S.No Month
Energy Input
Billed and losses Hawal Rainawari K.K.Moulla Khanyar Zakura
Total for
the Division
Input (LU's) 113.81 113.81
Billed (LU's) 60.93 60.93
Losses % 53.54 53.54
Input (LU's) 117.67 117.67
Billed (LU's) 62.30 62.30
Losses % 52.94 52.94Input (LU's) 0.00
Billed (LU's) 0.00
Losses % 0.00
Input (LU's) 0.00
Billed (LU's) 0.00
Losses % 0.00
Input (LU's) 0.00
Billed (LU's) 0.00
Losses % 0.00
Input (LU's) 0.00
Billed (LU's) 0.00
Losses % 0.00
Input (LU's) 0.00Billed (LU's) 0.00
Losses % 0.00
Input (LU's) 0.00
Billed (LU's) 0.00
Losses % 0.00
Input (LU's) 0.00
Billed (LU's) 0.00
Losses % 0.00
Input (LU's) 139.35 139.35
Billed (LU's) 39.50 39.50
Losses % 72.00 72.00
Input (LU's) 141.82 141.82
Billed (LU's) 40.16 40.16Losses % 72.00 72.00
4
5 August
May
Form # 1: Monthly Energy-Kashmir
MONTHLY ENERGY INPUT, ENERGY BILLED & LOSSES FOR THE YEAR 2001-11(For Achievement under Triparitite MoU and for progress to SERC)
April1
7 Jan-12
8
June
2
September6
July
3
Feb-12
8
October
November
7
9 December
-
7/28/2019 SERC Rainawari
2/48
Input (LU's) 129.18 129.18
Billed (LU's) 39.83 39.83
Losses % 69.00 69.00
*
Mar-129
-
7/28/2019 SERC Rainawari
3/48
orm # 2: Monthly Meters-Kashmir
S.No Month
Total consumers
electronic metering
level and % metering at
end of month Hawal Rainawari K.K.Moulla Khanyar Zakura
Total Consumers 10567
Meters Installed 6685
% Metering 63.26
Total Consumers 10582
Meters Installed 6700% Metering 63.32
Total Consumers
Meters Installed
% Metering
Total Consumers
Meters Installed
% Metering
Total Consumers
Meters Installed
% Metering
Total Consumers
Meters Installed
% MeteringTotal Consumers
Meters Installed
% Metering
Total Consumers
Meters Installed
% Metering
Total Consumers
Meters Installed
% Metering
Total Consumers 10363.00
Meters Installed 370.00
% Metering
Total Consumers 10481.00
Meters Installed 650.00
10 January
4 July
9 December
6 September
7 October
8 November
MONTHLY TOTAL CONSUMERS, ELECTRONIC METERS INSTALLED AND %age ELECTRONIC FOR THE YEA(For Achievement under Triparitite MoU and for progress reporting to SERC)
1 April
5 August
2 May
3 June
-
7/28/2019 SERC Rainawari
4/48
% Metering
Total Consumers 10371.00
Meters Installed 720.00
% Metering
February
March
11
12
-
7/28/2019 SERC Rainawari
5/48
Total for
the Division
2011-12
-
7/28/2019 SERC Rainawari
6/48
-
7/28/2019 SERC Rainawari
7/48
Form # 3: Monthly Revenue-Kashmir
S.No Month
Monthly Revenue
Realised, Pure & ED
(Rs. In lacs) Hawal Rainawari K.K.Moulla Khanyar Zakura
Total for
the Division
Revenue Pure 4.85
ED 1.06
Total (Rs. In lacs) 5.91
Revenue Pure 46.47
ED 10.20Total 56.67
Revenue Pure
ED
Total
Revenue Pure
ED
Total
Revenue Pure
ED
Total
Revenue Pure
ED
Total
Revenue Pure
ED
Total
Revenue Pure
ED
Total
Revenue Pure
ED
Total
Revenue Pure 57.359
ED 12.59
Total 69.95Revenue Pure 60.64
10 January
4 July
9 December
6 September
7 October
8 November
MONTHLY REVENUE REALISED (PURE AND ED) FOR THE YEAR 2011-12(For Achievement under Triparitite MoU and for progress reporting to SERC)
1 April
5 August
2 May
3 June
-
7/28/2019 SERC Rainawari
8/48
ED 13.31
Total 73.95
Revenue Pure 262.29
ED 57.58
Total 319.87
11
12
February
March
-
7/28/2019 SERC Rainawari
9/48
S.No Month
Monthly
Connections added
metered and flat rate
(No's) Hawal Rainawari K.K.Moulla Khanyar Zakura
Total for
the Division
Metered 12
Flat Rate 0
Total 12
Metered 15
Flat Rate 0
Total 15
Metered
Flat Rate
Total
Metered
Flat Rate
Total
Metered
Flat Rate
Total
Metered
Flat Rate
Total
Metered
Flat Rate
Total
Metered
Flat Rate
Total
Metered
Flat Rate
Total
Metered 100.00
Flat Rate 18.00
Total 118.00
Metered 105.00
8 November
10 January
9 December
6 September
7
4 July
5 August
October
Form # 4: Monthly Connection-Kashmir
2 May
3 June
MONTHLY CONNECTIONS ADDED (METERED AND FLAT RATE) FOR THE YEAR 2011-12(For Achievement under Triparitite MoU and for progress reporting to SERC)
1 April
-
7/28/2019 SERC Rainawari
10/48
Flat Rate 15.00
Total 120.00
Metered 98.00
Flat Rate 12.00
Total 110.0012 March
11 February
-
7/28/2019 SERC Rainawari
11/48
-
7/28/2019 SERC Rainawari
12/48
Description
Category Hawal Rainawari K.K.Moulla Khanyar Zakura
Total for
the Division
Domestic
N.Dom/Commercial
Iri/Aggri.
State / Central
Publ;ic LightingLT Industries
HT Industries
HT P. Inten.
LT Pub. WW
HT Pub. WW
Gen. Bulk
Temporary
Total
Domestic
N.Dom/Commercial
Iri/Aggri.
State / Central
Publ;ic LightingLT Industries
HT Industries
HT P. Inten.
LT Pub. WW
HT Pub. WW
Gen. Bulk
Temporary
Metered
Flat Rate
Total
Domestic
N.Dom/Commercial
Iri/Aggri.State / Central
Connectionsason31
.05.2010
EnergyBilledason31.0
5.2010
Lac's
Form # 5: Category Detail-Kashmir
MONTHLY CONNECTIONS ENERGY SALES AND REVENUE FOR THE YEAR 2010-11(For Achievement under Triparitite MoU and for progress reporting to SERC)
-
7/28/2019 SERC Rainawari
13/48
Publ;ic Lighting
LT Industries
HT Industries
HT P. Inten.
LT Pub. WW
HT Pub. WW
Gen. Bulk
Temporary
Metered
Flat Rate
Total
Revenueason31.05.2010
-
7/28/2019 SERC Rainawari
14/48
S.No Name of Feeder Energy Pumped Energy Billed
Energy Billed in
Rs (Lac's) Losses (LU's) %age Losses
Energy Realised
(LU's)
1 Feeder-1 Habak 14.00 7.50 37.50 6.50 46.42857143
2 Feeder-2 Habak 16.80 9.00 27.00 7.80 46.42857143
3 Feeder-3 Habak 3.06 1.64 4.02 1.42 46.40522876
4 Feeder-5 Habak 15.68 8.40 20.58 7.28 46.42857143
5 Feeder-1 Kathidarwaza 10.84 5.80 14.21 5.04 46.49446494
6 Feeder-2 Kathidarwaza 12.10 6.48 15.88 5.62 46.44628099
7 Feeder-3 Kathidarwaza 2.85 1.50 7.50 1.35 47.36842105
8 Feeder-5 Kathidarwaz 15.13 8.12 19.89 7.01 46.33179114
9 Feeder-1 Rainawari 2.23 1.20 6.00 1.03 46.18834081
10 Feeder-2 Rainawari 4.43 2.37 5.81 2.06 46.50112867
11 Feeder-3 Rainawari 5.34 2.85 6.98 2.49 46.62921348
12 Feeder-4 Rainawari 11.35 6.07 14.87 5.28 46.51982379
113.81 60.93 180.24 52.88
S.No Name of Feeder Energy Pumped Energy Billed
Energy Billed in
Rs (Lac's) Losses (LU's) %age Losses
Energy Realised
(LU's)
1 Feeder-1 Habak 18.80 12.85 64.25 5.95 31.64893617
2 Feeder-2 Habak 16.40 7.72 23.16 8.68 52.92682927
3 Feeder-3 Habak 3.04 1.43 3.50 1.61 52.96052632
4 Feeder-5 Habak 15.55 8.52 20.87 7.03 45.20900322
5 Feeder-1 Kathidarwaza 11.20 6.27 15.36 4.93 44.01785714
6 Feeder-2 Kathidarwaza 11.80 5.55 13.60 6.25 52.96610169
MONTH WISE AUDIT OF INDYSTRIAL FEEDERS FOR THE MONTH OF APRIL, 2010
(For Achievement under Triparitite MoU and for progress reporting to SERC)
Total
MONTH WISE AUDIT OF INDYSTRIAL FEEDERS FOR THE MONTH OF MAY, 2010(For Achievement under Triparitite MoU and for progress reporting to SERC)
-
7/28/2019 SERC Rainawari
15/48
7 Feeder-3 Kathidarwaza 2.63 1.84 9.20 0.79 30.03802281
8 Feeder-5 Kathidarwaz 14.93 7.03 17.22 7.90 52.91359678
9 Feeder-1 Rainawari 2.24 1.05 5.25 1.19 53.125
10 Feeder-2 Rainawari 4.37 2.06 5.05 2.31 52.8604119
11 Feeder-3 Rainawari 5.41 2.55 6.25 2.86 52.8650647
12 Feeder-4 Rainawari 11.53 5.43 13.30 6.10 52.90546401
117.9 62.30 197.02 55.60
S.No Name of Feeder Energy Pumped Energy Billed Losses (LU's) %age Losses
1 Feeder-1 Habak
2 Feeder-2 Habak
3 Feeder-3 Habak
4 Feeder-5 Habak
5 Feeder-1 Kathidarwaza
6 Feeder-2 Kathidarwaza
7 Feeder-3 Kathidarwaza
8 Feeder-5 Kathidarwaz9 Feeder-1 Rainawari
10 Feeder-2 Rainawari
11 Feeder-3 Rainawari
12 Feeder-4 Rainawari
13 Feeder-8 Khanyar
14 Feeder-1 Zakura
(For Achievement under Triparitite MoU and for progress reporting to SERC)
MONTH WISE AUDIT OF INDYSTRIAL FEEDERS FOR THE MONTH OF JULY, 2010
Total
Total
MONTH WISE AUDIT OF INDYSTRIAL FEEDERS FOR THE MONTH OF JUNE, 2010
-
7/28/2019 SERC Rainawari
16/48
S.No Name of Feeder Energy Pumped Energy Billed Losses (LU's) %age Losses
1 Feeder-1 Habak
2 Feeder-2 Habak
3 Feeder-3 Habak
4 Feeder-5 Habak
5 Feeder-1 Kathidarwaza6 Feeder-2 Kathidarwaza
7 Feeder-3 Kathidarwaza
8 Feeder-5 Kathidarwaz
9 Feeder-1 Rainawari
10 Feeder-2 Rainawari
11 Feeder-3 Rainawari
12 Feeder-4 Rainawari
13 Feeder-8 Khanyar
14 Feeder-1 Zakura
S.No Name of Feeder Energy Pumped Energy Billed Losses (LU's) %age Losses
1 Feeder-1 Habak
2 Feeder-2 Habak
3 Feeder-3 Habak
4 Feeder-5 Habak
5 Feeder-1 Kathidarwaza
6 Feeder-2 Kathidarwaza
7 Feeder-3 Kathidarwaza
(For Achievement under Triparitite MoU and for progress reporting to SERC)
Total
MONTH WISE AUDIT OF INDYSTRIAL FEEDERS FOR THE MONTH OF AUGUST, 2010
(For Achievement under Triparitite MoU and for progress reporting to SERC)
-
7/28/2019 SERC Rainawari
17/48
8 Feeder-5 Kathidarwaz
9 Feeder-1 Rainawari
10 Feeder-2 Rainawari
11 Feeder-3 Rainawari
12 Feeder-4 Rainawari
13 Feeder-8 Khanyar
14 Feeder-1 Zakura
S.No Name of Feeder Energy Pumped Energy Billed Losses (LU's) %age Losses
1 Feeder-1 Habak
2 Feeder-2 Habak
3 Feeder-3 Habak
4 Feeder-5 Habak
5 Feeder-1 Kathidarwaza
6 Feeder-2 Kathidarwaza
7 Feeder-3 Kathidarwaza8 Feeder-5 Kathidarwaz
9 Feeder-1 Rainawari
10 Feeder-2 Rainawari
11 Feeder-3 Rainawari
12 Feeder-4 Rainawari
13 Feeder-8 Khanyar
14 Feeder-1 Zakura
Total
MONTH WISE AUDIT OF INDYSTRIAL FEEDERS FOR THE MONTH OF OCTUMBER, 20(For Achievement under Triparitite MoU and for progress reporting to SERC)
MONTH WISE AUDIT OF INDYSTRIAL FEEDERS FOR THE MONTH OF SEPTEMBER, 20
(For Achievement under Triparitite MoU and for progress reporting to SERC)
Total
-
7/28/2019 SERC Rainawari
18/48
S.No Name of Feeder Energy Pumped Energy Billed Losses (LU's) %age Losses
1 Feeder-1 Habak
2 Feeder-2 Habak
3 Feeder-3 Habak
4 Feeder-5 Habak
5 Feeder-1 Kathidarwaza
6 Feeder-2 Kathidarwaza7 Feeder-3 Kathidarwaza
8 Feeder-5 Kathidarwaz
9 Feeder-1 Rainawari
10 Feeder-2 Rainawari
11 Feeder-3 Rainawari
12 Feeder-4 Rainawari
13 Feeder-8 Khanyar
14 Feeder-1 Zakura
S.No Name of Feeder Energy Pumped Energy Billed Losses (LU's) %age Losses
1 Feeder-1 Habak
2 Feeder-2 Habak
3 Feeder-3 Habak
4 Feeder-5 Habak
5 Feeder-1 Kathidarwaza
6 Feeder-2 Kathidarwaza
7 Feeder-3 Kathidarwaza
8 Feeder-5 Kathidarwaz
9 Feeder-1 Rainawari
10 Feeder-2 Rainawari
MONTH WISE AUDIT OF INDYSTRIAL FEEDERS FOR THE MONTH OF NOVEMBER, 20
(For Achievement under Triparitite MoU and for progress reporting to SERC)
Total
-
7/28/2019 SERC Rainawari
19/48
11 Feeder-3 Rainawari
12 Feeder-4 Rainawari
13 Feeder-8 Khanyar
14 Feeder-1 Zakura
S.No Name of Feeder Energy Pumped Energy Billed Losses (LU's) %age Losses
1 Feeder-1 Habak
2 Feeder-2 Habak
3 Feeder-3 Habak
4 Feeder-5 Habak
5 Feeder-1 Kathidarwaza
6 Feeder-2 Kathidarwaza
7 Feeder-3 Kathidarwaza
8 Feeder-5 Kathidarwaz
9 Feeder-1 Rainawari
10 Feeder-2 Rainawari
11 Feeder-3 Rainawari
12 Feeder-4 Rainawari13 Feeder-8 Khanyar
14 Feeder-1 Zakura
S.No Name of Feeder Energy Pumped Energy Billed Losses (LU's) %age Losses
1 Feeder-1 Habak
(For Achievement under Triparitite MoU and for progress reporting to SERC)
MONTH WISE AUDIT OF INDYSTRIAL FEEDERS FOR THE MONTH OF JANUARY, 201
(For Achievement under Triparitite MoU and for progress reporting to SERC)
Total
MONTH WISE AUDIT OF INDYSTRIAL FEEDERS FOR THE MONTH OF DECEMBER, 20
Total
-
7/28/2019 SERC Rainawari
20/48
2 Feeder-2 Habak
3 Feeder-3 Habak
4 Feeder-5 Habak
5 Feeder-1 Kathidarwaza
6 Feeder-2 Kathidarwaza
7 Feeder-3 Kathidarwaza
8 Feeder-5 Kathidarwaz
9 Feeder-1 Rainawari
10 Feeder-2 Rainawari
11 Feeder-3 Rainawari12 Feeder-4 Rainawari
13 Feeder-8 Khanyar
14 Feeder-1 Zakura
S.No Name of Feeder Energy Pumped Energy Billed Losses (LU's) %age Losses
1 Feeder-1 Habak
2 Feeder-2 Habak
3 Feeder-3 Habak4 Feeder-5 Habak
5 Feeder-1 Kathidarwaza
6 Feeder-2 Kathidarwaza
7 Feeder-3 Kathidarwaza
8 Feeder-5 Kathidarwaz
9 Feeder-1 Rainawari
10 Feeder-2 Rainawari
11 Feeder-3 Rainawari
12 Feeder-4 Rainawari
13 Feeder-8 Khanyar
14 Feeder-1 Zakura
Total
MONTH WISE AUDIT OF INDYSTRIAL FEEDERS FOR THE MONTH OF FEBRUARY, 201(For Achievement under Triparitite MoU and for progress reporting to SERC)
Total
-
7/28/2019 SERC Rainawari
21/48
S.No Name of Feeder Energy Pumped Energy Billed Losses (LU's) %age Losses
1 Feeder-1 Habak
2 Feeder-2 Habak3 Feeder-3 Habak
4 Feeder-5 Habak
5 Feeder-1 Kathidarwaza
6 Feeder-2 Kathidarwaza
7 Feeder-3 Kathidarwaza
8 Feeder-5 Kathidarwaz
9 Feeder-1 Rainawari
10 Feeder-2 Rainawari
11 Feeder-3 Rainawari
12 Feeder-4 Rainawari
13 Feeder-8 Khanyar
14 Feeder-1 Zakura
Total
MONTH WISE AUDIT OF INDYSTRIAL FEEDERS FOR THE MONTH OF MARCH, 2011(For Achievement under Triparitite MoU and for progress reporting to SERC)
-
7/28/2019 SERC Rainawari
22/48
Form # 6: En. Aud. Ind.
Energy Realised
in Rs (Lac's)
Whether KVAH
Based tariff
implemented
Form # 6: En. Aud. Ind.
Energy Realised
in Rs (Lac's)
Whether KVAH
Based tariff
implemented
-
7/28/2019 SERC Rainawari
23/48
Form # 6: En. Aud. Ind.
Whether KVAH
Based tariff
implemented
Yes
Form # 6: En. Aud. Ind.
-
7/28/2019 SERC Rainawari
24/48
Whether KVAH
Based tariff
implemented
Yes
Form # 6: En. Aud. Ind.
Whether KVAH
Based tariff
implemented
-
7/28/2019 SERC Rainawari
25/48
Yes
Form # 6: En. Aud. Ind.
Whether KVAH
Based tariff
implemented
Yes
0
10
-
7/28/2019 SERC Rainawari
26/48
Whether KVAH
Based tariff
implemented
Yes
Whether KVAHBased tariff
implemented
0
-
7/28/2019 SERC Rainawari
27/48
Yes
Whether KVAH
Based tariff
implemented
Yes
Whether KVAH
Based tariff
implemented
1
0
-
7/28/2019 SERC Rainawari
28/48
Yes
Whether KVAH
Based tariff
implemented
Yes
1
-
7/28/2019 SERC Rainawari
29/48
Whether KVAH
Based tariff
implemented
Yes
-
7/28/2019 SERC Rainawari
30/48
Hawal Rainawari K.K.Moulla Khanyar Zakura
Total for
the Division
0
Energy SuppliedKWH) 0
Energy Billed(KWH) 0
Amount Billed(Lacs) 0
Revenue Collectted(Lacs) 0% of RevenueCollection 0
Energy SuppliedKWH) 0
Energy Billed(KWH) 0
Amount Billed(Lacs) 0
Revenue Collectted(Lacs) 0
% of RevenueCollection 0
Energy SuppliedKWH) 0
Energy Billed(KWH) 0
Amount Billed(Lacs) 0
Revenue Collectted(Lacs) 0
% of RevenueCollection 0
Energy SuppliedKWH) 0
Energy Billed(KWH) 0
Amount Billed(Lacs) 0
Revenue Collectted(Lacs) 0% of RevenueCollection 0
MONTHLY ENERGY ACCOUNT & REVENUE REALISATION FOR INSTALLATIONS HAVING LOAD 25 KVA &
ABOVE FROM APRIL, 2010 TO JUNE, 2010
Form # 7
Energy Account
for the Month of
June, 2010
Energy Account
for the Month of
July, 2010
No. of Consumers
Energy/Revenue
Details
Energy Account
for the Month of
April, 2010
Energy Account
for the Month of
May, 2010
-
7/28/2019 SERC Rainawari
31/48
Hawal Rainawari K.K.Moulla Khanyar Zakura
No
KVA
Required
(KVAR)
Installed
(KVAR)
Deficiency
(KVAR)
%
Deficiency
Status of KVAR Compensation for Installations having Load 25 KVA & Above as on 31-05-2010(For achievement under Tripartite MoU and for progress reporting to SERC)
Format # 8
Electric Division-IV, Khanyar
KVAR Compensation Details
Electric Division-IV, Khanyar. Total for the
Division
Connections with load 25
KVA & Above
KVAR
Compensation through
Shunt Capacitor
Executive Engineer
-
7/28/2019 SERC Rainawari
32/48
Month of
the year
2007-08
Computerized
Billing Hawal Rainawari K.K.Moulla Khanyar Zakura
Total for
the Division
Total Energy Biled (LU's)
Energy Billed through computer(LU's)
%age computerised Billing #DIV/0!Total Energy Biled (LU's)
Energy Billed through computer(LU's)
%age computerised Billing #DIV/0!
Total Energy Biled (LU's)
Energy Billed through computer(LU's)
%age computerised Billing #DIV/0!
Total Energy Biled (LU's)
Energy Billed through computer(LU's)
%age computerised Billing #DIV/0!Jul-09
Form # 9
Apr-09
May-09
Jun-09
Monthly detail of Computerised Billed Energy From April, 2010 to June, 2010
(For Achievement under Triparitite MoU and for progress reporting to SERC)
-
7/28/2019 SERC Rainawari
33/48
DiVision:
N.A LT3Ph
17510 N.A N.A Name of 3
Computer Code: 9386 N.A N.A Feeder No
Sanctioned Load: 30 HP
S.No Month
KVAH Units
supplied
KWH Units
supplied
KVAH Units
recorded /
computed
KWH Units
recorded
AV-Power
Factor
Max. Demand
Recorded KVA Opening Balance
Energy Charges / F.R
Charges billed
(In Rs.)
Demand
charges billed
(In Rs. )
ED Bille
(In Rs
A B C D E=D/C F G H I J
1 Apr-11 N.A 0 N.A 20.00 N.A N.A 145010.10 47.30 805.00 10.41
2 May-11 N.A 0 N.A 0.00 N.A N.A 148061.00 0.00 805.00 0.00
3 Jun-11 N.A 0 N.A 80.00 N.A N.A 151098.99 189.20 805.00 41.62
4 Jul-11 N.A 0 N.A 0.00 N.A N.A 154436.04 0.00 805.00 0.00
5 Aug-11 N.A 0 N.A Locked N.A N.A 157569.66 118.25 805.00 26.02
6 Sep-11 N.A 0 N.A Locked N.A N.A 160907.62 7590.00 805.00 1669.8
7 Oct-11 N.A 0 N.A Locked N.A N.A 174237.35 11385.00 805.00 2505.0
8 Nov-11 N.A 0 N.A Locked N.A N.A 190949.26 11385.00 805.00 2505.0
9 Dec-11 N.A 0 N.A Locked N.A N.A 207911.85 11385.00 805.00 2505.0
10 Jan-12 N.A 0 N.A Locked N.A N.A 220169.58 0.00 805.00 0.00
11 Feb-12 N.A 0 N.A Locked N.A N.A 224289.20 0.00 805.00 0.00
12 Mar-12 N.A 0 N.A Locked N.A N.A 228470.61 0.00 805.00 0.00
1
2
3
4
5
1 Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.
Asstt. Exe. Engineer
Rainawari
Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
Electric Division-IV, KhanyarCircle:
In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing
Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
KVAH and demand readings will be required for load more than 100KW only.
Installation No: Meter Rated Current: Meter Type:
ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE M
Name of Installation:- Nazir Ah. Zargar
EM & RE Circle-Ist, Srinagar
Note:
Capacitor Installed: Y/N Rating of Capacitor:
Type: MetCT Ratio:Category: LT Indust. Supply Type:
-
7/28/2019 SERC Rainawari
34/48
DiVision:
N.A LT3Ph
18334 N.A N.A Name of
Computer Code: 10074 N N.A Feeder N
Sanctioned Load: 70 KW
S.No Month
KVAH Units
supplied
KWH Units
supplied
KVAH Units
recorded /
computed
KWH Units
computed
AV-Power
Factor
Max. Demand
Recorded KVA Opening Balance
Energy Charges / F.R
Charges billed
(In Rs.)
Demand
charges billed
(In Rs. )
ED Bil
(In Rs
A B C D E=D/C F G H I J
1 Apr-11 16232.05 13797.24 16232.04619 13797.24 0.85 N.A 1943230.38 67468.50 13280.00 14843
2 May-11 19409.38 16497.98 19409.38289 16497.98 0.85 N.A 2075629.8 80675.10 13280.00 17748
3 Jun-11 18450.04 15682.54 18450.0421 15682.54 0.85 N.A 2227587.5 76687.60 13280.00 16871
4 Jul-11 18027.93 15323.74 18027.93215 15323.74 0.85 N.A 2376519.0 74933.10 13280.00 16485
5 Aug-11 18626.56 15832.58 18626.56081 15832.58 0.85 N.A 2525349.9 77421.30 13280.00 17032
6 Sep-11 18626.56 15832.58 18626.56081 15832.58 0.85 N.A 2679724.0 77421.30 13280.00 17032
7 Oct-11 18626.56 15832.58 18626.56 15832.6 0.85 N.A 2284240.5 95951.79 16600.00 21109
8 Nov-11 18626.56 15832.58 18626.56 15832.6 0.85 N.A 2463024.0 95632.35 16600.00 21039
9 Dec-11 18626.56 15832.58 18626.56 15832.6 0.85 N.A 2102933.3 95672.28 16600.00 21047
10 Jan-12 18626.56 15832.58 18626.56 15832.6 0.85 N.A 2278624.7 95672.28 16600.00 21047
11 Feb-12 18626.56 15832.58 18626.56 15832.6 0.85 N.A 2456951.5 95672.28 16600.00 21047
12 Mar-12 18626.56 15832.58 18626.56 15832.6 0.85 N.A 2637953.2 95672.28 16600.00 21047
1
2
3
4
5
1
Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
KVAH and demand readings will be required for load more than 100KW only.
Please attach circle-wise and Divisional wise Abstracts with each energy account.
Asstt. Exe. Engineer
Rainawari
Meter Rated Current: Meter Type:
Type: Me
Installation No:
Category:
Note:
Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.
ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE
Circle: EM & RE Circle-Ist, Srinagar Electric Division-IV, Khanyar
Note:
LT Water Works
Name of Installation:- Executive Engineer, UEED
In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing
Capacitor Installed: Y/N Rating of Capacitor:
Supply Type:CT Ratio:
Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
-
7/28/2019 SERC Rainawari
35/48
-
7/28/2019 SERC Rainawari
36/48
DiVision:
N.A LT3Ph
75858A N.A N.A Name of
Computer Code: 10039 N N.A Feeder N
Sanctioned Load: 53 KW
S.No Month
KVAH Units
supplied
KWH Units
supplied
KVAH Units
recorded /
computed
KWH Units
recorded
AV-Power
Factor
Max. Demand
Recorded KVA Opening Balance
Energy Charges / F.R
Charges billed
(In Rs.)
Demand
charges billed
(In Rs. )
ED Bil
(In Rs
A B C D E=D/C F G H I J
1 Apr-11 7971.76 6776.00 7971.764706 6776 0.85 N.A 7303734.5 2667121.00 1060.00 586766
2 May-11 7972.94 6777.00 7972.941176 6777 0.85 N.A 10963164.85 2673066.75 1060.00 588074
3 Jun-11 7974.12 6778.00 7974.117647 6778 0.85 N.A 14685397.96 2649371.00 1060.00 582861
4 Jul-11 7975.29 6779.00 7975.294118 6779 0.85 N.A 18434122.10 2663187.00 1060.00 585901
5 Aug-11 7975.29 6779.00 7975.294118 6779 0.85 N.A 22253998.99 2661874.25 1060.00 585
6 Sep-11 7975.29 6779.00 7975.294118 6779 0.85 N.A 26132327.73 160875.00 1060.00 35392
7 Oct-11 17352.94 14750.00 17352.94118 14750 0.85 N.A 3989135.00 93334.31 1272.00 20533
8 Nov-11 18541.18 15760.00 18541.17647 15760 0.85 N.A 4104274.00 99725.34 1272.00 21939
9 Dec-11 18541.18 15760.00 18541.17647 15760 0.85 N.A 4228478.0 99725.24 1272.00 21939
10 Jan-12 18541.18 15760.00 18541.17647 11000 0.85 N.A 4360479.9 69605.25 1272.00 15313
11 Feb-12 18541.18 15760.00 18541.17647 12000 0.85 N.A 4489744.5 75933.00 1272.00 16705
12 Mar-12 18541.18 15760.00 18541.17647 7000 0.85 N.A 4582837.9 46546.50 1272.00 10240
1
2
3
4
5
1
Note:
Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.
Rainawari
Meter Rated Current: Meter Type:
Asstt. Exe. Engineer
KVAH and demand readings will be required for load more than 100KW only.
In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing
Please attach circle-wise and Divisional wise Abstracts with each energy account.
Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
Capacitor Installed: Y/N Rating of Capacitor:
Note:
Installation No:
Category: State CT Ratio: Supply Type: Type: Me
Circle: EM & RE Circle-Ist, Srinagar Electric Division-IV, Khanyar
ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE
Joint Director PoultaryName of Installation:-
-
7/28/2019 SERC Rainawari
37/48
DiVision:
N.A LT3Ph
14260A N.A N,.A Name of
Computer Code: 10043 N N.A Feeder N
Sanctioned Load: 300 KW
S.No Month
KVAH Units
supplied
KWH Units
supplied
KVAH Units
recorded /
computed
KWH Units
recorded
AV-Power
Factor
Max. Demand
Recorded KVA Opening Balance
Energy Charges / F.R
Charges billed
(In Rs.)
Demand
charges billed
(In Rs. )
ED Bil
(In Rs
A B C D E=D/C F G H I J
1 Apr-11 119983.76 101986.20 119983.7604 101986.2 0.85 N.A 3792883.5 498712.50 6000.00 109716
2 May-11 118693.61 100889.57 118693.6124 100889.6 0.85 N.A 4519440.0 493350.00 6000.00 108537
3 Jun-11 119983.76 101986.20 119983.7604 101986.2 0.85 N.A 5249759.7 498712.50 6000.00 109716
4 Jul-11 117403.46 99792.94 117403.4645 99792.94 0.85 N.A 5998169.3 487987.50 6000.00 107357
5 Aug-11 118693.61 100889.57 118693.6124 100889.6 0.85 N.A 6743534.7 493350.00 6000.00 108537
6 Sep-11 118693.61 100889.57 118693.6124 100889.6 0.85 N.A 7507215.8 493350.00 6000.00 108537
7 Oct-11 143529.41 122000.00 143529.4118 122000 0.85 N.A 3965135.5 771985.50 7200.00 169836
8 Nov-11 143529.41 122000.00 143529.4118 122000 0.85 N.A 1384055.0 759330.00 7200.00 167052
9 Dec-11 143529.41 122000.00 143529 122000 0.85 N.A 2317638.0 759330.00 7200.00 167052
10 Jan-12 143529.41 122000.00 143529 122000 0.85 N.A 3320250.6 759330.00 7200.00 167052
11 Feb-12 143529.41 122000.00 143529 122000 0.85 N.A 573093.2 759330.00 7200.00 167052
12 Mar-12 143529.41 122000.00 143529 122000 0.85 N.A 1575705.8 759330.00 7200.00 167052
1
2
3
4
5
1
Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.
Asstt. Exe. Engineer
Rainawari
KVAH and demand readings will be required for load more than 100KW only.
In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing
Meter Rated Current: Meter Type:
Supply Type: Type: Me
Installation No:
Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
Capacitor Installed: Y/N Rating of Capacitor:
Note:
Circle: EM & RE Circle-Ist, Srinagar Electric Division-IV, Khanyar
Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
Category: State CT Ratio:
Name of Installation:- Supdtt. JLNM Hospital
ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE
-
7/28/2019 SERC Rainawari
38/48
DiVision:
N.A LT3Ph
6162SD N.A N.A Name of
Computer Code: 10049 N N.A Feeder N
Sanctioned Load: 32 KW
S.No Month
KVAH Units
supplied
KWH Units
supplied
KVAH Units
recorded /
computed
KWH Units
recorded
AV-Power
Factor
Max. Demand
Recorded KVA Opening Balance
Energy Charges / F.R
Charges billed
(In Rs.)
Demand
charges billed
(In Rs. )
ED Bil
(In Rs
A B C D E=D/C F G H I J
1 Apr-11 9908.34 8422.09 9908.336341 8422.086 0.85 N.A 922056.25 41184.00 640.00 9060.
2 May-11 9908.34 8422.09 9908.336341 8422.086 0.85 N.A 991335.0 41184.00 640.00 9060.
3 Jun-11 9908.34 8422.09 9908.336341 8422.086 0.85 N.A 1061652.9 41184.00 640.00 9060.
4 Jul-11 9908.34 8422.09 9908.336341 8422.086 0.85 N.A 1133025.6 41184.00 640.00 9060.
5 Aug-11 9908.34 8422.09 9908.336341 8422.086 0.85 N.A 1205468.9 41184.00 640.00 9060.
6 Sep-11 9908.34 8422.09 9908.336341 8422.086 0.85 N.A 1278998.9 41184.00 640.00 9060.
7 Oct-11 12179.00 10352.15 12178.99675 10352.15 0.85 N.A 1353631.8 50622.00 768.00 11136
8 Nov-11 12179.00 10352.15 12178.99675 10352.15 0.85 N.A 1442072.0 50622.00 768.00 11136
9 Dec-11 12179.00 10352.15 12178.99675 10352.15 0.85 N.A 1531838.9 50622.00 768.00 11136
10 Jan-12 12179.00 10352.15 12178.996 7680 0.85 N.A 1512598.3 48597.12 768.00 10691
11 Feb-12 12179.00 7680.00 12178.996 7680 0.85 N.A 1598967.7 48597.12 768.00 10691
12 Mar-12 12179.00 7680.00 12178.996 7680 0.85 N.A 1688580.6 48597.12 768.00 10691
1
2
3
4
5
1
In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing
Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.
Asstt. Exe. Engineer
Rainawari
Rating of Capacitor:
Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
KVAH and demand readings will be required for load more than 100KW only.
Note:
Meter Type:
Electric Division-IV, Khanyar
Installation No: Meter Rated Current:
Capacitor Installed: Y/N
ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE
Circle: EM & RE Circle-Ist, Srinagar
Name of Installation:- Joint Director Horticulture, Hazratbal
Type: MeCategory: State CT Ratio: Supply Type:
-
7/28/2019 SERC Rainawari
39/48
DiVision:
N.A LT3Ph
90SD N.A LTKWH Name of
Computer Code: 10040 N N.A Feeder N
Sanctioned Load: 53 KW
S.No Month
KVAH Units
supplied
KWH Units
supplied
KVAH Units
recorded /
computed
KWH Units
COMPUT
ED
AV-Power
Factor
Max. Demand
Recorded KVA Opening Balance
Energy Charges / F.R
Charges billed
(In Rs.)
Demand
charges billed
(In Rs. )
ED Bil
(In Rs
A B C D E=D/C F G H I J
1 Apr-11 15701.10 13345.94 15701.10069 13345.94 0.85 N.A 1212543.38 65261.63 1060.00 14357
2 May-11 15689.75 13336.28 15689.74705 13336.28 0.85 N.A 1318642.77 65214.43 1060.00 14347
3 Jun-11 15733.61 13373.57 15733.61241 13373.57 0.85 N.A 1426270.87 65396.76 1060.00 14387
4 Jul-11 15708.33 13352.08 15708.32583 13352.08 0.85 N.A 1535755.98 65291.66 1060.00 14364
5 Aug-11 15710.39 13353.83 15710.38961 13353.83 0.85 N.A 1646743.52 65300.23 1060.00 14366
6 Sep-11 15710.39 13353.83 15710.38961 13353.83 0.85 N.A 1759407.29 65300.23 1060.00 14366
7 Oct-11 16858.82 14330.00 16858.82353 14330 0.85 N.A 1569261.01 90676.66 1272.00 19948
8 Nov-11 18435.29 15670.00 18435.29412 15670 0.85 N.A 1714742.90 99155.84 1272.00 21814
9 Dec-12 18435.29 15670.00 18435.29412 15670 0.85 N.A 1873689.18 99155.84 1272.00 21814
10 Jan-12 18435.29 15670.00 18435.29412 7000 0.85 N.A 1172412.50 46546.50 1272.00 21814
11 Feb-12 18435.29 15670.00 18435.29412 7000 0.85 N.A 1251059.46 46546.50 1272.00 21814
12 Mar-12 18435.29 15670.00 18435.29412 10000 0.85 N.A 1329706.42 66495.00 1272.00 21814
1
2
3
4
5
1
Note:
Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.
Asstt. Exe. Engineer
Please attach circle-wise and Divisional wise Abstracts with each energy account.
KVAH and demand readings will be required for load more than 100KW only.
Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
Note:
Installation No: Meter Rated Current:
Rainawari
In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing
Capacitor Installed: Y/N Rating of Capacitor:
Name of Installation:- Joint Director Poultary Briolers
Type: Me
Circle:
Category: State CT Ratio: Supply Type:
Meter Type:
ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE
EM & RE Circle-Ist, Srinagar Electric Division-IV, Khanyar
-
7/28/2019 SERC Rainawari
40/48
DiVision:
N.A LT3Ph
LAWDA2 N.A LTKWH Name of
Computer Code: 10085 N N.A Feeder NSanctioned Load: 200 KW
S.No Month
KVAH Units
supplied
KWH Units
supplied
KVAH Units
recorded /
computed
KWH Units
recorded
AV-Power
Factor
Max. Demand
Recorded KVA Opening Balance
Energy Charges / F.R
Charges billed
(In Rs.)
Demand
charges billed
(In Rs. )
ED Bil
(In Rs
A B C D E=D/C F G H I J
1 Apr-11 9412.94 8001.00 9412.941176 8001 0.85 N.A 5277467 123337.50 4000.00 27134
2 May-11 9414.12 8002.00 9414.117647 8002 0.85 N.A 5524798.52 134062.50 4000.00 29493
3 Jun-11 9415.29 8003.00 9415.294118 8003 0.85 N.A 5790110.40 139425.00 4000.00 30673
4 Jul-11 9416.47 8004.00 9416.470588 8004 0.85 N.A 6066537.16 150150.00 4000.00 33033
5 Aug-11 9416.47 8004.00 9416.470588 8004 0.85 N.A 6361380.71 0.00 4000.00 0.00
6 Sep-11 9416.47 8004.00 9416.470588 8004 0.85 N.A 6460861.42 246675.00 4000.00 54268
7 Oct-11 32352.94 27500.00 32352.94118 27500 0.85 N.A 6548885.50 174013.00 4800.00 38282
8 Nov-11 32352.94 27500.00 32352.94118 27500 0.85 N.A 6763581.00 174013.00 4800.00 38282
9 Dec-11 14117.65 12000.00 14117.64706 12000 0.85 N.A 6978277.00 47916.00 4800.00 10541
10 Jan-12 24705.88 21000.00 24705.88235 21000 0.85 N.A 6308644.50 83853.00 47200.00 18447
11 Feb-12 18823.53 16000.00 18823.52941 16000 0.85 N.A 5622288.16 63888.00 47200.00 14055
12 Mar-12 30588.24 26000.00 30588.23529 26000 0.85 N.A 5717127.52 108966.00 47200.00 23972
1
2
3
4
5
1
Rainawari
Asstt. Exe. Engineer
Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.
Capacitor Installed: Y/N Rating of Capacitor:
Note:
Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
KVAH and demand readings will be required for load more than 100KW only.
In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing
Installation No: Meter Rated Current: Meter Type:
Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
Circle: EM & RE Circle-Ist, Srinagar Electric Division-IV, Khanyar
ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE
Name of Installation:- Ex. Engineer LAWDA, Habak
Type: MeCategory: State CT Ratio:200/5A Supply Type:
-
7/28/2019 SERC Rainawari
41/48
DiVision:
N.A LT3Ph
LAWDA1 N.A LTKWH Name of
Computer Code: 10084 N N.A Feeder N
Sanctioned Load: 200 KW
S.No Month
KVAH Units
supplied
KWH Units
supplied
KVAH Units
recorded /
computed
KWH Units
recorded
AV-Power
Factor
Max. Demand
Recorded KVA Opening Balance
Energy Charges / F.R
Charges billed
(In Rs.)
Demand
charges billed
(In Rs. )
ED Bil
(In Rs
A B C D E=D/C F G H I J
1 Apr-11 12942.35 11001.00 12942.35294 11001 0.85 N.A 774782.3 69712.50 4000.00 15336
2 May-11 12943.53 11002.00 12943.52941 11002 0.85 N.A 883221.59 69712.50 4000.00 15336
3 Jun-11 12944.71 11003.00 12944.70588 11003 0.85 N.A 993287.46 85800.00 4000.00 18876
4 Jul-11 12945.88 11004.00 12945.88235 11004 0.85 N.A 1126409.91 85800.00 4000.00 18876
5 Aug-11 12945.88 11004.00 12945.88235 11004 0.85 N.A 1261529.20 0.00 4000.00 0.00
6 Sep-11 12945.88 11004.00 12945.88235 11004 0.85 N.A 1284512.14 150150.00 4000.00 33033
7 Oct-11 17647.06 15000.00 17647.05882 15000 0.85 N.A 1401209.00 94916.00 4800.00 20881
8 Nov-11 17647.06 15000.00 17647.05882 15000 0.85 N.A 1519407.00 94916.00 4800.00 20881
9 Dec-11 8235.29 7000.00 8235.294118 7000 0.85 N.A 1637605.00 27951.00 4800.00 6149.
10 Jan-12 8235.29 7000.00 8235.294118 7000 0.85 N.A 1380887.75 27951.00 4800.00 7027.
11 Feb-12 9411.76 8000.00 9411.764706 8000 0.85 N.A 925933.75 31944.00 4800.00 7376.
12 Mar-12 9411.76 8000.00 9411.764706 8000 0.85 N.A 920276.75 31944.00 4800.00 7376.
1
2
3
4
5
1
Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.
Asstt. Exe. Engineer
Rainawari
Note:
Type: Me
Capacitor Installed: Y/N Rating of Capacitor:
Category: State
Installation No: Meter Rated Current: Meter Type:
Circle: EM & RE Circle-Ist, Srinagar Electric Division-IV, Khanyar
Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
KVAH and demand readings will be required for load more than 100KW only.
In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing
ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE
CT Ratio:200/5A Supply Type:
Name of Installation:- Ex. Engineer LWDA, Hazratbal
-
7/28/2019 SERC Rainawari
42/48
-
7/28/2019 SERC Rainawari
43/48
DiVision:
N.A LT3Ph
14260 N.A N.A Name of
Computer Code: 10042 N N.A Feeder N
Sanctioned Load: 90 KW
S.No Month
KVAH Units
supplied
KWH Units
supplied
KVAH Units
recorded /
computed
KWH Units
recorded
AV-Power
Factor
Max. Demand
Recorded KVA Opening Balance
Energy Charges / F.R
Charges billed
(In Rs.)
Demand
charges billed
(In Rs. )
ED Bil
(In Rs
A B C D E=D/C F G H I J
1 Apr-11 1109009.98 942658.49 1109009.984 942658.5 0.85 N.A 6172863 4609600.00 1800.00 101411
2 May-11 206327.44 175378.32 206327.439 175378.3 0.85 N.A 10490647 857600.00 1800.00 188672
3 Jun-11 219222.90 186339.47 219222.9039 186339.5 0.85 N.A 11722191 911200.00 1800.00 200464
4 Jul-11 216643.81 184147.24 216643.8109 184147.2 0.85 N.A 13038580 900480.00 1800.00 198105
5 Aug-11 209003.97 177653.37 209003.9697 177653.4 0.85 N.A 12385429 868725.00 1800.00 191119
6 Sep-11 209003.53 177653.00 209003.5294 177653 0.85 N.A 13728940 868725.00 1800.00 191119
7 Oct-11 23529.41 20000.00 23529.41176 20000 0.85 N.A 10322005 126555.00 2160.00 27842
8 Nov-11 17647.06 15000.00 17647.05882 15000 0.85 N.A 9223577 94916.25 2160.00 20881
9 Dec-11 17647.06 15000.00 17647.05882 15000 0.85 N.A 9350164 94916.25 2160.00 20881
10 Jan-12 17647.06 15000.00 17647.05882 15000 0.85 N.A 9476750 94916.25 2160.00 20881
11 Feb-12 17647.06 15000.00 17647.05882 15000 0.85 N.A 9311770 94916.25 2160.00 20881
12 Mar-12 17647.06 15000.00 17647.05882 15000 0.85 N.A 9438356 94916.25 2160.00 20881
1
2
3
4
5
1
Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.
Asstt. Exe. Engineer
Rainawari
KVAH and demand readings will be required for load more than 100KW only.
In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing
Installation No: Meter Rated Current: Meter Type:
Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
Capacitor Installed: Y/N Rating of Capacitor:
Note:
Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
Category: State CT Ratio: Supply Type: Type: Me
Circle: EM & RE Circle-Ist, Srinagar Electric Division-IV, Khanyar
Name of Installation:- Supdtt. JLNM Hospital
ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE
-
7/28/2019 SERC Rainawari
44/48
DiVision:
N.A LT3Ph
46827 N.A N.A Name of
Computer Code: 10045 N N.A Feeder N
Sanctioned Load: 51 KW
S.No Month
KVAH Units
supplied
KWH Units
supplied
KVAH Units
recorded /
computed
KWH Units
recorded
AV-Power
Factor
Max. Demand
Recorded KVA Opening Balance
Energy Charges / F.R
Charges billed
(In Rs.)
Demand
charges billed
(In Rs. )
ED Bil
(In Rs
A B C D E=D/C F G H I J
1 Apr-11 19352.22 16449.39 19352.21942 16449.39 0.85 N.A 11950800.00 80437.50 1020.00 17696
2 May-11 19997.29 16997.70 19997.2934 16997.7 0.85 N.A 12238125.24 83118.75 1020.00 18286
3 Jun-11 16126.85 13707.82 16126.84951 13707.82 0.85 N.A 12533327.96 67031.25 1020.00 14746
4 Jul-11 15675.30 13324.00 15675.29773 13324 0.85 N.A 12811553.14 65154.38 1020.00 14333
5 Aug-11 14836.70 12611.20 14836.70155 12611.2 0.85 N.A 12380954.37 61668.75 1020.00 13567
6 Sep-11 14836.70 12611.20 14836.70155 12611.2 0.85 N.A 12649758.75 61668.75 1020.00 13567
7 Oct-11 23164.71 19690.00 23164.70588 19690 0.85 N.A 12882332.00 124593.40 1224.00 27410
8 Nov-11 24552.94 20870.00 24552.94118 20870 0.85 N.A 13231093.00 132060.14 1224.00 29053
9 Dec-11 24552.94 20870.00 24552.94118 20870 0.85 N.A 13594332.00 102509.55 1224.00 22552
10 Jan-12 47258.82 40170.00 47258.82353 40170 0.85 N.A 13720618.00 254185.72 1224.00 55920
11 Feb-12 28858.82 24530.00 28858.82353 24530 0.85 N.A 14055056.37 155219.70 1224.00 34148
12 Mar-12 20000.00 17000.00 20000 17000 0.85 N.A 14259759.28 113041.50 1224.00 24869
1
2
3
4
5
1
In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing
recorded KWH units with power factor = 0.85
Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.
Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
KVAH and demand readings will be required for load more than 100KW only.
Asstt. Exe. Engineer
Rainawari
Capacitor Installed: Y/N Rating of Capacitor:
Note:
Meter Type:
Electric Division-IV, Khanyar
Installation No: Meter Rated Current:
ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE
Circle: EM & RE Circle-Ist, Srinagar
Name of Installation:- Supdtt. Mental Hospital
Type: MeCategory: State CT Ratio: Supply Type:
-
7/28/2019 SERC Rainawari
45/48
-
7/28/2019 SERC Rainawari
46/48
DiVision:
N.A LT3Ph
5531A N.A N.A Name of
Computer Code: 10031 N N.A Feeder N
Sanctioned Load: 47.25 KW
S.No Month
KVAH Units
supplied
KWH Units
supplied
KVAH Units
recorded /
computed
KWH Units
recorded
AV-Power
Factor
Max. Demand
Recorded KVA Opening Balance
Energy Charges / F.R
Charges billed
(In Rs.)
Demand
charges billed
(In Rs. )
ED Bil
(In Rs
A B C D E=D/C F G H I J
1 Apr-11 1496.57 1272.09 1496.571635 1272.086 0.85 N.A 1010431.13 6220.50 960.00 1368.
2 May-11 1935.22 1644.94 1935.221942 1644.939 0.85 N.A 1034838.8 8043.75 960.00 1769.
3 Jun-11 1470.77 1250.15 1470.768676 1250.153 0.85 N.A 1062038.6 6113.25 960.00 1344.
4 Jul-11 1935.22 1644.94 1935.221942 1644.939 0.85 N.A 1087077.7 8043.75 960.00 1769.
5 Aug-11 1586.88 1348.85 1586.881992 1348.85 0.85 N.A 1115061.1 6595.88 960.00 1451.
6 Sep-11 1586.88 1348.85 1586.881992 1348.85 0.85 N.A 938537.7 6595.88 960.00 1451.
7 Oct-11 1552.94 1320.00 1552.941176 1320 0.85 N.A 866958.8 8352.63 1152.00 1837.
8 Nov-11 8623.53 7330.00 8623.529412 7330 0.85 N.A 878300.0 46382.41 1152.00 10204
9 Dec-11 11764.71 10000.00 11764.70588 10000 0.85 N.A 936038.0 63277.50 1152.00 13921
10 Jan-12 14611.76 12420.00 14611.76471 12420 0.85 N.A 1014390.3 78590.66 1152.00 17289
11 Feb-12 15976.47 13580.00 15976.47059 13580 0.85 N.A 1109131.4 85930.84 1152.00 18904
12 Mar-12 9411.76 8000.00 9411.764706 8000 0.85 N.A 1205293.6 53196.00 1152.00 11703
1
2
3
4
5
1
Rainawari
Asstt. Exe. Engineer
Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.
Capacitor Installed: Y/N Rating of Capacitor:
Note:
Please attach circle-wise and Divisional wise Abstracts with each energy account.Note:
KVAH and demand readings will be required for load more than 100KW only.
In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing
Supply Type:
Circle:
Installation No: Meter Rated Current: Meter Type:
Name of Installation:- Supdtt. Central Jail
Type: MeCategory: State CT Ratio:
EM & RE Circle-Ist, Srinagar Electric Division-IV, Khanyar
ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE
-
7/28/2019 SERC Rainawari
47/48
DiVision:
N.A LT3Ph
420SM N.A N.A Name of
Computer Code: 8482 N N.A Feeder N
Sanctioned Load: 26 HP
S.No Month
KVAH Units
supplied
KWH Units
supplied
KVAH Units
recorded /
computed
KWH Units
recorded
AV-Power
Factor
Max. Demand
Recorded KVA Opening Balance
Energy Charges / F.R
Charges billed
(In Rs.)
Demand
charges billed
(In Rs. )
ED Bil
(In Rs
A B C D E=D/C F G H I J
1 Apr-11 2640.00 2244.00 2640 2244 0.85 N.A 187540.313 4578.64 700.00 1007.
2 May-11 1980.00 1683.00 1980 1683 0.85 N.A 197156.13 4396.54 700.00 967.2
3 Jun-11 1540.00 1309.00 1540 1309 0.85 N.A 206673.89 0.00 700.00 0.00
4 Jul-11 4982.35 4235.00 4982.352941 4235 0.85 N.A 210484.50 4292.48 700.00 944.3
5 Aug-11 2290.59 1947.00 2290.588235 1947 0.85 N.A 220063.72 4682.70 700.00 1030.
6 Sep-11 2290.59 1947.00 2290.588235 1947 0.85 N.A 230305.85 4812.78 700.00 1058.
7 Oct-11 711.76 605.00 711.7647059 605 0.85 N.A 237952.60 1643.79 800.00 361.6
8 Nov-11 2329.41 1980.00 2329.411765 1980 0.85 N.A 244369.38 5379.66 800.00 1183.
9 Dec-11 2329.41 1980.00 2329.411765 1980 0.85 N.A 252221.00 5379.66 800.00 1183.
10 Jan-12 1164.71 990.00 1164.705882 990 0.85 N.A 256308.55 2689.83 800.00 591.7
11 Feb-12 517.65 440.00 517.6470588 440 0.85 N.A 260879.18 1195.48 800.00 263.0
12 Mar-12 0.00 0.00 0 0 0.85 N.A 263626.71 0.00 800.00 0.00
1
2
3
4
5
1
Please attach circle-wise and Divisional wise Abstracts with each energy account.Note:
Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.
Asstt. Exe. Engineer
Rainawari
Note:
Type: Me
Capacitor Installed: Y/N Rating of Capacitor:
Category: LT Indust.
Installation No: Meter Rated Current: Meter Type:
Circle: EM & RE Circle-Ist, Srinagar Electric Division-IV, Khanyar
Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
KVAH and demand readings will be required for load more than 100KW only.
In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing
ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE
CT Ratio: Supply Type:
Name of Installation:- Ghulam Mohd. Zaroo
-
7/28/2019 SERC Rainawari
48/48
DiVision:
N.A 11KV
100-SD N.A
HT
Trivector Name of
Computer Code: 10021 N N.A Feeder N
Sanctioned Load: 760kws
S.No Month
KVAH Units
supplied
KWH Units
supplied
KVAH Units
recorded /
computed
KWH Units
recorded
AV-Power
Factor
Max. Demand
Recorded KVA Opening Balance
Energy Charges / F.R
Charges billed
(In Rs.)
Demand
charges billed
(In Rs. )
ED Bil
(In Rs
A B C D E=D/C F G H I J
1 Apr-11 144496.57 122822.09 144496.5716 122822.1 0.85 511.01 4088142 600600.00 8260.00 132132
2 May-11 152237.46 129401.84 152237.4594 129401.8 0.85 511.01 4956990.0 632775.00 8260.00 139210
3 Jun-11 148367.02 126111.96 148367.0155 126112 0.85 511.01 5881681.9 616687.50 8260.00 135671
4 Jul-11 138045.83 117338.96 138045.8318 117339 0.85 511.01 6798838.6 573787.50 8260.00 126233
5 Aug-11 145786.72 123918.71 145786.7196 123918.7 0.85 511.01 7672671.1 605962.50 8260.00 133311
6 Sep-11 140626.13 119532.21 140626.1278 119532.2 0.85 511.01 8602422.2 584512.50 8260.00 128592
7 Oct-11 160000.00 136000.00 160000 136000 0.85 511.01 6483990.5 860574.00 9912.00 189326
8 Nov-11 152941.18 130000.00 152941.1765 130000 0.85 511.01 7656959.8 822607.50 9912.00 180973
9 Dec-11 122352.94 104000.00 122352.9412 104000 0.85 511.01 7310265.4 658060.00 9912 144773
10 Jan-12 165882.35 141000.00 165882.3529 141000 0.85 511.01 8234794.9 892212.75 9912.00 123433
11 Feb-12 107058.82 91000.00 107058.8235 91000 0.85 511.01 9173192.3 561060.50 9912.00 113938
12 Mar-12 98823.53 84000.00 98823.52941 84000 0.85 511.01 8185810.9 517902.00 9912.00 166769
1
2
3
45
1
Note: Asstt. Exe. Engineer
In case trivector meter is not installed for load more than 100KW, please workout the KVAH units by dividing
Type of supply may be 33KV/11KV/3-ph. LT/1-ph. LT
11KV Trivector Meter not commissioned/Tested yet Rainawari
Please attach circle-wise and Divisional wise Abstracts with each energy account.
Note:
Late payment penalty (surcharge) if any adjusted in opening balance, when payment has not been made within due date.
CT Ratio: Supply Type: Type: Me
KVAH and demand readings will be required for load more than 100KW only.
Capacitor Installed: Y/N Rating of Capacitor:
Note:
Installation No: Meter Rated Current: Meter Type:
Type of metering may be HT Trivector/HT KWH/LT Trivector/LT KWH
ENERGY ACCOUNT OF 25 KVA AND ABOVE INSTALLATIONS UNDER TRIPARITE
Circle: EM & RE Circle-Ist, Srinagar Electric Division-IV, Khanyar
Name of Installation:- Ex. Engineer PHE, Pokhribal
Category: State