 0.85 N.A 1575705.8 759330.00 7200.00 167052

    1

    2

    3

    4

    5

    1

    Please attach circle-wise and Divisional wise Abstracts with each energy account.

    Note:

    Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

    Asstt. Exe. Engineer

    Rainawari

    KVAH and demand readings will be required for load more than 100KW only.

    In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing

    Meter Rated Current: Meter Type:

    Supply Type: Type: Me

    Installation No:

    Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

    Capacitor Installed: Y/N Rating of Capacitor:

    Note:

    Circle: EM & RE Circle-Ist, Srinagar Electric Division-IV, Khanyar

    Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

    Category: State CT Ratio:

    Name of Installation:- Supdtt. JLNM Hospital

    ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE

  • 7/28/2019 SERC Rainawari

    38/48

    DiVision:

    N.A LT3Ph

    6162SD N.A N.A Name of

    Computer Code: 10049 N N.A Feeder N

    Sanctioned Load: 32 KW

    S.No Month

    KVAH Units

    supplied

    KWH Units

    supplied

    KVAH Units

    recorded /

    computed

    KWH Units

    recorded

    AV-Power

    Factor

    Max. Demand

    Recorded KVA Opening Balance

    Energy Charges / F.R

    Charges billed

    (In Rs.)

    Demand

    charges billed

    (In Rs. )

    ED Bil

    (In Rs

    A B C D E=D/C F G H I J

    1 Apr-11 9908.34 8422.09 9908.336341 8422.086 0.85 N.A 922056.25 41184.00 640.00 9060.

    2 May-11 9908.34 8422.09 9908.336341 8422.086 0.85 N.A 991335.0 41184.00 640.00 9060.

    3 Jun-11 9908.34 8422.09 9908.336341 8422.086 0.85 N.A 1061652.9 41184.00 640.00 9060.

    4 Jul-11 9908.34 8422.09 9908.336341 8422.086 0.85 N.A 1133025.6 41184.00 640.00 9060.

    5 Aug-11 9908.34 8422.09 9908.336341 8422.086 0.85 N.A 1205468.9 41184.00 640.00 9060.

    6 Sep-11 9908.34 8422.09 9908.336341 8422.086 0.85 N.A 1278998.9 41184.00 640.00 9060.

    7 Oct-11 12179.00 10352.15 12178.99675 10352.15 0.85 N.A 1353631.8 50622.00 768.00 11136

    8 Nov-11 12179.00 10352.15 12178.99675 10352.15 0.85 N.A 1442072.0 50622.00 768.00 11136

    9 Dec-11 12179.00 10352.15 12178.99675 10352.15 0.85 N.A 1531838.9 50622.00 768.00 11136

    10 Jan-12 12179.00 10352.15 12178.996 7680 0.85 N.A 1512598.3 48597.12 768.00 10691

    11 Feb-12 12179.00 7680.00 12178.996 7680 0.85 N.A 1598967.7 48597.12 768.00 10691

    12 Mar-12 12179.00 7680.00 12178.996 7680 0.85 N.A 1688580.6 48597.12 768.00 10691

    1

    2

    3

    4

    5

    1

    In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing

    Please attach circle-wise and Divisional wise Abstracts with each energy account.

    Note:

    Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

    Asstt. Exe. Engineer

    Rainawari

    Rating of Capacitor:

    Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

    Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

    KVAH and demand readings will be required for load more than 100KW only.

    Note:

    Meter Type:

    Electric Division-IV, Khanyar

    Installation No: Meter Rated Current:

    Capacitor Installed: Y/N

    ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE

    Circle: EM & RE Circle-Ist, Srinagar

    Name of Installation:- Joint Director Horticulture, Hazratbal

    Type: MeCategory: State CT Ratio: Supply Type:

  • 7/28/2019 SERC Rainawari

    39/48

    DiVision:

    N.A LT3Ph

    90SD N.A LTKWH Name of

    Computer Code: 10040 N N.A Feeder N

    Sanctioned Load: 53 KW

    S.No Month

    KVAH Units

    supplied

    KWH Units

    supplied

    KVAH Units

    recorded /

    computed

    KWH Units

    COMPUT

    ED

    AV-Power

    Factor

    Max. Demand

    Recorded KVA Opening Balance

    Energy Charges / F.R

    Charges billed

    (In Rs.)

    Demand

    charges billed

    (In Rs. )

    ED Bil

    (In Rs

    A B C D E=D/C F G H I J

    1 Apr-11 15701.10 13345.94 15701.10069 13345.94 0.85 N.A 1212543.38 65261.63 1060.00 14357

    2 May-11 15689.75 13336.28 15689.74705 13336.28 0.85 N.A 1318642.77 65214.43 1060.00 14347

    3 Jun-11 15733.61 13373.57 15733.61241 13373.57 0.85 N.A 1426270.87 65396.76 1060.00 14387

    4 Jul-11 15708.33 13352.08 15708.32583 13352.08 0.85 N.A 1535755.98 65291.66 1060.00 14364

    5 Aug-11 15710.39 13353.83 15710.38961 13353.83 0.85 N.A 1646743.52 65300.23 1060.00 14366

    6 Sep-11 15710.39 13353.83 15710.38961 13353.83 0.85 N.A 1759407.29 65300.23 1060.00 14366

    7 Oct-11 16858.82 14330.00 16858.82353 14330 0.85 N.A 1569261.01 90676.66 1272.00 19948

    8 Nov-11 18435.29 15670.00 18435.29412 15670 0.85 N.A 1714742.90 99155.84 1272.00 21814

    9 Dec-12 18435.29 15670.00 18435.29412 15670 0.85 N.A 1873689.18 99155.84 1272.00 21814

    10 Jan-12 18435.29 15670.00 18435.29412 7000 0.85 N.A 1172412.50 46546.50 1272.00 21814

    11 Feb-12 18435.29 15670.00 18435.29412 7000 0.85 N.A 1251059.46 46546.50 1272.00 21814

    12 Mar-12 18435.29 15670.00 18435.29412 10000 0.85 N.A 1329706.42 66495.00 1272.00 21814

    1

    2

    3

    4

    5

    1

    Note:

    Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

    Asstt. Exe. Engineer

    Please attach circle-wise and Divisional wise Abstracts with each energy account.

    KVAH and demand readings will be required for load more than 100KW only.

    Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

    Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

    Note:

    Installation No: Meter Rated Current:

    Rainawari

    In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing

    Capacitor Installed: Y/N Rating of Capacitor:

    Name of Installation:- Joint Director Poultary Briolers

    Type: Me

    Circle:

    Category: State CT Ratio: Supply Type:

    Meter Type:

    ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE

    EM & RE Circle-Ist, Srinagar Electric Division-IV, Khanyar

  • 7/28/2019 SERC Rainawari

    40/48

    DiVision:

    N.A LT3Ph

    LAWDA2 N.A LTKWH Name of

    Computer Code: 10085 N N.A Feeder NSanctioned Load: 200 KW

    S.No Month

    KVAH Units

    supplied

    KWH Units

    supplied

    KVAH Units

    recorded /

    computed

    KWH Units

    recorded

    AV-Power

    Factor

    Max. Demand

    Recorded KVA Opening Balance

    Energy Charges / F.R

    Charges billed

    (In Rs.)

    Demand

    charges billed

    (In Rs. )

    ED Bil

    (In Rs

    A B C D E=D/C F G H I J

    1 Apr-11 9412.94 8001.00 9412.941176 8001 0.85 N.A 5277467 123337.50 4000.00 27134

    2 May-11 9414.12 8002.00 9414.117647 8002 0.85 N.A 5524798.52 134062.50 4000.00 29493

    3 Jun-11 9415.29 8003.00 9415.294118 8003 0.85 N.A 5790110.40 139425.00 4000.00 30673

    4 Jul-11 9416.47 8004.00 9416.470588 8004 0.85 N.A 6066537.16 150150.00 4000.00 33033

    5 Aug-11 9416.47 8004.00 9416.470588 8004 0.85 N.A 6361380.71 0.00 4000.00 0.00

    6 Sep-11 9416.47 8004.00 9416.470588 8004 0.85 N.A 6460861.42 246675.00 4000.00 54268

    7 Oct-11 32352.94 27500.00 32352.94118 27500 0.85 N.A 6548885.50 174013.00 4800.00 38282

    8 Nov-11 32352.94 27500.00 32352.94118 27500 0.85 N.A 6763581.00 174013.00 4800.00 38282

    9 Dec-11 14117.65 12000.00 14117.64706 12000 0.85 N.A 6978277.00 47916.00 4800.00 10541

    10 Jan-12 24705.88 21000.00 24705.88235 21000 0.85 N.A 6308644.50 83853.00 47200.00 18447

    11 Feb-12 18823.53 16000.00 18823.52941 16000 0.85 N.A 5622288.16 63888.00 47200.00 14055

    12 Mar-12 30588.24 26000.00 30588.23529 26000 0.85 N.A 5717127.52 108966.00 47200.00 23972

    1

    2

    3

    4

    5

    1

    Rainawari

    Asstt. Exe. Engineer

    Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

    Capacitor Installed: Y/N Rating of Capacitor:

    Note:

    Please attach circle-wise and Divisional wise Abstracts with each energy account.

    Note:

    KVAH and demand readings will be required for load more than 100KW only.

    In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing

    Installation No: Meter Rated Current: Meter Type:

    Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

    Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

    Circle: EM & RE Circle-Ist, Srinagar Electric Division-IV, Khanyar

    ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE

    Name of Installation:- Ex. Engineer LAWDA, Habak

    Type: MeCategory: State CT Ratio:200/5A Supply Type:

  • 7/28/2019 SERC Rainawari

    41/48

    DiVision:

    N.A LT3Ph

    LAWDA1 N.A LTKWH Name of

    Computer Code: 10084 N N.A Feeder N

    Sanctioned Load: 200 KW

    S.No Month

    KVAH Units

    supplied

    KWH Units

    supplied

    KVAH Units

    recorded /

    computed

    KWH Units

    recorded

    AV-Power

    Factor

    Max. Demand

    Recorded KVA Opening Balance

    Energy Charges / F.R

    Charges billed

    (In Rs.)

    Demand

    charges billed

    (In Rs. )

    ED Bil

    (In Rs

    A B C D E=D/C F G H I J

    1 Apr-11 12942.35 11001.00 12942.35294 11001 0.85 N.A 774782.3 69712.50 4000.00 15336

    2 May-11 12943.53 11002.00 12943.52941 11002 0.85 N.A 883221.59 69712.50 4000.00 15336

    3 Jun-11 12944.71 11003.00 12944.70588 11003 0.85 N.A 993287.46 85800.00 4000.00 18876

    4 Jul-11 12945.88 11004.00 12945.88235 11004 0.85 N.A 1126409.91 85800.00 4000.00 18876

    5 Aug-11 12945.88 11004.00 12945.88235 11004 0.85 N.A 1261529.20 0.00 4000.00 0.00

    6 Sep-11 12945.88 11004.00 12945.88235 11004 0.85 N.A 1284512.14 150150.00 4000.00 33033

    7 Oct-11 17647.06 15000.00 17647.05882 15000 0.85 N.A 1401209.00 94916.00 4800.00 20881

    8 Nov-11 17647.06 15000.00 17647.05882 15000 0.85 N.A 1519407.00 94916.00 4800.00 20881

    9 Dec-11 8235.29 7000.00 8235.294118 7000 0.85 N.A 1637605.00 27951.00 4800.00 6149.

    10 Jan-12 8235.29 7000.00 8235.294118 7000 0.85 N.A 1380887.75 27951.00 4800.00 7027.

    11 Feb-12 9411.76 8000.00 9411.764706 8000 0.85 N.A 925933.75 31944.00 4800.00 7376.

    12 Mar-12 9411.76 8000.00 9411.764706 8000 0.85 N.A 920276.75 31944.00 4800.00 7376.

    1

    2

    3

    4

    5

    1

    Please attach circle-wise and Divisional wise Abstracts with each energy account.

    Note:

    Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

    Asstt. Exe. Engineer

    Rainawari

    Note:

    Type: Me

    Capacitor Installed: Y/N Rating of Capacitor:

    Category: State

    Installation No: Meter Rated Current: Meter Type:

    Circle: EM & RE Circle-Ist, Srinagar Electric Division-IV, Khanyar

    Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

    Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

    KVAH and demand readings will be required for load more than 100KW only.

    In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing

    ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE

    CT Ratio:200/5A Supply Type:

    Name of Installation:- Ex. Engineer LWDA, Hazratbal

  • 7/28/2019 SERC Rainawari

    42/48

  • 7/28/2019 SERC Rainawari

    43/48

    DiVision:

    N.A LT3Ph

    14260 N.A N.A Name of

    Computer Code: 10042 N N.A Feeder N

    Sanctioned Load: 90 KW

    S.No Month

    KVAH Units

    supplied

    KWH Units

    supplied

    KVAH Units

    recorded /

    computed

    KWH Units

    recorded

    AV-Power

    Factor

    Max. Demand

    Recorded KVA Opening Balance

    Energy Charges / F.R

    Charges billed

    (In Rs.)

    Demand

    charges billed

    (In Rs. )

    ED Bil

    (In Rs

    A B C D E=D/C F G H I J

    1 Apr-11 1109009.98 942658.49 1109009.984 942658.5 0.85 N.A 6172863 4609600.00 1800.00 101411

    2 May-11 206327.44 175378.32 206327.439 175378.3 0.85 N.A 10490647 857600.00 1800.00 188672

    3 Jun-11 219222.90 186339.47 219222.9039 186339.5 0.85 N.A 11722191 911200.00 1800.00 200464

    4 Jul-11 216643.81 184147.24 216643.8109 184147.2 0.85 N.A 13038580 900480.00 1800.00 198105

    5 Aug-11 209003.97 177653.37 209003.9697 177653.4 0.85 N.A 12385429 868725.00 1800.00 191119

    6 Sep-11 209003.53 177653.00 209003.5294 177653 0.85 N.A 13728940 868725.00 1800.00 191119

    7 Oct-11 23529.41 20000.00 23529.41176 20000 0.85 N.A 10322005 126555.00 2160.00 27842

    8 Nov-11 17647.06 15000.00 17647.05882 15000 0.85 N.A 9223577 94916.25 2160.00 20881

    9 Dec-11 17647.06 15000.00 17647.05882 15000 0.85 N.A 9350164 94916.25 2160.00 20881

    10 Jan-12 17647.06 15000.00 17647.05882 15000 0.85 N.A 9476750 94916.25 2160.00 20881

    11 Feb-12 17647.06 15000.00 17647.05882 15000 0.85 N.A 9311770 94916.25 2160.00 20881

    12 Mar-12 17647.06 15000.00 17647.05882 15000 0.85 N.A 9438356 94916.25 2160.00 20881

    1

    2

    3

    4

    5

    1

    Please attach circle-wise and Divisional wise Abstracts with each energy account.

    Note:

    Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

    Asstt. Exe. Engineer

    Rainawari

    KVAH and demand readings will be required for load more than 100KW only.

    In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing

    Installation No: Meter Rated Current: Meter Type:

    Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

    Capacitor Installed: Y/N Rating of Capacitor:

    Note:

    Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

    Category: State CT Ratio: Supply Type: Type: Me

    Circle: EM & RE Circle-Ist, Srinagar Electric Division-IV, Khanyar

    Name of Installation:- Supdtt. JLNM Hospital

    ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE

  • 7/28/2019 SERC Rainawari

    44/48

    DiVision:

    N.A LT3Ph

    46827 N.A N.A Name of

    Computer Code: 10045 N N.A Feeder N

    Sanctioned Load: 51 KW

    S.No Month

    KVAH Units

    supplied

    KWH Units

    supplied

    KVAH Units

    recorded /

    computed

    KWH Units

    recorded

    AV-Power

    Factor

    Max. Demand

    Recorded KVA Opening Balance

    Energy Charges / F.R

    Charges billed

    (In Rs.)

    Demand

    charges billed

    (In Rs. )

    ED Bil

    (In Rs

    A B C D E=D/C F G H I J

    1 Apr-11 19352.22 16449.39 19352.21942 16449.39 0.85 N.A 11950800.00 80437.50 1020.00 17696

    2 May-11 19997.29 16997.70 19997.2934 16997.7 0.85 N.A 12238125.24 83118.75 1020.00 18286

    3 Jun-11 16126.85 13707.82 16126.84951 13707.82 0.85 N.A 12533327.96 67031.25 1020.00 14746

    4 Jul-11 15675.30 13324.00 15675.29773 13324 0.85 N.A 12811553.14 65154.38 1020.00 14333

    5 Aug-11 14836.70 12611.20 14836.70155 12611.2 0.85 N.A 12380954.37 61668.75 1020.00 13567

    6 Sep-11 14836.70 12611.20 14836.70155 12611.2 0.85 N.A 12649758.75 61668.75 1020.00 13567

    7 Oct-11 23164.71 19690.00 23164.70588 19690 0.85 N.A 12882332.00 124593.40 1224.00 27410

    8 Nov-11 24552.94 20870.00 24552.94118 20870 0.85 N.A 13231093.00 132060.14 1224.00 29053

    9 Dec-11 24552.94 20870.00 24552.94118 20870 0.85 N.A 13594332.00 102509.55 1224.00 22552

    10 Jan-12 47258.82 40170.00 47258.82353 40170 0.85 N.A 13720618.00 254185.72 1224.00 55920

    11 Feb-12 28858.82 24530.00 28858.82353 24530 0.85 N.A 14055056.37 155219.70 1224.00 34148

    12 Mar-12 20000.00 17000.00 20000 17000 0.85 N.A 14259759.28 113041.50 1224.00 24869

    1

    2

    3

    4

    5

    1

    In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing

    recorded KWH units with power factor = 0.85

    Please attach circle-wise and Divisional wise Abstracts with each energy account.

    Note:

    Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

    Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

    Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

    KVAH and demand readings will be required for load more than 100KW only.

    Asstt. Exe. Engineer

    Rainawari

    Capacitor Installed: Y/N Rating of Capacitor:

    Note:

    Meter Type:

    Electric Division-IV, Khanyar

    Installation No: Meter Rated Current:

    ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE

    Circle: EM & RE Circle-Ist, Srinagar

    Name of Installation:- Supdtt. Mental Hospital

    Type: MeCategory: State CT Ratio: Supply Type:

  • 7/28/2019 SERC Rainawari

    45/48

  • 7/28/2019 SERC Rainawari

    46/48

    DiVision:

    N.A LT3Ph

    5531A N.A N.A Name of

    Computer Code: 10031 N N.A Feeder N

    Sanctioned Load: 47.25 KW

    S.No Month

    KVAH Units

    supplied

    KWH Units

    supplied

    KVAH Units

    recorded /

    computed

    KWH Units

    recorded

    AV-Power

    Factor

    Max. Demand

    Recorded KVA Opening Balance

    Energy Charges / F.R

    Charges billed

    (In Rs.)

    Demand

    charges billed

    (In Rs. )

    ED Bil

    (In Rs

    A B C D E=D/C F G H I J

    1 Apr-11 1496.57 1272.09 1496.571635 1272.086 0.85 N.A 1010431.13 6220.50 960.00 1368.

    2 May-11 1935.22 1644.94 1935.221942 1644.939 0.85 N.A 1034838.8 8043.75 960.00 1769.

    3 Jun-11 1470.77 1250.15 1470.768676 1250.153 0.85 N.A 1062038.6 6113.25 960.00 1344.

    4 Jul-11 1935.22 1644.94 1935.221942 1644.939 0.85 N.A 1087077.7 8043.75 960.00 1769.

    5 Aug-11 1586.88 1348.85 1586.881992 1348.85 0.85 N.A 1115061.1 6595.88 960.00 1451.

    6 Sep-11 1586.88 1348.85 1586.881992 1348.85 0.85 N.A 938537.7 6595.88 960.00 1451.

    7 Oct-11 1552.94 1320.00 1552.941176 1320 0.85 N.A 866958.8 8352.63 1152.00 1837.

    8 Nov-11 8623.53 7330.00 8623.529412 7330 0.85 N.A 878300.0 46382.41 1152.00 10204

    9 Dec-11 11764.71 10000.00 11764.70588 10000 0.85 N.A 936038.0 63277.50 1152.00 13921

    10 Jan-12 14611.76 12420.00 14611.76471 12420 0.85 N.A 1014390.3 78590.66 1152.00 17289

    11 Feb-12 15976.47 13580.00 15976.47059 13580 0.85 N.A 1109131.4 85930.84 1152.00 18904

    12 Mar-12 9411.76 8000.00 9411.764706 8000 0.85 N.A 1205293.6 53196.00 1152.00 11703

    1

    2

    3

    4

    5

    1

    Rainawari

    Asstt. Exe. Engineer

    Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

    Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

    Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

    Capacitor Installed: Y/N Rating of Capacitor:

    Note:

    Please attach circle-wise and Divisional wise Abstracts with each energy account.Note:

    KVAH and demand readings will be required for load more than 100KW only.

    In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing

    Supply Type:

    Circle:

    Installation No: Meter Rated Current: Meter Type:

    Name of Installation:- Supdtt. Central Jail

    Type: MeCategory: State CT Ratio:

    EM & RE Circle-Ist, Srinagar Electric Division-IV, Khanyar

    ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE

  • 7/28/2019 SERC Rainawari

    47/48

    DiVision:

    N.A LT3Ph

    420SM N.A N.A Name of

    Computer Code: 8482 N N.A Feeder N

    Sanctioned Load: 26 HP

    S.No Month

    KVAH Units

    supplied

    KWH Units

    supplied

    KVAH Units

    recorded /

    computed

    KWH Units

    recorded

    AV-Power

    Factor

    Max. Demand

    Recorded KVA Opening Balance

    Energy Charges / F.R

    Charges billed

    (In Rs.)

    Demand

    charges billed

    (In Rs. )

    ED Bil

    (In Rs

    A B C D E=D/C F G H I J

    1 Apr-11 2640.00 2244.00 2640 2244 0.85 N.A 187540.313 4578.64 700.00 1007.

    2 May-11 1980.00 1683.00 1980 1683 0.85 N.A 197156.13 4396.54 700.00 967.2

    3 Jun-11 1540.00 1309.00 1540 1309 0.85 N.A 206673.89 0.00 700.00 0.00

    4 Jul-11 4982.35 4235.00 4982.352941 4235 0.85 N.A 210484.50 4292.48 700.00 944.3

    5 Aug-11 2290.59 1947.00 2290.588235 1947 0.85 N.A 220063.72 4682.70 700.00 1030.

    6 Sep-11 2290.59 1947.00 2290.588235 1947 0.85 N.A 230305.85 4812.78 700.00 1058.

    7 Oct-11 711.76 605.00 711.7647059 605 0.85 N.A 237952.60 1643.79 800.00 361.6

    8 Nov-11 2329.41 1980.00 2329.411765 1980 0.85 N.A 244369.38 5379.66 800.00 1183.

    9 Dec-11 2329.41 1980.00 2329.411765 1980 0.85 N.A 252221.00 5379.66 800.00 1183.

    10 Jan-12 1164.71 990.00 1164.705882 990 0.85 N.A 256308.55 2689.83 800.00 591.7

    11 Feb-12 517.65 440.00 517.6470588 440 0.85 N.A 260879.18 1195.48 800.00 263.0

    12 Mar-12 0.00 0.00 0 0 0.85 N.A 263626.71 0.00 800.00 0.00

    1

    2

    3

    4

    5

    1

    Please attach circle-wise and Divisional wise Abstracts with each energy account.Note:

    Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

    Asstt. Exe. Engineer

    Rainawari

    Note:

    Type: Me

    Capacitor Installed: Y/N Rating of Capacitor:

    Category: LT Indust.

    Installation No: Meter Rated Current: Meter Type:

    Circle: EM & RE Circle-Ist, Srinagar Electric Division-IV, Khanyar

    Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

    Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

    KVAH and demand readings will be required for load more than 100KW only.

    In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing

    ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE

    CT Ratio: Supply Type:

    Name of Installation:- Ghulam Mohd. Zaroo

  • 7/28/2019 SERC Rainawari

    48/48

    DiVision:

    N.A 11KV

    100-SD N.A

    HT

    Trivector Name of

    Computer Code: 10021 N N.A Feeder N

    Sanctioned Load: 760kws

    S.No Month

    KVAH Units

    supplied

    KWH Units

    supplied

    KVAH Units

    recorded /

    computed

    KWH Units

    recorded

    AV-Power

    Factor

    Max. Demand

    Recorded KVA Opening Balance

    Energy Charges / F.R

    Charges billed

    (In Rs.)

    Demand

    charges billed

    (In Rs. )

    ED Bil

    (In Rs

    A B C D E=D/C F G H I J

    1 Apr-11 144496.57 122822.09 144496.5716 122822.1 0.85 511.01 4088142 600600.00 8260.00 132132

    2 May-11 152237.46 129401.84 152237.4594 129401.8 0.85 511.01 4956990.0 632775.00 8260.00 139210

    3 Jun-11 148367.02 126111.96 148367.0155 126112 0.85 511.01 5881681.9 616687.50 8260.00 135671

    4 Jul-11 138045.83 117338.96 138045.8318 117339 0.85 511.01 6798838.6 573787.50 8260.00 126233

    5 Aug-11 145786.72 123918.71 145786.7196 123918.7 0.85 511.01 7672671.1 605962.50 8260.00 133311

    6 Sep-11 140626.13 119532.21 140626.1278 119532.2 0.85 511.01 8602422.2 584512.50 8260.00 128592

    7 Oct-11 160000.00 136000.00 160000 136000 0.85 511.01 6483990.5 860574.00 9912.00 189326

    8 Nov-11 152941.18 130000.00 152941.1765 130000 0.85 511.01 7656959.8 822607.50 9912.00 180973

    9 Dec-11 122352.94 104000.00 122352.9412 104000 0.85 511.01 7310265.4 658060.00 9912 144773

    10 Jan-12 165882.35 141000.00 165882.3529 141000 0.85 511.01 8234794.9 892212.75 9912.00 123433

    11 Feb-12 107058.82 91000.00 107058.8235 91000 0.85 511.01 9173192.3 561060.50 9912.00 113938

    12 Mar-12 98823.53 84000.00 98823.52941 84000 0.85 511.01 8185810.9 517902.00 9912.00 166769

    1

    2

    3

    45

    1

    Note: Asstt. Exe. Engineer

    In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing

    Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT

    11KV Trivector Meter not commissioned/Tested yet Rainawari

    Please attach circle-wise and Divisional wise Abstracts with each energy account.

    Note:

    Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.

    CT Ratio: Supply Type: Type: Me

    KVAH and demand readings will be required for load more than 100KW only.

    Capacitor Installed: Y/N Rating of Capacitor:

    Note:

    Installation No: Meter Rated Current: Meter Type:

    Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH

    ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE

    Circle: EM & RE Circle-Ist, Srinagar Electric Division-IV, Khanyar

    Name of Installation:- Ex. Engineer PHE, Pokhribal

    Category: State