september 21 update. future main entrance (looking south)

12
September 21 Update

Upload: willow-atwater

Post on 15-Dec-2015

215 views

Category:

Documents


1 download

TRANSCRIPT

September 21 Update

Future Main Entrance (looking south)

September 19th- Cafeteria Floor

.Lower level- locker rooms below the auxillary gym

.Lower hallway from Building A to gym and locker rooms Lower lobby- concession stand and rest rooms.

. Cafeteria (kitchen in background) Art room (looking east)

Main gym view from the upper hallway Auxillary gym view from the upper hallway

Back of the auditorium. Front auditorium accessible ramp.

Music room – northwest corner Vocational garage and welding lab.

View from the main lobby looking north. Main entrance looking south.

Upper hallway between the gyms Upper hallway from the gyms back to (main gym to the left, aux gym to the right) the main school looking east.

Main level STEM lab wall. STEM lab inside view